FINAL 2010 REGIONAL TRANSPORTATION
IMPROVEMENT PROGRAM
September 2010
401 B Street, Suite 800 • San Diego, CA 92101-4231 • (619) 699-1900
ii
BOARD OF DIRECTORS
The 18 cities and county government are SANDAG serving as the forum for regional decision-making. SANDAG builds consensus; plans, engineers, and builds public transit; makes strategic plans; obtains and allocates
resources; and provides information on a broad range of topics pertinent to the region’s quality of life.
CHAIR Hon. Lori Holt Pfeiler
FIRST VICE CHAIR Hon. Jerome Stocks
SECOND VICE CHAIR Hon. Jack Dale
EXECUTIVE DIRECTOR Gary L. Gallegos
CITY OF CARLSBAD Hon. Matt Hall, Councilmember (A) Hon. Bud Lewis, Mayor (A) Hon. Ann Kulchin, Mayor Pro Tem
CITY OF CHULA VISTA Hon. Cheryl Cox, Mayor (A) Hon. Rudy Ramirez, Deputy Mayor (A) Hon. Steve Castaneda, Councilmember
CITY OF CORONADO Hon. Carrie Downey, Councilmember (A) Hon. Al Ovrom, Mayor Pro Tem (A) Hon. Michael Woiwode, Councilmember
CITY OF DEL MAR Hon. Crystal Crawford, Councilmember (A) Hon. Carl Hillard, Councilmember (A) Hon. Mark Filanc, Councilmember
CITY OF EL CAJON Hon. Mark Lewis, Mayor (A) Hon. Jillian Hanson-Cox, Councilmember
CITY OF ENCINITAS Hon. Jerome Stocks, Councilmember (A) Hon. Teresa Barth, Councilmember (A) Hon. Dan Dalager, Mayor
CITY OF ESCONDIDO Hon. Lori Holt Pfeiler, Mayor (A) Hon. Sam Abed, Councilmember
CITY OF IMPERIAL BEACH Hon. Jim Janney, Mayor (A) Hon. Patricia McCoy, Mayor Pro Tem (A) Hon. Jim King, Councilmember
CITY OF LA MESA Hon. Art Madrid, Mayor (A) Hon. Mark Arapostathis, Councilmember (A) Hon. David Allan, Vice Mayor
CITY OF LEMON GROVE Hon. Mary Teresa Sessom, Mayor (A) Hon. Jerry Jones, Mayor Pro Tem (A) Hon. Jerry Selby, Councilmember
CITY OF NATIONAL CITY Hon. Ron Morrison, Mayor (A) Vacant (A) Hon. Rosalie Zarate, Councilmember
CITY OF OCEANSIDE Hon. Jim Wood, Mayor (A) Hon. Esther Sanchez, Councilmember (A) Hon. Charles “Chuck” Lowery, Councilmember
CITY OF POWAY Hon. Don Higginson, Mayor (A) Hon. Jim Cunningham, Councilmember (A) Hon. Carl Kruse, Deputy Mayor
CITY OF SAN DIEGO Hon. Jerry Sanders, Mayor (A) Hon. Anthony Young, Councilmember (A) Hon. Sherri Lightner, Councilmember Hon. Ben Hueso, Council President (A) Hon. Marti Emerald, Councilmember (A) Hon. Todd Gloria, Councilmember
CITY OF SAN MARCOS Hon. Jim Desmond, Mayor (A) Hon. Hal Martin, Vice Mayor (A) Hon. Rebecca Jones, Councilmember
CITY OF SANTEE Hon. Jack Dale, Councilmember (A) Hon. Hal Ryan, Councilmember (A) Hon. John Minto, Councilmember
CITY OF SOLANA BEACH Hon. Lesa Heebner, Deputy Mayor (A) Hon. Dave Roberts, Councilmember (A) Hon. Mike Nichols, Councilmember
CITY OF VISTA Hon. Judy Ritter, Mayor Pro Tem (A) Hon. Bob Campbell, Councilmember (A) Hon. Steve Gronke, Councilmember
COUNTY OF SAN DIEGO Hon. Pam Slater-Price, Chairwoman (A) Hon. Greg Cox, Supervisor (A) Hon. Ron Roberts, Chair Pro Tem Hon. Bill Horn, Vice Chair (A) Hon. Dianne Jacob, Supervisor
ADVISORY MEMBERS IMPERIAL COUNTY Hon. Wally Leimgruber, District 5 Supervisor (A) Hon. David Ouzan, Councilmember
CALIFORNIA DEPARTMENT OF TRANSPORTATION Cindy McKim, Director (A) Laurie Berman, District 11 Director
METROPOLITAN TRANSIT SYSTEM Harry Mathis, Chairman (A) Hon. Ron Roberts (A) Hon. Jerry Selby
NORTH COUNTY TRANSIT DISTRICT Hon. Bob Campbell, Chairman (A) Hon. Carl Hilliard, Planning Committee Chair (A) Hon. Dave Roberts, Monitoring Committee Chair
U.S. DEPARTMENT OF DEFENSE CAPT Keith Hamilton, USN, CEC, Southwest Division Naval Facilities Engineering Command (A) CAPT James W. Wink, USN, CEC Southwest Division Naval Facilities Engineering Command
SAN DIEGO UNIFIED PORT DISTRICT Scott Peters, Commissioner (A) Stephen Padilla, Commissioner
SAN DIEGO COUNTY WATER AUTHORITY Mark Muir, Director (A) Howard Williams, Director (A) Gary Croucher, Director
SOUTHERN CALIFORNIA TRIBAL CHAIRMEN’S ASSOCIATION Hon. Edwin 'Thorpe' Romero, Barona Band of Mission Indians Hon. Allen Lawson, San Pasqual Band of Dieguieño Indians (A) Denis Turner, SCTCA Executive Director
MEXICO Hon. Remedios Gómez-Arnau Cónsul General of Mexico Hon. Martha E. Rosas, Deputy Cónsul General of Mexico
As of September 13, 2010
v
TABLE OF CONTENTS
Chapter 1 – EXECUTIVE SUMMARY Overview............................................................................................................................................. 3 Document Organization ...................................................................................................................... 3 Program Summary............................................................................................................................... 4 Consistency with the RTP .................................................................................................................... 4 Air Quality Conformity Determination ................................................................................................. 4 Financial Capacity Assessment............................................................................................................. 10 Public Participation .............................................................................................................................. 10 Status of Projects from the 2008 RTIP.................................................................................................. 11
Chapter 2 – RTIP DEVELOPMENT PROCESS
Federal Transportation Requirements .................................................................................................. 15 Air Quality Conformity ................................................................................................................... 16 Federal Funding Programs.............................................................................................................. 16 Federal Submittal Requirements ..................................................................................................... 17
State Transportation Requirements...................................................................................................... 17 State Transportation Improvement Program.............................................................................. 17 Proposition 1A Safe, Reliable High-Speed Passenger Train Bond Act
for the 21st Century ............................................................................................................. 20 Proposition 1B Highway Safety, Traffic Reduction, Air Quality, and
Port Security Bond Act for 2006 .......................................................................................... 20 State Submittal Requirements ........................................................................................................ 20
TransNet Requirements ....................................................................................................................... 21 RTIP Development Process for TransNet............................................................................................... 21
Public Participation......................................................................................................................... 21 RTIP Amendment Process .................................................................................................................... 22
Formal Amendments...................................................................................................................... 22 Administrative Modifications .......................................................................................................... 23 Grouped Project Listings (Lump Sums)............................................................................................ 23
Participation by Federal Agencies ........................................................................................................ 24 Chapter 3 – PROJECT LISTINGS
Caltrans Highway Projects ................................................................................................................... 27 Local Agency Projects .......................................................................................................................... 27 Transit Projects .................................................................................................................................... 28 Other Regional and Miscellaneous Projects.......................................................................................... 28 Federal Funding Requirements............................................................................................................. 28 Status of Prior RTIP Projects ................................................................................................................. 28 Consistency with the RTP .................................................................................................................... 29 Advance Construction ......................................................................................................................... 29 Toll Credit ........................................................................................................................................... 29
vi
Chapter 4 – FINANCIAL CAPACITY ANALYSIS Inflation Assumptions.......................................................................................................................... 163 Expenditures and Revenues Demonstration of Fiscal Constraint........................................................... 163 Innovative Financing............................................................................................................................ 167 Program Revenues............................................................................................................................... 167
Federal Revenues ........................................................................................................................... 167 State Revenues............................................................................................................................... 169 Local Revenues............................................................................................................................... 170 Other Transportation Program Revenues ........................................................................................ 170
TransNet Revenue Estimates ................................................................................................................ 171 Operations and Maintenance Costs..................................................................................................... 171
Transit Operating Costs.................................................................................................................. 171 Preventive Maintenance ................................................................................................................. 172 Highway Costs ............................................................................................................................... 173 Local Streets and Road Costs.......................................................................................................... 173
Chapter 5 – AIR QUALITY CONFORMITY ANALYSIS
Demonstration of Fiscal Constraint...................................................................................................... 177 Development of Transportation Control Measures............................................................................... 178 Air Quality Conformity Requirements .................................................................................................. 178 Quantitative Emissions Analysis ........................................................................................................... 180 Emissions Budget Analysis ................................................................................................................... 180 Conclusion .......................................................................................................................................... 182
APPENDICES
A. Public Participation ...................................................................................................................... 187 Public Participation/Involvement Policy, Board Policy No. 025 ................................................. 190
B. Projects Exempt from Air Quality Conformity Determination........................................................ 201 C. Regional Emissions Analysis and Modeling Procedures................................................................. 205 D. Expedited Project Selection Process.............................................................................................. 235
Technical Appendix 7, Transportation Evaluation Criteria and Rankings.................................. 236 E. Non-Carry Over Projects From 2008 RTIP ..................................................................................... 277 F. Regional Arterial System.............................................................................................................. 347 G. Public Comments/Responses ....................................................................................................... 359 H. Glossary of Terms and Acronyms................................................................................................. 365
vii
LIST OF TABLES
Chapter 1 – EXECUTIVE SUMMARY Table 1-1 2010 RTIP Program Summary, Summary of Major Projects by Mode ............................ 5
Table 1-2 2010 RTIP – San Diego Region, Transportation Tactics ................................................. 9
Chapter 3 – PROJECT LISTINGS
Table 3-1 2010 Regional Transportation Improvement Program, San Diego Region..................... 31
Chapter 4 – FINANCIAL CAPACITY ANALYSIS
Table 4-1a 2010 Regional Transportation Improvement Program (RTIP) – San Diego Region, Revenue..................................................................................................... 164
Table 4-1b 2010 Regional Transportation Improvement Program (RTIP) – San Diego Region, Programmed.............................................................................................. 165
Table 4-1c 2010 Regional Transportation Improvement Program (RTIP) – San Diego Region, Revenue vs. Programmed........................................................................... 166
Table 4-2 TransNet Revenue Forecast, FY 2011-2015 RTIP – San Diego Region .......................... 171
Table 4-3 Transit Operating Costs and Revenues Forecast ........................................................... 172
Chapter 5 –AIR QUALITY CONFORMITY ANALYSIS
Table 5-1 2010 RTIP – San Diego Region, Transportation Control Measure Projects..................... 181
Table 5-2 2010 RTIP and 2030 San Diego Regional Transportation Plan: Pathways to the Future (RTP), Air Quality Conformity Analysis for Eight-Hour Ozone.................. 182
Table 5-3 2010 RTIP and 2030 San Diego Regional Transportation Plan: Pathways to the Future (RTP), Air Quality Conformity Analysis for Carbon Monoxide ................. 182
Appendix C – REGIONAL EMISSIONS ANALYSIS AND MODELING PROCEDURES
Table C.1 San Diego Regional Population and Employment Forecast ........................................... 208
Table C.2 2030 and 2050 Regional Growth Forecast Comparison ............................................... 208
Table C.3 2010 RTIP and 2030 Revenue Constrained RTP Air Quality Conformity Analysis for Eight-Hour Ozone ................................................................................ 218
Table C.4 EMFAC 2007 Adjustment Factors ................................................................................ 218
Table C.5 2010 RTIP and 2030 Revenue Constrained RTP Air Quality Conformity Analysis for Carbon Monoxide................................................................................ 219
Table C.6 Exempt Projects ........................................................................................................... 220
Table C.7 Phased Highway Projects – 2030 Regional Transportation Plan Revenue Constrained Plan ...................................................................................... 225
Table C.8 Phased Transit Services – 2030 Regional Transportation Plan Revenue Constrained Plan ...................................................................................... 227
Table C.9 Phased Arterial Projects – 2030 Regional Transportation Plan Revenue Constrained Plan ...................................................................................... 228
viii
Appendix D – EXPEDITED PROJECT SELECTION PROCESS Table TA 7.1 Summary of Highway Project Evaluation Criteria..................................................... 238
Table TA 7.2 Highway Corridor Evaluation Criteria ...................................................................... 239
Table TA 7.3 Highway Corridor Evaluation Criteria Weighting..................................................... 242
Table TA 7.4 Highway Corridor Evaluation Ranking..................................................................... 243
Table TA 7.5 HOV Project Evaluation Criteria Summary ............................................................... 245
Table TA 7.6 HOV Connector Criteria.......................................................................................... 246
Table TA 7.7 HOV Connector Evaluation Criteria Weighting........................................................ 247
Table TA 7.8 HOV Connector Evaluation Ranking........................................................................ 248
Table TA 7.9 Freeway Connectors Study Evaluation Criteria ........................................................ 249
Table TA 7.10 Freeway-to-Freeway Connector Criteria .................................................................. 250
Table TA 7.11 Freeway Connectors Project Rankings..................................................................... 253
Table TA 7.12 Transit Services Evaluation Criteria .......................................................................... 254
Table TA 7.13 Detailed Scoring for Transit Project Criteria ............................................................. 255
Table TA 7.14 Transit Criteria Weighting....................................................................................... 258
Table TA 7.15 Transit Services Evaluation Ranking......................................................................... 259
Table TA 7.16 Regional Ranking Criteria for Transit Capital Replacement and Rehabilitation Projects Definitions ............................................................... 268
Table TA 7.17 Regional Ranking Criteria for Transit Capital Replacement and Rehabilitation Project.................................................................................. 270
Table TA 7.18 Regionally Funded Arterial System Projects ............................................................. 273
Appendix E – NON-CARRY OVER PROJECTS FROM 2008 RTIP
Table E-1 2008 Regional Transportation Improvement Program, San Diego Region ................................................................................................... 278
Appendix F – Regional Arterial System
Table TA 7.19 Regional Arterials by Jurisdiction............................................................................. 347
ix
LIST OF FIGURES
Chapter 1 - EXECUTIVE SUMMARY Figure 1-1 Map - 2010 RTIP, Major Transportation Projects ............................................................. 7
Chapter 2 – RTIP DEVELOPMENT PROCESS
Figure 2-1 State Transportation Fund Allocation Process ................................................................. 18 Chapter 3 – PROJECT LISTINGS
Figure 3-1 RTIP Project Users Guide................................................................................................. 30 Appendix C – REGIONAL EMISSIONS ANALYSIS AND MODELING PROCEDURES
Figure C.1 San Diego Regional Population, Jobs, and Housing Forecast ........................................... 207 Figure C.2 Map – Eastern San Diego County Attainment Areas for the
8-Hour Ozone NAAQS............................................................................................... 223
3
Chapter 1
EXECUTIVE SUMMARY
OVERVIEW
The 2010 Regional/Federal Transportation Improvement Program (R/FTIP) is a multi-billion dollar, five-year program of major highway, transit arterial, and non-motorized projects funded by federal, state, TransNet local sales tax, and other local and private funding covering the years FY 2010/11 to FY 2014/15. The 2010 RTIP, which includes the air quality emissions analysis for all regionally significant projects, requires approval by the Federal Highway Administration (FHWA) and the Federal Transit Administration (FTA).
The 2010 RTIP is a prioritized program designed to implement the region’s overall strategy for providing mobility and improving the efficiency and safety of the transportation system, while reducing transportation-related air pollution in support of efforts to attain federal and state air quality standards for the region. The 2010 RTIP also incrementally implements the Regional Transportation Plan (RTP), the long-range transportation plan for the San Diego region (approved by the SANDAG Board of Directors November 2007).
DOCUMENT ORGANIZATION
This document includes five chapters. This first chapter, the Executive Summary, provides an overview of the document. Chapter 2 describes the RTIP development process, including federal, state, and TransNet transportation programming requirements. Chapter 3 contains the detailed listings of projects. Chapter 4 provides the financial capacity analysis, and Chapter 5 describes the air quality conformity analysis.
Also included are a number of appendices: Appendix A describes the SANDAG public participation process. Appendix B lists the projects exempt from air quality conformity review. Appendix C includes the detailed air quality emissions analysis report. Appendix D outlines the Expedited Project Selection Process (EPSP) that allows SANDAG to move funding between the first quadrennial element in order to advance the implementation of certain projects (delay others) different than their programmed dates. Appendix E provides the status of all non-carryover projects from the 2008 RTIP. Appendix F provides the list of Regional Arterial System (RAS) projects within San Diego based upon the approved RTP. Appendix G includes a summary of public comments and SANDAG responses. Appendix H includes a glossary of acronyms and terms.
The 2010 RTIP can also be found on the SANDAG Web site at www.sandag.org\2010RTIP. This Web page is designed to provide background information as well as the latest updates to the program. The site is updated regularly to provide the latest information available.
4
PROGRAM SUMMARY
A summary of the major highway, transit, local street and road, and other projects is provided in Table 1-1. A map illustrating major transportation projects included in the 2010 RTIP is shown in Figure 1-1. The individual project listings have been developed in coordination with the California Department of Transportation (Caltrans), the San Diego Metropolitan Transit System (MTS), the North County Transit District (NCTD), local jurisdictions, other agencies, and various SANDAG stakeholders and working groups.
CONSISTENCY WITH THE RTP
On December 10, 2007, the FHWA and FTA issued a finding that the SANDAG 2030 Revenue Constrained RTP entitled, 2030 San Diego Regional Transportation Plan: Pathways for the Future (RTP), was in conformance with federal air quality and planning regulations. The 2010 RTIP is consistent with the 2030 Revenue Constrained RTP and, as a financially constrained document, it contains only those major transportation projects listed in the revenue constrained RTP.
AIR QUALITY CONFORMITY DETERMINATION
Federal metropolitan planning and air quality regulations prescribe the process for determining air quality conformity. These regulations require that the proposed RTIP: (1) provide for the timely implementation of transportation control measures (TCMs), (2) include a quantitative emissions analysis of projects programmed in the RTIP, including all regionally significant projects, and (3) be within the region’s emissions budgets (targets) included in the approved State Implementation Plan (SIP).
The 2010 RTIP programs substantial funds for the implementation of the four Transportation Tactics adopted in the 1991 Regional Air Quality Strategy (RAQS)/1982 SIP for air quality improvement. These Transportation Tactics also are included as TCMs in the 1982 SIP and have been fully implemented. The Transportation Tactics programmed for implementation are provided in Table 1-2 and total approximately $2.9 billion, or 29 percent of the total funds programmed. Included are $19.7 million for Ridesharing, $2.8 billion for Transit Improvements, $39.8 million for Bicycle Facilities and Programs, and $97.6 million for Traffic Flow Improvements. Based upon this analysis, the 2010 RTIP provides for the expeditious implementation of the four Transportation Tactics included in the 1991 RAQS.
A quantitative air quality emissions analysis was conducted for the years 2010, 2020, and 2030 revenue constrained transportation scenarios, as shown in Chapter 5. The results of these analyses were distributed to the San Diego Region Conformity Working Group (CWG) on June 1, 2010, and reviewed by the CWG at its meeting on June 9, 2010. The 2010 RTIP meets the conditions for determining conformity with the applicable SIPs for air quality. A detailed description of the regional emissions analysis and modeling procedures is included in Appendix C. Chapter 5 of this report summarizes the air quality conformity analysis for the 2010 RTIP.
Table 1-1
DESCRIPTION FEDERAL STATE TRANSNET TOTAL
Highway Projects
I-5 (HOV/Managed Lanes/Lomas Santa Fe) $48,474 $98,826 $78,304 $24,800 $250,404
I-15 (Managed Lanes including GARVEE Debt Service) $242,919 $892,863 $224,524 $18,262 $1,378,568
SR 52 (Extension/Auxiliary Lanes) $67,531 $291,769 $204,474 $1,000 $564,774
SR 76 (East and Middle) $99,853 $0 $229,603 $30,000 $359,456
I-805 (HOV/Managed Lanes/DAR at Carroll Canyon) $59,253 $0 $88,750 $180 $148,183
SR 905 (I-805 to Otay Mesa POE) $256,958 $187,673 $1,582 $0 $446,213
SR 78 $500 $18,463 $1,000 $28,900 $48,863
SR 11 $5,700 $88,001 $0 $626,420 $720,121
Toll Roads (SR 125/SR241) $136,702 $0 $22,596 $775,609 $934,907
Highway Bridge Program/Other State Administered Programs $143,947 $5,294 $0 $7,334 $156,575
State Highway Operations Protection Program (SHOPP) $0 $262,505 $0 $0 $262,505
Other Highway Projects $27,515 $157,028 $18,683 $115,316 $318,542
Subtotal Highway Projects $1,089,352 $2,002,422 $869,516 $1,627,821 $5,589,111
Transit Projects
Blue Line (including vehicle purchase) $71,228 $307,646 $68,977 $4,453 $452,304
Mid-Coast $15,159 $43,293 $578,088 $0 $636,540
I-15 BRT $24,920 $13,043 $73,245 $36 $111,244
Mid-City Rapid $22,749 $0 $21,778 $0 $44,527
Superloop $617 $0 $28,341 $0 $28,958
Southbay BRT $1,562 $0 $97,991 $355 $99,908
Other BRT $0 $0 $4,301 $0 $4,301
Coastal Corridor (LOSSAN) $23,538 $4,647 $7,819 $0 $36,004
Bus/Rail Infrastructure $179,415 $106,467 $41,918 $56,687 $384,488
Bus/Rail Intermodal Stations $12,026 $123,960 $15,460 $683 $152,129
Bus/Rail Vehicle Purchase $55,225 $7,700 $0 $13,403 $76,329
Other Bus/Rail (Operations/Planning) $315,790 $0 $229,448 $182,006 $727,243
Subtotal Transit Projects $722,229 $606,756 $1,167,365 $257,625 $2,753,975
Local Streets & Roads Projects
Highway Bridge Replacement/Rehabilitation $147,523 $0 $14,090 $18,503 $180,116
Regional Arterial System $17,928 $0 $128,907 $218,846 $365,681
Roadway Maintenance & Rehabilitation $0 $0 $107,371 $34,355 $141,726
Traffic Signal Projects $200 $0 $32,252 $1,900 $34,352
Other Local Street & Road $19,059 $0 $288,449 $169,899 $477,407
Subtotal Local Streets & Roads Projects $184,710 $0 $571,069 $443,503 $1,199,282
Other Projects
Bicycle/Pedestrian Projects $1,285 $5,903 $15,293 $17,296 $39,777
Miscellaneous* $12,043 $3,771 $404,520 $0 $420,334
Transportation Demand Management (TDM) $19,685 $0 $0 $0 $19,685
Transportation Enhancements (TE) $0 $5,867 $6,795 $280 $12,942
Transportation Management System/Intelligent Transportation System $22,411 $14,063 $22,959 $2,744 $62,177
Subtotal Other Projects $55,424 $29,604 $449,567 $20,320 $554,915
GRAND TOTAL $2,051,715 $2,638,782 $3,057,517 $2,349,269 $10,097,283*Includes SANDAG planning and the TransNet Environmental Mitigation Program
LOCAL/ PRIVATE
2010 RTIP Program SummarySummary of Major Projects by Mode (in $000s)
5
P A C I F I C O C E A N
P A C I F I C O C E A N
North CountyWest
North CountyEast
NorthCity
EastCounty
SouthCounty
Oceanside
Carlsbad
Encinitas
Del Mar
Solana Beach
Poway
SanDiego
Coronado
ImperialBeach
LemonGrove
LaMesa
Santee
ElCajon
Escondido
CampPendleton
County of San Diego
Vista
SanMarcos
ChulaVista
Tijuana, B.C.
UNITED STATES
MEXICO
NationalCity
76
1-D
905 115
125
54
805
805
8055
5
5
282
16394
67
52
52
15
56
78
78
78
76
67
8
8
15
125
125
94
15
75
2010 RTIP Major
TransportationProjects
Transit Projects
Highway Projects
0 3 6
0 4.83 9.6
MILES
KILOMETERS
CentralSeptember 2010
Project Descriptions
SR 76 Widening
Coastal Corridor (LOSSAN)
I-5 HOV/Managed Lanes
SR 78
I-15 HOV/Managed Lanes & BRT
Mid-Coast LRT Extension
SR 52
I-805 Managed Lanes
Blue Line Trolley Improvement
South Bay BRT
SR 11 New Freeway
ABCDEFGHIJK
San Diego Region
MAP AREA
A
B
C
I
F
E
G
H
K
J
D
Figure 1-1
7
9
Table 1-2 2010 RTIP – San Diego Region (in $000s)
Transportation Tactics
RIDESHARING
Transportation Demand Management (TDM) $19,685
Subtotal: $19,685
TRANSIT IMPROVEMENTS
Blue Line (including vehicle purchase) $452,304
Mid-Coast $636,540
I-15 Bus Rapid Transit (BRT) $111,244
Mid-City Rapid $44,527
Superloop $28,958
Southbay BRT $99,908
Other BRT $4,301
Coastal Corridor (LOSSAN) $36,004
Bus/Rail Infrastructure $384,488
Bus/Rail Intermodal Stations $152,129
Bus/Rail Vehicle Purchase $76,329
Other Bus/Rail (Operations/Planning) $727,243
Subtotal: $2,753,975
BICYCLE FACILITIES AND PROGRAMS
Bicycle/Pedestrian Projects $39,777
Subtotal: $39,777
TRAFFIC FLOW IMPROVEMENTS
Transportation Management System/Intelligent Transportation System $62,177
Traffic Management/Signal Projects $35,424
Subtotal: $97,601
Total Transportation Tactics in 2010 RTIP: $2,911,038
Total All Transportation Projects in 2010 RTIP: $10,097,283
Share of T-Tactics Projects in 2010 RTIP: 29%
10
FINANCIAL CAPACITY ASSESSMENT
Chapter 4 provides a financial capacity analysis of the major program areas. Based upon this analysis, the projects contained within the 2010 RTIP are reasonable when considering available funding sources.
For non-attainment and maintenance areas, the 2010 RTIP must be a revenue constrained document with programmed projects based upon committed funding for the first two fiscal years of the RTIP and/or reasonably available for the third fiscal year. Funding assumptions are generally based upon: (1) authorized or appropriated levels of federal and state funding from current legislation; (2) conservative projections of future federal and state funding based upon a continuation of current funding levels; (3) the most current revenue forecasts for the TransNet program; and (4) the planning and programming documents of the local transportation providers.
The projects programmed in the 2010 RTIP are expressed in future year dollars. That is, they have been escalated based upon anticipated inflation and other factors to the expected year of obligation or expenditure. Funding for the State Transportation Improvement Program (STIP) and State Highway Operations and Protection Program (SHOPP) are based upon the 2010 Fund Estimate (FE) adopted by the California Transportation Commission (CTC) on October 14, 2009. Based upon the Department of Finance, the FE assumes no escalation from the baseline budget from 2009-10 to 2010-11 and displays a 1.3 percent annual escalation for the State Operations expenditures for 2011-12 through 2014-15. For the major projects funded with the County Transportation Sales Tax, TransNet, the SANDAG rate takes into account the recent trend in low-bid construction environment and gradually increases over the five year period. The rate used for FY 2011 starts at (-1%) and gradually increases over the next five fiscal years. This rate is also consistent with the current update to the long range plan and the Plan of Finance.
PUBLIC PARTICIPATION
It is the policy of SANDAG to encourage public participation in the development of agency planning and programming activities. SANDAG has various working groups made up of stakeholders and other members of the public. The public is provided opportunities to participate at SANDAG Board and committee meetings, SANDAG public notices of document availability and public hearings, and through the SANDAG public communications program. Pursuant to 23 U.S.C. 134(i), the Draft RTIP was released for public review and comment on July 27, 2010, for 30 days, and a public hearing was held on September 3, 2010. Comments on the Draft RTIP, as well as speakers from the public hearing, are included in Appendix G.
Examples of public outreach efforts and ongoing participation include:
Independent Taxpayer Oversight Committee (ITOC): In conformance with the regional transportation sales tax TransNet Ordinance, a citizen advisory committee, the ITOC, was established, which oversees projects funded through the TransNet program. As the document through which SANDAG identifies TransNet projects, the RTIP is reviewed by the ITOC, and their comments on the TransNet Program of Projects are conveyed to the SANDAG Transportation Committee, and ultimately to the Board of Directors.
11
Tribes: In addition to sending out notices to local tribal governments regarding the development of the RTIP, SANDAG actively solicits participation from the 17 tribal governments, along with the Reservation Transportation Authority in San Diego County. SANDAG regularly hosts a tribal forum made up of elected officials from each of the tribes. SANDAG also held a workshop specifically to seek involvement in the regional planning and programming processes.
Public Workshops: SANDAG provided information for the RTIP seeking comments during a special workshop developed for the 2030 San Diego Regional Transportation Plan: Pathways for the Future (RTP). SANDAG is undergoing an extensive public workshop for the upcoming 2050 RTP, including seeking public input for the 2010 RTIP.
Expansion of Electronic Notifications: In addition to the current list of external industry professionals, SANDAG continually strives to expand the notifications to other citizen-involved working groups. SANDAG has established accounts on Facebook and Twitter to ensure maximum outreach.
Appendix A in the 2010 RTIP describes the SANDAG public participation process and includes a copy of the latest Public Participation Policy which contains the section specifically addressing the RTIP development and amendment process.
At its meeting on December 18, 2009, the SANDAG Board of Directors adopted an updated Public Participation Plan (PPP). The revised PPP reflects the SANDAG commitment to public participation and involvement to include all residents and stakeholders in the regional planning and decision-making process. The development of the PPP was a six-month collaborative process from June to December 2009 that included development, input, and feedback from the SANDAG Policy Advisory Committees, Regional Planning Stakeholders Working Group, community and business groups, residents, and other stakeholders.
The PPP was developed in accordance with guidelines established by the Federal Highway Administration for metropolitan transportation planning (23 CFR 450.316). It addresses Title VI, related nondiscrimination requirements, and reflects the principles of social equity and environmental justice. Included in the PPP are procedures, strategies, and outcomes associated with the ten requirements listed in 23 CFR 450.316. The PPP also fulfills various state and federal public involvement requirements and is available on the SANDAG Web site at www.sandag.org.
STATUS OF PROJECTS FROM THE 2008 RTIP
When no funding is programmed in the current cycle (e.g., FY 2011 to FY 2015), the project is considered complete for purposes of the RTIP, even though construction may still be ongoing. These projects are either complete, open to traffic, or are currently in construction. There were a number of regionally significant projects that fall under this category. The projects over $10 million are listed below.
• CAL78A Interstate 805 Southbound Auxiliary - $19.7 million: This project constructed two southbound auxiliary lanes from SR 54 to E Street in Chula Vista.
• CAL90 I-8 Auxiliary Lane - $28.8 million: This project constructed an eastbound auxiliary lane from Second Street to Greenfield Drive in El Cajon.
12
• CAL91 SR 15 Citracado to Valley Parkway - $25.2 million: This project constructed northbound and southbound auxiliary lanes from Citracado Parkway to Valley Parkway in Escondido.
• SAN41 Replace Santa Margarita Bridge - $42.7 million: This project replaced the Santa Margarita Bridge within the boundaries of Pendleton USMC Base near Oceanside and constructed double track from Stuart Mesa to Fallbrook.
• CNTY19 Valley Center North and South - $63.7 million: This project widened and reconstructed Valley Center Road from Escondido to Cole Grade Road.
• SNT02 Forester Creek Channelization - $25.5 million: This project constructed Olive Lane and Mission Gorge Road bridges over flood control channel in Santee.
There are projects included in the 2010 RTIP which may have opened to traffic. Unlike the projects listed above, these projects were carried over into the 2010 RTIP because funds continue to be programmed (for such purposes as landscaping). All other projects that did not carry over into the 2010 RTIP – as a result of project completion, delay, or deletion – are included in Appendix E.
15
Chapter 2
RTIP DEVELOPMENT PROCESS
This chapter discusses the federal, state, and TransNet programming requirements, and the process used by SANDAG to develop this update. It also describes the process for amendments during this cycle.
FEDERAL TRANSPORTATION REQUIREMENTS
SANDAG is designated by the U.S. Department of Transportation (DOT) and the U.S. Environmental Protection Agency (EPA) as the Metropolitan Planning Organization (MPO) for the San Diego region.
As the MPO, SANDAG must have a continuing, comprehensive, and coordinated transportation planning process in order to receive federal capital or operating funds. The planning process includes the development of (1) a long-range, minimum of 20-years transportation plan describing the policies, strategies, and transportation facility needs, and (2) a Federal Transportation Improvement Program (FTIP) covering at least a four-year period. As both the MPO and the Regional Transportation Planning Agency (RTPA), the SANDAG Regional Transportation Improvement Program (RTIP) is equivalent to the FTIP.
Consistent with these requirements, the SANDAG Board of Directors, in November 2007, adopted the 2030 Revenue Constrained RTP: Pathways for the Future, for which the FHWA and FTA issued a finding of conformity to the 2030 Revenue Constrained RTP on December 10, 2007. On January 22, 2010, the SANDAG Board adopted the 2008 RTIP Amendment No. 16 and its conformity finding, and conformity redetermination for the 2030 RTP. The U.S. DOT made a finding of conformity for the amendment on February 19, 2010. On July 23, 2010, the SANDAG Board adopted the 2008 RTIP Amendment No. 23 and its conformity finding, and conformity redetermination for the 2030 RTP. The U.S. DOT made a finding of conformity for Amendment No. 23 on July 29, 2010. The 2010 RTIP includes five years of project programming. Both the RTP and the RTIP documents fulfill federal requirements.
Federal and state regulations identify the development process and required content for the programming document. In general, the RTIP must include all major projects receiving certain categories of federal or state transportation funding which need federal approval, capacity increasing projects, and projects identified as regionally significant. The 2010 RTIP also includes the Program of Projects funded by TransNet, the local transportation sales tax program administered by SANDAG.
The 2010 RTIP indicates the region’s priorities for the implementation of transportation projects. It is required to include realistic estimates of project costs and anticipated program revenue. It also must be a financially constrained program. This means that funding must be available and committed to implement the projects listed in this document. As a result, all projects in the first two fiscal years must have dedicated funding, and projects in the out-years either must have a firm funding commitment or a reasonable strategy or expectation that funds will be available. In addition, all projects within the 2010 RTIP must be consistent with the RTP.
16
The U.S. Environmental Protection Agency (EPA) designated the San Diego air basin as non-attainment for the federal 8-Hour Ozone standard effective June 15, 2004. The U.S. EPA initially classified the air basin as a basic non-attainment area under Subpart 1 of the Clean Air Act and the maximum statutory date for the Eight-Hour Ozone Standard was set as June 15, 2009. However, EPA, in response to a court decision, on January 16, 2009, proposed that among other areas of the country, the San Diego basic non-attainment area will be reclassified as a Subpart 2 moderate non-attainment area, with a maximum statutory attainment date of June 15, 2010. Final EPA action on this proposed reclassification has not been taken.
Several areas that are tribal lands in eastern San Diego County were excluded from the non-attainment designation. In cooperation with the San Diego APCD and SANDAG, the California Air Resources Board (ARB) developed an Eight-Hour Ozone Attainment Plan, which was submitted to the U.S. EPA by June 15, 2007. The budgets in the 8-Hour Ozone Attainment Plan for San Diego County were found adequate for transportation conformity purposes by the U.S. EPA, effective June 9, 2008.
Air Quality Conformity
The 2010 RTIP must be evaluated for conformity with the State Implementation Plans (SIP) for air quality attainment. The SIP requires that the 2010 RTIP satisfy a number of specific tests to indicate the program will achieve certain air quality emissions reductions and requires the RTIP to implement agreed-upon transportation control measures (Transportation Tactics). Chapter 5 further describes the air quality conformity process.
Federal Funding Programs
Federal funds programmed are based upon the federal authorizing legislation, Safe, Accountable, Flexible, and Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU), which expired September 30, 2009; however, on March 18, 2010, the President signed H.R. 2847, the Hiring Incentives to Restore Employment (HIRE) Act, which included the Surface Transportation Extension Act of 2010. The bill extends the provisions set forth in SAFETEA-LU through December 31, 2010. Major federal programs included in the RTIP are listed below:
American Recovery and Reinvestment Act (ARRA)
Federal Railroad Administration Track 1 Intercity Rail and Transportation Investment Generating Economic Recovery (TIGER)
FHWA Transportation Enhancement (TE); Regional Surface Transportation Program (RSTP)
FTA Section 5307, 5309, 5311; Transit Investment for Greenhouse Gas Emissions Reduction (TIGGER)
Congestion Mitigation and Air Quality Program (CMAQ)
Federal Demonstration/High Priority Program (HPP)/Borders and Corridors Infrastructure Programs
Federal Lands Highway – Indian Reservation Roads (IRR)
Federal Transit Administration Sections 5307 (Urbanized Formula Grant), 5309 (Fixed Guideway Modification/New Start/Bus/Bus Discretionary Programs), 5310 (Capital Program), 5311 (Rural Transit) Programs, 5316 JARC (Jobs Access Reverse Commute), and 5317 (New Freedom)
Highway Bridge Program (HBP)
Highway Safety Improvement Program (HSIP)/High Risk Rural Roads Program (HRRR)/Hazard Elimination Safety (HES)/Safe Routes to Schools (SRTS)
Railroad/Highway Grade Crossing Program (Section 130 Rail)
17
Surface Transportation Program (STP)
Transportation, Community and Systems Preservation (TCSP)
Transportation Enhancement (TE) Program.
Federal funding for the STP and CMAQ programs is apportioned by the State to the San Diego region by formula. As the MPO, SANDAG is responsible for determining which projects receive funding under the San Diego region’s share of these two federal funding programs.
STP funds can be used for state highway, local street and road, transit, bicycle, traffic signal, and transportation demand management (TDM) projects. CMAQ funds can be used for most categories of transportation projects that improve air quality, such as alternative-fuel transit vehicles, TDM activities and high-occupancy vehicle (HOV) facilities as provided in federal law. CMAQ funds cannot be used for projects that increase the transportation system’s capacity for single-occupant vehicles (SOVs).
Federal Submittal Requirements
Upon adoption by SANDAG, the 2010 RTIP will be submitted to Caltrans for inclusion in the Federal State Transportation Improvement Program (FSTIP), which incorporates the Transportation Improvement Programs (TIPs) from other MPOs around the State. The 2010 RTIP also will be submitted to the FHWA, FTA, and EPA for federal approval of the air quality conformity determination. The FHWA and FTA approve the RTIP project programming as an element of the FSTIP.
EPA acts as a commenting agency to the FHWA and FTA in the RTIP air quality conformity process. The 2010 RTIP may be amended by SANDAG, as needed. However, any revisions that add or modify capacity-increasing, non-exempt projects require an air quality conformity determination. A listing of projects that are typically exempt from the air quality conformity determination is provided in Appendix B.
STATE TRANSPORTATION REQUIREMENTS
In addition to serving as the federal MPO, SANDAG is designated by the State of California as one of 26 Regional Transportation Planning Agencies (RTPA). RTPAs are responsible for implementing state laws regarding transportation planning and funding and to ensure coordinated planning efforts meeting both state and federal requirements. The 2010 RTIP is a document which meets both federal and state regulations and includes major projects receiving state transportation funds.
State Transportation Improvement Program
The State Transportation Improvement Program (STIP) adopted by the California Transportation Commission (CTC) in May 2010 is the State’s spending plan that includes, in addition to state funding sources, federal Transportation Enhancement (TE) program funds. Pursuant to SB 45, the STIP is comprised of the Regional Improvement Program (RIP) and the Interregional Improvement Program (IIP). The CTC develops the STIP Fund Estimate that includes the RIP “County Share” and IIP fund allocations. The program is updated every two years and currently covers a five-year period. STIP funded projects, like all other state and federally funded projects, must be listed in the RTIP in order for the sponsor agencies to access funding. The STIP consists of funds from the Transportation Investment Fund (TIF) as well as from the Public Transportation Account. As illustrated in Figure 2-1, various administrative, operations, and maintenance programs absorb 100 percent of the State Highway Account (SHA) funds. There are no longer any SHA remaining funds to distribute between the regional and statewide needs.
18
Figure 2-1 State Transportation Fund Allocation Process
STATE HIGHWAY ACCOUNT
(State and Federal Funds)
70% 30%
Non-STIP Projects
SHOPP:
Maintenance/Operations
Rehabilitation/Safety
Administration
Local Assistance
Support Engineering
Other
STIP Projects
Highways
Transit
Local Projects
Support/Engineering
75% 25%
Regional Improvement Program (RIP)
Interregional
Improvement Program (IIP)
40% 60% 60% 40%
North Counties
South Counties
Interregional Program
State
Discretionary Program
SANDAG Share
(Approximately 6.4% of total RIP)
19
Seventy-five percent of the STIP funds flow to the regions by formula whereby the regional planning agencies are charged with developing an expenditure plan for the funds. Eligible project types include improvements to state highways, local roads, public transit, intercity rail, pedestrian and bicycle facilities, grade separations, transportation system management, transportation demand management, soundwall projects, intermodal facilities, and safety. The regional share is further divided between northern (forty percent) and southern (sixty percent) areas of the State.
The remaining twenty-five percent of the funds flow through the IIP, which is a statewide competitive program administered by Caltrans. Sixty percent (of the twenty-five percent) is directed to projects that improve interregional transportation and forty percent is programmed at the discretion of the CTC, subject to the north/south ratio identified above. Eligible project types include intercity passenger rail, mass transit guideways, grade separations, and state highways.
As the RTPA for the San Diego region, SANDAG is responsible for nominating projects to receive the region’s share of regional STIP (STIP-RIP) funding (as discussed above). These projects in total must be constrained to the “County Share or target” funding amount specified in the STIP Fund Estimate published by the CTC. The California Department of Transportation (Caltrans) is responsible for nominating projects to be funded under the interregional STIP (STIP-IIP) statewide program. The CTC must approve the local projects proposed in the RIP and IIP by including them in the adopted STIP or an STIP amendment in order for these projects to receive funding.
State law requires the CTC to adopt the STIP Fund Estimate by April of every odd-numbered year; however, the 2010 STIP Fund Estimate was adopted by the CTC in October 2009 due to the delay in the passage of the state budget. The 2010 STIP does not include any new programming capacity apart from the federal (TE) funds, which have limited applicability. For SANDAG, the priority for STIP funded projects continues to be based upon the criteria approved by the SANDAG Transportation Committee at its October 21, 2005, meeting. These criteria include:
Complete projects currently programmed in the STIP
Place particular emphasis on programming and completing TransNet Early Action projects
Program projects at the earliest possible time they can be constructed or implemented
Maintain existing STIP funding levels as a minimum on existing programmed projects
Reflect the efforts by the region and Caltrans to complete some of these projects outside the STIP through other funding sources.
SANDAG is responsible for selecting the TE projects and submitting them to Caltrans for project eligibility. With the 2008 STIP, the TE funds were programmed for the Pilot Smart Growth Incentives Program for funds received through FY 2011. The region is in the process of prioritizing other projects for funds that are available through the 2010 STIP for approval. Final funding allocation rests with the CTC.
In addition, Caltrans develops the 2010 State Highway Operation and Protection Program (SHOPP) which is divided into six project groupings - bridge preservation, collision reduction, mandates, mobility, roadway preservation, and roadside preservation. Projects funded with STIP and SHOPP are programmed in the 2010 RTIP based upon the final CTC adoption. Under Senate Bill (SB) 45, RTPAs must submit the RIP projects and Caltrans must submit its IIP projects to the CTC by December 15 of each odd-numbered year. Due to the delay in the adoption of the Fund Estimate, CTC changed the due date to February 2009.
20
Proposition 1A Safe, Reliable High-Speed Passenger Train Bond Act for the 21st Century
In November 2008, voters approved the infrastructure bond program for capital improvements to intercity rail lines, commuter rail lines, and urban rail systems that provide direct connectivity to the high-speed train system and its facilities. The act authorized the CTC to allocate the proceeds anticipated to be $950 million. The CTC approved the list of projects to be funded under this program at its May 2010 meeting. For the San Diego region, $39.5 million were awarded to North County Transit District to implement the Positive Train Control project and $57.8 million to SANDAG to implement the Blue Line Corridor project. The funding is subject to legislative appropriation and the sale of bonds by the State. So far, no funds have been allocated.
Proposition 1B Highway Safety, Traffic Reduction, Air Quality, and Port Security Bond Act for 2006
In November 2006, voters approved the general obligation infrastructure bond that is expected to inject $19.9 billion to various existing and new transportation programs. The programs add money for various existing programs such as the STIP, the SHOPP, Local Streets and Roads, and State Transit Assistance. Programs to be funded with these bond proceeds include the Corridor Mobility Improvement Account (CMIA) for congestion relief; the Trade Corridor Improvement Fund (TCIF) for port infrastructure, goods movement, and security; a revived State and Local Partnership Program (SLPP); Transit Security Grant Program, Highway-Railroad Crossing Safety (HRCSA), Intercity Rail Improvement, Public Transportation Modernization, Improvement, and Service Enhancement Account (PTMISEA) and others. Some of the programs such as the SLPP require follow-up legislation that will help define the eligibility and administration policies and procedures. The San Diego region anticipates receiving approximately $1.4 billion from the various bond programs. Already, the CTC awarded $367 million in CMIA funds for the I-15 Managed Lanes (South) project, $6 million in HRCSA for the Harbor Drive Grade Separation Project, and $82 million in STIP funds sourced from the bonds for the SR 52 Extension to Santee project. An additional $82 million in CMIA were originally approved for the I-805 HOV lanes project between Carroll Canyon Road and the I-5 “Merge” projects. Of this amount, $56.7 million were replaced with federal stimulus funds. SANDAG has not yet identified the project in which this fund will be used. The CTC has also awarded $400 million for goods movement infrastructure improvements on border, rail, and port projects.
In FY 2001, the Governor of California initiated a new, one-time funding program, Traffic Congestion Relief Program (TCRP), in an effort to relieve congestion statewide. The CTC oversees the TCRP, which is included in the adopted Fund Estimate; however, the status of TCRP-funded projects remains uncertain as the State faces significant budget deficits and competing unmet needs. The 2010 RTIP reflects the TCRP funds in the year of anticipated allocation for the four remaining corridors (Pacific Surfliner, SR 94, SR 94/SR 125 Interchange, and I-5/Virginia Avenue Realignment).
State Submittal Requirements
The RTIP which includes all STIP funded projects and all other federal and locally funded projects must be submitted to Caltrans by October 1, 2010.
21
TRANSNET REQUIREMENTS
The 2010 RTIP includes the TransNet Program of Projects (POP). TransNet is the local ½ cent transportation sales tax funding program that was approved by San Diego voters in November 2004.
Serving as the San Diego County Regional Transportation Commission (RTC), SANDAG is required to approve a multi-year TransNet POP, consistent with the RTIP update schedule, which identifies all major transportation projects proposed to use the sales tax funds over the multi-year period. In order to receive TransNet revenue, transportation projects must be included in the approved RTIP/TransNet POP.
The TransNet program includes several subprograms. After deducting for administrative expenses (one percent), two percent for bicycle/pedestrian projects, and $250,000 (plus CPI) for the Independent Taxpayers Oversight Committee (ITOC), the remainder of the revenues is divided between Major Corridors, Local System Improvements, and Transit System Improvements. Under the Ordinance, the highway and transit major corridor projects were specified in the approved ballot measure. The schedule and funding of the major TransNet highway and transit projects are developed cooperatively by SANDAG, Caltrans, and the region’s transit operators.
The TransNet-funded bicycle projects are developed through SANDAG’s Bicycle-Pedestrian Working Group. The TransNet bicycle projects are programmed by SANDAG in conjunction with a separate process that also allocates the Transportation Development Act (TDA) Article 3 funds and shows as a lump sum project (SAN21) in Chapter 3. Regionally significant or federally funded bike projects are listed separately.
The San Diego region’s 18 cities and the County develop the TransNet program of local street and road projects. The local TransNet project listings (contained in Chapter 3) include those projects from each of the three priority areas identified in the TransNet ordinance – congestion relief, repair and rehabilitation, and improved safety. The projects within each jurisdiction must be approved by each city council or the County Board of Supervisors after holding a public hearing.
RTIP DEVELOPMENT PROCESS FOR TRANSNET
Designated as the region’s MPO and RTPA and as the RTC, SANDAG has the overall responsibility for developing the required RTIP document. In a memo dated January 26, 2010, SANDAG requested that project sponsors review and update the projects for submittal for inclusion into the 2010 RTIP. The individual project listings included in Chapter 3 have been submitted by the project sponsors and reviewed for compliance by SANDAG.
The 2010 RTIP has been prepared with input and cooperation from Caltrans, the cities and County, the region’s transit operators, and SANDAG’s Transportation Committee, as well as other technical and advisory working groups.
Public Participation
SANDAG has provided ample opportunity for community involvement and interagency consultation in the development of the 2010 RTIP, and the SANDAG public participation process provides additional opportunity for public review and comment on the draft document prior to its adoption. Opportunities for community involvement and interagency consultation on the transportation projects included in the 2010 RTIP have been
22
provided through public meetings of the various SANDAG committees and working groups that are responsible for the development and oversight of the projects. These committees include the Transportation Committee, Cities/County Transportation Advisory Committee (CTAC), Bicycle-Pedestrian Working Group, Stakeholders Working Group, and San Diego Region Conformity Working Group. In addition, SANDAG provided an overview of the RTIP process and requirements at the Tribal Transportation Working Group consisting of the 17 tribal governments along with the Reservation Transportation Authority at a Tribal Summit in July 2010. Also, SANDAG conducted five workshops throughout the county for the Regional Transportation Plan, which included information about the RTIP.
At its July 23, 2010, meeting, the SANDAG Board approved the distribution of the Draft 2010 RTIP for a 30 day public comment period. SANDAG received several comments. A public hearing on the Draft 2010 RTIP was held by the SANDAG Transportation Committee at its meeting on September 3, 2010. Public comments and SANDAG responses are included in Appendix G. The SANDAG Board at its meeting on September 24, 2010, adopted the 2010 RTIP. The final 2010 RTIP is also available at the RTIP Web page – www.sandag.org/2010RTIP.
RTIP AMENDMENT PROCESS
On occasion, circumstances may dictate changes to the current RTIP. Federal regulations allow changes, or amendments, if the procedures are consistent with federal requirements. SANDAG will consider such amendments when the circumstances prompting the amendments are compelling, and when the changes will not adversely affect air quality conformity or financial constraint of the Transportation Improvement Program. The proposed changes to projects also must be consistent with the rules of the particular funding program.
There are two types of amendments, formal and administrative modifications (described in detail below). SANDAG processes formal amendments generally on a quarterly basis and administrative modifications on an as-needed basis. Both the 2010 RTIP and any amendment requests during the 2010 RTIP cycle that involve the TransNet program must include the sponsor’s governing board/council approval.
Formal Amendments
Project requests that do not meet the Administrative Modification criteria require formal amendments. The conditions for formal amendments include, but are not limited to, the following:
Add a new federal or state funded project or delete an existing federal or state funded project;
Shift funds from beyond the first four years (FY 2015) to the quadrennial element (FY 2011 through FY 2014), or vice versa;
The request would affect air quality conformity or the timely implementation of TCMs;
The request would require additional air quality emissions analysis and/or a new finding of air quality conformity by adding a new capacity increasing (CI) project or deleting an existing CI project;
The request would impact the financial constraint of the RTIP;
The request would result in major changes in scope, design, and/or concept.
23
Formal amendments require an action by the SANDAG Transportation Committee (SANDAG Board if the amendment requires redetermination of air quality), Caltrans, FHWA, FTA, and EPA. Formal amendments will be processed generally on the quarterly basis. Due to the lengthy process involved in determining air quality conformity, amendment requests for regionally significant capacity increasing projects requiring new emissions analysis will be scheduled on an as-needed basis (not on any regular schedule).
Administrative Modifications
Administrative modifications require the approval of the SANDAG Transportation Committee and the State but do not require federal approval. Federal agencies will be notified of the amendments for informational purposes. The streamlined approach helps expedite the approval process. Project requests that fall within the following criteria can be administratively amended:
Revise a project description which does not change the scope of the project or is in conflict with the project environmental document and wherein the project does not affect air quality or the timely implementation of TCMs or impacts financial constraint;
Increase the funding amount up to 25 percent of the project cost or $5 million, whichever is less (there is no limit to funding reductions for exempt projects);
Change in funding source;
Change a project lead agency;
Split or combine individually listed projects as long as cost, schedule, and scope remain unchanged;
Change required information for grouped project (lump sum) listings; or
Add or delete projects from grouped project (lump sum) listings as long as the funding amount stays within the guidelines indicated above.
Grouped Project Listings (Lump Sums)
Grouped projects or lump sum line items are projects grouped under a specified work type (projects must be exempt from air quality conformity). The purpose is to provide flexibility where the individual implementation priorities are unclear. In cooperation with the MPOs around the State, Caltrans, FHWA and FTA, and based upon 40 CFR part 93.126 Exempt Tables 2 and 3, an agreed-upon list of grouped project listings was developed for use in the RTIP. Examples include:
Railroad crossing projects (non-capacity increasing)
Transportation Enhancement (TE)
Highway Safety Program
Highway Maintenance
Shoulder Improvements
Ride Sharing or Van-Pooling
Traffic Control Devices
Lighting Improvements
Bike and Pedestrian Facilities
Intersection Channelization
24
Interchange Reconfiguration
Emergency Repair Program
Transportation System Management
Seismic Retrofit
Minor Safety and Hazard Projects
Pavement Rehabilitation
Bridge Replacement and Retrofit.
For each grouped project listing in the RTIP, SANDAG maintains a list of projects that comprise the lump sum projects, which is available on the RTIP Web page at www.sandag.org/2010RTIP.
PARTICIPATION BY FEDERAL AGENCIES
This report was funded in part through grants from the Federal Highway Administration and Federal Transit Administration, U.S. Department of Transportation. The views and opinions of SANDAG expressed herein do not necessarily state or reflect those of the U.S. Department of Transportation.
27
Chapter 3
PROJECT LISTINGS
This chapter contains the individual project listings for those major highway, transit, local street and road, and non-motorized projects and programs proposed to use federal, state, TransNet, and other local funding. The listings are grouped by project sponsors in alphabetical order. The listings include descriptive material (i.e., type of work, termini length, etc.), the anticipated federal, state, and local revenue sources, and the fiscal year of proposed work (see Figure 3-1).
Federally funded discretionary projects are based upon listings from federal appropriations. Programming levels for formula programs such as Federal Transit Administration (FTA) Urbanized Area Formula, Fixed Guideway, Jobs Access, and New Freedom are based upon the UZA estimate as provided in the Federal Register. Caltrans provided the estimated revenues for the Regional Surface Transportation Program (RSTP) and Congestion Mitigation and Air Quality (CMAQ) programs. Also included are projects funded by the STIP, SHOPP, Proposition 1A, Proposition 1B, Traffic Congestion Relief Program (TCRP), the TransNet local sales tax program (including short- and long-term borrowings), other local funding, and private sources.
CALTRANS HIGHWAY PROJECTS
Caltrans is the project sponsor for most of the highway projects. Senate Bill 45 requires that projects in the STIP be programmed in six categories: (1) project development, (2) design, (3) construction engineering, (4) right-of-way capital, (5) right-of-way support, and (6) construction capital to allow CTC to monitor the projects by these phases. However, for purposes of the SANDAG RTIP, projects are shown by fiscal year and three phases: Preliminary Engineering, Right-of-Way, and Construction. This provides enough detailed information for regional programming purposes and meets federal requirements.
Several highway programs are identified in the Caltrans listing as grouped projects (lump sums). These state administered programs such as Highway Bridge Program (HBP), SHOPP programs, and Highway Safety Program (among others) are identified by Caltrans headquarters office and administered by the local Caltrans district offices. All grouped projects listed are exempt for purposes of air quality. The list of individual projects that make up the lump sum is available on the 2010 RTIP Web site at www.sandag.org/2010RTIP.
LOCAL AGENCY PROJECTS
The 18 cities and the County of San Diego are the project sponsors for the local agency projects included in this chapter. The local agency listings, organized alphabetically by jurisdiction and MPO ID number, generally consist of regional arterial, local street and road, bicycle, and traffic signal improvement projects. The local agency projects include those funded by federal, state, TransNet, and other local funding programs.
28
TRANSIT PROJECTS
Senate Bill 1703 consolidated the regional planning functions and major capital projects between SANDAG, the San Diego Metropolitan Transit System (MTS), and the North County Transit District (NCTD) effective July 2003. As a result, major regionally significant transit projects are being implemented by SANDAG with minor capital projects and operations continuing under NCTD and MTS. For all of these projects, costs and revenues are listed by fiscal year for each project phase or for the total project.
OTHER REGIONAL AND MISCELLANEOUS PROJECTS
SANDAG also is the project sponsor for other regional projects. The listing includes the Regional Transportation Demand Management (TDM) Program (one of the identified Transportation Tactics), the Freeway Service Patrol (FSP) Program, the I-15 Managed Lane Value Pricing Project, and Intelligent Transportation System (ITS) projects.
Other project listings are included for project sponsors not members of SANDAG that have transportation projects within the San Diego region. These include the Bureau of Indian Affairs, the Transportation Corridor Agencies, and other requesting agencies.
FEDERAL FUNDING REQUIREMENTS
The federal revenue sources shown in this chapter are identified either by specific federal fund category (e.g., RSTP, CMAQ) or by the STIP and SHOPP funding programs. The specific federal fund categories and federal eligibility for the specific projects funded under the STIP and SHOPP are determined by Caltrans as part of a statewide fund management activity.
The STIP and SHOPP projects listed in this chapter must include any required non-federal matching funds. In general, Caltrans provides the non-federal matching funds for STIP state highway projects, and local agencies provide the non-federal matching funds for local street and road projects.
In order to receive federal funding, projects listed in this chapter must provide a minimum non-federal local match, depending on type of federal funds. The federal participation rates range from 80 percent (FTA, High Priority, etc.) to 91.57 percent (Interstate Highway Maintenance).
Full 100 percent federal funding is applicable for projects such as traffic control signalization, pavement marking, carpooling and vanpooling, installation of traffic signs, traffic lights, guardrails, impact attenuators, concrete barrier end treatments, breakaway utility poles, and priority control system projects. Also approved for 100 percent federal funding are those projects funded with the American Recovery and Reinvestment Act (ARRA) funds.
STATUS OF PRIOR RTIP PROJECTS
Appendix E includes a list of projects from the previous RTIP that were not carried over into the RTIP. The status for each project is indicated in bold text. “Completed” indicates the project has opened to traffic or has begun construction and no money is programmed beyond FY 2010. ”Delayed” indicates that the project is ongoing but no new funding has been identified for the RTIP period or the agency has determined other
29
priority projects to fund and may be brought back. “Deleted” indicates that the agency has decided to no longer pursue the project. With this appendix, every project from the previous RTIP is accounted for and provides a complete picture of the projects’ status.
CONSISTENCY WITH THE RTP
In order to illustrate the level of consistency between the RTP and the RTIP and to provide additional information for each project, the individual project listing in the following pages provides the RTP page number for those regionally significant projects, the regional arterial system as identified in the RTP, the estimated total project cost, the Caltrans numbers, the federal earmark numbers, and TransNet-related identifiers. The TIP User Guide (Figure 3-1) points to the various sources of information provided for each project.
ADVANCE CONSTRUCTION
For some of the major projects, as well as projects funded with federal funds, agencies programmed future funds using Advanced Construction (AC). Using the AC fund source allows agencies to front local or state funds in order to fully fund a phase or to advance the project with the anticipation of a future reimbursement once the federal funds become available. In order to provide an accurate project cost, the AC funds are shown as a negative number in the future reimbursement years while the federal funds are shown as ‘Conversion.’
TOLL CREDIT
In May 2010, the FHWA approved the conditional use of toll credit as a match for federal funds and Caltrans transmitted initial guidance. In June 2010, guidance on the use of toll credit for FTA funds projects was released by Caltrans. Toll credits would act as a soft match to federal funds indicated in the RTIP as part of the project description. Although the use of toll credits does not add new funding, it does offer agencies the flexibility to use certain projects with 100 percent federal funds while other projects can be funded with 100 percent local funds. Due to the timing of the approval and guidance with respect to the development of the RTIP, only MTS and SANDAG have programmed the use of toll credit. SANDAG is in the process of outreach efforts to member agencies on providing information and soliciting input for use of toll credits. Additionally, the State is currently working with the FTA regarding the tracking mechanism for this new program.
