FG Construction Documents 03-005

Embed Size (px)

Citation preview

  • 7/28/2019 FG Construction Documents 03-005

    1/27

  • 7/28/2019 FG Construction Documents 03-005

    2/27

  • 7/28/2019 FG Construction Documents 03-005

    3/27

  • 7/28/2019 FG Construction Documents 03-005

    4/27

  • 7/28/2019 FG Construction Documents 03-005

    5/27

  • 7/28/2019 FG Construction Documents 03-005

    6/27

  • 7/28/2019 FG Construction Documents 03-005

    7/27

  • 7/28/2019 FG Construction Documents 03-005

    8/27

    16 R UP

    14R DN

    A-01-12Right

    A-01-1

    A-01-2

    A-01-2

    1Rear

    2

    Left

    1Front

    "R-CONTROL" SIP WALL

    UN-INSULATED, STICKBUILT WALL OR INTPARTITION

    LOAD BEARINGPARTITION

    NOTE:

    DIMENSIONS TO EXTERIOR SIPWALLS REFERENCE OUTSIDE FACEOF SHETAHING.

    DIMENSIONS TO EXTERIOR GARAGEWALLS REFERENCE OUTSIDE FACEOF STUD.

    DIMENSIONS TO INTERIORPARTITIONS REFERENCE CENTEROF 2x4 OR 2x6 STUD.

    WALL LEGEND

    34'-0"

    34' - 0"

    R E F

    DW

    LIVING

    DINING

    KITCHEN

    BATH 1

    ENTRY

    4x6 POST4x6 POST

    DBL 1 3/4"x16" LVL ABOVE(OR AS REQ)

    DBL 1 3/4"x16" LVLABOVE (OR AS REQ)

    4x6 POST

    20' - 8 3/4"

    17'-111/2"

    14'-111/2"

    4x6 POST

    D B L 1 3 / 4 " x 1

    6 " L V L A B O V E

    ( O R A S R E Q )

    CL

    TOP OF SUB FLREL = 0'-0"

    2-6x7-0

    2-6x7-0

    2

    8'-33/4"

    7'-111/4" 1

    '-81/2"

    1'-101/2"

    6' - 4 1/2"

    3' - 7 1/2"

    3' - 8"

    3

    P A N T R Y

    1A-03-1

    3 2

    D E S K

    34' - 0"

    34'-0"

    2' - 6 1/2" 5' - 9 1/2" 8' - 9" 6' - 10"

    4'-7"

    16'-4"

    3'-0"

    7' - 7" 18' - 10" 7' - 7"

    2 - 6 x 7 - 0

    1 1

    1

    1

    1

    1

    OVERALL R.O.

    10' - 1"

    OVERALLR.O.

    10'-1"

    DECK

    18'-6"

    15'-6"

    CL CL

    15'-6"

    18'-6"

    DECK CONSTRUCTION: (TOP DOWN)- COMPOSITE DECKING- 2x8 PT JOISTS @ 16" O/C (OR AS REQ)

    FNDWALLTOOUTSIDE FACEOFFRAMING

    12'-0"

    1' - 0"32' - 0"

    1' - 0"

    1

    1

    1

    2'-01/2"

    3'-10"

    4'-81/4"

    7'-6"

    5'-5"

    D

    3-0x7-0STEEL

    SCALE

    PROJECT NUMBER:

    DATE:

    DRAWN BY:

    CHECKED BY:

    PROJECT NAME:

    NOTES:

    REVISION SCHEDULE:

    348 MEDFORD ST. SUITE 1CHARLESTOWN, MA 02129

    COPYRIGHT BY FREEGREEN INC. ALL RIGHTS RESERVE

    www.FreeGreen.com

    FREE GREEN

    1/4" = 1'-

    A-02-2

    ENTRY LEVEL FLOORPLAN

    09-0

    MODERN CUBE

    06 APRIL, 200

    BU,

    D = COMBINA TION SMOKE & CARBON MONOXIDE DETDETECTORS SHALL BE INSTALLED OUTSIDE EACHSEPARATE SLEEPING AREA IN THE IMMEDIATE VICBEDROOMS AND ON EACH STORY OF THE DWELLININCLUDING BASEMENTS. ALL DETECTORS SHALLCONNECTED TO A SOUNDING DEVICE OR OTHERDETECTORS TO PROVIDE AN ALARM AUDIBLE IN ASLEEPING AREAS. AL L DETECTORS SHALL BE APPAND LISTED AND SHALL BE INSTALLED IN ACCORWITH MANUFACTURER'S INSTRUCTIONS.

