FEDERAL ELECTRICITY AND WATER AUTHORITY

UNITED ARAB EMIRATES

Page 2: FEDERAL ELECTRICITY AND WATER AUTHORITY … · introduction federal electricity and water authority (fewa) is one of the utility in the united arab emirates responsible for the supply

INTRODUCTION

FEDERAL ELECTRICITY AND WATER AUTHORITY (FEWA) IS ONE OF THE

UTILITY IN THE UNITED ARAB EMIRATES RESPONSIBLE FOR THE SUPPLY AND

DISTRIBUTION OF ELECTRICITY AND WATER IN THE NORTHERN EMIRATES.

THE AREAS OF NORTHERN EMIRATES COVERED BY FEWA ARE THE

FOLLOWING

AJMAN (WEST)

RAS AL KHAIMAH (NORTH)

UM AL QUWAIN (WEST)

FUJAIRAH (EAST)

DHAID (CENTRAL)

Page 3: FEDERAL ELECTRICITY AND WATER AUTHORITY … · introduction federal electricity and water authority (fewa) is one of the utility in the united arab emirates responsible for the supply

AMI PILOT PROJECT INITIATIVE BY FEWA

THE IDEA OF A IMPLEMENTING AN AUTOMATIC METER READING (AMR) PILOT PROJECT WAS INITIATED IN THE YEAR 2007 BY THE MANAGEMENT OF FEWA.

FEWA ATTENDED VARIOUS PRESENTATIONS, SEMINARS AND VISITED INSTALLATIONS TO UNDERSTAND THE TECHNLOGY THAT WAS AVAILABLE.

THE PILOT PROJECT IMPLEMENTATION WAS DELAYED DUE TO ONE

MAIN REASON …..….

“THERE WAS NO CLEAR AND SATISFACTORY INTEROPERABLE PROTOCOL THAT

WAS WELL DEFINED THAT COULD PROVIDE US WITH AN OPEN SYSTEM”

TODAY THE TECHNOLOGY HAS ADVANCED AND THERE IS A CLEAR DIRECTION

TOWARDS INTEROPERABILITY AND OPEN SYSTEMS.

FEWA BY WAY OF THE PILOT PROJECT IMPLEMENTATION WILL BE WELL

PLACED TO TAKE INTO CONSIDERATION FUTURE EVOVLING TECHNOLOGIES

IN THIS FIELD DURING THE FINAL ROLL OUTS.

Page 4: FEDERAL ELECTRICITY AND WATER AUTHORITY … · introduction federal electricity and water authority (fewa) is one of the utility in the united arab emirates responsible for the supply

BRIEF DETAILS OF AMI PILOT PROJECT

RESIDENTIAL VILLAS AND

SMALL COMMERCIAL

ESTABLISHMENTS

BUILDINGS FOR

OFFICES AND

RESIDENTIAL

APARTMETNS

INDUSTRIAL AREA

Nuaimiya Area - Ajman

Page 5: FEDERAL ELECTRICITY AND WATER AUTHORITY … · introduction federal electricity and water authority (fewa) is one of the utility in the united arab emirates responsible for the supply

ENTERPRISE

SAP SOLUTIONS

AMI MDM S/W

MDUS

HEAD ENDS

MDUS

PI INTEGRATOR

AMI SOFTWARE

AND SYSTEM

DATA

CONCENTRATORS

ELECTRICITY METERS

(RESIDENTIAL + C & I)

WATER METERS

SAPCurrently being

implemented

To be awarded to

any one

manufacturer

To be awarded to

two

manufacturers

BPLC

COMMUNICATIONS

To be awarded to

three

manufacturers

To be awarded to

three

manufacturers

To be awarded to

two manufacturers

APPROVALS AND

PREQUALIFICATION PROCESS

Consideration for

additional MDM

suppliers

To pre-qualify

three

manufacturers

To pre-qualify four

manufacturers

To pre-qualify six

manufacturers

To pre qualify six

manufacturers

START END

Details and Objectives

Page 6: FEDERAL ELECTRICITY AND WATER AUTHORITY … · introduction federal electricity and water authority (fewa) is one of the utility in the united arab emirates responsible for the supply

