69
2. STRUCTURES FOR GGNS UNIT 2 ARE FOR INFORMATION ONLY,SINCE CONSTRUCTION OF UNIT 2 WAS SUSPENDED ON 8/21/91. PROPOSED NEW FACILITY CONSTRUCTION AREAS. LEGEND: SERI GRAND GULF NUCLEAR STATION SITE EARLY SITE PERMIT APPLICATION SITE SAFETY ANALYSIS REPORT REV. FIGURE 2.4-1 0 SURFACE DRAINAGE PLAN (UFSAR FIGURE 2.4-1)

FIGURE 2.4-1 SITE SAFETY ANALYSIS REPORT EARLY SITE … · construction areas. legend: seri ... hydrographic details of the mississippi river at grand gulf seri ... cairo, illinois

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: FIGURE 2.4-1 SITE SAFETY ANALYSIS REPORT EARLY SITE … · construction areas. legend: seri ... hydrographic details of the mississippi river at grand gulf seri ... cairo, illinois

2. ST

RU

CT

UR

ES

FO

R G

GN

S U

NIT

2 AR

E F

OR

INF

OR

MA

TIO

N O

NLY

,SIN

CE

CO

NS

TR

UC

TIO

N O

F UN

IT 2 WA

S S

US

PE

ND

ED

ON

8/21/91.

PR

OP

OS

ED

NE

W FA

CILITY

C

ON

ST

RU

CT

ION

AR

EA

S.

LEG

EN

D:

SE

RI

GR

AN

D G

ULF N

UC

LEA

R S

TATIO

N S

ITEE

AR

LY S

ITE

PE

RM

IT A

PP

LICA

TIO

NS

ITE

SA

FE

TY

AN

ALY

SIS

RE

PO

RT

RE

V.

FIGU

RE

2.4-10

SU

RF

AC

E D

RA

INA

GE

PLA

N(U

FS

AR

FIG

UR

E 2.4-1)

Page 2: FIGURE 2.4-1 SITE SAFETY ANALYSIS REPORT EARLY SITE … · construction areas. legend: seri ... hydrographic details of the mississippi river at grand gulf seri ... cairo, illinois

RE

GIO

NA

L TO

PO

GR

AP

HY

(UF

SA

R F

IGU

RE

2.4-2)

SE

RI

GR

AN

D G

ULF N

UC

LEA

R S

TATIO

N S

ITEE

AR

LY S

ITE

PE

RM

IT A

PP

LICA

TIO

NS

ITE

SA

FE

TY

AN

ALY

SIS

RE

PO

RT

RE

V.

FIGU

RE

2.4-20

Page 3: FIGURE 2.4-1 SITE SAFETY ANALYSIS REPORT EARLY SITE … · construction areas. legend: seri ... hydrographic details of the mississippi river at grand gulf seri ... cairo, illinois

LOW

ER

MIS

SIS

SIP

PI R

EG

ION

HY

DR

OLO

GIC

BO

UN

DA

RY

(UF

SA

R F

IGU

RE

2.4-3)

SE

RI

GR

AN

D G

ULF N

UC

LEA

R S

TATIO

N S

ITEE

AR

LY S

ITE

PE

RM

IT A

PP

LICA

TIO

NS

ITE

SA

FE

TY

AN

ALY

SIS

RE

PO

RT

RE

V.

FIGU

RE

2.4-30

Page 4: FIGURE 2.4-1 SITE SAFETY ANALYSIS REPORT EARLY SITE … · construction areas. legend: seri ... hydrographic details of the mississippi river at grand gulf seri ... cairo, illinois

MISSISSIPPI RIVER LEVEES AND NAVIGATION CUTOFFS

SOURCE: ADAPTED FROM U.S. ARMY CORPS OF ENGINEERS

SERIGRAND GULF NUCLEAR STATION SITE

EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT

REV.FIGURE 2.4-3a 0

Page 5: FIGURE 2.4-1 SITE SAFETY ANALYSIS REPORT EARLY SITE … · construction areas. legend: seri ... hydrographic details of the mississippi river at grand gulf seri ... cairo, illinois

DR

AIN

AG

E A

RE

AS

OF

TH

E

MIS

SIS

SIP

PI B

AS

IN(U

FS

AR

FIG

UR

E 2.4-4)

SE

RI

GR

AN

D G

ULF N

UC

LEA

R S

TATIO

N S

ITEE

AR

LY S

ITE

PE

RM

IT A

PP

LICA

TIO

NS

ITE

SA

FE

TY

AN

ALY

SIS

RE

PO

RT

RE

V.

FIGU

RE

2.4-40

Page 6: FIGURE 2.4-1 SITE SAFETY ANALYSIS REPORT EARLY SITE … · construction areas. legend: seri ... hydrographic details of the mississippi river at grand gulf seri ... cairo, illinois

HY

DR

OG

RA

PH

IC D

ETA

ILS O

F THE

MIS

SIS

SIP

PI R

IVE

R A

TG

RA

ND

GU

LF

SE

RI

GR

AN

D G

ULF N

UC

LEA

R S

TATIO

N S

ITEE

AR

LY S

ITE

PE

RM

IT A

PP

LICA

TIO

NS

ITE

SA

FE

TY

AN

ALY

SIS

RE

PO

RT

RE

V.