    No. Description Date

    FLOOR TO FLOOR HEIGHTS WILL VARY BASED ON DEFLOOR FRAMING AS DETERMINED BY STRUCTURALENGINEER. STAIR RISERS MUST NOT EXCEED 7 3/4", TREADS MUST NOT BE LESS THAN 10" AS PER IRC 200WALL MOUNT STAIR RAIL. MAX PROJECTION MUST EXCEED 4 1/2" FROM FACE OF FINISH WALL AS PER IR

    1 STEPS OR RAMP TO GRADE AS REQ PER SITE CONDITMINIMUM 3'-0" LANDING REQUIRED AT ALL ENTRY WPORCHES, BALCONIES OR RAISED FLOOR SURFACES MORE THAN 30" ABOVE THE FLOOR OR GRADE BELOHAVE GUARDS NOT LESS THAN 36" IN HEIGHT.

    2

    3

    1/4" = 1'-0"1 ENTRY LEVEL FLOOR PLAN

    3 BEDROOM

  • 7/28/2019 FG Construction Documents 03-005

    9/27

    16 R DN

    A-01-12Right

    A-01-1

    A-01-2

    A-01-2

    1Rear

    2

    Left

    1Front

    W D

    34'-0"

    BATH 2

    MASTERBATH

    BED 1BED 2

    MASTER BED

    CL

    CL

    L I N E N

    4x6 POST

    4x6 POST4x6 POST DBL 1 3/4"x16"

    LVL ABOVE(OR AS REQ)

    DBL 1 3/4"x16"LVL ABOVE

    (OR AS REQ)

    20' - 8 3/4"

    12' - 2 1/4"

    17'-111/2"

    14'-111/2"

    EGRESS

    EGRESS EGRESS

    TEMPERED/ OBSCURE

    2'-41/2"

    2'-41/2"

    2'-41/2"

    1'-0"

    5'-51/2"

    6'-11/2"

    16' - 0 1/4" 3' - 8"3' - 10 1/2"

    5' - 9 3/4"3' - 5 1/2"3' - 3"3' - 10"

    16' - 6 3/4"

    3

    2

    1A-03-1

    34' - 0"

    4

    4

    T E M P E R E D /

    O B S C U R E

    2 - 6 x 7 - 0

    2 - 6 x 7 - 0

    2 - 6 x 7 - 0

    2 - 6 x 7 - 0

    34' - 0"

    34'-0"

    6'-71/4"

    10'-103/4"

    16'-6"

    7' - 5 1/2"13' - 11"

    OVERALL R.O.

    10' - 1"2' - 6 1/2"

    4'-7"

    3'-0"

    OVERALLR.O.

    10'-1"

    16'-4"

    1

    1

    1

    2 2

    2 2

    3

    4

    18'-6"

    15'-6"

    CL CL

    15'-6"

    18'-6"

    2' - 6 1/2" 10' - 1" 9' - 0 1/2" 12' - 4"

    "R-CONTROL" SIP WALL

    UN-INSULATED, STICK

    BUILT WALL OR INTPARTITION

    LOAD BEARINGPARTITION

    NOTE:

    DIMENSIONS TO EXTERIOR SIPWALLS REFERENCE OUTSIDE FACEOF SHETAHING.

    DIMENSIONS TO EXTERIOR GARAGEWALLS REFERENCE OUTSIDE FACEOF STUD.

    DIMENSIONS TO INTERIORPARTITIONS REFERENCE CENTEROF 2x4 OR 2x6 STUD.