30
Figure 3-1 RTIP Project Users Guide
MPO ID………………RTIP project number
RTIP # .......................for the 2010 adoption, this shows as Adoption: 10-00; for all amendments following, this will state the last amendment the project was approved (Ex. RTIP #: 10-01)
Title ..........................name of the project
Description ..............project information, including location, limits, and scope
EA No. ......................unique number assigned by Caltrans when Caltrans is either the lead agency or providing oversight
PPNO No. .................unique number assigned by Caltrans as the lead agency or for project oversight
RTP Page No. ...........in order to show consistency between the plan and the program, provides the RTP page number for reference – only applies to regionally significant projects
SANDAG ID..............SANDAG capital project or OWP number; provides reference to the SANDAG capital budget
Earmark No. ............federal legislative number
RAS...........................Regional Arterial System (Technical Appendix RTP page number)
RT .............................state route in which this project is located
Capacity Status .......indicates whether a project will increase system capacity (CI) or not (NCI); important for regional air quality determination
CR/Maint..................for local TransNet funded projects, identifies either congestion relief or maintenance
Est. Total Cost .........sometimes the total program is less than the estimated total project cost because the project continues beyond the RTIP cycle years; estimated total cost should always be consistent with the RTP
Exempt Category ....based upon 40 CFR part 93.126 Exempt Tables 2 and 3
Open to Traffic........all non-exempt projects will have an estimated date when the project will be available for public use; if project is exempt, the project will not have this information
Footnote…………….any additional information pertaining to the project
Table 3-1
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
CAL09
Caltrans
ADOPTION: 10-00
Project Description:
EA NO: 235800
PPNO: 0615, 0615A
RTP PG NO: A-5
SANDAG ID: 1200501, 1200504
From La Jolla Village Dr. to Harbor Dr. - construct High Occupancy Vehicle
(HOV)/Managed Lanes on I-5
Interstate 5 - HOV Managed Lanes
Exempt Category: Non-ExemptCapacity Status: CIRT:5
Est Total Cost: $139,782 Open to Traffic: Phase 1: Jul 2011 Phase 2: Jul 2016
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
CBI $500 $500 $500
IM $4,000 $4,000 $4,000
RSTP $29,121 $29,121 $29,121
STIP-RIP AC $50,000 $50,000 $50,000
STIP-RIP NHS $1,831 $1,831 $1,831
STIP-RIP State Cash $628 $628 $628
STP $2,000 $2,000 $2,000
TransNet - MC $28,283 $22,840 $579 $44,025 $7,677 $51,702
TOTAL $139,782 $66,363 $22,840 $579 $50,000 $7,677 $50,000 $82,105
MPO ID:
Project Title:
CAL09A ADOPTION: 10-00
Project Description:
EA NO: 2358U
PPNO: 0701
RTP PG NO: A-5
SANDAG ID: 1200502
From Via De La Valle to San Elijo Lagoon - construct interchange and High
Occupancy Vehicle (HOV) Lane
I-5 Lomas Santa Fe Interchange/HOV lanes
Exempt Category: Non-ExemptCapacity Status: CIRT:5
Est Total Cost: $55,408 Open to Traffic: Phase 1: Mar 2009
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Corridor Mobility Program $24,500 $24,500 $24,500
TCRP $6,000 $6,000 $6,000
TransNet - MC $19,955 $1,689 $1,574 $1,690 $2,518 $210 $22,180 $24,908
TOTAL $55,408 $50,455 $1,689 $1,574 $1,690 $210 $52,680 $2,518
MPO ID:
Project Title:
CAL09C ADOPTION: 10-00
Project Description:
EA NO: 2T040
PPNO: 0716
RTP PG NO: A-5, A22, A-39
SANDAG ID: 1280505
RAS (TA 9-5)
From Carroll Canyon Road to I- 5 - on I-805, construct Direct Access Ramps
(DARs) and HOV lanes to Carroll Canyon Road
I-805 Direct Access Ramp and HOV at Carroll Canyon
Exempt Category: Non-ExemptCapacity Status: CIRT:805
Est Total Cost: $86,743 Open to Traffic: Phase 1: Jun 2012
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Other Fed - ARRA-RSTP $51,817 $51,817 $51,817
TransNet - MC $16,928 $2,563 $2,430 $935 $935 $635 $15,625 $1,500 $7,301 $24,426
TOTAL $76,243 $68,745 $2,563 $2,430 $935 $935 $635 $1,500 $59,118 $15,625
Additional local contribution programmed in SD32*
Friday, September 17, 2010
31
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
CAL18
Caltrans
ADOPTION: 10-00
Project Description:
EA NO: 064811
PPNO: 0672
RTP PG NO: A-5
SANDAG ID: 1201502
EARMARK NO: 3783, CA707
From SR56 to Centre City Pkwy - construct managed lanes including 3 Direct
Access Ramps (DARs)
I-15 Managed Lanes (Middle)
Exempt Category: Non-ExemptCapacity Status: CIRT:15
Est Total Cost: $471,115 Open to Traffic: Phase 1: Sep 2008 Phase 2: Sep 2008 Phase 3: Mar 2009
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
CMAQ $35,586 $974 $34,612 $35,586
DEMO - Sec 115 $1,000 $1,000 $1,000
HPP $5,000 $5,000 $5,000
Local Funds $15,810 $15,810 $15,810
RSTP $57,153 $57,153 $57,153
SHOPP - State Cash $4,136 $4,136 $4,136
STIP-IIP NHS $36,032 $36,032 $36,032
STIP-IIP NHS GARVEE $49,250 $49,250 $49,250
STIP-IIP State Cash $4,668 $4,668 $4,668
STIP-RIP NHS $3,984 $3,984 $3,984
STIP-RIP NHS GARVEE $147,750 $147,750 $147,750
STIP-RIP State Cash $516 $516 $516
TCRP $64,300 $24,963 $9,337 $30,000 $64,300
TransNet - MC $14,504 $10,220 $10,220 $10,986 $984 $126 $44,820 $45,930
TransNet - MC AC $0
TOTAL $471,115 $439,689 $10,220 $10,220 $10,986 $10,437 $430,231 $30,447
MPO ID:
Project Title:
CAL18A ADOPTION: 10-00
Project Description:
EA NO: 081001
PPNO: 0672F
RTP PG NO: A-5
SANDAG ID: 1201503
From Clarence Lane to SR 78 - construct managed lanes
I-15 Managed Lanes-North Segment
Exempt Category: Non-ExemptCapacity Status: CIRT:15
Est Total Cost: $190,231 Open to Traffic: Phase 1: Dec 2011
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
CMAQ $64,803 $4,050 $5,432 $55,321 $64,803
RSTP $56,654 $1,505 $55,149 $56,654
STIP-RIP NHS $4,426 $4,426 $4,426
STIP-RIP State Cash $574 $574 $574
TransNet - MC $33,122 $12,653 $13,112 $4,372 $210 $305 $17,482 $704 $45,588 $63,774
TOTAL $190,231 $159,579 $12,653 $13,112 $4,372 $210 $305 $6,136 $156,058 $28,037
Friday, September 17, 2010
32
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
CAL18B
Caltrans
ADOPTION: 10-00
Project Description:
EA NO: 081501
PPNO: 0672G
RTP PG NO: A-5
SANDAG ID: 1201501, 1201506
From SR 163 to I-15/SR 56 Separation - construct managed lanes, south
segment including Direct Access Ramps: construct auxiliary lane along
northbound I-15 from Pomerado Rd. overcrossing to Carroll Canyon Rd.
overcrossing, construct transit center at Miramar College near Hillery Dr.
I-15 Managed Lanes- South Segment and Mira Mesa Transit Center
Exempt Category: Non-ExemptCapacity Status: CIRT:15
Est Total Cost: $442,324 Open to Traffic: Phase 1: Dec 2012
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
CMAQ $11,744 $11,744 $11,744
Corridor Mobility Program $286,482 $40,200 $326,682 $326,682
Local Funds $2,315 $2,315 $2,315
STIP-RIP NHS $8,853 $8,853 $8,853
STIP-RIP State Cash $1,147 $1,147 $1,147
TransNet - MC $43,875 $17,699 $15,861 $7,835 $4,970 $1,343 $41,009 $18,937 $31,637 $91,583
TOTAL $442,324 $354,416 $57,899 $15,861 $7,835 $4,970 $1,343 $18,937 $360,634 $62,753
MPO ID:
Project Title:
CAL26 ADOPTION: 10-00
Project Description:
EA NO: 010611
PPNO: 0260
RTP PG NO: A-5
SANDAG ID: 1205203
EARMARK NO: CA424/604, HPP
1134/2735
In San Diego, Santee and Lakeside, from SR 125 to Cuyamaca Street to SR 67 -
construct 4 lane freeway
State Route 52 Freeway (E&F)
Exempt Category: Non-ExemptCapacity Status: CIRT:52
Est Total Cost: $520,529 Open to Traffic: Phase 1: Dec 2010
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
DEMO $2,250 $2,250 $2,250
HPP $9,737 $278 $10,015 $10,015
RSTP $46,199 $7,839 $22,438 $31,600 $54,038
STIP-IIP NHS $3,010 $2,125 $885 $3,010
STIP-IIP State Cash $5,355 $4,732 $623 $5,355
STIP-RIP NHS $26,558 $5,848 $20,710 $26,558
STIP-RIP Prior NHS $16,375 $16,375 $16,375
STIP-RIP Prior State Cash $802 $802 $802
STIP-RIP State Cash $192,669 $11,140 $26,205 $155,324 $192,669
TCRP $45,000 $45,000 $45,000
TCSP $1,228 $1,228 $1,228
TransNet - H $44,340 $671 $43,669 $44,340
TransNet - MC $87,981 $4,558 $15,696 $9,054 $1,600 $14,781 $53,969 $50,139 $118,889
TOTAL $520,529 $481,504 $12,675 $15,696 $9,054 $1,600 $234,154 $247,078 $39,297
Friday, September 17, 2010
33
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
CAL26B
Caltrans
ADOPTION: 10-00
Project Description:
EA NO: 267300, 2T020X, 2T061X
PPNO: 0698, 0702, 0706B
RTP PG NO: A-5
SANDAG ID: 1205202
From SR 52/I-15 to Mast Blvd. Undercrossing (7.4/13.3) (Aux Lanes); from Mast
Blvd. Undercrossing to SR 52/SR 125 separation(13.3/14.9) (IW); and from west
of Santo Road Overcrossing to west of Oak Canyon Bridge (truck lanes) - in San
Diego, Phase 1: construct eastbound and westbound auxiliary lanes and truck
lanes; Phase 2: add one mixed flow lane in each direction, widen two structures
and install a ramp meter at Mission Gorge Road (PE only) and widen existing
roadway
SR 52 Auxiliary Lanes, Truck Lane and Inside Widening
Exempt Category: Non-ExemptCapacity Status: CIRT:52
Est Total Cost: $44,245 Open to Traffic: Phase 1: Dec 2010 Phase 2: Jun 2013
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $1,000 $1,000 $1,000
SHOPP - State Cash $2,000 $2,000 $2,000
TransNet - MC $34,287 $6,958 $4,292 $10 $36,943 $41,245
TOTAL $44,245 $37,287 $6,958 $10 $38,943 $5,292
MPO ID:
Project Title:
CAL29 ADOPTION: 10-00
Project Description:
EA NO: 08010
PPNO: 0759
RTP PG NO: A-6
SANDAG ID: 1207602
EARMARK NO: CA603/2719
From Melrose Dr. to So. Mission Rd. - in San Diego County in and near
Oceanside - widen from 2 to 4 lanes
SR 76 Middle
Exempt Category: Non-ExemptCapacity Status: CIRT:76
Est Total Cost: $171,359 Open to Traffic: Phase 1: Dec 2012
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
DEMO - TEA 21 $5,519 $5,519 $5,519
HPP $4,000 $4,000 $4,000
Other Fed - ARRA-RSTP $75,613 $75,613 $75,613
RSTP $6,285 $6,285 $6,285
STP $1,000 $1,000 $1,000
TransNet - MC $45,663 $9,409 $6,678 $3,740 $9,434 $37,362 $18,694 $65,490
TOTAL $157,907 $138,080 $9,409 $6,678 $3,740 $46,881 $94,307 $16,719
The state contributed $13M for environmental support outside of the STIP or RTIP*
Friday, September 17, 2010
34
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
CAL29B
Caltrans
ADOPTION: 10-00
Project Description:
EA NO: 25711
RTP PG NO: A-6
SANDAG ID: 1207606From Mission Rd. to I-15 - In and near Oceanside from Mission Rd to I-15, widen
from 2 to 4 lanes
SR 76 East
Exempt Category: Non-ExemptCapacity Status: CIRT:76
Est Total Cost: $201,549 Open to Traffic: Phase 1: Jul 2014
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $30,000 $30,000 $30,000
RSTP $7,436 $7,436 $7,436
TransNet - MC $7,776 $15,394 $38,596 $49,367 $37,834 $15,146 $14,102 $16,201 $133,810 $164,113
TOTAL $201,549 $15,212 $15,394 $38,596 $49,367 $67,834 $15,146 $16,201 $163,810 $21,538
MPO ID:
Project Title:
CAL31 ADOPTION: 10-00
Project Description:
EA NO: 00300
RTP PG NO: A-6From SR 905 to SR 54 - construct 4-lane facility and 6-lane freeway with
interchange and High Occupancy Vehicle (HOV) provisions
SR 125 (Toll, Gap, Connector)
Exempt Category: Non-ExemptCapacity Status: CIRT:125
Est Total Cost: $492,244 Open to Traffic: Phase 1: Sep 2008 Phase 2: Sep 2009 Phase 3: Jan 2012
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $332,946 $24,850 $40,075 $268,021 $332,946
RSTP $136,702 $44,116 $92,586 $136,702
TransNet - H $9,903 $12,693 $2,103 $20,493 $22,596
TOTAL $492,244 $479,551 $12,693 $86,294 $381,100 $24,850
Friday, September 17, 2010
35
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
CAL38
Caltrans
ADOPTION: 10-00
Project Description:
EA NO: 093160
PPNO: 0374K
RTP PG NO: A-6
SANDAG ID: 1390501
EARMARK NO: CA612, HPP 2813
From I-805 to Otay Mesa Port of Entry - construct 6-lane freeway (Phase 1)
SR-905 New Freeway
Exempt Category: Non-ExemptCapacity Status: CIRT:905
Est Total Cost: $426,013 Open to Traffic: Phase 1: Aug 2012
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
CBI $105,342 $105,342 $105,342
DEMO - Sec 115 $3,000 $3,000 $3,000
DEMO - TEA 21 $40,485 $40,485 $40,485
HPP $12,000 $600 $11,400 $12,000
Other Fed - ARRA-STP $73,931 $73,931 $73,931
STIP-IIP Interstate $100,666 $12,944 $28,087 $59,635 $100,666
STIP-IIP Prior NHS $6,406 $1,976 $4 $4,426 $6,406
STIP-IIP Prior State Cash $12,966 $7,000 $5,966 $12,966
STIP-IIP State Cash $23,296 $1,933 $9,176 $12,187 $23,296
STIP-RIP Interstate $20,974 $11,912 $9,062 $20,974
STP $1,000 $1,000 $1,000
STP - Sec 117 $1,000 $1,000 $1,000
TCRP $23,365 $23,365 $23,365
TransNet - Border $1,114 $225 $243 $1,582 $1,582
TOTAL $426,013 $425,545 $225 $243 $229,337 $172,223 $24,453
MPO ID:
Project Title:
CAL38A ADOPTION: 10-00
Project Description:
EA NO: 09183
PPNO: 0957
RTP PG NO: A-6In San Diego on SR 905 from I-805 to 0.9 mile east and on I-805 between SR 905
and Palm Ave. - improve interchange including widen connector, widen exit from
SR 905, widen entrance to I-805, and construct auxiliary lane on I-805
SR 905/I-805 Interchange
Exempt Category: Non-ExemptCapacity Status: CIRT:905
Est Total Cost: $20,200 Open to Traffic: Phase 1: Jul 2012
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Other Fed - FRA ARRA Tiger $20,200 $1,000 $200 $19,000 $20,200
TOTAL $20,200 $20,200 $200 $19,000 $1,000
Friday, September 17, 2010
36
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
CAL42
Caltrans
ADOPTION: 10-00
Project Description: Projects are consistent with 40 CFR Part 93.126 Exempt Table 2 categories -
repair damage caused by natural disasters, civil unrest, or terrorist acts; this
applies to damages that do not qulalify for Federal Emergency Relief funds or to
damages that qualify for federal Emergency Relief funds but extend beyond the
Federally declaired disaster period
Grouped Projects for Emergency Repair - SHOPP Emergency Response
Program
Exempt Category: Safety - Emergency Relief (23 U.S.C. 125)Capacity Status: NCI
Est Total Cost: $1,023
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
SHOPP (AC) $906 $140 $27 $738 $905
SHOPP - State Cash $117 $18 $4 $96 $118
TOTAL $1,023 $1,023 $31 $834 $158
MPO ID:
Project Title:
CAL44 ADOPTION: 10-00
Project Description: Countywide - projects are consistent with 40 CFR Part 93.126 Exempt Table 2
categories – widen narrow pavements or reconstructing bridges (no additional
travel lanes)
Highway Bridge Program
Exempt Category: Safety - Non capacity widening or bridge reconstructionCapacity Status: NCI
Est Total Cost: $145,446
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
HBP $48,519 $4,356 $675 $5,735 $11,259 $63,739 $134,285 $134,285
Local Bridge Seismic Retrofit Acct $3,599 $743 $21 $931 $5,294 $5,294
Local Funds $3,675 $297 $75 $4,192 $(2,372) $5,867 $5,867
Local Funds AC $2,000 $(2,000) $32,354 $(32,354)$0
TOTAL $145,446 $57,793 $2,653 $750 $43,024 $11,280 $29,944 $145,446
MPO ID:
Project Title:
CAL46A ADOPTION: 10-00
Project Description: Projects are consistent with 40 CFR Parts 93.126 and 93.127 Exempt Tables 2
and 3 categories -railroad/highway crossing, safer non-federal-aid system roads,
shoulder improvements, traffic control devices and operating assistance other
than signalization projects, intersection signalization projects at individual
intersections, pavement marking demonstration, truck climbing lanes outside the
urbanized area, lighting improvements, emergency truck pullovers
Grouped Projects for Safety Improvements - SHOPP Mobility Program
Exempt Category: Safety - Shoulder ImprovementsCapacity Status: NCI
Est Total Cost: $16,065
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
SHOPP (AC) $825 $10,247 $1,984 $1,746 $24 $11,287 $13,057
SHOPP - State Cash $107 $1,328 $1,574 $736 $5 $2,267 $3,008
TOTAL $16,065 $932 $11,575 $3,558 $29 $13,554 $2,482
Friday, September 17, 2010
37
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
CAL46B
Caltrans
ADOPTION: 10-00
Project Description: Projects are consistent with 40 CFR Parts 93.126 and 93.127 Exempt Tables 2
and 3 categories -railroad/highway crossing, safer non-federal-aid system roads,
shoulder improvements, traffic control devices and operating assistance other
than signalization projects, intersection signalization projects at individual
intersections, pavement marking demonstration, truck climbing lanes outside the
urbanized area, lighting improvements, emergency truck pullovers
Grouped Projects for Safety Improvements - SHOPP Collision Reduction Program
Exempt Category: Safety - Pavement marking demonstrationCapacity Status: NCI
Est Total Cost: $40,833
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
SHOPP - Collision Reduction - National Hwy System (AC) $4,218 $761 $10 $3,447 $4,218
SHOPP - State Cash $2,373 $1,417 $894 $640 $63 $3,981 $4,684
SHOPP CR-Surface Trans Prgm(AC) $18,316 $6,717 $6,897 $4,176 $475 $27,280 $31,931
TOTAL $40,833 $20,689 $12,352 $7,791 $548 $34,708 $5,577
MPO ID:
Project Title:
CAL46D ADOPTION: 10-00
Project Description: Projects are consistent with 40 CFR Part 93.126 Exempt Table 2 category -
widening narrow pavements or reconstructing bridges (no additional lanes)
Grouped Projects for Bridge Preservation
Exempt Category: Safety - Non capacity widening or bridge reconstructionCapacity Status: NCI
Est Total Cost: $9,820
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
SHOPP (AC) $2,518 $6,176 $2,049 $12 $6,634 $8,695
SHOPP - State Cash $326 $800 $265 $1 $859 $1,125
TOTAL $9,820 $2,844 $6,976 $13 $7,493 $2,314
MPO ID:
Project Title:
CAL46E ADOPTION: 10-00
Project Description: Projects are consistent with 40 CFR Part 93.126 Exempt Table 2 categories –
pavement resurfacing and/or rehabilitation, emergency relief (23 USC 125),
widening narrow pavements or reconstructing bridges (no additional travel lanes)
Grouped Projects for Pavement Resurfacing and/or Rehabilitation - SHOPP
Roadway Preservation Program
Exempt Category: Safety - Pavement resurfacing and/or rehabilitationCapacity Status: NCI
Est Total Cost: $130,912
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
SHOPP (AC) $63,172 $9,601 $43,123 $8,656 $817 $106,424 $115,897
SHOPP - State Cash $8,185 $1,244 $5,587 $1,121 $106 $13,788 $15,015
TOTAL $130,912 $71,357 $10,845 $48,710 $923 $120,212 $9,777
Friday, September 17, 2010
38
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
CAL46I
Caltrans
ADOPTION: 10-00
Project Description: Projects are consistent with 40 CFR Parts 93.126 and 93.127 Exempt Tables 2
and 3 categories -railroad/highway crossing, safer non-federal-aid system roads,
shoulder improvements, traffic control devices and operating assistance other
than signalization projects, intersection signalization projects at individual
intersections, pavement marking demonstration, truck climbing lanes outside the
urbanized area, lighting improvements, emergency truck pullovers
Group Projects for Safety Improvements - SHOPP Mandates Program
Exempt Category: Other - Plantings, landscaping, etcCapacity Status: NCI
Est Total Cost: $63,853
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
SHOPP (AC) $1,348 $736 $27,262 $27,183 $5,298 $259 $50,973 $56,530
SHOPP - State Cash $175 $95 $3,532 $3,522 $686 $33 $6,604 $7,323
TOTAL $63,853 $1,523 $831 $30,794 $30,705 $292 $57,577 $5,984
MPO ID:
Project Title:
CAL66 ADOPTION: 10-00
Project Description:
EA NO: 05631
PPNO: 0999
RTP PG NO: A-6; B-5
EARMARK NO: CA393/740
From Border of Mexico east of SR 905/Otay Mesa Border Crossing to future SR
125/905 junction - from Britannia Blvd. on SR 905 to the Border of Mexico east of
SR 905 / Otay Mesa Border Crossing - construction of 4-lane freeway
State Route 11
Exempt Category: Non-ExemptCapacity Status: CIRT:11
Est Total Cost: $720,121 Open to Traffic: Phase 1: Dec 2014
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
CBI $4,900 $4,900 $4,900
HPP $800 $800 $800
Local Funds $123,070 $503,350 $42,690 $80,380 $503,350 $626,420
STIP-IIP NHS $6,882 $6,882 $6,882
STIP-IIP Prior State Cash $5,200 $5,200 $5,200
STIP-IIP State Cash $919 $919 $919
Trade Corridor Program $75,000 $75,000 $75,000
TOTAL $720,121 $141,771 $578,350 $80,380 $578,350 $61,391
MPO ID:
Project Title:
CAL67 ADOPTION: 10-00
Project Description:
EA NO: 28710
PPNO: T0770
SANDAG ID: 1280508In San Diego on Route 94 between I-805 and Downtown for the South Bay Bus
Rapid Transit - environmental studies and future construction of High Occupancy
Vehicle (HOV) lanes; also includes environmental clearance for 2 HOV lanes in
the median of SR94 and direct connectors at the I-805/SR94 interchange
SR 94 Widening
Exempt Category: Other - Engineering studiesCapacity Status: NCIRT:94
Est Total Cost: $11,000
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TCRP $10,000 $10,000 $10,000
TransNet - MC $934 $33 $33 $1,000 $1,000
TOTAL $11,000 $10,934 $33 $33 $11,000
Friday, September 17, 2010
39
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
CAL68
Caltrans
ADOPTION: 10-00
Project Description:
EA NO: 14665
PPNO: 0356
RTP PG NO: A-6From SR 94 to SR125 - near La Mesa and Lemon Grove on SR 125 from
Mariposa St to SR 94 and on SR 94 from SR 125 to Bancroft Dr. Construct freeway
connector, replace and widen bridges
SR 94/125 Widening
Exempt Category: Non-ExemptCapacity Status: CIRT:94
Est Total Cost: $60,000 Open to Traffic: Phase 1: Jan 2018
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TCRP $6,196 $47,268 $6,536 $12,732 $47,268 $60,000
TOTAL $60,000 $6,196 $47,268 $6,536 $47,268 $12,732
MPO ID:
Project Title:
CAL71 ADOPTION: 10-00
Project Description:
EA NO: 07890K
EARMARK NO: 210 (2003), 275
(2005)In Carlsbad, on I-5 from Carlsbad Village Drive (formally Elm Street)
undercrossing to California Street overcrossing, on SR 78 from I-5/SR 78
separation to Jefferson Street overcrossing - modify interchange, future
construction of auxiliary lanes and direct connectors
I-5/SR 78
Exempt Category: Other - Engineering studiesCapacity Status: NCIRT:5
Est Total Cost: $1,000
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
STP $500 $500 $500
STP - Sec 117 $500 $500 $500
TOTAL $1,000 $500 $500 $1,000
MPO ID:
Project Title:
CAL73 ADOPTION: 10-00
Project Description: From Richmond to 6th - landscaping, lighting and fencing; rehabiiltate and
preservation of the architectual features
Balboa Park Historic Preservation
Exempt Category: Other - Transportation enhancement activitiesCapacity Status: NCI
Est Total Cost: $5,867
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
STIP-IIP STP TE $3,197 $73 $219 $1,705 $607 $27 $4,560 $5,194
STIP-IIP State Cash $414 $10 $28 $221 $78 $4 $591 $673
TOTAL $5,867 $3,611 $83 $247 $1,926 $31 $5,151 $685
Friday, September 17, 2010
40
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
CAL75
Caltrans
ADOPTION: 10-00
Project Description:
EA NO: 06500
PPNO: 0129P
RAS (TA 7-48)From Genesee Avenue to Sorrento Valley Overhead - in San Diego from Genesee
Ave. OC to Roselle St., realignment and widening of the existing Genesse Ave. SB
off-ramp to provide for a 2-lane exit configuration and additional left turn storage
I-5 Sorrento Valley Auxiliary Lane
Exempt Category: Non-ExemptCapacity Status: CIRT:5
Est Total Cost: $12,987 Open to Traffic: Phase 1: Jun 2015
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
SHOPP (AC) $11,497 $2,184 $443 $8,871 $11,498
SHOPP - State Cash $1,490 $283 $57 $1,149 $1,489
TOTAL $12,987 $12,987 $500 $10,020 $2,467
MPO ID:
Project Title:
CAL77 ADOPTION: 10-00
Project Description:
EA NO: 00270
EARMARK NO: CA643/3120On I-5 from 0.1 km south of junction with I-8 and on the right lanes through the
Sea World Drive interchange, On I-8 from I-8/I-5 separation to 0.6 km east of
Morena Blvd. undercrossing - construction of auxiliary lanes and widening of
connectors; toll credit of $290,000 will be used to match FY 2011 HPP funds for
the design phase. Transportation Development Credit of $290 will be used to
match FY11 federal funds for the preliminary engineering phase
I-5/I-8 Connector
Exempt Category: Non-ExemptCapacity Status: CIRT:5
Est Total Cost: $4,155 Open to Traffic: Phase 1: Apr 2014
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
HPP $1,160 $1,160 $1,160
IM $1,025 $1,025 $1,025
SHOPP - State Cash $1,970 $1,970 $1,970
TOTAL $4,155 $1,970 $2,185 $4,155
MPO ID:
Project Title:
CAL78B ADOPTION: 10-00
Project Description:
EA NO: 08163
PPNO: 0732
RTP PG NO: A-5; A-10
SANDAG ID: 1280503
On I-805 from the I-805/SR 52 to Sorrento Valley, on SR 52 at the I-805/SR 52
separation - Preliminary engineering for future construction of managed lanes;
design Phase 1 - one High Occupancy Vehicle (HOV) lane in each direction
including the south facing Direct Access Ramps at Carroll Canyon Rd
I-805 HOV/Managed Lanes - North
Exempt Category: Non-ExemptCapacity Status: CIRT:805
Est Total Cost: $25,924 Open to Traffic: Phase 1: Jan 2016
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
RSTP $1,775 $1,775 $1,775
TransNet - MC $7,649 $13,212 $3,288 $23,349 $800 $24,149
TOTAL $25,924 $9,424 $13,212 $3,288 $800 $25,124
Friday, September 17, 2010
41
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
CAL78C
Caltrans
ADOPTION: 10-00
Project Description:
EA NO: 08161
PPNO: 0730
RTP PG NO: G-2, F-6
SANDAG ID: 1280501/510
From Palomar Street to Landis Street - preliminary engineering for future
construction of managed lanes including design of 2 High Occupancy Vehicle
(HOV) lanes in the median of I-805 for the South Bay Rapid Transit project
including Direct Access Ramp (DAR) at Palomar Street
I-805 HOV/Managed Lanes - South
Exempt Category: Non-ExemptCapacity Status: CIRT:805
Est Total Cost: $46,016 Open to Traffic: Phase 1: Dec 2021
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $180 $180 $180
RSTP $4,113 $1,548 $5,661 $5,661
TransNet - MC $21,621 $16,856 $1,656 $40,133 $40,133
TransNet - Transit $42 $42 $42
TOTAL $46,016 $25,956 $18,404 $1,656 $46,016
MPO ID:
Project Title:
CAL104 ADOPTION: 10-00
Project Description: Projects are consistent with 40 CFR Parts 93.126 and 127 Exempt Tables 2 and 3
categories - railroad/highway crossing, safer non-federal-aid system roads,
shoulder improvements, traffic control devices and operating assistance other
than signalization projects, intersection signalization projects at individual
intersections, pavement marking demonstration, truck climbing lanes outside the
urbanized area, lighting improvements, emergency truck pullovers
Grouped Projects for Safety Improvements - Safe Routes to School (SRTS)
Program
Exempt Category: Safety - Lighting improvementsCapacity Status: NCI
Est Total Cost: $3,751
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $259 $100 $359 $359
Safe Routes to School (SR2S) $371 $450 $1,842 $730 $3,392 $3,392
TOTAL $3,751 $371 $709 $1,842 $830 $3,751
MPO ID:
Project Title:
CAL105 ADOPTION: 10-00
Project Description: Projects are consistent with 40 CFR Parts 93.126 and 93.127 Exempt Tables 2
and 3 categories - railroad/highway crossing, safer non-federal-aid system roads,
shoulder improvements, traffic control devices and operating assistance other
than signalization projects, intersection signalization projects at individual
intersections, pavement marking demonstration, truck climbing lanes outside the
urbanized area, lighting improvements, emergency truck pullovers
Grouped Projects for Highway Safety Improvement - HSIP Program
Exempt Category: Safety - Safety Improvement ProgramCapacity Status: NCI
Est Total Cost: $8,450
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
HSIP $443 $334 $3,705 $2,753 $7,235 $7,235
Local Funds $50 $860 $306 $1,215 $1,215
TOTAL $8,450 $443 $384 $4,565 $3,059 $8,450
Friday, September 17, 2010
42
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
CAL107
Caltrans
ADOPTION: 10-00
Project Description:
EA NO: 29321
RTP PG NO: B-5
SANDAG ID: 1300702
EARMARK NO: CA380/618
From 32nd Street to Harbor Drive - in San Diego, grade separation
32nd Street - Grade Separation
Exempt Category: Safety - Railroad/highway crossingCapacity Status: NCI
Est Total Cost: $118,460
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
HPP $800 $800 $800
Local Funds $3,600 $20,860 $42,535 $11,350 $13,110 $42,535 $66,995
Trade Corridor Program $50,665 $50,665 $50,665
TOTAL $118,460 $4,400 $20,860 $93,200 $13,110 $93,200 $12,150
MPO ID:
Project Title:
CAL110 ADOPTION: 10-00
Project Description:
EA NO: 29760
PPNO: 0859
SANDAG ID: 1300703
EARMARK NO: CA560/2340
I-5, Harbor Drive, and Civic Center Drive - in National City, at-grade improvements
and construct truck ramp linking I-5 to National City Marine Cargo terminal
At Civic Center Drive, Harbor Drive, and I-5
Exempt Category: Other - Intersection channelization projectsCapacity Status: NCI
Est Total Cost: $3,950
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
HPP $20 $20 $20
Local Funds $1,206 $1,574 $1,106 $100 $1,574 $2,780
Trade Corridor Program $1,150 $1,150 $1,150
TOTAL $3,950 $1,226 $2,724 $100 $2,724 $1,126
MPO ID:
Project Title:
CAL111 ADOPTION: 10-00
Project Description:
EA NO: 297700
RTP PG NO: B-5, B-1
SANDAG ID: 1300701
EARMARK NO: CA588/2618
10th Avenue and Harbor Drive from 10th Ave./Ceasar Chavez - Marine Terminal to
Harbor Drive - Port of San Diego Access Improvement and Truck Route to I-5 and
I-15
Grade Separation At 10th Ave Marine Terminal/Cesar Chavez Blvd.
Exempt Category: Safety - Railroad/highway crossingCapacity Status: NCI
Est Total Cost: $67,200
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
HPP $400 $400 $400
Local Funds $1,750 $12,750 $21,390 $5,510 $8,990 $21,390 $35,890
Trade Corridor Program $30,910 $30,910 $30,910
TOTAL $67,200 $2,150 $12,750 $52,300 $8,990 $52,300 $5,910
Friday, September 17, 2010
43
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
CAL115
Caltrans
ADOPTION: 10-00
Project Description:
EA NO: 29761
PPNO: 0855
SANDAG ID: 1300704
EARMARK NO: CA560/2340
Bay Marina/I-5 Intersection - in National City, at-grade intersection improvements,
construction of truck ramp linking I-5 to National City Marine Cargo terminal
Bay Marina Drive at I-5 At-Grade Improvements
Exempt Category: All Projects - Intersection channelization projectsCapacity Status: NCIRT:5
Est Total Cost: $3,290
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
HPP $535 $375 $1,470 $875 $35 $1,470 $2,380
Trade Corridor Program $910 $910 $910
TOTAL $3,290 $535 $375 $2,380 $35 $2,380 $875
MPO ID:
Project Title:
CAL116 ADOPTION: 10-00
Project Description:
EA NO: 29490
PPNO: 0743From Tecate International Border Crossing to Thing Road - in San Diego County -
improve pedestrian facilities
Tecate International Border Crossing, Pedestrian Facilities
Exempt Category: Air Quality - Bicycle and pedestrian facilitiesCapacity Status: NCI
Est Total Cost: $2,382
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
STIP-IIP STP TE $109 $311 $1,702 $411 $9 $1,702 $2,122
STIP-IIP State Cash $40 $220 $39 $1 $220 $260
TOTAL $2,382 $109 $351 $1,922 $10 $1,922 $450
MPO ID:
Project Title:
CAL117 ADOPTION: 10-00
Project Description:
EA NO: 26630
PPNO: 0962
From Otay Mesa IBC to Siempre Viva Road Overcrossing South - in San Ysidro,
on SR 905 from the Otay Mesa International Border Crossing into Mexico to
Siempre Viva Road Overcrossing South - improve pedestrian and bicycle
aesthetics, accessibility, and safety
Otay Port Of Entry Pedestrian/Bicycle Facilities - Paseo De La Amistad
International Border Crossing
Exempt Category: Air Quality - Bicycle and pedestrian facilitiesCapacity Status: NCI
Est Total Cost: $2,060
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
STIP-IIP STP TE $100 $208 $1,527 $295 $13 $1,527 $1,835
STIP-IIP State Cash $27 $198 $25 $2 $198 $225
TOTAL $2,060 $100 $235 $1,725 $15 $1,725 $320
Friday, September 17, 2010
44
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
CAL120
Caltrans
ADOPTION: 10-00
Project Description:
EA NO: 29310
RTP PG NO: A-5
SANDAG ID: 1201510From I-15 to Nordahl Road - cities of Escondido and San Marcos, widen
southbound I-15 to westbound SR78 ramp; construct westbound auxiliary lane on
SR78; widen westbound SR78 offramp to Nordahl Road
SR 78 Auxiliary Lanes
Exempt Category: Non-ExemptCapacity Status: CIRT:78
Est Total Cost: $8,963 Open to Traffic: Phase 1: Sep 2011
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
SHOPP - State Cash $200 $200 $200
SHOPP Augmentation - Mobility $7,763 $90 $7,673 $7,763
TransNet - MC $840 $134 $26 $1,000 $1,000
TOTAL $8,963 $840 $8,097 $26 $290 $7,673 $1,000
MPO ID:
Project Title:
CAL194 ADOPTION: 10-00
Project Description: Projects are consistent with 40 CFR Parts 93.126 and 93.127 Exempt Tables 2
and 3 categories -pavement resurfacing and/or rehabilitation - Project listing for
Pavement resurfacing and/or rehabilitation on the State Highway System -
Highway Maintenance
Grouped Projects for Pavement Resurfacing and/or Rehabilitation on the State
Highway System - Highway Maintenance Program
Exempt Category: Safety - Pavement resurfacing and/or rehabilitationCapacity Status: NCI
Est Total Cost: $13,422
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Highway Maintenance - NHS $9,738 $9,738 $9,738
Highway Maintenance - State Cash $3,684 $1,200 $22 $2,462 $3,684
TOTAL $13,422 $13,422 $22 $12,200 $1,200
MPO ID:
Project Title:
CAL213 ADOPTION: 10-00
Project Description: Projects are consistent with 40 CFR Part 93.126 Exempt Tables 2 and Table 3 -
railroad/highway crossing, safer non-federal-aid system roads, shoulder
improvements, traffic control devices and operating assistance other than
signalization projects, intersection signalization projects at individual
intersections, pavement marking demonstration, truck climbing lanes outside the
urbanized area, lighting improvements, emergency truck pullovers
Grouped Projects for the State Minor Program
Exempt Category: Safety - Pavement resurfacing and/or rehabilitationCapacity Status: NCI
Est Total Cost: $5,402
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Minor Program $4,782 $1,830 $2,952 $4,782
Minor Program - St Cash $620 $237 $383 $620
TOTAL $5,402 $5,402 $3,335 $2,067
Friday, September 17, 2010
45
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
CB04A
Carlsbad, City of
ADOPTION: 10-00
Project Description:
RAS (TA 7-43)
TransNet - LSI: CREl Camino Real from Tamarack Ave. to Chestnut Ave. - in Carlsbad, widen El
Camino Real to prime arterial standards with three travel lanes, bike lanes and
sidewalks in each direction including intersection improvements at Tamarack
Avenue and Chestnut Avenue
El Camino Real Widening - Tamarack Avenue to Chestnut Avenue
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $12,349 Open to Traffic: Phase 1: Jun 2012
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $8,001 $1,225 $60 $6,716 $8,001
Local RTCIP $422 $422 $422
TransNet - LSI Carry Over $3,926 $3,926 $3,926
TOTAL $12,349 $8,423 $3,926 $60 $11,064 $1,225
MPO ID:
Project Title:
CB04B ADOPTION: 10-00
Project Description:
RAS (TA 7-43)
El Camino Real and Cannon Road - in Carlsbad, along the eastside of El
Camino Real just south of Cannon Road widen to prime arterial standards with
three through lanes, a right turn lane and a sidewalk approaching the intersection
El Camino Real and Cannon Road
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $589 Open to Traffic: Phase 1: Dec 2014
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $589 $85 $504 $589
TOTAL $589 $589 $504 $85
MPO ID:
Project Title:
CB04C ADOPTION: 10-00
Project Description:
RAS (TA 7-43)
TransNet - LSI: CREl Camino Real from Lisa Street to Crestview Drive - in Carlsbad, along the west
side of El Camino Real, roadway widening to provide three southbound through
lanes, curb, gutter and sidewalk per Prime Arterial standards
El Camino Real - Lisa Street to Crestview Drive
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $2,125 Open to Traffic: Phase 1: Jun 2013
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - LSI $1,955 $1,955 $1,955
TransNet - LSI Carry Over $170 $170 $170
TOTAL $2,125 $170 $1,955 $1,955 $170
Friday, September 17, 2010
46
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
CB13
Carlsbad, City of
ADOPTION: 10-00
Project Description:
EARMARK NO: CA366, CA517
RAS (TA 7-43)Poinsettia Lane from Cassia Drive to Skimmer Court - in Carlsbad, from Cassia
Drive to Skimmer Court, construct a new 4-lane roadway with median, bike lanes,
and sidewalks/trails to major arterial standards
Poinsettia Lane Reach E
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $13,450 Open to Traffic: Phase 1: Jun 2014
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
HPP $1,436 $1,436 $1,436
Local Funds $1,260 $10,754 $1,260 $1,900 $8,854 $12,014
TOTAL $13,450 $1,260 $12,190 $1,900 $10,290 $1,260
MPO ID:
Project Title:
CB17 ADOPTION: 10-00
Project Description:
RTP PG NO: A-6
RAS (TA 7-43)Carlsbad Blvd. from Encina Power Plant to Warm water outfall channel - in
Carlsbad, on the Carlsbad Blvd bridge over the Encina Power Plant warm water
discharge, upgrade bridge railings on the bridge, (local match to HBP, part of
CAL44)
Carlsbad Blvd. Bridge over Encina Power Station
Exempt Category: Safety - Guardrails, median barriers, crash cushionsCapacity Status: NCI
Est Total Cost: $158
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - L (Cash) $8 $150 $57 $101 $158
TOTAL $158 $8 $150 $101 $57
MPO ID:
Project Title:
CB18 ADOPTION: 10-00
Project Description:
RTP PG NO: A-6
RAS (TA 7-43)Carlsbad Blvd. from Mountain View to State - in Carlsbad 0.6 miles NW of
Carlsbad Village Drive, upgrade the bridge railings on the Carlsbad Blvd. Bridge
over the San Diego Northern Railway (SDNR) railroad (local match to HBP, part of
CAL44)
Carlsbad Blvd. Bridge over SDNR Railroad
Exempt Category: Safety - Guardrails, median barriers, crash cushionsCapacity Status: NCI
Est Total Cost: $44
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - L (Cash) $12 $32 $44 $44
TOTAL $44 $12 $32 $44
Friday, September 17, 2010
47
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
CB20
Carlsbad, City of
ADOPTION: 10-00
Project Description: TransNet - LSI: CRStreet locations by year as follows: FY10/11 roadways - Palomar Airport Road,
College Blvd., Cannon Blvd., Faraday Ave., Paseo del Norte, Carslbad Blvd., FY
11/12 roadways - La Costa Ave., Calle Barcelona, El Camino Real, Levante Street,
Rancho Santa Fe, Los Coches and FY 12/13 roadways - Carlsbad Blvd., Carlsbad
Village Drive, Grand Avenue, Jefferson Street, State Street, Chestnut Avenue,
Basswood Ave., Las Flores, and Kelly Dr., FY 13/14 roadways - Avenida Encinas,
Paseo Del Norte, Poinsettia, El Camino Real, Alicante, and El Fuerte, FY 14/15
roadways - El Camino Real, Faraday Avenue, El Fuerte, Palmer Wary, Melrose
Drive, Palomar Airport Road, Cannon Road and College Blvd. - in Carlsbad,
pavement overlay and roadway repairs; to be implemented in a series of zones
throughout the city
Pavement Management - Overlay
Exempt Category: Safety - Pavement resurfacing and/or rehabilitationCapacity Status: NCI
Est Total Cost: $22,620
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $3,715 $2,120 $1,260 $1,310 $1,370 $1,625 $11,400 $11,400
TransNet - L (Cash) $946 $946 $946
TransNet - LSI $1,990 $2,030 $1,875 $5,895 $5,895
TransNet - LSI Carry Over $329 $1,940 $2,269 $2,269
TOTAL $20,510 $4,990 $2,120 $3,200 $3,300 $3,400 $3,500 $20,510
MPO ID:
Project Title:
CB21 ADOPTION: 10-00
Project Description: Various minor/local roadways within each zone as noted on the project diagram -
in Carlsbad, street sealing and roadway repairs
Pavement Management -Seal
Exempt Category: Safety - Pavement resurfacing and/or rehabilitationCapacity Status: NCI
Est Total Cost: $3,300
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $800 $500 $500 $500 $500 $500 $3,300 $3,300
TOTAL $3,300 $800 $500 $500 $500 $500 $500 $3,300
MPO ID:
Project Title:
CB22 ADOPTION: 10-00
Project Description: Avenida Encinas from Palomar Airport Rd. to Encina Water Pollution Control
Facility (EWPCF) - in Carlsbad; Avenida Encinas from Palomar Airport Road
southerly to existing improvements adjacent to the EWPCF; roadway widening to
Secondary Arterial standards
Avenida Encinas - Widen from Palomar Airport Road to EWPCF
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $3,041 Open to Traffic: Phase 1: Dec 2015
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $2,605 $436 $400 $30 $2,611 $3,041
TOTAL $3,041 $2,605 $436 $30 $2,611 $400
Friday, September 17, 2010
48
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
CB24
Carlsbad, City of
ADOPTION: 10-00
Project Description:
RAS (TA 7-43)
From College Boulevard to Palomar Airport Road - in Carlsbad, at the intersection
of College Blvd. and Palomar Airport Raod, roadway widening along southbound
College Blvd. to provide dual left turns, one thru lane, one shared thru/right turn
lane and one right turn lane and to lengthen right turn lanes on the other
approaches to the intersection
College Boulevard and Palomar Airport Road - Intersection Improvements
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $838 Open to Traffic: Phase 1: Jun 2012
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $838 $193 $645 $838
TOTAL $838 $838 $645 $193
MPO ID:
Project Title:
CB26 ADOPTION: 10-00
Project Description:
RAS (TA 7-43)
From Melrose Drive to Palomar Airport Road - in Carlsbad, at the intersection of
Palomar Airport Road and Melrose Drive, roadway widening along southbound
Melrose to provide an additional right turn lane to westbound Palomar Airport
Road
Melrose and Palomar Airport Road
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $410 Open to Traffic: Phase 1: Jan 2012
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $410 $50 $360 $410
TOTAL $410 $410 $360 $50
MPO ID:
Project Title:
CB30 ADOPTION: 10-00
Project Description:
RAS (TA 7-43)
From El Camino Real to Tamarack Avenue - in Carlsbad at the intersection of El
Camino Real and Tamarack Avenue construct a second left turn lane from El
Camino Real to westbound Tamarack
El Camino Real Left Turn Lane to westbound Tamarack Ave.
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $286 Open to Traffic: Phase 1: Jun 2014
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $286 $70 $216 $286
TOTAL $286 $286 $216 $70
Friday, September 17, 2010
49
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
CB31
Carlsbad, City of
ADOPTION: 10-00
Project Description:
RAS (TA 7-43)
El Camino Real from La Costa Ave, to Arenal Rd. - in Carlsbad, along El Camino
Real from 700 feet north of La Costa Avenue to Arenal Road, widening along the
southbound side of the roadway to provide three travel lanes and a bike lane in
accordance with Prime Arterial Standards
El Camino Real Widening - La Costa Avenue to Arenal Road
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $2,400 Open to Traffic: Phase 1: Mar 2017
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $625 $625 $625
Local RTCIP $1,775 $1,775 $1,775
TOTAL $2,400 $2,400 $1,775 $625
MPO ID:
Project Title:
CB32 ADOPTION: 10-00
Project Description:
RAS (TA 7-43)
TransNet - LSI: CREl Camino Real from Cassia Road to Camino Vida Roble - in Carlsbad, widen El
Camino Real from 900 feet north of Cassia Road to Camino Vida Roble, along
the northbound side of the roadway to provide three travel lanes and a bike lane in
accordance with Prime Arterial standards
El Camino Real Widening - Cassia to Camino Vida Roble
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $2,650 Open to Traffic: Phase 1: Mar 2014
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - LSI Carry Over $215 $2,435 $315 $1,350 $985 $2,650
TOTAL $2,650 $215 $2,435 $1,350 $985 $315
MPO ID:
Project Title:
CB33 ADOPTION: 10-00
Project Description:
RAS (TA 7-43)
From Palomar Airport Road to El Camino Real - in Carlsbad, widening along
eastbound Palomar Airport Road to provide a dedicated right turn lane to
southbound El Camino Real
Palomar Airport Road and El Camino Real Right Turn Lane
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $590 Open to Traffic: Phase 1: Jun 2016
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $590 $90 $500 $590
TOTAL $590 $590 $500 $90
Friday, September 17, 2010
50
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
CB34
Carlsbad, City of
ADOPTION: 10-00
Project Description:
RAS (TA 7-43)
From Palomar Aiport Road to Paseo Del Norte - in Carlsbad, widening along
eastbound Palomar Airport Road to provide a dedicated right turn lane to
southbound Paseo Del Norte
Palomar Airport Road and Paseo Del Norte Right Turn Lane
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $563 Open to Traffic: Phase 1: Jun 2013
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $563 $63 $500 $563
TOTAL $563 $563 $500 $63
MPO ID:
Project Title:
CB35 ADOPTION: 10-00
Project Description:
RAS (TA 7-43)
From Palomar Airport Road to Paseo Del Norte - in Carlsbad, lengthen the left
turn pocket along eastbound Palomar Airport Road to northbound Paseo Del
Norte
Palomar Airport Road and Paseo Del Norte Left Turn Lane
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $232 Open to Traffic: Phase 1: Jun 2013
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $232 $30 $202 $232
TOTAL $232 $232 $202 $30
MPO ID:
Project Title:
CB36 ADOPTION: 10-00
Project Description:
RAS (TA 7-43)
TransNet - LSI: CRCarlsbad Boulevard from Palomar Airport Road to Avenida Encinas - in Carlsbad,
realign the southbound lanes of Carlsbad Blvd and future construction completion
of roadway to major arterial standards with enhanced parkways
Carlsbad Boulevard Realignment
Exempt Category: Other - Engineering studiesCapacity Status: NCI
Est Total Cost: $3,250
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $250 $250 $250
TransNet - L Carry Over $346 $346 $346
TransNet - LSI $1,967 $1,967 $1,967
TransNet - LSI Carry Over $687 $687 $687
TOTAL $3,250 $250 $3,000 $3,250
Friday, September 17, 2010
51
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
CHV06
Chula Vista, City of
ADOPTION: 10-00
Project Description: TransNet - LSI: MaintCitywide - AC overlay, chip seals and slurry seal rehabilitation
Pavement Rehabilitation Program
Exempt Category: Safety - Pavement resurfacing and/or rehabilitationCapacity Status: NCI
Est Total Cost: $27,588
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $1,000 $160 $840 $1,000
TransNet - L $15,900 $3,250 $12,650 $15,900
TransNet - L (Cash) $6,900 $1,300 $5,600 $6,900
TransNet - LSI $250 $400 $280 $920 $820 $690 $1,980 $2,670
TransNet - LSI Carry Over $613 $106 $507 $613
TOTAL $27,083 $23,800 $863 $400 $280 $920 $820 $21,577 $5,506
MPO ID:
Project Title:
CHV08 ADOPTION: 10-00
Project Description: Willow Street from Bonita Road to Sweetwater Road - replace and widen bridge
including shoulders
Willow Street Bridge Project
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $17,057 Open to Traffic: Phase 1: Dec 2014
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
HBP $1,320 $240 $12,821 $1,320 $240 $12,821 $14,381
HBRR $500 $500 $500
Local Funds $236 $1,661 $236 $1,661 $1,897
Local RTCIP $219 $60 $219 $60 $279
TOTAL $17,057 $2,275 $300 $14,482 $300 $14,482 $2,275
MPO ID:
Project Title:
CHV18 ADOPTION: 10-00
Project Description: TransNet - LSI: CRCitywide - sidewalk construction, replacements, installation in areas along school
routes, around senior citizen centers and in areas of high pedestrian traffic
Sidewalk Rehabilitation/Installation Program
Exempt Category: Air Quality - Bicycle and pedestrian facilitiesCapacity Status: NCI
Est Total Cost: $3,339
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $1,289 $1,289 $1,289
TransNet - L $1,950 $1,950 $1,950
TransNet - LSI Carry Over $100 $100 $100
TOTAL $3,339 $3,239 $100 $3,339
Friday, September 17, 2010
52
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
CHV19
Chula Vista, City of
ADOPTION: 10-00
Project Description: TransNet - LSI: CRNorth Broadway from C Street to D Street - pavement reconstruction and
associated drainage
North Broadway Reconstruction
Exempt Category: Safety - Pavement resurfacing and/or rehabilitationCapacity Status: NCI
Est Total Cost: $2,957
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $324 $324 $324
TransNet - L (Cash) $2,368 $300 $2,068 $2,368
TransNet - LSI Carry Over $265 $265 $265
TOTAL $2,957 $2,692 $265 $2,657 $300
MPO ID:
Project Title:
CHV20 ADOPTION: 10-00
Project Description: TransNet - LSI: CRFourth Ave. from Brisbane St. to SR54 - add additional lane on east side of Fourth
Ave.
North Fourth Avenue and Brisbane St
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $750 Open to Traffic: Phase 1: Dec 2011
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - L $500 $100 $400 $500
TransNet - LSI $250 $75 $175 $250
TOTAL $750 $500 $250 $575 $175
MPO ID:
Project Title:
CHV22 ADOPTION: 10-00
Project Description: TransNet - LSI: MaintCitywide - study GIS-based infrastructure deficiency database for pavement and
street improvements; planning rehabilitation programs; prepare Capital
Improvement Program related to street improvements
Advance Planning Studies
Exempt Category: Other - Engineering studiesCapacity Status: NCI
Est Total Cost: $1,303
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $585 $585 $585
TransNet - L $375 $375 $375
TransNet - L (Cash) $82 $82 $82
TransNet - LSI $45 $39 $40 $42 $46 $49 $261 $261
TOTAL $1,303 $1,087 $39 $40 $42 $46 $49 $1,303
Friday, September 17, 2010
53
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
CHV26
Chula Vista, City of
ADOPTION: 10-00
Project Description: TransNet - LSI: MaintCitywide - master plan will identify missing pedestrian improvements, establish
priorities and program capital improvement projects that will increase connectivity
among existing facilities
Pedestrian Master Plan
Exempt Category: Air Quality - Bicycle and pedestrian facilitiesCapacity Status: NCI
Est Total Cost: $281
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TDA - Bicycles $150 $150 $150
TransNet - L (Cash) $45 $45 $45
TransNet - L Carry Over $61 $61 $61
TransNet - LSI $25 $25 $25
TOTAL $281 $195 $86 $281
MPO ID:
Project Title:
CHV30 ADOPTION: 10-00
Project Description:
PPNO: 09CA013
EARMARK NO: CA3482, CA677
TransNet - LSI: CROn I-5 between SR 54 and Main Street interchange - conduct a study to examine
multi-modal improvements to the I-5 corridor between the Main Street Interchange
and State Route 54
I-5 Multi-Modal Corridor Improvement Study
Exempt Category: Other - Engineering studiesCapacity Status: NCI
Est Total Cost: $2,765
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
HPP $800 $1,187 $1,987 $1,987
TCSP $222 $222 $222
TransNet - L $50 $50 $50
TransNet - L (Cash) $16 $16 $16
TransNet - LSI $100 $100 $100
TransNet - LSI Carry Over $390 $390 $390
TOTAL $2,765 $950 $1,815 $2,765
MPO ID:
Project Title:
CHV33 ADOPTION: 10-00
Project Description: TransNet - LSI: MaintCitywide - field identification and installation/ construction of traffic calming
devices in public school zones, such as traffic control devices (for example,
flashing beacons), signs, striping and minor street improvements
School Zone Traffic Calming Program
Exempt Category: Safety - Non signalization traffic control and operatingCapacity Status: NCI
Est Total Cost: $1,200
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $50 $50 $50
TransNet - L $280 $280 $280
TransNet - L (Cash) $97 $97 $97
TransNet - LSI $240 $270 $510 $510
TransNet - LSI Carry Over $130 $130 $130
TOTAL $1,067 $427 $130 $240 $270 $1,067
Friday, September 17, 2010
54
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
CHV34
Chula Vista, City of
ADOPTION: 10-00
Project Description: TransNet - LSI: MaintCitywide - provide community outreach and education regarding traffic/ safety
hazards; install and construct traffic calming and pedestrian safety measures
Neighborhood Traffic and Pedestrian Safety Program
Exempt Category: Safety - Non signalization traffic control and operatingCapacity Status: NCI
Est Total Cost: $1,400
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $70 $70 $70
TransNet - L $280 $280 $280
TransNet - LSI $230 $230 $460 $460
TransNet - LSI Carry Over $320 $320 $320
TOTAL $1,130 $350 $320 $230 $230 $1,130
MPO ID:
Project Title:
CHV35 ADOPTION: 10-00
Project Description: TransNet - LSI: MaintUpgrade of signals located at Fourth Ave. and Beyer Blvd., Fourth Ave. and Main
Street and at Third Avenue and Montgomery Street - annual program to prioritize
Traffic Signing and Striping CIP projects including upgrading and maintaining
traffic signal and streetlight systems
Traffic Signing, Studies and Signal Upgrade
Exempt Category: Other - Intersection signalization projectsCapacity Status: NCI
Est Total Cost: $3,661
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $571 $571 $571
TransNet - L $135 $135 $135
TransNet - LSI $20 $1,075 $160 $160 $150 $150 $240 $1,475 $1,715
TransNet - LSI Carry Over $1,240 $590 $650 $1,240
TOTAL $3,661 $726 $2,315 $160 $160 $150 $150 $2,125 $1,536
MPO ID:
Project Title:
CHV36 ADOPTION: 10-00
Project Description:
EARMARK NO: CA356, CA450
Heritage Road from Main Street to Entertainment Circle - preliminary engineering,
environmental analysis for future widening of bridge
Heritage Road Bridge Studies
Exempt Category: Other - Engineering studiesCapacity Status: NCI
Est Total Cost: $4,620
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
HPP $1,995 $805 $2,800 $2,800
Local Funds $1,820 $1,820 $1,820
TOTAL $4,620 $3,815 $805 $4,620
Friday, September 17, 2010
55
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
CHV39
Chula Vista, City of
ADOPTION: 10-00
Project Description: TransNet - LSI: CRPalomar Street from I-5 to Orange Ave.; Broadway from Palomar Street to C Street;
H Street from I-805 to I-5; Heritage Rd. from Telegraph Canyon Rd. to Palomar St.;
Paseo Ranchero from E. J Street to Telegraph Canyon Rd.; Otay Lakes Rd. from
Telegraph Canyon Rd. to E. H Street; E. H Street from I-805 to Hidden Vista; E.
Orange/ Olympic Pkwy. at I-805; Telegraph Canyon Rd. at I-805 - upgrade traffic
signal coordination at locations identified by the City's Traffic Monitoring Program
in order to reduce congestion and intersection delays
Traffic Signal System Optimization
Exempt Category: Other - Traffic signal synchronization projectsCapacity Status: NCI
Est Total Cost: $602
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - L $150 $150 $150
TransNet - LSI $25 $50 $50 $52 $50 $50 $277 $277
TransNet - LSI Carry Over $175 $175 $175
TOTAL $602 $175 $225 $50 $52 $50 $50 $602
MPO ID:
Project Title:
CHV40 ADOPTION: 10-00
Project Description: TransNet - LSI: CRAlong Bayshore Bikeway from E Street to Main Street - provide funds for
preliminary engineering on Segments 7 and 8 of the Chula Vista portion of the
Bayshore Bikeway
Bayshore Bikeway
Exempt Category: Air Quality - Bicycle and pedestrian facilitiesCapacity Status: NCI
Est Total Cost: $125
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $50 $50 $50
TransNet - L $50 $50 $50
TransNet - LSI $25 $25 $25
TOTAL $125 $100 $25 $125
MPO ID:
Project Title:
CHV43 ADOPTION: 10-00
Project Description: TransNet - LSI: MaintCitywide - program will allow for identification and implementation of solutions for
congestion relief on local streets, such as median installation , new traffic
signals, traffic signal upgrades, intersection lighting, traffic signal coordination/
interconnection, video traffic surveillance systems, traffic data collection systems.