FIGU

RE

2.4-50

Page 7: FIGURE 2.4-1 SITE SAFETY ANALYSIS REPORT EARLY SITE … · construction areas. legend: seri ... hydrographic details of the mississippi river at grand gulf seri ... cairo, illinois

WA

TE

R S

UR

FA

CE

PR

OF

ILES

FO

R 1937 H

IGH

F

LOW

AN

D 1993 LO

W W

AT

ER

RE

FE

RE

NC

E

PLA

NE

Source: A

dapted from U

SA

CE

, 2001

SE

RI

GR

AN

D G

ULF N

UC

LEA

R S

TATIO

N S

ITEE

AR

LY S

ITE

PE

RM

IT A

PP

LICA

TIO

NS

ITE

SA

FE

TY

AN

ALY

SIS

RE

PO

RT

RE

V.

FIGU

RE

2.4-60

Page 8: FIGURE 2.4-1 SITE SAFETY ANALYSIS REPORT EARLY SITE … · construction areas. legend: seri ... hydrographic details of the mississippi river at grand gulf seri ... cairo, illinois

HY

DR

OG

RA

PH

FO

R T

HE

MIS

SIS

SIP

PI

RIV

ER

AT

VIC

KS

BU

RG

, MS

Source: A

dapted from U

.S. A

rmy C

orps of Engineers

SE

RI

GR

AN

D G

ULF N

UC

LEA

R S

TATIO

N S

ITEE

AR

LY S

ITE

PE

RM

IT A

PP

LICA

TIO

NS

ITE

SA

FE

TY

AN

ALY

SIS

RE

PO

RT

RE

V.

FIGU

RE

2.4-70

Page 9: FIGURE 2.4-1 SITE SAFETY ANALYSIS REPORT EARLY SITE … · construction areas. legend: seri ... hydrographic details of the mississippi river at grand gulf seri ... cairo, illinois

HY

DR

OG

RA

PH

FO

R M

ISS

ISS

IPP

I RIV

ER

AT N

ATC

HE

Z, MS

Source: A

dapted from U

.S. A

rmy C

orps of Engineers

SE

RI

GR

AN

D G

ULF N

UC

LEA

R S

TATIO

N S

ITEE

AR

LY S

ITE

PE

RM

IT A

PP

LICA

TIO

NS

ITE

SA

FE

TY

AN

ALY

SIS

RE

PO

RT

RE

V.

FIGU

RE

2.4-80

Page 10: FIGURE 2.4-1 SITE SAFETY ANALYSIS REPORT EARLY SITE … · construction areas. legend: seri ... hydrographic details of the mississippi river at grand gulf seri ... cairo, illinois

18601880

19001920

19401960

19802000

DATES: 06/24/1858 to 02/13/1999

500000

1e + 06

1.5e + 06

2e + 06

2.5e + 06

USG

S 07289000 MISSISSIPPI R

IVER AT VICKSBU

RG

, MS

Streamflow, cubic feet per second

Source: U.S.G

.S.

AN

NU

AL M

AX

IMU

M IN

ST

AN

TA

NE

OU

S P

EA

KS

TR

EA

MF

LOW

- MIS

SIS

SIP

PI R

IVE

RU

SG

S S

TA

TIO

N, V

ICK

SB

UR

G, M

S

SE

RI

GR

AN

D G

ULF N

UC

LEA

R S

TATIO

N S

ITEE

AR

LY S

ITE

PE

RM

IT A

PP

LICA

TIO

NS

ITE

SA

FE

TY

AN

ALY

SIS

RE

PO

RT

RE

V.

FIGU

RE

2.4-90

Page 11: FIGURE 2.4-1 SITE SAFETY ANALYSIS REPORT EARLY SITE … · construction areas. legend: seri ... hydrographic details of the mississippi river at grand gulf seri ... cairo, illinois

LOC

AL D

RA

INA

GE

BA

SIN

S(U

FS

AR

FIG

UR

E 2.4-8)

LEG

EN

D:

PR

OP

OS

ED

NE

W F

AC

ILITY

C

ON

ST

RU

CT

ION

AR

EA

S

1. GG

NS

UN

IT 1 F

AC

ILITIE

S A

DD

ED

FO

R R

EFE

RE

NC

E.

NO

TE

S:

SE

RI

GR

AN

D G

ULF N

UC

LEA

R S

TATIO

N S

ITEE

AR

LY S

ITE

PE

RM

IT A

PP

LICA

TIO

NS

ITE

SA

FE

TY

AN

ALY

SIS

RE

PO

RT

RE

V.

FIG

UR

E 2.4-10

0

Page 12: FIGURE 2.4-1 SITE SAFETY ANALYSIS REPORT EARLY SITE … · construction areas. legend: seri ... hydrographic details of the mississippi river at grand gulf seri ... cairo, illinois

DIMENSIONLESS HYDROGRAPH FORTHE PLANT SITE DRAINAGE BASINS

(UFSAR FIGURE 2.4-9)

SERIGRAND GULF NUCLEAR STATION SITE

EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT

REV.FIGURE 2.4-11 0

Page 13: FIGURE 2.4-1 SITE SAFETY ANALYSIS REPORT EARLY SITE … · construction areas. legend: seri ... hydrographic details of the mississippi river at grand gulf seri ... cairo, illinois

BASIN A & BHYDROGRAPHS

(UFSAR FIGURE 2.4-10)