    WALL LEGEND

    LADDER STAIRS TOACCESS HATCH FOR

    ROOF DECK 1

    9' - 4 1/4"

    D D

    D

    D

    BOOK SHELF

    SCALE

    PROJECT NUMBER:

    DATE:

    DRAWN BY:

    CHECKED BY:

    PROJECT NAME:

    NOTES:

    REVISION SCHEDULE:

    348 MEDFORD ST. SUITE 1CHARLESTOWN, MA 02129

    COPYRIGHT BY FREEGREEN INC. ALL RIGHTS RESERVE

    www.FreeGreen.com

    FREE GREEN

    1/4" = 1'-

    A-02-3

    UPPER LEVELFLOOR PLAN

    09-0

    MODERN CUBE

    06 APRIL, 200

    BU,

    D = COMBINA TION SMOKE & CARBON MONOXIDE DETDETECTORS SHALL BE INSTALLED OUTSIDE EACHSEPARATE SLEEPING AREA IN THE IMMEDIATE VICBEDROOMS AND ON EACH STORY OF THE DWELLININCLUDING BASEMENTS. ALL DETECTORS SHALLCONNECTED TO A SOUNDING DEVICE OR OTHERDETECTORS TO PROVIDE AN ALARM AUDIBLE IN ASLEEPING AREAS. AL L DETECTORS SHALL BE APPAND LISTED AND SHALL BE INSTALLED IN ACCORWITH MANUFACTURER'S INSTRUCTIONS.

    No. Description Date

    FLOOR TO FLOOR HEIGHTS WILL VARY BASED ON DEFLOOR FRAMING AS DETERMINED BY STRUCTURALENGINEER. STAIR RISERS MUST NOT EXCEED 7 3/4", TREADS MUST NOT BE LESS THAN 10" AS PER IRC 200WALL MOUNT STAIR RAIL. MAX PROJECTION MUST EXCEED 4 1/2" FROM FACE OF FINISH WALL AS PER IR

    1

    2

    1/4" = 1'-0"1 UPPER LEVEL FLOOR PLAN

    DRIP PAN AND FLOOR DRAIN UNDER WASHER IN LAUAREA. VE NT DRYER THROUGH ADJACENT EXT WALTHROUGH ROOF.

    3

    3 BEDROOM

  • 7/28/2019 FG Construction Documents 03-005

    10/27

    A-01-12Right

    A-01-1

    A-01-2

    A-01-2

    1Rear

    2

    Left

    1Front

    1A-03-1

    ROOF DECKROOF DECK CONSTRUCTION: (TOP DOWN)- COMPOSITE DECKING OVER 2x6 PT SLEEPERS @16" O/C- FULLY ADHERED 60 MIL REINFORCED EPDM MEMBRANE- SUBSTRATE FOR EPDM AS REQ- 5/8" SHEATHING- RIGID INSULATION TAPERED TO 1/4" OVER 12"- 3/4" SHEATHING- OPEN WEB ROOF TRUSSES @16" O/C OR AS REQ

    W/ SPRAY FOAM INSULATION (UNVENTED)- 1/2" GYPSUM BOARD (REQ FOR THERMAL BARRIER)

    ACCESS HATCH TO ROOF DECKFROM UPPER LEVEL. VERIFY ALL R.O.DIMENSIONS WITH MANUFACTURERSSPECIFICATIONS.

    EXTERNAL DRAIN CONDUCTORHEAD AND DOWNSPOUT. DO WNSPOUTTO DRAIN AWAY FROM BUILDING

    36" PARAPET WALL W/ METAL CAP1

    36" PARAPET WALL W/ METAL CAP1

    36" PARAPET WALL W/ METAL CAP1

    36" PARAPET WALL W/ METAL CAP1

    34'-0"

    34' - 0"

    34' - 0"

    2

    CL

    4'-3"

    8'-6"

    8'-6"

    8'-6"

    4'-3"

    CL

    CL

    CL

    2

    CL

    CL

    CL

    CL

    34'-0"

    4'-3"

    8'-6"

    8'-6"

    8'-6"

    4'-3"

    3

    EXTERNAL DRAIN CONDUCTORHEAD AND DOWNSPOUT. D OWNSPOUT

    TO DRAIN AWAY FROM BUILDING

    SCALE

    PROJECT NUMBER:

    DATE:

    DRAWN BY:

    CHECKED BY:

    PROJECT NAME:

    NOTES:

    REVISION SCHEDULE:

    348 MEDFORD ST. SUITE 1CHARLESTOWN, MA 02129

    COPYRIGHT BY FREEGREEN INC. ALL RIGHTS RESERVE

    www.FreeGreen.com

    FREE GREEN

    1/4" = 1'-

    A-02-4

    ROOF DECK PLAN

    09-0

    MODERN CUBE

    06 APRIL, 200

    BU,

    No. Description Date

    1/4" = 1'-0"1 ROOF DECK PLAN

    MATERIAL FOR PARAPET WALL CAP SHOULD EITHERALUMINUM WITH AN ANODIZED OR KYNAR PAINT FSTEEL WITH A GALVANIZED OR GALVALUME FINISH

    1

    OVERFLOW OUTLET THROUGH PARAPET WALL WHEMEETS AT TOP OF WATERPROOF SURFACE.

    2

    DEPTH OF SPRAY FOAM INSULATION TO MEET 2006 IREQUIREMENT FOR THE PROJECTS CLIMATE ZONE.

    3

    3 BEDROOM

  • 7/28/2019 FG Construction Documents 03-005

    11/27

    A-01-12Right

    A-01-1

    A-01-2

    A-01-2

    1Rear

    2

    Left

    1Front

    1A-03-1

    36" PARAPET WALL W/ METAL CAP1

    36" PARAPET WALL W/ METAL CAP1

    36" PARAPET WALL W/ METAL CAP1

    36" PARAPET WALL W/ METAL CAP1

    34'-0"

    34' - 0"

    34' - 0"

    2

    CL

    4'-3"

    8'-6"

    8'-6"

    8'-6"

    4'-3"

    CL

    CL

    CL

    2

    CL

    CL

    CL

    CL

    34'-0"

    4'-3"

    8'-6"

    8'-6"

    8'-6"

    4'-3"

    X

    Y2

    X2

    Y

    X

    2" FILL

    2" FILL

    1/2"

    1 1/2"

    2 1/2"

    3 1/2"

    4 1/2"

    TAPERED INSULATION COMES IN 4'-0"x4'-0" SHEETS.CUT SHEETS AS REQUIRED. JOINTS MAY BE STAGGERED.ALL SEAMS MUST BE TAPED PRIOR TO APPLYING EPDM.2" RIGID INSULATION FILLERS COME IN 4'-0"x8'-0" SHEETS.MINIMUM PITCH MUST BE 1/4" OVER 12".

    INDICATES LOCATION OF SINGLE2" RIGID INSULATION FILLER.

    SLOPE

    Y

    Y

    Y

    Y

    X

    X

    X2 X2

    X2

    X2

    X2

    X2

    Y2

    Y2Y2Y2 Y2

    Y2

    Y2

    Y2

    Y

    Y

    Y

    Y

    X

    X

    X2 X2

    X2

    X2

    X2

    X2

    Y2

    Y2

    Y2Y2 Y2

    Y2

    Y2

    Y2

    Y

    Y

    Y

    Y

    X

    X

    X2X2

    X2

    X2

    X2

    X2

    Y2

    Y2Y2 Y2Y2

    Y2

    Y2

    Y2

    Y

    Y

    Y

    Y

    X

    X

    X2X2

    X2

    X2

    X2

    X2

    Y2

    Y2

    Y2 Y2Y2

    Y2

    Y2

    Y2

    EXTERNAL DRAIN CONDUCTORHEAD AND DOWNSPOUT. D OWNSPOUTTO DRAIN AWAY FROM BUILDING

    EXTERNAL DRAIN CONDUCTORHEAD AND DOWNSPOUT. DO WNSPOUT

    TO DRAIN AWAY FROM BUILDING

    S L O P E

    S L O P E

    SLOPE

    S L O P E

    S L O P E

    SCALE

    PROJECT NUMBER:

    DATE:

    DRAWN BY:

    CHECKED BY:

    PROJECT NAME:

    NOTES:

    REVISION SCHEDULE:

    348 MEDFORD ST. SUITE 1CHARLESTOWN, MA 02129

    COPYRIGHT BY FREEGREEN INC. ALL RIGHTS RESERVE

    www.FreeGreen.com

    FREE GREEN

    1/4" = 1'-

    A-02-5

    ROOF DECKDRAINAGE PLAN

    09-0

    MODERN CUBE

    06 APRIL, 200

    BU,

    No. Description Date

    1/4" = 1'-0"1 ROOF DECK DRAINAGE PLAN

    MATERIAL FOR PARAPET WALL CAP SHOULD EITHERALUMINUM WITH AN ANODIZED OR KYNAR PAINT FSTEEL WITH A GALVANIZED OR GALVALUME FINISH

    1

    OVERFLOW OUTLET THROUGH PARAPET WALL WHEMEETS AT TOP OF WATERPROOF SURFACE.

    2

    3 BEDROOM

  • 7/28/2019 FG Construction Documents 03-005

    12/27

  • 7/28/2019 FG Construction Documents 03-005

    13/27

  • 7/28/2019 FG Construction Documents 03-005

    14/27

  • 7/28/2019 FG Construction Documents 03-005

    15/27

  • 7/28/2019 FG Construction Documents 03-005

    16/27

  • 7/28/2019 FG Construction Documents 03-005

    17/27

  • 7/28/2019 FG Construction Documents 03-005

    18/27

    A-01-12Right

    A-01-1

    A-01-2

    A-01-2

    1Rear

    2

    Left

    1Front

    WALL LEGEND

    POURED CONCRETEFOUNDATION WALL

    NOTE:

    DIMENSIONS ON THIS PAGEREFERENCE OUTSIDE FACES OFCONCRETE FOUNDATION WALLSAND PT SILL PLATES ABOVE WHERETHEY OCCUR BASED ON ENTRYLEVEL FLOOR FRAMING PLAN.

    CONC FOUNDATION WALL AS REQFOOTING AS REQ BELOW FROST DEPTH

    TOP OF GRADE BEAMEL = (-) 9'-5 1/4"

    1A-03-1

    34' - 0"

    21' - 0" 13' - 0"

    34'-0"

    34' - 0"2' - 1 3/4"

    16' - 8 1/2"

    34'-0"

    CL

    CL CL CL CL CL

    2' - 0" 7' - 6" 7' - 6" 7' - 6" 7' - 6" 2' - 0"

    11'-101/2"

    12" DIA CONC SUPPORTW/ FOOTING BELOWFROST DEPTH TYP

    12" DIA CONC SUPPORTW/ FOOTING BELOWFROST DEPTH TYP

    C O N C F O U N D A T I O N W A L L A S R E Q

    F O O T I N G A S R E Q B E L O W

    F R O S T D E P T H

    C O N C F O U N D A T I O N W A L L A S R E Q

    F O O T I N G A S R E Q B E L O W

    F R O S T D E P T H

    TOP OF FND WALLEL = (-) 0'-5 1/4"

    TOP OF FND WALLEL = (-) 0'-5 1/4"

    TOP OF FND WALLEL = (-) 8'-7 1/4"

    TOP OF FND WALLEL = (-) 0'-5 1/4"

    TOP OF FND WALLEL = (-) 0'-5 1/4"

    TOP OF FND WALLEL = (-) 8'-7 1/4"

    4'-0"

    R.O.

    2'-51/2"SQUARE

    27'-61/2"

    R.O. FOR DIRECT VENTGARAGE FAN W/ HOOD

    CONC LINTEL ABOVE

    + / - 4 8 ' - 1 " ( V . I . F . )

    8

    A-04-2

    15' - 1 3/4"

    SCALE

    PROJECT NUMBER:

    DATE:

    DRAWN BY:

    CHECKED BY:

    PROJECT NAME:

    NOTES:

    REVISION SCHEDULE:

    348 MEDFORD ST. SUITE 1CHARLESTOWN, MA 02129

    COPYRIGHT BY FREEGREEN INC. ALL RIGHTS RESERVE

    www.FreeGreen.com

    FREE GREEN

    1/4" = 1'-

    A-05-1

    FOUNDATION PLAN

    09-0

    MODERN CUBE

    06 APRIL, 200

    BU,

    BASEMENTS / CRAWL SPACES / SLABS:THE BUILDER ASSUMES ALL RESPONSIBILITIES FOR PROVACCESS FOR DUCT AND PLUMBING CHASES BELOW CONCSLABS AND THROUGH FOUNDATION WALLS AS REQUIREDALSO THE RESPONSIBILITY OF THE BUILDER TO PROVIDEADEQUATE LIGHT AND VENTILATION FOR BASEMENTS ANCRAWL SPACES AS REQUIRED BY LOCAL CODES.

    1 XXXXXXXXXXX.

    No. Description Date

    1/4" = 1'-0"1 Foundation

    3 BEDROOM

  • 7/28/2019 FG Construction Documents 03-005

    19/27

  • 7/28/2019 FG Construction Documents 03-005

    20/27

    16 R UP

    14R DN

    U C

    U C

    U C

    U C

    UCGFI GFI

    U C

    G F I

    D

    F

    GFI-WP

    GFI-WP

    3

    3

    A-01-12Right

    A-01-1

    A-01-2

    A-01-2

    1Rear

    2

    Left

    1Front

    1A-03-1

    DBL 1 3/4"x16" LVL(OR AS REQ)

    DBL 1 3/4"x16" LVL(OR AS REQ)

    D B L 1 3 / 4 " x 1

    6 " L V L A B O V E

    ( O R A S R E Q )

    16" OPEN WEB FLOOR TRUSSES @16" O/COR AS REQ BY STRUCTURAL ENGINEER

    1

    1

    1

    1 1

    16" OPEN WEB FLOOR TRUSSES @16" O/COR AS REQ BY STRUCTURAL ENGINEER

    2

    2

    3

    33'-7"

    CL

    14'-11"

    D B L H E A D E R

    ( A S R E Q )

    2x12

    3' - 6 1/4"

    14'-23/4"

    34'-0"

    34' - 0"

    34'-0"

    34' - 0"

    18'-6"

    15'-6"

    CL

    4x6 POST

    4x6 POST

    4x6 POST

    SCALE

    PROJECT NUMBER:

    DATE:

    DRAWN BY:

    CHECKED BY:

    PROJECT NAME:

    GENERAL:

    THE FRAMING LAYOUT ON THIS PAGE IS INTENDED TO BE ASUGGESTED LAYOUT ONLY. DESIGN LOADS & WEATHERCONDITIONS VARY BY REGION. AS A RESULT THE SIZE, SPLAYOUT OF ALL STRUCTURAL ELEMENTS IN THIS HOME DMUST BE APPROVED BY ASTRUCTURAL ENGINEERAND CODEOFFICIAL BASED ON YOUR SPECIFIC SITE LOCATION PRIORCONSTRUCTION.

    REVISION SCHEDULE:

    348 MEDFORD ST. SUITE 1CHARLESTOWN, MA 02129

    COPYRIGHT BY FREEGREEN INC. ALL RIGHTS RESERVE

    www.FreeGreen.com

    MATERIAL SPECIFICATIONS: ( VERIFY W/ LOCAL CODE)

    FLOOR SHEATHING:3/4" APA-RATED EXPOSURE 1, T&G,48/24 SPAN RATING, EXPOSURE 110d COMMON NAILS @6" O/C B.N. & E.N.,10d COMMON NAILS @10" O/C INT. FRAMING

    ROOF SHEATHING:5/8" APA-RATED EXPOSURE 1,24" MINIMUM SPAN RATING,8d COMMON NAILS @6" O/C B.N. & E.N.,8d COMMON NAILS @10" O/C INT. FRAMING

    SAWN STRUCTURAL FRAMING MEMBERS:MEMBERS GRADE 2x_ WALL STUDS D.F. #22x_ FL OOR JOI ST S & ROOF RAFT ERS D.F. #2BEAMS & HEADERS D.F. #1POSTS (4x,6x,8x) D.F. #1