Congestion Relief Study and Implementation
Exempt Category: Other - Intersection signalization projectsCapacity Status: NCI
Est Total Cost: $1,070
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $50 $15 $35 $50
TransNet - L $75 $25 $50 $75
TransNet - L (Cash) $500 $500 $500
TransNet - LSI $75 $75 $75 $75 $300 $300
TransNet - LSI Carry Over $145 $145 $145
TOTAL $1,070 $625 $145 $75 $75 $75 $75 $85 $985
Friday, September 17, 2010
56
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
CHV44
Chula Vista, City of
ADOPTION: 10-00
Project Description: TransNet - LSI: CRIn Chula Vista - preliminary analysis of the I-805/ SR54 interchange and include
other on/off ramps on SR54 to I-5, the Bonita Road and Main Street on/ off ramps
to I-805 and the impact of traffic in Otay Mesa on La Media Road and other major
streets in Chula Vista in order to reduce congestion
I-805, SR54 and Otay Mesa Transportation System Improvements
Exempt Category: Other - Engineering studiesCapacity Status: NCI
Est Total Cost: $570
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - L $100 $100 $100
TransNet - LSI $90 $90 $90 $270 $270
TransNet - LSI Carry Over $200 $200 $200
TOTAL $570 $100 $200 $90 $90 $90 $570
MPO ID:
Project Title:
CHV45 ADOPTION: 10-00
Project Description: TransNet - LSI: MaintCitywide - traffic monitoring to comply with the City's traffic threshold standards, as
well as the city's annual traffic count program, which provides data for safety
commission studies, capital improvements projects, speed surveys and other
traffic uses
Traffic Monitoring Program
Exempt Category: Safety - Non signalization traffic control and operatingCapacity Status: NCI
Est Total Cost: $565
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local RTCIP $50 $50 $50
TransNet - LSI $190 $70 $70 $330 $330
TransNet - LSI Carry Over $185 $185 $185
TOTAL $565 $50 $375 $70 $70 $565
MPO ID:
Project Title:
CHV46 ADOPTION: 10-00
Project Description: TransNet - LSI: MaintArea in the vicinity of Harborside Elementary School southeast of the intersection
of Naples Street and Industrial Blvd. - install missing pedestrian improvements
and rehabilitate existing pedestrian infrastructure in order to provide pedestrians
with a safer route to school
Harborside Elementary Pedestrian Improvements
Exempt Category: Air Quality - Bicycle and pedestrian facilitiesCapacity Status: NCI
Est Total Cost: $640
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $65 $65 $65
TCSP $80 $410 $80 $410 $490
TransNet - LSI $85 $20 $65 $85
TOTAL $640 $165 $475 $540 $100
Friday, September 17, 2010
57
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
CHV47
Chula Vista, City of
ADOPTION: 10-00
Project Description: TransNet - LSI: MaintArea is generally bounded by the northern City limits, the Bayfront, L Street to the
south and Hilltop Drive to the east - update the traffic threshold standards
established for the Urban Core Specific Plan area based on the General Plan
update adopted by Council in late 2005; these standards need to take into
account alternative modes of transportation emphasized in the General Plan
Urban Core Level of Service Thresholds Study
Exempt Category: Other - Engineering studiesCapacity Status: NCI
Est Total Cost: $125
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local RTCIP $75 $75 $75
TransNet - LSI $20 $20 $20
TransNet - LSI Carry Over $30 $30 $30
TOTAL $125 $95 $30 $125
MPO ID:
Project Title:
CHV48 ADOPTION: 10-00
Project Description: TransNet - LSI: CRVarious locations (see list of specific locations) - ongoing program of pavement
rehabilitation and reconstruction which includes overlays (one-inch thick and
greater) and street reconstruction
Pavement Major Rehabilitation
Exempt Category: Safety - Pavement resurfacing and/or rehabilitationCapacity Status: NCI
Est Total Cost: $19,921
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - LSI $1,268 $2,752 $2,966 $3,245 $3,650 $2,070 $11,811 $13,881
TransNet - LSI Carry Over $6,040 $910 $5,130 $6,040
TOTAL $19,921 $7,308 $2,752 $2,966 $3,245 $3,650 $16,941 $2,980
MPO ID:
Project Title:
CHV49 ADOPTION: 10-00
Project Description:
EARMARK NO: CA635/3067
Within the Chula Vista Urban Core Specific Plan Area, which is bordered by SR54,
I-5, H Street and I-805 - study to determine ways to develop more bikeways and
pedestrian access to the downtown Third Avenue area; construction of
improvements recommended by the study
Third Avenue Bicycle and Pedestrian Access
Exempt Category: Air Quality - Bicycle and pedestrian facilitiesCapacity Status: NCI
Est Total Cost: $3,150
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
HPP $240 $240 $240
Local Funds $60 $850 $60 $850 $910
TransNet - SMIP $2,000 $325 $1,675 $2,000
TOTAL $3,150 $300 $2,850 $2,525 $625
Friday, September 17, 2010
58
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
CHV51
Chula Vista, City of
ADOPTION: 10-00
Project Description: Naples St. from Oleander Ave. to Oasis Ave. - reconstruct the steep cross gutter at
the intersection of Naples St. and Oleander Ave. in order to increase vehicle safety
and reduce congestion caused by vehicles slowing down; Americans with
Disabilities Act (ADA)-compliant pedestrian improvements will also be
constructed
Naples and Oleander Cross Gutter
Exempt Category: Safety - Safer non-Federal-aid system roadsCapacity Status: NCI
Est Total Cost: $205
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - L Carry Over $205 $45 $160 $205
TOTAL $205 $205 $160 $45
MPO ID:
Project Title:
CHV52 ADOPTION: 10-00
Project Description: TransNet - LSI: CRIndustrial Blvd. from L Street to Palomar Street - construct bike lanes on both
sides of Industrial Blvd. from L Street to Palomar Street; construct curb, gutter and
sidewalk on Industrial Blvd. from Naples Street to Palomar Street
Industrial Blvd. Bicycle and Pedestrian Facilities
Exempt Category: Air Quality - Bicycle and pedestrian facilitiesCapacity Status: NCI
Est Total Cost: $465
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - LSI Carry Over $181 $181 $181
TransNet - SMIP $284 $39 $245 $284
TOTAL $465 $465 $245 $220
MPO ID:
Project Title:
CHV53 ADOPTION: 10-00
Project Description: Citywide - update the Citywide Bikeway Master Plan
Bikeway Master Plan Update
Exempt Category: Air Quality - Bicycle and pedestrian facilitiesCapacity Status: NCI
Est Total Cost: $200
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TDA - Bicycles $150 $150 $150
TransNet - L (Cash) $50 $50 $50
TOTAL $200 $50 $150 $200
Friday, September 17, 2010
59
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
CHV54
Chula Vista, City of
ADOPTION: 10-00
Project Description: TransNet - LSI: CRBroadway from Main Street to Southern City Limits - overlay and reconstruction of
the pavement on Broadway, construction of curb, gutter and sidewalk and
installation of bike lanes
South Broadway Improvements South of Main Street
Exempt Category: Safety - Pavement resurfacing and/or rehabilitationCapacity Status: NCI
Est Total Cost: $2,200
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - LSI Carry Over $500 $500 $500
TOTAL $500 $500 $500
MPO ID:
Project Title:
CHV55 ADOPTION: 10-00
Project Description: TransNet - LSI: CROxford Street between Third Avenue and Alpine Avenue, First avenue between
Palomar Street and Naples Street, Second Avenue between Naples Street and
Palomar Street, Glenhaven Way to Amy Street (cul-de-sac) - construction (Phase
1) of missing street improvements, primarily curb, gutter, sidewalk and Americans
with Disabilities Act (ADA)-compliant pedestrian ramps, on four streets in the
Montgomery area of Chula Vista
Castle Park Sidewalk Improvements
Exempt Category: Air Quality - Bicycle and pedestrian facilitiesCapacity Status: NCI
Est Total Cost: $2,838
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $717 $200 $517 $717
TransNet - LSI Carry Over $70 $70 $70
TOTAL $787 $717 $70 $517 $270
MPO ID:
Project Title:
CHV58 ADOPTION: 10-00
Project Description: TransNet - LSI: CRC Street from Fifth Ave. to 350 feet west of Fourth Ave.; Moss Street from Broadway
to Fourth Ave.; Oxford Street from Broadway to Fifth Ave., Palomar Street from
Broadway to Fifth Ave. - design and future construction of sidewalk and other
pedestrian improvements in areas without existing sidewalk - design phase only
New Sidewalk Construction
Exempt Category: Air Quality - Bicycle and pedestrian facilitiesCapacity Status: NCI
Est Total Cost: $338
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - LSI $338 $338 $338
TOTAL $338 $338 $338
Friday, September 17, 2010
60
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
CHV59
Chula Vista, City of
ADOPTION: 10-00
Project Description: TransNet - LSI: CRSouth side of Naples Street between Broadway and Fifth Ave. and areas with
missing infrastructure on Naples Street between Fifth Ave. and Third Ave. -
design phase of future construction of missing curb, gutter, sidewalk and other
pedestrian infrastucture on Naples Street
Naples Street New Sidewalk Construction
Exempt Category: Air Quality - Bicycle and pedestrian facilitiesCapacity Status: NCI
Est Total Cost: $1,500
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - LSI $182 $182 $182
TOTAL $182 $182 $182
MPO ID:
Project Title:
CHV60 ADOPTION: 10-00
Project Description: TransNet - LSI: CRFourth Ave. and G Street; Second Ave. and Quintard St. - traffic signals will be
upgraded and modified in order to reduce the frequency of collisions
Traffic Signal Upgrades
Exempt Category: Other - Intersection channelization projectsCapacity Status: NCI
Est Total Cost: $745
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $175 $175 $175
TransNet - LSI $34 $34 $34
TransNet - LSI Carry Over $265 $265 $265
TOTAL $474 $175 $299 $474
MPO ID:
Project Title:
CHV61 ADOPTION: 10-00
Project Description: TransNet - LSI: MaintBonita Road from Allen School Road to Allen School Road - repair sections of the
top and side of the existing reinforced concrete box culvert, which carries flow from
Bonita Road, in order to eliminate the potential for failure and damage to Bonita
Road and eliminate a potential hazard to the public
Bonita Road/ Allen School Road Drainage Structure
Exempt Category: Safety - Safer non-Federal-aid system roadsCapacity Status: NCI
Est Total Cost: $150
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - LSI $150 $150 $150
TOTAL $150 $150 $150
Friday, September 17, 2010
61
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
COR04
Coronado, City of
ADOPTION: 10-00
Project Description: TransNet - LSI: MaintAll streets in Coronado Cays - preventive maintenance such as slurry seal, crack
sealing, and minor drainage repair
Street and Road Preventive Maintenance; Minor Drainage Repair
Exempt Category: Safety - Pavement resurfacing and/or rehabilitationCapacity Status: NCI
Est Total Cost: $3,856
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $306 $268 $260 $327 $260 $260 $103 $1,578 $1,681
TransNet - L $1,581 $138 $1,443 $1,581
TransNet - LSI $70 $100 $100 $15 $255 $270
TransNet - LSI Carry Over $176 $115 $33 $24 $300 $324
TOTAL $3,856 $1,957 $444 $375 $360 $360 $360 $3,576 $280
MPO ID:
Project Title:
COR05 ADOPTION: 10-00
Project Description:
EARMARK NO: CA397/713,
HPP866/3789From Glorietta to Alameda - from San Diego-Coronado Bridge plaza westerly 1.4
miles beneath Fourth Street with egress onto Naval Air Station North Island - SR
75 Tunnel Environmental Impact Study (EIS) to provide analysis of a tunnel - this
project is included as informational purposes for National Environmental Policy
Act (NEPA) clearance only, future phases are outside of TIP cycle but included in
the long range plan
SR 75 Tunnel
Exempt Category: Other - Engineering studiesCapacity Status: NCI
Est Total Cost: $19,146
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
CBI $500 $500 $500
HPP $9,000 $9,000 $9,000
Local Funds $8,337 $8,337 $8,337
STP $745 $745 $745
TCSP $564 $564 $564
TOTAL $19,146 $19,146 $19,146
Friday, September 17, 2010
62
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
COR07
Coronado, City of
ADOPTION: 10-00
Project Description:
TransNet - LSI: CR
First Street (D Avenue to east end cul-de-sac approximately 1,900 feet), Second
Street (Orange Avenue to A Avenue, 1,400 feet), Aruba Bend ( 850 feet),
St.Christopher Lane (800 feet), Park Place (Star Park Circle to Isabella Avenue,
600 feet), Star Park Circle (740 feet), Encino Row, 570 feet) and Kingston Court
(all three legs, 1,430 feet). - rehabilitation of roadways including removal and
replacement of severely damaged areas, grinding and overlays of 1 1/2"
Street and Road Major Rehabilitation; Major Drainage; Reconstruction; Traffic
Operations
Exempt Category: Safety - Pavement resurfacing and/or rehabilitationCapacity Status: NCI
Est Total Cost: $7,154
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $109 $912 $136 $353 $323 $75 $1,758 $1,833
TransNet - L $1,665 $165 $1,500 $1,665
TransNet - L Carry Over $400 $20 $380 $400
TransNet - LSI $180 $427 $441 $463 $397 $427 $145 $2,190 $2,335
TransNet - LSI Carry Over $461 $309 $151 $51 $870 $921
TOTAL $7,154 $1,954 $2,200 $750 $750 $750 $750 $6,698 $456
Friday, September 17, 2010
63
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
DM01
Del Mar, City of
ADOPTION: 10-00
Project Description: TransNet - LSI: MaintCitywide - resurface and/or rehabilitate roadways
Resurfacing & Drainage Projects
Exempt Category: Safety - Pavement resurfacing and/or rehabilitationCapacity Status: NCI
Est Total Cost: $1,776
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $590 $590 $590
TransNet - L $831 $831 $831
TransNet - LSI $98 $48 $49 $50 $54 $56 $355 $355
TOTAL $1,776 $1,519 $48 $49 $50 $54 $56 $1,776
MPO ID:
Project Title:
DM02 ADOPTION: 10-00
Project Description: TransNet - LSI: CRAt N. Torrey Pines Bridge, Corona Del Mar Bridge over San Dieguito River - local
match to federal Highway Bridge Program providing for seismic retrofit (part of
CAL44); project will undertake full replacement of bridge upper deck, full depth
pavement repair, and seismic upgrades
Local Match to Bridge Retrofit Projects
Exempt Category: Safety - Non capacity widening or bridge reconstructionCapacity Status: NCI
Est Total Cost: $294
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - LSI $182 $12 $100 $294 $294
TOTAL $294 $182 $12 $100 $294
MPO ID:
Project Title:
DM03 ADOPTION: 10-00
Project Description: TransNet - LSI: CRJimmy Durante Blvd. from Camino Del Mar to South of San Dieguito Drive - grind
and 2" overlay
Jimmy Durante Blvd. Northbound lane
Exempt Category: Safety - Pavement resurfacing and/or rehabilitationCapacity Status: NCI
Est Total Cost: $140
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - LSI $20 $120 $140 $140
TOTAL $140 $20 $120 $140
Friday, September 17, 2010
64
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
DM04
Del Mar, City of
ADOPTION: 10-00
Project Description: TransNet - LSI: CRFrom 11th to 9th Street and from 13th to 15th Street - on Camino Del Mar, grind
and 2" overlay
Camino Del Mar Major Rehabilitation Projects
Exempt Category: Safety - Pavement resurfacing and/or rehabilitationCapacity Status: NCI
Est Total Cost: $583
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - LSI $230 $112 $83 $26 $132 $583 $583
TOTAL $583 $230 $112 $83 $26 $132 $583
Friday, September 17, 2010
65
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
EL03
El Cajon, City of
ADOPTION: 10-00
Project Description: TransNet - LSI: CRMollison from Main Street to Washington, Mollison from Broadway to Greenfield,
Greenfield, Third Street from Lexington to Washington, Jamacha Road from
Washington to south city limits, 2nd Street/I-8 overpass, Main Street from I-8 to
Travelodge - street reconstruction and overlays of 2" - 3" thick, including collectors,
thoroughfares & residential streets
Overlay/Reconstruction Projects
Exempt Category: Safety - Pavement resurfacing and/or rehabilitationCapacity Status: NCI
Est Total Cost: $16,447
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - L $6,747 $6,747 $6,747
TransNet - L (Cash) $2,500 $2,500 $2,500
TransNet - LSI $400 $200 $1,000 $1,000 $1,000 $1,000 $4,600 $4,600
TransNet - LSI Carry Over $2,600 $2,600 $2,600
TOTAL $16,447 $9,647 $2,800 $1,000 $1,000 $1,000 $1,000 $16,447
MPO ID:
Project Title:
EL06 ADOPTION: 10-00
Project Description: TransNet - LSI: MaintReplacement of interconnect cable at various streets including Jamacha,
Washington Avenue and Chase Avenue. Modification of existing traffic signal to
improve traffic flow and safety at Main Street and Ballard Street. - new, upgrade or
modification of traffic signals and Traffic Management Center, including rewire,
modifications, replacement of signal interconnect cable, wireless video
monitoring cameras and other necessary equipment; matching funds for
Proposition 1B Traffic Light Synchronization Program Grant
Traffic Signals Projects
Exempt Category: Other - Traffic signal synchronization projectsCapacity Status: NCI
Est Total Cost: $1,652
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - L $580 $580 $580
TransNet - L (Cash) $300 $300 $300
TransNet - LSI $100 $272 $100 $100 $100 $100 $772 $772
TOTAL $1,652 $980 $272 $100 $100 $100 $100 $1,652
MPO ID:
Project Title:
EL11 ADOPTION: 10-00
Project Description: TransNet - LSI: MaintVarious locations - repair broken sidewalk, driveway, ramps, etc.
Sidewalk and other Repairs
Exempt Category: Air Quality - Bicycle and pedestrian facilitiesCapacity Status: NCI
Est Total Cost: $1,350
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - L $450 $150 $300 $450
TransNet - L (Cash) $150 $150 $150
TransNet - LSI $150 $150 $150
TransNet - LSI Carry Over $150 $150 $150 $150 $600 $600
TOTAL $1,350 $600 $150 $150 $150 $150 $150 $1,200 $150
Friday, September 17, 2010
66
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
EL18
El Cajon, City of
ADOPTION: 10-00
Project Description: TransNet - LSI: CRBroadway from Main Street to City Limits - provide for new street lights which
include removing wooden pole mounted lights with utility underground
Street Light Installation Projects
Exempt Category: Safety - Lighting improvementsCapacity Status: NCI
Est Total Cost: $266
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - LSI $25 $100 $25 $25 $25 $200 $200
TransNet - LSI Carry Over $66 $66 $66
TOTAL $266 $66 $25 $100 $25 $25 $25 $266
MPO ID:
Project Title:
EL20 ADOPTION: 10-00
Project Description: TransNet - LSI: MaintCitywide - replace led lights on all signals
Traffic Signal LED Light Bulb Replacement
Exempt Category: Other - Traffic signal synchronization projectsCapacity Status: NCI
Est Total Cost: $135
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - LSI $135 $135 $135
TOTAL $135 $135 $135
MPO ID:
Project Title:
EL21 ADOPTION: 10-00
Project Description: TransNet - LSI: MaintDowntown El Cajon and surrounding areas. - street resurfacing with slurry seals
and asphalt rubber aggregate membrane (ARAM)
Street Resurfacing with slurry seals and ARAM products
Exempt Category: Safety - Pavement resurfacing and/or rehabilitationCapacity Status: NCI
Est Total Cost: $2,500
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - L Carry Over $341 $341 $341
TransNet - LSI $400 $159 $400 $400 $400 $1,759 $1,759
TransNet - LSI Carry Over $400 $400 $400
TOTAL $2,500 $400 $500 $400 $400 $400 $400 $2,500
Friday, September 17, 2010
67
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
EL23
El Cajon, City of
ADOPTION: 10-00
Project Description: TransNet - LSI: MaintAll City Traffic Signals - repainting of traffic signal heads and other minor traffic
signal maintenance
Traffic Signal Maintenance
Exempt Category: Other - Intersection signalization projectsCapacity Status: NCI
Est Total Cost: $135
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - L (Cash) $15 $15 $15
TransNet - LSI $40 $40 $80 $80
TransNet - LSI Carry Over $40 $40 $40
TOTAL $135 $15 $40 $40 $40 $135
MPO ID:
Project Title:
EL24 ADOPTION: 10-00
Project Description:
RAS (TA 7-8)
TransNet - LSI: CRJamacha Road from Washington Avenue to Gustavo Avenue - upgrading of traffic
signals on Jamacha at the intersection of Lexington Avenue, Washington Avenue
and Granite Hills Drive
Jamacha Road Traffic Signals
Exempt Category: Other - Traffic signal synchronization projectsCapacity Status: NCI
Est Total Cost: $204
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - LSI $204 $204 $204
TOTAL $204 $204 $204
Friday, September 17, 2010
68
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
ENC14A
Encinitas, City of
ADOPTION: 10-00
Project Description: TransNet - LSI: CROrpheus Ave-Leucadia Blvd. to Glaucus St , Eolus Ave-Leucadia Blvd to Glaucus
St , Falcon Hill Ct-Nolbey St to end , San Andrade Dr.-Balour Dr to San Clemente ,
San Abella Dr.-Balour Dr to San Clemente , Guadalajara Dr-Balour Dr to San
Clemente , San Clemente-Guadalajara to end , Fulvia St.-Leucadia Blvd to
Orpheus Ave , Leucadia Blvd.-Hermes Ave to Hymettus Ave , Monterey Vista
Way-Santa Fe Dr to end , Monterey Vista Pl-Monterey Vista Way to end , Village
View Rd-Wandering Rd to end , Tres Hermanas-Wandering Rd to Village View Rd
, Avenida La Posta- Wandering Rd to Village View Rd , Summerdawn Pl-Village
View Rd to end , Mountain Vista-Village Park to El Camino Real , Hummock
Lane-Gardendale Rd to end , Lone Jack Rd-Rancho Santa Fe Rd to Fortuna
Ranch Rd , Cerro St-Willowsprings to El Camino Real , Avenida De Las
Adelsas-El Camino Real Cerro St , Elva Ct-Oakbranch Dr to end , Elva
Terrace-Oakbranch Dr to end , Delage Dr-Oakbranch Dr to Pegaso St , Pegaso
St-Delage Dr to Oakbranch Dr , Avenida De Las Rosas-Avenida De Las Adelsas
to Willowsprings , Calle Narcisos-Avenida De Las Rosas to end , Pensa
Mientos-Avenida De Las Rosas to end , Calle Tulipanes- Avenida De Las Rosas
to end , - asphalt grinding, 6" dig outs, and 1-1/2" polymer modified asphalt
overlay
Street Overlay Program
Exempt Category: Safety - Pavement resurfacing and/or rehabilitationCapacity Status: NCI
Est Total Cost: $10,331
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $2,516 $850 $850 $850 $800 $750 $6,616 $6,616
TransNet - L $600 $600 $600
TransNet - L (Cash) $240 $240 $240
TransNet - LSI $665 $300 $350 $410 $520 $630 $2,875 $2,875
TOTAL $10,331 $4,021 $1,150 $1,200 $1,260 $1,320 $1,380 $10,331
MPO ID:
Project Title:
ENC17 ADOPTION: 10-00
Project Description: TransNet - LSI: MaintSidewalks on Westminster/Summit from Verdi to Montgomery (Cardiff Elementary
School), Hygeia Ave. from Leucadia Blvd. to 380' south, Hygeia from Cereus St. to
220' north of Cereus, Cereus Street from Hermes Ave. to Hygeia, Union St. from
the Paul Ecke School driveway to the SE corner of Union/Vulcan, and Vulcan Ave.
from Union to 260' south (Paul Ecke Elementary School), Melba Rd. from Nardo to
Bonita, south side of Santa Fe from I-5 to MacKinnon, Balour Drive from Santa Fe
to Melba Road, Encinitas Blvd from Balour westerly 600', a citywide sidewalk
replacement program and matching funds for a TDA grant to complete a study for
sidewalks on Vulcan Avenue. - installation of pathways to include curb, gutter,
drainage improvements and landscaping where appropriate
Safe Routes to School Sidewalk Program
Exempt Category: Air Quality - Bicycle and pedestrian facilitiesCapacity Status: NCI
Est Total Cost: $3,408
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $1,212 $1,212 $1,212
TransNet - L $900 $900 $900
TransNet - L (Cash) $296 $296 $296
TransNet - LSI $200 $200 $200 $200 $200 $1,000 $1,000
TOTAL $3,408 $2,408 $200 $200 $200 $200 $200 $3,408
Friday, September 17, 2010
69
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
ENC19
Encinitas, City of
ADOPTION: 10-00
Project Description: TransNet - LSI: CROn Rubenstein Avenue, Summit Avenue and Westminster Drive; Via Cantebria
between Garden View Road and Town Center; Gardendale Road - install
horizontal and vertical traffic safety and calming improvements such as speed
cushions, chicanes, narrowing roadway, landscaped pop-outs and stop signs;
develop Traffic Calming Plan for local neighborhoods
Traffic Safety/Calming
Exempt Category: Safety - Safer non-Federal-aid system roadsCapacity Status: NCI
Est Total Cost: $1,426
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $180 $180 $180
TransNet - L $450 $450 $450
TransNet - L (Cash) $87 $87 $87
TransNet - L Carry Over $150 $20 $130 $150
TransNet - LSI $150 $150 $150 $50 $59 $559 $559
TOTAL $1,426 $867 $150 $150 $150 $50 $59 $1,406 $20
MPO ID:
Project Title:
ENC20 ADOPTION: 10-00
Project Description: TransNet - LSI: CRN. Coast Hwy. 101 from A Street to La Costa Avenue - design/construct
comprehensive streetscape improvements: new curb, gutter, sidewalk and
landscaping - the preferred design may include pedestrian and bicycle
improvements, lane reconfiguration, and five traffic circles to facilitate and ease
traffic congestion and more efficiently move vehicular traffic
North Coast Highway 101 Beautification
Exempt Category: Air Quality - Bicycle and pedestrian facilitiesCapacity Status: NCI
Est Total Cost: $5,200
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - L $500 $500 $500
TransNet - L (Cash) $100 $100 $100
TransNet - L Carry Over $320 $320 $320
TransNet - LSI $300 $300 $500 $1,000 $600 $600 $2,100 $2,700
TOTAL $3,620 $920 $300 $300 $500 $1,000 $600 $2,100 $1,520
Friday, September 17, 2010
70
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
ENC28
Encinitas, City of
ADOPTION: 10-00
Project Description: TransNet - LSI: Mainton Highway 101/Chesterfield; Leucadia/101; El Camino Real/Manchester Ave.;
Manchester Ave./Mira Costa College; E Street/Hwy. 101; Balour Ave/Encinitas; Via
Cantebria/Encinitas, D-E Streets/Hwy. 101 and other circulation element roads
within the City - install radio communication to traffic signals, hard wiring system
to traffic signals, audible pedestrian signal; replace battery backup units; install
pedestrian countdown times; upgrade BiTrans Chip in signal controllers at
various traffic signals
Traffic Signal Modifications
Exempt Category: Other - Traffic signal synchronization projectsCapacity Status: NCI
Est Total Cost: $882
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - L $100 $100 $100
TransNet - L (Cash) $382 $382 $382
TransNet - L Carry Over $150 $150 $150
TransNet - LSI $50 $50 $50 $50 $50 $250 $250
TOTAL $882 $632 $50 $50 $50 $50 $50 $882
MPO ID:
Project Title:
ENC31 ADOPTION: 10-00
Project Description:
RTP PG NO: A-5
RAS (TA 7-44)At I-5/Encinitas Blvd. Interchange - modify interchange to improve safety and
alleviate congestion (design only)
I-5/Encinitas Blvd. Interchange Modification
Exempt Category: Non-ExemptCapacity Status: CIRT:5
Est Total Cost: $1,330 Open to Traffic: Phase 1: Nov 2013
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $883 $200 $247 $1,330 $1,330
TOTAL $1,330 $883 $200 $247 $1,330
MPO ID:
Project Title:
ENC32 ADOPTION: 10-00
Project Description:
SANDAG ID: 1143800
Along LOSSAN railroad (Mile Post 235.1 to 239.5) from La Costa Avenue to
Chesterfield Drive - PE, PS&E for 4 grade separated crossings located at
Montgomery Ave., Santa Fe Drive, El Portal and Hillcrest; construction of Phase I at
Santa Fe Drive
Encinitas Pedestrian Crossing
Exempt Category: Safety - Railroad/highway crossingCapacity Status: NCI
Est Total Cost: $25,000
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $425 $1,300 $1,725 $1,725
STIP-IIP AC $1,248 $1,248 $1,248
TCRP $1,248 $2,752 $1,248 $2,752 $4,000
TOTAL $6,973 $1,673 $5,300 $5,725 $1,248
Friday, September 17, 2010
71
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
ENC44
Encinitas, City of
ADOPTION: 10-00
Project Description: TransNet - LSI: CRSouthwest corner of Vulcan Avenue and E Street - includes the design and
construction of a parking lot to accommodate parking for downtown
visitors/employees and patrons of the Coaster; project will also include bike
storage facilities, a sidewalk and connection to the future Coastal Rail Trails
project
Downtown/Coaster Station Parking Lot
Exempt Category: Other - Transportation enhancement activitiesCapacity Status: NCI
Est Total Cost: $1,320
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - L (Cash) $40 $40 $40
TransNet - L Carry Over $640 $640 $1,280 $1,280
TOTAL $1,320 $680 $640 $1,280 $40
Friday, September 17, 2010
72
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
ESC02A
Escondido, City of
ADOPTION: 10-00
Project Description:
EARMARK NO: CA332/260
RAS (TA 7-44)
TransNet - LSI: CREast Valley Pkwy to Valley Center Dr, New Eureka Ranch St to E. Valley Pkwy -
widen roadway from 4 to 6 lanes with raised medians and left turn pockets;
modify signal at Lake Wohlford and Valley Center Road; widen bridge over
Escondido Creek
East Valley/Valley Center
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $14,299 Open to Traffic: Phase 1: Jan 2012
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
HPP $1,600 $1,600 $1,600
Local Funds $1,342 $256 $1,086 $1,342
RSTP $7,969 $1,771 $6,198 $7,969
TransNet - L Carry Over $1,588 $229 $1,167 $192 $1,588
TransNet - LSI $400 $200 $200 $400
TransNet - LSI Carry Over $1,400 $1,400 $1,400
TOTAL $14,299 $11,311 $2,988 $7,621 $4,478 $2,200
MPO ID:
Project Title:
ESC03 ADOPTION: 10-00
Project Description:
RAS (TA 7-44)
TransNet - LSI: CRCitracado from Don Lee to Vineyard - widen from 2 to 4 lanes with left turn pockets
and new traffic signal at Aero Way and Citracado Parkway
Citracado Parkway
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $7,373 Open to Traffic: Phase 1: Dec 2009
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $2,400 $600 $1,800 $2,400
TransNet - L $3,200 $3,200 $3,200
TransNet - L (Cash) $173 $173 $173
TransNet - L Carry Over $100 $100 $100
TransNet - LSI Carry Over $1,500 $1,500 $1,500
TOTAL $7,373 $5,773 $1,600 $600 $6,673 $100
MPO ID:
Project Title:
ESC04 ADOPTION: 10-00
Project Description:
RAS (TA 7-44)
TransNet - LSI: CRCitracado Parkway from West Valley to Harmony Grove - widen from 2 to 4 lanes
with raised medians, construct bridge over Escondido Creek
Citracado Parkway II
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $19,547 Open to Traffic: Phase 1: Jul 2013
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
HUD $908 $908 $908
Local Funds $13,625 $425 $180 $180 $839 $1,000 $12,571 $14,410
TransNet - L $581 $581 $581
TransNet - LSI $527 $1,712 $1,409 $3,648 $3,648
TOTAL $19,547 $15,114 $952 $1,892 $1,589 $1,581 $16,219 $1,747
Friday, September 17, 2010
73
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
ESC05
Escondido, City of
ADOPTION: 10-00
Project Description:
RAS (TA 7-44)
From La Honda Drive at citrus/Mission Avenue to e. Washington Avenue - widen
from 2 to 4 lanes and construct missing section of El Norte Pkwy. with left turn
pockets, raised medians and new traffic signals
El Norte Parkway Phase IV
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $4,586 Open to Traffic: Phase 1: Jan 2009
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - L $700 $700 $700
TransNet - L (Cash) $351 $351 $351
TransNet - L Carry Over $3,535 $3,535 $3,535
TOTAL $4,586 $1,051 $3,535 $4,586
MPO ID:
Project Title:
ESC06 ADOPTION: 10-00
Project Description:
RAS (TA 7-44)
El Norte Parkway from Kaile Lane to Key Lime Way - construct missing two lane
bridge at Escondido Creek
El Norte Parkway Bridge at Escondido Creek
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $4,950 Open to Traffic: Phase 1: Jul 2009
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $650 $650 $650
TransNet - L $2,000 $50 $1,950 $2,000
TransNet - L (Cash) $1,950 $1,950 $1,950
TransNet - L Carry Over $350 $350 $350
TOTAL $4,950 $4,600 $350 $4,900 $50
MPO ID:
Project Title:
ESC08 ADOPTION: 10-00
Project Description: From Escondido Boulevard to Juniper Street and from Juniper Street to Chestnut
Street - widen from 2 to 4 lanes with left turn pockets, raised medians on Felicita;
new traffic signals at Juniper and Chestnut, Juniper and 13th Ave., Juniper and
15th Ave.; modify traffic signal at Juniper and Felicita
Felicita Ave/Juniper Street
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $5,186 Open to Traffic: Phase 1: Apr 2012
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $3,500 $3,500 $3,500
TransNet - L (Cash) $330 $330 $330
TransNet - L Carry Over $1,356 $50 $1,306 $1,356
TOTAL $5,186 $3,830 $1,356 $5,136 $50
Friday, September 17, 2010
74
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
ESC09
Escondido, City of
ADOPTION: 10-00
Project Description: TransNet - LSI: CRNinth Avenue from La Terraza to Spruce - widen from 2 to 4 lanes with raised
median and modify traffic signals at Ninth Ave and Tulip Street - design phase
Ninth Avenue
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $1,331 Open to Traffic: Phase 1: Jul 2014
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - LSI Carry Over $161 $161 $161
TOTAL $161 $161 $161
MPO ID:
Project Title:
ESC11 ADOPTION: 10-00
Project Description: TransNet - LSI: MaintCitywide - reconstruction, resurfacing, chip sealing, crack filling, sidewalk repair
Street Rehabilitation & Resurface
Exempt Category: Safety - Pavement resurfacing and/or rehabilitationCapacity Status: NCI
Est Total Cost: $15,804
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $6,569 $1,199 $300 $7,468 $7,768
TransNet - L $1,904 $1,904 $1,904
TransNet - L (Cash) $1,500 $1,500 $1,500
TransNet - L Carry Over $500 $500 $500
TransNet - LSI $3,043 $182 $3,225 $3,225
TransNet - LSI Carry Over $907 $907 $907
TOTAL $15,804 $13,016 $2,788 $15,504 $300
Friday, September 17, 2010
75
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
ESC13
Escondido, City of
ADOPTION: 10-00
Project Description:
RAS (TA 7-44)
TransNet - LSI: CRNordahl Road from Mission Ave. to Montiel Road - replace the Nordahl Road
Overcrossing to increase the minimum vertical clearance from 14’-9” to the
Caltrans minimum vertical clearance of 16’-6”, and provide an additional 14-feet
of structure width necessary to facilitate the required construction staging of the
project; the additional width of the overcrossing will accommodate operational
improvements through left-turn storage at the ramp intersections; widen the
eastbound and westbound exit ramps to provide three lanes at the intersections;
widen Nordahl Road to provide a dedicated right-turn onto Montiel Road (no
additional travel lanes)
Nordahl Road Bridge @ SR-78
Exempt Category: Safety - Non capacity widening or bridge reconstructionCapacity Status: NCI
Est Total Cost: $7,651
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
DEMO - TEA 21 $2,250 $1,100 $1,150 $2,250
RSTP $300 $300 $300
TransNet - L $424 $52 $372 $424
TransNet - L (Cash) $2,000 $2,000 $2,000
TransNet - L Carry Over $364 $191 $173 $364
TransNet - LSI $313 $313 $313
TransNet - MC $2,000 $2,000 $2,000
TOTAL $7,651 $4,974 $2,677 $4,008 $3,643
MPO ID:
Project Title:
ESC17 ADOPTION: 10-00
Project Description: Citywide - curb & gutter, sidewalks, street lights and other misc. street
improvements
Neighborhood Projects
Exempt Category: Safety - Pavement resurfacing and/or rehabilitationCapacity Status: NCI
Est Total Cost: $2,000
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $200 $200 $200
TransNet - L $350 $350 $350
TransNet - L (Cash) $50 $50 $50
TransNet - L Carry Over $1,400 $200 $1,200 $1,400
TOTAL $2,000 $400 $1,600 $1,800 $200
Friday, September 17, 2010
76
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
ESC24
Escondido, City of
ADOPTION: 10-00
Project Description:
RAS (TA 7-44)
TransNet - LSI: CRCentre City Parkway from Mission Road to SR 78 - widen 4 lanes to 6 lanes with
intersection improvements
Centre City Parkway
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $3,520 Open to Traffic: Phase 1: Jan 2011
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $846 $300 $100 $446 $846
TransNet - L $974 $974 $974
TransNet - L (Cash) $1,400 $1,400 $1,400
TransNet - LSI $300 $300 $300
TOTAL $3,520 $3,220 $300 $100 $3,120 $300
MPO ID:
Project Title:
ESC25 ADOPTION: 10-00
Project Description:
RAS (TA 7-44)
Citracado/Nordahl from Country Club Lane to SR 78 - widen from 4 lanes to 6
lanes with double left turn lanes and exclusive right turn lanes
Citracado/Nordahl
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $3,776 Open to Traffic: Phase 1: Jul 2008
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $477 $25 $452 $477
TransNet - H (78) $2,154 $2,154 $2,154
TransNet - L $700 $175 $200 $325 $700
TransNet - L (Cash) $245 $245 $245
TransNet - L Carry Over $200 $200 $200
TOTAL $3,776 $3,576 $200 $200 $3,176 $400
MPO ID:
Project Title:
ESC27 ADOPTION: 10-00
Project Description: TransNet - LSI: CRMaple from 2nd Ave to Valley Prkwy - reconstruct from 2-lane through street to a
short two-lane cul-de-sac ending in large pedestrian plaza - design phase
Maple Street Pedestrian Plaza
Exempt Category: Air Quality - Bicycle and pedestrian facilitiesCapacity Status: NCI
Est Total Cost: $1,230
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $230 $230 $230
TransNet - LSI $200 $200 $200
TransNet - LSI Carry Over $800 $800 $800
TOTAL $1,230 $230 $1,000 $1,230
Friday, September 17, 2010
77
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
ESC30
Escondido, City of
ADOPTION: 10-00
Project Description:
RAS (TA 7-44)
TransNet - LSI: CREl Norte Parkway from Washington Avenue to Valley Parkway - construct stamped
concrete medians with landscape and irrigation
El Norte Parkway Medians and Landscaping
Exempt Category: Safety - Adding mediansCapacity Status: NCI
Est Total Cost: $1,109
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - L (Cash) $271 $271 $271
TransNet - LSI $200 $200 $200
TransNet - LSI Carry Over $638 $100 $538 $638
TOTAL $1,109 $271 $838 $1,009 $100
MPO ID:
Project Title:
ESC35 ADOPTION: 10-00
Project Description:
RAS (TA 7-39)
TransNet - LSI: CRBear Valley Parkway from San Pasqual Valley Road to Boyle Avenue - Bear Valley
Parkway from San Pasqual Valley Road to Boyle Avenue - widen from two lanes to
four lanes, with a center median, a bike lane and shoulder in each direction of
travel (CNTY39)
Bear Valley Parkway North Contribution
Exempt Category: Other - Non construction related activitiesCapacity Status: NCI
Est Total Cost: $100
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - LSI $100 $100 $100
TOTAL $100 $100 $100
Friday, September 17, 2010
78
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
IB02
Imperial Beach, City of
ADOPTION: 10-00
Project Description: TransNet - LSI: MaintVarious locations - street maintenance
Street Maintenance Operations
Exempt Category: Safety - Pavement resurfacing and/or rehabilitationCapacity Status: NCI
Est Total Cost: $2,828
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - L $1,655 $1,655 $1,655
TransNet - LSI $305 $157 $163 $171 $183 $195 $1,173 $1,173
TOTAL $2,828 $1,960 $157 $163 $171 $183 $195 $2,828
MPO ID:
Project Title:
IB11 ADOPTION: 10-00
Project Description: Palm Ave (SR75) from 7th Street to 9th Street - design and construct vehicle,
bicycle and public transit circulation and pedestrian access improvements along
and across SR 75, including 7th Street and 9th Street intersections
SR 75 Vehicle, Bicycle, Transit, Pedestrian Improvements
Exempt Category: Air Quality - Bicycle and pedestrian facilitiesCapacity Status: NCI
Est Total Cost: $300
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local RTCIP $300 $90 $210 $300
TOTAL $300 $300 $210 $90
MPO ID:
Project Title:
IB12 ADOPTION: 10-00
Project Description: TransNet - LSI: CR1-11 3rd Street (I.B. Blvd. to Elm Ave.), 2-11 7th Street (Encina Ave. to I.B. Blvd.),
3-11-Adelfa Court (Oneonta Ave. to Hemlock Ave.), 4-11 Delaware Street (Grove
Ave. to I.B. Blvd.), 5-11 Arriba Ave. (9th to Cul-de-sac), 6-11 Elder Ave. (3rd to
Seacoast), 7-11 Elder Ave. (10th Street to east City Limits), 8-11 14th St (Grove
Ave. to Iris Ave.), 9-11 Hemlock (Adela Court to 10th St.), 10-11 Daisy Ave. (Corvina
St to Seacoast Dr.) , 11-11 Grove St. (Connecticut to 8th St.), 12-12 Elm Ave. New
storm drain (Florence to Florida), 13-12 Calla storm drain (532 Calla to Rainbow),
14-13 9th Steet Overlay (Calla to Imperial Beach Blvd.), 15-14 Elm Ave (7th to
10th) , 16-14 7th St (Encina to Palm Ave), 17-15 Georgia St (I.B. Blvd. to Fern St.) ,
18-15 Donax Ave (13th St. to East City Limits) , 19-15 Donax Ave (2nd to 3rd St.),
20-15 5th St. (I.B. Blvd. to Fern St.) , 21-15 Fern St. (5th St to Sports Park) , 22-15
Grove Ave (Sports Park to Louden Lane) , 23-15-Louden Lane (I.B. Blvd. to Grove
Ave.) - work includes but not limited to overlay, new sidewalks, curbs and gutters,
ramps, and storm drain
Major Street Improvements
Exempt Category: Safety - Pavement resurfacing and/or rehabilitationCapacity Status: NCI
Est Total Cost: $3,835
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - L (Cash) $200 $462 $662 $662
TransNet - LSI $711 $367 $379 $398 $428 $454 $821 $1,916 $2,737
TransNet - LSI Carry Over $436 $131 $305 $436
TOTAL $3,835 $911 $1,265 $379 $398 $428 $454 $2,883 $952
Friday, September 17, 2010
79
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
LAM17
La Mesa, City of
ADOPTION: 10-00
Project Description: TransNet - LSI: CRResurfacing Projects: FY10 - Boulder Drive, Chevy Chase, from Hillcrest Ave. to
Sunrise Ave., Colina Drive from Orchard Way to end of street, Crowder Lane from
Lemon Ave. to Hillcrest Ave., Grape Street from Lee Ave. to Normal Ave., Hillcrest
Ave., Lee Aven. from University Ave. to Grape Street, Maiden Lane, Normal Ave.
from Windsor Dr. to Lemon Ave., Palm Ave. from University Ave. to Allison Ave.,
Spring Street from Allison Ave. to La Mesa Blvd., Summit Drive; FY11 - Normal Ave.
From Lowell St. to Windsor Ave.; FY13 - Normal Avenue from Windsor Ave. to La
Mesa Blvd. - rehabilitate pavement of identified priority streets that are in poor
condition and in need of major reconstruction including removal of existing
pavement greater than 1" in depth, and construction of new structural pavement to
provide a smooth travel surface
Street Construction
Exempt Category: Safety - Pavement resurfacing and/or rehabilitationCapacity Status: NCI
Est Total Cost: $5,000
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - CP $2,500 $150 $2,350 $2,500
TransNet - L $1,100 $100 $1,000 $1,100
TransNet - LSI $100 $368 $200 $200 $200 $200 $140 $1,128 $1,268
TransNet - LSI Carry Over $132 $132 $132
TOTAL $5,000 $1,200 $3,000 $200 $200 $200 $200 $4,610 $390
MPO ID:
Project Title:
LAM18 ADOPTION: 10-00
Project Description: TransNet - LSI: MaintCitywide - minor repairs or maintenance based on Pavement Management
System Study
Street Maintenance-Various
Exempt Category: Safety - Pavement resurfacing and/or rehabilitationCapacity Status: NCI
Est Total Cost: $1,260
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - L $340 $340 $340
TransNet - LSI $170 $150 $150 $150 $150 $150 $920 $920
TOTAL $1,260 $510 $150 $150 $150 $150 $150 $1,260
MPO ID:
Project Title:
LAM19 ADOPTION: 10-00
Project Description: TransNet - LSI: MaintCitywide - updates to the existing Pavement Management System Study to
determine condition of city streets
Update Pavement Management Study
Exempt Category: Other - Engineering studiesCapacity Status: NCI
Est Total Cost: $65
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - L $35 $35 $35
TransNet - LSI $5 $5 $5 $5 $5 $5 $30 $30
TOTAL $65 $40 $5 $5 $5 $5 $5 $65
Friday, September 17, 2010
80
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
LAM20
La Mesa, City of
ADOPTION: 10-00
Project Description: TransNet - LSI: MaintCitywide - remove and replace identified and prioritized tripping hazards
Curb and Gutter and Sidewalk
Exempt Category: Safety - Pavement resurfacing and/or rehabilitationCapacity Status: NCI
Est Total Cost: $825
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - L $200 $200 $200
TransNet - LSI $125 $100 $100 $100 $100 $100 $625 $625
TOTAL $825 $325 $100 $100 $100 $100 $100 $825
MPO ID:
Project Title:
LAM21 ADOPTION: 10-00
Project Description: TransNet - LSI: CRParkway Dr. from Marengo to Lambda Ln., Spring St. from Park Ave. to southern
city limits, Orien Ave. from Lowell St. to 7463 Orien Ave., Normal Ave. from Lowell
St. to Windsor Ave., Waite Dr. from western city limit to High St., Massachusetts
Ave. from University Ave. to southern city limits - installation of new streetlights to
bring underground districts up to current city standards
Street Lights for Utility Undergrounding
Exempt Category: Safety - Lighting improvementsCapacity Status: NCI
Est Total Cost: $123
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - L $63 $63 $63
TransNet - LSI $20 $20 $20 $60 $60
TOTAL $123 $83 $20 $20 $123
MPO ID:
Project Title:
LAM22 ADOPTION: 10-00
Project Description: TransNet - LSI: CRLake Murray @ El Paso, Lake Murray @ Baltimore - improve existing traffic signal
and intersection locations by providing safety improvements such as protected left
turns, overhead signals in lieu of island signals, and pedestrian ramps for
improved pedestrian access
Traffic Signal Upgrades - Various
Exempt Category: Other - Intersection signalization projectsCapacity Status: NCI
Est Total Cost: $470
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - L $170 $20 $150 $170
TransNet - LSI $100 $100 $100 $30 $270 $300
TOTAL $470 $170 $100 $100 $100 $420 $50
Friday, September 17, 2010
81
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
LAM23
La Mesa, City of
ADOPTION: 10-00
Project Description: TransNet - LSI: MaintCitywide - install pedestrian ramps in the sidewalk where there is no existing
access, in order to comply with the Americans with Disabilities Act
Pedestrian Ramps-Various
Exempt Category: Air Quality - Bicycle and pedestrian facilitiesCapacity Status: NCI
Est Total Cost: $408
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - L $100 $100 $100
TransNet - LSI $58 $50 $50 $50 $50 $50 $308 $308
TOTAL $408 $158 $50 $50 $50 $50 $50 $408
MPO ID:
Project Title:
LAM24 ADOPTION: 10-00
Project Description: TransNet - LSI: CRJohnson St. from Garfield St. to 8975 Johnson St., Adams Avenue Drainage
improvement between Adams/Tower Avenues, Amaya Dr. from Water St to
Primrose Lane, Schuyler area - improvements to address inadequate street
drainage by constructing new or improving existing storm drain or surface
improvements, reducing congestion by improved vehicular and pedestrian flow all
year around
Roadway Drainage Improvements
Exempt Category: Safety - Pavement resurfacing and/or rehabilitationCapacity Status: NCI
Est Total Cost: $1,388
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - L $160 $18 $142 $160
TransNet - LSI $528 $300 $100 $100 $100 $100 $100 $1,128 $1,228
TOTAL $1,388 $688 $300 $100 $100 $100 $100 $1,270 $118
MPO ID:
Project Title:
LAM25 ADOPTION: 10-00
Project Description: TransNet - LSI: MaintCitywide - implement traffic calming measures including signing and striping,
speed bumps and other similar measures
Traffic Calming -Various
Exempt Category: Safety - Non signalization traffic control and operatingCapacity Status: NCI
Est Total Cost: $250
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - L $100 $100 $100
TransNet - LSI $25 $25 $25 $25 $25 $25 $150 $150
TOTAL $250 $125 $25 $25 $25 $25 $25 $250
Friday, September 17, 2010
82
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
LAM28
La Mesa, City of
ADOPTION: 10-00
Project Description: TransNet - LSI: CRLa Mesa Blvd from Acacia Avenue to Grant Street - improvements to the downtown
village along La Mesa Boulevard inlcuding reconstruction of poor pavement
sections, replacement of pavement to accommodate alignment revisions/new
medians/etc., new curb & gutter to address alignment revisions and replace C&G
in poor condition, installation of new sidewalk to match alignment changes,
replacement of sidewalk in poor condition, lighting and landscape enhancements
and replacement
Downtown Village Streetscape Improvement Project
Exempt Category: Other - Plantings, landscaping, etcCapacity Status: NCI
Est Total Cost: $991
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - LSI Carry Over $991 $991 $991
TOTAL $991 $991 $991
Friday, September 17, 2010
83
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
LG13
Lemon Grove, City of
ADOPTION: 10-00
Project Description: TransNet - LSI: CRVarious - Federal Boulevard Resurfacing Project: This project proposes roadway
rehabilitation (grinding and overlay, new structural pavement, or new overlay
1-inch thick or greater) on Federal Boulevard between College Avenue and the
west City limits;
Lemon Grove Avenue Realignment Project: A key project in the redevelopment of
the city's Downtown Village Specific Plan, this project improves access to and
from SR-94, reducing motorist delays and emissions, while greatly enhancing the
visual appeal of the block adjacent to the trolley station. This project is expected to
extend to FY2013;
Pavement Rehabilitation (citywide): This project involves roadway rehabilitation
(grinding and overlay, new structural pavement, or new overlay 1-inch thick or
greater) of several streets within the city. Streets were prioritized for work based
on levels of deterioration identified in the Pavement Management System;
Sidewalk Rehabilitation: This annual project adds sidewalks, widens sidewalks,
removes and/or replaces various sidewalk locations and installs Americans with
Disabilities Act (ADA) compliant curb ramps throughout the city;
Safe Routes to School match: These projects will improve the City's sidewalk
system, eliminate several potential pedestrian hazards, install in-pavement
lighted markings, and create a safety zone for school children and family
members to walk and bike to and from school
Street Improvements (Congestion Relief)
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $3,449 Open to Traffic: Phase 1: Dec 2012
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - L (Cash) $1,413 $744 $74 $2,083 $2,157
TransNet - LSI $64 $212 $179 $256 $247 $334 $129 $1,163 $1,292
TOTAL $3,449 $1,477 $956 $179 $256 $247 $334 $3,246 $203
MPO ID:
Project Title:
LG14 ADOPTION: 10-00
Project Description: TransNet - LSI: MaintCitywide - traffic related projects scheduled throughout each fiscal year: traffic
loop replacements, traffic signal upgrades, street striping improvements, traffic
calming studies, and the repair or replacement of street signs; these projects are
part of the annual maintenance program established within the City to maintain
the operational readiness of the street system
Traffic Improvements (Preventative Maintenance)
Exempt Category: Other - Traffic signal synchronization projectsCapacity Status: NCI
Est Total Cost: $571
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - LSI $72 $90 $90 $90 $90 $90 $50 $472 $522
TransNet - LSI Carry Over $49 $5 $44 $49
TOTAL $571 $121 $90 $90 $90 $90 $90 $516 $55
Friday, September 17, 2010
84
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
LG15
Lemon Grove, City of
ADOPTION: 10-00
Project Description: TransNet - LSI: MaintCitywide - improvements or repairs to multiple storm drain facilities such as spot
repairs to existing pipes, berms or other diversion devices; attention will be given
to the continuous maintenance of Chollas Creek in accordance with the
requirements of the National Pollutant Discharge Elimination System (NPDES)
permit which involve debris removal, vegetation control, and/or habitat restoration
Storm Drain Rehabilitation (Preventive Maintenance)
Exempt Category: Other - Plantings, landscaping, etcCapacity Status: NCI
Est Total Cost: $130
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - LSI $30 $20 $20 $20 $20 $20 $130 $130
TOTAL $130 $30 $20 $20 $20 $20 $20 $130
MPO ID:
Project Title:
LG16 ADOPTION: 10-00
Project Description: TransNet - LSI: CRFor intersections: Longdale Drive at Myra Street, Olive Street at Pacific Avenue,
San Miguel Avenue at MacArthur Drive, and , San Miguel Avenue at New Jersey
Avenue; for point locations: Bakersfield Street, Colfax Drive, Dennis Lane, Drew
Lane, Darryl Street, Elkhorn Street, Ensenada Street, North Avenue, and San Altos
Place. - evaluate, prioritize, and implement improvements to the city's storm drain
system by identifying deteriorated or problematic portions of the storm drain
system, perform risk assessments to prioritize need, and perform the necessary
construction repairs or replacements to avoid roadway flooding
Storm Drain Rehabilitation (Congestion Relief)
Exempt Category: Other - Plantings, landscaping, etcCapacity Status: NCI
Est Total Cost: $966
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - LSI $467 $100 $100 $100 $100 $100 $82 $884 $966
TOTAL $966 $467 $100 $100 $100 $100 $100 $884 $82
MPO ID:
Project Title:
LG17 ADOPTION: 10-00
Project Description: TransNet - LSI: MaintCitywide - survey of streets for pavement management system
Street Improvements (Preventive Maintenance)
Exempt Category: Safety - Pavement resurfacing and/or rehabilitationCapacity Status: NCI
Est Total Cost: $163
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - LSI $63 $50 $50 $163 $163
TOTAL $163 $63 $50 $50 $163
Friday, September 17, 2010
85
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
LG18
Lemon Grove, City of
ADOPTION: 10-00
Project Description: TransNet - LSI: CRIntersections along Broadway Avenue, College Avenue, Federal Boulevard,
Lemon Grove Avenue, Massachusetts Avenue, Sweetwater Way, and Skyline Drive
- citywide projects may include: median installation for safety improvement or left
turn movement, new traffic signals, passive permissive left turn installation, signal
removal for congestion relief reasons, traffic signal upgrades, intersection
lighting, traffic signal coordination, and traffic signal interconnection/optimization
Traffic Improvements (Congestion Relief)
Exempt Category: Other - Intersection signalization projectsCapacity Status: NCI
Est Total Cost: $494
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - LSI $44 $90 $90 $90 $90 $90 $45 $449 $494
TOTAL $494 $44 $90 $90 $90 $90 $90 $449 $45
Friday, September 17, 2010
86
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
NC01
National City, City of
ADOPTION: 10-00
Project Description:
RTP PG NO: A-6
RAS (TA 7-45)
TransNet - LSI: CRPlaza Blvd. from Highland Ave. to Euclid Ave. - widen from 2 to 3 lanes including a
new traffic lane in each direction, new sidewalks, sidewalk widening, traffic signal
upgrades and interconnection
Plaza Blvd Widening
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $3,393 Open to Traffic: Phase 1: Jul 2015
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
RSTP $2,000 $2,000 $2,000
TransNet - L $797 $797 $797
TransNet - LSI $200 $39 $33 $31 $142 $151 $303 $293 $596
TOTAL $3,393 $2,997 $39 $33 $31 $142 $151 $293 $3,100
MPO ID:
Project Title:
NC03 ADOPTION: 10-00
Project Description: TransNet - LSI: CRHarding Avenue (north-end to W. 30th St.), Van Ness Avenue(Leonard St. to
200'south), E. 31st St. (B Ave. to D Ave., Roosevelt Avenue (north-end to W. 18th
St.), Thelma Way (4th St. to E. 5th St.), E Avenue (E. 20th St. to Cul-de-sac), B
Avenue (E. 7th St. to E. 8th St.), E. 5th Street (D Ave. to Highland Ave.), E. 17th St.
(N Ave. to Palm Ave.), F Avenue (E. 4th St. to E. 8th St.), Lanoitan Avenue (Division
St. to Melrose St.), Burden Dr. (E. 7th St. to E. 8th St.), E. 1st St. (Euclid Ave. to
Clairmont Ave.), E. 24th St. (N.C. Blvd. to D Ave.), E. 2nd St. (Valva Ave. to
Clairmont Ave.) W. 19th St. (Wilson Ave. to Harding Ave.), E. 3rd St. (Valva Ave. to
Clairmont Ave.), W. 16th Street (Hoover Ave. to N.C. Blvd.), Prospect Avenue (E.
20th St. to E. 22nd St.), E. 28th St. (J Ave. to K Ave.), U Avenue (E. 1st St. to E. 4th
St.), Paradise Dr. (PCC Fork in Road to E. 10th St.) E. 5th St. (N.C. Blvd. to D Ave.),
E. 5th St. (Q Ave. to R Ave.), N Avenue (E. 16th St. to E. 18th St.), E. 15th St.
(Highland Ave. to K Ave.), G Ave.(E. 21st St. to E. 22nd St.), E. 7th St. (Palm Ave. to
Q Ave.), F Ave. (E. 26th St. to E. 28th St.), E. 18th St. (Highland Ave. to Palm Ave.),
Valva Ave. (Melrose St. to E. 3rd St.), Paradise Drive (E. 8th St. to Fork in Road),
Salot Street (E. 7th St. to E. 8th St.), I Ave. (E. 13th St. to E. 15th St.), Melrose St.
(Valva Ave. to Clairmont Ave.), V Ave. (E. 7th St. to E. 8th St.), C Ave. (E. 18th St. to
E. 22nd St.), Terry Lane (R Ave. to East Cul-de-sac), W. 11th St. (Hoover Ave. to
N.C. Blvd.), 40 W. 20th St. (Wilson Ave. to Harding Ave.), E. 16th St. (N Ave. to Palm
Ave.),E. 28th St. (K Ave. to L Ave.) - Provide roadway rehabilitation (grinding and
new overlay 1 inch thick or greater)and repair of concrete sidewalks, curb and
gutters
Street Resurfacing Project
Exempt Category: Safety - Pavement resurfacing and/or rehabilitationCapacity Status: NCI
Est Total Cost: $19,541
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $4,114 $300 $300 $300 $300 $300 $5,614 $5,614
TransNet - CP $4,500 $4,500 $4,500
TransNet - L $5,313 $5,313 $5,313
TransNet - L (Cash) $629 $629 $629
TransNet - LSI $1,066 $102 $167 $246 $922 $982 $3,485 $3,485
TOTAL $19,541 $15,622 $402 $467 $546 $1,222 $1,282 $19,541
Friday, September 17, 2010
87
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
NC04
National City, City of
ADOPTION: 10-00
Project Description: TransNet - LSI: CRNational City Boulevard (1st Street to 35th Street), Plaza Boulevard (Roosevelt
Avenue to Paradise Valley Road), Euclid Avenue (Division Street to Sweetwater
Road), 30th Street (National City Boulevard to Euclid Avenue), Harbor Drive (Civic
Center Drive to 8th Street), Highland Avenue (Division Street to 30th Street), 8th
Street (Harbor Drive to Paradise Valley Road), Division Street (Highland Avenue to
Harbison Avenue), DD Avenue (8th Street to 30th Street), Palm Avenue (Division
Street to 18th Street), 18th Street (National City Boulevard to Euclid Avenue), 24th
Street (Tidelands Avenue to Highland Avenue), Sweetwater Road (Euclid Avenue
to Plaza Bonita Center Way) - install and/or upgrade traffic signals
Traffic Signal Install/Upgrade
Exempt Category: Other - Intersection signalization projectsCapacity Status: NCI
Est Total Cost: $1,020
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $50 $50 $50
TransNet - L $472 $472 $472
TransNet - LSI $300 $20 $17 $15 $71 $76 $498 $498
TOTAL $1,020 $822 $20 $17 $15 $71 $76 $1,020
Friday, September 17, 2010
88
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
NCTD01
North County Transit District
ADOPTION: 10-00
Project Description: NCTD service area - bus tire lease
Bus Associated Capital Maintenance
Exempt Category: Mass Transit - Rehabilitation of transit vehiclesCapacity Status: NCI
Est Total Cost: $1,200
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
FTA 5307 $240 $240 $240 $240 $960 $960
Local Funds $60 $60 $60 $60 $240 $240
TOTAL $1,200 $300 $300 $300 $300 $1,200
MPO ID:
Project Title:
NCTD02 ADOPTION: 10-00
Project Description: NCTD service area - fixed route, rail fleet and facility maintenance costs
Preventive Maintenance
Exempt Category: Mass Transit - Transit operating assistanceCapacity Status: NCI
Est Total Cost: $70,672
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
FTA 5307 $7,027 $7,408 $7,657 $7,777 $29,869 $29,869
FTA 5309 (FG) $6,280 $6,532 $6,793 $7,064 $26,669 $26,669
Local Funds $3,327 $3,485 $3,613 $3,710 $14,134 $14,134
TOTAL $70,672 $16,634 $17,425 $18,063 $18,551 $70,672
MPO ID:
Project Title:
NCTD03 ADOPTION: 10-00
Project Description: NCTD service area - operating cost associated with providing ADA/paratransit
services
ADA Paratransit Services
Exempt Category: Mass Transit - Transit operating assistanceCapacity Status: NCI
Est Total Cost: $13,260
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
FTA 5307 $1,500 $1,500 $1,500 $1,500 $6,000 $6,000
Local Funds $1,404 $1,495 $1,632 $1,711 $6,242 $6,242
TransNet - ADA $236 $245 $258 $279 $1,018 $1,018
TOTAL $13,260 $3,140 $3,240 $3,390 $3,490 $13,260
Friday, September 17, 2010
89
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
NCTD05
North County Transit District
ADOPTION: 10-00
Project Description: NCTD service area - purchase replacement vehicles and related equipment;
Compressed Natural Gas (CNG) buses, Americans with Disabilities Act (ADA)
vans and shuttle vehicles
Bus/ADA/ Revenue Vehicle Purchases & Related Equipment
Exempt Category: Mass Transit - Purchase new buses and rail cars to replace existing
vehicles or minor expansions of fleet
Capacity Status: NCI
Est Total Cost: $34,580
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
FTA 5307 $9,243 $1,952 $2,415 $5,510 $19,120 $19,120
FTA 5311 $2,036 $2,036 $2,036
FTA Funds - AR-5311 $578 $578 $578
Local Funds $2,677 $488 $604 $1,378 $5,146 $5,146
TCRP $7,700 $7,700 $7,700
TOTAL $34,580 $22,234 $2,440 $3,019 $6,888 $34,580
MPO ID:
Project Title:
NCTD06 ADOPTION: 10-00
Project Description: NCTD service area - facility and support equipment for fixed route and rail
services including radio equipment, buildings and structures, shop and garage
equipment, computer hardware & software, furnitures and fixtures, service
vehicles and solar installations
Bus/Rail Support Equipment & Facility
Exempt Category: Mass Transit - Purchase of office, shop and operating equipment for
existing facilities
Capacity Status: NCI
Est Total Cost: $5,618
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
FTA 5307 $1,329 $1,060 $1,253 $852 $4,494 $4,494
Local Funds $332 $265 $313 $213 $1,124 $1,124
TOTAL $5,618 $1,661 $1,325 $1,566 $1,065 $5,618
MPO ID:
Project Title:
NCTD16B ADOPTION: 10-00
Project Description: For Sprinter service - start-up operating cost; debt service payments on $34
million Certificates Of Participation (COP) after construction is completed
Oceanside to Escondido Rail Operations
Exempt Category: Mass Transit - Transit operating assistanceCapacity Status: NCI
Est Total Cost: $30,961
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
CMAQ $16,000 $16,000 $16,000
Local Funds $2,250 $2,250 $2,250
TransNet - TSI $2,945 $1,646 $2,720 $2,691 $2,709 $12,711 $12,711
TOTAL $30,961 $21,195 $1,646 $2,720 $2,691 $2,709 $30,961
Friday, September 17, 2010
90
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
NCTD18
North County Transit District
ADOPTION: 10-00
Project Description: NCTD service area - cross-tie renewal program, street cross protection, rail
structure rehabilitation, rail replacement, storage tracks, rail lubricators, at-grade
crossing renewal, turnout renewal, other misc. improvements
Rail - ROW Improvements
Exempt Category: Mass Transit - Track rehabilitation in existing right of wayCapacity Status: NCI
Est Total Cost: $17,152
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
FTA 5307 $7,277 $650 $787 $798 $798 $10,310 $10,310
FTA 5309 (FG) $621 $621 $621
FTA Funds - AR-5307 $570 $570 $570
FTA Funds - AR-5309 $862 $862 $862
Local Funds $1,780 $163 $197 $200 $200 $2,538 $2,538
TransNet - Transit $2,251 $2,251 $2,251
TOTAL $17,152 $13,361 $813 $984 $998 $998 $17,152
MPO ID:
Project Title:
NCTD20 ADOPTION: 10-00
Project Description: NCTD service area - locomotive purchase/overhaul, revenue vehicles, misc.