SERIGRAND GULF NUCLEAR STATION SITE

EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT

REV.FIGURE 2.4-12 0

Page 14: FIGURE 2.4-1 SITE SAFETY ANALYSIS REPORT EARLY SITE … · construction areas. legend: seri ... hydrographic details of the mississippi river at grand gulf seri ... cairo, illinois

PLANT DRAINAGE AREASDURING PMP

(UFSAR FIGURE 2.4-7a SH. 1)

SERIGRAND GULF NUCLEAR STATION SITE

EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT

REV.FIGURE 2.4-13 SHEET 1 OF 2 0

Page 15: FIGURE 2.4-1 SITE SAFETY ANALYSIS REPORT EARLY SITE … · construction areas. legend: seri ... hydrographic details of the mississippi river at grand gulf seri ... cairo, illinois

PLANT DRAINAGE AREASDURING PMP

(UFSAR FIGURE 2.4-7a SH. 2)

SERIGRAND GULF NUCLEAR STATION SITE

EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT

REV.FIGURE 2.4-13 SHEET 2 OF 2 0

Page 16: FIGURE 2.4-1 SITE SAFETY ANALYSIS REPORT EARLY SITE … · construction areas. legend: seri ... hydrographic details of the mississippi river at grand gulf seri ... cairo, illinois

DESIGN-PROJECT FLOOD FOR THELOWER MISSISSIPPI RIVER

U.S. CORPS OF ENGINEERS 1958(UFSAR FIGURE 2.4-11)

SERIGRAND GULF NUCLEAR STATION SITE

EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT

REV.FIGURE 2.4-14 0

Page 17: FIGURE 2.4-1 SITE SAFETY ANALYSIS REPORT EARLY SITE … · construction areas. legend: seri ... hydrographic details of the mississippi river at grand gulf seri ... cairo, illinois

DPF HYDROGRAPHS FORMISSISSIPPI RIVER

(UFSAR FIGURE 2.4-12)

SERIGRAND GULF NUCLEAR STATION SITE

EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT

REV.FIGURE 2.4-15 0

Page 18: FIGURE 2.4-1 SITE SAFETY ANALYSIS REPORT EARLY SITE … · construction areas. legend: seri ... hydrographic details of the mississippi river at grand gulf seri ... cairo, illinois

DISCHARGE-FREQUENCY RELATIONSHIPFOR MISSISSIPPI RIVER FLOODS AT

VICKSBURG(UFSAR FIGURE 2.4-13)

SERIGRAND GULF NUCLEAR STATION SITE

EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT

REV.FIGURE 2.4-16 0

Page 19: FIGURE 2.4-1 SITE SAFETY ANALYSIS REPORT EARLY SITE … · construction areas. legend: seri ... hydrographic details of the mississippi river at grand gulf seri ... cairo, illinois

PMF HYDROGRAPHS FORMISSISSIPPI RIVER

(UFSAR FIGURE 2.4-14)

SERIGRAND GULF NUCLEAR STATION SITE

EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT

REV.FIGURE 2.4-17 0

Page 20: FIGURE 2.4-1 SITE SAFETY ANALYSIS REPORT EARLY SITE … · construction areas. legend: seri ... hydrographic details of the mississippi river at grand gulf seri ... cairo, illinois

SITE DRAINAGE PLAN(UFSAR FIGURE 2.4-7)

PROPOSED NEW FACILITY CONSTRUCTION AREAS.

SERIGRAND GULF NUCLEAR STATION SITE

EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT

REV.FIGURE 2.4-18 0

Page 21: FIGURE 2.4-1 SITE SAFETY ANALYSIS REPORT EARLY SITE … · construction areas. legend: seri ... hydrographic details of the mississippi river at grand gulf seri ... cairo, illinois

RATING CURVE FOR THE MISSISSIPPIRIVER AT GRAND GULF SITE

(UFSAR FIGURE 2.4-15)

SERIGRAND GULF NUCLEAR STATION SITE

EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT

REV.FIGURE 2.4-19 0

Page 22: FIGURE 2.4-1 SITE SAFETY ANALYSIS REPORT EARLY SITE … · construction areas. legend: seri ... hydrographic details of the mississippi river at grand gulf seri ... cairo, illinois

ACCESS ROADPLAN AND PROFILE

(UFSAR FIGURE 2.4-7b SH. 1)

SERIGRAND GULF NUCLEAR STATION SITE

EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT

REV.FIGURE 2.4-20 SHEET 1 OF 2 0

Page 23: FIGURE 2.4-1 SITE SAFETY ANALYSIS REPORT EARLY SITE … · construction areas. legend: seri ... hydrographic details of the mississippi river at grand gulf seri ... cairo, illinois

ACCESS ROADPLAN AND PROFILE

(UFSAR FIGURE 2.4-7b SH. 2)

SERIGRAND GULF NUCLEAR STATION SITE

EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT

REV.FIGURE 2.4-20 SHEET 2 OF 2 0

Page 24: FIGURE 2.4-1 SITE SAFETY ANALYSIS REPORT EARLY SITE … · construction areas. legend: seri ... hydrographic details of the mississippi river at grand gulf seri ... cairo, illinois

CROSS SECTIONS OF STREAM A(UFSAR FIGURE 2.4-7c)

SERIGRAND GULF NUCLEAR STATION SITE

EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT

REV.FIGURE 2.4-21 0

Page 25: FIGURE 2.4-1 SITE SAFETY ANALYSIS REPORT EARLY SITE … · construction areas. legend: seri ... hydrographic details of the mississippi river at grand gulf seri ... cairo, illinois