    WOOD BEAM MINIMUM ALLOWABLE BENDING STRESS:MEMBERS Fb (PSI)GLUED LAMINATED TIMBERS 2400LAMINATED VENEER LUMBER 2700

    INTERIOR HEADERS:INTERIOR NON-BEARING SPANS USE:2x4 FLAT FOR SPANS UP TO 3'-0"4x4 D.F. #2 FOR SPANS UP TO 5'-0"4x6 D.F. #2 FOR SPANS UP TO 8'-0"

    NOTES:

    FREE GREEN

    1/4" = 1'-

    A-05-3

    UPPER LEVEL FLRFRAMING PLAN

    09-0

    MODERN CUBE

    06 APRIL, 200

    BU,

    No. Description Date

    1 2x6 SOLID BRIDGING FASTENED TO EACH TRUSS ANDFASTENED SECURELY TO END OF WALL.

    2 PROVIDE 2x_ BLOCKING BETWEEN TOP CHORDS OF ETRUSS.

    3 PROVIDE CONT 2x8 BLOCKING (RIPPED TO 6 1/2") ON WALLS ADJACENT TO TOP CHORD BEARING TRUSSE

    1/4" = 1'-0"1 UPPER LEVEL FLOOR FRAMING PLAN

    3 BEDROOM

  • 7/28/2019 FG Construction Documents 03-005

    21/27

    16 R DN

    A-01-12Right

    A-01-1

    A-01-2

    A-01-2

    1Rear

    2

    Left

    1Front

    1

    A-03-1

    4x6 POST

    DBL 1 3/4"x16" LVL(OR AS REQ)

    16" OPEN WEB FLOOR TRUSSES @16" O/COR AS REQ BY STRUCTURAL ENGINEER

    1

    1

    1

    1 1

    16" OPEN WEB FLOOR TRUSSES @16" O/COR AS REQ BY STRUCTURAL ENGINEER

    2

    3

    334'-0"

    34' - 0"

    34'-0"

    34' - 0"

    4x6 POST

    4x6 POST

    4x6 POST

    2

    18'-6"

    15'-6"

    CL

    TOP CHORD BEARING ON THIS END

    BOTTOM CHORD BEARING ON THIS END

    TOP CHORD BEARING ON THIS END

    44

    16

    6

    3' - 3 1/4"2'-1"

    13'-31/4"

    7

    1 3/4"x16" LVL

    SCALE

    PROJECT NUMBER:

    DATE:

    DRAWN BY:

    CHECKED BY:

    PROJECT NAME:

    GENERAL:

    THE FRAMING LAYOUT ON THIS PAGE IS INTENDED TO BE ASUGGESTED LAYOUT ONLY. DESIGN LOADS & WEATHERCONDITIONS VARY BY REGION. AS A RESULT THE SIZE, SPLAYOUT OF ALL STRUCTURAL ELEMENTS IN THIS HOME DMUST BE APPROVED BY ASTRUCTURAL ENGINEERAND CODEOFFICIAL BASED ON YOUR SPECIFIC SITE LOCATION PRIORCONSTRUCTION.

    REVISION SCHEDULE:

    348 MEDFORD ST. SUITE 1CHARLESTOWN, MA 02129

    COPYRIGHT BY FREEGREEN INC. ALL RIGHTS RESERVE

    www.FreeGreen.com

    MATERIAL SPECIFICATIONS: ( VERIFY W/ LOCAL CODE)

    FLOOR SHEATHING:3/4" APA-RATED EXPOSURE 1, T&G,48/24 SPAN RATING, EXPOSURE 110d COMMON NAILS @6" O/C B.N. & E.N.,10d COMMON NAILS @10" O/C INT. FRAMING

    ROOF SHEATHING:5/8" APA-RATED EXPOSURE 1,24" MINIMUM SPAN RATING,8d COMMON NAILS @6" O/C B.N. & E.N.,8d COMMON NAILS @10" O/C INT. FRAMING