support equipment including vehicles, spare components and signal equipment
upgrade/replacement and Positive Train Control (PTC)
Rail Vehicles & Related Equipment
Exempt Category: Mass Transit - Purchase new buses and rail cars to replace existing
vehicles or minor expansions of fleet
Capacity Status: NCI
Est Total Cost: $74,363
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
FTA 5307 $5,839 $4,429 $418 $420 $418 $11,524 $11,524
FTA 5309 (FG) $476 $476 $476
Local Funds $1,479 $247 $244 $902 $105 $2,976 $2,976
PTMISEA (Prop1B) $6,170 $6,170 $6,170
Prop 1A - High Speed Rail $8,500 $14,000 $11,010 $8,333 $41,843 $41,843
STA $452 $1,003 $1,454 $1,454
STIP-IIP PTA $1,000 $500 $500 $1,000
TCRP $129 $129 $129
TransNet - MC $4,000 $4,000 $4,000
TransNet - Transit (Cash) $1,349 $1,349 $1,349
Transit Sec Grant Prg (Prop1B) $860 $860 $860 $860 $3,442 $3,442
TOTAL $74,363 $20,084 $24,539 $18,702 $10,515 $523 $73,863 $500
Friday, September 17, 2010
91
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
NCTD29
North County Transit District
ADOPTION: 10-00
Project Description: NCTD Service area - local short range and other transit planning studies
Planning
Exempt Category: Other - Non construction related activitiesCapacity Status: NCI
Est Total Cost: $1,000
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
FTA 5307 $200 $200 $200 $200 $800 $800
Local Funds $50 $50 $50 $50 $200 $200
TOTAL $1,000 $250 $250 $250 $250 $1,000
MPO ID:
Project Title:
NCTD34 ADOPTION: 10-00
Project Description: NCTD service area - operating support for existing fixed route and rail transit
service, including intercity bus and rural services
Expanded Transit Service
Exempt Category: Mass Transit - Transit operating assistanceCapacity Status: NCI
Est Total Cost: $125,562
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
FTA 5311 $349 $359 $370 $381 $1,459 $1,459
Local Funds $21,650 $22,780 $24,777 $26,254 $95,462 $95,462
TransNet - TSI $7,270 $6,517 $7,046 $7,808 $28,641 $28,641
TOTAL $125,562 $29,269 $29,656 $32,193 $34,443 $125,562
MPO ID:
Project Title:
NCTD40 ADOPTION: 10-00
Project Description: NCTD service area - Coaster & Sprinter station improvements including platform
extension; Convention Center/Padres stadium design; information display panel;
electronic signage
Rail Station Improvements
Exempt Category: Mass Transit - Reconstruction or renovation of transit structuresCapacity Status: NCI
Est Total Cost: $3,039
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
FTA 5307 $589 $200 $200 $257 $200 $1,446 $1,446
Local Funds $149 $50 $50 $64 $50 $363 $363
TransNet - MC $1,230 $1,230 $1,230
TOTAL $3,039 $1,968 $250 $250 $321 $250 $3,039
Friday, September 17, 2010
92
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
NCTD42
North County Transit District
ADOPTION: 10-00
Project Description: Along coastal Right Of Way (ROW) from Orange County Line to downtown station
at Santa Fe Depot and along inland ROW from Oceanside Transit Center
(Oceanside, CA) to Escondido Transit Center (Escondido, CA). - bridges & other
infrastructure improvements along rail ROW to be implemented by NCTD
Bridge & Infrastructure Program. NCTD
Exempt Category: Safety - Railroad/highway crossingCapacity Status: NCI
Est Total Cost: $40,351
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
FTA 5307 $2,840 $4,000 $6,632 $2,220 $15,692 $15,692
FTA 5309 (FG) $16,568 $3,120 $13,448 $16,568
Local Funds $4,878 $780 $4,098 $4,878
STA $1,000 $1,658 $555 $3,213 $3,213
TOTAL $40,351 $24,286 $5,000 $8,290 $2,775 $36,451 $3,900
Friday, September 17, 2010
93
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
O06
Oceanside, City of
ADOPTION: 10-00
Project Description:
RAS (TA 7-45)
TransNet - LSI: CRMelrose Drive from North Santa Fe Avenue to Spur Avenue - in Oceanside, future
construction of 4-lane arterial highway with medians, sidewalks and bike lanes
Melrose Drive Extension
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $13,025 Open to Traffic: Phase 1: Dec 2018
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $1,000 $1,000 $1,000
Local RTCIP $3,000 $4,000 $4,000 $3,000 $8,000 $11,000
TransNet - L $1,000 $1,000 $1,000
TransNet - L Carry Over $25 $25 $25
TOTAL $13,025 $1,000 $1,025 $3,000 $4,000 $4,000 $8,000 $5,025
MPO ID:
Project Title:
O09 ADOPTION: 10-00
Project Description: At SR 78 - reconstruct to accommodate increased lane/shoulder width - Design
Phase
El Camino Real Bridge
Exempt Category: Safety - Non capacity widening or bridge reconstructionCapacity Status: NCI
Est Total Cost: $1,397
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $275 $275 $275
Local RTCIP $250 $250 $250
TransNet - L $872 $872 $872
TOTAL $1,397 $1,147 $250 $1,397
MPO ID:
Project Title:
O14 ADOPTION: 10-00
Project Description: North Coast Highway bridge over the San Luis Rey River, Douglas Drive bridge
over the San Luis Rey River - seismic retrofit of highway bridges over the San Luis
Rey River
Bridge Rehabilitation
Exempt Category: Safety - Non capacity widening or bridge reconstructionCapacity Status: NCI
Est Total Cost: $3,900
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $50 $50 $50
TransNet - L $3,850 $3,850 $3,850
TOTAL $3,900 $3,850 $50 $3,900
Friday, September 17, 2010
94
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
O17
Oceanside, City of
ADOPTION: 10-00
Project Description: TransNet - LSI: CRLoma Alta Creek and Sprinter right-of-way east of El Camino Real and east of
Rancho del Oro Blvd. - construction of flood control walls
Loma Alta Creek/Sprinter Detention Basin
Exempt Category: Mass Transit - Track rehabilitation in existing right of wayCapacity Status: NCI
Est Total Cost: $10,200
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - L $7,000 $7,000 $7,000
TransNet - L Carry Over $700 $700 $700
TransNet - LSI Carry Over $2,000 $500 $2,500 $2,500
TOTAL $10,200 $7,000 $700 $2,000 $500 $10,200
MPO ID:
Project Title:
O18 ADOPTION: 10-00
Project Description: TransNet - LSI: MaintCitywide - in Oceanside, slurry sealing of streets, completion of missing
segments of sidewalks, new access ramps and shoulder improvements for
pedestrian accessibility and road safety, parkway trees, streetlights
Neighborhood Sidewalk/ADA/Traffic Improvements
Exempt Category: Safety - Pavement resurfacing and/or rehabilitationCapacity Status: NCI
Est Total Cost: $7,550
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - L $1,150 $1,150 $1,150
TransNet - L (Cash) $600 $600 $600
TransNet - LSI $500 $1,000 $1,000 $1,000 $1,100 $4,600 $4,600
TransNet - LSI Carry Over $1,200 $1,200 $1,200
TOTAL $7,550 $1,750 $1,700 $1,000 $1,000 $1,000 $1,100 $7,550
MPO ID:
Project Title:
O20 ADOPTION: 10-00
Project Description:
RAS (TA 7-45)
TransNet - LSI: Maint
Oceanside Boulevard from I-5 to El Camino Real - acquire right-of-way and
construct wider sidewalk and bus stop waiting pads to allow NCTD buses to
deploy wheelchair lifts
Oceanside Boulevard Bus Stop Americans with Disabilities Act (ADA) Upgrades
Exempt Category: Mass Transit - Construction of small passenger shelters and
information kiosks
Capacity Status: NCI
Est Total Cost: $180
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - LSI Carry Over $180 $50 $50 $80 $180
TOTAL $180 $180 $50 $80 $50
Friday, September 17, 2010
95
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
O22
Oceanside, City of
ADOPTION: 10-00
Project Description:
RAS (TA 7-45)
TransNet - LSI: CRCollege Boulevard from Vista Way to Old Grove Road - in Oceanside, widen from
the existing four lanes to six lanes with bike lanes and raised median
College Boulevard Widening from Vista Way to Old Grove Road
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $300 Open to Traffic: Phase 1: Jun 2020
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - LSI Carry Over $200 $100 $300 $300
TOTAL $300 $200 $100 $300
MPO ID:
Project Title:
O23 ADOPTION: 10-00
Project Description:
RAS (TA 7-45)
TransNet - LSI: CRCollege Boulevard from Adams Street to North River Road - in Oceanside, widen
from four to six lanes plus bike lanes and a striped-only median; widening
includes the approach roadway and the bridge deck over the San Luis Rey River -
Design Phase
College Boulevard Bridge Widening at San Luis Rey River
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $200 Open to Traffic: Phase 1: Jun 2019
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - LSI $75 $75 $75
TransNet - LSI Carry Over $125 $125 $125
TOTAL $200 $125 $75 $200
MPO ID:
Project Title:
O24 ADOPTION: 10-00
Project Description: TransNet - LSI: CROceanside Boulevard from Coast Highway to College Boulevard, College
Boulevard from Vista Way to Mesa Drive, Vista Way from Jefferson Street to El
Camino Real, and El Camino Real from SR-78 to Douglas Drive, and North River
Road from Vandegrift Boulevard to Sleeping Indian Road. - in Oceanside,
permanent asphalt overlay (2-inches minimum)of arterial streets
Street Overlay Program
Exempt Category: Safety - Pavement resurfacing and/or rehabilitationCapacity Status: NCI
Est Total Cost: $9,000
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - LSI $1,000 $2,000 $1,500 $1,500 $6,000 $6,000
TransNet - LSI Carry Over $3,000 $3,000 $3,000
TOTAL $9,000 $3,000 $1,000 $2,000 $1,500 $1,500 $9,000
Friday, September 17, 2010
96
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
O25
Oceanside, City of
ADOPTION: 10-00
Project Description: TransNet - LSI: CRCollege Boulevard and El Camino Real, College Boulevard and SR-78, El
Camino Real and SR-78, Oceanside Boulevard and El Camino Real, College
Boulevard and North River Road, Mission Avenue and El Camino Real, Coast
Highway and Mission Avenue, Coast Highway and Oceanside Boulevard - in the
City of Oceanside, installation of a new traffic management center (TMC) to
conduct real time traffic monitoring and demand-based adaptive control of traffic
signals
Traffic Management Center and Adaptive Traffic Signals
Exempt Category: Other - Traffic signal synchronization projectsCapacity Status: NCI
Est Total Cost: $1,850
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
ARRA - DOE $200 $200 $200
TransNet - LSI $400 $400 $400 $1,200 $1,200
TransNet - LSI Carry Over $450 $450 $450
TOTAL $1,850 $650 $400 $400 $400 $1,850
MPO ID:
Project Title:
O26 ADOPTION: 10-00
Project Description:
RAS (TA 7-45)
TransNet - LSI: CRFrom W. of Rancho del Oro to East of Rancho del Oro - widen SR76 for one
additional lane width 1500 feet west and east of Rancho del Oro Boulevard
SR76 Widening at Rancho del Oro Boulevard
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $3,100 Open to Traffic: Phase 1: Dec 2017
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - LSI $250 $1,000 $1,600 $250 $2,600 $2,850
TransNet - LSI Carry Over $250 $250 $250
TOTAL $3,100 $250 $250 $1,000 $1,600 $2,600 $500
MPO ID:
Project Title:
O27 ADOPTION: 10-00
Project Description: TransNet - LSI: CRNorth Coast Highway from SR-76 to SR-76 - in Oceanside, construction of a traffic
circle at the intersection of North Coast Highway and State Route 76:the traffic
circle will be unsignalized; free traffic flow at all approaches
Coast Highway and SR-76 Roundabout
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $1,050 Open to Traffic: Phase 1: Jun 2016
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $1,000 $1,000 $1,000
TransNet - LSI $50 $50 $50
TOTAL $1,050 $50 $1,000 $1,000 $50
Friday, September 17, 2010
97
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
POW02
Poway, City of
ADOPTION: 10-00
Project Description:
RAS (TA 7-45)
Espola Road from Twin Peaks Road to Titan Way - widen Espola Road from 2 to
3 lanes with 8-foot bike lanes/shoulders
Espola Road
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $4,922 Open to Traffic: Phase 1: Nov 2012
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $1,275 $1,572 $1,486 $1,275 $3,057 $4,332
Local RTCIP $100 $100 $100 $100 $200 $300
RSTP $290 $290 $290
TOTAL $4,922 $1,565 $100 $1,672 $1,586 $3,257 $1,665
MPO ID:
Project Title:
POW10 ADOPTION: 10-00
Project Description: TransNet - LSI: CRCarriage Road Reconstruction from Poway Road to Buckley Street - 10/11, Twin
Peaks Road Overlay from Ted Williams Road to Silverset Street - 11/12, Stowe
Drive Overlay from Pomerado Road to Iavelli Street - 12/13, Scripps Poway
Parkway Overlay from Tech Center to Community Road - 13/14, Solara Way
Overlay from Tannin Drive to Valle Verde Drive - 13/14, Scripps Poway Parkway
Overlay from Eeast City Limits to Danielson Street - 14/15 - reconstruction and
overlay
Poway Road Reconstruction and Overlay Projects
Exempt Category: Safety - Pavement resurfacing and/or rehabilitationCapacity Status: NCI
Est Total Cost: $3,256
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - LSI $601 $761 $650 $839 $405 $3,256 $3,256
TOTAL $3,256 $601 $761 $650 $839 $405 $3,256
MPO ID:
Project Title:
POW11 ADOPTION: 10-00
Project Description: TransNet - LSI: CRPoway Road from Pomerado Rd to Garden Rd - to study the design options to
increase traffic flow and safety on Poway Road from Pomerado Road to Garden
Road
Poway Road Corridor Study
Exempt Category: Other - Engineering studiesCapacity Status: NCI
Est Total Cost: $200
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - LSI Carry Over $200 $200 $200
TOTAL $200 $200 $200
Friday, September 17, 2010
98
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
POW12
Poway, City of
ADOPTION: 10-00
Project Description: TransNet - LSI: CRPoway Rd from Millards Rd to Millards Rd - redesign intersection to increase
traffic flow and safety
Intersection Improvement Projects
Exempt Category: Other - Intersection channelization projectsCapacity Status: NCI
Est Total Cost: $250
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - LSI $250 $40 $210 $250
TOTAL $250 $250 $210 $40
MPO ID:
Project Title:
POW13 ADOPTION: 10-00
Project Description: TransNet - LSI: CRIntersections of Stowe Drive and Danielson Street (11/12) and Kirkham Drive and
Community Road (13/14) - signalization of intersections
Intersection Signalization Projects
Exempt Category: Other - Intersection signalization projectsCapacity Status: NCI
Est Total Cost: $430
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - LSI $180 $250 $90 $340 $430
TOTAL $430 $180 $250 $340 $90
MPO ID:
Project Title:
POW14 ADOPTION: 10-00
Project Description: TransNet - LSI: MaintZone 1 - 10/11, Zone 2 - 11/12, Zone 3 - 12/13, Zone 4 - 13/14, Zone 5 - 14/15 -
street resurfacing and rehabilitation of the local City streets by maintenance zones
Poway Annual Street Maintenance Program
Exempt Category: Safety - Pavement resurfacing and/or rehabilitationCapacity Status: NCI
Est Total Cost: $1,811
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - LSI $330 $310 $360 $388 $413 $1,801 $1,801
TransNet - LSI Carry Over $10 $10 $10
TOTAL $1,811 $340 $310 $360 $388 $413 $1,811
Friday, September 17, 2010
99
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
SAN03A
San Diego Association of Governments
ADOPTION: 10-00
Project Description: Countywide - provides rapid removal of disabled vehicles; joint project between
SANDAG, Caltrans and California Highway Patrol to alleviate traffic congestion
associated with non-recurring incidents
Freeway Service Patrol
Exempt Category: Safety - Non signalization traffic control and operatingCapacity Status: NCI
Est Total Cost: $17,903
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
FSP $2,483 $2,895 $2,895 $2,895 $2,895 $14,063 $14,063
Local Funds $325 $325 $325
RSTP $621 $723 $723 $724 $724 $3,515 $3,515
TOTAL $17,903 $3,429 $3,618 $3,618 $3,619 $3,619 $17,903
MPO ID:
Project Title:
SAN04 ADOPTION: 10-00
Project Description:
RTP PG NO: A-5
SANDAG ID: 1201504From SR 163 to SR 78 - implementation and expansion of FasTrak system along
I-15 corridor
I-15 FasTrak
Exempt Category: Safety - Non signalization traffic control and operatingCapacity Status: NCIRT:15
Est Total Cost: $25,464
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
CMAQ $234 $234 $234
Local Funds $17 $17 $17
RSTP $250 $250 $250
Toll - Managed Lanes $120 $120 $120
TransNet - MC $17,838 $2,445 $1,688 $1,266 $5,022 $18,215 $23,237
Value Pricing Program $1,606 $1,606 $1,606
TOTAL $25,464 $20,065 $2,445 $1,688 $1,266 $18,215 $7,249
MPO ID:
Project Title:
SAN07A ADOPTION: 10-00
Project Description:
SANDAG ID: 11091
Regionwide - planning, programming and monitoring activities related to
transportation funding
Plan, Program & Monitor
Exempt Category: Other - Non construction related activitiesCapacity Status: NCI
Est Total Cost: $3,771
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
STIP-RIP State Cash $2,115 $705 $317 $317 $317 $3,771 $3,771
TOTAL $3,771 $2,115 $705 $317 $317 $317 $3,771
Friday, September 17, 2010
100
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
SAN11A
San Diego Association of Governments
ADOPTION: 10-00
Project Description:
SANDAG ID: 60001
Countywide - Component of overall regional Transportation Demand
Management
Regional Rideshare Program
Exempt Category: Air Quality - Ride-sharing and van-pooling programCapacity Status: NCI
Est Total Cost: $19,685
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
CMAQ $4,031 $4,283 $5,547 $5,824 $19,685 $19,685
TOTAL $19,685 $4,031 $4,283 $5,547 $5,824 $19,685
MPO ID:
Project Title:
SAN13 ADOPTION: 10-00
Project Description:
SANDAG ID: 1142600
EARMARK NO:
E2008-BUSP-0111Regionwide - operations facility/control center to coordinate and integrate several
Intelligent Transportaion System (ITS) deployments; part of ITS regional
architecture
Joint Transit Operations Center
Exempt Category: Mass Transit - Construction or renovation of power, signal, and
communications systems
Capacity Status: NCI
Est Total Cost: $2,631
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
FTA 5309 (Bus) $1,668 $1,668 $1,668
TransNet - H $15 $948 $963 $963
TOTAL $2,631 $1,668 $15 $948 $2,631
MPO ID:
Project Title:
SAN19 ADOPTION: 10-00
Project Description:
RTP PG NO: A-5
From SR 56 to Centre City Pkwy - Debt service for issue of GARVEE bonds for the
I-15 ML (CAL18) project
GARVEE Debt Service
Exempt Category: Other - Non construction related activitiesCapacity Status: NCIRT:15
Est Total Cost: $238,283
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
STIP-IIP NHS GARVEE $31,987 $5,459 $5,459 $5,459 $5,459 $5,459 $59,282 $59,282
STIP-RIP NHS GARVEE $97,121 $16,376 $16,376 $16,376 $16,376 $16,376 $179,001 $179,001
TOTAL $238,283 $129,108 $21,835 $21,835 $21,835 $21,835 $21,835 $238,283
Friday, September 17, 2010
101
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
SAN21
San Diego Association of Governments
ADOPTION: 10-00
Project Description: Projects are consistent with 40 CFR Part 93.126 Exempt Table 2 categories -
bicycle and pedestrian facilities (both motorized and non-motorized)
Grouped Projects for Bicycle and Pedestrian Facilities
Exempt Category: Air Quality - Bicycle and pedestrian facilitiesCapacity Status: NCI
Est Total Cost: $18,461
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $9,144 $755 $1,750 $8,149 $9,899
TDA - Bicycles $4,436 $116 $1,090 $3,462 $4,552
TransNet - B $1,449 $347 $75 $1,720 $1,795
TransNet - BPNS $1,003 $847 $1,849 $1,849
TransNet - L (Cash) $16 $14 $2 $16
TransNet - LSI $250 $250 $250
TransNet - LSI Carry Over $100 $100 $100
TOTAL $18,461 $16,032 $2,431 $15,532 $2,929
MPO ID:
Project Title:
SAN23 ADOPTION: 10-00
Project Description:
PPNO: 7307
RTP PG NO: A-5
SANDAG ID: 1041501From Old Town Transit Center to University City - 11-mile trolley line with new
transit stations proposed at Tecolote Road, Clairemont Drive, Balboa Avenue,
University Center Lanes, UCSD West, UCSD East, Executive Drive, and the UTC
transit center
Mid-Coast Corridor Project
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $1,246,292 Open to Traffic: Phase 1: Dec 2014
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
FTA 5307 $519 $519 $519
FTA 5309 (NS) $14,640 $14,640 $14,640
PTA $537 $537 $537
STIP-RIP AC $28,756 $28,756 $28,756
STIP-RIP State Cash $4,000 $4,000 $4,000
TCRP $10,000 $10,000 $10,000
TransNet - MC $8,252 $78,321 $312,211 $178,644 $8,252 $569,176 $577,428
TransNet - Transit $660 $660 $660
TOTAL $636,540 $30,356 $8,252 $28,756 $78,321 $312,211 $178,644 $569,176 $67,364
Total cost assumes Full Funding Grant Agreement with FTA*
Friday, September 17, 2010
102
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
SAN26
San Diego Association of Governments
ADOPTION: 10-00
Project Description:
RTP PG NO: A-5
SANDAG ID: 1201505
From SR 163 to SR 78 - construct transit stations along the at Del Lago, Rancho
Bernardo Road, and Sabre Springs Parkway for I-15 BRT service including
surface parking, bus staging, bike lockers and station amenities
I-15 BRT Transit Stations @Rancho Bernardo, Sabre Springs, and Del Lago
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $46,170 Open to Traffic: Phase 1: Mar 2009
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
CMAQ $12,012 $12,012 $12,012
FTA 5309 (Bus) $2,788 $2,788 $2,788
STIP-RIP PTA $7,327 $7,327 $7,327
TCRP $5,716 $5,716 $5,716
TransNet - MC $4,273 $4,058 $2,210 $686 $11,227 $11,227
TransNet - Transit $7,100 $7,100 $7,100
TOTAL $46,170 $39,216 $4,058 $2,210 $686 $5,716 $40,454
MPO ID:
Project Title:
SAN26A ADOPTION: 10-00
Project Description:
SANDAG ID: 1201508
From Escondido to San Diego - planning, operations and vehicle acquisition for
the Bus Rapid Transit (BRT) service along I-15 corridor
I-15 BRT Operations and Vehicles
Exempt Category: Mass Transit - Purchase new buses and rail cars to replace existing
vehicles or minor expansions of fleet
Capacity Status: NCI
Est Total Cost: $34,470
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
CMAQ $10,120 $10,120 $10,120
Local Funds $36 $36 $36
TransNet - MC $1,576 $7,283 $14,673 $425 $357 $1,576 $22,738 $24,314
TOTAL $34,470 $11,732 $7,283 $14,673 $425 $357 $32,858 $1,612
MPO ID:
Project Title:
SAN26B ADOPTION: 10-00
Project Description:
SANDAG ID: 1201509
Broadway corridor, Kettner and India Streets - upgrade transit stations in
downtown San Diego for Bus Rapid Transit (BRT) services
Transit Stations Upgrades
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $9,154 Open to Traffic: Phase 1: Mar 2012
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - MC $633 $3,830 $4,691 $1,400 $803 $6,951 $9,154
TOTAL $9,154 $633 $3,830 $4,691 $803 $6,951 $1,400
Friday, September 17, 2010
103
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
SAN26C
San Diego Association of Governments
ADOPTION: 10-00
Project Description:
SANDAG ID: 1201507
At University Avenue and at El Cajon Blvd. (mid-city area of San Diego) - construct
transit stations
I-15 BRT Mid-City In-Line Bus Rapid Transit Stations
Exempt Category: Mass Transit - Reconstruction or renovation of transit structuresCapacity Status: NCI
Est Total Cost: $21,450
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - MC $1,303 $1,862 $1,674 $6,046 $10,410 $155 $6,372 $52 $15,026 $21,450
TOTAL $21,450 $1,303 $1,862 $1,674 $6,046 $10,410 $155 $52 $15,026 $6,372
MPO ID:
Project Title:
SAN27 ADOPTION: 10-00
Project Description:
RTP PG NO: A-5
SANDAG ID: 1300601, 1300602From Commercial St. to International Border - SD&AE freight facility and South
Line Mainline in San Ysidro - environmental studies, design, site planning, and
construction for an international freight facility; signal installation for the track and
rail cars
San Ysidro Intermodal Freight Facility/South Line Rail
Exempt Category: Mass Transit - Track rehabilitation in existing right of wayCapacity Status: NCI
Est Total Cost: $149,090
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
CBI $600 $600 $600
DEMO - TEA 21 $9,980 $2,055 $7,925 $9,980
Local Funds $320 $320 $320
Trade Corridor Program $107,360 $107,360 $107,360
Trade Corridor Program Conversion $16,600 $16,600 $16,600
TransNet - Border $1,725 $5,900 $3,888 $500 $700 $1,517 $14,230 $14,230
TransNet - MC AC $1,700 $14,900 $(16,600)$0
TOTAL $149,090 $14,325 $20,800 $111,248 $500 $700 $1,517 $7,925 $123,960 $17,205
MPO ID:
Project Title:
SAN28 ADOPTION: 10-00
Project Description:
EA NO: R550SB
PPNO: 7300
SANDAG ID: 1143000From Mile Post (MP) 244.1 in Del Mar to MP 245.7 in Del Mar - stabilize bluff areas
Del Mar Bluff Stabilization
Exempt Category: Mass Transit - Track rehabilitation in existing right of wayCapacity Status: NCI
Est Total Cost: $14,237
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
FTA 5309 (NS) $4,386 $405 $3,981 $4,386
STIP-GF IIP State Cash $4,500 $4,500 $4,500
STIP-IIP AC $3,397 $3,397 $3,397
STIP-IIP PTA $1,200 $1,200 $1,200
STIP-IIP State Cash $754 $754 $754
TOTAL $14,237 $10,840 $3,397 $12,632 $1,605
Friday, September 17, 2010
104
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
SAN29
San Diego Association of Governments
ADOPTION: 10-00
Project Description:
EA NO: R690SA
PPNO: 7301
RTP PG NO: A-5
SANDAG ID: 1142200, 1239801
Phase 1: Control Point (CP) Pines (Mile Post (MP) 249.8) to CP Miramar (MP 251),
Phase 2: CP Miramar (MP 251) to CP Cumbres (MP 252.9) - realign curve and
construct second main track; fully funds PE and design for both Phase 1 and
Phase 2; construction for Phase 1 only
Sorrento to Miramar Double Track/Realign
Exempt Category: Mass Transit - Track rehabilitation in existing right of wayCapacity Status: NCI
Est Total Cost: $26,800
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
STIP-IIP PTA $3,900 $3,900 $3,900
STIP-IIP State Cash $1,300 $1,300 $1,300
Trade Corridor Program $10,800 $10,800 $10,800
TransNet - MC $371 $1,090 $540 $7,669 $1,130 $2,381 $8,419 $10,800
TOTAL $26,800 $5,571 $11,890 $540 $7,669 $1,130 $19,219 $7,581
MPO ID:
Project Title:
SAN40 ADOPTION: 10-00
Project Description: Countywide - ongoing regional transportation planning including the regional
vanpool program
Metropolitan Planning
Exempt Category: Other - Non construction related activitiesCapacity Status: NCI
Est Total Cost: $18,093
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
FTA 5307 $3,412 $3,549 $3,691 $3,839 $14,491 $14,491
Local Funds $853 $887 $902 $960 $3,602 $3,602
TOTAL $18,093 $4,265 $4,436 $4,593 $4,799 $18,093
MPO ID:
Project Title:
SAN46 ADOPTION: 10-00
Project Description:
RTP PG NO: A-5
SANDAG ID: 1041502University City in San Diego - design and construction of transit priority treatments,
que jumper lanes, street modifications, new and modified transit stations, and
acquisition of 12 expansion shuttles
Super Loop
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $36,349 Open to Traffic: Phase 1: Jun 2009
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
FTA 5309 (NS) $617 $617 $617
TransNet - MC $12,348 $13,610 $1,684 $6,323 $100 $21,219 $27,642
TransNet - Transit $699 $699 $699
TOTAL $28,958 $13,664 $13,610 $1,684 $100 $21,219 $7,639
Friday, September 17, 2010
105
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
SAN47
San Diego Association of Governments
ADOPTION: 10-00
Project Description:
SANDAG ID: 1280504
From Otay Ranch to downtown San Diego - plan, design, and construct transit
stations, transit way, local street and road modifications, freeway modifications
South Bay BRT
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $97,108 Open to Traffic: Phase 1: Sep 2014
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
FTA 5307 $545 $545 $545
FTA 5309 (Bus) $1,017 $1,017 $1,017
Local Funds $355 $355 $355
TransNet - MC $5,888 $13,343 $19,196 $33,770 $19,980 $2,220 $12,409 $6,194 $75,794 $94,397
TransNet - Transit $794 $794 $794
TOTAL $97,108 $8,599 $13,343 $19,196 $33,770 $19,980 $2,220 $6,194 $75,794 $15,120
MPO ID:
Project Title:
SAN54 ADOPTION: 10-00
Project Description: Regionwide - implementation of Intelligent Transportation System (ITS) projects
such as Compass Card Program, Intermodal Transportation Management
System (IMTMS), Freeway Service Patrol, 511 Advanced Traveler Information
System, Regional Arterial Management System; activities include data collection,
dissemination, software upgrades
ITS Operating
Exempt Category: Safety - Non signalization traffic control and operatingCapacity Status: NCI
Est Total Cost: $11,743
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - MC $2,179 $2,260 $2,345 $2,433 $2,526 $11,743 $11,743
TOTAL $11,743 $2,179 $2,260 $2,345 $2,433 $2,526 $11,743
MPO ID:
Project Title:
SAN55 ADOPTION: 10-00
Project Description: MTS service area - provide for support equipment and facilities work related to
bus and rail operations such as roof renovations, shop equipment, Light Rail
Vehicle (LRV) car wash replacement, building repairs, Intelligent Transportation
infrastructure, servers, and storage, non-revenue vehicles, and safety and security
equipment
Bus & Fixed Guideway Support Equipment and Facilities 114-00 / 124-00
Exempt Category: Mass Transit - Purchase of office, shop and operating equipment for
existing facilities
Capacity Status: NCI
Est Total Cost: $9,015
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
FTA 5307 $1,803 $1,803 $1,803 $1,803 $7,212 $7,212
Local Funds $451 $451 $451 $451 $1,803 $1,803
TOTAL $9,015 $2,254 $2,254 $2,254 $2,254 $9,015
Friday, September 17, 2010
106
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
SAN58
San Diego Association of Governments
ADOPTION: 10-00
Project Description: Projects are consistent with 40 CFR Part 93.126 Exempt Table 2 categories:
operating assistance to transit operators - non profit agencies providing transit
service to eldery and disabled residents
Grouped Projects for Operating Assistance - 5317 New Freedom Program
Exempt Category: Mass Transit - Transit operating assistanceCapacity Status: NCI
Est Total Cost: $1,530
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
FTA 5317 - NF $368 $368 $368
Local Funds $571 $120 $692 $692
TransNet - SS $269 $201 $470 $470
TOTAL $1,530 $1,208 $321 $1,530
MPO ID:
Project Title:
SAN64 ADOPTION: 10-00
Project Description:
PPNO: 2074
From Mile Post (MP) 225.3 to MP 225.9 - in Oceanside, adds a new 0.6 mile
section of double track and replace the 700-foot long San Luis Rey River Bridge
just north of the Oceanside Transit Center on the San Diego Subdivision of the
San Diego Northern Railway (SDNR)
San Luis Rey Bridge Replacement & Second Track
Exempt Category: Other - Engineering studiesCapacity Status: NCI
Est Total Cost: $3,000
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
STIP-IIP AC $3,000 $3,000 $3,000
TOTAL $3,000 $3,000 $3,000
MPO ID:
Project Title:
SAN66 ADOPTION: 10-00
Project Description:
SANDAG ID: 1210010-70
From 12th/Imperial to San Ysidro - design and construction for Trolley wayside
and trackway modifications including stations to support new low-floor vehicle
operations on the Blue Line
Blue Line Upgrade
Exempt Category: Mass Transit - Reconstruction or renovation of transit structuresCapacity Status: NCI
Est Total Cost: $219,304
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
FTA 5307 $1,313 $4,000 $8,000 $10,000 $3,000 $1,000 $25,313 $26,313
FTA Funds - AR-5307 $42,904 $6,786 $36,118 $42,904
FTA Funds - AR-5309 $2,011 $2,011 $2,011
PTMISEA (Prop1B) $6,134 $3,627 $17,425 $10,750 $37,936 $37,936
Prop 1A - High Speed Rail $6,351 $17,690 $25,450 $8,364 $57,855 $57,855
SLPP (Prop1B) $1,313 $592 $15,845 $17,750 $17,750
TransNet - MC $1,885 $10,064 $13,215 $7,489 $1,186 $696 $1,885 $32,650 $34,535
TOTAL $219,304 $48,113 $17,511 $27,785 $66,449 $47,386 $12,060 $209,633 $9,671
Friday, September 17, 2010
107
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
SAN67
San Diego Association of Governments
ADOPTION: 10-00
Project Description:
SANDAG ID: 1210002
Along Blue Line service - low-floor vehicle procurement and existing light rail
vehicle rehabilitation for the San Diego Trolley system sufficient to run low floor
service on the Blue Line
Blue Line Vehicles
Exempt Category: Mass Transit - Purchase new buses and rail cars to replace existing
vehicles or minor expansions of fleet
Capacity Status: NCI
Est Total Cost: $233,000
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $4,453 $4,453 $4,453
PTMISEA (Prop1B) $25,558 $81,620 $55,830 $163,008 $163,008
SLPP (Prop1B) $31,097 $31,097 $31,097
TransNet - MC $3 $5,830 $13,952 $3,010 $11,647 $3 $34,439 $34,442
TransNet - MC AC $46,000 $(46,000)$0
TOTAL $233,000 $50,456 $62,485 $81,620 $23,782 $3,010 $11,647 $228,544 $4,456
MPO ID:
Project Title:
SAN68 ADOPTION: 10-00
Project Description:
SANDAG ID: 1280507
Between Chula Vista and Sorrento Valley along I-805 corridor - new buses
equipped with lane-keeping and adaptive cruise control technology; freeway
median lane restriping and signing (MTS to procure vehicles)
Vehicle Assist and Automation/Bus on Shoulder Service
Exempt Category: Other - Non construction related activitiesCapacity Status: NCI
Est Total Cost: $22,500
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
FTA 5309 (Bus) $15,000 $660 $14,340 $15,000
ITS $3,000 $3,000 $3,000
TransNet - MC $1,098 $1,502 $1,900 $2,438 $1,300 $762 $4,500
TOTAL $22,500 $16,098 $4,502 $1,900 $1,300 $15,102 $6,098
MPO ID:
Project Title:
SAN73 ADOPTION: 10-00
Project Description: From Mile Post (MP) 239.6 to MP 241.1 - in the Cities of Encinitas and Solana
Beach, preliminary engineering to double track 1.5 miles between Control Point
(CP) Cardiff and CP Craven
Cardiff to Craven Double Track
Exempt Category: Other - Engineering studiesCapacity Status: NCI
Est Total Cost: $4,397
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
STIP-IIP AC $2,200 $2,197 $4,397 $4,397
TOTAL $4,397 $2,200 $2,197 $4,397
Friday, September 17, 2010
108
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
SAN74
San Diego Association of Governments
ADOPTION: 10-00
Project Description:
SANDAG ID: 1143300
Route 350, a six-mile local bus route in the City of Escondido - improvements
include bus stop consolidation and enhancements, queue jumper, and transit
signal priority; improve transit travel times and reliability
Escondido Bus Rapid Transit
Exempt Category: Mass Transit - Reconstruction or renovation of transit structuresCapacity Status: NCI
Est Total Cost: $4,301
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - MC $2,353 $1,948 $1,425 $2,876 $4,301
TOTAL $4,301 $2,353 $1,948 $2,876 $1,425
STIP/SLPP for TransNet exchange*
MPO ID:
Project Title:
SAN78 ADOPTION: 10-00
Project Description:
SANDAG ID: 1240001
From downtown San Diego to San Diego State University via Park and El Cajon
Boulevards - development of a Rapid Bus route including enhanced vehicles and
stations, transit signal priority, real-time information and improved frequencies
Mid-City Rapid Bus
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $44,527 Open to Traffic: Phase 1: Jun 2012
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
FTA 5307 $320 $320 $320
FTA 5309 (NS) $22,429 $729 $21,700 $22,429
TransNet - MC $3,444 $3,910 $12,693 $1,532 $471 $21,108 $21,579
TransNet - Transit $199 $199 $199
TOTAL $44,527 $26,392 $3,910 $12,693 $1,532 $42,808 $1,719
MPO ID:
Project Title:
SAN79 ADOPTION: 10-00
Project Description:
SANDAG ID: 1142500
MTS service area - develop modern operation center which combines elements of
train location, switch control, and fire/life and safety monitoring, to control
passenger information signs and public address systems; procure both a
back-end computer system, as well as deploy the necessary field equipment to
safely and efficiently control the train network
Centralized Train Control (CTC)
Exempt Category: Mass Transit - Construction or renovation of power, signal, and
communications systems
Capacity Status: NCI
Est Total Cost: $12,131
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
FTA 5307 $3,200 $3,200 $3,200
Local Funds $800 $800 $800
TransNet - MC $3,126 $2,959 $1,110 $936 $8,131 $8,131
TOTAL $12,131 $7,126 $2,959 $1,110 $936 $12,131
STIP-TransNet swap*
Friday, September 17, 2010
109
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
SAN80
San Diego Association of Governments
ADOPTION: 10-00
Project Description: Countywide - Coaster, Sprinter, Blue/Orange/Green Line improvements, Mid
Coast, I-15 Bus Rapid Transit (BRT), Mid City Rapid, Super Loop, South Bay BRT ,
and the Transit Only Lane project operating costs
TransNet Major Transit Corridor Operations
Exempt Category: Mass Transit - Transit operating assistanceCapacity Status: NCI
Est Total Cost: $59,567
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - BRT/Rail Ops $2,805 $3,730 $5,594 $15,661 $15,751 $16,026 $59,567 $59,567
TOTAL $59,567 $2,805 $3,730 $5,594 $15,661 $15,751 $16,026 $59,567
MPO ID:
Project Title:
SAN84 ADOPTION: 10-00
Project Description: Projects are consistent with 40 CFR Part 93.126 Exempt Table 2 categories:
operating assistance to transit operators - non profit agencies providing
transportation programs specializing in services for seniors
Grouped Projects for Operating Assistance - TransNet Senior Mini-Grant Program
Exempt Category: Mass Transit - Transit operating assistanceCapacity Status: NCI
Est Total Cost: $3,761
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $585 $319 $905 $905
TransNet - SS $1,537 $1,320 $2,856 $2,856
TOTAL $3,761 $2,122 $1,639 $3,761
MPO ID:
Project Title:
SAN94 ADOPTION: 10-00
Project Description: From SR 52 to SR 78 - I-15 Corridor in San Diego region is one of eight pioneer
sites selected throughout the nation by US Department Of Transportation (DOT)
for the the ICM initiative; I-15 ICM project establishes an operational platform that
will allow the transportation network to be operated in a more coordinated and
integrated manner; project includes the integration of existing Intelligent
Transportation System (ITS) platforms, development of a Decision Support
System, and upgrades to the traffic signal syncrhonization network to a
responsive system; provide for better management of traffic conditions along the
I-15 corridor
I-15 Integrated Corridor Management Project (ICM)
Exempt Category: Other - Non construction related activitiesCapacity Status: NCIRT:15
Est Total Cost: $11,151
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
STA $100 $100 $100
State Bond - TLSP $2,162 $2,162 $2,162
USDOTs $200 $3,218 $3,694 $1,777 $8,889 $8,889
TOTAL $11,151 $2,462 $3,218 $3,694 $1,777 $11,151
Friday, September 17, 2010
110
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
SAN114
San Diego Association of Governments
ADOPTION: 10-00
Project Description: Projects are consistent with 40 CFR Parts 93.126 and 93.127 Exempt Tables 2
and 3 categories: rehabilitation or reconstruction of track structures, track, and
trackbed in existing right-of-way (non-capacity increasing)- From Oceanside to
San Diego along the LOSSAN Corridor; design track improvements; SANDAG ID
1239802 to 1239808
Group Projects for Rehabilitation or Reconstruction of Track Structures, Track, and
Trackbed in Exisiting Rights-of-Way: Coastal Rail Corridor
Exempt Category: Mass Transit - Track rehabilitation in existing right of wayCapacity Status: NCI
Est Total Cost: $36,004
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
IRI-1B (Prop1B) $3,146 $3,146 $3,146
Other Fed - ARRA - Federal railroad Administration $11,800 $11,800 $11,800
Prop. 116 $501 $501 $501
RSTP $11,738 $11,738 $11,738
TCRP $1,000 $1,000 $1,000
TransNet - MC $2,901 $4,718 $200 $7,819 $7,819
TOTAL $36,004 $16,140 $19,664 $200 $11,800 $24,204
MPO ID:
Project Title:
SAN122 ADOPTION: 10-00
Project Description:
SANDAG ID: 1280509
From Heritage Road to I-805 - design extension of transit guideway for the South
Bay Bus Rapid Transit service along East Palomar
South Bay BRT: West Guideway
Exempt Category: Mass Transit - Track rehabilitation in existing right of wayCapacity Status: NCI
Est Total Cost: $2,800
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - MC $700 $2,100 $2,800 $2,800
TOTAL $2,800 $700 $2,100 $2,800
MPO ID:
Project Title:
SAN123 ADOPTION: 10-00
Project Description:
SANDAG ID: 1143200
Within the parking area of the UTC Shopping mall area - off street transit center for
existing Metropolitan Transit System (MTS) and North County Transit District
(NCTD) for local and express service for SuperLoop, Mid-Coast and Bus Rapid
Transit (BRT)
University Town Center (UTC) Transit Center
Exempt Category: Mass Transit - Reconstruction or renovation of transit structuresCapacity Status: NCI
Est Total Cost: $5,700
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - MC $5 $855 $1,335 $3,505 $550 $5,150 $5,700
TOTAL $5,700 $5 $855 $1,335 $3,505 $5,150 $550
Friday, September 17, 2010
111
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
SAN125
San Diego Association of Governments
ADOPTION: 10-00
Project Description: San Diego County - purchase of modified vans/buses by various non-profit
organizations for purposes of transporting elderly and disabled
FTA Section 5310 Elderly and Disabled Transit Program
Exempt Category: Mass Transit - Purchase new buses and rail cars to replace existing
vehicles or minor expansions of fleet
Capacity Status: NCI
Est Total Cost: $1,088
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
FTA 5310 $963 $963 $963
Local Funds $125 $125 $125
TOTAL $1,088 $1,088 $1,088
Friday, September 17, 2010
112
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
CNTY05
San Diego County
ADOPTION: 10-00
Project Description: TransNet - LSI: CRBetween Lakeside Avenue and Mapleview Street;, in the vicinity of Channel Rd
Bridge - in Lakeside, design an equestrian trail crossing at the San Diego River
Channel Road Equestrian Crossing
Exempt Category: Air Quality - Bicycle and pedestrian facilitiesCapacity Status: NCI
Est Total Cost: $215
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - L $87 $87 $87
TransNet - L (Cash) $1 $1 $1
TransNet - LSI $35 $92 $127 $127
TOTAL $215 $88 $35 $92 $215
MPO ID:
Project Title:
CNTY14 ADOPTION: 10-00
Project Description:
RAS (TA 7-50)
TransNet - LSI: CRSouth Santa Fe Avenue from Montgomery Dr to 700 ft South of Woodland Ave -
Vista City limits to 700 feet south of Woodland - reconstruct and widen from 2 to 4
lanes including bicycle lane
South Santa Fe Avenue North
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $22,066 Open to Traffic: Phase 1: Apr 2014
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $200 $200 $200
TransNet - H $8,836 $500 $8,336 $8,836
TransNet - H (78) $4,512 $3,670 $843 $4,513
TransNet - L $611 $12 $599 $611
TransNet - L (Cash) $671 $671 $671
TransNet - LSI $12 $2,791 $262 $12 $3,053 $3,065
TransNet - LSI Carry Over $4,170 $300 $3,870 $4,170
TOTAL $22,066 $14,842 $4,170 $2,791 $262 $9,679 $7,522 $4,865
MPO ID:
Project Title:
CNTY14A ADOPTION: 10-00
Project Description:
RAS (TA 7-50)
TransNet - LSI: CRSouth Santa Fe from 700 ft south of Woodland Dr to Smilax Rd - widening of
South Santa Fe Avenue to a five-lane major road with a center left turn lane, curb,
gutter, sidewalk, bike lanes, and drainage improvements from 700 ft south of
Woodland Dr to Smilax Road
South Santa Fe Avenue South
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $1,500 Open to Traffic: Phase 1: Jun 2019
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
RSTP $61 $61 $61
TransNet - L $175 $175 $175
TransNet - L (Cash) $36 $36 $36
TransNet - LSI $433 $669 $1,102 $1,102
TransNet - LSI Carry Over $98 $98 $98
TOTAL $1,472 $644 $828 $1,472
Friday, September 17, 2010
113
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
CNTY17
San Diego County
ADOPTION: 10-00
Project Description: TransNet - LSI: CRPh 2: on SR94 extend Jamacha Blvd; Ph 3: on SR54 extend from Cuyamaca
College east to Braham - previously CI and widened from 4 to 6 lanes with
intersection improvements, raised median and left turn pockets; current money
allocated is NCI for plant establishment and environmental mitigation
SR 54/94 Phase II & III
Exempt Category: Non-ExemptCapacity Status: CIRT:54
Est Total Cost: $16,890 Open to Traffic: Phase 1: Sep 2008 Phase 2: Sep 2008
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $1,207 $1,207 $1,207
TransNet - L $15,410 $200 $15,210 $15,410
TransNet - L Carry Over $40 $40 $40
TransNet - LSI $211 $22 $233 $233
TOTAL $16,890 $16,868 $22 $16,690 $200
MPO ID:
Project Title:
CNTY21 ADOPTION: 10-00
Project Description:
RAS (TA 7-49)
TransNet - LSI: CRBradley Avenue from Magnolia Ave. to Mollison Ave. - widen of Bradley Ave.
including the SR-67 overpass from 2 to 4 lanes plus sidewalks
Bradley Avenue Overpass at SR 67
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $34,000 Open to Traffic: Phase 1: Dec 2017
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
RSTP $750 $750 $750
TransNet - L $195 $195 $195
TransNet - LSI $914 $332 $206 $106 $109 $3,114 $1,197 $3,584 $4,781
TransNet - LSI Carry Over $69 $69 $69
TOTAL $5,795 $1,859 $401 $206 $106 $109 $3,114 $3,584 $2,211
MPO ID:
Project Title:
CNTY24 ADOPTION: 10-00
Project Description:
RAS (TA 7-49)
TransNet - LSI: CRCole Grade Road from N. of Horse Creek Trail to South of Pauma Heights Road -
widen to accommodate 14-ft traffic lane in both direction, 12-ft center 2-way left
turn, 6-ft bike lane & 10-ft pathway
Cole Grade Road
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $1,474 Open to Traffic: Phase 1: Dec 2018
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - L $350 $350 $350
TransNet - L (Cash) $288 $142 $430 $430
TransNet - LSI $143 $26 $80 $109 $336 $249 $445 $694
TOTAL $1,474 $638 $285 $26 $80 $109 $336 $445 $1,029
Friday, September 17, 2010
114
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
CNTY26
San Diego County
ADOPTION: 10-00
Project Description: TransNet - LSI: MaintRamona Drive Sidewalks, Julian Avenue, Olive Vista Drive, and Valley Center
Road - construction of curbs, gutter, sidewalks, drainage, and landscaping
Street Improvements
Exempt Category: Other - Plantings, landscaping, etcCapacity Status: NCI
Est Total Cost: $14,781
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - L $8,005 $405 $500 $7,100 $8,005
TransNet - L (Cash) $883 $124 $111 $648 $883
TransNet - LSI $1,185 $942 $26 $673 $50 $1,430 $2,153
TransNet - LSI (Cash) $2,540 $2,540 $2,540
TransNet - LSI Carry Over $1,200 $500 $50 $650 $1,200
TOTAL $14,781 $12,613 $2,142 $26 $711 $12,368 $1,702
MPO ID:
Project Title:
CNTY33 ADOPTION: 10-00
Project Description: TransNet - LSI: CRAt Via de Santa Fe and La Granada from Camino Selva to La Fletcha - modify
intersection to encourage northbound traffic to use La Granada north of this
intersection; work includes new striping, stop signs and new sidewalk
Via de Santa Fe/La Granada
Exempt Category: Other - Interchange reconfiguration projectsCapacity Status: NCI
Est Total Cost: $1,009
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - L $169 $121 $48 $169
TransNet - L (Cash) $37 $37 $37
TransNet - L Carry Over $4 $4 $4
TransNet - LSI $460 $214 $40 $634 $674
TransNet - LSI Carry Over $125 $125 $125
TOTAL $1,009 $670 $339 $52 $759 $198
MPO ID:
Project Title:
CNTY34 ADOPTION: 10-00
Project Description:
RAS (TA 7-49)
TransNet - LSI: CRDye Road from Dye Road to San Vicente Road - in Ramona, study, design and
construct a 2-lane community collector road with intermittent turn lanes, bike
lanes, curb, gutter, and pathway/walkway
Dye Road Extension
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $2,521 Open to Traffic: Phase 1: Dec 2017
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - L $300 $300 $300
TransNet - L (Cash) $250 $250 $250
TransNet - LSI $1,126 $378 $179 $106 $82 $1,751 $120 $1,871
TransNet - LSI Carry Over $100 $100 $100
TOTAL $2,521 $1,676 $478 $179 $106 $82 $120 $2,401
Friday, September 17, 2010
115
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
CNTY35
San Diego County
ADOPTION: 10-00
Project Description: TransNet - LSI: CRRamona Street from Boundary Ave. to Warnock Dr. - in the community of Ramona,
construct new road extension, 2 lanes with intermittent turn lanes, bike lanes and
walkway/pathway
Ramona Street Extension
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $4,507 Open to Traffic: Phase 1: Jun 2013
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - L $287 $233 $54 $287
TransNet - LSI $396 $240 $3,054 $530 $1,081 $105 $3,034 $4,220
TOTAL $4,507 $683 $240 $3,054 $530 $159 $3,034 $1,314
MPO ID:
Project Title:
CNTY36 ADOPTION: 10-00
Project Description: TransNet - LSI: CRSan Vicente Road from Warnock Drive to Wildcat Canyon Road - in Ramona,
design and reconstruct road improvements, including 2-lane community collector
road with intermittent turn lanes, bike lanes, asphalt concrete dike, and
pathway/walkway
San Vicente Road Improvements
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $27,242 Open to Traffic: Phase 1: Jan 2015
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - L $790 $790 $790
TransNet - L (Cash) $591 $591 $591
TransNet - LSI $1,081 $981 $618 $8,268 $7,358 $7,095 $2,797 $983 $21,621 $25,401
TransNet - LSI Carry Over $460 $381 $79 $460
TOTAL $27,242 $2,462 $1,441 $618 $8,268 $7,358 $7,095 $1,062 $21,621 $4,559
MPO ID:
Project Title:
CNTY38 ADOPTION: 10-00
Project Description: TransNet - LSI: CRAt intersections of Via De La Valle/Paseo Delicias, El Montevideo/Paseo
Delicias/La Valle Plateada, and El Camino Del Norte/El Escondido Del Dios
Highway - in Rancho Santa Fe, replace existing stop sign control with
roundabouts at several intersections including Americans with Disabilities Act
(ADA) compliant pathways to accommodate bicycles in the traffic lane or on
walked on the pedestrian paths
Rancho Santa Fe Roundabouts
Exempt Category: Other - Interchange reconfiguration projectsCapacity Status: NCI
Est Total Cost: $612
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
RSTP $96 $96 $96
TransNet - LSI $503 $13 $512 $4 $516
TOTAL $612 $503 $109 $4 $608
Friday, September 17, 2010
116
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
CNTY39
San Diego County
ADOPTION: 10-00
Project Description:
RAS (TA 7-49)
TransNet - LSI: CRBear Valley Parkway from San Pasqual Valley Road to Boyle Avenue - widen from
two to four lanes, with a center median, a bike lane and shoulder in each direction
of travel
Bear Valley Parkway North
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $13,151 Open to Traffic: Phase 1: Dec 2015
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - L $6 $6 $6
TransNet - L (Cash) $6 $6 $6
TransNet - LSI $783 $10 $2,237 $4,505 $3,924 $1,680 $1,041 $1,729 $10,369 $13,139
TOTAL $13,151 $795 $10 $2,237 $4,505 $3,924 $1,680 $1,729 $10,369 $1,053
MPO ID:
Project Title:
CNTY42 ADOPTION: 10-00
Project Description:
RAS (T A7-50)
TransNet - LSI: CROtay Mesa Road from SR 125 to Enrico Fermi Drive - future widening of Otay Mesa
Otay Mesa Road Widening
Exempt Category: Other - Engineering studiesCapacity Status: NCI
Est Total Cost: $220
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - LSI $198 $10 $2 $210 $210
TransNet - LSI Carry Over $10 $10 $10
TOTAL $220 $198 $10 $10 $2 $220
MPO ID:
Project Title:
CNTY46 ADOPTION: 10-00
Project Description:
RAS (TA 7-49 and 50)
TransNet - LSI: CRAvocado Blvd, Paradise Valley Rd, San Miguel Rd, Spring St, Alpine Blvd,
Ballantyne St, Graves Ave, Pino Dr, Posthill Rd, Riverside Dr, Valle Vista Rd,
Woodside Ave, Black Canyon Rd, Haverford Rd, Old Julian Hwy, Pamo Rd, Pile St,
Wildcat Canyon Rd, Fallbrook St, Green Canyon Rd, Olive Hill Rd, Osborne St,
Buena Creek Rd, Del Dios Hwy, El Camino del Norte, El canino Real, South
Santa Fe Ave, Via de la Valle, Cole Grade Rd, and Lilac Rd. (More or fewer roads
may be resurfaced depending on bid results) - roadway rehabilitation and
resurfacing along several miles of county maintained roads; pavement overlays
applied will be between 2" and 4" in thickness
Asphalt Concrete (AC) Overlay
Exempt Category: Safety - Pavement resurfacing and/or rehabilitationCapacity Status: NCI
Est Total Cost: $7,900
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - LSI $7,345 $7,345 $7,345
TransNet - LSI (Cash) $555 $555 $555
TOTAL $7,900 $7,345 $555 $7,900
Friday, September 17, 2010
117
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
CNTY66
San Diego County
ADOPTION: 10-00
Project Description:
RTP PG NO: TA 7A - 49
EARMARK NO: CA475
RAS (TA 7A-49)
TransNet - LSI: CR
Lonestar Road from Alta Road to SR 125 - in Otay, future construction of 4-lane
Major Road (Alta Road to Enrico Fermi Drive) and 6-lane Prime Arterial (Enrico
Fermi Drive to SR125) with bike lanes and sidewalks
Lonestar Road
Exempt Category: Other - Engineering studiesCapacity Status: NCI
Est Total Cost: $30,000
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
HPP $400 $400 $400
TransNet - LSI $100 $67 $167 $167
TOTAL $567 $500 $67 $567
MPO ID:
Project Title:
CNTY75 ADOPTION: 10-00
Project Description: TransNet - LSI: CRSee Project CNTY38 RSF Roundabouts and CNTY14A South Santa Fe South -
transfer of funds to the City of San Diego in exchange for RSTP with City of SD
project El Camino Real (SD34) project
City of San Diego Funding Swap
Exempt Category: Other - Non construction related activitiesCapacity Status: NCI
Est Total Cost: $157
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - LSI $157 $157 $157
TOTAL $157 $157 $157
MPO ID:
Project Title:
CNTY76 ADOPTION: 10-00
Project Description:
RAS (TA 7-49)
TransNet - LSI: CRJamacha Blvd from Omega St to Sweetwater Springs Blvd - in unincorporated
Spring Valley, the current funds programmed are for Phase 1 - between Omega
Street and Spring Valley Glen, widen from two lane to four lane roadway with
bicycle and pedestrian improvements
Jamacha Blvd (Phase 1 and 2)
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $7,038 Open to Traffic: Phase 1: Apr 2011 Phase 2: Jan 2012
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $2,654 $2,654 $2,654
TransNet - LSI $1,550 $657 $2,207 $2,207
TransNet - LSI Carry Over $2,177 $2,177 $2,177
TOTAL $7,038 $4,204 $2,177 $657 $7,038
Friday, September 17, 2010
118
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
CNTY78
San Diego County
ADOPTION: 10-00
Project Description:
RTP PG NO: 6-55; E-14
TransNet - LSI: CRNCTD RIGHT OF WAY from City of San Marcos/County border to City of
Vista/County border - In unincorporated North County Metro: the current funds
programmed are for the segment from City of San Marcos/County border to City of
Vista/County border; construct bicycle/pedestrian trail within NCTD right of way
Inland Rail Trail
Exempt Category: Air Quality - Bicycle and pedestrian facilitiesCapacity Status: NCI
Est Total Cost: $2,323
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
BTA $1,461 $1,461 $1,461
TransNet - LSI $25 $555 $282 $25 $80 $757 $862
TOTAL $2,323 $25 $2,016 $282 $80 $2,218 $25
Friday, September 17, 2010
119
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
MTS23A
San Diego Metropolitan Transit System
ADOPTION: 10-00
Project Description: MTS service area - Operating support for existing services including urban,
Americans with Disabilities Act (ADA), and rural bus service
Transit Service Operations
Exempt Category: Mass Transit - Transit operating assistanceCapacity Status: NCI
Est Total Cost: $143,553
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
FTA 5307 $4,253 $4,423 $4,600 $4,784 $18,061 $18,061
TDA $1,063 $1,106 $1,150 $1,196 $4,515 $4,515
TransNet - TSI $21,733 $22,517 $23,734 $25,636 $27,357 $120,977 $120,977
TOTAL $143,553 $27,049 $28,046 $29,484 $31,616 $27,357 $143,553
MPO ID:
Project Title:
MTS28 ADOPTION: 10-00
Project Description: MTS service area - purchase replacement buses, replacement Light Rail
Vehicles, procurement of materials and services for the rehabilitation or retrofit of
mechanical components, electrical components, and coach bodies of Light Rail
Vehicles and buses
Bus & Rail Rolling Stock purchases and Rehabilitations
Exempt Category: Mass Transit - Purchase new buses and rail cars to replace existing
vehicles or minor expansions of fleet
Capacity Status: NCI
Est Total Cost: $40,660
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
FTA 5307 $8,568 $9,318 $8,224 $6,418 $32,528 $32,528
TDA $2,142 $2,330 $2,056 $1,605 $8,132 $8,132
TOTAL $40,660 $10,710 $11,648 $10,280 $8,023 $40,660
Friday, September 17, 2010
120
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
MTS30
San Diego Metropolitan Transit System
ADOPTION: 10-00
Project Description: MTS facilities throughout the MTS service area - install security cameras on
bus/rail rolling stock and at bus/rail facilities and stations; Southbay and East
County bus maintenance facility expansions and upgrades including: land
acquisition, Site development plans, building demolition and remodeling, fencing,
lot paving, and storm water pollution prevention program compliance; other misc
capital equipment for transit maintenance; design and procurement of materials
and services for support equipment. Transportation Development Credit of
$2,557,351 will used used to match FY10 federal funds for the construction phase
Bus/Rail Support Facilities and Equipment
Exempt Category: Mass Transit - Purchase of office, shop and operating equipment for
existing facilities
Capacity Status: NCI
Est Total Cost: $74,055
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
FTA 5307 $25,402 $2,445 $1,225 $1,225 $1,225 $31,522 $31,522
FTA 5309 (FG) $259 $259 $259
FTA 5316 - JARC $63 $63 $63
Local Funds $1,898 $1,898 $1,898
PTMISEA (Prop1B) $7,478 $7,478 $7,478
STA $3,242 $3,242 $3,242
TDA $19,943 $611 $306 $306 $306 $21,473 $21,473
TransNet - Transit $7,224 $7,224 $7,224
Transit Security (TSGP) $896 $896 $896
TOTAL $74,055 $66,405 $3,056 $1,531 $1,531 $1,531 $74,055
MPO ID:
Project Title:
MTS31 ADOPTION: 10-00
Project Description: Along Blue Line Right-Of-Way (ROW) - Blue Line tie replacement, rail profile
grinding
Rail Electrification and Power
Exempt Category: Mass Transit - Track rehabilitation in existing right of wayCapacity Status: NCI
Est Total Cost: $2,800
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
FTA 5307 $1,400 $280 $280 $280 $2,240 $2,240
TDA $350 $70 $70 $70 $560 $560
TOTAL $2,800 $1,750 $350 $350 $350 $2,800
Friday, September 17, 2010
121
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
MTS32A
San Diego Metropolitan Transit System
ADOPTION: 10-00
Project Description: MTS service area - Maintenance of equipment, rolling stock, and facilities for bus
and rail systems. . Transportation Development Credit of $2,529,084 will be used
to match FY10 federal funds for the preliminary engineering phase
Preventive Maintenance
Exempt Category: Mass Transit - Transit operating assistanceCapacity Status: NCI
Est Total Cost: $326,750
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
FTA 5307 $70,854 $19,089 $18,525 $17,938 $17,327 $143,734 $143,734
FTA 5309 (FG) $54,956 $14,111 $14,675 $15,262 $15,873 $114,877 $114,877
Local Funds $7,383 $7,383 $7,383
TDA $27,556 $8,300 $8,300 $8,300 $8,300 $60,756 $60,756
TOTAL $326,750 $160,749 $41,500 $41,500 $41,500 $41,500 $326,750
MPO ID:
Project Title:
MTS33A ADOPTION: 10-00
Project Description: MTS service area - Subsidy for senior and disabled as required by TransNet
Senior Disabled Program
Exempt Category: Mass Transit - Transit operating assistanceCapacity Status: NCI
Est Total Cost: $3,208
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - ADA $576 $597 $630 $680 $725 $3,208 $3,208
TOTAL $3,208 $576 $597 $630 $680 $725 $3,208
MPO ID:
Project Title:
MTS35 ADOPTION: 10-00
Project Description: MTS service area - Rail infrastructure maintenance and upgrades including rail tie
replacement, WYE switch indicator standardization, rail file grinding, and traction
motor disconnects
Fixed Guideway Transitways/Lines
Exempt Category: Mass Transit - Track rehabilitation in existing right of wayCapacity Status: NCI
Est Total Cost: $11,894
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
FTA 5307 $2,561 $2,149 $1,321 $3,324 $9,355 $9,355
TDA $840 $537 $330 $831 $2,539 $2,539
TOTAL $11,894 $3,401 $2,686 $1,651 $4,155 $11,894
Friday, September 17, 2010
122
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
SD01
San Diego, City of
ADOPTION: 10-00
Project Description: TransNet - LSI: CRAlvarado Canyon Road from Fairmount Ave./Camino del Rio N to Fairmount
Ave./Mission Gorge Road - in San Diego, roadway realignment and improvements
to include traffic signal modifications to improve traffic flow at the interchange of
I-8, Fairmount Avenue and Mission Gorge Road. (CIP: 52-713.0)
Alvarado Canyon Road Realignment
Exempt Category: Other - Intersection signalization projectsCapacity Status: NCI
Est Total Cost: $1,550
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $1,000 $1,000 $1,000
TransNet - L $450 $450 $450
TransNet - LSI $100 $100 $100
TOTAL $1,550 $550 $1,000 $1,550
MPO ID:
Project Title:
SD06 ADOPTION: 10-00
Project Description:
RAS (TA7-47)
TransNet - LSI: CRFairmount Avenue between Meade Avenue and Aldine Drive, Aldine Drive between
Fairmount Avenue and Adams Avenue - in San Diego, provides for road
restoration and slope stability improvements for the purpose of improving capacity
impeding conditions as a result of slope failure and related drainage conditions
(CIP 52-592.0)
Aldine Drive and Fairmont Avenue Slope Restoration
Exempt Category: Safety - Guardrails, median barriers, crash cushionsCapacity Status: NCI
Est Total Cost: $4,135
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $1,110 $1,110 $1,110
TransNet - L $500 $300 $200 $500
TransNet - LSI $1,825 $700 $2,525 $2,525
TOTAL $4,135 $3,435 $700 $3,835 $300
Friday, September 17, 2010
123
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
SD09
San Diego, City of
ADOPTION: 10-00
Project Description: TransNet - LSI: CRGenesee Ave. & Marlesta Dr.: new sidewalk, curb ramps, railings, Satellite Blvd.:
new sidewalk northside between Thermal & Saturn, Hollister St & Ilex St.: new
sidewalk & curb ramps where missing, 28th St. from Treat St. to 115'north: new
sidewalk, La Jolla Shores Dr. n/o Cam del Collado: new sidewalk where missing
Nimitz Blvd. at W. Pt. Loma: new sidewalk on southside, Juniper St. from Felton
St. to Westland Ave.: new sidewalk northside 67th St. from El Cajon Blvd. to
Amherst: new sidewalk where missing including curb and gutter: install new 5
foot wide sidewalk Green Bay from Iris to Rimbey: new sidewalk and curb ramps:
east and west side of Viewridge Ave from Balboa Ave to Ridgehaven Court: east
and west side of Candlelight Dr from Candlelight Pl to Van Nuys: north and south
side of Euclid Ave between Dwight St and Isla Vista Dr: Genesee Ave from Derrick
Dr to Mt. Herbert Ave: SD Mission Rd from Fairmount Ave to Rancho Mission Rd:
54th from Santa Margarita to Imperial and from Naranja to Imperial: Montezuma
Road: 5922 El Cajon Blvd: - install new sidewalks (CIP 52-700/715,
59-002.0,37-064.0)
Sidewalks - Citywide
Exempt Category: Air Quality - Bicycle and pedestrian facilitiesCapacity Status: NCI
Est Total Cost: $7,880
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - L $2,150 $2,150 $2,150
TransNet - LSI $3,264 $1,041 $375 $350 $350 $350 $5,730 $5,730
TOTAL $7,880 $5,414 $1,041 $375 $350 $350 $350 $7,880
MPO ID:
Project Title:
SD14 ADOPTION: 10-00
Project Description: TransNet - LSI: CRState Route 15 from Landis Street to Adams Avenue - in San Diego, Pedestrian
and bicycle right-of-way improvements along I-15 corridor including widened
pedestrian paths, lighting, signage, striping and signal improvements (581270)
Funding for construction of this project is programmed in V04, Smart Growth
Incentive Program
SR 15 Bikeway
Exempt Category: Air Quality - Bicycle and pedestrian facilitiesCapacity Status: NCI
Est Total Cost: $912
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
CMAQ $645 $525 $120 $645
TransNet - B $57 $57 $57
TransNet - LSI $160 $50 $160 $50 $210
TOTAL $912 $862 $50 $170 $742
Friday, September 17, 2010
124
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
SD15
San Diego, City of
ADOPTION: 10-00
Project Description: TransNet - LSI: CRInstall new street lights:, Donahue St @ Friars Rd, southside, Fifth Ave @ Brookes
Ave, ne corner & @ Anderson Pl, se corner, 43rd @ Keeler Ave, (1)east side (1)
sw corner, Abalone Pl @ Chelsea Ave, east side, Brookhaven Rd @ S
Meadowbrook Dr(1) nw corner (1)se corner, Buena Vista St @ Ingraham St, ne
corner, Carmel Ridge Rd @ Ted Williams Pkwy, ne corner, Carroll Road at Carroll
Way (1) nw corner (1) se corner, Chatsworth Blvd @ Tennyson St, Chickasaw Ct
@ Genesee Ave, nw corner, Chollas Station Rd @ Winlow St, nw corner, El
Camino Real @ San Raphael Driveway (east) (nw corner), Fay Ave @ Rushville
St, east side, Genesee Ave @ Sauk Ave, se corner, Imperial Ave @ Rainbow St (1)
ne corner, (1) se corner, La Jolla Scenic Dr N @ Via Posada, sw corner, Mesa
Way @ Via Maria, south side, Sixth Ave @ Anderson Pl (1) east side (1) nw corner,
Sixth Ave @ Ivy Lane, nw corner, Federal Blvd @ Pentacost Way (1) ne corner (1)
nw corner, Coast Blvd @ Girard Ave (1) sw corner (1) nw corner, 18th St @
Coronado Ave SB (1) ne corner (1) nw corner (1)south side, Candida St @ Via
Pasar, south side, Chatsworth Blvd @ Tennyson St, - in San Diego, install new
street lights (CIP 52-293.0, 61-201.0, 68-012.0)
Street Lights
Exempt Category: Safety - Lighting improvementsCapacity Status: NCI
Est Total Cost: $2,311
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $400 $400 $400
TransNet - L $1,100 $1,100 $1,100
TransNet - LSI $311 $100 $100 $100 $100 $100 $811 $811
TOTAL $2,311 $1,811 $100 $100 $100 $100 $100 $2,311
MPO ID:
Project Title:
SD16A ADOPTION: 10-00
Project Description: TransNet - LSI: CRNew traffic signal installation locations:, 31st Street @ Imperial Avenue; El Cajon
Blvd @ Dayton St; 29th St @ Oceanview Blvd, Traffic signal
upgrades/modernization locations:, El Cajon @ Texas St, Coronado Blvd @
Saturn Blvd, Euclid Ave @ Imperial Ave, 9th Ave @ E St, 10th Ave @ F St, 16th St @