RIPRAP GRADATION CURVE(USAR FIGURE 2.4-16a)

SERIGRAND GULF NUCLEAR STATION SITE

EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT

REV.FIGURE 2.4-22 0

Page 26: FIGURE 2.4-1 SITE SAFETY ANALYSIS REPORT EARLY SITE … · construction areas. legend: seri ... hydrographic details of the mississippi river at grand gulf seri ... cairo, illinois

CULVERT NO. 1PLAN AND SECTIONS

(UFSAR FIGURE 2.4-7d)

SERIGRAND GULF NUCLEAR STATION SITE

EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT

REV.FIGURE 2.4-23 0

Page 27: FIGURE 2.4-1 SITE SAFETY ANALYSIS REPORT EARLY SITE … · construction areas. legend: seri ... hydrographic details of the mississippi river at grand gulf seri ... cairo, illinois

SERIGRAND GULF NUCLEAR STATION SITE

EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT

REV.FIGURE 2.4-24 0

PROFILE AND SECTIONSOF PERIPHERAL DRAINAGE

FOR BASIN B(UFSAR FIGURE 2.4-16)

Page 28: FIGURE 2.4-1 SITE SAFETY ANALYSIS REPORT EARLY SITE … · construction areas. legend: seri ... hydrographic details of the mississippi river at grand gulf seri ... cairo, illinois

BOUNDARIES OF WATER SURFACE AT EL.103 IN THE SITE REGION(UFSAR FIGURE 2.4-17)

SERIGRAND GULF NUCLEAR STATION SITE

EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT

REV.FIGURE 2.4-25 0

Page 29: FIGURE 2.4-1 SITE SAFETY ANALYSIS REPORT EARLY SITE … · construction areas. legend: seri ... hydrographic details of the mississippi river at grand gulf seri ... cairo, illinois

(Ref. Figure 2.4-18)

GROUND SURFACE PROFILE OFMISSISSIPPI RIVER FLOOD PLAIN

(UFSAR FIGURE 2.4-18)

SERIGRAND GULF NUCLEAR STATION SITE

EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT

REV.FIGURE 2.4-26 0

Page 30: FIGURE 2.4-1 SITE SAFETY ANALYSIS REPORT EARLY SITE … · construction areas. legend: seri ... hydrographic details of the mississippi river at grand gulf seri ... cairo, illinois

MAJOR RESERVOIRS INTHE MISSISSIPPI BASIN(UFSAR FIGURE 2.4-19)

SERIGRAND GULF NUCLEAR STATION SITE

EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT

REV.FIGURE 2.4-27 0

Page 31: FIGURE 2.4-1 SITE SAFETY ANALYSIS REPORT EARLY SITE … · construction areas. legend: seri ... hydrographic details of the mississippi river at grand gulf seri ... cairo, illinois

SEISMIC RISK MAPFOR THE UNITED STATES

(UFSAR FIGURE 2.4-20)

SERIGRAND GULF NUCLEAR STATION SITE

EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT

REV.FIGURE 2.4-28 0

Page 32: FIGURE 2.4-1 SITE SAFETY ANALYSIS REPORT EARLY SITE … · construction areas. legend: seri ... hydrographic details of the mississippi river at grand gulf seri ... cairo, illinois

SEISMIC ZONE MAPOF THE UNITED STATES

SOURCE: 1997 UNIFORM BUILDING CODE

SERIGRAND GULF NUCLEAR STATION SITE

EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT

REV.FIGURE 2.4-28a 0

Page 33: FIGURE 2.4-1 SITE SAFETY ANALYSIS REPORT EARLY SITE … · construction areas. legend: seri ... hydrographic details of the mississippi river at grand gulf seri ... cairo, illinois

SIT

E

DESIGN PROJECT FLOOD ELEVATIONS FROMCAIRO, ILLINOIS TO HEAD OF PASSES

SERIGRAND GULF NUCLEAR STATION SITE

EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT

REV.FIGURE 2.4-29 0

Page 34: FIGURE 2.4-1 SITE SAFETY ANALYSIS REPORT EARLY SITE … · construction areas. legend: seri ... hydrographic details of the mississippi river at grand gulf seri ... cairo, illinois

PLAN SHOWING AREAS THAT MAY BESUBMERGED DUE TO A FLOOD RISING TO

EL. 103 MSL AT THE SITE(UFSAR FIGURE 2.4-22)

SERIGRAND GULF NUCLEAR STATION SITE

EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT

REV.FIGURE 2.4-30 0

Page 35: FIGURE 2.4-1 SITE SAFETY ANALYSIS REPORT EARLY SITE … · construction areas. legend: seri ... hydrographic details of the mississippi river at grand gulf seri ... cairo, illinois

INSTANTANEOUS LOW FLOW INMISSISSIPPI RIVER-TYPICAL GAUGE

RECORD AT VICKSBURG, MISS.SEPTEMBER 18, 19, 20 & 21, 1967

(UFSAR FIGURE 2.4-25)

SERIGRAND GULF NUCLEAR STATION SITE

EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT

REV.FIGURE 2.4-31 0

Page 36: FIGURE 2.4-1 SITE SAFETY ANALYSIS REPORT EARLY SITE … · construction areas. legend: seri ... hydrographic details of the mississippi river at grand gulf seri ... cairo, illinois