FEWA

ENTERPRISE

BACKEND

SYSTEM - SAP

A B C

A B C

A B C

AMI MDM S/W

MDUS

HEAD ENDS

MDUS

PI INTEGRATOR

AMI SOFTWARE

AND SYSTEM

DATA

CONCENTRATORS

ELECTRICITY

METERS

WATER METERS

INTEROPERABLE

PROTOCOLS

MDUS PROTOCOL

DLMS/COSEM

PROTOCOL

DLMS/COSEM

PROTOCOL

M-BUS

PROTOCOL

MV BPLC / WAN

LV PLC

WIRED / WIRELESS

MBUS

INTEROPERABILITY – Open Solutions

Page 7: FEDERAL ELECTRICITY AND WATER AUTHORITY … · introduction federal electricity and water authority (fewa) is one of the utility in the united arab emirates responsible for the supply

OBJECTIVES - OPEN SYSTEM

PROTOCOL

M-BUS PROTOCOL

DLMS / COSEM

DLMS / COSEM (TCP/IP)

AMI MDM SYSTEM

AMI MDM SYSTEM

MDUS

ENTERPRISE SAP SOLUTION

WATER METERS

ELECTRICITY METERS

DATA CONCENTRATORS

Page 8: FEDERAL ELECTRICITY AND WATER AUTHORITY … · introduction federal electricity and water authority (fewa) is one of the utility in the united arab emirates responsible for the supply

BROAD BAND OVER POWER LINE CARRIER COMMUNICATION FOR AMI

X X X X

Main WAN Intranet on Fiber, Pilot cable or Radio

X

RING MAIN UNIT

X X

BPLC modem

Ethernet port

DISTRIBUTION

TRANSFORMER

Ethernet

port

11 KV

Ethernet port

DC DC DC

LV

PLC

LV

PLC

LV

PLC

MV

BPLC

Page 9: FEDERAL ELECTRICITY AND WATER AUTHORITY … · introduction federal electricity and water authority (fewa) is one of the utility in the united arab emirates responsible for the supply

BROAD BAND OVER POWER LINE CARRIER COMMUNICATION OTHER APPLICATIONS

X X X X

Main WAN Intranet on Fiber, Pilot cable or Radio

X

RING MAIN UNIT

BPLC

modem

Ethernet port

DISTRIBUTION

TRANSFORMER

REMOTE

TERMINAL

UNIT

INDICATIONS AND ALARMS

MEASURMENTS

CONTROLS

ELECTRICAL

LINEAR

ACTUATOR

TRANSFORMER MONITORING

Page 10: FEDERAL ELECTRICITY AND WATER AUTHORITY … · introduction federal electricity and water authority (fewa) is one of the utility in the united arab emirates responsible for the supply

FORESEEN CONSTRAINTS

Lv P

ow

er

Lin

e C

arr

ier

M-Bus DATA CONCENTRATOR

FOR WATER METERS

M-Bus wired / wireless

PLC DATA

CONCENTRATOR

REACTIVE POWER

COMPENSATORS ON LV

NETWORK

LINE NOISE

CONSIDERATIONS OF DATA

THROUGHPUT

Page 11: FEDERAL ELECTRICITY AND WATER AUTHORITY … · introduction federal electricity and water authority (fewa) is one of the utility in the united arab emirates responsible for the supply

IDIS

Why is it considered by FEWA in Pilot Project ??

The IDIS group defines DLMS/COSEM compliant interoperability parameters

between

•Water meters and Electricity meters (Mbus protocol)

•Electricity meters and Data Concentrators (DLMS/COSEM Protocol)

•Data Concentrators and AMI MDM (DLMS/COSEM Protocol)

Extensive tests are already conducted by ERDF in France for interoperability

Using the IDIS interoperable standards for the FEWA pilot

project will save time and efforts in the open systems testing.

FEWA do not intend to have a specialized team or hire a third

party consultant for interoperable tests between various

vendors.

Page 12: FEDERAL ELECTRICITY AND WATER AUTHORITY … · introduction federal electricity and water authority (fewa) is one of the utility in the united arab emirates responsible for the supply

Conclusion