Market St, Alvardo Canyon Rd @ Paradise Valley Rd, Moore St & Old Town Ave,
Interconnect Systems:, Hardware, Software upgrades to centrally controlled traffic
signal optimization system, Traffic signal controller replacement:, 75 downtown
locations, Clairemont Mesa Bvd @ Clairemont Mesa Drive , Clairemont Mesa Bvd
@ Diane Ave, Clairemont Mesa Bvd @ Limerick Ave, Clairemont Mesa Bvd @
Doliva Dr, Santo Rd @ Shields St, Bannock Ave @ Genesee Ave, - install new
traffic signals with intersection street lighting systems, upgrade/modernize traffic
signals, install passive/permissive traffic signal systems; traffic signal
interconnect systems (CIP 62-001/002/210, 63-002/043, 68-001/010/011,
62-275/292, 62-331.0)
Traffic Signals Citywide
Exempt Category: Other - Intersection signalization projectsCapacity Status: NCI
Est Total Cost: $14,780
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - L $4,280 $4,280 $4,280
TransNet - LSI $2,745 $1,655 $1,525 $1,525 $1,525 $1,525 $10,500 $10,500
TOTAL $14,780 $7,025 $1,655 $1,525 $1,525 $1,525 $1,525 $14,780
Friday, September 17, 2010
125
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
SD18
San Diego, City of
ADOPTION: 10-00
Project Description: TransNet - LSI: CRIn Smart Growth Areas of San Diego: Park Blvd. @ City College; lighted crosswalk
and pop-outs, Park Blvd. @ Essex St; lighted crosswalk, Rimbey Ave. @ school
location mid-block: crosswalk and pop-outs, 5th Ave. @ Nutmeg St.; lighted
crosswalk, Thermal Ave. @ Hermes St.; pop-outs, Park Blvd. @ Cypress Ave.;
lighted crosswalk and pop-outs, Girard between Pearl St. and Gentner; pop-outs
and lighted sidewalk, Adams Ave. @ Hamilton St.; pop-outs, Saturn Ave. @
Hermes St.; pop-outs, La Jolla Mesa @ Van Nuys; pop outs, La Jolla Blvd at
Marine St; pop outs and crosswalk. Traffic calming measures at; Landale Drive,
Leon Avenue, Washington Place, Cardeno Drive, Lotus Drive, Calle Cristobal,
Park Village Road, Villa Mallorca - traffic control and traffic calming measures (CIP
61-001.0)
Traffic Control Measures
Exempt Category: Safety - Non signalization traffic control and operatingCapacity Status: NCI
Est Total Cost: $3,471
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $371 $371 $371
TransNet - L $1,600 $1,600 $1,600
TransNet - LSI $400 $300 $200 $200 $200 $200 $1,500 $1,500
TOTAL $3,471 $2,371 $300 $200 $200 $200 $200 $3,471
MPO ID:
Project Title:
SD19 ADOPTION: 10-00
Project Description: TransNet - LSI: CRStreamview Drive from 54th Street to College Avenue - in San Diego, installation
of new raised median, new sidewalk including curb & gutter, and traffic circles to
improve the flow of traffic and increase safety (CIP 52-588.0)
Streamview Drive
Exempt Category: Safety - Adding mediansCapacity Status: NCI
Est Total Cost: $1,975
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - L $350 $350 $350
TransNet - LSI $180 $200 $200 $795 $250 $380 $1,245 $1,625
TOTAL $1,975 $530 $200 $200 $795 $250 $1,245 $730
Friday, September 17, 2010
126
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
SD23
San Diego, City of
ADOPTION: 10-00
Project Description: TransNet - LSI: CRRansom/Darwin , Glen Curtis Drain, Ingulf Place , Riviera Drive at 3663, Wenrich
Drive, Fashion Valley Road, - roadway drainage projects for the purpose of
improving traffic impeding conditions and alleviate significant and frequent
flooding (CIP 13-005.0, 13-502.0, 11-3020/3060/3070)
Storm Drains - Roadway Drainage Improvements
Exempt Category: Other - Intersection channelization projectsCapacity Status: NCI
Est Total Cost: $8,008
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $1,605 $1,605 $1,605
TransNet - L $3,302 $3,302 $3,302
TransNet - LSI $477 $185 $600 $633 $606 $600 $3,101 $3,101
TOTAL $8,008 $5,384 $185 $600 $633 $606 $600 $8,008
MPO ID:
Project Title:
SD31 ADOPTION: 10-00
Project Description:
RAS (TA7-46)
TransNet - LSI: CRCarmel Valley Road from 300 feet east of Portofino Drive to Via Mar Valle (Del Mar
limit) - in San Diego, modify existing 2-lane collector street by adding Class II bike
path (CIP 52-517.0)
Carmel Valley Road
Exempt Category: Air Quality - Bicycle and pedestrian facilitiesCapacity Status: NCI
Est Total Cost: $6,004
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $562 $562 $562
TransNet - L $5,197 $5,197 $5,197
TransNet - LSI $195 $25 $25 $245 $245
TOTAL $6,004 $5,954 $25 $25 $6,004
MPO ID:
Project Title:
SD34 ADOPTION: 10-00
Project Description:
RAS (TA7-47)
TransNet - LSI: CREl Camino Real from San Dieguito Road to Via de la Valle - in San Diego on El
Camino Real from San Dieguito Road to Via de la Valle - reconstruct & widen
from 2 to 4 lanes and extend transition lane and additional grading to avoid
biological impacts (CIP 52-479.0)
El Camino Real
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $33,805 Open to Traffic: Phase 1: Jun 2015
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
HBP $320 $1,992 $20,696 $2,312 $20,696 $23,008
HBRR $1,708 $1,700 $8 $1,708
Local Funds $1,472 $157 $1,128 $501 $1,629
Local Funds AC $20,696 $(20,696)$0
RSTP $2,560 $2,560 $2,560
TransNet - LSI $600 $500 $2,100 $1,700 $1,100 $3,800 $4,900
TOTAL $33,805 $4,100 $25,905 $2,100 $1,700 $2,821 $27,056 $3,928
Friday, September 17, 2010
127
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
SD38
San Diego, City of
ADOPTION: 10-00
Project Description: TransNet - LSI: CROn Georgia Street over University Avenue - in San Diego, provides for bridge
replacement, retaining walls and guardrails along bridge walls (CIP 52-555)
Georgia St Bridge/University Ave
Exempt Category: Safety - Guardrails, median barriers, crash cushionsCapacity Status: NCI
Est Total Cost: $2,652
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $421 $421 $421
TransNet - L $631 $631 $631
TransNet - LSI $1,600 $1,600 $1,600
TOTAL $2,652 $631 $421 $1,600 $2,652
MPO ID:
Project Title:
SD49 ADOPTION: 10-00
Project Description: TransNet - LSI: CREl Cajon Blvd. (CIP 39-234.0), Navajo (CIP 52-668.0), Normal St. (CIP 52-769.0)
and Thorn (52-406.0), Balboa Ave @ Hathaway, Camino Ruiz @ Capricorn Way,
Balboa Ave @ Mt. Culebra, (52-808) - safety improvements and/or left turn
movements
Median Improvements Citywide
Exempt Category: Safety - Pavement marking demonstrationCapacity Status: NCI
Est Total Cost: $3,902
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $1,327 $1,102 $225 $1,327
TransNet - L (Cash) $641 $641 $641
TransNet - LSI $510 $400 $297 $327 $200 $200 $1,934 $1,934
TOTAL $3,902 $2,478 $400 $297 $327 $200 $200 $2,800 $1,102
MPO ID:
Project Title:
SD51 ADOPTION: 10-00
Project Description:
RAS (T7-48)
TransNet - LSI: CRNorth Torrey Pines Road from Carmel Valley Road to Torrey Pines Park Road - in
San Diego, replace North Torrey Pines Road bridge over Los Penasquitos Creek
(CIP 53-050.0)
North Torrey Pines Road Bridge
Exempt Category: Safety - Non capacity widening or bridge reconstructionCapacity Status: NCI
Est Total Cost: $1,606
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $243 $243 $243
TransNet - L $1,035 $100 $935 $1,035
TransNet - LSI $75 $88 $65 $50 $50 $328 $328
TOTAL $1,606 $1,353 $88 $65 $50 $50 $1,506 $100
Friday, September 17, 2010
128
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
SD70
San Diego, City of
ADOPTION: 10-00
Project Description:
RAS (T7-49)
TransNet - LSI: CRWest Mission Bay Drive bridge over San Diego River - in San Diego, replace
bridge and increase from 4 to 6-lane bridge including Class II bike lane (52-643)
West Mission Bay Drive Bridge
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $120,600 Open to Traffic: Phase 1: Dec 2015
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
HBP $5,560 $97,206 $4,040 $1,520 $97,206 $102,766
HBRR $2,600 $2,600 $2,600
Local Funds $1,390 $12,594 $1,010 $380 $12,594 $13,984
Local Funds AC $97,206 $(97,206)$0
TransNet - L $650 $650 $650
TransNet - LSI $200 $100 $100 $200 $600 $600
TOTAL $120,600 $3,450 $7,050 $100 $200 $109,800 $1,900 $109,800 $8,900
MPO ID:
Project Title:
SD81 ADOPTION: 10-00
Project Description:
RAS (TA7-47)
Genesee Avenue from Noble Drive to SR 52 - in San Diego, future widening to
6-lane major street north of Decoro Street and to a 6-lane primary arterial south of
Decoro Street and included Class II bicycle lanes (CIP 52-458.0)
Genesee Avenue - Nobel Drive to SR52
Exempt Category: Other - Engineering studiesCapacity Status: NCI
Est Total Cost: $5,952
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $1,500 $2,675 $1,777 $5,952 $5,952
TOTAL $5,952 $1,500 $2,675 $1,777 $5,952
MPO ID:
Project Title:
SD83 ADOPTION: 10-00
Project Description:
RAS (TA7-47)
TransNet - LSI: CRFriars Road from Avenida de las Tiendas to Mission Center Road - widen and
improve Friars Road and overcrossing; reconstruct interchange including
improvements to ramp intersections (Phase 1). Construct new connector
roadways and structures (Phase 2). Construct auxilliary lanes along northbound
and southbound SR163 (Phase 3). (CIP Legacy#52-455.0) (WBS# S-00851)
SR 163/Friars Road Interchange Modification
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $68,020 Open to Traffic: Phase 1: Jun 2014
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $4,273 $38,000 $1,153 $3,120 $38,000 $42,273
RSTP $2,240 $2,240 $2,240
TransNet - L $2,207 $2,207 $2,207
TransNet - LSI $4,500 $2,500 $5,379 $2,219 $5,100 $1,602 $2,000 $17,698 $1,602 $21,300
TOTAL $68,020 $13,220 $2,500 $5,379 $40,219 $5,100 $1,602 $20,818 $39,602 $7,600
Friday, September 17, 2010
129
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
SD86
San Diego, City of
ADOPTION: 10-00
Project Description: TransNet - LSI: CRWest Point Loma Blvd. from Rue D'Orleans to Famosa Blvd. - in San Diego,
provide enhanced pedestrian and bicycle access, and usability to the open space
area by leveling and widening access road which would improve emergency
vehicle access and also provided mitigation for impacts to coastal salt marsh
(CIP 12-152.0)
Famosa Slough Salt Marsh Restoration
Exempt Category: Air Quality - Bicycle and pedestrian facilitiesCapacity Status: NCI
Est Total Cost: $178
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - L $129 $89 $40 $129
TransNet - LSI $24 $25 $49 $49
TOTAL $178 $153 $25 $89 $89
MPO ID:
Project Title:
SD90 ADOPTION: 10-00
Project Description:
RAS (TA7-46)
TransNet - LSI: CRClairemont Mesa Blvd. from Kearny Villa Road to Kearny Mesa - in San Diego,
widen from 4 to 6 lane prime arterial; Phase II of the project - west ramps (CIP
52-745.0)
SR 163/Clairemont Mesa Blvd. Interchange
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $22,200 Open to Traffic: Phase 1: Jun 2008 Phase 2: Dec 2015
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $10,462 $2,535 $7,927 $10,462
RSTP $5,238 $5,238 $5,238
TransNet - L $500 $500 $500
TransNet - LSI $1,000 $3,920 $1,080 $1,000 $5,000 $6,000
TOTAL $22,200 $17,200 $3,920 $1,080 $18,665 $3,535
MPO ID:
Project Title:
SD97 ADOPTION: 10-00
Project Description: TransNet - LSI: CRWillow Elementary located in San Ysidro on Willow Road, Joyner Elementary
located on Myrtle Ave, Nestor Elementary School, Southwest High School, Mar
Vista Middle School - in San Diego, provide traffic control devices (CIP
68-017,62-266.0,62-337.0)
School Traffic Safety Improvements
Exempt Category: Other - Intersection signalization projectsCapacity Status: NCI
Est Total Cost: $2,100
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $150 $150 $150
TransNet - L $620 $620 $620
TransNet - LSI $330 $200 $200 $200 $200 $200 $1,330 $1,330
TOTAL $2,100 $1,100 $200 $200 $200 $200 $200 $2,100
Friday, September 17, 2010
130
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
SD99
San Diego, City of
ADOPTION: 10-00
Project Description: TransNet - LSI: CRCitywide - in San Diego, bridge retrofit or replacement projects citywide(CIP
525190) including Voltaire Street Bridge over Nimitz Blvd. rehabilitation (CIP
525233) and Barnett Ave. Bridge over Pacific Highway (CIP 525231)
Bridge Rehabilitation
Exempt Category: Safety - Non capacity widening or bridge reconstructionCapacity Status: NCI
Est Total Cost: $670
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - L $300 $300 $300
TransNet - LSI $100 $270 $370 $370
TOTAL $670 $400 $270 $670
MPO ID:
Project Title:
SD102 ADOPTION: 10-00
Project Description: TransNet - LSI: CROtay Truck Route from Drucker Lane to Point of Entry - in San Diego, add
emergency lane primarily for Border Patrol use and fire department access
(Phase 3) (CIP 52-682.1)
Otay Truck Route
Exempt Category: Safety - Emergency truck pulloversCapacity Status: NCI
Est Total Cost: $4,602
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $1,202 $442 $760 $1,202
STP - Sec 117 $2,000 $2,000 $2,000
TransNet - LSI $150 $200 $300 $750 $500 $900 $1,400
TOTAL $4,602 $3,352 $200 $300 $750 $500 $3,660 $442
MPO ID:
Project Title:
SD102A ADOPTION: 10-00
Project Description:
EARMARK NO: CA596/2655,
CA700/3776
TransNet - LSI: CRon Otay Truck Route - in San Diego, from Drucker Lane to La Media, add one lane
(total 3 lanes) for trucks; from Britannia to La Media, add one lane for trucks and
one lane for emergency vehicles (Border Patrol/fire department access); along
Britannia from Britannia Court to the Otay Truck Route - add one lane for trucks
(CIP 52-682.1)
Otay Truck Route Widening (Ph. 4)
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $5,718 Open to Traffic: Phase 1: Dec 2009
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
HPP $800 $1,000 $2,400 $1,800 $2,400 $4,200
Local Funds $318 $200 $650 $518 $650 $1,168
TransNet - L $100 $100 $100
TransNet - LSI $250 $250 $250
TOTAL $5,718 $1,468 $1,200 $3,050 $3,050 $2,668
Friday, September 17, 2010
131
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
SD103
San Diego, City of
ADOPTION: 10-00
Project Description:
RTP PG NO: A-5
RAS (TA7-41)Along I- 5 from Sorrento Valley Road to Genesee Avenue - in San Diego, replace
Genesee Ave. over crossing from 4-lane bridge with 6-lane bridge; construct
auxiliary lanes and replace Voight Drive bridge; add additional lane at on/off ramp
to Sorrento Valley Rd.; add one carpool lane and one general purpose lane to on
ramp from Sorrento Valley Road to southbound I-5; install ramp meters at on
ramp and construct a southbound auxiliary lane between Sorrento Valley Road
and Genesee Avenue
I-5/Genesee Ave Interchange
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $27,363 Open to Traffic: Phase 1: Oct 2012
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
HPP $1,600 $1,600 $1,600
Local Funds $9,200 $15,600 $9,940 $3,960 $10,900 $24,800
TransNet - MC $963 $963 $963
TOTAL $27,363 $10,800 $16,563 $3,960 $11,863 $11,540
MPO ID:
Project Title:
SD113 ADOPTION: 10-00
Project Description:
RAS (TA7-41)
TransNet - LSI: CRInterstate 5 from Sorrento Valley Rd to Sorrento Valley Rd - in San Diego, future
new freeway access interchange including ramp (CIP 52-765.0) (S-00914)
I-5/Sorrento Valley Road
Exempt Category: Other - Engineering studiesCapacity Status: NCI
Est Total Cost: $3,775
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
DEMO - Sec 115 $1,500 $1,500 $1,500
STP - Sec 112 $600 $600 $600
STP - Sec 117 $1,500 $1,500 $1,500
TransNet - LSI $175 $175 $175
TOTAL $3,775 $3,600 $175 $3,775
MPO ID:
Project Title:
SD115 ADOPTION: 10-00
Project Description:
RAS (TA7-47)
I 805 from La Jolla Village to La Jolla Village - in San Diego on I-805 at La Jolla
Village Drive - reconfigure interchange and add 220 meters of acceleration lane
(CIP 524850)
La Jolla Village Drive/I-805 Interchange Ramps
Exempt Category: Other - Interchange reconfiguration projectsCapacity Status: NCI
Est Total Cost: $28,975
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $23,975 $5,000 $3,055 $25,920 $28,975
TOTAL $28,975 $23,975 $5,000 $25,920 $3,055
Friday, September 17, 2010
132
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
SD120
San Diego, City of
ADOPTION: 10-00
Project Description:
EARMARK NO: CA 317/90
TransNet - LSI: CRHazard Center Drive from 400' west of SR163 to 600' east of SR163 - in San
Diego on Hazard Center Drive under SR 163 - construct bicycle and pedestrian
path on north side of San Diego River (CIP 58-191.0)
San Diego River Multi-Use Bicycle and Pedestrian Path
Exempt Category: Air Quality - Bicycle and pedestrian facilitiesCapacity Status: NCI
Est Total Cost: $2,040
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
HPP $400 $400 $400
TransNet - B $180 $180 $180
TransNet - LSI $320 $1,140 $320 $1,140 $1,460
TOTAL $2,040 $900 $1,140 $1,540 $500
MPO ID:
Project Title:
SD129 ADOPTION: 10-00
Project Description:
RAS (TA7-48)
TransNet - LSI: CRUniversity Avenue from Florida Street to Boundary Street - in San Diego,
environmental studies for improvements to University Avenue transit corridor in
North Park (CIP 52-766.0), improvements include installation of new medians for
safety improvements, restriping, pedestrian popouts, new traffic signal, enhanced
pedestrian crossings, and new bike racks (augments Smart Growth Funding for
this project in V04)
University Avenue Mobility Project Phase 2
Exempt Category: Other - Transportation enhancement activitiesCapacity Status: NCI
Est Total Cost: $3,675
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - L $175 $175 $175
TransNet - LSI $200 $300 $200 $2,800 $200 $500 $2,800 $3,500
TOTAL $3,675 $375 $300 $200 $2,800 $500 $2,800 $375
MPO ID:
Project Title:
SD130 ADOPTION: 10-00
Project Description:
EARMARK NO: CA574/2479
TransNet - LSI: CRSkyline Drive from 58th St. to Sears Avenue - Skyline Drive from 58th Street to
Sears Avenue - in San Diego, installation of new medians for safety
improvements, intersection lighting, traffic signal upgrades and other street
improvements to enhance pedestrian and vehicular movement (CIP 52-763.0)
(WBS# S-00912)
Skyline Drive - 58th Street to Sears Avenue
Exempt Category: Other - Intersection channelization projectsCapacity Status: NCI
Est Total Cost: $2,705
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
HPP $800 $800 $800
Local Funds $325 $325 $325
TransNet - L $305 $305 $305
TransNet - LSI $1,275 $180 $1,095 $1,275
TOTAL $2,705 $305 $2,400 $2,220 $485
Friday, September 17, 2010
133
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
SD133
San Diego, City of
ADOPTION: 10-00
Project Description: TransNet - LSI: CRMira Sorrento Place from Scranton Rd. to Vista Sorrento Pkwy. - in San Diego,
widen the existing two-lane 560' portion of Mira Sorrento Place (40' road width, 55'
right of way) to a four-lane collector (72' road width, 92' right of way), and extend
the road to intersect with Vista Sorrento Parkway at the existing on/off ramps to
I-805 (CIP 52-676.0)
Mira Sorrento Place
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $12,875 Open to Traffic: Phase 1: May 2008 Phase 2: May 2008
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $11,885 $2,600 $1,500 $7,785 $11,885
TransNet - L $810 $810 $810
TransNet - LSI $120 $60 $180 $180
TOTAL $12,875 $12,815 $60 $1,500 $8,775 $2,600
MPO ID:
Project Title:
SD137 ADOPTION: 10-00
Project Description:
RAS (TA7-48)
TransNet - LSI: CRPalm Ave from I-805 to Beyer Blvd - in San Diego, install traffic improvements to
include raised medians with turn pockets, traffic signals, pedestrian refuge areas,
etc (CIP 52-764.0)
Palm Avenue Roadway Improvements
Exempt Category: Other - Non construction related activitiesCapacity Status: NCI
Est Total Cost: $3,754
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - L $300 $300 $300
TransNet - LSI $569 $630 $2,255 $569 $2,885 $3,454
TOTAL $3,754 $869 $630 $2,255 $2,885 $869
MPO ID:
Project Title:
SD153 ADOPTION: 10-00
Project Description: TransNet - LSI: CR25th Street from F Street to Russ Boulevard (Balboa Park) including adjacent
intersecting streets along 25th Street from F Street to Russ Boulevard. - in San
Diego, augments existing Smart Growth projects (V04) related infrastructure
improvements to include the construction of amenities to improve pedestrian
safety and provide traffic calming, including the installation of a roundabout at the
intersection of 25th and B Streets; the roundabout will replace a four-way stop
controlled intersection and will provide continuous flow and reduce delay;
congestion will be reduced as vehicles will no longer stop and queue at the stop
signs; the improvements will promote and improve pedestrian safety at
intersection crossings and create a more walkable neighborhood; streetscape
and parking improvements may also be provided (CIP 62-332.0)
25th Street Renaissance
Exempt Category: Other - Interchange reconfiguration projectsCapacity Status: NCI
Est Total Cost: $1,025
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - LSI $200 $125 $700 $200 $125 $700 $1,025
TOTAL $1,025 $200 $125 $700 $125 $700 $200
Friday, September 17, 2010
134
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
SD155
San Diego, City of
ADOPTION: 10-00
Project Description: Old Otay Mesa Road from Hawkin Dr. to 1,100 feet west of Crescent Bay Dr. - in
San Diego, widen road by approximately 20 feet for the purpose of installing new
sidewalk with concrete curb and gutter, and to allow for the installation of bike
lanes, guardrails, fence, minor drainage facilities and retaining walls. This
project will not increase traffic lanes (CIP 52-775.0/52-642.0)
Old Otay Mesa Road
Exempt Category: Air Quality - Bicycle and pedestrian facilitiesCapacity Status: NCI
Est Total Cost: $7,600
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $3,900 $3,500 $2,400 $1,500 $3,500 $7,400
TransNet - L $200 $200 $200
TOTAL $7,600 $4,100 $3,500 $1,500 $3,500 $2,600
MPO ID:
Project Title:
SD156 ADOPTION: 10-00
Project Description: TransNet - LSI: CROn 34th and 35th Streets from Adams to Madison, on from Felton to 35th Street -
in San Diego, construction of new sidewalk and drainage improvements including
curbs and gutters (CIP 52-774.0)
34th and 35th at Madison Avenue Improvements
Exempt Category: Safety - Pavement resurfacing and/or rehabilitationCapacity Status: NCI
Est Total Cost: $1,734
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - L $60 $60 $60
TransNet - LSI $120 $251 $303 $1,000 $120 $251 $1,303 $1,674
TOTAL $1,734 $180 $251 $303 $1,000 $251 $1,303 $180
MPO ID:
Project Title:
SD157 ADOPTION: 10-00
Project Description: TransNet - LSI: CRCherokee St from Monroe Ave to E Mountain View - in San Diego, construction of
sidewalk and drainage improvements including curb and gutter; drainage
improvements will reduce frequent flooding problems (CIP 52-773.0)
Cherokee Street Improvements
Exempt Category: Safety - Pavement resurfacing and/or rehabilitationCapacity Status: NCI
Est Total Cost: $2,060
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - L $30 $30 $30
TransNet - LSI $70 $480 $1,480 $70 $480 $1,480 $2,030
TOTAL $2,060 $100 $480 $1,480 $480 $1,480 $100
Friday, September 17, 2010
135
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
SD161
San Diego, City of
ADOPTION: 10-00
Project Description: TransNet - LSI: CRVarious locations: Balboa Avenue from I-5 to I-15, Rosecrans St from I-8 to Kellog
Street, University Avenue from 54th St to 68th St - in San Diego, perform
preliminary design work for future congestion relief project development (CIP
59-023.0); project types include roadway realignment, roadway widening for bike
lanes, new or widened sidewalks, new traffic signals and traffic signal upgrades
including intersection lighting, traffic calming measures
Preliminary Engineering for Congestion Relief Projects
Exempt Category: Other - Engineering studiesCapacity Status: NCI
Est Total Cost: $1,426
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - L $600 $600 $600
TransNet - LSI $576 $50 $50 $50 $50 $50 $826 $826
TOTAL $1,426 $1,176 $50 $50 $50 $50 $50 $1,426
MPO ID:
Project Title:
SD163 ADOPTION: 10-00
Project Description: TransNet - LSI: CRProspect Street and Silverado Street - in San Diego, install intersection
improvements to include a roundabout which provide continuous flow and reduce
delay; the improvements will promote and improve pedestrian safety at the
intersection crossing (CIP 52-776.0)
Prospect Street/Silverado Street Roundabout
Exempt Category: Other - Intersection channelization projectsCapacity Status: NCI
Est Total Cost: $1,811
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $891 $891 $891
TransNet - L $150 $150 $150
TransNet - LSI $770 $770 $770
TOTAL $1,811 $920 $891 $1,661 $150
MPO ID:
Project Title:
SD166 ADOPTION: 10-00
Project Description: TransNet - LSI: CRCitywide including , Park Blvd, Adams Ave, Aldine Dr, Monroe Ave, & El Cajon Blvd
- install Class II bike lanes or Class II bike routes (CIP 58-204.0)
Minor Bicycle Facilities
Exempt Category: Air Quality - Bicycle and pedestrian facilitiesCapacity Status: NCI
Est Total Cost: $465
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - L $15 $15 $15
TransNet - LSI $290 $100 $15 $15 $15 $15 $175 $275 $450
TOTAL $465 $305 $100 $15 $15 $15 $15 $290 $175
Friday, September 17, 2010
136
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
SD172
San Diego, City of
ADOPTION: 10-00
Project Description: TransNet - LSI: CRvarious locations citywide including West Mission Bay Drive Bridge Seismic
Retrofit project, and Desert View Drive Alley Repair (CIP 52-805.1) grant funding
provided through FHWA and Office of Emergency Services (OES) R-304725, and
the At-Grade Crossing and Traffic Synchronization Improvement Project (TSLP)
(CIP 59-021.0) - in San Diego; the City's share of TLSP Grant (R-304384); match
to Safe Routes to School - Florence Griffith Joyner Elementary (CIP 62-337.0)
(R-303994)
Transportation Grant Matches
Exempt Category: Safety - Pavement resurfacing and/or rehabilitationCapacity Status: NCI
Est Total Cost: $4,565
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - L $458 $458 $458
TransNet - L Carry Over $108 $108 $108
TransNet - LSI $399 $755 $700 $900 $610 $635 $3,999 $3,999
TOTAL $4,565 $857 $863 $700 $900 $610 $635 $4,565
list of approved grants available*
MPO ID:
Project Title:
SD175 ADOPTION: 10-00
Project Description: TransNet - LSI: CROn Talbot Street at Martinez Street - in San Diego, stabilize adjacent slope to
prevent slope failure which would create capacity impeding conditions by
impacting vehicle usage of roadway (CIP 13-501.0)
Talbot Street Slope
Exempt Category: Other - Plantings, landscaping, etcCapacity Status: NCI
Est Total Cost: $3,106
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $2,000 $2,000 $2,000
TransNet - L $250 $250 $250
TransNet - L Carry Over $480 $480 $480
TransNet - LSI Carry Over $376 $376 $376
TOTAL $3,106 $250 $2,856 $2,856 $250
MPO ID:
Project Title:
SD176 ADOPTION: 10-00
Project Description: TransNet - LSI: MaintCitywide - in San Diego, maintenance and non congestion relief efforts including
but not limited to pavement overlay, pot hole repair, etc
Maintenance and Non Congestion Relief Efforts
Exempt Category: Safety - Pavement resurfacing and/or rehabilitationCapacity Status: NCI
Est Total Cost: $49,866
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - L Carry Over $536 $536 $536
TransNet - LSI $13,990 $6,639 $6,759 $7,029 $7,310 $7,602 $49,330 $49,330
TOTAL $49,866 $13,990 $7,175 $6,759 $7,029 $7,310 $7,602 $49,866
Friday, September 17, 2010
137
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
SD178
San Diego, City of
ADOPTION: 10-00
Project Description: TransNet - LSI: CRAt Pershing and Redwood Street - in San Diego, install permanent traffic
roundabout improvement to replace stop signs at the controlled intersection;
roundabouts provide continuous flow and reduce delay; congestion is reduced
because vehicles will no longer stop and queue up at the stop signs: the
improvements will promote and improve pedestrian safety at the intersection
crossing (CIP 52-696.0)
Pershing Drive/Redwood Street Intersection
Exempt Category: Other - Intersection channelization projectsCapacity Status: NCI
Est Total Cost: $900
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - LSI Carry Over $900 $900 $900
TOTAL $900 $900 $900
MPO ID:
Project Title:
SD179 ADOPTION: 10-00
Project Description:
RAS (TA7-47)
TransNet - LSI: CRon Linda Vista Road at Genesee Avenue - in San Diego, roadway improvements
to include extension of medians for left turn lanes and the widening of Linda Vista
Road for the creation of exclusive right turn lanes (CIP 52-754.0)
Linda Vista Road at Genesee Avenue
Exempt Category: Other - Intersection channelization projectsCapacity Status: NCI
Est Total Cost: $1,003
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $53 $53 $53
TransNet - LSI $70 $150 $150 $580 $70 $300 $580 $950
TOTAL $1,003 $123 $150 $150 $580 $300 $580 $123
MPO ID:
Project Title:
SD181 ADOPTION: 10-00
Project Description: Soledad Mountain Road from Desert View Dr. to Palomino Circle - in San Diego,
reconstruct roadway lost as result of landslide (CIP 52-805.0); grant match
provided for Soledad Mountain Road (CIP 52-805.0) grant funding provided
through FHWA and Office of Emergency Services (OES) R-304725.
Soledad Mountain Road Emergency Repair
Exempt Category: Other - Damage repair caused by unusual disastersCapacity Status: NCI
Est Total Cost: $26,919
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $26,090 $26,090 $26,090
TransNet - L Carry Over $829 $829 $829
TOTAL $26,919 $26,090 $829 $26,919
Friday, September 17, 2010
138
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
SD183
San Diego, City of
ADOPTION: 10-00
Project Description: TransNet - LSI: CRDivision Street from Bryanview to 61st - in San Diego, major roadway
reconstruction; improvements may include installation of curb, gutter and
sidewalks, retaining walls, drainage, landscaping and property acquisition (CIP
52-813.0)
Division Street - Bryanview to 61st - Reconstruction
Exempt Category: Safety - Pavement resurfacing and/or rehabilitationCapacity Status: NCI
Est Total Cost: $500
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - LSI $500 $300 $200 $500
TOTAL $500 $500 $300 $200
MPO ID:
Project Title:
SD184 ADOPTION: 10-00
Project Description: TransNet - LSI: CRSaturn Blvd from Coronado to Grove - in San Diego, roadway reconstruction to
include installation of new sidewalk, curb and gutter; new paving and retaining
walls, drainage improvements (CIP 52-814.0)
Saturn Boulevard Westside
Exempt Category: Other - Intersection channelization projectsCapacity Status: NCI
Est Total Cost: $2,350
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - LSI $100 $150 $700 $1,400 $250 $2,100 $2,350
TOTAL $2,350 $100 $150 $700 $1,400 $250 $2,100
MPO ID:
Project Title:
SD186 ADOPTION: 10-00
Project Description: Citywide - City of San Diego 1% administrative costs
Administrative Expenses
Exempt Category: Other - Non construction related activitiesCapacity Status: NCI
Est Total Cost: $1,726
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - LSI $348 $224 $228 $237 $246 $256 $1,538 $1,538
TransNet - LSI Carry Over $188 $188 $188
TOTAL $1,726 $348 $412 $228 $237 $246 $256 $1,726
Friday, September 17, 2010
139
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
SD188
San Diego, City of
ADOPTION: 10-00
Project Description: TransNet - LSI: CRVarious locations - studies to provide congestion relief efforts to include
intersection lighting, traffic signal coordination, centrally controlled traffic signal
optimization system, traffic data collection for performance monitoring; traffic
calming in Smart Growth areas; and project development/preliminary
engineering/Corridor studies
Congestion Relief/Traffic Operations
Exempt Category: Other - Engineering studiesCapacity Status: NCI
Est Total Cost: $13,558
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - LSI $3,400 $2,032 $2,032 $2,032 $2,032 $2,032 $13,558 $13,558
TOTAL $13,558 $3,400 $2,032 $2,032 $2,032 $2,032 $2,032 $13,558
MPO ID:
Project Title:
SD189 ADOPTION: 10-00
Project Description:
RAS (TA 7-48)
Sea World Drive from Friars Road to Morena Boulevard - in San Diego, replace
existing 4-lane bridge with an 8-lane bridge with new on/off ramps; widen
approachways to add right turn lanes to improve access to I-5 (CIP 52-706.0)
Sea World Drive Widening and I- 5 Interchange Improvements
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $20,249 Open to Traffic: Phase 1: Jul 2019
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $3,175 $472 $5,616 $10,986 $9,263 $10,986 $20,249
TOTAL $20,249 $3,175 $472 $5,616 $10,986 $10,986 $9,263
MPO ID:
Project Title:
SD190 ADOPTION: 10-00
Project Description:
RAS (TA 7-48)
On Palm Avenue at Interstate 805 - in San Diego, future widening of Palm Avenue
Bridge including providing for repairs to the bridge approaches and abutments,
installing sidewalks, signals, and striping
• Phase I was work pertaining to re-striping to reconfigure travel lanes; no
actual modifications to the physical geometry of the bridge took place
• Phase II of the project will widen the bridge on the north side; in addition to
this the scope of work will also contain restriping of the lanes and modifications to
the on/off ramps
• Phase III of the project will widen the bridge on the south side; in addition to
this the scope of work will also contain restriping of the lanes and modifications to
the on/off ramps
• Both Phase II & III will have environmental documentation prepared and all
technical studies performed before entering into full design signage
modifications: also modify freeway on and off ramps (CIP 52-640.0)
Palm Avenue/Interstate 805 Interchange
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $6,000 Open to Traffic: Phase 1: Jun 2008 Phase 2: Jun 2016 Phase 3: Jun 2019
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $2,000 $2,000 $1,380 $620 $5,750 $250 $6,000
TOTAL $6,000 $2,000 $2,000 $1,380 $620 $250 $5,750
Friday, September 17, 2010
140
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
SD196
San Diego, City of
ADOPTION: 10-00
Project Description: TransNet - LSI: CRTorrey Pines Road from Prospect Place to La Jolla Shores Drive - improvements
to include guardrails, medians, a new traffic signal, bike lanes and sidewalks.
(WBS S-00613)
Torrey Pines Road Improvements, Phase 2
Exempt Category: Other - Transportation enhancement activitiesCapacity Status: NCI
Est Total Cost: $1,670
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - LSI $500 $300 $870 $500 $1,170 $1,670
TOTAL $1,670 $500 $300 $870 $1,170 $500
MPO ID:
Project Title:
SD198 ADOPTION: 10-00
Project Description: TransNet - LSI: CRCherokee Avenue from Madison Avenue to Cherokee Avenue - this project
provides for reconstruction of the intersection of Madison Avenue and Cherokee
Avenue for pedestrian safety. (Sublet of 58-127.0)
Cherokee Traffic Calming
Exempt Category: Safety - Safety Improvement ProgramCapacity Status: NCI
Est Total Cost: $240
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - LSI $240 $240 $240
TOTAL $240 $240 $240
MPO ID:
Project Title:
SD199 ADOPTION: 10-00
Project Description: TransNet - LSI: CRMarket Street from Euclid Avenue to 54th Street - in San Diego, this project
provides for roadway reconstruction improvement of Market Street - Euclid Avenue
to 54th Street
Market Street - Euclid to 54th Roadway Improvements
Exempt Category: Safety - Pavement resurfacing and/or rehabilitationCapacity Status: NCI
Est Total Cost: $240
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - LSI $240 $240 $240
TOTAL $240 $240 $240
Friday, September 17, 2010
141
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
SD200
San Diego, City of
ADOPTION: 10-00
Project Description: TransNet - LSI: CREuclid Avenue from Euclid Avenue to SR-94 Off-Ramp - study of the feasibility for
constructing an SR-94 Eastbound off-Ramp at Euclid Avenue to facilitate
community access to the freeway
SR94/Euclid Avenue Interchange Improvements
Exempt Category: Other - Engineering studiesCapacity Status: NCI
Est Total Cost: $2,000
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - LSI $2,000 $2,000 $2,000
TOTAL $2,000 $2,000 $2,000
Friday, September 17, 2010
142
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
SM19
San Marcos, City of
ADOPTION: 10-00
Project Description: From Discovery Street to San Marcos Boulevard - in San Marcos, construct 4-lane
arterial; between Bent Ave to Discovery Street construct 6-lane arterial
Grand Avenue Bridge
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $12,524 Open to Traffic: Phase 1: Jun 2013
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $2,424 $4,600 $5,500 $2,044 $680 $9,800 $12,524
TOTAL $12,524 $2,424 $4,600 $5,500 $680 $9,800 $2,044
MPO ID:
Project Title:
SM22 ADOPTION: 10-00
Project Description:
RAS (TA 7-50)
From Bosstick to Smilax - widen and realign existing road to 4-lane secondary
arterial standards
South Santa Fe from Bosstick to Smilax
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $5,435 Open to Traffic: Phase 1: Jun 2014
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $3,335 $320 $600 $600 $335 $3,320 $1,200 $4,855
TransNet - H (78) $580 $580 $580
TOTAL $5,435 $3,915 $320 $600 $600 $3,900 $1,200 $335
MPO ID:
Project Title:
SM24 ADOPTION: 10-00
Project Description:
RAS (TA 7-51)
TransNet - LSI: CRFrom La Moree Road to Rancheros Drive - modify existing ramps at Woodland
Parkway and Barham Drive; widen and realign SR 78 undercrossing and
associated work
Woodland Parkway Interchange Improvements
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $48,550 Open to Traffic: Phase 1: Jun 2013 Phase 2: Jun 2015
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $1,980 $4,170 $700 $4,500 $35,600 $1,850 $5,000 $40,100 $46,950
TransNet - L $600 $600 $600
TransNet - LSI $1,000 $1,000 $1,000
TOTAL $48,550 $2,580 $4,170 $700 $5,500 $35,600 $5,000 $41,100 $2,450
Friday, September 17, 2010
143
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
SM25
San Marcos, City of
ADOPTION: 10-00
Project Description:
RAS (TA 7-50)
TransNet - LSI: CRFrom Twin Oaks to Woodward Street - construction of approximately 700 lineal
feet of a new 4-lane secondary arterial including a bridge
Borden Road Street Improvements and Bridge Construction
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $10,800 Open to Traffic: Phase 1: Apr 2013
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $1,090 $910 $1,500 $3,300 $800 $1,200 $4,800 $6,800
TransNet - LSI Carry Over $4,000 $4,000 $4,000
TOTAL $10,800 $1,090 $910 $5,500 $3,300 $1,200 $8,800 $800
MPO ID:
Project Title:
SM27 ADOPTION: 10-00
Project Description: From San Marcos Boulevard to Main Street - reconstruct road to arterial street
standards
McMahr Street Improvements
Exempt Category: Safety - Pavement resurfacing and/or rehabilitationCapacity Status: NCI
Est Total Cost: $3,670
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $470 $200 $1,500 $1,500 $470 $200 $3,000 $3,670
TOTAL $3,670 $470 $200 $1,500 $1,500 $200 $3,000 $470
MPO ID:
Project Title:
SM30 ADOPTION: 10-00
Project Description:
RAS (TA 4-50)
TransNet - LSI: CRFrom Rancho Santa Fe to Bent Avenue - widen road to a 6-lane prime arterial
San Marcos Boulevard Street Improvements
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $5,930 Open to Traffic: Phase 1: Jul 2014 Phase 2: Jul 2016
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $290 $270 $700 $870 $800 $650 $2,060 $220 $2,930
TransNet - L (Cash) $70 $118 $188 $188
TransNet - LSI $112 $1,718 $412 $1,418 $1,830
TransNet - LSI Carry Over $982 $982 $982
TOTAL $5,930 $360 $270 $700 $1,100 $3,500 $2,660 $2,620 $650
Friday, September 17, 2010
144
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
SM31
San Marcos, City of
ADOPTION: 10-00
Project Description:
RAS (TA 7-50)
From McMahr Rd to Bent Ave/Craven Rd - widen roadway to four lane secondary
arterial
Discovery Street Improvements
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $4,100 Open to Traffic: Phase 1: Jul 2012
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $500 $2,000 $1,600 $200 $300 $3,600 $4,100
TOTAL $4,100 $500 $2,000 $1,600 $300 $3,600 $200
MPO ID:
Project Title:
SM32 ADOPTION: 10-00
Project Description: From San Marcos Boulevard to Discovery Street - widen to four lane secondary
arterial and construct a bridge at San Marcos Creek
Via Vera Cruz Bridge and Street Improvements
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $11,500 Open to Traffic: Phase 1: Jul 2013
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $9,000 $2,500 $11,500 $11,500
TOTAL $11,500 $9,000 $2,500 $11,500
MPO ID:
Project Title:
SM38 ADOPTION: 10-00
Project Description: TransNet - LSI: MaintVarious Locations - roadway, street lighting, traffic signal, signage maintenance
Street Maintenance Operations
Exempt Category: Safety - Pavement resurfacing and/or rehabilitationCapacity Status: NCI
Est Total Cost: $1,100
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - LSI $430 $430 $430
TransNet - LSI Carry Over $670 $670 $670
TOTAL $1,100 $1,100 $1,100
MPO ID:
Project Title:
SM42 ADOPTION: 10-00
Project Description:
RAS (TA 7-51)
From Craven Road to Twin Oaks Valley Road - in the City of San Marcos, on
Discovery Street from Craven Road to west of Twin Oaks Valley Road, construct
approximately 5,100 lineal feet of a new 6-lane roadway.
Street Improvements: Discovery Street; Craven Road to West of Twin Oaks Valley
Road
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $12,500 Open to Traffic: Phase 1: Jun 2013
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $2,500 $3,300 $6,700 $500 $2,000 $10,000 $12,500
TOTAL $12,500 $2,500 $3,300 $6,700 $2,000 $10,000 $500
Friday, September 17, 2010
145
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
SM43
San Marcos, City of
ADOPTION: 10-00
Project Description:
RAS (TA 7-51)
Barham Drive from Twin Oaks Valley Road to La Moree Road - in the City of San
Marcos, on Barham Drive between Twin Oaks Valley Road and La Moree Road,
widen and reconstruct the north side of Barham Drive to a 6-lane prime arterial
and associated work
Street Improvements and Widening
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $3,580 Open to Traffic: Phase 1: May 2014
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $350 $2,680 $550 $350 $1,600 $1,630 $3,580
TOTAL $3,580 $350 $2,680 $550 $1,600 $1,630 $350
MPO ID:
Project Title:
SM44 ADOPTION: 10-00
Project Description:
RTP PG NO: A-19
From Woodland Parkway to Nordahl Road - construct auxiliary lanes along
eastbound SR-78 between Woodland Parkway Interchange and Nordahl Road
Interchange; includes widening of Mission Road undercrossing
Eastbound SR-78 Auxiliary lane
Exempt Category: Non-ExemptCapacity Status: CIRT:78
Est Total Cost: $14,000 Open to Traffic: Phase 1: Aug 2011
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $750 $2,750 $1,250 $2,250 $3,500
SHOPP Augmentation - Mobility $10,500 $10,500 $10,500
TOTAL $14,000 $750 $13,250 $12,750 $1,250
MPO ID:
Project Title:
SM45 ADOPTION: 10-00
Project Description: From San Marcos Blvd to Twin Oaks Valley Rd - in San Marcos, on SR-78 at San
Marcos Creek between Twin Oaks Valley Road and San Marcos Boulevard
Interchange, construct a culvert
San Marcos Creek Bridge at State Route 78
Exempt Category: Safety - Non capacity widening or bridge reconstructionCapacity Status: NCIRT:78
Est Total Cost: $21,400
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $1,380 $2,020 $15,000 $3,000 $1,400 $20,000 $21,400
TOTAL $21,400 $1,380 $2,020 $15,000 $3,000 $20,000 $1,400
Friday, September 17, 2010
146
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
SM46
San Marcos, City of
ADOPTION: 10-00
Project Description: From San Marcos Blvd to Discovery Street - in San Marcos, widen existing
roadway and construct bridge to a 4-lane arterial road including sidewalks and
bicycle facilities
Bent Avenue Bridge between San Marcos Blvd and Discovery Street
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $13,000 Open to Traffic: Phase 1: Dec 2014
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $1,000 $500 $500 $11,000 $1,000 $1,000 $11,000 $13,000
TOTAL $13,000 $1,000 $500 $500 $11,000 $1,000 $11,000 $1,000
MPO ID:
Project Title:
SM47 ADOPTION: 10-00
Project Description:
RAS (TA 7-44)
Nordahl Road from Mission Road to Montiel Road - Nordahl Road from Mission
Road to Montiel Road - replace the Nordahl Road Overcrossing to increase
clearance and provide additional 14-feet of structure width necessary to facilitate
the required construction staging of the project; the additional width of the
overcrossing will accommodate operational improvements through left-turn
storage at the ramp intersections; widen Nordahl Road to provide a dedicated
right-turn onto Montiel Road (no additional travel lanes) - joint project with City of
Escondido and Caltrans
Nordahl Road Bridge @ SR-78
Exempt Category: Safety - Non capacity widening or bridge reconstructionCapacity Status: NCI
Est Total Cost: $4,500
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $500 $3,500 $500 $3,500 $4,000
TCSP $500 $500 $500
TOTAL $4,500 $500 $4,000 $500 $4,000
Friday, September 17, 2010
147
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
SNT04
Santee, City of
ADOPTION: 10-00
Project Description: TransNet - LSI: CRFY 2010/2011 - Residential Zone CE:, Iverness Road - Carlton Oaks Drive to
Carlton Oaks Drive, Wethersfield Road - Carlton Oaks Drive to Iverness Road,
Massot Avenue, Lomker Way, Lomket Court, Allano Way, Pine Valley Drive,
Dunwoodie Road - Residential Zone BG:, Caretta Drive - El Nopal to Second
Street, Cleary Street - Holborn Street to Second Street, Trigal Way, Montura Court,
Montura Avenue, Holborn Street, Holborn Court, Valor Place, Valor Lane, Sayers
Court, Melanie Court, Delia Court - Residential Zone DD:, Heartly road, Isacc
Street, Abraham Way, Stevens Street, , Wheatlands Avenue, Wheatlands Court,
Wheatlands Road - Residential Zone EA: - Bushy Hill Drive, Simeon Drive, Wahl
Street - Other: Tamberly Way - Mission Gorge Road to end of cul-de-sac Los
Ranchitos Road - Mast Boulevard to north City limits - reconstruction and
rehabilitation in the form of removal and replacement of existing pavement section
2 inches minimum, 3 inches typical, edge grind with 1.5 inch minimum overlay,
complete reconstruction with 6 inches base and 2 inch surface course
Santee Rehabilitation and Major Repair Work
Exempt Category: Safety - Pavement resurfacing and/or rehabilitationCapacity Status: NCI
Est Total Cost: $16,535
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $1,186 $500 $500 $500 $500 $500 $90 $3,596 $3,686
TransNet - L $7,729 $7,729 $7,729
TransNet - LSI $287 $937 $974 $475 $582 $679 $190 $3,744 $3,934
TransNet - LSI Carry Over $1,186 $50 $1,136 $1,186
TOTAL $16,535 $10,388 $1,437 $1,474 $975 $1,082 $1,179 $16,205 $330
Friday, September 17, 2010
148
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
SB07
Solana Beach, City of
ADOPTION: 10-00
Project Description:
RAS (TA 7-51)
TransNet - LSI: CRFrom Dahlia Dr to Ocean St - construct street and parkway improvements to
increase pedestrian safety and enhance pedestrian parkways; complement and
connect to the recently constructed Coastal Rail Trail providing a pedestrian
friendly environment along the Highway 101 corridor
Highway 101 Streetscape and Traffic Calming Project
Exempt Category: Air Quality - Bicycle and pedestrian facilitiesCapacity Status: NCI
Est Total Cost: $930
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - L (Cash) $787 $400 $387 $787
TransNet - LSI $143 $143 $143
TOTAL $930 $787 $143 $530 $400
MPO ID:
Project Title:
SB08 ADOPTION: 10-00
Project Description: TransNet - LSI: CRFrom San Andres Drive to Solana Drive - add pedestrian facilities along existing
2-lane road; construct approximately 590 lineal feet of curb, gutter and sidewalk
and retaining walls along east side of road, as well as restoring highly eroded
slope above proposed sidewalk
Marine View Avenue Curb, Gutter & Sidewalk
Exempt Category: Air Quality - Bicycle and pedestrian facilitiesCapacity Status: NCI
Est Total Cost: $419
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - LSI $185 $185 $185
TransNet - LSI Carry Over $234 $234 $234
TOTAL $419 $234 $185 $419
Friday, September 17, 2010
149
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
TCA01
Transportation Corridor Agencies
ADOPTION: 10-00
Project Description: On SR 241 from Orange/San Diego County line to Cristianitos interchange -
construct 3 general purpose toll lanes; from Cristianitos interchange to I-5 -
construct 2 general purpose toll lanes (program funding for Phase 1 only)
Foothill Transportation Corridor South
Exempt Category: Non-ExemptCapacity Status: CIRT:241
Est Total Cost: $442,663 Open to Traffic: Phase 1: Dec 2015 Phase 2: Dec 2030
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $83,275 $2,658 $11,730 $115,000 $115,000 $115,000 $82,333 $15,330 $345,000 $442,663
TOTAL $442,663 $83,275 $2,658 $11,730 $115,000 $115,000 $115,000 $15,330 $345,000 $82,333
Funding Source = Foothill/Eastern Tansportation Corridor Agency*
Friday, September 17, 2010
150
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
BIA11
U.S. Bureau of Indian Affairs
ADOPTION: 10-00
Project Description: Various locations around Indian reservations - planning for and construction of
roadway rehabilitation and reconstruction
Indian Reservation Road Program
Exempt Category: Safety - Pavement resurfacing and/or rehabilitationCapacity Status: NCI
Est Total Cost: $12,043
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
BIA $9,152 $2,891 $143 $11,900 $12,043
TOTAL $12,043 $9,152 $2,891 $11,900 $143
Friday, September 17, 2010
151
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
V04
Various Agencies
ADOPTION: 10-00
Project Description: Projects are consistent with CFR Parts 93.126 and 93.127 Exempt Tables 2 and 3
categories: transportation enhancement activities (except rehabilitation and
operation of historic transportaion buildings, structures, or facilities)
Grouped Projects for Transportation Enhancement Activities - Smart Growth
Incentive Program
Exempt Category: Other - Transportation enhancement activitiesCapacity Status: NCI
Est Total Cost: $705
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $280 $280 $280
TransNet - LSI $425 $425 $425
TOTAL $705 $280 $425 $705
MPO ID:
Project Title:
V07 ADOPTION: 10-00
Project Description:
SANDAG ID: 1200200
Countywide - habitat acquisition, restoration, creation, enhancement,
management and monitoring necessary for meeting project mitigation
requirements; mitigation efforts will focus on TransNet Early Action Program
projects, then Regional Transportation Plan (RTP) Revenue Constrained projects,
then the remaining Regional Transportation Plan (RTP) projects in this order
Biological Mitigation Program
Exempt Category: Other - Advance land acquisitionsCapacity Status: NCI
Est Total Cost: $428,000
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - REMP $85,862 $60,150 $59,100 $53,600 $58,100 $53,100 $4,510 $220,350 $145,052 $369,912
TOTAL $369,912 $85,862 $60,150 $59,100 $53,600 $58,100 $53,100 $220,350 $145,052 $4,510
Project completion outside of programming cycle*
MPO ID:
Project Title:
V08 ADOPTION: 10-00
Project Description:
SANDAG ID: 1200300
Countywide - regional habitat management and monitoring
Regional Habitat Conservation Fund
Exempt Category: Other - Plantings, landscaping, etcCapacity Status: NCI
Est Total Cost: $34,451
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - REMP $6,080 $10,046 $4,132 $4,867 $4,537 $4,789 $6,430 $28,021 $34,451
TOTAL $34,451 $6,080 $10,046 $4,132 $4,867 $4,537 $4,789 $28,021 $6,430
Project completion outside of programming cycle*
Friday, September 17, 2010
152
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
VISTA08
Vista, City of
ADOPTION: 10-00
Project Description:
RAS (TA 7-51)
From Melrose Dr to Thunder Dr - realign West Vista Way including providing
preliminary improvement plans, final right-of-way maps, and a metes and bounds
legal description anticipated to provide congestion relief with future widening of
West Vista Way from 2 to 4 lanes
West Vista Way Widening Design, CIP 7741
Exempt Category: Other - Engineering studiesCapacity Status: NCI
Est Total Cost: $1,981
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $35 $35 $35
RSTP $990 $990 $990
TCSP $570 $570 $570
TransNet - L $386 $386 $386
TOTAL $1,981 $1,411 $570 $1,981
MPO ID:
Project Title:
VISTA08A ADOPTION: 10-00
Project Description:
EARMARK NO: CA028
RAS (TA 7-51)
TransNet - LSI: CRFrom Emerald Dr to Grapevine Rd - the scope of this project is to provide
Right-of-Way acquistion and construction for the widening of W. Vista Way a
distance of 1,500 feet from the intersection with Emerald Drive to the intersection
with Grapevine Road
W. Vista Way Widening Construction - Phase I, CIP 8191
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $2,908 Open to Traffic: Phase 1: Dec 2010
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
HPP $245 $245 $245
STP $250 $250 $250
TransNet - L Carry Over $705 $705 $705
TransNet - LSI $1,708 $50 $200 $1,458 $1,708
TOTAL $2,908 $2,203 $705 $445 $2,413 $50
MPO ID:
Project Title:
VISTA17 ADOPTION: 10-00
Project Description: TransNet - LSI: MaintFrom Olive Ave to Date St - reconstruct pavement and install curb, gutter,
sidewalk, and bike lanes to provide a safe route to school
Grapevine Road Street Improvement Project CIP 8018
Exempt Category: Other - Plantings, landscaping, etcCapacity Status: NCI
Est Total Cost: $1,604
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $1,304 $180 $190 $934 $1,304
TransNet - L $230 $230 $230
TransNet - L Carry Over $25 $25 $25
TransNet - LSI $45 $45 $45
TOTAL $1,604 $1,559 $45 $190 $1,234 $180
Friday, September 17, 2010
153
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
VISTA25
Vista, City of
ADOPTION: 10-00
Project Description: TransNet - LSI: MaintCitywide - repair/replace sidewalks, curbs, and gutters
Roadway Rehabilitation/Curbs and Gutters CIP 7650
Exempt Category: Safety - Pavement resurfacing and/or rehabilitationCapacity Status: NCI
Est Total Cost: $546
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $371 $371 $371
TransNet - LSI $75 $25 $25 $25 $25 $175 $175
TOTAL $546 $446 $25 $25 $25 $25 $546
MPO ID:
Project Title:
VISTA27 ADOPTION: 10-00
Project Description: TransNet - LSI: CRFoothill Drive including improvements between Beverly Drive and Vale Terrace
Drive and from east of Bonair Road to Elm Drive. - overlay various portions of
Foothill Drive including improvements between Beverly Drive and Vale Terrace
Drive and from east of Bonair Road to Elm Drive.
Foothill Overlay and Improvements CIP 8141
Exempt Category: Safety - Pavement resurfacing and/or rehabilitationCapacity Status: NCI
Est Total Cost: $1,900
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $118 $118 $118
TransNet - L $382 $382 $382
TransNet - L Carry Over $527 $527 $527
TransNet - LSI $873 $873 $873
TOTAL $1,900 $1,027 $873 $1,900
MPO ID:
Project Title:
VISTA30 ADOPTION: 10-00
Project Description:
TransNet - LSI: Maint
S. Melrose Dr. from South City Limit to W. Vista Way; N. Melrose Dr. from Copper
to North City Limit; Bobier Dr. from West City Limit to Lynette Circle; North Dr. from
West City Limit to Melrose Dr.; and N. Santa Fe Ave from Osborne to Bobier. -
FY2006/07 and FY2007/08, repair/rehabilitate distressed pavement areas and
overlay streets with asphalt concrete where identified as priorities in street
inventory
Street Rehabilitation and Maintenance Annual Project 07/08, CIP 8154
Exempt Category: Safety - Pavement resurfacing and/or rehabilitationCapacity Status: NCI
Est Total Cost: $7,995
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $3,017 $300 $2,717 $3,017
TransNet - L $1,242 $1,242 $1,242
TransNet - L Carry Over $1,723 $1,723 $1,723
TransNet - LSI $1,957 $56 $2,013 $2,013
TOTAL $7,995 $7,939 $56 $7,695 $300
Friday, September 17, 2010
154
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
VISTA32
Vista, City of
ADOPTION: 10-00
Project Description: From Oak Dr to East Vista Way - install new traffic signal, curb and gutter, and
Americans with Disabilities Act (ADA) improvements at the intersection
Signal - E. Vista Way at Oak Drive CIP 8127
Exempt Category: Other - Traffic signal synchronization projectsCapacity Status: NCI
Est Total Cost: $245
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $241 $241 $241
TransNet - L Carry Over $4 $4 $4
TOTAL $245 $241 $4 $245
MPO ID:
Project Title:
VISTA33 ADOPTION: 10-00
Project Description: From East Dr to N. Santa Fe - install a new traffic signal and Americans with
Disabilities Act (ADA) improvements
Signal - N. Santa Fe at East Drive CIP 8128
Exempt Category: Other - Traffic signal synchronization projectsCapacity Status: NCI
Est Total Cost: $215
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $212 $212 $212
TransNet - L Carry Over $3 $3 $3
TOTAL $215 $212 $3 $215
MPO ID:
Project Title:
VISTA34 ADOPTION: 10-00
Project Description: TransNet - LSI: CRUniversity Dr from Sycamore Ave. to Wal-Mart driveway; Business Park Dr. from
Sycamore Ave to Poinsettia Ave.; Hacienda Dr. from West city limit to Emerald Dr.;
Hacienda Dr. from La Tortuga Dr. to 1475 west of La Tortuga Dr.; Crescent Dr.
from Escondido Ave. to Eucalyptus Ave.; Arcadia Ave. from Oak Dr. to Bonair Road;
Osborne St. from N. Santa Fe Ave. to Guajome Lake Rd.; Townsite Dr. from
Wellpot Pl. to Indian Rock Rd.; Alta Vista Dr. from Escondido Ave. to Verdant Pl.;
and Beaumont Dr. from Eucalyptus Ave. to Coventry Rd. - repair/rehabilitate
distressed pavement areas and overlay streets with asphalt concrete where
identified as priorities in street inventory, including all preparation work such as
dig-outs, skin patching, shoulder grading, traffic loops, raising manholes, striping,
and traffic safety control, as well as survey monument preservation
Street Rehabilitation and Maintenance CIP8155
Exempt Category: Safety - Pavement resurfacing and/or rehabilitationCapacity Status: NCI
Est Total Cost: $6,630
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $2,679 $2,679 $2,679
TransNet - L Carry Over $50 $23 $73 $73
TransNet - LSI $3,313 $564 $3,878 $3,878
TOTAL $6,630 $6,042 $587 $6,630
Friday, September 17, 2010
155
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
MPO ID:
Project Title:
VISTA39
Vista, City of
ADOPTION: 10-00
Project Description: Longhorn Dr at Promontory Ridge Way - install curb pop-outs and medians at the
intersection of Longhorn Drive at Promontory Ridge Way
Pedestrian Improvements, CIP 8187
Exempt Category: Safety - Safety Improvement ProgramCapacity Status: NCI
Est Total Cost: $66
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
Local Funds $15 $15 $15
TDA - Bicycles $51 $51 $51
TOTAL $66 $15 $51 $66
MPO ID:
Project Title:
VISTA42 ADOPTION: 10-00
Project Description: TransNet - LSI: MaintFrom North Santa Fe to Melrose Dr - install storm drain from N. Santa Fe to 1,500
ft west to address groundwater problems; rehabilitate pavement from N. Santa
Fe and Melrose Drive
Bobier Dr. Storm Drain & Street Rehabilitation, CIP 8218
Exempt Category: Safety - Pavement resurfacing and/or rehabilitationCapacity Status: NCI
Est Total Cost: $55
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - LSI $55 $55 $55
TOTAL $55 $55 $55
MPO ID:
Project Title:
VISTA43 ADOPTION: 10-00
Project Description: TransNet - LSI: MaintCitywide - update to the City's Pavement and Sidewalk Management System
Pavement and Sidewalk Management Systems
Exempt Category: Other - Engineering studiesCapacity Status: NCI
Est Total Cost: $90
CONRWPEPRIORTOTAL 10/11 11/12 12/13 13/14 14/15
TransNet - LSI $90 $90 $90
TOTAL $90 $90 $90
Friday, September 17, 2010
156
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
RTIP Fund Types
Federal Funding
ARRA American Recovery and Reinvestment Act (Federal Stimulus Program)
BIP/CBI Border Infrastructure Program/Corridors and Borders Infrastructure Program
CMAQ Congestion Mitigation and Air Quality
DEMO High Priority Demonstration Program under TEA-21
DEMO-Sec 115 High Priority Demonstration Program under FY 2004 Appropriations
DEMO-Sec 117/STP Surface Transportation Program under FHWA Administrative Program (congressionally
directed appropriations)
DOE Department of Energy
FRA Federal Railroad Administration
FTA Section 5307 Federal Transit Administration Urbanized Area Formula Program
FTA Section 5309 (Bus) Federal Transit Administration Discretionary Program
FTASection 5309 (FG) Federal Transit Administration Fixed Guideway Modernization Formula program
FTA Section 5309 (NS) Federal Transit Administration Discretionary - New Starts Program
FTA Section 5310 Federal Transit Administration Elderly & Disabled Program
FTA Section 5311 Federal Transit Administration Rural Program
FTA Section 5316 (JARC) Federal Transit Administration Jobs Access Reverse Commute
FTA Section 5317 (NF) Federal Transit Administration New Freedom
HBP Highway Bridge Program under SAFETEA-LU
HBRR Highway Bridge Repair and Rehabilitation under TEA-21
HES Hazard Elimination System (administered by Caltrans)
HPP High Priority Program under SAFETEA-LU
HUD Housing and Urban Development
IM Interstate Maintenance Discretionary
IRR Indian Reservation Roads program
ITS Intelligent Transportation System
NHS National Highway System (administered by Caltrans)
RSTP Regional Surface Transportation Program
RTP Recreational Trails Program
SRTS Safe Routes to School (administered by Caltrans)
TCSP Transportation & Community & System Preservation
TE Transportation Enhancement Program
TIGER (ARRA) Transportation Investment Generating Economic Recovery (Federal Stimulus)
TIGGER (ARRA) Transit Investment for Greenhouse Gas and Energy Reduction (Federal Stimulus)
TSGP Transit Security Grant Program
Friday, September 17, 2010
157
San Diego Region (in $000s)2010 Regional Transportation Improvement Program
State Funding
BTA Bicycle Transportation Account
CMIA Corridor Mobility Improvement Account (State Prop. 1B)
FSP Freeway Service Patrol
GARVEE Grant Anticipated Revenue Vehicles
HSIP Highway Safety Improvement Program
IRI Intercity Rail Improvement (State Prop. 1B)
Prop 1A - High Speed Rail High Speed Passenger Train Bond Program (State Prop. 1A)
PTA Public Transportation Account
SHOPP State Highway Operation & Protection Program
SLPP State Local Partnership Program (State Prop. 1B)
STIP-IIP State Transportation Improvement Program - Interregional Program
STIP-RIP State Transportation Improvement Program - Regional Improvement Program
TCRP Traffic Congestion Relief Program
TLSP Traffic Light Synchronization Program (State Prop. 1B)
TSM Transportation Systems Management
Local Funding
TDA Transportation Development Act
TDA-B Transportation Development Act-Bicycle & Pedestrian Facilities
TransNet-78 Prop. A Local Transportation Sales Tax - SR 78
TransNet-ADA Prop. A Local Transportation Sales Tax - Transit
TransNet-B Prop. A Local Transportation Sales Tax - Bike
TransNet-Border Prop. A Extension Local Transportation Sales Tax - Border
TransNet-BPNS Prop. A Local Transportation Sales Tax extension - Bicycle, Pedestrian and Neighborhood
Safety Program
TransNet-BRT/Ops Prop. A Extension Local Transportation Sales Tax - Bus Rapid Transit/New Service
TransNet-CP Prop. A Local Transportation Sales Tax - Commercial Paper
TransNet-H Prop. A Local Transportation Sales Tax - Highway
TransNet-L Prop. A Local Transportation Sales Tax - Local Streets & Roads
TransNet-LSG Prop. A Extension Local Transportation Sales Tax - Local Smart Growth
TransNet-LSI Prop. A Extension Local Transportation Sales Tax - Local System Improvements
TransNet-MC Prop. A Extension Local Transportation Sales Tax - Major Corridors
TransNet-REMP Prop. A Extension Local Transportation Sales Tax - Regional Environmental Mitigation Program
TransNet-SMIP Prop. A Extension Local Transportation Sales Tax - Regional Smart Growth Incentive Program
TransNet-SS Prop. A Extension Local Transportation Sales Tax - Senior Services
TransNet-T Prop. A Local Transportation Sales Tax - Transit
TransNet-TSI Prop. A Extension Local Transportation Sales Tax- Transit System Improvements
Friday, September 17, 2010
158
RoadName BegLocation EndLocationBONITA RD CITY LIMIT @ WILLOW ST OTAY LAKES RD
BRANDYWINE AV MENDOCINO DR MENDOCINO DR
BRANDYWINE AV OLYMPIC PW POINT LA JOLLA DR
BROADWAY C STREET D STREET
BROADWAY MAIN ST BEYER BL
BROADWAY D STREET F STREET
C ST BROADWAY FIFTH AVE
C ST N GLOVER AV SECOND AVE
D ST BROADWAY THIRD AVE
E H ST TIERRA DEL REY REGULO PL
E J ST FLOYD AV ENTRADA PL
E J ST HILLTOP DR MELROSE AVE
E J ST REDBUD PL RIVER ASH DR
E L ST HELIX AVE NACION AVE
E ORANGE AV HILLTOP DR MELROSE AVE
E PALOMAR ST MELROSE AVE NOLAN AVE
FIRST AV G ST I ST
FOURTH AV C ST DAVIDSON ST
FOURTH AV L ST ORANGE AVE
G ST WEST END FOURTH AVE
H ST SECOND AVE HILLTOP DR
HILLTOP DR J ST EAST TELEGRAPH CYN RD
HILLTOP DR L ST EAST NAPLES ST EAST
J ST FOURTH AVE THIRD AVE
K ST COLORADO BROADWAY
K ST THIRD AVE COUNTRY CLUB DR
L ST BROADWAY THIRD AVE
MAIN ST ALBANY AVE HILLTOP DR
MAIN ST INDUSTRIAL BLVD BROADWAY
MELROSE AVE TELEGRAPH CANYON RD MAIN ST
N FOURTH AV SR-54 FREEWAY RAMP C ST
OLYMPIC PW I-805 FREEWAY RAMP CONCORD WY
OTAY LAKES RD E H ST GOTHAM ST
PASEO RANCHERO S RANCHO DEL REY PW E H ST
TELEGRAPH CANYON RD I-805 FREEWAY RAMP I-805 FREEWAY RAMP
THIRD AV PALOMAR ST ORANGE AVE
CHV48 MAJOR PAVEMENT REHABILITATION
Lump Sum Locations for Chula Vista (CHV48)
159
163
Chapter 4
FINANCIAL CAPACITY ANALYSIS
This chapter provides an analysis of the financial capacity of the region's transportation agencies to implement the programmed projects. Financial capacity is measured by a comparison of the total cost of the proposed projects against the assumed revenues and a test of the reasonableness of the revenue assumptions.