SOLE SOURCE AQUIFER MAP

SERIGRAND GULF NUCLEAR STATION SITE

EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT

REV.FIGURE 2.4-31a 0

Page 37: FIGURE 2.4-1 SITE SAFETY ANALYSIS REPORT EARLY SITE … · construction areas. legend: seri ... hydrographic details of the mississippi river at grand gulf seri ... cairo, illinois

LOW FLOWS IN THE MISSISSIPPIRIVER AT VICKSBURG(UFSAR FIGURE 2.4-26)

SERIGRAND GULF NUCLEAR STATION SITE

EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT

REV.FIGURE 2.4-32 0

Page 38: FIGURE 2.4-1 SITE SAFETY ANALYSIS REPORT EARLY SITE … · construction areas. legend: seri ... hydrographic details of the mississippi river at grand gulf seri ... cairo, illinois

SITE HYROLOGIC FEATURES(NORMAL CONDITIONS)(UFSAR FIGURE 2.4-27)PROPOSED NEW PLANT CONSTRUCTION AREAS.

SERIGRAND GULF NUCLEAR STATION SITE

EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT

REV.FIGURE 2.4-33 0

Page 39: FIGURE 2.4-1 SITE SAFETY ANALYSIS REPORT EARLY SITE … · construction areas. legend: seri ... hydrographic details of the mississippi river at grand gulf seri ... cairo, illinois

HYDROGRAPH OF A WELL COMPLETEDIN THE MS RIVER ALLUVIAL AQUIFER,

VICKSBURG, MS

SOURCE: USGS

SERIGRAND GULF NUCLEAR STATION SITE

EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT

REV.FIGURE 2.4-34 0

Page 40: FIGURE 2.4-1 SITE SAFETY ANALYSIS REPORT EARLY SITE … · construction areas. legend: seri ... hydrographic details of the mississippi river at grand gulf seri ... cairo, illinois

HYDROGRAPH OF A WELL COMPLETED IN THELOWER CATAHOULA FORMATION,

PORT GIBSON, MS

SOURCE: USGS

SERIGRAND GULF NUCLEAR STATION SITE

EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT

REV.FIGURE 2.4-35 0

Page 41: FIGURE 2.4-1 SITE SAFETY ANALYSIS REPORT EARLY SITE … · construction areas. legend: seri ... hydrographic details of the mississippi river at grand gulf seri ... cairo, illinois

DESIGN PROJECT FLOOD ELEVATION (102.1')

MISSISSIPPI RIVERLOW WATER REF. PLANE (37.5')

DESIGN PROJECT FLOOD ELEVATION (102.1')

MISSISSIPPI RIVERLOW WATER REF. PLANE (37.5')

NOTES:1. SEE REF. 1 AND 8 FOR SOURCE DATA & GGNS UFSAR FIGURE 2.4-28.2. CLOUDS INDICATE ESP APPLICATION DATA.

HYDROGEOLOGICCROSS SECTION A-A'

(UFSAR FIGURE 2.4-28)SECTION LOCATION IS SHOWN IN (UFSAR FIGURE 2.4-27) FIGURE 2.4-33

SERIGRAND GULF NUCLEAR STATION SITE

EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT

REV.FIGURE 2.4-36 0

Page 42: FIGURE 2.4-1 SITE SAFETY ANALYSIS REPORT EARLY SITE … · construction areas. legend: seri ... hydrographic details of the mississippi river at grand gulf seri ... cairo, illinois

NOTES:1. SEE REF. 1 AND 8 FOR SOURCE DATA.2. CLOUDS INDICATE ESP APPLICATION CHANGES.

APPROXIMATE BOUNDARY OF NEW FACILITY POWER BLOCK CONSTRUCTION AREA

HYDROGEOLOGICCROSS SECTION B-B'

(UFSAR FIGURE 2.4-29)

SERIGRAND GULF NUCLEAR STATION SITE

EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT

REV.FIGURE 2.4-37 0

SECTION LOCATION IS SHOWN IN (UFSAR FIGURE 2.4-27) FIGURE 2.4-33

Page 43: FIGURE 2.4-1 SITE SAFETY ANALYSIS REPORT EARLY SITE … · construction areas. legend: seri ... hydrographic details of the mississippi river at grand gulf seri ... cairo, illinois

Jefferson Co.

Warren Co.

Claiborne Co.

Adams Co.

GGNS Site

Q

B C

J

M

N

J

F

C

K

G

D

L

H

E

FA

B

A

M

G

N

H

O

J

Q

L

P

K

EDCB

E

LK

F

M

G

O

N

H

D

P AR S

ONM

J LK

EH

D

GF

CBA

COUNTY WELL LOCATION GRID

WELL GRID BOUNDARIESCOUNTY BOUNDARIES

Source: Adapted from Mississippi Industrial and Technological Research Commission, Water Research Bulletin 63-1

LEGEND:

SERIGRAND GULF NUCLEAR STATION SITE

EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT

REV.FIGURE 2.4-38 0

Page 44: FIGURE 2.4-1 SITE SAFETY ANALYSIS REPORT EARLY SITE … · construction areas. legend: seri ... hydrographic details of the mississippi river at grand gulf seri ... cairo, illinois

NOTES:1. OBSERVATION WELL AND PIEZOMETER LOCATIONS ARE SHOWN IN FIGURE 2.4-33 (UFSAR FIGURE 2.4-27).