    SAWN STRUCTURAL FRAMING MEMBERS:MEMBERS GRADE 2x_ WALL STUDS D.F. #22x_ FL OOR JOI ST S & ROOF RAFT ERS D.F. #2BEAMS & HEADERS D.F. #1POSTS (4x,6x,8x) D.F. #1

    WOOD BEAM MINIMUM ALLOWABLE BENDING STRESS:MEMBERS Fb (PSI)GLUED LAMINATED TIMBERS 2400LAMINATED VENEER LUMBER 2700

    INTERIOR HEADERS:INTERIOR NON-BEARING SPANS USE:2x4 FLAT FOR SPANS UP TO 3'-0"4x4 D.F. #2 FOR SPANS UP TO 5'-0"4x6 D.F. #2 FOR SPANS UP TO 8'-0"

    NOTES:

    FREE GREEN

    1/4" = 1'-

    A-05-4

    ROOF FRAMINGPLAN

    09-0

    MODERN CUBE

    06 APRIL, 200

    BU,

    No. Description Date

    1 2x6 SOLID BRIDGING FASTENED TO EACH TRUSS ANDFASTENED SECURELY TO END OF WALL.

    2 PROVIDE 2x_ BLOCKING BETWEEN TOP CHORDS TRU

    3 PROVIDE CONT 2x8 BLOCKING (RIPPED TO 6 1/2") ON WALLS ADJACENT TO TOP CHORD BEARING TRUSSE

    1/4" = 1'-0"1 ROOF FRAMING PLAN

    4 PROVIDE SOLID BLOCKING BETWEEN TRUSSES

    5 T.O. SIP IN THIS LOCATION TO DROP TO 8'-1" IN HEIGHFLUSH WITH BOTTOM CHORD OF ROOF TRUSSES. THALLOWS FOR BEARING SURFACE FOR LVL & TO ALLROOF DECK DRAINAGE OUTLET.

    6 1 3/4"x16" LVL SISTERED TO FACE OF TRUSS

    7 R.O. FOR ROOF HATCH.

    3 BEDROOM

  • 7/28/2019 FG Construction Documents 03-005

    22/27

  • 7/28/2019 FG Construction Documents 03-005

    23/27

  • 7/28/2019 FG Construction Documents 03-005

    24/27

  • 7/28/2019 FG Construction Documents 03-005

    25/27

  • 7/28/2019 FG Construction Documents 03-005

    26/27

  • 7/28/2019 FG Construction Documents 03-005

    27/27

    SCALE

    PROJECT NUMBER:

    DATE:

    DRAWN BY:

    CHECKED BY:

    PROJECT NAME:

    NOTES:

    REVISION SCHEDULE:

    348 MEDFORD ST. SUITE 1CHARLESTOWN, MA 02129

    COPYRIGHT BY FREEGREEN INC. ALL RIGHTS RESERVED.

    www.FreeGreen.com

    FREE GREEN

    P-01-1

    R-CONTROL SIPPAGE

    09-0

    MODERN CUBE

    06 APRIL, 2009

    BU, S

    No. Description Date

    THROUGH THE FREEGREEN, R-CONTROL SIP's RELATIONSHIP,THIS HOME HAS BEEN PRE-DESIGNED USING STRUCTURALINSULATED PANELS SIP's. THE IMAGE ON THIS PAGE IS A 3-DMODEL OF THE EXISTING SIP LAYOUT FOR THIS HOME. JUSTCONTACT R-CONTROL AND THE SIP's ARE READY TO BEMANUFACTURED AND DELIVERED FOR YOUR PROJECT.

    THIS PAGE IS NOT INTENDED FOR USE IN CONSTRUCTION.PLEASE VISIT R-CONTROL SIP's AT THE FOLLOWING ON-LINEADDRESS:

    www.R-Control.com/Free-House-Plans-Freegreen-R-Control.asp

    R-CONTROL WILL BE HAPPY TO COLLABORATE WITH YOU ONYOUR PROJECT, WALK YOU THROUGH R-CONTROL SIP'sINSTALLATION, PROVIDE TECHNICAL INFORMATION, PRICING AANSWERS TO ALL YOUR QUESTIONS.

    3 BEDROOM