Separate analyses are provided for the state highway and local street and road projects, the transit program, and other transportation projects and programs. The assumptions used in the forecasts of available funding are based upon information provided in the 2010 State Transportation Improvement Program (STIP) Fund Estimate (FE) that was adopted by the California Transportation Commission (CTC) in October 2009, and other forecasts of ongoing transportation funding programs.
INFLATION ASSUMPTIONS
The projects to be programmed in the 2010 RTIP, covering fiscal years 2011 to 2015, are expressed in future dollars. That is, they have been escalated based upon anticipated inflation and other factors to the expected year of obligation or expenditure. For STIP and State Highway Operations Protection Program (SHOPP), the revenues and program are based upon the 2010 FE. Based upon Department of Finance Budget Letter, the FE assumes no escalation from the baseline budget from 2010 to 2011 and displays a 1.3 percent annual escalation for State Operations expenditures for 2012 through 2015. For the major TransNet-funded projects, the SANDAG rate takes into account the recent trend in low-bid construction environment and gradually increases over the five year period. The rates used for FY 2011 start at (-1) percent and gradually increase over the next five fiscal years. This rate is also consistent with the current update to the long range plan as well as the Plan of Finance.
EXPENDITURES AND REVENUES DEMONSTRATION OF FISCAL CONSTRAINT
Tables 4-1a to 4-1c provide a summary by major funding sources (i.e., federal, state, TransNet, and local) for programs, expenditures, and balance of remaining revenues for the RTIP program period. The five-year project costs and programmed revenues are contained within the individual project listings in Chapter 3. Individual projects listed in Chapter 3 include phases where full funding is reasonably anticipated to be available within the time period contemplated for completion of the phase or project.
Prior FY2011 FY2012 FY2013 FY2014 FY2015 TotalSales Tax $972,514 $518,801 $404,126 $456,714 $620,213 $431,722 $3,404,090
City $0 $0 $0 $0 $0 $0 $0County $919,664 $503,207 $389,395 $439,315 $601,649 $423,240 $3,276,470Other (Transportation Development Act) $52,850 $15,594 $14,731 $17,399 $18,564 $8,482 $127,620
Other Local Funds $790,337 $84,353 $92,608 $786,308 $273,990 $154,751 $2,182,347City General Funds $566,555 $81,358 $80,528 $158,578 $128,440 $39,751 $1,055,210Street Taxes and Developer Fees $223,662 $2,995 $12,080 $627,730 $145,550 $115,000 $1,127,017Other (registration fees (AB434) and Prop 42) $120 $0 $0 $0 $0 $0 $120
Transit $23,935 $28,160 $29,621 $32,002 $35,081 $0 $148,799Other Transit (e.g., parcel/property taxes, parking revenue, etc) $23,935 $28,160 $29,621 $32,002 $35,081 $0 $148,799
Local Total $1,786,786 $631,314 $526,355 $1,275,024 $929,284 $586,473 $5,735,236State Highway Operations and Protection Program (SHOPP) $8,106 $116,831 $42,579 $47,339 $87,206 $0 $302,061
SHOPP (Including Augmentation) $8,106 $116,831 $42,579 $47,339 $87,206 $0 $302,061SHOPP Prior $0 $0 $0 $0 $0 $0 $0
State Transportation Improvement Program (STIP) $509,132 $6,760 $34,728 $2,942 $50,345 $538 $604,445STIP (Including Augmentation) $462,883 $6,760 $34,728 $2,942 $50,345 $538 $558,196STIP Prior $46,249 $0 $0 $0 $0 $0 $46,249Proposition 1A - High Speed Rail $8,500 $14,000 $17,361 $26,023 $25,450 $8,364 $99,698Proposition 1B $325,082 $120,258 $217,740 $247,279 $10,771 $931 $922,061STP Enhancement $3,197 $186 $519 $3,302 $219 $1,705 $9,128GARVEE Bonds $326,108 $21,835 $21,835 $21,835 $21,835 $21,835 $435,283Highway Maintenance - State Cash $0 $3,684 $0 $0 $0 $0 $3,684Traffic Congestion Relief Program $180,654 $50,020 $6,536 $0 $0 $0 $237,210State Transit Assistance (STA) $3,694 $1,002 $1,000 $1,658 $555 $0 $7,909Other (FSP, Prop 116, R&I) $1,138 $4,564 $2,895 $2,895 $2,895 $2,895 $17,282
State Total $1,365,611 $339,140 $345,193 $353,273 $199,276 $36,268 $2,638,761Federal Transit Administration
Bus and Bus Related Grants (5309c) $20,473 $0 $0 $0 $0 $0 $20,473Clean Fuel Formula Program (5308) $0 $0 $0 $0 $0 $0 $0Elderly & Persons with Disabilities Formula Program (5310) $0 $963 $0 $0 $0 $0 $963Fixed Guideway Modernization (5309a) $72,880 $20,934 $21,722 $22,643 $23,548 $0 $161,727Intercity Bus (5311f) $0 $0 $0 $0 $0 $0 $0Job Access and Reverse Commute Program (5316) $63 $0 $0 $0 $0 $0 $63Metropolitan Planning (5303) $0 $0 $0 $0 $0 $0 $0New and Small Starts (Capital Investment Grants) (5309b) $42,071 $0 $0 $0 $0 $0 $42,071New Freedom (SAFETEA-LU) $368 $0 $0 $0 $0 $0 $368Nonurbanized Area Formula Program (5311) $2,036 $677 $704 $733 $381 $0 $4,531Public Transportation on Indian Reservation (5311c) $0 $0 $0 $0 $0 $0 $0Transit in the Parks (5320) $0 $0 $0 $0 $0 $0 $0Urbanized Area Formula Program (5307) $127,942 $61,088 $63,532 $66,073 $68,716 $3,000 $390,351CMAQ/5307 Transfer $0 $0 $0 $0 $0 $0 $0ARRA - FTA 5307 $43,474 $0 $0 $0 $0 $0 $43,474ARRA - FTA 5309 $2,873 $0 $0 $0 $0 $0 $2,873ARRA - FTA 5311 $578 $0 $0 $0 $0 $0 $578ARRA - Federal Railroad Administration $0 $11,800 $0 $0 $0 $0 $11,800ARRA - FTA Transit Investment for Greenhouse Gas Energy Reduction $0 $0 $0 $0 $0 $0 $0ARRA - FRA TIGER Discretionary Grant $0 $20,200 $0 $0 $0 $0 $20,200Other (TSGP) $896 $0 $0 $0 $0 $0 $896
Federal Transit Total $313,654 $115,662 $85,958 $89,449 $92,645 $3,000 $700,368Federal Highway Non-Discretionary
Congestion Mitigation and Air Quality (CMAQ) $151,144 $31,318 $31,882 $32,445 $33,040 $33,700 $313,529Surface Transportation Program (Regional) $377,204 $33,726 $33,316 $33,917 $34,528 $35,219 $547,910High Risk Rural Road (HRRR) $0 $0 $0 $0 $0 $0 $0Highway Bridge Program (HBP) $54,967 $12,148 $675 $5,735 $24,081 $181,641 $279,247Highway Safety Improvement Program (HSIP) $443 $334 $3,705 $2,753 $0 $0 $7,235Railway (Section 130) $0 $0 $0 $0 $0 $0 $0Safe Routes to School (SRTS) (SAFETEA-LU) $371 $450 $1,842 $730 $0 $0 $3,393Safe Routes to School (SR2S) $0 $0 $0 $0 $0 $0 $0Transportation Improvements (TI) $0 $0 $0 $0 $0 $0 $0Federal Lands Highway $0 $0 $0 $0 $0 $0 $0ARRA - SHOPP $0 $0 $0 $0 $0 $0 $0ARRA - STIP $0 $0 $0 $0 $0 $0 $0ARRA - TE $0 $0 $0 $0 $0 $0 $0ARRA - RSTP $201,361 $0 $0 $0 $0 $0 $201,361Other (RITA, DOE ARRA) $5,195 $3,918 $3,694 $1,778 $0 $0 $14,585
Subtotal $790,685 $81,894 $75,114 $77,358 $91,649 $250,560 $1,367,260 Federal Highway Discretionary Programs
Bridge Discretionary Program $0 $0 $0 $0 $0 $0 $0Corridor Infrastructure Improvement Program (SAFETEA-LU Sec $0 $0 $0 $0 $0 $0 $0Coordinated Border Infrastructure (SAFETEA-LU Sec.1303) $111,842 $0 $0 $0 $0 $0 $111,842Ferry Boat Discretionary $0 $0 $0 $0 $0 $0 $0High Priority Projects (HPP) $116,356 $5,483 $3,870 $1,436 $0 $0 $127,145Highway Maintenance - National Highway System $0 $14,521 $0 $0 $0 $0 $14,521National Scenic Byways Program $0 $0 $0 $0 $0 $0 $0Projects of National/Regional Significance (SAFETEA-LU Sec. 130 $0 $0 $0 $0 $0 $0 $0Public Lands Highway Discretionary $9,152 $2,891 $0 $0 $0 $0 $12,043Recreational Trails $0 $0 $0 $0 $0 $0 $0Transportation & Community and System Preservation Program $1,872 $1,202 $500 $0 $0 $0 $3,574Other (ITS, IM, Sec 112/117, value pricing, STP) $12,114 $4,025 $0 $0 $0 $0 $16,139
Subtotal $251,336 $28,122 $4,370 $1,436 $0 $0 $285,264 Federal Highway Total $1,042,021 $110,016 $79,484 $78,794 $91,649 $250,560 $1,652,524FEDERAL TOTAL $1,355,675 $225,678 $165,442 $168,243 $184,294 $253,560 $2,352,892
$4,508,072 $1,196,132 $1,036,990 $1,796,540 $1,312,854 $876,301 $10,726,889
FUNDING SOURCE
Table 4-1a
2010 Regional Transportation Improvement Program (RTIP)San Diego Region - (in $000s)
REVENUESFE
DER
AL
HIG
HW
AY
REVENUE TOTAL
LOC
AL
STA
TEFE
DER
AL
TRA
NSI
T
164
Prior FY2011 FY2012 FY2013 FY2014 FY2015 Total
Local Total $1,786,786 $630,590 $472,548 $1,236,126 $896,311 $384,425 $5,406,786
State Highway Operations and Protection Program (SHOPP) $8,106 $116,831 $42,579 $47,339 $87,206 $0 $302,061SHOPP (Including Augmentation) $8,106 $116,831 $42,579 $47,339 $87,206 $0 $302,061SHOPP Prior $0 $0 $0 $0 $0 $0 $0
State Transportation Improvement Program (STIP) $509,132 $6,760 $34,728 $2,942 $50,345 $537 $604,444STIP (Including Augmentation) $462,883 $6,760 $34,728 $2,942 $50,345 $538 $558,196STIP Prior $46,249 $0 $0 $0 $0 $0 $46,249Proposition 1A - High Speed Rail $8,500 $14,000 $17,361 $26,023 $25,450 $8,364 $99,698Proposition 1B $325,082 $120,258 $217,740 $247,279 $10,771 $931 $922,061STP Enchancement $3,197 $209 $519 $3,302 $219 $1,705 $9,151GARVEE Bonds $326,108 $21,835 $21,835 $21,835 $21,835 $21,835 $435,283Highway Maintenance - State Cash $0 $3,684 $0 $0 $0 $0 $3,684Traffic Congestion Relief Program $180,654 $50,020 $6,535 $0 $0 $0 $237,209State Transit Assistance (STA) $3,694 $1,002 $1,000 $1,658 $555 $0 $7,909Other (FSP, Prop 116, R&I) $1,138 $4,564 $2,895 $2,895 $2,895 $2,895 $17,282
State Total $1,365,611 $339,163 $345,192 $353,273 $199,276 $36,267 $2,638,782Federal Transit Administration
Bus and Bus Related Grants (5309c) $20,473 $0 $0 $0 $0 $0 $20,473Clean Fuel Formula Program (5308) $0 $0 $0 $0 $0 $0 $0Elderly & Persons with Disabilities Formula Program (5310) $0 $963 $0 $0 $0 $0 $963Fixed Guideway Modernization (5309a) $72,880 $20,391 $21,207 $22,055 $22,936 $0 $159,469Intercity Bus (5311f) $0 $0 $0 $0 $0 $0 $0Job Access and Reverse Commute Program (5316) $63 $0 $0 $0 $0 $0 $63Metropolitan Planning (5303) $0 $0 $0 $0 $0 $0 $0New and Small Starts (Capital Investment Grants) (5309b) $42,071 $0 $0 $0 $0 $0 $42,071New Freedom (SAFETEA-LU) $368 $0 $0 $0 $0 $0 $368Nonurbanized Area Formula Program (5311) $2,036 $349 $359 $370 $381 $0 $3,495Public Transportation on Indian Reservation (5311c) $0 $0 $0 $0 $0 $0 $0Transit in the Parks (5320) $0 $0 $0 $0 $0 $0 $0Urbanized Area Formula Program (5307) $127,942 $61,058 $63,500 $66,039 $68,716 $3,000 $390,255CMAQ/5307 Transfer $0 $0 $0 $0 $0 $0 $0ARRA - FTA 5307 $43,474 $0 $0 $0 $0 $0 $43,474ARRA - FTA 5309 $2,873 $0 $0 $0 $0 $0 $2,873ARRA - FTA 5311 $578 $0 $0 $0 $0 $0 $578ARRA - Federal Railroad Administration $0 $11,800 $0 $0 $0 $0 $11,800ARRA - FTA Transit Investment for Greenhouse Gas Energy Reduction (T $0 $0 $0 $0 $0 $0 $0ARRA - FRA TIGER Discretionary Grant $0 $20,200 $0 $0 $0 $0 $20,200Other (TSGP) $896 $0 $0 $0 $0 $0 $896
Federal Transit Total $313,654 $114,761 $85,066 $88,464 $92,033 $3,000 $696,978Federal Highway Non-Discretionary
Congestion Mitigation and Air Quality (CMAQ) $151,144 $4,031 $4,283 $5,547 $5,824 $0 $170,829Surface Transportation Program (Regional) $377,204 $12,725 $723 $723 $724 $724 $392,823High Risk Rural Road (HRRR) $0 $0 $0 $0 $0 $0 $0Highway Bridge Program (HBP) $54,967 $12,148 $675 $5,735 $24,081 $181,641 $279,247Highway Safety Improvement Program (HSIP) $443 $334 $3,705 $2,753 $0 $0 $7,235Railway (Section 130) $0 $0 $0 $0 $0 $0 $0Safe Routes to School (SRTS) (SAFETEA-LU) $371 $450 $1,842 $730 $0 $0 $3,393Safe Routes to School (SR2S) $0 $0 $0 $0 $0 $0 $0Transportation Improvements (TI) $0 $0 $0 $0 $0 $0 $0Federal Lands Highway $0 $0 $0 $0 $0 $0 $0ARRA - SHOPP $0 $0 $0 $0 $0 $0 $0ARRA - STIP $0 $0 $0 $0 $0 $0 $0ARRA - TE $0 $0 $0 $0 $0 $0 $0ARRA - RSTP $201,361 $0 $0 $0 $0 $0 $201,361Other (RITA, DOE ARRA) $5,195 $3,918 $3,694 $1,778 $0 $0 $14,585
Subtotal $790,685 $33,606 $14,922 $17,266 $30,629 $182,365 $1,069,473 Federal Highway Discretionary Programs
Bridge Discretionary Program $0 $0 $0 $0 $0 $0 $0Corridor Infrastructure Improvement Program (SAFETEA-LU Sec. 1302) $0 $0 $0 $0 $0 $0 $0Coordinated Border Infrastructure (SAFETEA-LU Sec.1303) $111,842 $0 $0 $0 $0 $0 $111,842Ferry Boat Discretionary $0 $0 $0 $0 $0 $0 $0High Priority Projects (HPP) $116,356 $5,483 $3,870 $1,436 $0 $0 $127,145Highway Maintenance - National Highway System** $0 $14,521 $0 $0 $0 $0 $14,521National Scenic Byways Program $0 $0 $0 $0 $0 $0 $0Projects of National/Regional Significance (SAFETEA-LU Sec. 1301) $0 $0 $0 $0 $0 $0 $0Public Lands Highway Discretionary $9,152 $2,891 $0 $0 $0 $0 $12,043Recreational Trails $0 $0 $0 $0 $0 $0 $0Transportation & Community and System Preservation Program $1,872 $1,202 $500 $0 $0 $0 $3,574Other (ITS, IM, Sec 112/117, value pricing, STP) $12,114 $4,025 $0 $0 $0 $0 $16,139
Subtotal $251,336 $28,122 $4,370 $1,436 $0 $0 $285,264 Federal Highway Total $1,042,021 $61,728 $19,292 $18,702 $30,629 $182,365 $1,354,737FEDERAL TOTAL $1,355,675 $176,489 $104,358 $107,166 $122,662 $185,365 $2,051,715
$4,508,072 $1,146,242 $922,098 $1,696,565 $1,218,249 $606,057 $10,097,282
FUNDING SOURCE
Table 4-1b
Final 2010 Regional Transportation Improvement Program (RTIP)San Diego Region - (in $000s)
PROGRAMMED
FED
ERA
L H
IGH
WA
Y
PROGRAMMED TOTAL
LOC
AL
STA
TEFE
DER
AL
TRA
NSI
T
165
Prior FY2011 FY2012 FY2013 FY2014 FY2015 Total
Local Total $0 $724 $53,807 $38,898 $32,973 $202,048 $328,450
State Highway Operations and Protection Program (SHOPP) $0 $0 $0 $0 $0 $0 $0SHOPP (Including Augmentation) $0 $0 $0 $0 $0 $0 $0SHOPP Prior $0 $0 $0 $0 $0 $0 $0
State Transportation Improvement Program (STIP) $0 $0 $0 $0 $0 $0 $0STIP (Including Augmentation) $0 $0 $0 $0 $0 $0 $0STIP Prior $0 $0 $0 $0 $0 $0 $0Proposition 1A - High Speed Rail $0 $0 $0 $0 $0 $0 $0Proposition 1B $0 $0 $0 $0 $0 $0 $0GARVEE Bonds $0 $0 $0 $0 $0 $0 $0Highway Maintenance - State Cash $0 $0 $0 $0 $0 $0 $0Traffic Congestion Relief Program $0 $0 $0 $0 $0 $0 $0State Transit Assistance (STA) $0 $0 $0 $0 $0 $0 $0Other (Please specify) $0 $0 $0 $0 $0 $0 $0
State Total $0 $0 $0 $0 $0 $0 $0Federal Transit Administration
Bus and Bus Related Grants (5309c) $0 $0 $0 $0 $0 $0 $0Clean Fuel Formula Program (5308) $0 $0 $0 $0 $0 $0 $0Elderly & Persons with Disabilities Formula Program (5310) $0 $0 $0 $0 $0 $0 $0Fixed Guideway Modernization (5309a) $0 $543 $515 $588 $612 $0 $2,258Intercity Bus (5311f) $0 $0 $0 $0 $0 $0 $0Job Access and Reverse Commute Program (5316) $0 $0 $0 $0 $0 $0 $0Metropolitan Planning (5303) $0 $0 $0 $0 $0 $0 $0New and Small Starts (Capital Investment Grants) (5309b) $0 $0 $0 $0 $0 $0 $0New Freedom (SAFETEA-LU) $0 $0 $0 $0 $0 $0 $0Nonurbanized Area Formula Program (5311) $0 $328 $345 $363 $0 $0 $1,036Public Transportation on Indian Reservation (5311c) $0 $0 $0 $0 $0 $0 $0Transit in the Parks (5320) $0 $0 $0 $0 $0 $0 $0Urbanized Area Formula Program (5307) $0 $30 $32 $34 $0 $0 $96CMAQ/5307 Transfer $0 $0 $0 $0 $0 $0 $0ARRA - FTA Transit Investment for Greenhouse Gas Energy Reduction $0 $0 $0 $0 $0 $0 $0Other (TSGP) $0 $0 $0 $0 $0 $0 $0
Federal Transit Total $0 $901 $892 $985 $612 $0 $3,390Federal Highway Non-Discretionary
Congestion Mitigation and Air Quality (CMAQ) $0 $27,287 $27,599 $26,898 $27,216 $33,700 $142,700Surface Transportation Program (Regional) $0 $21,001 $32,593 $33,194 $33,804 $34,495 $155,087High Risk Rural Road (HRRR) $0 $0 $0 $0 $0 $0 $0Highway Bridge Program (HBP) $0 $0 $0 $0 $0 $0 $0Highway Safety Improvement Program (HSIP) $0 $0 $0 $0 $0 $0 $0Railway (Section 130) $0 $0 $0 $0 $0 $0 $0Safe Routes to School (SRTS) (SAFETEA-LU) $0 $0 $0 $0 $0 $0 $0Safe Routes to School (SR2S) $0 $0 $0 $0 $0 $0 $0Transportation Improvements (TI) $0 $0 $0 $0 $0 $0 $0Federal Lands Highway $0 $0 $0 $0 $0 $0 $0ARRA - SHOPP $0 $0 $0 $0 $0 $0 $0ARRA - STIP $0 $0 $0 $0 $0 $0 $0ARRA - TE $0 $0 $0 $0 $0 $0 $0ARRA - RSTP $0 $0 $0 $0 $0 $0 $0Other (RITA, DOE ARRA) $0 $0 $0 $0 $0 $0 $0
Subtotal $0 $48,288 $60,192 $60,092 $61,020 $68,195 $297,787 Federal Highway Discretionary Programs
Bridge Discretionary Program $0 $0 $0 $0 $0 $0 $0Corridor Infrastructure Improvement Program (SAFETEA-LU Sec. 1302) $0 $0 $0 $0 $0 $0 $0Coordinated Border Infrastructure (SAFETEA-LU Sec.1303) $0 $0 $0 $0 $0 $0 $0Ferry Boat Discretionary $0 $0 $0 $0 $0 $0 $0High Priority Projects (HPP) $0 $0 $0 $0 $0 $0 $0Highway Maintenance - National Highway System $0 $0 $0 $0 $0 $0 $0National Scenic Byways Program $0 $0 $0 $0 $0 $0 $0Projects of National/Regional Significance (SAFETEA-LU Sec. 1301) $0 $0 $0 $0 $0 $0 $0Public Lands Highway Discretionary $0 $0 $0 $0 $0 $0 $0Recreational Trails $0 $0 $0 $0 $0 $0 $0Transportation and Community and System Preservation Program $0 $0 $0 $0 $0 $0 $0Other (ITS, IM, Sec 112/117, value pricing, STP) $0 $0 $0 $0 $0 $0 $0
Subtotal $0 $0 $0 $0 $0 $0 $0 Federal Highway Total $0 $48,288 $60,192 $60,092 $61,020 $68,195 $297,787FEDERAL TOTAL $0 $49,189 $61,084 $61,077 $61,632 $68,195 $301,177
$0 $49,913 $114,891 $99,975 $94,605 $270,243 $629,627
LOC
AL
Table 4-1c
2010Regional Transportation Improvement Program (RTIP)San Diego Region - (in $000s)
REVENUES VS. PROGRAMMEDFUNDING SOURCE
STA
TEFE
DER
AL
TRA
NSI
T
REVENUE VS. PROGRAMMED TOTAL
FED
ERA
L H
IGH
WA
Y
166
167
INNOVATIVE FINANCING
The Grant Anticipation Revenue Vehicle (GARVEE) program is an innovative financing technique established in federal law and defined in state law (SB 928, 1999). The intent of the program is to provide a financing mechanism to accelerate the funding and construction of critical transportation projects in order to provide the congestion relief benefits to the public significantly sooner than under traditional financial techniques. SANDAG and the State successfully pursued the GARVEE bond for the I-15 Managed Lanes project (CAL18). In a joint venture with Caltrans, SANDAG pays for 75 percent of the debt service through its RIP share of the STIP while Caltrans pays for the remaining 25 percent through the IIP share of the STIP. This project is open to traffic although landscaping and other works continue. The debt service is scheduled to end in FY 2015.
With the approval by the voters of San Diego County to extend the TransNet program, the SANDAG Board at its meeting in January 2005 approved a set of projects for accelerated implementation referred to as the TransNet Early Action Program (EAP), a list of regionally significant projects in the region. By FY 2018, SANDAG anticipates all of the EAP projects to open to traffic, providing much needed congestion relief. To accomplish this, SANDAG developed the Plan of Finance (POF), the financial strategy for implementing the EAP, which includes work on 25 of the 47 major corridor projects identified in the TransNet Extension Ordinance and Expenditure Plan. The POF is the debt financing mechanism through which SANDAG plans to complete the EAP projects.
The region, the State, and much of the country continue to suffer under severe budget and fiscal limitations and grappling with the impact of the recession. SANDAG firmly believes that the continuation of major transportation projects would benefit the regional economic outlook by providing jobs, containing costs (by avoiding cost increases associated with project delays), and providing congestion relief, which saves travel time. With the use of such financial tools as GARVEE, the financial strategy outline in the TransNet POF, and other innovative mechanisms, SANDAG, with endorsement from its Board of Directors, fully intends to continue to aggressively promote early completion of transportation projects.
PROGRAM REVENUES
RTIP revenue sources have been grouped into different categories and are described below:
Federal Revenues
Federal funds programmed are based upon the federal authorizing legislation, Safe, Accountable, Flexible, and Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU), which expired September 30, 2009. On March 18, 2010, President Obama signed a new bill into law which extends SAFETEA-LU until December 2010.
• American Recovery and Reinvestment Act (ARRA): This act, which was signed into law on February 17, 2009, includes appropriations and tax law changes totaling approximately $787 billion to support government-wide efforts to stimulate the economy. Goals of the statute include the preservation or creation of jobs and the promotion of an economic recovery, as well as the investment in transportation, environmental protection, and other infrastructure improvements providing long-term economic benefits. The transportation funds the region received include the following programs: Federal Transit Administration Sections 5307, 5309, 5311, and Transit Investment for Greenhouse Gas Emission
168
Reduction (TIGGER); Federal Highway Administration Transportation Enhancement (TE), Regional Surface Transportation Program (RSTP), State Highway Operations Protection Program (SHOPP); Federal Railroad Administration Track 1 Intercity Rail and Transportation Investment Generating Economic Recovery (TIGER).
• Borders and Corridors Infrastructure Program: SAFETEA-LU changed the distribution of this program to a formula based program at the national level but administered at the state level. No new funding is programmed.
• Congestion Mitigation and Air Quality (CMAQ)/Regional Surface Transportation Program (RSTP): Both of these formula programs are estimated and apportioned by Caltrans for the San Diego region. By SANDAG Board policy, 90 percent of these programs are allocated to the ‘Early Action Program,’ which seeks to advance regionally significant projects in order to provide increased mobility in the region.
• Demonstration/High-Priority Projects: SAFETEA-LU includes several San Diego region projects under the High-Priority Project Authorizations program. Funding beyond SAFETEA-LU is based upon annual federal appropriations. No new earmarks are programmed.
• FTA Urbanized Area Formula (Section 5307) Program: The FTA Section 5307 program is a formula program to fund ongoing preventive maintenance, bus acquisition programs, the regional vanpool program, office and shop equipment, and other transit capital projects. The revenues are based upon apportionment published in the latest Federal Register (FR) for the current year; future years are escalated by four percent to 2014, which is the average increase over SAFETEA-LU.
• FTA (Section 5309) Capital Program: The FTA Section 5309 program includes both a discretionary program for major bus and new starts capital projects and formula program for fixed guideway rail modernization. The revenues for the formula program (5309 fixed guideway) are based upon apportionment published in the latest Federal Register (FR) for the current year; future years are escalated by four percent to 2014, which is based upon the average growth over the SAFETEA-LU period. Discretionary funding is programmed upon award or based upon the published FR.
• FTA Formula (Section 5310) Program: This program is administered by Caltrans and the funds are allocated each year by the CTC. Recipients are nonprofit organizations serving the elderly and the disabled community in need of vehicles and other capital items in order to provide services. The funds are programmed annually after approval by CTC.
• FTA Formula (Section 5311) Program: Section 5311 includes both a formula program (5311) as well as discretionary program (5311f) to support transit services in the non-urbanized areas of the region. Caltrans provides the estimates of revenues for the formula program and announces the award under the discretionary program on an annual basis.
• FTA Formula (Section 5316) Jobs Access Reverse Commute Program: This program can fund operating, capital, and mobility management projects providing transportation services to jobs and employment-related activities for persons with limited means. Funding is based upon the FR; no new funding is programmed.
169
• FTA Formula (Section 5317) New Freedom Program: This program can fund operating, capital, and mobility management projects providing new or expanded transportation services and facilities for persons with disabilities. Funding is based upon the FR; no new funding is programmed.
• Highway Bridge Program (HBP)/Hazard Elimination Safety (HES)/Safe Routes to Schools (SRTS), High Risk Rural Roads (HRRR)/Highway Safety Improvement Program (HSIP): These programs are administered by Caltrans at the statewide level. All funding is provided by Caltrans and programmed as a grouped project.
• Transportation Enhancement (TE): Although this is a federal program, the fund administration was transferred from the regional agencies to CTC. The SANDAG Board determines the projects to be funded under this program, but no new projects have been selected; therefore, the current grouped project is a carryover from the prior RTIP and does not reflect any new projects.
• Transportation, Community and Systems Preservation (TCSP): Researches relationships between transportation, community preservation, and the environment; funds projects to address transportation efficiency and community system preservation. Projects are programmed upon award.
State Revenues
The state highway projects programmed are based upon the adopted 2010 STIP or other CTC action.
• Freeway Service Patrol (FSP): Funds are provided through the state legislature. The FSP program costs and revenue estimates have been developed jointly by SANDAG, Caltrans, and the California Highway Patrol based upon the most current statewide FSP Act funding levels.
• Proposition 1A: The Safe, Reliable High-Speed Passenger Train Bond Act for the 21st Century approved by the voters as Proposition 1A on November 4, 2008, authorizes the CTC, upon appropriation by the Legislature, to allocate funds for capital improvement to intercity rail, commuter rail, and urban rail systems. The CTC approved the program of projects under this program at its May 2010 meeting.
• Proposition 1B: The CTC is the responsible agency for administering the transportation component of the Highway Safety, Traffic Reduction, Air Quality, and Port Security Bond Act of 2006, approved by the voters as Proposition 1B on November 7, 2006. CTC has approved or allocated funding for some programs, including STIP/SHOPP Augmentation, Public Transportation Modernization, Improvement, and Service Enhancement Account (PTMISEA), Corridor Mobility Improvement Account (CMIA), the Highway-Railroad Crossing Safety Account, Intercity Rail Improvement, and the Trade Corridor Improvement Fund (TCIF). The funding received under these programs is included in the RTIP. As the other programs are allocated, to the extent that the San Diego region is the recipient; those will be programmed as they are approved.
• State Transit Assistance (STA): The STA program provides state operating and capital support for the region’s transit operators through a formula program. The STA funds can be used for both operating (after meeting certain eligibility criteria) and capital projects. Certain STA funds are included in the ‘local’ revenue sources. The funding levels are based upon apportionment provided by the State Controller’s office.
170
• STIP and SHOPP: The CTC programs the STIP and SHOPP on a statewide basis. The program funding is based upon reasonably expected state and federal revenues, as identified in the 2010 STIP Fund Estimate.
• Traffic Congestion Relief Program (TCRP): In FY 2001, the Governor of California initiated a new funding program (TCRP) in an effort to relieve congestion statewide. The TCRP was created as a result of a budget surplus; however, with the subsequent and continuing budget deficit, TCRP allocations have been sporadic. TCRP funds are based upon the priority list of TCRP allocations.
Local Revenues
• TransNet Local Transportation Sales Tax Program: TransNet revenues are estimated based upon taxable retail sales forecasts derived from SANDAG’s short-term forecasting model (see Table 4-2). This program also specifies several sub-programs that augment the major transportation projects in the region, including Major Corridors, Smart Growth Incentive Program, and an innovative program for early mitigation for projects - Environmental Mitigation Program – the first in the State to purchase right-of-way early in order to reduce the cost of projects in the future while preserving the ecology of the region.
• Local Agency Funding: The local agency revenues programmed are based upon reasonably expected revenues as submitted by local agencies. Included are city and county local gas tax subventions, developer fees, local public funds, Proposition 42 funds, and developer funds administered by local agencies.
• Local Privatization/Toll Revenues: There is one local privatization/toll revenue funding: the SR 241 Foothill Corridor toll road and one public toll road – the SR 11 project sponsored by SANDAG.
• Transportation Development Act (TDA): Although this is a state program, TDA is administered locally. Funds are based upon a ¼ percent state sales tax, with revenues made available primarily for transit operating and capital purposes. The San Diego County Auditor and Controller’s office estimates the apportionment for the upcoming fiscal year. SANDAG prepares the short-term estimate of TDA based upon a forecast of sales tax revenues using SANDAG’s short-term forecasting model, which takes into consideration numerous variables, including population growth, jobs, inflation, and real income growth.
Other Transportation Program Revenues
• Other Funds: These funds include contributions from various state funding sources, local agency contributions, private sector funding, advertising income, investment earnings, passenger fare revenue, and other miscellaneous income. Revenues from these sources are generally consistent with established historical trends or are based upon funding commitments from local agencies.
• Innovative Financing: One project funded through federally funded Grant Anticipation Revenue Vehicle (GARVEE) is the RTIP I-15 Managed Lanes project, which is currently open to traffic. For other major projects, the intent of innovative financing is to provide a mechanism to accelerate the funding and construction of critical transportation projects in order to provide the congestion relief benefits to the public significantly sooner than under traditional financial techniques. Based upon this concept, the SANDAG Board approved the issuance of $600 million in long term debt backed by TransNet in order to complete major transportation projects early.
171
TRANSNET REVENUE ESTIMATES
The TransNet Ordinance and Expenditure Plan describe the process for allocating the sales tax program revenues to specified agencies and for selecting which major projects will be eligible to receive sales tax funding. Table 4-2 shows the current forecast of TransNet sales tax revenues from FY 2011 to FY 2015.
The TransNet revenues programmed reflect the latest estimate of sales tax revenues based upon SANDAG’s newly developed short-term forecast model. The programming of TransNet funds is typically less than the TransNet receipts, since a portion of the annual receipts is committed to revenue bond debt service. Debt service information is provided as part of the annual Cash Flow Update sent to each agency at the beginning of the fiscal year.
Table 4-2 TransNet Revenue Forecast
FY 2011-2015 RTIP – San Diego Region (in $000s of future dollars)
FY 2011 FY 2012 FY 2013 FY 2014 FY 2015 TOTAL
Estimated Revenue(1) $203,528 $210,855 $222,242 $240,021 $256,102 $1,132,748
Administration (2) $2,035 $2,109 $2,222 $2,400 $2,561 $11,327
Independent Taxpayer Oversight Committee $342 $348 $354 $361 $370 $1,775
Bicycle Projects $4,071 $4,217 $4,445 $4,800 $5,122 $22,655
Major Corridors $83,562 $86,573 $91,254 $98,563 $105,173 $465,125
New BRT/Rail Operations $15,964 $16,539 $17,433 $18,829 $20,092 $88,857
Transit System Improvements $32,518 $33,690 $35,511 $38,356 $40,928 $181,003
Local Streets Improvements $65,037 $67,380 $71,023 $76,712 $81,856 $362,008
(1) 1/2% sales tax (2) 1% maximum Note: Revenue estimates are based upon proposed FY 2011 TransNet budget and current SANDAG short term forecasting model.
OPERATIONS AND MAINTENANCE COSTS
Although the RTIP is a program document that includes major transportation capital projects, 23 CFR 450.21(m) and 23 CFR 450.322(f)(10)(i) require that the RTIP financial chapter illustrates the costs and revenue sources to adequately operate and maintain highway, transit, and other federally funded public transportation systems projects.
Transit Operating Costs
Two transit districts provide transit service in San Diego County – the North County Transit District (NCTD) and the San Diego Metropolitan Transit System (MTS). NCTD services 1,020 square miles located in the northern portion of the County and provides commuter rail, new light rail, fixed-route, general purpose demand response, and ADA (Americans With Disabilities Act) paratransit services. For FY 2011, NCTD
172
estimates providing 6.8 million service miles carrying 11.5 million passengers. MTS provides transit service in the remaining areas of the County. In addition to providing fixed-route, general purpose demand response, and ADA paratransit services, MTS also operates the region’s light rail system. The MTS area operators estimate carrying approximately 82 million passengers over 28 million annual service miles in FY 2011. Both NCTD and MTS provide these services on a coordinated basis.
Table 4-3 shows the projected ongoing operating costs as developed by the two transit districts for the next five years. Although both transit districts have balanced budgets for FY 2011, as the table illustrates, they face a combined $58.4 million deficit over the next five years. With reduced revenues and increases in cost, the transit agencies are struggling to meet the needs of the transit dependent and provide mobility alternatives for the choice rider. Both transit agencies have implemented various cost-saving measures including additional contracting out to private firms, increasing fares, and reduced services, among others. It is anticipated that the agencies will balance the operating budget on an annual basis for the upcoming fiscal year.
Table 4-3 Transit Operating Costs and Revenues Forecast
(in $000s of future dollars)
FY 2011 FY 2012 FY 2013 FY 2014 FY 2015 TOTAL
North County Transit District
Revenues $80,801 $80,498 $82,068 $83,910 $86,395 $413,672
Less Expenses $80,801 $81,027 $82,687 $85,482 $87,596 $417,595
Projected Deficit/Surplus $0 $(529) $(619) $(1,572) $(1,201) $(3,921)
Metropolitan Transit System
Revenues $211.745 $206,047 $209,284 $213,295 $218,126 $1,058,497
Less Expenses $211,745 $217,039 $222,464 $228,026 $233,727 $1,113,001
Projected Deficit/Surplus $0 $(10,991) $(13,179) $(14,730) $(15,600) ($54,504)
Source: June 18, 2010 Transportation Committee Meeting (Draft FY 2011 Transit Agency Operating Budgets)
Preventive Maintenance
Preventive maintenance projects are those projects which focus on maintenance of equipment, rolling stock, and facilities for bus and rail systems. Timely preventive maintenance activities are necessary to ensure proper performance of the transportation infrastructure and enhance safety and accessibility. MTS and NCTD have programmed a total of $237 million for FY2011-FY2015. MTS32A and NCTD02 are those projects which are programmed with $166 million and $70.7 million, respectively,
173
Highway Costs
Caltrans is responsible for the operations, maintenance, and rehabilitation of state highways in the San Diego region. Excluding capital projects, over the next five years, Caltrans estimates approximately $58.6 million for operations and administrative costs and $403 million for maintenance costs. The highway costs are based upon anticipated revenues the State has deemed available; therefore, costs equal revenues.
Local Streets and Road Costs
There are three federally funded local street and road projects in the 2010 RTIP. It is anticipated that the maintenance cost associated with these projects will be absorbed into the agencies’ annual maintenance budget funded from local sources.
177
Chapter 5
AIR QUALITY CONFORMITY ANALYSIS
On April 15, 2004, the U.S. Environmental Protection Agency (EPA) designated the San Diego air basin as non-attainment for the new Eight-Hour Ozone Standard. This designation took effect on June 15, 2004. Several areas that are tribal lands in eastern San Diego County were excluded from the non-attainment designation. The air basin was initially classified as a basic non-attainment area under Subpart 1 of the Clean Air Act and the maximum statutory attainment date for the Eight-Hour Ozone Standard was set as June 15, 2009. However, the EPA, in response to a court decision, on January 16, 2009, proposed that, among other areas of the country, the San Diego basic non-attainment area be reclassified as a Subpart 2 moderate non-attainment area, with a maximum statutory attainment date of June 15, 2010. Final EPA action on this proposed reclassification is still pending.
In cooperation with the San Diego Air Pollution Control District (APCD) and SANDAG, the California Air Resources Board (ARB) developed an Eight-Hour Ozone Attainment Plan which was submitted to the U.S. EPA on June 15, 2007. The budgets in the Eight-Hour Ozone Attainment Plan for San Diego County were found adequate for transportation conformity purposes by the U.S. EPA, effective June 9, 2008.
The SANDAG Board of Directors made a finding of conformity of the 2030 San Diego Regional Transportation Plan: Pathways for the Future (RTP) and 2006 RTIP, as amended, on November 30, 2007. The U.S. Department of Transportation (DOT) issued its conformity finding on December 10, 2007. On July 25, 2008, a conformity determination for the 2008 RTIP and conformity redetermination for the 2030 RTP were made by the SANDAG Board of Directors. The U.S. DOT issued its conformity finding on November 17, 2008. On January 22, 2010, the SANDAG Board adopted the 2008 RTIP Amendment No. 16 and its conformity finding. The U.S. DOT made a finding of conformity for the amendment on February 19, 2010. On July 23, 2010, the SANDAG Board adopted the 2008 RTIP Amendment No. 23 and its conformity finding, and conformity redetermination for the 2030 RTP. The U.S. DOT made a finding of conformity for Amendment No. 25 on July 29, 2010.
Also, the U.S. EPA designated the San Diego region as a federal maintenance area for the Carbon Monoxide (CO) standard. On January 30, 2006, the U.S. EPA approved the 2004 Revision to the California State Implementation Plan for Carbon Monoxide or CO Maintenance Plan as a State Implementation Plan (SIP) revision.
DEMONSTRATION OF FISCAL CONSTRAINT
The 2010 RTIP is consistent with the 2030 RTP. As a financially constrained document, the 2010 RTIP contains only those major transportation projects listed in the revenue constrained 2030 RTP. Chapter 4 of the 2010 RTIP includes detailed discussion on fiscal constraint and overall financial capacity to carry out projects included in the RTIP.
178
DEVELOPMENT OF TRANSPORTATION CONTROL MEASURES
In 1982, SANDAG adopted four Transportation Tactics as elements of the 1982 Revised Regional Air Quality Strategy (RAQS). These Transportation Tactics are ridesharing, transit improvements, traffic flow improvements, and bicycle facilities and programs.
These four Transportation Tactics were subsequently approved by the San Diego Air Pollution Control Board (APCB) and are included in the 1982 SIP for Air Quality as Transportation Control Measures (TCMs). The U.S. EPA approved this State Implementation Plan (SIP) revision for the San Diego Air Basin in 1983. However, the four TCMs have been fully implemented.
The California Clean Air Act required the preparation of a 1991 RAQS, including TCMs. During 1991 and 1992, SANDAG, in cooperation with local agencies, transit agencies, and the APCD developed a TCM Plan. SANDAG approved the TCM Plan on March 27, 1992.
On June 30, 1992, the APCD amended the TCM Plan and adopted the 1991 RAQS, including the amended TCM Plan. TCMs included in the 1991 RAQS include the four Transportation Tactics described above, as well as a transportation demand management (TDM) program, vanpools, high-occupancy vehicle (HOV) lanes, and park-and-ride facilities. On November 12, 1992, the Air Resources Board (ARB) gave approval to the 1991 RAQS, including the TCMs.
The 1995 Triennial RAQS Update subsequently deleted the Employee Commute Travel Reduction Program contained in the TDM program because the program was no longer required under federal law. Assembly Bill 3048 (Statutes of 1996, Chapter 777) eliminated all state requirements for mandatory trip reduction programs. As a result, the Student Travel Reduction Program, the Non-Commute Travel Reduction Program, and the Goods Movement/Truck Operation Program proposed in the 1991 RAQS were no longer statutorily mandated and were deleted from the RAQS in 1998. The 2001, 2004, and 2009 Triennial RAQS Revisions did not make changes to measures related to mobile sources or the TCM Plan.
AIR QUALITY CONFORMITY REQUIREMENTS
SANDAG, as the Metropolitan Planning Organization (MPO), and the U.S. DOT must make a determination that the 2010 RTIP and the 2030 RTP conform to the applicable SIP. Conformity to the SIP means that transportation activities will not create new air quality violations, worsen existing violations, or delay the attainment of the National Ambient Air Quality Standards (NAAQS).
Based upon the U.S. EPA’s Transportation Conformity Rule, as amended, conformity of transportation plans and programs, including the 2010 RTIP, is determined according to the 1990 Clean Air Act Amendments (CAAA) [Section 176(c)(3)(A)] if the following is demonstrated:
• The 2010 RTIP provides for the timely implementation of the Transportation Tactics contained in the 1991 RAQS. These tactics are also included as TCMs in the 1982 SIP, but have been fully implemented.
• A quantitative analysis is conducted on the cumulative emissions of projects programmed within the 2010 RTIP, including all regionally significant, capacity-increasing projects. Further, implementation of the projects and programs must meet the motor vehicle emissions budget developed by local and state air quality agencies and approved by the U.S. EPA. The 2010 RTIP must meet the applicable emission budgets prescribed in the Eight-Hour Ozone Attainment Plan for San Diego County which were found
179
adequate for transportation conformity purposes by the U.S. EPA, effective June 9, 2008. Also, the 2010 RTIP must meet the CO emissions budget established in the CO Maintenance Plan (approved by the U.S. EPA in January 2006).
• In addition to the required emissions tests, consultation with transportation and air quality agencies is required. The consultation process followed to prepare the air quality conformity analysis complies with the San Diego Transportation Conformity Procedures adopted in July 1998.
• Interagency consultation involves SANDAG, the San Diego APCD, Caltrans, ARB, the U.S. DOT, and the U.S. EPA, which form the San Diego Region Conformity Working Group (CWG).
Consultation is a three-tier process that:
1. formulates and reviews drafts through a conformity working group;
2. provides local agencies and the public with opportunities for input through existing regional advisory committees and workshops; and
3. seeks comments from affected federal and state agencies through participation in the development of draft documents and circulation of supporting materials prior to formal adoption.
SANDAG consulted with the CWG for the preparation of the new air quality analysis of the 2010 RTIP. Conformity of the 2030 San Diego Regional Transportation Plan: Pathways for the Future (RTP) also is being redetermined for consistency purposes.
The schedule for the development of the 2010 RTIP and criteria and procedures for determining conformity were presented to the CWG on March 3, 2010. The draft list of non-capacity increasing projects was provided to the CWG on April 26, 2010, and the draft list of capacity increasing projects was provided to the CWG on May 5, 2010. Comments from the CWG were incorporated into the final exempt project list.
The quantitative emissions analyses for the 2010 RTIP conformity determination and 2030 RTP redetermination were initiated in April 2010 and the results distributed on June 1, 2010, to the San Diego Conformity Working Group for an initial review and comment period. The San Diego Region CWG reviewed the draft air quality conformity analysis at its June 9, 2010, meeting. The Draft 2010 RTIP and its conformity analysis and the 2030 RTP conformity redetermination were released for public review and comment on July 23, 2010. The results of the regional emissions analysis indicate that the 2010 RTIP and 2030 RTP meet the air quality conformity requirements.
The SANDAG Board of Directors made a conformity finding for the 2010 RTIP and redetermination of conformity for the 2030 RTP, and approved the 2010 RTIP at its September 24, 2010, meeting. The following sections provide a summary of the air quality conformity analysis of the 2010 RTIP and 2030 RTP in relation to the above conformity requirements.
The first requirement of the air quality conformity finding is to provide for the expeditious implementation of adopted TCMs, which are also the Transportation Tactics included in the 1991 RAQS. These tactics are ridesharing, transit improvements, traffic flow improvements, and bicycle facilities and programs.
180
The 1982 SIP established the TCMs, which identified general objectives and implementing actions for each tactic. Due to substantial investments since 1982, SANDAG has fully implemented the TCMs. Ridesharing, transit, bicycling, and traffic flow improvements continue to be funded, although the level of implementation established in the SIP has been surpassed. No TCMs have been removed or substituted from the SIP.
The 2010 RTIP makes substantial progress in programming funds for implementation of the four adopted Transportation Tactics for the San Diego region contained in the 1991 RAQS. Table 5-1 shows that Transportation Tactics programmed for implementation total approximately $2.9 billion, or 29 percent of the total funds programmed. Included are $19.7 million for Ridesharing, $2.8 billion for Transit Improvements, $39.8 million for Bicycle Facilities and Programs, and $97.6 million for Traffic Flow Improvements. Based upon this analysis, the 2010 RTIP continues to provide for the expeditious implementation of the four Transportation Tactics approved in the 1991 RAQS.
QUANTITATIVE EMISSIONS ANALYSIS
The second requirement of the conformity finding is to conduct a quantitative emissions analysis on the 2010 RTIP. The emissions analysis must show that implementation of the 2010 RTIP and 2030 RTP meet the emissions budgets established in the 2004 CO Maintenance Plan and in the Eight-Hour Ozone Attainment Plan for San Diego County.
A quantitative emissions analysis was conducted according to the requirements established in the Transportation Conformity Rule under Section 93.122(b). Motor vehicle emissions forecasts were produced for the following analysis years: 2010, 2020, and 2030.
SANDAG's regional growth forecasts and transportation models, as well as ARB’s emissions model, were used to generate the emissions forecasts. Transportation forecasts were developed using the TransCAD 5.0 transportation planning computer package. The four-step transportation modeling process includes trip generation, trip distribution, mode split, and trip assignment. The quantitative emissions analysis was conducted using the EMissions FACtors (EMFAC) 2007 model.
All of the proposed capacity-increasing improvements identified in the 2010 RTIP that are on the Regional Arterial System (as defined in the RTP) or the FHWA functional classification system (other principal arterials and higher classifications) were modeled.
EMISSIONS BUDGET ANALYSIS
Tables 5-2 and 5-3 provide a summary of the results of the quantitative emissions analysis conducted for the 2010 RTIP and 2030 RTP. The analysis shown in Table 5-2 demonstrates that the 2010 RTIP and the 2030 San Diego Regional Transportation Plan: Pathways for the Future (RTP) meet the applicable budgets for the Eight-Hour Ozone Standard. Projected reactive organic gas (ROG) and nitrogen oxide (NOx) emissions for 2010, 2020, and 2030 are below the established SIP budgets. Table 5-3 shows that projected CO emissions from the 2010 RTIP and the 2030 San Diego Regional Transportation Plan: Pathways for the Future (RTP) are below the 2003 CO budget of 730 tons per day.
181
Table 5-1 2010 RTIP - San Diego Region (in $000s) Transportation Control Measure Projects
RIDESHARING
Transportation Demand Management (TDM) $19,685
Subtotal: $19,685
TRANSIT IMPROVEMENTS
Blue Line (including vehicle purchase) $452,304
Mid-Coast $636,540
I-15 BRT $111,244
Mid-City Rapid $44,527
Superloop $28,958
Southbay BRT $99,908
Other BRT $4,301
Coastal Corridor (LOSSAN) $36,004
Bus/Rail Infrastructure $384,488
Bus/Rail Intermodal Stations $152,129
Bus/Rail Vehicle Purchase $76,329
Other Bus/Rail (Operations/Planning) $727,243
Subtotal: $2,753,975
BICYCLE FACILITIES AND PROGRAMS
Bicycle/Pedestrian Projects $39,777
Subtotal: $39,777
TRAFFIC FLOW IMPROVEMENTS
Transportation Management System/Intelligent Transportation System $62,177
Traffic Management/Signal Projects $35,424
Subtotal: $97,601
Total Transportation Tactics in 2010 RTIP: $2,911,038
Total All Transportation Projects in 2010 RTIP: $10,097,283
Share of T-Tactics Projects in 2010 RTIP: 29%
182
Table 5-2 2010 RTIP and 2030 Regional Transportation Plan: Pathways to the Future
Air Quality Conformity Analysis for Eight-Hour Ozone
ROG NOx
Year
Average Weekday Vehicle Starts
(1,000s)
Average Weekday Vehicle Miles
(1,000s)
SIP Emissions
Budget Tons/Day
ROG Emissions Tons/Day
SIP Emissions
Budget Tons/Day
NOx Emissions Tons/Day
2010 13,470 82,599 53 38 98 72
2020 15,066 90,819 53 24 98 40
2030 16,511 103,449 53 20 98 32
Note: Emissions budgets from Eight-Hour Ozone Attainment Plan for San Diego County, found adequate for transportation conformity purposes by the U.S. EPA, effective June 9, 2008.
Table 5-3 2010 RTIP and 2030 Regional Transportation Plan: Pathways to the Future
Air Quality Conformity Analysis for Carbon Monoxide
CO
Year
Average Weekday
Vehicle Starts (1,000s)
Average Weekday
Vehicle Miles (1,000s)
SIP Emissions Budget
Tons/Day
CO Emissions Tons/Day
2010 13,470 82,599 730 399
2018 14,747 89,175 730 250
2020 15,066 90,819 730 213
2030 16,511 103,449 730 163
Note: Emissions budgets for the San Diego region from 2004 Revision to California State Implementation Plan for Carbon Monoxide, Updated Maintenance Plan for Ten Federal Planning Areas (Approved as SIP revision in January 2006).
CONCLUSION
Based upon an evaluation of projects and funds programmed and a quantitative emissions analysis, the 2010 RTIP and 2030 RTP meet the U.S. EPA transportation conformity regulations contained within the federal guidelines published on August 15, 1997, and subsequent amendments, as well as the requirements of the federal Clean Air Act amendments of 1990.
187
Appendix A
PUBLIC PARTICIPATION
It is the policy of SANDAG to encourage public participation in the transportation planning and programming processes. The public involvement program consists of (1) participation on various SANDAG working groups, (2) opportunities to comment at SANDAG Board meetings and public hearings, (3) through the SANDAG public communications program; and (4) special outreach efforts conducted for the 2030 San Diego Regional Transportation Plan: Pathways for the Future (RTP). All of these components were used in the development of the 2010 RTIP.
SANDAG COMMITTEES AND WORKING GROUPS
SANDAG uses policy and advisory committees and technical working groups to provide additional opportunities for involvement in SANDAG transportation planning and programming activities by local agency officials and staff, interested groups, and the general public. The following committees and working groups have participated in the development of the RTIP. Meeting notices and agendas are sent to the committee and working group members and other citizen groups and individuals expressing an interest. All committee and working group meetings are open to the public.
POLICY ADVISORY COMMITTEE
• Transportation Committee: This committee of SANDAG Board members has been delegated additional authority for numerous transportation related issues, including holding public hearings and approving RTIP amendments in addition to continuing its advisory role to the full SANDAG Board on matters pertaining to major transportation projects and transportation policy-level matters. The Committee provides recommendations to the Board regarding funding of transportation projects included in the RTIP and TransNet Program. The Committee includes a subset of the Board of Directors, including MTS and NCTD. Additionally, Caltrans and members of the Southern California Tribal Chairmen’s Association act as advisory members of the Committee.
WORKING GROUPS/ADVISORY COMMITTEES
Independent Taxpayer Oversight Committee (ITOC): This advisory committee made up of members of the public was created in FY 2008 with the passage of the TransNet extension. Based upon the provisions of the TransNet Extension Ordinance, the ITOC is responsible for reviewing projects proposed for funding with TransNet funds and providing comments to the SANDAG Transportation Committee and to the Board of Directors for consideration when actions are taken on the RTIP. Specifically, the ITOC’s role in the RTIP process is provided below:
188
8. “Review and comment on the programming of TransNet revenues in the Regional Transportation Improvement Program (RTIP). This provides an opportunity for the ITOC to raise concerns regarding the eligibility of projects proposed for funding before any expenditures are made. In addition to a general eligibility review, this effort should focus on significant cost increases and/or scope changes on the major corridor projects identified in the Ordinance and Expenditure Plan.”
• Cities/County Transportation Advisory Committee (CTAC): CTAC reviews and provides an advisory role in: (1) transportation fund allocations; (2) local streets and road projects included in the RTP and RTIP; and (3) highway and local streets and road-related SANDAG studies. Membership includes public works directors or engineers from each city and the County, Caltrans, MTS, NCTD, the Port of San Diego, and APCD.
• Bicycle-Pedestrian Advisory Working Group: This working group helps in the development of the bicycle and pedestrian facilities portion of the RTP and RTIP, and recommends projects for funding under the Transportation Development Act (TDA), the TransNet Program, and any bicycle/pedestrian-related federal funding programs. Membership includes citizen participants, the cities and County, Caltrans, MTS, NCTD, and the Port of San Diego.
• Subcommittee for Accessible Transportation (SCAT): SCAT is responsible for review and comment on accessibility issues related to services and programs for the elderly and physically challenged. Membership includes representatives from the region’s transit operators and user groups.
• San Diego Regional Traffic Engineers’ Council (SANTEC): SANTEC serves as SANDAG's technical advisory committee on regional traffic engineering matters. Membership includes a traffic engineering representative from each city, the County, and Caltrans.
• San Diego Region Conformity Working Group (CWG): The CWG provides federal interagency coordination for the transportation/air quality conformity process and advises on regional and statewide air quality matters. The CWG includes representatives from SANDAG, Caltrans, APCD, the California Air Resources Board (CARB), FHWA, FTA, and EPA.
The Transportation Committee and the various working groups are provided with both written material and staff presentations on the major projects included in the 2010 RTIP. Where appropriate, their comments are noted in staff reports to the SANDAG Board, and may be reflected in the 2010 RTIP or in its subsequent amendments.
SANDAG BOARD MEETINGS AND PUBLIC HEARINGS
All SANDAG Board meetings are noticed, open to the public, and held in handicapped-accessible meeting rooms served by public transportation. The public hearing notice is published in local newspapers of general circulation as well as in minority newspapers. The SANDAG Board accepted and released the Draft 2010 RTIP, including its draft air quality conformity analysis, for review and distribution at its meeting on July 23, 2010, and held a public hearing at the Transportation Committee on September 3, 2010, meeting.
189
In addition, each city and the County of San Diego are responsible for providing adequate notice and holding public meetings and/or public hearings as part of their process to develop and submit transportation projects for inclusion in the 2010 RTIP. Pursuant to federal law, the requirements to hold public hearings/notices for federally funded transit projects for MTS and NCTD are herein incorporated as part of the public hearing process for the 2010 RTIP. The public meetings/hearings held by each member agency provide further opportunities for public involvement and participation on specific projects and programs.
PUBLIC PARTICIPATION POLICY AND PUBLIC PARTICIPATION PLAN
While the Public Participation Policy provides the overall guiding principle to ensure public input and involvement, the Public Participation Plan (PPP) establishes a processes for obtaining input from and providing information to the public concerning agency policies, programs, projects, and program funding in order to ensure the public is informed and has the opportunity for input so plans can reflect the public’s vision. The PPP was developed in response to the requirements set forth in title 23 Code of Federal Regulations section 450.316. A copy of the PPP is available on the SANDAG Web site at www.sandag.org.