HYDROGRAPHS OF WELLS ANDPIEZOMETERS

(UFSAR FIGURE 2.4-32, SH.1)

SERIGRAND GULF NUCLEAR STATION SITE

EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT

REV.FIGURE 2.4-39 SHEET 1 OF 5 0

Page 45: FIGURE 2.4-1 SITE SAFETY ANALYSIS REPORT EARLY SITE … · construction areas. legend: seri ... hydrographic details of the mississippi river at grand gulf seri ... cairo, illinois

NOTES:1. OBSERVATION WELL AND PIEZOMETER LOCATIONS ARE SHOWN IN FIGURE 2.4-33 (UFSAR FIGURE 2.4-27).

HYDROGRAPHS OF WELLS ANDPIEZOMETERS

(UFSAR FIGURE 2.4-32. SH.2)

SERIGRAND GULF NUCLEAR STATION SITE

EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT

REV.FIGURE 2.4-39 SHEET 2 OF 5 0

Page 46: FIGURE 2.4-1 SITE SAFETY ANALYSIS REPORT EARLY SITE … · construction areas. legend: seri ... hydrographic details of the mississippi river at grand gulf seri ... cairo, illinois

NOTES:1. OBSERVATION WELL AND PIEZOMETER LOCATIONS ARE SHOWN IN FIGURE 2.4-33 (UFSAR FIGURE 2.4-27).

HYDROGRAPHS OF REPLACEMENTPIEZOMETERS

(UFSAR FIGURE 2.4-32, SH.3)

SERIGRAND GULF NUCLEAR STATION SITE

EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT

REV.FIGURE 2.4-39 SHEET 3 OF 5 0

Page 47: FIGURE 2.4-1 SITE SAFETY ANALYSIS REPORT EARLY SITE … · construction areas. legend: seri ... hydrographic details of the mississippi river at grand gulf seri ... cairo, illinois

NOTES:1. OBSERVATION WELL AND PIEZOMETER LOCATIONS ARE SHOWN IN FIGURE 2.4-33 (UFSAR FIGURE 2.4-27).

HYDROGRAPHS OF WELLS ANDPIEZOMETERS

(UFSAR FIGURE 2.4-32, SH.4)

SERIGRAND GULF NUCLEAR STATION SITE

EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT

REV.FIGURE 2.4-39 SHEET 4 OF 5 0

Page 48: FIGURE 2.4-1 SITE SAFETY ANALYSIS REPORT EARLY SITE … · construction areas. legend: seri ... hydrographic details of the mississippi river at grand gulf seri ... cairo, illinois

NOTES:1. OBSERVATION WELL AND PIEZOMETER LOCATIONS ARE SHOWN IN FIGURE 2.4-33 (UFSAR FIGURE 2.4-27).

HYDROGRAPHS OF WELLS ANDPIEZOMETERS

(UFSAR FIGURE 2.4-32, SH.5)

SERIGRAND GULF NUCLEAR STATION SITE

EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT

REV.FIGURE 2.4-39 SHEET 5 OF 5 0

Page 49: FIGURE 2.4-1 SITE SAFETY ANALYSIS REPORT EARLY SITE … · construction areas. legend: seri ... hydrographic details of the mississippi river at grand gulf seri ... cairo, illinois

NOTES: 1. GRID COORDINATES SHOWN ARE BASED ON MISSISSIPPI COORDINATE SYSTEM, WEST ZONE. 2. DATUM FOR ELEVATIONS SHOWN IS MEAN SEA LEVEL. 3. GGNS UNIT 2 STRUCTURES ARE SHOWN FOR INFO ONLY.

PUMPOUT TESTGROUND WATER LEVEL CONTOURS

(PREPUMPING STATIC LEVELS)AUGUST 7, 1979

(UFSAR FIGURE 2.4-38)

SERIGRAND GULF NUCLEAR STATION SITE

EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT

REV.FIGURE 2.4-40 0

Page 50: FIGURE 2.4-1 SITE SAFETY ANALYSIS REPORT EARLY SITE … · construction areas. legend: seri ... hydrographic details of the mississippi river at grand gulf seri ... cairo, illinois

NOTES:1. LOCATIONS OF MISSISSIPPI RIVER, HAMILTON & GIN LAKES ARE SHOWN IN FIGURE 2.4-33 (UFSAR FIGURE 2.4-27).

HYDROGRAPHS OF MISSISSIPPI RIVER,GIN LAKE, AND HAMILTON LAKE

(UFSAR FIGURE 2.4-33)

SERIGRAND GULF NUCLEAR STATION SITE

EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT

REV.FIGURE 2.4-41 0

Page 51: FIGURE 2.4-1 SITE SAFETY ANALYSIS REPORT EARLY SITE … · construction areas. legend: seri ... hydrographic details of the mississippi river at grand gulf seri ... cairo, illinois

SITE HYDROLOGIC FEATURESFLOOD CONDITIONS MAY 1973

(UFSAR FIGURE 2.4-34)

NOTES: 1. GRID COORDINATES SHOWN ARE BASED ON MISSISSIPPI COORDINATE SYSTEM, WEST ZONE. 2. DATUM FOR ELEVATIONS SHOWN IS MEAN SEA LEVEL. 3. GGNS UNIT 2 STRUCTURES ARE SHOWN FOR INFO ONLY.

PROPOSED NEW PLANT CONSTRUCTION AREAS.