190
BOARD POLICY NO. 025
PUBLIC PARTICIPATION/INVOLVEMENT POLICY Purpose This policy establishes a process for obtaining input from and providing information to the public concerning agency programs, projects, and program funding in order to ensure the public is informed and has the opportunity to provide SANDAG with input so plans can reflect the public’s desire. SANDAG will review and update this plan every three years. Various federal and state laws and regulations require that an agency such as SANDAG conduct public participation programs to ensure that the public is involved and that community concerns are addressed. For example, planning of mass transit capital projects, development of short range service policies and plans, and fare policy and structure changes to public transportation require public participation. The California Environmental Quality Act (CEQA) and the National Environmental Policy Act (NEPA) also have public information components that require an agency such as SANDAG to conduct public participation programs to ensure that the public is involved and that community concerns are addressed. A significant component of the SANDAG mission is a strong commitment to public participation and involvement to include all residents and stakeholders in the regional planning process. The public participation policy is consistent with the requirements of Public Utility Code Section 132360.1 established with the passage of Assembly Bill 361 which reads as follows: (c) The agency shall engage in a public collaborative planning process; recommendations from that process shall be made available and considered for integration into the plan. A procedure to carry out this process including a method of addressing and responding to recommendations from the public shall be adopted. Social Equity and Environmental Justice Ensuring the meaningful involvement of low income, minority, disabled, senior, and other traditionally underrepresented communities is a key component of SANDAG public participation activities. SANDAG policies, procedures, and programs are consistent with federal and state environmental justice laws, regulations, and requirements, Title VI, related nondiscrimination requirements, and reflect the principles of social equity and environmental justice. Social equity means ensuring that all people are treated fairly and are given equal opportunity to participate in the planning and decision-making process, with an emphasis on ensuring that traditionally disadvantaged groups are not left behind. Environmental justice means ensuring that plans, policies, and actions do not disproportionately affect low income and minority communities.
191
Scope The policy addresses public participation policies and public information efforts in the following areas: A. Overall Public Participation Process B. Short Range Program – Regional Transportation Improvement Program C. Development Planning D. Design and Construction E. Fare Changes F. Short Range Transit Planning G. Native American Consultation A. Overall Public Participation Process -- Unless otherwise noted or required, these are
SANDAG general policies for public participation for major planning initiatives such as the Regional Transportation Plan, Regional Comprehensive Plan, Regional Short Range Transit Plan, and other planning and programming projects
1. The SANDAG Public Participation/Involvement Program is designed to inform and
involve the region’s residents in the decision-making process on issues such as growth, transportation, environmental management, housing, open space, air quality, energy, fiscal management, economic development, and public safety.
2. The Public Participation/Involvement Program seeks to involve all citizens, including but not limited to low income households, limited English proficient individuals, Hispanic, African American, Asian, Native American, senior, and other communities, persons with disabilities, as well as community and civic organizations, public agencies, business groups and associations, environmental organizations, and other stakeholders.
3. SANDAG Board meetings provide the public forum and decision point for significant
regional issues. SANDAG Directors usually hold one or two Board meetings each month: a Board Policy Meeting the second Friday of each month and a Board Business Meeting the fourth Friday of each month. Meetings held at the SANDAG office are accessible by public transit. During these meetings, Directors adopt plans, allocate transportation funds, approve transit construction plans, approve transit fare changes, and establish policies and develop programs that are used by local governments as well as other public and private organizations.
4. The SANDAG Public Participation/Involvement Program shall comply with the
Americans with Disabilities Act (ADA). SANDAG shall hold public meetings in buildings, rooms, or locations that are accessible to persons with disabilities. SANDAG shall provide public meeting information in alternate formats and shall provide special accommodations at public meetings with three business days notice.
5. The SANDAG Public Participation/Involvement Program is carried out as an
integrated work element of the agency’s Overall Work Program and Budget and as part of other programming, development, and implementation processes such as the Regional Transportation Plan, the Regional Comprehensive Plan, Regional Short
192
Range Transit Plan, Regional Transportation Improvement Program, Environmental Impact Reports, transit capital project development, project construction, transit fare changes, corridor studies, and other projects.
6. SANDAG shall proactively seek and promote public participation in SANDAG
workshops and public hearings, as well as participation and attendance at committees, working groups, and task forces. SANDAG shall follow local, state, and federal guidelines for posting public meeting and hearing notices. Depending upon the specific project, SANDAG shall endeavor to hold meetings at times that can attract as many participants as possible, including evenings and weekends and at locations in communities throughout the region. SANDAG shall endeavor to hold these meetings in locations that are accessible by public transit.
7. SANDAG shall inform the public in a timely manner about regional issues, actions, and pending decisions through a number of efforts. As needed or required, SANDAG shall post public notices in newspapers of general circulation for publication of legal notices. Other publication and distribution efforts can include mail distribution to residents, agencies, and city/county governments, the SANDAG Web site, e-mail lists, and rEgion – the SANDAG monthly electronic newsletter. As needed, SANDAG also shall distribute press releases and media alerts to local, regional, and Mexico border area print and broadcast media.
8. SANDAG shall regularly inform local print and broadcast media about SANDAG decisions, events, research, and other issues. SANDAG shall regularly distribute press releases to County News Service, Daily Transcript, East County Californian, El Latino, La Prensa, Los Angeles Times, North County Times, San Diego Business Journal, San Diego Metropolitan, San Diego Union-Tribune, San Diego Voice & Viewpoint, The Star News, and numerous community newspapers. SANDAG shall also distribute information to local and Mexico radio and television stations.
9. SANDAG shall use its Web site to provide the public with useful and timely information including meeting schedules and agendas; plans and environmental documents; reports and other publications; demographic profiles and data downloads; and interactive database and mapping applications.
10. As appropriate and as required by local, state, and federal guidelines, SANDAG shall
translate into Spanish, and other languages, publications, announcements, and Web content. In addition, numerous staff members are bilingual Spanish-English speakers and participate in public outreach and conduct presentations in Spanish. Translators shall be hired as needed and as required by local, state, and federal guidelines to provide services in Spanish and other languages as appropriate.
11. SANDAG conducts periodic public opinion surveys as part of the outreach and citizen
participation component of the SANDAG work program. These surveys shall be designed to include the San Diego region’s residents in the regional planning process and to keep SANDAG officials aware of issues that are of concern to the people who live here.
193
12. SANDAG will endeavor to respond to general comments received by phone, fax, letter, or e-mail within five (5) business days of receipt. Comments shall be routed to the SANDAG staff person who is responsible for that issue. Comments may be responded to in writing (e-mail or letter) or may be resolved with the initial phone call. Some comments may need to be resolved by another agency or jurisdiction so the customer is referred to the appropriate entity. When a comment is submitted as part of a public review process (e.g., a plan or environmental report) the comment and response is logged into a database. Comments, concerns, and responses received as part of a public review process shall be included in the final plan or report.
B. Short Range Program – Regional Transportation Improvement Program (RTIP) –
document updated every two years outlining major transportation projects to be implemented during a five-year period.
1. SANDAG shall follow the latest federal and state regulations regarding participation
by interested parties.
2. As the document that implements the long range plan, the RTIP shall be incorporated as part of the Board adopted public involvement process established for the Regional Transportation Plan (October 27, 2006) including participating in public outreach efforts, providing adequate public notice (legal notice publications), employing visualization techniques, holding public meetings at convenient and accessible locations.
3. SANDAG shall respond to any significant public input or comment received during the development of the biennial update and/or during the amendment cycle as part of its report to the Board or Transportation Committee (as appropriate).
4. The biennial RTIP update will be noticed in newspapers of general circulation including in alternate languages and a public hearing shall be held prior to final adoption by the Board of Directors.
5. During the amendment cycle, SANDAG will provide a draft of the amendment to all interested parties for a 15-day comment period.
C. Development Planning – Planning, environmental, preliminary engineering activities on
major capital projects.
1. SANDAG shall follow current federal and state regulations regarding public involvement processes and procedures. SANDAG shall develop public involvement programs tailored to meet specific project needs which address the unique challenges presented by each project. Programs shall be developed using the joint Federal Highway Administration and Federal Transit Administration (FHWA/FTA) guidelines titled “Public Involvement Techniques for Transportation Decision-Making.”
2. The public involvement program shall set objectives, identify people to be reached,
develop public involvement strategy, and define specific outreach techniques.
194
3. The public involvement program shall be developed so that critical community concerns and technical issues are identified in the study. The issues need to address the engineering, environmental, economic, and financial analyses that respond effectively to community needs and preferences and satisfy local, state, and federal environmental clearance requirements.
4. To facilitate community participation, lists of individuals, agencies, and
organizations shall be developed for distribution of agency materials. These lists will include persons who have indicated an interest in transportation planning projects during previous public information efforts and/or focused on the specific project. Project information would be distributed to the persons on this list in conjunction with public meetings and workshops, to solicit comments and recommendations.
5. Environmental documents shall be prepared in accordance with California
Environmental Quality Act (CEQA) and the National Environmental Policy Act (NEPA), as appropriate, and in coordination and consultation with various federal, state, and local agencies, and with elected officials, community leaders, organizations, and other individuals from the neighborhoods and communities potentially affected by the proposed action. Coordination and public involvement shall be achieved through a variety of means, such as formal public hearings and meetings, circulation of draft documents, mailings, focus group meetings, workshops, and individual/group contacts.
6. Formal scoping meetings, public hearings, and/or other meetings during the
comment period and environmental document certification shall be held in accordance with the requisite environmental document. As required, meetings shall be announced in the Federal Register, local publications, and on the SANDAG Web site. Persons and organizations on the project mailing list also will be notified. SANDAG shall endeavor to hold public meetings in locations accessible by public transit.
7. SANDAG shall prepare and distribute appropriate notices and communications to
comply with CEQA and NEPA requirements. 8. A public information program shall be developed to inform the community of
factors related to the project. The information program may include briefings for the news media, informational meetings, presentations to include community and professional associations and educational institutions, business groups and associations, environmental organizations, and other public forums.
9. A project working group may be organized to review and comment on the project
to build understanding and identify support for feasible alternatives. This group may consist of various elected officials/staff, community and neighborhood organizations, business organizations, property owners, and other stakeholders and interested parties. This group would be formed to provide comment and guidance regarding technical issues, review study alternatives and evaluation results, and provide community input regarding the alternatives. This iterative process would allow for identified issues and concerns to receive follow-up responses. Meeting summaries of project working group activities shall be produced. Meeting notices, agendas, and/or other information shall be posted to the SANDAG Web site.
195
10. Other public input opportunities include SANDAG Board of Directors meetings and meetings of SANDAG policy committees: Executive, Transportation, Regional Planning, Borders, and Public Safety. Other opportunities for public participation are at working group meetings, general public meetings, and presentations to planning and community groups.
D. Design and Construction – Design and construction of capital projects.
1. For all capital improvement projects with significant community impacts, SANDAG shall provide opportunities for members of the public to provide input and express concerns. SANDAG also shall implement a program designed to inform the public of progress, as well as safety and community impacts in the event of construction.
2. SANDAG shall hold publicly noticed meetings at key stages of project development
and implementation in the area(s) being impacted. The location of the meetings shall depend upon the geographic location of the project. Meetings concerning projects exclusively within the North County Transit District (NCTD) service area shall be held in North County locations, and if appropriate, at SANDAG offices. Meetings concerning projects exclusively within the Metropolitan Transit System (MTS) service area shall be held in MTS service areas affected, and if appropriate, at SANDAG offices. Meetings concerning all other projects shall be held at SANDAG offices or other locations specified in SANDAG agendas. SANDAG, MTS, and NCTD offices are accessible by public transit. SANDAG shall endeavor to hold off-site public meetings at locations accessible by public transit.
3. SANDAG shall solicit input from the representatives of interest groups of the local
population, such as community groups, planning groups, business groups and associations, business improvement districts, environmental organizations, neighborhood associations, and senior and disabled riders. These stakeholders will be consulted during the design and construction of capital projects.
4. SANDAG shall work to advise the public regarding actual and perceived disruption
during construction of capital projects by distributing informational, educational, and public information materials, and by using other traditional community relations tools.
5. SANDAG shall endeavor to meet citizen concerns as they arise and attempt to
resolve those concerns. 6. For all projects requiring environmental review under CEQA and NEPA, such as
major capital improvement projects, SANDAG shall provide opportunities for members of the public to provide input and comply with all related legal requirements.
6.1 SANDAG shall solicit input from the representatives of interest groups of the
local population, such as community groups, planning groups, business groups and associations, and neighborhood associations.
6.2 SANDAG shall incorporate public input into project planning and
development where practical and feasible.
196
6.3 SANDAG shall hold a public hearing to seek public comment whenever
required under CEQA and/or NEPA.
6.3.1 Published notifications for such hearings shall be published in newspapers of general circulation for publication of legal notices. Notices also may be published in regional, community, or Spanish-language newspapers to reach the affected area.
6.3.2 Any item subject to a public hearing will be listed and described in
the Board’s published agenda, which shall be posted at least 72 hours in advance of the meeting at the Board’s meeting place and on the SANDAG Web site.
6.3.3 Public hearings shall be conducted by SANDAG at the published date,
time, and place. The public hearing will allow for interested parties to be heard. The Board also will consider any written comments that were forwarded to the Board prior to the hearing.
E. Fare Changes
1. SANDAG has adopted Board Policy No. 029 to provide policy guidance for fare changes. This section of this policy is designed to inform and involve public transit riders, stakeholders, and the general public about proposed changes in transit fares. It is not intended to apply to transit route changes within the purview of the transit operators. 1.1 Consistent with Board Policy No. 004, SANDAG staff shall hold one or more
public meetings to provide the public an opportunity to comment on proposed fare changes. A minimum of two public meetings shall be held prior to the first reading of any proposed fare change that affects services operating in both the MTS and NCTD service areas. At least one public meeting shall be held in the MTS service area, and at least one public meeting shall be held in the NCTD service area. If one or more public meetings are conducted by a public meeting officer pursuant to Board Policy No. 004, at least one of the public meetings shall be held with a starting time no earlier than 6:00 p.m. A public meeting for proposed fare changes that do not affect the entire region may be held exclusively within the general geographic area that is being affected by the fare change. Such public meeting shall be held at a time convenient for users and potential users of the affected service. Public meetings at which formal public testimony will be taken shall be held at locations that are accessible by users of public transit. An official transcriber or other means of recording all public input received shall be utilized at all public hearings, meetings, workshops or open-houses at which formal public testimony is taken. A record of the input received shall be provided to the Transportation Committee or Board of Directors at the time of the first and second readings of amendments to the fare ordinance for the purpose of adjusting fare prices.
197
1.2 Public comments on proposed fare changes also shall be accepted at the SANDAG Board or Transportation Committee meeting before any final action is taken.
1.3 Take One, Rider Alerts, or other public notices in both English and Spanish
will be posted on all affected public transit vehicles within the affected area at least 15 calendar days prior to the public hearing and will include a description of the proposed fare change, the date, time, intent and location of the public meeting, and the deadline for written, e-mail and phone comments from the public. The notices will be posted to the SANDAG and Transit Agency Web site(s).
1.4 Print notice of public meetings at which formal public testimony will be
taken will be provided at least 15 calendar days prior to the public meeting date in newspapers of general circulation in the affected area(s), including appropriate minority and community publications. Public notices will be printed in Spanish in Spanish-language newspapers. Such public meeting notices will include a description of proposed fare changes, the date, time, intent, and location of the public meeting(s), and the deadline for written, e-mail, and phone comments from the public.
1.5 An open phone line will be made available to take public comments at least
15 calendar days prior to adoption of fare changes. 1.6 A Transportation Committee and/or Board report (as appropriate) will be
completed and available for public review at least 72 hours prior to the public meeting at which the fare changes are proposed for adoption and posted to the SANDAG Web site(s).
2. After a fare change is approved by SANDAG:
2.1. The public will be notified via news release(s)
2.2. Take One, Rider Alerts, or other public notices in both English and Spanish
will be posted on all affected transit vehicles at least 15 calendar days prior to changes going into effect and posted to the SANDAG and Transit Agency Web site(s).
3. SANDAG shall follow federal Title VI and environmental justice requirements when
implementing transit fare changes. 3.1. Residential, employment, and transportation patterns of low-income and
minority populations shall be identified so that their needs can be identified and addressed, and the benefits and burdens of transportation investments can be fairly distributed. SANDAG shall endeavor to involve the affected communities in evaluating the benefits and burdens of transportation investments.
198
3.2. SANDAG shall evaluate and - where necessary - improve the public involvement processes to eliminate participation barriers and engage minority and low-income populations in transportation decision making.
F. Short Range Transit Planning
1. Public information and involvement programs for the Regional Short Range Transit Plan and the Coordinated Human Resources and Public Transit Transportation Plan shall be the responsibility of SANDAG.
2. Public information and involvement programs for transit service changes will fall
under adopted policies of MTS and NCTD. G. Native American Consultation
1. SANDAG shall establish and adhere to government-to-government relationships when interacting with Tribal Governments, acknowledging these tribes as unique and separate governments within the United States.
2. SANDAG shall recognize and respect important California Native American rights,
sites, traditions, and practices. 3. SANDAG engages in “consultation” with Tribal Governments prior to making
decisions, taking actions, or implementing programs that may impact their communities.
4. To facilitate effective consultation with Tribal Governments, SANDAG has
established a Tribal Government Liaison. The Liaison shall serve as an initial contact for Tribal Governments and communicates with tribal governments regarding SANDAG activities.
4.1. “Consultation” is the active, affirmative process of: (1) identifying and
seeking input from appropriate American Indian government bodies, community groups, and individuals; and (2) considering their interests as a necessary and integral part of the decision-making process.
Adopted March 2005
Amended January 2006
Amended December 2007
Amended December 2008
Amended January 2010
201
APPENDIX B Projects Exempt from Air Quality Conformity Determination*
SAFETY - Railroad/highway crossing. - Hazard elimination program. - Safer non-federal-aid systems roads. - Shoulder improvements. - Increasing sight distance. - Safety Improvement program. - Traffic control devices and operating assistance other - Railroad/highway crossing warning devices. than signalization projects. - Guardrails, median barriers, crash cushions. - Pavement resurfacing and/or rehabilitation. - Pavement marking demonstration. - Emergency relief (23 U.S.C. 125). - Fencing. - Skid treatments. - Safety roadside rest areas. - Adding medians. - Truck climbing lanes outside the urbanized area. - Lighting improvements. - Widening narrow pavements or reconstructing bridges - Emergency truck pullovers. (no additional travel lanes).
MASS TRANSIT - Operating assistance to transit agencies. - Purchase of support vehicles. - Rehabilitation of transit vehicles. - Purchase of office, shop, and operating equipment for - Purchase of operating equipment for vehicles existing facilities. (e.g., radios, fareboxes, lifts, etc.). - Construction or renovation of power, signal, and - Construction of small passenger shelters and communications systems. information kiosks. - Reconstruction or renovation of transit buildings and - Rehabilitation or reconstruction of track structures, structures (e.g., rail or bus buildings, storage and track, and trackbed in existing rights-of-way. maintenance facilities, stations, terminals, and ancillary - Purchase of new buses and rail cars to replace structures). existing vehicles or for minor expansions of fleet. - Construction of new bus or rail storage/maintenance facilities categorically excluded in 23 CFR part 771.
AIR QUALITY - Continuation of ride-sharing and van-pooling - Bicycle and pedestrian facilities. promotion activities at current levels.
OTHER - Specific activities which do not involve or directly lead - Engineering to assess social, economic, and environmental to construction, such as: effects of the proposed action or alternatives to that action. Planning and technical studies. - Noise attenuation. Grants for training and research programs. - Emergency or hardship advance land acquisitions (23 CFR Planning activities conducted pursuant to titles 23 710.204(d)). and 49 U.S.C. - Acquisition of scenic easements. Federal-aid systems revisions. - Plantings, landscaping, etc. - Sign removal. - Directional and informational signs. - Transportation enhancement activities (except - Repair of damage caused by natural disasters, civil unrest, rehabilitation and operation of historic transportation or terrorist acts, except projects involving substantial buildings, structures, or facilities). functional, locational or capacity changes.
ALL PROJECTS - Intersection channelization projects. - Intersection signalization projects at individual intersections. - Interchange reconfiguration projects. - Changes in vertical and horizontal alignment. - Truck size and weight inspection stations. - Bus terminal and transfer points.
*Source: Part II Environmental Protection Agency 40 CFR Parts 51 & 93 Transportation Conformity Rule, as amended, July 1, 2004
205
Appendix C
REGIONAL EMISSIONS ANALYSIS AND MODELING PROCEDURES
BACKGROUND
The federal Clean Air Act (CAA), which was last amended in 1990, requires the United States Environmental Protection Agency (U.S. EPA) to set National Ambient Air Quality Standards (NAAQS) for pollutants considered harmful to public health and the environment. California has adopted state air quality standards that are more stringent than the NAAQS. Areas with levels that exceed the standard for specified pollutants are designated as non-attainment areas.
The U.S. EPA requires that each state containing non-attainment areas develop plans to attain the NAAQS by a specified attainment deadline. These attainment plans are called State Implementation Plans (SIP). The San Diego County Air Pollution Control District (APCD) prepares the San Diego portion of the California SIP. Once the standards are attained, further plans - called Maintenance Plans - are required to demonstrate continued maintenance of the NAAQS.
SANDAG and the U.S. Department of Transportation (DOT) must make a determination that the Regional Transportation Plan (RTP) and the Regional Transportation Improvement Program (RTIP) conform to the SIP for air quality. Conformity to the SIP means that transportation activities will not create new air quality violations, worsen existing violations, or delay the attainment of the national ambient air quality standards.
On November 30, 2007, the SANDAG Board made a finding of conformity of the 2030 San Diego Regional Transportation Plan: Pathways for the Future (RTP) and the 2006 RTIP Amendment No. 9 and adopted the plan. The U.S. DOT made its conformity determination on December 10, 2007.
On July 25, 2008, the SANDAG Board adopted the 2008 RTIP. On November 17, 2008, the U.S. DOT made a finding of conformity for the 2008 RTIP and a conformity redetermination for the 2030 San Diego Regional Transportation Plan: Pathways for the Future (RTP).
On January 22, 2010, the SANDAG Board adopted the 2008 RTIP Amendment No. 16 and its conformity finding. The U.S. DOT made a finding of conformity for this amendment on February 19, 2010.
On July 23, 2010, the SANDAG Board adopted the 2008 RTIP Amendment No. 23 and its conformity finding. The U.S. DOT made a finding of conformity for this amendment on July 29, 2010.
The SANDAG Board approved the 2010 RTIP on September 24, 2010, as well as redetermining conformity for the 2030 RTP for consistency purposes.
206
The San Diego region attained the federal One-Hour Ozone Standard in 2001. The U.S. EPA redesignated the San Diego air basin as attainment/maintenance and approved the One-Hour Ozone Maintenance Plan as a SIP revision, effective on July 28, 2003. On June 15, 2005, the U.S. EPA revoked the federal One-Hour Ozone Standard after the Eight-Hour Ozone Standard became applicable for conformity.
On April 15, 2004, the EPA designated the San Diego air basin as non-attainment for the 1997 Eight-Hour Ozone Standard. This designation took effect on June 15, 2004. Several areas that are tribal lands in eastern San Diego County were excluded from the non-attainment designation. As shown in Figure C.2, La Posta Areas #1 and #2, Cuyapaipe, Manzanita, and Campo Areas #1 and #2 are attainment areas for the 8-Hour Ozone NAAQS.
The air basin was initially classified as a basic non-attainment area under Subpart 1 of the Clean Air Act and the maximum statutory attainment date for the Eight-Hour Ozone Standard was set as June 15, 2009. However, the EPA, in response to a court decision, on January 16, 2009, proposed that, among other areas of the country, the San Diego basic non-attainment area will be reclassified as a Subpart 2 moderate non-attainment area, with a maximum statutory attainment date of June 15, 2010. Final EPA action on this proposed reclassification is yet to be taken.
In cooperation with the San Diego APCD and SANDAG, the California Air Resources Board (ARB) developed an Eight-Hour Ozone Attainment Plan which was submitted to the U.S. EPA on June 15, 2007. The budgets in the Eight-Hour Ozone Attainment Plan for San Diego County were found adequate for transportation conformity purposes by the U.S. EPA, effective June 9, 2008.
The San Diego region also has been designated by the U.S. EPA as a federal maintenance area for the Carbon Monoxide (CO) standard. On November 8, 2004, the ARB submitted the 2004 revision to the California SIP for CO to the U.S. EPA. Effective January 30, 2006, the U.S. EPA has approved this maintenance plan as a SIP revision.
TRANSPORTATION CONFORMITY: MODELING PROCEDURES
Introduction
The 2010 RTIP is consistent with the 2030 San Diego Regional Transportation Plan: Pathways for the Future (RTP). As a financially constrained plan, the 2010 RTIP only contains those major transportation projects listed in the Revenue Constrained 2030 RTP. Chapter 4 of the 2010 RTIP includes a detailed discussion on fiscal constraint. Conformity of the 2030 RTP expires on December 10, 2011; however, to comply with the transportation conformity rule standards which require a redetermination of conformity within two years of new budgets, the SANDAG Board of Directors approved a redetermination of conformity of the 2030 San Diego Regional Transportation Plan: Pathways for the Future (RTP) in conjunction with the 2008 RTIP on July 25, 2008. The 2010 RTIP includes additional capacity increasing projects and the SANDAG Board of Directors approved the 2010 RTIP and made a conformity determination for the RTIP and redetermination for the RTP on September 24, 2010. Table C.2 to Table C.5 include the conformity analysis for both the 2010 RTIP and the 2030 Revenue Constrained RTP.
207
Growth Forecasts
Every three to five years, SANDAG produces a long-range forecast of population, housing, and employment growth for the San Diego region. The most recent is the 2050 Regional Growth Forecast, which was accepted by the SANDAG Board on February 26, 2010, for planning purposes. The 2050 Regional Growth Forecast also will be utilized in the development of the 2050 RTP, which is anticipated to be adopted in summer 2011.
The forecast process relies upon three integrated forecasting models. The first one, the Demographic and Economic Forecasting Model (DEFM), provides a detailed econometric and demographic forecast for the entire region. The second one, the Interregional Commuting Model, provides a forecast of commuting between the San Diego region, Orange County, southwest Riverside County, Imperial County, and Tijuana/Northern Baja California. The third one, the Urban Development Model, allocates the results of the first two models to subregional areas based upon the current plans and policies of the jurisdictions.
In April 2010, SANDAG consulted with the San Diego Region Conformity Working Group (CWG) on the use of the 2050 Regional Growth Forecast for the air quality conformity analysis of the 2010 RTIP and 2030 RTP conformity redetermination. Previously, both the U.S. DOT and the U.S. EPA concurred that approved plans should be used as input in the air quality conformity process. Figure C.1 and Table C.1 show the regional population, jobs, and housing growth forecast for the San Diego region through 2050.
Figure C.1 San Diego Regional Population, Jobs, and Housing Forecast
0.0
1.0
2.0
3.0
4.0
5.0
1970 1975 1980 1985 1990 1995 2000 2005 2010 2015 2020 2025 2030 2035 2040 2045 2050
Popu
latio
n, J
obs,
and
Hou
sing
(m
illio
ns)
Population Housing Jobs
Source: SANDAG, February 2010
208
Table C.1 San Diego Regional Population and Employment Forecast
2050 Regional Growth Forecast Year Population Employment 2008 3,131,552 1,501,080 2020 3,535,000 1,619,615 2030 3,870,000 1,751,630 2040 4,163,688 1,877,668 2050 4,384,867 2,003,038
Source: SANDAG, February 2010
The 2050 Regional Growth Forecast is based largely upon the adopted general plans and community plans and policies of the 18 cities and, in some cases, includes draft plans which are nearing completion. Because many of the local general plans have horizon years of 2030 –twenty years before the 2050 Growth Forecast horizon year- the later part of the Forecast was developed in collaboration with each of the local jurisdictions through an iterative process that allowed each city to provide their projections for land uses in those later years. For the unincorporated area, the forecast is based upon the County’s Referral Alternative draft of the General Plan update, with additional constraints included for sensitive habitat areas.
The 2050 Growth Forecast incorporates new data from the recent economic downturn and is the first forecast to be prepared under the guidelines of Senate Bill (SB) 375. SB 375 calls for housing all of the region’s population within the region, rather than relying upon interregional commuting patterns to help accommodate future growth. Current economic conditions have resulted in lower projected population and employment numbers as compared to the previous forecast (Table C.2).
Table C.2
2030 and 2050 Regional Growth Forecast Comparison
Regional Growth Forecast Comparison Year Population Employment
2030 Regional Growth Forecast
2050 Regional Growth Forecast % Change
2030 Regional Growth Forecast
2050 Regional Growth Forecast % Change
2020 3,635,855 3,535,000 -3% 1,741,033 1,619,615 -7%
2030 3,984,753 3,870,000 -3% 1,913,682 1,751,630 -8%
209
Transportation Modeling
SANDAG follows a widely used, four-step transportation modeling process of trip generation, trip distribution, mode choice, and assignment to forecast travel activity in the San Diego region. After a first pass through the four steps, a feedback process is used to pass congested travel conditions back into trip distribution and through to assignment. After several feedback iterations, a final pass is made through the mode choice and assignment steps to reflect congested travel conditions in mode decision making. Travel model results then are combined with additional post-process input and output functions to form the complete modeling chain. For the first time, a truck model is run parallel to the four-step model and truck origin-destination trip tables are merged with vehicle trip tables for highway assignment and air quality procedures.
The estimates of regional transportation-related emissions analysis meet the requirements established in the Transportation Conformity Rule, Sections 93.122(b) and 93.122(c). These requirements relate to the procedures to determine regional transportation-related emissions, including the use of network-based travel models, methods to estimate traffic speeds and delays, and the estimation of vehicle miles of travel.
TransCAD 5.0 is the transportation planning computer package used by SANDAG to provide a framework for performing much of the computer processing involved with modeling and is used for the trip distribution and assignment steps. Another software package used extensively in the modeling process is ArcInfo. This geographic information system (GIS) maintains, manipulates, and displays transportation, land use, and demographic data. SANDAG has written numerous programs that provide a linkage between TransCAD and ArcInfo. Other custom programs perform some modeling functions such as trip generation and mode choice.
A number of data files and surveys are used to calibrate the transportation models. These include:
1995 and 2006 Travel Behavior Surveys
2001 Caltrans Statewide Travel Survey
2001-2003 San Diego Regional Transit Survey
External Trip Surveys (2006 Interregional Travel Behavior Survey)
Traffic Generation Studies
1991 San Diego Visitor Survey
2000 Census Transportation Planning Package
2010 Gateway Forecast; 2002 Freight Analysis Framework
In addition to model parameters derived from these surveys, there are three major inputs to the transportation models:
Growth forecast inputs used to describe existing and planned land use patterns and demographic characteristics;
Highway networks used to describe existing roadway facilities and planned improvements to the roadway system; and
Transit networks used to describe existing and planned public transit service.
210
Highway Networks
The regional highway networks in the 2010 RTIP and 2030 RTP include all roads classified by local jurisdictions in their general plan circulation elements. These roads include freeways, expressways, conventional state highways, prime arterials, and selected major streets. In addition, some local streets are included in the networks for connectivity between zones.
The route improvements and additions in the 2010 RTIP and 2030 RTP are developed to provide adequate travel service that is compatible with adopted regional policies for land use and population growth. All regionally significant projects are included in the quantitative emissions analysis. These include all state highways, all proposed national highway system routes, all regionally significant arterials, and all Federal Highway Administration functionally classified "Other Principal Arterials."
The networks also account for programs intended to improve the operation of the highway system, including high occupancy vehicle (HOV) lanes and ramp metering. Existing and proposed toll facilities also are modeled to reflect time, cost, and capacity effects of these facilities. The State Route (SR) 125 South, SR 11, and SR 241 are the only modeled toll facilities included in the Revenue Constrained Plan for the San Diego region.
In addition, several managed/HOV lanes are included in the Revenue Constrained Plan. Facilities with proposed managed lanes include Interstate 5 (I-5), I-15, I-805, and SR 52. Managed lanes are defined as reversible HOV routes and HOV routes with two or more lanes in the peak direction. It is assumed that the excess capacity not utilized by carpools and transit on these facilities would be managed so that single occupant vehicles could use these lanes under a pricing mechanism. Traffic flows would be managed so that the facility would operate at level of service D or better.
Based upon the networks and programs described above, the transportation forecasts of the 2010 RTIP and 2030 RTP differentiate between eight highway modes:
drive alone non-toll
drive alone toll
shared-ride non-HOV/non-toll
shared-ride HOV/non-toll
shared-ride HOV/Toll
light heavy duty
medium heavy duty
heavy heavy duty.
SANDAG maintains a master highway network from which a specific year network, between the years 2008 (the 2050 Regional Growth Forecast base year) and 2030, can be built. Three networks were built and verified (2010, 2020, and 2030) for air quality conformity analyses of the 2010 RTIP and 2030 RTP.
A list of the major highway and near-term regional arterial projects is included in the conformity analysis, and their implementation phasing is included with the draft Air Quality Conformity Determination. The Transportation Project Evaluation Criteria and Rankings are included in the 2030 RTP. Locally funded, regionally significant projects also have been included in the air quality conformity analysis. These projects are funded with TransNet funds, a 20-year, half-cent local sales tax for transportation that expired in 2008;
211
TransNet Extension funds, a 40-year, half-cent local sales tax extension approved by voters in 2004 that expires in 2048; and other local revenue sources.
Transit Networks
SANDAG also maintains transit network datasets for existing and proposed transit systems. Most transit routes run over the same streets, freeways, HOV lanes, and ramps used in the highway networks. As a result, the only additional facilities that are added to the transportation coverage for transit modeling purposes are:
trolley and commuter rail lines
streets used by buses that are not part of local general plan circulation elements.
There are seven transit modes, which group routes with similar operating characteristics. They are:
commuter rail
trolley
bus rapid transit (BRT)
rapid bus
limited-express bus
express bus
local bus.
BRT service would have stations similar to commuter rail and trolleys, and operating characteristics midway between rail and bus service. BRT service would be provided by advanced design buses operating on HOV lanes, some grade-separated transit ways, and surface streets with priority transit treatments. Once TransCAD transit networks have been built, TransCAD finds minimum time paths between transit access points (TAP). TAPs are selected transit stops that are used to represent walk and auto access to the transit system. The following four sets of paths are created for modes:
a.m. peak-period local bus
a.m. peak-period premium service
mid-day local bus
mid-day premium service.
Bus speeds assumed in the transit networks are derived from modeled highway speeds and reflect the effects of congestion. Regional and express transit routes on surface streets are assumed to operate out of congestion due to priority transit treatments. Higher bus speeds may result for transit vehicles operating on highways with HOV lanes and HOV bypass lanes at ramp meters, compared to those routes that operate on highways where these facilities do not exist.
In addition to transit travel times, transit fares are required as input to the mode choice model. TransCAD procedures replicate the San Diego region’s complicated fare policies which differ between:
212
buses which collect a flat fare of between $1.00 and $4.00, depending on the type of service
trolleys which, in 2008 charge $1.25 for internal downtown trips and $2.50 for all other trips, and $2.50 for all trolley trips after 2008
SPRINTER which charges $2.00
commuter rail (COASTER) which has a zone-based fare of between $5.00 and $6.50
proposed BRT routes which are assumed to charge $4.00
proposed Rapid Bus routes, which are assumed to charge $2.50.
Fares are converted to 1999 dollars (consistent with household incomes from the growth forecast) and are assumed to remain constant in inflation-adjusted dollars over the forecast period.
Near-term transit route changes are drawn from the Regional Short-Range Transit Plan produced in cooperation with the region’s transit agencies. Longer-range improvements are proposed as a part of the RTP development and other transit corridor studies. In addition to federal and state funded projects, locally funded, regionally significant transit projects have been included in the air quality conformity analysis of the 2010 RTIP and 2030 RTP. These transit projects also are funded with TransNet funds or other local revenue sources. Once network coding is completed, the transportation models are run for the applicable scenarios (2010, 2020, and 2030). The air quality conformity document contains the list of major regional transit projects included in the analysis and their implementation phasing.
Trip Generation
Trip generation is the first step in the transportation modeling process. Average weekday trip ends by all forms of transportation starting and ending in each zone are estimated for ten trip types.
1. home-work 6. work-other 2. home-college 7. other-other 3. home-school 8. serve passenger 4. home-shop 9. visitor 5. home-other 10. airport
The model computes person trips, which account for all forms of transportation including automobiles, light duty trucks, taxicabs, motorcycles, public transit, bicycling, and walking.
The trip generation model works by applying trip rates to zone-level growth forecasts. The model calculates each of the trip ends separately, as trip productions and attractions. Trip production rates are expressed as trips per household, while trip production rates vary by trip type and structure type. Trip attractions are expressed as trips per acre of nonresidential land use or trips per household. Trip attraction rates vary by trip type and land use category. The 2050 Regional Growth Forecast was used to produce trip generation forecasts for the years 2010, 2020, and 2030. Trip generation rates were established by utilizing data from traffic generator studies and expanding rates from the 1995 and 2006 Travel Behavior Surveys and 2001 Caltrans Statewide Travel Survey.
The SANDAG regional transportation model uses a relatively high trip generation rate for households (8.1 vehicle trips per day), which may account for possible increases in trip-making as new facilities are built. Also, the model accounts for travel diversion among facilities.
213
The model reduces future year person trips by a small amount to reflect increased use of teleworking and e-commerce. Reduction factors of 1, 3, or 5 percent were applied to selected trip purposes and land uses. Telework reduction factors depend on the likelihood the land use type would have employee categories that could feasibly telecommute. Reduction factors start in year 2020.
The truck model follows a similar process as the person model. The model computes truck vehicle trips for heavy duty trucks, including light heavy duty, medium heavy duty, and heavy heavy duty trucks. The truck classifications correspond to the California Air Resources Board truck classifications used in the air quality model EMFAC. Trip production and attraction rates are expressed as trips per employee and the rates vary by employee industry category.
Trip Distribution
After trip generation, trip movements between zones are determined using a doubly-constrained, gamma-function gravity model form of the trip distribution model. Inputs to the trip distribution model include zone-level trip generation forecasts by trip type, zone-to-zone impedances, and gamma function parameters by trip type and 4D category. 4D index categories attempt to define locations by their density, diversity, distance, and urban design characteristics. A high 4D index value represents areas that would be considered smart growth and would result in shortened trip lengths. In this way, the model is designed to reflect changing trip patterns in response to the types of new development in land use scenarios. The model also modifies trip patterns as new roadways are added.
Truck trip distribution is performed in a similar manner but is used to distribute vehicle trips rather than person trips by purpose as in the person model. The truck model also uses different distribution parameters by vehicle types, which are not segmented by 4D category.
The model is calibrated to match observed trip length frequencies from the 2006 Travel Behavior Survey and 2001 Caltrans Statewide Travel Survey. Zone-to-zone impedances are a composite measure of peak and off-peak travel times and costs by highway, transit, and non-motorized modes.
Mode Choice
At this point in the modeling process, total person trip movements between zones are split into different forms of transportation by highway, transit, and non-motorized modes (bicycling and walking). Highway modes include drive alone non-toll, drive alone toll, shared-ride non-HOV/non-toll, shared-ride HOV/non-toll, and shared-ride HOV/Toll. Nine transit modes differentiate transit trips by three ride modes (rail, BRT, and bus) and three access modes (walk, drive, and drop-off). The mode choice model is designed to link mode use to demographic assumptions, highway network conditions, transit system configuration, land use alternatives, parking costs, transit fares, and auto operating costs. Trips between zone pairs are allocated to modes based upon the cost and time of traveling by a particular mode compared to the cost and time of traveling by other modes. For example, vehicle trips on a congested route would be more likely to be diverted to light rail than vehicle trips on an uncongested freeway.
214
Income level also is considered since lower-income households tend to own fewer automobiles, and therefore, make more trips by transit and carpooling. People in higher-income households tend to choose modes based upon time and convenience rather than cost. The mode choice model is calibrated using 1995 and 2006 Travel Behavior Survey trip tables by mode and income and 2001-2003 Regional Transit Survey transit trip characteristics. Regional-level Census 2000 work trip mode shares also were used to fine tune mode share estimates.
Highway and transit travel times reflect highway congestion effects from the final iteration of the feedback loop. The model produces a.m. peak, p.m. peak, and off-peak period trip tables for vehicles and transit riders. The a.m. peak period is from 6:00 to 9:00 in the morning and the p.m. peak period is from 3:00 to 6:00 in the afternoon. The off-peak period covers the remaining 18 hours of the day.
Highway and Transit Assignment
Highway assignment produces traffic volume estimates for all roadway segments in the system. These traffic volumes are an important input to emissions modeling. Similarly, transit trips are assigned to transit routes and segments.
Highway
SANDAG loads traffic using the TransCAD “Multi-Modal Multi-Class Assignment” function. Before loading the traffic onto the network, the three truck modes are combined with the five passenger vehicle modes. Multi-class assignment allows SANDAG to assign the eight vehicle modes (as defined in the Highway Network section) in one combined procedure.
The highway assignment model works by finding roads that provide the shortest travel impedance between each zone pair. Trips between zone pairs are then accumulated on road segments making up minimum paths. Highway impedances consider posted speed limits, signal delays, congestion delays, and costs. The model computes congestion delays for each segment based upon the ratio of the traffic volume to roadway capacity. Motorists may choose different paths during peak hours when congestion can be heavy and off-peak hours when roadways are typically free flowing. For this reason, traffic is assigned separately for a.m. peak, p.m. peak, and off-peak periods. Vehicle trip tables for each scenario reflect increased trip-making due to population growth and variations in travel patterns due to the alternative transportation facilities/networks proposed.
Model accuracy is assessed by comparing model estimated traffic volumes with actual traffic counts obtained through the SANDAG traffic monitoring program and Highway Performance Monitoring System (HPMS) estimates of vehicle miles of travel (VMT).
After completing the highway assignments, additional processing is needed. Adjustments are made for calibration error volume, HOV/managed lane volume, bus volumes, hourly distribution factors, level of service (LOS), and travel time.
215
Transit
For transit assignment, TransCAD software assigns TAP-to-TAP transit trips to the network. Eight separate transit assignments are produced for peak and off-peak periods; walk and auto access; and local bus and premium service. These individual assignments are summed to obtain total transit ridership forecasts.
Before assigning transit trips, external transit trips coming into San Diego from outside the region need to be added to the internal transit trips estimated by the mode choice model. Currently, few transit trips enter from the north or east; however, over 20,000 transit trips cross the Mexican border each day. An external transit trip table for the base year is developed from on-board transit ridership surveys and factored to future years based upon border crossing trends to account for these trips.
For accuracy, transit ridership forecasts from the transit assignment model are compared with transit counts from the SANDAG transit passenger counting program to determine whether transit modeling parameters need to be adjusted.
Some of these comparisons of model-estimated boardings with actual boardings include:
System-level boardings, which may reveal transfer rate problems and lead to changes to the transfer wait time factor in the mode choice model;
Boardings by mode, which may reveal modal biases and lead to changes in mode choice modal constants;
Boardings by frequency of service, which may show biases that lead to changes in the first wait factor in the mode choice model; and
Centre City screenline crossings, which may lead to changes in parking costs, and boardings by stop location, which may indicate problems with specific generators such as a university.
Post-TransCAD Processing
Standard TransCAD output needs to be reformatted and adjusted to be useful for emissions modeling. Several routines and computer programs have been written to accomplish the following major functions:
Correcting link-specific traffic volume forecasts for calibration error
Adding in estimated travel on roads not in the transportation modeling process
Computing link speeds based upon corrected link volumes, highway capacity manual relationships between congestion, and speed (or signal delay)
Splitting link volumes into heavy-duty truck and other traffic to obtain speed distributions by vehicle class
Preparing a data set that contains total VMT, number of trip starts, and VMT by speed category by time of day for each vehicle class.
216
The travel demand modeling procedures used for the 2010 RTIP and 2030 RTP differ from previous modeling procedures in three key ways. First, a truck model is being run parallel to the four-step model for the first time. Truck origin-destination trip tables are merged with vehicle trip tables for highway assignment and air quality procedures. Second, new inputs were used, including the recently completed 2010 Gateway Forecast (a forecast of freight traffic in the region), 2002 Freight Analysis Framework data, and the 2050 Regional Growth Forecast projections. The third difference is a 4D (density, diversity, distance, and urban design characteristics) category was used as inputs into the trip distribution model. These new inputs and procedures have contributed to changes in emissions modeling output.
Motor Vehicle Emissions Modeling
Emissions Model
In November 2006, ARB released EMission FACtors (EMFAC) 2007, an emissions inventory model that calculates emissions for motor vehicles operating in California. It is an integrated model that combines emission rate data with vehicle activity to calculate regional emissions. The U.S. EPA approved EMFAC 2007 for use in conformity determinations on January 18, 2008.
The EMFAC 2007 model supports calculation of emissions for the Burden mode. The Burden mode is used for calculating regional emission inventories. In this mode, the model reports total emissions as tons per day for each pollutant, by vehicle class, and the total vehicle fleet. The Burden mode uses emission factors that have been corrected for ambient conditions and speeds combined with vehicle activity to calculate emissions in tons per day. Vehicle activity includes the number of vehicles, daily vehicle miles traveled, and the number of daily trips.
The air quality analysis of the 2010 RTIP and 2030 RTP was conducted using EMFAC 2007’s Burden mode. Projections of daily regional emissions were prepared for reactive organic gases (ROG), nitrogen oxides (NOx), and CO.
On-road motor vehicle emissions are attributed to several different processes:
Starting exhaust
Running exhaust
Idle exhaust (calculated for heavy-duty trucks only)
Resting and diurnal evaporation
Running losses
Hot soak evaporation.
Emission factors vary by vehicle class, fuel usage, and technology. The fuels modeled are gasoline, diesel, and electrically powered vehicles. Technology categories can be grouped into catalyst, noncatalyst, and diesel. Thirteen vehicle classes are modeled:
217
passenger car line-haul vehicle
two types of light-duty trucks urban bus
medium-duty truck school bus
two types of light-heavy-duty trucks motorcycle
medium-heavy-duty truck motor home
heavy-heavy-duty truck Emission factors for processes that vary by temperature (i.e., starting exhaust, hot soak, and running exhaust) are broken down further by specified temperature ranges. Exhaust emission factors also are broken down by speed range.
Regional Emissions Forecasts
Regional transportation forecasts were initiated in April 2010. Output from the TransCAD model was then reformatted and adjusted to be useful for emissions modeling.
Eight-Hour Ozone Standard
Effective June 9, 2008, the U.S. EPA found the eight-hour ozone budgets included in the Eight-Hour Ozone Attainment Plan for San Diego County adequate for transportation conformity purposes. In April 2010, SANDAG prepared countywide forecasts of average weekday ROG and NOx emissions for 2010, 2020, and 2030, using the EMFAC 2007 model. ROG and NOx emissions are based upon the summer season.
The analysis years were selected to comply with Sections 93.106(a) (1) and 93.118 (a) of the Transportation Conformity Rule. According to these sections, the first horizon year (2010) must be within ten years from the base year used to validate the regional transportation model (2008), the last horizon year must be the last year of the transportation plan’s forecast period (2030), and the horizon years may be no more than ten years apart (2020).
CO Standard
CO regional emissions were projected for 2010, 2018, 2020, and 2030 for the conformity determination of the 2010 RTIP and 2030 RTP conformity redetermination. CO emissions are based upon the winter season. Regional emissions for 2018 are interpolated.
Emissions Modeling Results
An emissions budget is the part of the SIP that identifies emissions levels necessary for meeting emissions reduction milestones, attainment, or maintenance demonstrations.
218
To determine conformity of the 2010 RTIP and 2030 RTP, the plan must comply with the emission analysis described in the Regional Emissions Forecast section. Table C.3 shows that the projected ROG and NOx emissions from the 2010 RTIP and 2030 RTP are below the 2008 ROG and NOx budgets.
Table C.3
2010 RTIP and 2030 Revenue Constrained RTP Air Quality Conformity Analysis for Eight-Hour Ozone
ROG NOx
Year
Average Weekday Vehicle Starts
(1,000s)
Average Weekday Vehicle Miles
(1,000s)
SIP Emissions
Budget Tons/Day
ROG Emissions Tons/Day
SIP Emissions
Budget Tons/Day
NOx Emissions Tons/Day
2010 13,470 82,599 53 38 98 72
2020 15,066 90,819 53 24 98 40
2030 16,511 103,449 53 20 98 32
Note: Emissions budgets are from the Eight-Hour Ozone Attainment Plan for San Diego County, which were found adequate for transportation conformity purposes by the U.S. EPA, effective June 9, 2008.
Adjustment factors for ROG and NOx were provided by ARB to account for recently adopted emission control programs not reflected in EMFAC 2007 and other corrections. Table C.4 includes the adjustment factors by analysis year.
Table C.4 EMFAC 2007 Adjustment Factors
Year ROG Adjustment Factor (tons/day)
NOx Adjustment Factor (tons/day)
2010 0.04 2.37
2020 0.33 2.40
2030 0.71 2.80
Note: Adjustment factors were provided by ARB. The tons listed are subtracted from the EMFAC 2007 output of tons per day for ROG and NOx.
219
Table C.5 shows that projected CO emissions from the 2010 RTIP and 2030 RTP are below the 2003 CO budget of 730 tons per day.
Table C.5 2010 RTIP and 2030 Revenue Constrained RTP
Air Quality Conformity Analysis for Carbon Monoxide
CO
Year
Average Weekday
Vehicle Starts (1,000s)
Average Weekday Vehicle Miles
(1,000s)
SIP Emissions Budget
Tons/Day
CO Emissions Tons/Day
2010 13,470 82,599 730 399
2018 14,747 89,175 730 250
2020 15,066 90,819 730 213
2030 16,511 103,449 730 163
Note: Emissions budgets for the San Diego region from 2004 Revision to California State Implementation Plan for Carbon Monoxide, Updated Maintenance Plan for Ten Federal Planning Areas (Approved as SIP revision in January 2006).
Exempt Projects
Section 93.126 of the Transportation Conformity Rule exempts certain highway and transit projects from the requirement to determine conformity. The categories of exempt projects include safety, mass transit, air quality (ridesharing and bicycle and pedestrian facilities), and other (such as planning studies).
Table C.6 illustrates the exempt projects considered in the 2010 RTIP and 2030 Revenue Constrained RTP. This table shows short-term exempt projects. Additional unidentified projects could be funded with revenues expected to be available from the continuation of existing state and federal programs.
220
Table C.6 Exempt Projects
Project/Program Description
Bikeway, Rail Trail and Pedestrian Projects Bayshore Bikeway Third Avenue Bicycle and Pedestrian Access Industrial Boulevard Bicycle and Pedestrian Facilities Escondido Creek Bikeway Ash Street Undercrossing Maple Street Pedestrian Plaza West Bernardo Bike Path Sweetwater River Bike Path Gap Closure Highway 101 Streetscape and Traffic Calming Project SR 15 Bikeway San Diego River Multi-Use Bicycle and Pedestrian Path SR 56 Bike Path; Interchange at Black Mountain Road Otay POE Pedestrian/Bicycle Facility
Regionwide Traffic Incident Management Freeway Service Patrol
Safety Improvement Program Hazard Elimination Bridge Rehabilitation/Preservation Collision Reduction Roadway/Roadside Preservation Noise Barrier Program Safe Routes to Schools Highway Safety Improvement Program
Transportation Demand Management Regional Vanpool Program RideLink Regional Rideshare Program
Transportation Management Systems FastTrak (I-15) ITS Operating Vehicle Assist and Automation/Bus on Shoulder Service Alvarado Canyon Road Realignment Other Traffic Management Systems
221
Implementation of Transportation Control Measures
There are four federally-approved Transportation Control Measures (TCM) that must be implemented in San Diego, which the SIP refers to as Transportation Tactics. They include ridesharing, transit improvements, traffic flow improvements, and bicycle facilities and programs.
These TCMs were established in the 1982 SIP, which identified general objectives and implementing actions for each tactic. The TCMs have been fully implemented. Ridesharing, transit, bicycling, and traffic flow improvements continue to be funded, although the level of implementation established in the SIP has been surpassed. The list of actions that implemented the TCMs is available at SANDAG.
Interagency Consultation Process and Public Input
The consultation process followed to prepare the air quality conformity analysis for the 2010 RTIP and 2030 RTP complies with the San Diego Transportation Conformity Procedures adopted in July 1998. In turn, these procedures comply with federal requirements under 40 CFR 93. Interagency consultation involves SANDAG (as the MPO for San Diego County), the APCD, Caltrans, ARB, U.S. DOT, and U.S. EPA.
Consultation is a three-tier process that:
1. formulates and reviews drafts through a conformity working group
2. provides local agencies and the public with opportunities for input through existing regional advisory committees and workshops
3. seeks comments from affected federal and state agencies through participation in the development of draft documents and circulation of supporting materials prior to formal adoption.
SANDAG consulted on the development of the air quality conformity analysis of the 2010 RTIP and 2030 RTP at meetings of the CWG, as follows:
On March 3, 2010, SANDAG staff presented the schedule for the preparation of the 2010 RTIP and criteria and procedures to be followed for its conformity analysis. Staff confirmed that a redetermination of conformity would be done for the 2030 RTP, in conjunction with the 2010 RTIP for consistency purposes. Staff presented information on the 2050 Regional Growth Forecast, Transportation Control Measures, the Revenue Constrained financial assumptions, latest emissions model, and public involvement and outreach.
On April 26, 2010, SANDAG staff distributed the draft list of exempt projects to be included in the 2010 RTIP for interagency consultation. On May 5, 2010, staff distributed the draft list of capacity increasing projects for CWG review.
On June 1, 2010, SANDAG released the draft air quality conformity analysis of the 2010 RTIP to the San Diego Region CWG for a 30-day review-and-comment period. On June 9, 2010, the draft air quality analysis was discussed at the meeting of the San Diego Region CWG, and there were no comments.
The Draft 2010 RTIP was presented to the TransNet Independent Taxpayers Oversight Committee (ITOC) on July 14, 2010, for input. There were no comments.
222
On July 27, 2010, the Draft 2010 RTIP and its conformity determination and the 2030 RTP conformity redetermination were released for a 30-day public review period. Several comments were received.
On September 3, 2010, the SANDAG Transportation Committee held a public hearing on the 2010 RTIP and recommended approval of the final 2010 RTIP and its conformity determination to the Board of Directors. There were two speakers at the meeting.
On September 8, 2010, the proposed Final 2010 RTIP was presented to the TransNet ITOC for review. There were no significant comments.
The SANDAG Board adopted the 2010 RTIP and its conformity determination and the 2030 RTP conformity redetermination at its September 24, 2010, meeting.
Members of the public are welcomed to provide comments at meetings of the CWG, the Transportation Committee, and the SANDAG Board of Directors.
CUYAPAIPECUYAPAIPE
MANZANITAMANZANITA
LA POSTA #1LA POSTA #1
CAMPO #1CAMPO #1
CAMPO #3CAMPO #2
LA POSTA #2LA POSTA #2
Eastern San Diego County AttainmentAreas For The 8-Hour Ozone NAAQS
0 0.5 1 1.5 2Miles
ORC0400503.1 March 9, 2004
San Diego County
2030 Regional Transportation Plan 223
225
Table C.7 Phased Highway Projects – 2030 Regional Transportation Plan Revenue Constrained Plan¹
($ MILLIONS – 2008 DOLLARS) YEAR
BUILT
BY
FREEWAY FROM TO EXISTING IMPROVEMENT
COST CUMULATIVE
COST
2010 I-5 I-805 SR 56 10F 14F $186 $186
2010 I-15 SR 56 Centre City Parkway 8F 10F + 4ML/MB $427 $613
2010 SR 125 SR 905 San Miguel Road -- 4T $640 $1,253
2010 SR 125 San Miguel Road SR 54 -- 4F $160 $1,413
2010 SR 52 SR 125 SR 67 -- 4F $538 $1,951
2010 SR 75/282 Glorietta Boulevard Alameda Boulevard 6C 6C+2TU (PE only) $20 $1,971
2020 I-5 La Jolla Village Drive I-5/I-805 Merge 8F/14F 8F/14F + 2HOV $160 $2,131
2020 I-5 I-5/I-805 Merge Cannon Road 8F/14F 8F/14F + 4ML $1,440 $3,571
2020 I-5/I-805 North to North & South to South -- HOV Connectors $170 $3,741
2020 I-5/I-805 Port of Entry – Mexico -- Inspection Facility $30 $3,771
2020 SR 11 SR 905 Mexico -- 4T $300 $4,071
2020 I-15 SR 163 SR 56 8F + 2ML (R) 10F + 4ML/MB $414 $4,485
2020 I-15 Centre City Parkway SR 78 8F 8F + 4ML $210 $4,695
2020 SR 52 I-805 SR 125 4F/6F 6F + 2ML (R) $330 $5,025
2020 SR 76 Melrose Drive I-15 2C 4C $500 $5,525
2020 SR 241 Orange County I-5 -- 4T $402 $5,927
2020 I-805 Palomar Street SR 94 8F 8F + 2HOV $584 $6,511
2020 I-805/SR 94 North to West & East to South -- HOV Connectors $95 $6,606
2020 I-805 Carroll Canyon Road I-5 8F 8F + 2HOV $218 $6,824
2020 SR 905 I-805 Mexico -- 6F $595 $7,419
226
Table C.7 Phased Highway Projects - 2030 Regional Transportation Plan Revenue Constrained Plan
(cont’d)
($ MILLIONS – 2008 DOLLARS) YEAR
BUILT
BY
FREEWAY FROM TO EXISTING IMPROVEMENT
COST CUMULATIVE
COST
2020 I-5/SR 56 West to North & South to East -- Freeway Connectors $185 $7,604
2020 I-15/I-805 North to North & South to South -- HOV Connectors $66 $7,670
2020 I-15 SR 94 SR 163 6F/8F 8F + 2HOV $265 $7,935
2020 I-15/SR 94 South to West & East to North -- HOV Connectors $140 $8,075
2020 SR 56 I-5 I-15 4F 6F $53 $8,128
2020 SR 94 I-5 I-805 8F 8F + 2HOV $200 $8,328
2020 SR 94/SR 125 West to North & South to East -- Freeway Connectors $150 $8,478
2020 I-805 SR 52 Carroll Canyon Road 8F 8F + 4ML $203 $8,681
2030 I-5 J Street Sea World Drive 8F Access Improvements $225 $8,906
2030 I-5 I-8 La Jolla Village Drive 8F/10F 8F/10F + 2HOV $200 $9,106
2030 I-5 Cannon Road Vandegrift Boulevard 8F 8F + 4ML $800 $9,906
2030 I-5/SR 78 West to South & South to East -- Freeway Connectors $200 $10,106
2030 SR 125 Telegraph Canyon. San Miguel Road 4T 8T $130 $10,236
2030 SR 125 San Miguel Road SR 54 4F 8F $40 $10,276
2030 SR 241* Orange County I-5 4T 4T/6T $150 $10,426
2030 I-805 Palomar Street SR 94 8F + 2HOV 8F + 4ML $300 $10,726
2030 I-805 SR 94 SR 52 8F 8F + 2HOV $631 $11,357
2030 I-805/SR 52 West to North & South to East -- HOV Connectors $190 $11,547
¹ These projects are included in the 2010, 2010, 2020, and 2030 analysis years for air quality assessment. * SR 241 - 4 toll lanes from I-5 to Cristianitos interchange; 6 toll lanes from Cristianitos Interchange to Orange County line
KEY: C = Conventional Highway Lanes
F = Freeway Lanes TU = Tunnel
T = Toll Lanes MB = Movable Barrier
ML = Managed Lanes (HOV & Value Pricing) HOV = High Occupancy Vehicle Lanes ML(R) = Managed Lanes (Reversible)
227
Table C.8 Phased Transit Services - 2030 Regional Transportation Plan Revenue Constrained Plan¹
YEAR ROUTE DESCRIPTION
PEAK
HEADWAY
(MINUTES)
OFF-PEAK
HEADWAY
(MINUTES)
2010 634 UCSD/UTC Super Loop 10 15
2010 350 Escondido Rapid Bus 10 10
2020 510 Increase in Blue Line Service (current headways 7½/15) 7.5 10
2020 610 Escondido to Downtown San Diego via I-15/SR 94* 15 30
2020 470 Escondido to Sorrento Mesa via Mira Mesa Blvd. (and via Carroll Canyon after 2020) 10 --
2020 611 Mid-City Rapid Bus – SDSU to Downtown San Diego via El Cajon Boulevard and
Park Boulevard
10 10
2020 680 Otay Mesa to Sorrento Mesa via I-805/I-15/SR 52 10 --
2020 628 Otay Mesa to Downtown San Diego via I-805/SR 94 10 30
2020 398 Increase in COASTER Service (current headways 36/120)** 20 60
2020 399 Increase in SPRINTER Rail (opening headways 30/30) 15 30
2020 570 Mid-Coast Trolley 15 15
2030 510 Increase in Blue Line Trolley Service 7.5 7.5
2030 520 Increase in Orange Line Trolley Service (current headways 15/15) 7.5 15
2030 530 Increase in Green Line Trolley Service (current headways 15/15) 7.5 15
2030 610 Increase in Escondido to Downtown San Diego via I-15/SR 94* 10 15
2030 470 Increase in Escondido to Sorrento Mesa via Carroll Canyon Road 10 15
2030 628 Increase in Otay Mesa to Downtown San Diego via I-805/SR 94 10 15
2030 680 Increase in Otay Mesa to Sorrento Mesa via I-805/I-15/SR 52 10 15
2030 399 Increase in SPRINTER Rail 15 15
¹ These projects are included in the 2010, 2010, 2020, and 2030 analysis years for air quality assessment.