SERIGRAND GULF NUCLEAR STATION SITE

EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT

REV.FIGURE 2.4-42 0

Page 52: FIGURE 2.4-1 SITE SAFETY ANALYSIS REPORT EARLY SITE … · construction areas. legend: seri ... hydrographic details of the mississippi river at grand gulf seri ... cairo, illinois

PLANT SITEWELL PLAN

(UFSAR FIGURE 2.4-35c)

SERIGRAND GULF NUCLEAR STATION SITE

EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT

REV.FIGURE 2.4-43 0

Page 53: FIGURE 2.4-1 SITE SAFETY ANALYSIS REPORT EARLY SITE … · construction areas. legend: seri ... hydrographic details of the mississippi river at grand gulf seri ... cairo, illinois

HYDROGRAPHS OF CONSTRUCTION OBSERVATION WELLS

(UFSAR FIGURE 2.4-36, SH.1)

SERIGRAND GULF NUCLEAR STATION SITE

EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT

REV.FIGURE 2.4-44 SHEET 1 OF 5 0

Page 54: FIGURE 2.4-1 SITE SAFETY ANALYSIS REPORT EARLY SITE … · construction areas. legend: seri ... hydrographic details of the mississippi river at grand gulf seri ... cairo, illinois

HYDROGRAPHS OF CONSTRUCTION OBSERVATION WELLS

(UFSAR FIGURE 2.4-36, SH.2)

SERIGRAND GULF NUCLEAR STATION SITE

EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT

REV.FIGURE 2.4-44 SHEET 2 OF 5 0

Page 55: FIGURE 2.4-1 SITE SAFETY ANALYSIS REPORT EARLY SITE … · construction areas. legend: seri ... hydrographic details of the mississippi river at grand gulf seri ... cairo, illinois

HYDROGRAPHS OF CONSTRUCTION OBSERVATION WELLS

(UFSAR FIGURE 2.4-36, SH.3)

SERIGRAND GULF NUCLEAR STATION SITE

EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT

REV.FIGURE 2.4-44 SHEET 3 OF 5 0

Page 56: FIGURE 2.4-1 SITE SAFETY ANALYSIS REPORT EARLY SITE … · construction areas. legend: seri ... hydrographic details of the mississippi river at grand gulf seri ... cairo, illinois

HYDROGRAPHS OF CONSTRUCTION OBSERVATION WELLS

(UFSAR FIGURE 2.4-36, SH.4)

SERIGRAND GULF NUCLEAR STATION SITE

EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT

REV.FIGURE 2.4-44 SHEET 4 OF 5 0

Page 57: FIGURE 2.4-1 SITE SAFETY ANALYSIS REPORT EARLY SITE … · construction areas. legend: seri ... hydrographic details of the mississippi river at grand gulf seri ... cairo, illinois

HYDROGRAPHS OF CONSTRUCTION OBSERVATION WELLS

(UFSAR FIGURE 2.4-36, SH.5)

SERIGRAND GULF NUCLEAR STATION SITE

EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT

REV.FIGURE 2.4-44 SHEET 5 OF 5 0

Page 58: FIGURE 2.4-1 SITE SAFETY ANALYSIS REPORT EARLY SITE … · construction areas. legend: seri ... hydrographic details of the mississippi river at grand gulf seri ... cairo, illinois

NOTES:1. OBSERVATION WELLS MW-1 AND MW-2 WERE DRY FROM SEPT., 1976 TO JAN., 1979.2. OBSERVATION WELL LOCATIONS SHOWN ON FIGURE 2.4-43 (UFSAR FIGURE 2.4-35c).3. TEMPORARY SITE DRAINAGE CAUSES RECHARGE INTO FILL NEAR MW-4. AREA TO BE REGRADED NEAR MW-4 FEB., 1979.

HYDROGRAPHS OF REPLACEMENT OBSERVATION WELLS

MW-3 AND MW-4(UFSAR FIGURE 2.4-36a, SH.1)

SERIGRAND GULF NUCLEAR STATION SITE

EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT

REV.FIGURE 2.4-45 SHEET 1 OF 2 0

Page 59: FIGURE 2.4-1 SITE SAFETY ANALYSIS REPORT EARLY SITE … · construction areas. legend: seri ... hydrographic details of the mississippi river at grand gulf seri ... cairo, illinois

NOTES:1. OBSERVATION WELL LOCATIONS SHOWN ON FIGURE 2.4-43 (UFSAR FIGURE 2.4-35c).

HYDROGRAPHS OF REPLACEMENT OBSERVATION WELLS

MW-5 AND MW-6(UFSAR FIGURE 2.4-36a, SH.2)

SERIGRAND GULF NUCLEAR STATION SITE

EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT

REV.FIGURE 2.4-45 SHEET 2 OF 2 0

Page 60: FIGURE 2.4-1 SITE SAFETY ANALYSIS REPORT EARLY SITE … · construction areas. legend: seri ... hydrographic details of the mississippi river at grand gulf seri ... cairo, illinois

NOTES: 1. GRID COORDINATES SHOWN ARE BASED ON MISSISSIPPI COORDINATE SYSTEM, WEST ZONE. 2. DATUM FOR ELEVATIONS SHOWN IS MEAN SEA LEVEL EL. 0.0. 3. GGNS UNIT 2 STRUCTURES ARE SHOWN FOR INFO ONLY.

PUMPOUT TESTGROUND WATER LEVEL CONTOURS

NOVEMBER 6 , 1979(UFSAR FIGURE 2.4-39)

SERIGRAND GULF NUCLEAR STATION SITE

EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT

REV.FIGURE 2.4-46 0

Page 61: FIGURE 2.4-1 SITE SAFETY ANALYSIS REPORT EARLY SITE … · construction areas. legend: seri ... hydrographic details of the mississippi river at grand gulf seri ... cairo, illinois

NOTES: 1. GRID COORDINATES SHOWN ARE BASED ON MISSISSIPPI COORDINATE SYSTEM, WEST ZONE. 2. DATUM FOR ELEVATIONS SHOWN IS MEAN SEA LEVEL EL. 0.0. 3. GGNS UNIT 2 STRUCTURES ARE SHOWN FOR INFO ONLY.

PUMPOUT TESTGROUND WATER LEVEL CONTOURS

(HIGH RIVER LEVEL)DECEMBER 10 , 1979

(UFSAR FIGURE 2.4-40)

SERIGRAND GULF NUCLEAR STATION SITE

EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT

REV.FIGURE 2.4-47 0

Page 62: FIGURE 2.4-1 SITE SAFETY ANALYSIS REPORT EARLY SITE … · construction areas. legend: seri ... hydrographic details of the mississippi river at grand gulf seri ... cairo, illinois

HYDROGRAPHS OF MISSISSIPPIRIVER WELLS 3 AND 5DURING PUMP TEST

(UFSAR FIGURE 2.4-41)

SERIGRAND GULF NUCLEAR STATION SITE

EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT

REV.FIGURE 2.4-48 0

Page 63: FIGURE 2.4-1 SITE SAFETY ANALYSIS REPORT EARLY SITE … · construction areas. legend: seri ... hydrographic details of the mississippi river at grand gulf seri ... cairo, illinois

NOTES: 1. GRID COORDINATES SHOWN ARE BASED ON MISSISSIPPI COORDINATE SYSTEM, WEST ZONE. 2. DATUM FOR ELEVATIONS SHOWN IS MEAN SEA LEVEL EL. 0.0. 3. GGNS UNIT 2 STRUCTURES ARE SHOWN FOR INFO ONLY.

PUMPOUT TESTGROUND WATER LEVEL CONTOURS

(LOW RIVER LEVEL)NOVEMBER 17, 1978

(UFSAR FIGURE 2.4-42)

SERIGRAND GULF NUCLEAR STATION SITE

EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT

REV.FIGURE 2.4-49 0

Page 64: FIGURE 2.4-1 SITE SAFETY ANALYSIS REPORT EARLY SITE … · construction areas. legend: seri ... hydrographic details of the mississippi river at grand gulf seri ... cairo, illinois

4. GGNS UNIT 2 STRUCTURES ARE SHOWN FOR INFO ONLY.

CALCULATED GROUNDWATER LEVEL CONTOURS

(LOW RIVER LEVEL)(UFSAR FIGURE 2.4-43)

SERIGRAND GULF NUCLEAR STATION SITE

EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT

REV.FIGURE 2.4-50 0

Page 65: FIGURE 2.4-1 SITE SAFETY ANALYSIS REPORT EARLY SITE … · construction areas. legend: seri ... hydrographic details of the mississippi river at grand gulf seri ... cairo, illinois

HYDROGRAPHS OF HAMILTON LAKEAND OBSERVATION WELLS

F-4 AND F-6 DURING PUMP TESTS(UFSAR FIGURE 2.4-45)

SERIGRAND GULF NUCLEAR STATION SITE

EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT

REV.FIGURE 2.4-51 0

Page 66: FIGURE 2.4-1 SITE SAFETY ANALYSIS REPORT EARLY SITE … · construction areas. legend: seri ... hydrographic details of the mississippi river at grand gulf seri ... cairo, illinois

AVERAGEPOST-CONSTRUCTION

GROUND WATER ELEVATIONS(UFSAR FIGURE 2.4-48)

SERIGRAND GULF NUCLEAR STATION SITE

EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT

REV.FIGURE 2.4-52 0

Page 67: FIGURE 2.4-1 SITE SAFETY ANALYSIS REPORT EARLY SITE … · construction areas. legend: seri ... hydrographic details of the mississippi river at grand gulf seri ... cairo, illinois

DW-8A WATER-LEVEL HYDROGRAPHAND 6-MONTH CUMULATIVE PRECIPITATION

1987-1991(UFSAR FIGURE 2.4-50)

SERIGRAND GULF NUCLEAR STATION SITE

EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT

REV.FIGURE 2.4-53 0

Page 68: FIGURE 2.4-1 SITE SAFETY ANALYSIS REPORT EARLY SITE … · construction areas. legend: seri ... hydrographic details of the mississippi river at grand gulf seri ... cairo, illinois

GGNS GROUNDWATER LEVEL AND RAINFALL HYDROGRAPHS - 2001

SERIGRAND GULF NUCLEAR STATION SITE

EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT

REV.FIGURE 2.4-54 0

Page 69: FIGURE 2.4-1 SITE SAFETY ANALYSIS REPORT EARLY SITE … · construction areas. legend: seri ... hydrographic details of the mississippi river at grand gulf seri ... cairo, illinois

CALCULATED GROUNDWATER LEVEL CONTOURS

(NORMAL RIVER LEVEL)(UFSAR FIGURE 2.4-44)

SERIGRAND GULF NUCLEAR STATION SITE

EARLY SITE PERMIT APPLICATIONSITE SAFETY ANALYSIS REPORT

REV.FIGURE 2.4-55 0