* I-15 BRT services includes all-day core service (Route 610) and peak period express services (Routes 607 and 608)
** Average headways
228
Table C.9 Phased Arterial Projects - 2030 Regional Transportation Plan Revenue Constrained Plan¹
CONFORMITY
ANALYSIS
YEAR
SANDAG
ID
LEAD
AGENCY PROJECT TITLE PROJECT DESCRIPTION
2010 CNTY08 County of
San Diego
Mission Road Pepper Tree Lane to Clemmens Lane in Fallbrook - widen
from three to five lanes
2010 CNTY23 County of
San Diego
Valley Center Road (Wohlford
Intersection)
East of Valley Center & Cole Grade Road and extending
approximately six miles to Rincon Casino - widen from two
to three lanes; construct traffic signal at North Lake
Wohlford Road/Valley Center Road intersection
2010 ESC25 Escondido Citracado/Nordahl Country Club to State Route 78 – widen from four to six
lanes with double left turn lanes and exclusive right turn
lanes
2010 SNT02 Santee Forester Creek Channelization Forester Creek Channelization - construct Olive Lane &
Mission Gorge Road bridges over flood control channel
2010 CB04 Carlsbad El Camino Real Improvements SR 78 and Olivenhain Road - widen and improve to six lane
arterial including traffic signal upgrades, bike lanes, and
sidewalks
2010 CB12 Carlsbad College Boulevard Reach A Badger Lane to future Cannon Road - construct four lane
arterial with median, bike lanes, and sidewalks/trails
2010 CB13 Carlsbad Poinsettia Lane Reach E Cassia Drive to Skimmer Court - construct 4-lane arterial
with median, bike lanes, and sidewalks/trails (DEMO
ID: CA366 HPP No: 517)
2010 CNTY17 County of
San Diego
SR 54/SR 94 Ph 1: widen from four to six lanes with intersection
improvements, raised median and left turn pockets; Ph 2:
on SR 94 extend Jamacha Blvd; Ph 3: on SR 54 extend from
Cuyamaca College east to Braham
2010 CNTY19 County of
San Diego
Valley Center North & South City of Escondido to Cole Grade Road - widen and
reconstruct with 14-ft striped center 2-way lane, bike lanes
and pathways
2010 ESC03 Escondido Citracado Parkway Don Lee Lane to Vineyard Avenue - widen from two to four
lanes with left turn pockets and new traffic signal at Aero
Way and Citracado Parkway
2010 ESC05 Escondido El Norte Parkway, Phase IV La Honda Drive at Citrus/Mission Avenue & at
E Washington Avenue - widen from two to four lanes and
construct missing section of El Norte Pkwy with left turn
pockets, raised medians and new traffic signals at Lincoln
Ave, Citrus/Mission Ave and E Washington Ave
229
Table C.9 Phased Arterial Projects - 2030 Regional Transportation Plan Revenue Constrained Plan¹
(cont’d)
CONFORMITY
ANALYSIS
YEAR
SANDAG
ID
LEAD
AGENCY PROJECT TITLE PROJECT DESCRIPTION
2010 ESC24 Escondido Centre City Parkway SR 78 to Mission Avenue - widen from four to six lanes
with intersection improvements on Mission Avenue
2010 NC01 National City Plaza Blvd Widening Highland Ave to Euclid Ave - widen from two to three lanes
2010 N/A Poway Espola Road Twin Peaks Road and Titan Way - future widening from
two to four lanes
2010 SM09 San Marcos South Santa Fe Road Rancho Santa Fe Road to Bosstick Boulevard - construct
new four lane arterial with raised median, curb and gutter,
sidewalk, utility undergrounding, and traffic signal system
(CIP-011)
2010 SM22 San Marcos South Santa Fe from Bosstick
to Smilax
Widen and realign existing road to four secondary arterial
standards
2010 SM23 San Marcos Barham Drive Widening Woodland Pkwy to Opper Street - widen Barham Drive to
secondary arterial standards
2010 SM28 San Marcos Twin Oaks Valley Road Street
Widening and Improvements
San Marcos Blvd to Borden Rd - future widening from two
lanes to four lanes including sidewalk and landscaping
2010 VISTA08 Vista West Vista Way Widening Melrose Drive west to Thunder Drive - realign W. Vista Way
including providing preliminary improvement plans, final
right-of-way maps, and a metes and bounds legal
description anticipated to provide congestion relief by
widening W. Vista Way from two to four lanes
2020 CB11 Carlsbad Cannon Road Reach 4 College Blvd. to boundary with Oceanside - construct four
lane arterial with median, bike lanes, sidewalks, and
pedestrian trails
2020 CHV08 Chula Vista Willow Street Bridge Project Bonita to Sweetwater - replace and widen from two to four
lanes including bicycle lanes
2020 CNTY14 County of
San Diego
South Santa Fe Avenue Vista City limits to 700 feet south of Woodland -
reconstruct and widen from two to four lanes including
bicycle lane
2020 CNTY14
A
County of
San Diego
South Santa Fe Avenue South Future widening of South Santa Fe Ave. from 700 feet
south of Woodland Dr./South Santa Fe intersection to San
Marcos city limits at Similax Road
230
Table C.9 Phased Arterial Projects - 2030 Regional Transportation Plan Revenue Constrained Plan¹
(cont’d)
CONFORMITY
ANALYSIS
YEAR
SANDAG
ID
LEAD
AGENCY PROJECT TITLE PROJECT DESCRIPTION
2020 CNTY21 County of
San Diego
Bradley Avenue Overpass at
SR 67
Magnolia Ave to Mollison Ave - future widening of Bradley
Ave overpass from two to four lanes
2020 CNTY24 County of
San Diego
Cole Grade Road Future widening of Cole Grade Road from north of Horse
Creek Trail to south of Pauma Heights Road to
accommodate 14-ft traffic lane in both direction, 12-ft
center 2-way left turn, 6-ft bike lane and 10-ft pathway
2020 CNTY39 County of
San Diego
Bear Valley Parkway North Bear Valley Parkway from San Pasqual Valley Road to Boyle
Avenue - future widening
2020 EL10 El Cajon Jamacha Road East Main Street to south of City limit - future widening of
Jamacha Road from four to six lanes
2020 ESC02A Escondido East Valley/Valley Center East Valley Pkwy to Valley Center Dr - widen roadway from
four to six lanes with raised medians and left turn pockets;
New Eureka Ranch Street and E. Valley Pkwy - modify signal
at Lake Wohlford and Valley Center Road; widen bridge
over Escondido Creek (DEMO ID: CA332; HPP No: 260)
2020 ESC04 Escondido Citracado Parkway II West Valley Pkwy to Harmony Grove Road - widen from two
to four lanes with raised medians, construct bridge over
Escondido Creek
2020 SD11 San Diego
City
Regents Road Bridge Bridge spanning the AT&SF railroad and a portion of the
Rose Canyon floodplain connecting the existing Regents Rd
on both sides of the canyon - future widening Regents Rd
from 100' north of Lahitte Ct to Governor and from 100'
north of Lahitte Ct to the south abutment of the bridge
including four lane with sidewalks and class II bike lanes
(CIP 53-044.0)
2020 SD34 San Diego
City
El Camino Real San Dieguito Road to Via de la Valle - reconstruct and widen
from two to four lanes and extend transition lane and
additional grading to avoid biological impacts (CIP 52-479)
2020 SD70 San Diego
City
W. Mission Bay Bridge Over San Diego River - replace from four to six lane bridge
with class II bike lane (52-643)
2020 SD81 San Diego
City
Genesee Avenue - Nobel Drive
to SR 52
Nobel Drive to SR 52 - future widening to six lane major
street north of Decoro Street and to a six lane primary
arterial south of Decoro Street (CIP 52-458.0)
231
Table C.9 Phased Arterial Projects - 2030 Regional Transportation Plan Revenue Constrained Plan¹
(cont’d)
CONFORMITY
ANALYSIS
YEAR
SANDAG
ID
LEAD
AGENCY PROJECT TITLE PROJECT DESCRIPTION
2020 SD83 San Diego
City
SR 163 and Friars Road Future construction new southbound SR 163 to westbound
Friars Road off-ramp - PE only (CIP 52-455)
2020 SD90 San Diego
City
SR 163/Clairemont Blvd.
Interchange
Kearny Mesa to Kearny Villa Road - widen from four to six
lane prime arterial (CIP 52-745.0)
2020 SD103 San Diego
City
I-5/Genesse Ave Interchange In San Diego, replace Genesee Ave overcrossing from four
lane bridge with six lane bridge; between Sorrento Valley
Road and La Jolla Village Drive - construct auxiliary lanes and
replace Voight Drive bridge (DEMO ID: CA639; HPP
No: 3086)
2020 SD113 San Diego
City
I-5/Sorrento Valley Road On I-5 at Sorrento Valley - future new freeway access
interchange including ramp
2020 SD115 San Diego
City
La Jolla Village Drive/I-805
Interchange Ramps
I-805 at La Jolla Village Drive - reconfigure interchange and
add 220 meters of acceleration lane (524850)
2020 SM10 San Marcos SR 78/Smilax Interchange
Improvements
Construct new interchange at Smilax Road and SR 78
2020 SM24 San Marcos Woodland Parkway Interchange
Improvements
Modify existing ramps at Woodland Parkway and Barham
Drive between Hill Drive and Rancheros Drive; future
widening and realignment of SR 78 overcrossing and
associated work
2020 SM30 San Marcos San Marcos Boulevard Street
Improvements
San Marcos Boulevard: Between Rancho Santa Fe Road to
Bent Avenue; widen road to a six lane prime arterial
1 These projects are included in the 2010, 2010, 2020, and 2030 analysis years for air quality assessment
235
Appendix D
EXPEDITED PROJECT SELECTION PROCESS
Federal Regulations 23 Code of Federal Regulations (CFR) Part 450.330 and Title 23 of the United States Code (USC) allow for the movement of projects within the quadrennial element of the Federal Transportation Improvement Program (FTIP), subject to procedures agreed to by the cooperating parties. SANDAG as the Metropolitan Planning Agency (MPO) for the San Diego region has in place a formal project selection process agreed to by all of the region’s partners, including the two transit districts.
SANDAG developed the project selection process through numerous consultations and cooperation of our region’s partners – Caltrans, North County Transit District, Metropolitan Transit System, and local agencies. The SANDAG Board formally adopted the process and criteria as part of the Regional Transportation Plan (RTP) in November 2008. The projects included in the 2010 RTIP reflect the projects prioritized in the RTP via the project selection process. Projects in the quadrennial element are either already in construction or identified as ready to deliver. The project selection criteria for these projects are derived from Technical Appendix 7 from the 2030 RTP. This appendix describes the process for developing evaluation criteria for prioritizing transportation projects included in the 2030 RTP and the 2010 RTIP. The information from the technical appendix is included below.
For projects within the State Transportation Improvement Program (STIP), SANDAG would advance projects subject to amendments or allocations approved by the California Transportation Commission.
For projects in which the State acts as the program manager, the decision for priority lies with the State. These programs include, among others, the State Highway Operation Protection Program (SHOPP), the Highway Bridge Program (HBP), Section 130 Rail program, Safe Routes to School (SRTS), High Risk Rural Road Program (HRRR), and Highway Safety Improvement Program (HSIP).
236
TECHNICAL APPENDIX 7 TRANSPORTATION EVALUATION CRITERIA AND RANKINGS
This technical appendix describes the process for developing evaluation criteria for prioritizing highway, high occupancy vehicle (HOV) connectors, freeway connectors, and transit projects included in the 2030 San Diego Regional Transportation Plan: Pathways for the Future (RTP). This appendix also includes information on the creation of criteria to prioritize regional rail grade separation, regional ranking criteria for transit capital replacement and rehabilitation projects, and screening criteria for the regional arterial system. Criteria were also developed to evaluate Goods Movement Action Plan projects and are included in RTP Appendix B.
TRANSPORTATION PROJECT EVALUATION CRITERIA
SANDAG utilized criteria for evaluating and ranking highway, transit, freeway connector and high occupancy vehicle (HOV) connectors in the previous RTP, MOBILITY 2030. In order to review and update the criteria for use in the 2030 RTP, the Transportation Committee approved the formation of the Transportation Project Evaluation Criteria Ad Hoc Working Group (TPEC) at its December 9, 2005, meeting. Regional arterials were not included in the updated ranking criteria since it was not anticipated that regional dollars would be distributed as part of the 2030 RTP.
The TPEC was composed of representatives from a number of standing SANDAG working groups, including the Bicycle-Pedestrian Working Group (BPWG), Cities/County Transportation Advisory Committee (CTAC), Regional Freight Working Group (FWG), Regional Housing Working Group (RHWG), Regional Planning Stakeholders Working Group (SWG), Regional Planning Technical Working Group (TWG), as well as staff from Caltrans, MTS, and NCTD. The TPEC met on a regular basis beginning in January 2008 and created updated evaluation criteria for regional transit service, highway, freeway connector, and HOV connector projects.
The revisions to the RTP criteria were intended to support the vision of the Regional Comprehensive Plan (RCP) and address the updated goals of the 2030 RTP. Where appropriate, efforts also were taken to simplify and standardize the criteria across different modal categories. The revised criteria are structured with a standard 100-point scoring system.
The TPEC organized the updated criteria into three criteria major categories: serves travel needs, develops network integration, and cost-effectiveness; and determined that each of these three categories should receive roughly one third of the total points. The serves travel needs category contains criteria that focus on the movement of people and goods and awards points for projects that serve peak-period trips, goods movement, or congested corridors. The network integration criteria give credit for projects that provide connectivity between surrounding land uses and the transportation network. Criteria in this category include measures such as serving RCP Smart Growth Areas, incorporation of transit and/or Managed or HOV lanes, and minimizing negative residential and environmental impacts. The cost-effectiveness criteria provide for a comprehensive assessment of the annual capital, operation, and maintenance costs of the project in relation to the number of people moved or person hours saved.
237
The same three criteria categories are used for transit services, highway, freeway connector, and HOV connector criteria, with variations in the individual criteria. TPEC felt that each of the three major categories should receive about one-third of the total points. Within each of the three categories weighting for each of the individual criteria also was determined. The full individual criteria descriptions, weighting, and score details are listed in Tables TA 7.1 to TA 7.15.
HIGHWAY CORRIDOR EVALUATION
SANDAG has used criteria for evaluating and ranking highway corridor projects since 1997. Using the MOBILITY 2030 criteria as a basis the TPEC created a set of revised highway corridor evaluation criteria which reflect SANDAG Board-adopted principles on smart growth and the Regional Transit Vision.
The ten highway evaluation criteria presented in Tables TA 7.1 and TA 7.2 quantify project traffic usage, travel time savings, cost, critical linkages, safety, goods movement, employment, smart growth, carpool lane integration, transit integration, habitat preservation, and residential impacts. SANDAG staff has worked with Caltrans, MTS, NCTD, the TPEC members and their respective working groups to revise and update the criteria. Table TA 7.3 describes the highway evaluation criteria weighting.
The highway network corridor evaluation has been used to develop the Reasonably Expected Revenue Network and Revenue Constrained Network alternatives and project phasing included in the 2030 RTP. The entire 52 unconstrained highway corridors originally evaluated for the 2030 RTP are listed in priority order in Table TA 7.4.
The prioritized list of highway projects is used as a tool in assembling logical networks of highway projects that complement transit and arterial projects. Priority order is not necessarily strictly followed. Rather, emphasis is placed upon developing meaningful networks in accordance with the 2030 RTP goals and objectives.
238
Table TA 7.1 Summary of Highway Project Evaluation Criteria
GOAL CRITERIA DESCRIPTION
Located in a High Crash Rate Area Is the project located in an area with a high
vehicular crash rate?
Serves Goods Movement Does the project provide for goods movement?
Serves Peak-Period Trips * What is the number of peak-period trips located
within one mile of the highway corridor?
Provides Mobility * What is the increase in person capacity resulting
from the project?
SERVES
TRAVEL
NEEDS
Provides Congestion Relief * What is the number of daily person-hours saved?
Serves RCP Smart Growth Areas Does the project serve RCP Smart Growth Areas?
Facilitates Carpool and Transit Mobility Does the project contain carpool/managed lane
facilities and/or regional or corridor transit
service?
Minimizes Habitat and Residential Impacts Does the project minimize negative habitat and
residential impacts?
DEVELOPS
NETWORK
INTEGRATION
Critical Linkage Is the project located in a high volume freeway
corridor and/or lacking a continuous parallel
arterial listed in the Regional Arterial System or
completes a missing link?
COST-
EFFECTIVENESS
Cost-Effectiveness * What is the annual capital and operating project
cost divided by person hours saved?
239
Table TA 7.2 Highway Corridor Evaluation Criteria
CRITERIA DESCRIPTION
1. Located in a High Crash Rate Area
Is the project located in an area with a high vehicular crash rate?
Score Description
5 Greater than 160 percent of the 3-year average statewide crash rate for a similar facility (i.e. 60% over the statewide average)
4 Greater than 150% “ “ 3 Greater than 140% “ “ 2 Greater than 130% “ “ 1 Greater than 120% “ “
Analysis based upon accident data provided by Caltrans.
2. Serves Goods Movement Does the project provide for goods movement?
A) Is the highway a major freight corridor as measured by truck AADT% 2 >7% 1 4%-7% 0 less than 3%
B) Is the highway part of a designated trade corridor as defined in the Regional Truck Network- as part of the RTP Freight Strategy?
2 Yes 0 No
C) Does the highway serve a major freight center (within one mile of the corridor) such as a Port, International Airport, Port of Entry, Rail Intermodal/Transload Facility or Industrial Cluster/Distribution Center?
1 Yes 0 No
3. Serves Peak-Period Trips* What is the number of peak-period trips located within one mile of the highway corridor?
Calculated as all peak-period origin and destinations within one mile of the highway corridor.
Score Description
5 - 1 Number of peak-period trips per mile
4. Provides Mobility* What is the increase in person capacity resulting from the project?
Calculated as change in person miles traveled divided by project length (miles).
Score Description
10 - 1 Change in persons per lane mile
240
Table TA 7.2 Highway Corridor Evaluation Criteria
(cont’d)
CRITERIA DESCRIPTION
5. Provides Congestion Relief *
What is the number of daily person-hours saved?
This criterion accounts for both current (2008) and 2030 congestion relief.
Total daily travel time is computed for a baseline condition that includes all current (2008) fully funded and/or environmentally cleared projects. Travel time is again computed by adding each project, one by one, to the baseline condition. The resulting travel time is then compared to the baseline travel time. The difference is the travel time savings that can be attributed to each project. Higher ranking projects have the largest number of person-hours saved.
To incorporate existing congestion the 2008 Congestions Mitigation Map was utilized to determine the level of service (LOS) on the existing network. The LOS were grouped into categories of F, E-D, and C-A. The 2030 hours were then divided by a factor assigned to these three groups. F = 1, E-D = 1.5 and C-A = 2.
Score Description
15 -1 Number of person hours saved (per lane mile)
6. Serves RCP Smart Growth Centers
Does the highway corridor serve existing/planned and/or potential RCP Smart Growth areas?
Highway Corridors shall receive points for each place type they serve.
Score Description
5 Serves existing/planned Metropolitan Center or Urban Center 3 Serves existing/planned Special Use Center 1 Serves potential Urban Center or Special Use Center
Scores are based upon the total number of these points*
5 More than 7 points 4 6 to 7 points 3 5 points 2 3 to 4 points 1 1 to 2 points
7. Facilitates Carpool and Transit Mobility
Does the project contain carpool/managed lane facilities and/or regional or corridor transit service?
Score Description
5 Includes carpool/managed lane facility and Regional or Corridor transit services identified in the Regionally Significant Transportation Network
3 Includes carpool facility/managed lane or Regional or Corridor transit services identified in the Regionally Significant Transportation Network.
241
Table TA 7.2 Highway Corridor Evaluation Criteria
(cont’d)
CRITERIA DESCRIPTION
8. Minimizes Habitat and Residential Impacts
Does the project minimize negative habitat and residential impacts?
Projects receive points for each of the descriptions they satisfy
Points Description
2 Avoids preserve areas as defined by habitat preserve plans 1 Avoids natural areas as defined by habitat preserve plans 2 Avoids existing residential development
(defined as existing housing stock within 500-feet of the highway right of way is
less than two dwelling-units per acre- this does not imply a taking and is used
only as a measure of proximity)
9. Critical Linkage Is the project located in a high volume freeway corridor and/or lacking a continuous parallel arterial or completes a missing link?
Score Description
5 High volume freeway corridor and lacking a continuous parallel arterial listed in the Regional Arterial System (High volume is defined as greater than 250,000 ADT using the 2030 Smart
Growth forecast)
3 Completes a missing regional link 1 High volume freeway corridor or lacking a continuous parallel arterial
listed in the Regional Arterial System
10. Cost-Effectiveness* What is the annual capital and operating project cost per project mile divided by person hours saved?
Calculated as:
[((Capital project cost/project life) + (operating & maintenance costs))/project mile)] /
Project life] / annual weekday person hours saved
Higher ranking projects have a lower cost per person hour saved.
Score Description
30 - 1 Cost per person hour saved per lane mile
Criterion denoted with an asterisk were calculated using a relative score quantitative method where the top scoring project received the full number of points for that criterion and the subsequent projects received points relative to the top project score.
242
Table TA 7.3 Highway Corridor Evaluation Criteria Weighting
CRITERIA
CATEGORY RTP GOALS CRITERIA DESCRIPTION
MAX
SCORE
TOTAL
PERCENT
Reliability Located in a High
Accident Rate Area
Is the project located in an
area with a high vehicular
crash rate?
5
Mobility Serves Goods
Movement
Does the project provide for
goods movement? 10
Accessibility,
Mobility,
Environmental
Sustainability
Serves Peak-Period
Trips
What is the number of peak-
period trips located within one
mile of the highway corridor?
5
Mobility Provides Mobility
What is the increase in person
capacity resulting from the
project?
10
SERVES
TRAVEL
NEEDS
Livability,
Mobility
Provides Congestion
Relief
What is the number of daily
person-hours saved? 15
45
Livability,
Accessibility
Serves RCP Smart
Growth Areas
Does the project serve RCP
Smart Growth Areas? 5
Accessibility,
Efficiency
Facilitates Carpool
and Transit Mobility
Does the project contain
carpool/managed lane facilities
and/or regional or corridor
transit service?
10
Environmental
Sustainability
Minimizes Habitat
and Residential
Impacts
Does the project minimize
negative habitat and
residential impacts?
5
DEVELOPS
NETWORK
INTEGRATION
Reliability,
Mobility Critical Linkage
Is the project located in a high
volume freeway corridor
and/or lacking a continuous
parallel arterial listed in the
Regional Arterial System or
completes a missing link?
5
25
COST-
EFFECTIVENESS Efficiency Cost-Effectiveness
What is the annual capital and
operating project cost divided
by person hours saved?
30 30
243
Table TA 7.4 Highway Corridor Evaluation Ranking
Initial Phase in RC
TransNet, EAP & Toll
No.Cost
(millions)Freeway From To Existing Improvements
YES TransNet 1 $450 I-5 I-8 La Jolla Village Dr 8F 10F + 2HOV
- TransNet 2 $350 I-5 SR 54 I-15 8F 10F+2HOV
YES EAP (Env) 3 $1,290 I-5 SR 56 Palomar Airport Rd 8F/10F 10F+4ML
- TransNet 4 $202 I-5 SR 905 SR 54 8F 8F + 2HOV
YES EAP (Env) 5 $2,410 I-805 H St I-8 8F/10F 10F+4ML
YES EAP (Env) 6 $579 I-805 I-8 SR 52 8F/10F 8F + 4ML
- - 7 $160 SR 125 SR 94 I-8 8F 10F+2HOV
- Toll 8 $2,060 I-15 SR 78 Riverside Co 8F 8F+4ML
YES EAP 9 $500 SR 52 I-15 SR 125 4F/6F 6F + 3ML-Rev
- TransNet 10 $870 I-5 I-15 I-8 8F 8F+2HOV
YES EAP (Env) 11 $610 I-805 Mission Valley Viaduct 8F 8F + 4ML
- - 12 $210 SR 52 I-5 I-805 4F 6F+2HOV
YES EAP (Env) 13 $291 I-5 La Jolla Village Dr SR 56 8F/14F 8F/14F + 4ML
YES EAP (Env) 14 $202 I-805 La Jolla Village Dr I-5 8F 8F + 4ML
- - 15 $184 I-8 SR 125 SR 67 8F 8F + 2HOV
YES EAP (Env) 16 $290 I-805 SR 52 La Jolla Village Dr 8F 10F+4ML
- TransNet 17 $400 SR 67 Mapleview St Dye Rd 2C/4C 4C
YES EAP (Env) 18 $532 I-805 SR 905 H St 8F 8F+4ML
- TransNet 19 $650 SR 78 I-5 I-15 6F 6F + 2HOV
YES EAP (Env) 20 $1,200 I-5 Palomar Airport Rd SR 76 8F 10F+4ML
YES EAP (Transit) 21 $200 SR 94 I-5 I-805 8F 8F+2HOV
- - 22 $48 I-8 SR 67 2nd Street 6F 6F + 2HOV
YES EAP (Transit) 23 $290 SR 52 I-805 I-15 6F 8F + 2HOV
YES Toll 24 $40 SR 125 San Miguel Rd. SR 54 4F 8F
- TransNet 25 $128 SR 54 I-5 SR 125 6F 8F+2HOV
YES EAP (Transit) 26 $580 I-15 I-5 SR 163 6F/9F 8F+2HOV
- - 27 $1,330 I-8 I-5 I-15 8F 8F+2HOV
- TransNet 28 $520 SR 94 I-805 College Ave 8F/10F 10F+2HOV
- - 29 $980 I-8 College Ave SR 125 8F 8F+2HOV
- - 30 $1,080 I-8 I-15 College Ave 10F 10F+2HOV
- - 31 $50 SR 52 SR 125 SR 67 4F 6F
- TransNet 32 $260 SR 94 College Ave SR 125 8F 8F + 2HOV
- - 33 $200 SR 163 I-805 I-15 8F 8F+2HOV
- - 34 $270 SR 125 I-8 SR 52 8F 8F+2HOV
YES EAP 35 $260 SR 76 Melrose Drive Mission Rd 2C 6C
YES EAP 36 $140 SR 76 Mission Rd I-15 2C 4C
- TransNet (GP Lanes) 37 $190 I-8 2nd Street Los Coches 4F 6F + 2HOV
- - 38 $270 SR 905 I-5 Mexico 4F/6F 8F
- TransNet 39 $170 SR 125 SR 54 SR 94 6F 8F+2HOV
- - 40 $160 SR 76 I-5 Melrose Drive 4E 6E
YES Toll 41 $300 SR 11 SR 905 Mexico --- 4T
- - 42 $143 I-8 Los Coches Dunbar Rd. 4F/6F 6F
- - 43 $130 SR 67 I-8 Mapleview St 4F/6F 8F/6F
- Toll 44 $810 I-5 SR 76 Orange Co 8F 8F + 4ML
YES (PE only) TransNet 45 $460 SR 75/SR 282 Glorietta Blvd. Alameda Blvd. 6C 6C + 4TU
- TransNet 46 $290 SR 56 I-5 I-15 4F/5F 6F + 2HOV
- TransNet 47 $260 SR 94 SR 125 Avocado Blvd 4F 6F+2HOV
- TransNet 48 $210 SR 94 Jamacha Rd Otay Lakes Rd 2C 4C
- TransNet (4 lanes) 49 $30 SR 94 Avocado Blvd Jamacha Rd 4C 6C
- - 50 $457 SR 54 SR 125 SR 94 --- 6E
- - 51 $200 SR 76 I-15 Pala Mission Rd 2C 4C/6C
- - 52 $980 SR 76 Pala Mission Rd La Jolla Indian Res 2C 4C
244
Table TA 7.4 Highway Corridor Evaluation Ranking
(continued)
Cost-
Effectiveness
[1] Serves Goods Movement 10 %
[2] Serves Peak Period Trips 5%
[3] Provides Mobility 10%
[4] Provides Current and Future Congestion Relief 15%
[5] High Vehicular Crash Rate 5%
[6] Serves RCP Smart Growth Areas 5%
[7] Facilitates Carpool and Transit 10%
[8] Minimizes Habitat and Residential Impacts 5%
[9] Critical Linkage 5%
[10] Cost-Effectiveness 30%
Weighted Score 100%
Original Weighting Rank (1-52)
Project Rank (1-52)
2 1.11 7.52 12.64 0 5 10 0 5 30.00 73.27 1 1
2 1.78 7.44 15.00 0 3 10 0 0 16.63 55.84 5 2
8 0.54 6.28 9.33 0 1 10 0 5 13.93 54.08 8 3
2 1.30 7.59 9.47 0 3 10 0 1 19.67 54.04 6 4
8 1.59 6.75 11.00 0 3 10 0 5 8.25 53.59 3 5
8 1.94 6.59 9.31 0 4 10 0 1 12.50 53.34 1 6
6 1.44 5.60 5.34 0 3 10 2 0 19.45 52.83 6 7
10 0.27 4.87 10.38 0 0 10 2 1 14.24 52.77 3 8
6 0.34 6.71 12.16 0 0 10 0 1 15.99 52.21 15 9
4 2.75 9.35 10.60 0 5 10 3 0 6.37 51.07 9 10
6 5.00 6.47 11.63 0 3 10 0 5 1.81 48.92 24 11
2 0.90 4.16 11.12 0 0 6 0 1 23.58 48.75 21 12
6 1.46 5.77 7.47 0 4 10 0 0 12.07 46.76 12 13
10 1.71 5.07 6.15 0 3 6 2 1 11.08 46.01 12 14
10 2.05 10.00 4.76 0 3 6 3 0 5.82 44.63 18 15
8 1.50 6.48 6.15 0 3 10 0 1 8.08 44.21 14 16
4 0.27 3.56 12.14 3 0 0 2 0 19.20 44.16 28 17
8 1.03 5.80 7.33 0 0 10 0 1 9.91 43.07 9 18
4 1.14 7.29 6.79 0 5 6 0 0 11.56 41.78 11 19
8 1.15 5.50 8.43 0 0 6 0 1 11.08 41.16 21 20
6 3.82 9.42 3.75 0 3 10 2 0 2.75 40.74 28 21
10 3.86 7.56 3.17 0 0 6 3 0 6.66 40.25 18 22
2 1.29 5.64 7.41 0 0 10 2 0 11.24 39.58 16 23
8 0.59 2.86 1.20 0 0 6 2 1 17.17 38.82 27 24
6 1.11 4.28 3.84 0 3 6 0 0 14.17 38.40 17 25
6 1.18 6.56 5.14 0 0 10 0 0 8.83 37.70 23 26
0 2.31 8.75 10.06 0 5 6 2 0 3.41 37.53 24 27
4 1.64 7.38 7.79 0 0 10 0 0 6.33 37.13 20 28
2 2.52 8.60 9.39 0 5 6 0 0 2.47 35.98 34 29
0 1.62 7.77 10.06 0 2 6 2 1 3.29 33.73 34 30
6 1.47 5.48 3.88 0 0 0 2 0 12.56 31.39 33 31
4 1.23 8.01 5.19 0 0 10 0 0 2.70 31.13 34 32
4 1.29 7.78 3.50 0 1 6 2 0 4.39 29.95 28 33
8 1.35 4.52 0.59 0 4 10 0 0 1.18 29.65 41 34
4 0.56 3.35 5.96 0 0 0 0 1 14.74 29.61 31 35
4 0.48 3.87 4.64 3 0 0 2 1 10.04 29.03 24 36
6 1.47 4.96 3.17 0 0 6 0 1 5.22 27.82 39 37
10 0.69 2.09 2.50 0 0 6 0 0 6.13 27.42 43 38
6 0.99 5.17 1.16 0 0 10 0 0 3.42 26.73 34 39
4 1.58 2.99 4.28 0 0 0 0 0 13.87 26.71 31 40
10 0.51 2.94 3.18 0 0 0 2 3 4.05 25.68 45 41
8 0.28 4.53 2.60 0 0 0 2 0 6.84 24.24 39 42
6 1.34 4.63 2.65 0 0 0 0 0 7.92 22.53 41 43
8 0.08 4.52 0.60 0 0 6 0 1 1.75 21.96 48 44
0 2.17 2.15 8.09 3 0 0 3 0 3.33 21.74 44 45
4 0.62 4.47 1.13 0 0 6 0 0 4.64 20.86 38 46
4 1.07 4.19 0.29 0 0 6 3 1 0.33 19.88 47 47
4 0.24 1.88 1.50 3 0 0 2 1 4.35 17.98 51 48
2 2.25 3.53 1.50 3 0 0 0 1 4.24 17.52 50 49
4 1.36 1.77 3.08 0 0 0 0 0 6.23 16.43 46 50
4 0.26 2.19 0.69 2 0 0 2 1 2.20 14.33 49 51
4 0.11 1.67 0.61 1 0 0 2 1 0.40 10.79 52 52
Serves Travel Needs Develops Network Integration
245
High Occupancy Vehicle (HOV) Connectors
HOV connectors will facilitate direct HOV to HOV access and allow for continuous movement on the HOV network from freeway to freeway. In MOBILITY 2030, HOV connectors were prioritized based upon average daily traffic data. For the 2030 RTP, the criteria were revised to evaluate traffic levels of the connector and the overall interchange, transit integration, habitat and residential impacts, and cost effectiveness. The HOV connector criteria and weighting are shown in Tables TA 7.5 through TA 7.7. The HOV Connectors are ranked by pair and shown in Table TA 7.8. A total of six HOV connectors are included in the Reasonably Expected Revenue Scenario and five are included in the Revenue Constrained Scenario.
Table TA 7.5
HOV Project Evaluation Criteria Summary
GOAL CRITERIA DESCRIPTION
Serves High Demand What is the 2030 Person Average Daily Traffic
on the HOV connections?
SERVES
TRAVEL
NEEDS Serves Congested Corridors What is the 2030 Average Daily Traffic for the
overall interchange?
Serves Regional and/or Corridor Transit
Routes
Does the project serve regional and/or corridor
transit?
DEVELOPS
NETWORK
INTEGRATION Minimizes Habitat and Residential Impacts Does the project minimize negative habitat and
residential impacts?
COST-
EFFECTIVENESS
Cost-Effectiveness What is the annual capital and operating
project cost divided by Person Average Daily
Traffic?
246
Table TA 7.6 HOV Connector Criteria
CRITERIA DESCRIPTION
1. Serves High Demand What is the 2030 Person Average Daily Traffic (PADT) on the HOV connections?
Score Description
5 More than 45,000 PADT (pair) 4 30,000 to 45,000 PADT (pair) 3 20,000 to 29,999 PADT (pair) 2 10,000 to 19,999 PADT (pair) 1 Less than 10,000 PADT (pair)
2. Serves Congested Corridors
What is the 2030 Average Daily Traffic (ADT) for the overall interchange?
Score Description
5 Over 450,000 ADT 4 400,000 to 450,000 ADT 3 375,000 to 399,999 ADT 2 300,000 to 374,999 ADT 1 Under 300,000 ADT
3. Serves Regional and/or Corridor Transit Routes
Does the project serve regional and/or corridor transit?
Score Description
5 Serves Regional or Corridor transit services identified in the Regionally Significant Transportation Network
0 Does not serve the Regional or Corridor transit services identified in the Regionally Significant Transportation Network
4. Minimizes Habitat and Residential Impacts
Does the project minimize negative habitat and residential impacts?
Projects receive points for each of the descriptions they satisfy.
Points Description
2 Avoids preserve areas as defined by habitat preserve plans 1 Avoids natural areas as defined by habitat preserve plans 2 Avoids existing residential development (defined as existing housing
stock within 500-feet of the highway right-of-way that is less than two dwelling-units per acre- this does not imply a taking and is used only as a measure of proximity).
247
Table TA 7.6 HOV Connector Criteria
(cont’d)
CRITERIA DESCRIPTION
5. Cost-Effectiveness What is the annual capital and operating project cost divided by Person Average Daily Traffic (by pair)
Calculated as:
[(Capital project cost/project life) + (annual operating & maintenance costs)] / Annual
Weekday Person Average Daily Traffic?
Higher ranking projects have a lower cost per Annual Person Average Daily Traffic (PADT).
Score Description
5 Less than $0.30 per PADT 4 $0.30 to $0.49 per PADT 3 $0.50 to $0.99 per PADT 2 $1.00 to $1.25 per PADT 1 Over $1.25 per PADT
Table TA 7.7 HOV Connector Evaluation Criteria Weighting
CRITERIA
GOAL RTP GOALS CRITERIA DESCRIPTION
MAX
SCORE
PERCENT
NEW
Mobility,
Reliability
Serves High
Demand
What is the 2030 Person
Average Daily Traffic on the
HOV connections?
20 SERVES
TRAVEL
NEEDS
Mobility Serves Congested
Corridors
What is the 2030 Average
Daily Traffic for the overall
interchange?
20
40
Livability,
Accessibility,
Mobility
Serves Regional
and/or Corridor
Transit Routes
Does the project serve regional
and/or corridor transit routes? 20
DEVELOPS
NETWORK
INTEGRATION
Environmental
Sustainability
Minimizes Habitat
and Residential
Impacts
Does the project minimize
negative habitat and
residential impacts?
10
30
COST-
EFFECTIVENESS Efficiency,
Mobility Cost-Effectiveness
What is the annual capital and
operating project cost divided
by Person average Daily Traffic
(PADT)?
30 30
TA 7-14 2030 Regional Transportation Plan – Technical Appendices
Table TA 7.8—HOV Connector Evaluation Ranking Cost-
Effectiveness
Initial Phase in RC
TransNet, EAP
No.Cost ($M)
Direction
[1] Serves High Demand 20%
[2] Serves Congested Corridors 20%
[3] Serves Regional and/or Corridor Transit Routes 20%
[4] Habitat/ Residential Impacts 10%
[5] Cost Effective- ness 30%
WeightedScore 100%
Project Rank (1-25)
YES 1 $190 I-15 I-805 North to North 20 16 20 0 30 86 1South to South
2 $166 I-805 SR 94 East to South 8 20 20 6 18 72 2North to West
2 $200 I-5 SR 94 South to East 20 16 0 6 30 72 2West to North
4 $200 I-805 SR 94 South to East 20 20 0 0 30 70 4North to West
YES TransNet 5 $170 I-5 I-805 North to North 20 12 0 4 30 66 5South to South
TransNet 5 $213 I-15 SR 78 East to South 20 12 0 10 24 66 5North to West
YES TransNet 5 $190 I-805 SR 52 West to North 8 16 20 4 18 66 5South to East
8 $180 I-15 SR 52 West to North 16 12 0 8 24 60 8South to East
YES TransNet 9 $140 I-15 SR 94 South to West 8 8 20 0 18 54 9East to North
9 $190 I-805 SR 163 North to North 16 8 0 6 24 54 9South to South
11 $280 I-8 SR 125 West to South 12 16 0 6 18 52 11North to East
12 $180 I-15 SR 163 North to North 12 12 0 8 18 50 12South to South
13 $190 I-5 SR 56 North to East 16 4 0 4 24 48 13West to South
14 $200 I-5 SR 94 West to South 8 20 0 6 12 46 14North to East
14 $190 I-15 SR 56 East to North 8 16 0 10 12 46 14South to West
16 $180 SR 52 SR 125 North to West 16 4 0 0 24 44 16East to South
18 $185 I-5 SR 78 North to East 12 8 0 0 18 38 18West to South
17 $200 I-805 SR 54 South to East 8 16 0 4 12 40 17West to North
19 $166 I-805 SR 94 West to South 4 20 0 4 6 34 19North to East
20 $180 I-5 SR 54 South to East 8 8 0 4 12 32 20West to North
21 $190 I-5 SR 56 South to East 4 20 0 0 6 30 21West to North
22 $185 I-5 SR 78 South to East 8 8 0 0 12 28 22West to North
23 $180 I-5 SR 52 South to East 8 8 0 4 6 26 23West to North
24 $180 I-5 SR 52 West to South 4 8 0 4 6 22 24North to East
25 $180 I-5 SR 54 West to South 4 4 0 0 6 14 25North to East
Serves Travel Needs Develops Network Integration
Intersecting Freeways
248
249
FREEWAY-TO-FREEWAY CONNECTORS
The TPEC also updated the Freeway-to-Freeway Connector criteria. The TPEC elected to use a number of the same criteria that were used to evaluate highway projects. The six criteria shown in Tables TA 7.9 and 7.10 quantify project area accident rates, goods movement, mobility, congestion relief, transit integration, and cost effectiveness. The ranked projects are shown in Table TA 7.11.
Table TA 7.9 Freeway Connectors Study Evaluation Criteria
GOAL CRITERIA DESCRIPTION
Located in a High Crash Rate Area Is the project located in an area with a vehicular high crash rate?
Serves Goods Movement Does the project provide for goods movement?
Provides Mobility What is the Person Average Daily Traffic?
SERVES TRAVEL NEEDS
Provides Congestion Relief What is the number of daily person-hours saved?
Serves Regional and/or Corridor Transit Routes
Does the project serve regional and/or corridor transit routes?
DEVELOPS NETWORK INTEGRATION
Minimizes Habitat and Residential Impacts Does the project minimize negative habitat and residential impacts?
COST-EFFECTIVENESS
Cost-Effectiveness What is the annual capital and operating project cost divided by person-hours saved?
250
Table TA 7.10 Freeway-to-Freeway Connector Criteria
CRITERIA DESCRIPTION
1. Located in a High Crash Rate Area
Is the project located in an area with a high vehicular crash rate?
Score Description
5 Greater than 160 percent of the 3-year average statewide crash rate for a similar facility (i.e., 60% over the statewide average)
4 Greater than 150% “ “ 3 Greater than 140% “ “ 2 Greater than 130% “ “ 1 Greater than 120% “ “
2. Serves Goods Movement
Does the project provide for goods movement?
A) Is the highway a major freight corridor as measured by truck AADT% 2 >7% 1 4%-7% 0 less than 3%
B) Is the highway part of a designated trade corridor as defined in the Regional Truck Network- as part of the RTP Freight Strategy?
2 Yes 0 No
C) Does the highway serve a major freight center (within one mile of the corridor) such as a Port, International Airport, Port of Entry, Rail Intermodal/Transload Facility or Industrial Cluster/Distribution Center?
1 Yes 0 No
3. Provides Mobility
What is 2030 Person Average Daily Traffic (PADT)?
Score Description
5 Over 45,000 PADT 4 30,000 to 45,000 PADT 3 25,000 to 29,999 PADT 2 20,000 to 24,999 PADT 1 Less than 20,000 PADT
251
Table TA 7.10 Freeway-to-Freeway Connector Criteria
(cont’d)
CRITERIA DESCRIPTION
4. Provides Congestion Relief
What is the number of daily person-hours saved?
Staff calculated the existing travel time using local roadways that provide the same movement that the proposed freeway connector would provide. The travel time savings has been equated to the existing travel time along the local roadways minus the travel time with the connector, which was then multiplied by the number of person trips.
Score Description
5 Over 1,400 person hours saved 4 1,000 to1,400 person hours saved 3 800 to 999 person hours saved 2 500 to 799 person hours saved 1 Under 500 person hours saved
5. Serves Regional and/or Corridor Transit Routes
Does the project serve regional and/or corridor transit?
Score Description
5 Serves Regional or Corridor transit services identified in the Regionally Significant Transportation Network
0 Does not serve Regional or Corridor transit services identified in the Regionally Significant Transportation Network
6. Minimizes Habitat and Residential Impacts
Does the project minimize negative habitat and residential impacts?
Projects receive points for each of the descriptions they satisfy (maximum of 5 points total)
Points Description
2 Avoids preserve areas as defined by habitat preserve plans 1 Avoids natural areas as defined by habitat preserve plans 2 Avoids existing residential development (defined as existing housing stock
within 500 feet of the highway right of way is less than two dwelling-units per acre- this does not imply a taking and is used only as a measure of proximity)
252
Table TA 7.10 Freeway-to-Freeway Connector Criteria
(cont’d)
CRITERIA DESCRIPTION
7. Cost-Effectiveness
What is the annual capital and operating/maintenance project cost divided by person-hours saved?
Calculated as:
[(Total capital costs/project life) + (annual operating & maintenance costs)]/ Annual
Weekday Person Hours Saved
Higher ranking projects have a lower cost per person-hour saved.
Score Description
5 Less that $1.25 per person hour saved 4 $1.25 to $2.00 per person hour saved 3 $2.01 to $3.00 per person hour saved 2 $3.01 to $5.00 per person hour saved 1 Over $5.00 per person hour saved
253
Table TA 7.11 Freeway Connectors Project Rankings
Cost-Effectiveness
Initial Phase in
RC
TransNet and EAP
No. FreewayIntersecting
FreewayMovement
[1] Serves Goods
Movement 10%
[2] Provides Mobility
10%
[3] Provides Congestion Relief 10%
[4] High Vehicular Accident
Rate Area 10%
[5] Serves Regional and/or
Corridor Transit
Routes 15%
[6] Minimizes Habitat and Residential
Impacts 15%
[7] Cost-Effectiveness
30%
Weighted Score 100%
Project Rank
YES TransNet 1 SR 94 SR 125 West to North 6 10 10 0 0 9 30 65 1
YES TransNet 2 SR 94 SR 125 South to East 6 10 8 0 0 9 30 63 2
YES TransNet 3 I-5 SR 56 West to North 6 6 10 0 0 0 30 52 3
YES TransNet 4 I-5 SR 78 West to South 6 10 6 0 0 0 24 46 4
5 I-5 I-8 East to North 0 6 6 2 0 6 24 44 5
YES TransNet 5 I-5 SR 78 South to East 6 10 6 4 0 0 18 44 5
YES TransNet 7 I-5 SR 56 South to East 6 6 6 0 0 0 24 42 7
8 I-5 SR 94 North to East 2 8 4 6 0 9 6 35 8
8 I-15 SR 56 North to West 8 4 2 0 0 15 6 35 8
10 I-5 I-8 South to West 0 2 2 0 0 6 12 22 10
Serves Travel Needs Develops
Network Integration
254
TRANSIT SERVICES EVALUATION
The TPEC, with key input from MTS and NCTD staff, updated the Transit Services Evaluation criteria in order to prioritize new transit services. Building on the criteria developed for use in MOBILITY 2030, the TPEC recommended a number of modifications which integrate the Regional Comprehensive Plan and transit connectivity. This evaluation and prioritization of regional transit services was used to develop the transit network in the 2030 RTP.
The draft criteria were presented for comment to the NCTD Board on August 17, 2008 and to the MTS Board on September 14, 2008. Modifications to the criteria were made in response to comments received. The criteria were accepted by the SANDAG Board on October 13, 2008 and incorporated in the development of the RTP transit network. Tables TA 7.12 and 7.13 describe the transit services evaluation criteria and detailed scoring. Table TA 7.14 describes the transit services criteria weighting. All transit routes evaluated for the 2030 RTP are listed in priority order in Table TA 7.15.
Table TA 7.12
Transit Services Evaluation Criteria
GOAL CRITERIA DESCRIPTION
Serves Congested Areas Does the route serve the more congested
corridors in the region?
Serves Peak-Period Trips What are the number of trips within the
capture areas of the transit stations and park
and ride facilities?
Provides Competitive/Reliable Transit What is the percentage of the route located in
priority treatment?
Peak Transit Utilization What are the morning and afternoon passenger
miles divided by seat miles?
SERVES
TRAVEL
NEEDS
Off-Peak Transit Utilization What are the midday and evening passenger
miles divided by seat miles?
Links High-Frequency Transit Services How many other high frequency (timed transfer
service or 15-minute or higher frequency)
transit routes does the route connect to?
DEVELOPS
NETWORK
INTEGRATION
Serves RCP Smart Growth Areas
Does the route serve existing/planned and/or
potential RCP Smart Growth areas?
COST-
EFFECTIVENESS
Project Cost-Effectiveness What is the annual capital and operating
lifecycle project cost divided by passenger
miles?
255
Table TA 7.13 Detailed Scoring for Transit Project Criteria
Criteria Description
1. Serves Congested Areas*
Does the route serve the more congested corridors in the region?
Score Description
10-0 Percentage of route corridor with Level of Service E or F in 2030
2. Serves Peak-Period Travel Trips *
What are the number of peak-period trips within the capture areas of the transit stations and park and ride facilities?
As calculated as:
a + 1/10b + #c = average peak trips.
a = All trips within 1/3 mile of the transit station (captures walkable trips).
b = All trips located between 1/3 to 1 mile of the transit station (captures trips served by shuttle/bicycles).
c = number of trips to account for park and ride facilities (captures park-and ride-origin trips) multiplied by the number of park and ride facilities located on the route.
Score Description
10-0 Total potential trips per station
3. Provides Competitive/ Reliable Transit *
What is the percentage of the route located in priority treatment?
Value Treatment
5 Dedicated Transit Guideway or Dedicated Arterial Lane or Rail 3 Managed Lane or HOV Lane or Arterial Spot Treatments
(e.g., signal priority, queue jumpers)
To calculate the score of a project the percentage of the route on dedicated treatment is multiplied by the value of the treatment to determine the total of points received. The point total is then associated with a project score.
Example Route A is located in 50% Dedicated Arterial Lane and 50% on an arterial with spot treatments.
(50 x 5) + (50 x 3) = 400
Score Description
5-0 500 – 0 points
256
Table TA 7.13 Detailed Scoring for Transit Project Criteria
(cont’d)
Criteria Description
4. Peak Transit Utilization*
What is the morning and afternoon peak-period transit utilization?
Transit utilization is calculated as passenger miles divided by seat miles.
Route Type Seats Assumed
Heavy Rail 140/car (5 car trains)
Trolley 68/car (3 car trains)
SPRINTER 136/car (1 car trains)
Bus 47/vehicle
Score Description
5-0 Percentage of highest-transit utilization of route during peak.
5. Off-Peak Transit Utilization *
What is the midday and evening transit utilization?
Transit utilization is calculated as passenger miles divided by seat miles.
Route Type Seats Assumed
Heavy Rail 140/car (5 car trains)
Trolley 68/car (3 car trains)
SPRINTER 136/car (1 car trains)
Bus 47/vehicle
Score Description
5-0 Percentage of highest utilization of route during off-peak-period
6. Links High-Frequency Transit Services*
How many other high frequency (timed transfer service or 15 minute or higher frequency) transit routes does the route connect to?
Score Description
20-0 Total number of route connections with high frequency transit
257
Table TA 7.13 Detailed Scoring for Transit Project Criteria
(cont’d)
Criteria Description
7. Serves RCP Smart Growth Centers *
Does the route serve existing/planned and/or potential RCP Smart Growth areas?
Transit routes shall receive points for each place type they serve.
Points Place Type
5 Serves existing/planned Metropolitan Center or Urban Center 4 Serves existing/planned Town Center or Special Use Center 3 Serves existing/planned Transit Corridor or Community Center 2 Serves existing/planned Rural Center 1 Serves potential RCP Smart Growth Area
Scores are based upon the total number of these points
Score Description
15-0 Total number of points
8. Cost Effectiveness * What is the annual capital and operating project cost divided by passenger miles?
Calculated as:
((Total annual operating/maintenance subsidy) + (capital project cost /
Project life)) / Passenger miles traveled
Higher ranking projects have a lower cost per passenger-mile traveled.
Score Description
30-0 Total dollar amount per passenger mile traveled
*Criterion denoted with an asterisk were calculated using a quantitative relative score method where the top scoring project received the full number of points for that criterion and the subsequent projects received points relative to the top project score.
258
Table TA 7.14 Transit Criteria Weighting
CRITERIA
GOAL RTP GOALS CRITERIA DESCRIPTION
MAX
SCORE PERCENT
Reliability,
Livability
Serves Congested
Areas
Does the route serve the more
congested corridors in the
region?
10
Livability,
Accessibility,
Mobility
Environmental
Sustainability
Serves Peak-period
Trips
What are the number of trips
within the capture areas of the
transit stations and park and
ride facilities?
10
Efficiency,
Reliability,
Mobility
Provides High
Speed/Reliable
Transit
What is the percentage of the
route located in priority
treatment?
5
Accessibility,
Mobility,
Environmental
Sustainability
Peak Transit
Utilization
What are the morning and
afternoon passenger miles
divided by seat miles?
5
SERVES
TRAVEL
NEEDS
Accessibility,
Mobility,
Environmental
Sustainability
Off-Peak Transit
Utilization
What are the midday and
evening passenger miles
divided by seat miles?
5
35
Reliability,
Livability,
Mobility
Links High-
Frequency Transit
Services
How many other high
frequency (timed transfer
service or 15 minute or higher
frequency) transit routes does
the route connect to?
20
DEVELOPS
NETWORK
INTEGRATION
Livability,
Accessibility,
Environmental
Sustainability
Serves RCP Smart
Growth Areas
Does the route serve
existing/planned and/or
potential RCP Smart Growth
areas?
15
35
COST-
EFFECTIVENESS Efficiency Cost Effectiveness
What is the annual project
capital and operating cost
divided by passenger miles?
30 30
259
Table TA 7.15 Transit Services Evaluation Ranking
YES EAP (Capital) 1 510 Light Rail Blue Line San Ysidro to Santa Fe Depot via Park/C Street 265
YES TransNet 2 15 BRT Mid-City Rapid SDSU to Downtown San Diego via El Cajon Boulevard and Park Boulevard 100
YES TransNet 3 530 Light Rail Green Line Santee to 12th and Imperial via Bayside Alignment 80
YES EAP 4 610 BRT Escondido to Downtown San Diego via I-15 & SR-94 315
YES TransNet 5 680 BRT Otay Mesa to Sorrento Mesa via I-805/I-15/SR-52 820
YES EAP 6 608 BRT Escondido to Downtown San Diego via I-15 & 4th/5th/SR 163 corridor guideway -
7 120 Rapid Bus Downtown San Diego to Kearny Mesa via 4th/5th/SR 163 corridor guideway 866
8 640 BRT San Ysidro to Downtown San Diego and Kearny Mesa via I-5 and 4th/5th/SR 163 corridor guideway 58
YES EAP 9 628 BRT Otay Mesa to Downtown San Diego via I-805/SR 94 420
YES TransNet 10 398 Commuter Rail COASTER Oceanside to Downtown San Diego 2,204
11 10 Rapid Bus La Mesa to Old Town via University Avenue 16
YES EAP (Capital) 12 520 Light Rail Orange Line El Cajon to American Plaza via Park/C Street 150
13 90 Express Bus El Cajon to Downtown San Diego via SR 125, SR 94, and Broadway 9
14 11 Rapid Bus SDSU to Downtown San Diego and Spring Valley via Adams, 1st Street, and National Avenue 61
15 210 BRT Mira Mesa to Downtown San Diego via I-15 and SR 94 15
YES EAP 16 607 BRT Rancho Bernardo to Downtown via I-15 & 4th/5th/SR 163 corridor guideway -
17 2 Rapid Bus North Park to Downtown San Diego via 30th Street and Broadway 7
YES EAP (Capital) 18 570 Light Rail Mid-Coast Trolley from Downtown San Diego to Sorrento Mesa 1,072
19 30 Rapid Bus UTC to Downtown San Diego via La Jolla Village Drive, La Jolla Boulevard, Grand Avenue, and I-5 11
20 955 Rapid Bus SDSU to National City via 54th Street, Euclid Avenue, and Main Street 13
YES TransNet 21 399 Light Rail SPRINTER Oceanside to Westfield North County (Double tracking, Top 4 Grade Separations) 762
22 41 Rapid Bus Fashion Valley to UTC/UCSD via SR 163, Genesee Avenue, and La Jolla Village 12
TransNet 23 472 Rapid Bus Oceanside to UTC via El Camino Real and I-5 52
24 150 BRT Sorrento Mesa to Downtown San Diego via I-5 13
25 13 Rapid Bus National City to Allied Gardens via Euclid and Fairmount 15
YES TransNet 26 470 BRT Riverside County to UTC/UCSD via Carroll Canyon 80
27 690 BRT Otay Ranch to UTC/UCSD via Palomar Street and I-805 14
28 929 Rapid Bus San Ysidro to 8th Street Trolley via 3rd Avenue and Highland 16
29 691 BRT Otay Ranch to Sorrento Mesa via Palomar Street and I-805 15
30 609 BRT Escondido to Kearny Mesa via I-15 54
31 27 Rapid Bus Pacific Beach to Kearny Mesa via Garnet and Balboa Avenue 9
32 660 BRT El Cajon to Kearny Mesa via Cuyamaca and SR 52 18
33 31 Rapid Bus Mira Mesa to UTC/UCSD via Carroll Canyon, Camino Santa Fe, and Miramar Road 8
34 709 Rapid Bus H Street Trolley to Otay Mesa via H Street, Palomar Street, and SR 125 13
35 50 Rapid Bus Bay Park to Kearny Mesa via Clairemont Drive and Clairemont Mesa Boulevard 10
TransNet 36 471 Rapid Bus Oceanside to San Marcos via Highway 101 and Palomar Airport Road 13
37 35 Rapid Bus Old Town to Ocean Beach via Midway Drive, W. Point Loma Blvd., and Cable Street 6
38 692 BRT El Cajon to Otay Mesa via SR 125 15
39 962 Rapid Bus Spring Valley to National City via Jamacha, Paradise Valley Rd and Plaza Boulevard 15
40 936 Rapid Bus 70th Street Trolley to Spring Valley via College Avenue and Skyline Drive 11
41 479 Rapid Bus Oceanside to Palomar Airport via College Avenue and Melrose Drive 13
42 303 Rapid Bus Oceanside to Vista via Mission, SR 76, and North Santa Fe 12
43 620 BRT Otay Border to Imperial Beach via Airway Road, SR 905, and Palm Avenue 157
Capital Costs
(millions)Mode DescriptionRank
Initial Phase in
RC
TransNet and EAP
Route
260
Table TA 7.15 Transit Services Evaluation Ranking
(continued)
Cost Effective-ness
[1]Serves Congested Areas (10%)
[2]Serves Peak Period Trips (10%)
[3]Provides Competitive/Reliable Transit (5%)
[4]Peak Transit Utilization (5%)
[5]Off-Peak Transit Utilization (5%)
[6]Links High Frequency Transit Services (20%)
[7]Serves RCP Smart Growth Areas (15%)
[3]Project Cost-Effective-ness (30%)
187 452 8.1 4.5 5.0 4.6 2.9 10.5 9.1 30.0 74.7
87 187 10.0 5.4 3.5 5.0 5.0 12 9.3 7.0 57.2
208 288 7.8 3.6 5.0 1.7 0.8 10.5 15.0 12.2 56.6
170 485 7.0 5.0 3.6 1.7 2.8 19 9.9 6.9 56.0
154 974 4.0 2.1 3.7 2.5 2.1 20 8.5 7.5 50.3
- - 7.4 10.0 3.6 1.8 0.0 13 9.3 4.1 49.2
13 879 6.3 5.2 4.9 2.9 2.5 14.5 7.4 4.0 47.7
42 100 7.0 6.1 3.6 2.4 0.0 19 5.3 4.2 47.6
65 485 5.0 5.4 3.6 2.5 2.8 14 4.2 8.3 45.9
187 2,391 7.0 5.7 5.0 1.3 0.5 13.5 7.0 5.2 45.1
30 46 8.3 2.5 3.0 2.0 1.5 10.5 12.3 5.0 45.1
153 303 6.1 4.7 5.0 1.1 0.6 9.5 7.8 9.1 44.0
16 25 4.4 8.8 1.5 2.5 0.0 10.5 3.6 12.3 43.6
149 210 7.0 3.6 3.0 1.5 1.6 11.5 8.9 5.5 42.5
39 54 6.9 7.3 3.0 2.1 0.0 11 5.1 6.6 42.0
- - 7.7 9.2 3.8 0.5 0.0 10 7.8 1.0 40.0
35 42 6.6 6.9 3.0 1.4 1.4 9.5 6.1 4.0 38.9
151 1,223 5.5 3.8 5.0 1.3 0.9 12.5 7.2 2.4 38.5
24 35 7.2 5.9 2.1 1.5 0.0 10 6.1 4.6 37.4
53 66 7.9 2.1 3.0 1.7 1.6 7 7.0 5.8 36.0
139 901 6.7 2.2 5.0 1.0 0.6 10.5 6.5 2.0 34.6
60 72 3.4 1.6 2.8 1.3 1.4 11.5 5.5 5.2 32.7
74 126 5.8 1.6 3.0 1.5 0.9 12.5 2.1 4.3 31.8
25 38 4.9 6.1 1.5 1.1 0.0 14.5 2.1 1.6 31.7
55 70 5.1 1.5 3.0 1.2 1.0 9 6.3 4.0 31.1
97 177 6.8 2.5 2.0 0.6 0.0 13.5 4.6 1.1 31.0
33 47 4.7 1.9 3.4 1.4 0.0 12.5 4.4 2.2 30.6
75 91 5.0 2.1 3.0 1.1 0.8 8 7.8 2.8 30.5
34 49 4.5 2.1 3.6 1.4 0.0 11 4.2 2.3 29.1
22 76 7.0 2.0 3.0 0.9 0.0 10 2.1 3.1 28.2
32 41 5.2 1.9 3.0 0.9 0.7 8 4.6 2.4 26.7
44 62 7.1 1.9 3.3 1.2 0.6 6.5 1.9 1.8 24.3
25 33 3.3 2.5 3.0 0.8 0.5 9 2.5 2.4 24.0
32 45 2.6 1.8 3.8 0.7 0.5 7.5 4.4 2.0 23.4
30 40 5.9 1.5 3.0 0.6 0.4 7 2.7 1.4 22.6
63 76 6.6 1.3 3.1 0.6 0.5 5.5 3.0 1.9 22.5
19 25 7.0 2.6 3.0 1.1 0.8 2.5 1.9 2.4 21.3
20 35 1.0 2.3 2.3 0.5 0.0 8.5 5.1 1.0 20.6
48 63 3.9 0.9 3.3 0.9 0.6 6 1.5 2.1 19.0
34 45 2.2 1.8 3.0 0.6 0.6 4 4.6 2.0 18.8
37 50 5.9 1.1 3.0 0.3 0.2 5.5 0.6 1.0 17.6
34 46 4.8 1.4 3.0 0.3 0.3 4.5 2.1 1.1 17.5
63 220 0.9 1.6 1.9 0.7 0.6 6 3.2 1.0 15.9
Total Score
Serves Travel Needs Develops Network Integration
Operating Subsidy
(millions)
Total Costs (millions)
261
RAIL GRADE SEPARATION EVALUATION CRITERIA
The Cities/County Transportation Advisory Committee (CTAC) developed regional rail grade separation prioritization criteria that stress congestion relief, safety and funding needs as the primary elements, with additional consideration of other factors including impacts to pedestrian traffic, bus transit operations, emergency services, truck freight operations and noise.
In preparation for the development of the criteria staff conducted a literature search of other rail grade separation prioritization criteria. These included the California Public Utilities Commission criteria, other states’ criteria, the federal government as well as articles published in research journals. The findings formed the basis for the initial discussions within CTAC.
The intent of the implementation of a regional rail grade separation program is to provide funding for construction of significant traffic congestion relief projects through the implementation of rail grade separations where other more economical alternatives are demonstrably not feasible or practical. Elimination of crossings is considered a potentially practical alternative. Program allocations will need to be considered in conjunction with other regional transportation funding priorities and needs, and will be dependent on the availability of funding from federal, state and local sources.
The rail grade separation prioritization criteria were accepted by the SANDAG Board of Directors for inclusion in the 2030 RTP on October 13, 2008. To date, a regional list of potential grade separations has not been created or prioritized.
Projects will be prioritized based upon two criteria categories: Project Specific Criteria and Regional Housing Needs Assessment (RHNA) Housing Production. The Project Specific Criteria will be worth 75 percent and the RHNA Housing Production criteria will compose 25 percent of the total project score.
Project-Specific Criteria
These criteria take into account existing vehicular and train traffic, accident history, cost, noise, access to emergency services and other factors.
The following criteria and point system will be implemented, with a potential maximum of 100 points. The total Project Specific Criteria score will be multiplied by .75 to produce a scaled 75 point score for the total regional rail grade separation project score.
1. Peak-period Exposure Index (PPEI) factor, measured as the product of the existing high directional traffic and the total measured blocking delay during the same three hours of the day experiencing the highest congestion at the crossing.
MAXIMUM POINTS = 20
PPEI = VT3 x BD3 x C3
262
Where the score is the product of the above formula, rounded to the next whole number, up to a maximum of 20; and, where
VT3 = Vehicular traffic in high direction during selected three hour period BD3 = Total blocking delay during same three hour period selected C3 = 1/1,350,000, a mathematical constant used for the three hour peak-period
calculation
Notes:
a. For crossings where two or more streets that are adjacent to each other that are impacted simultaneously by the operation of the train, the vehicular traffic volume on those streets is cumulative for purposes of the calculation of this congestion relief factor.
b. Selected three hour period consists of three, one-hour periods which may be consecutive. However, the selected three-hour period shall be the same when counting vehicular and train traffic.
c. Blocking delay shall be measured as the time period beginning when the warning devices are activated to the time when the warning devices are de-activated.
Example:
At a crossing, there are 5,400 total cars in the high direction counted between 6:30 a.m. and 7:30 am, 8:00 a.m. and 9:00 a.m. and between 5:00 p.m. and 6:00 p.m., with eight trains per hour during those same hours and 60 seconds delay time per train during those same hours.
VT3 = 5,400 cars in high direction selected three hour period BD3 = 8 trains x 2 directions x 3 hours x 60 second delay = 2,880 PPEI = 5,400 x 2,880 x [1/1,350,000] =11.52
Rounding up to next whole number: PPEI Score = 12
2. Peak Day Total Delay Exposure Index (PDEI) factor, measured as the product of the existing average daily traffic (ADT), the total number of trains, and an average train crossing delay time factor.
MAXIMUM POINTS = 20
PDEI = PD-ADT x PD-NT x ATCDF x PD-C
Where the score is the product of the above formula, rounded to the next whole number, up to a maximum of 20; and, where
PD-ADT = Peak Day Average Daily Traffic PD-NT = Peak Day Total Number of Trains ATCDF = Average Train Crossing Delay Factor, corresponds to point scale as shown in table
below PD-C = 1/1,000,000, a mathematical constant used for peak day period calculation
263
Average Train Crossing Delay Factor (ATCDF) Table
From (minutes) To (minutes) Points
0.00 0.75 1
0.75 1.00 2
1.00 1.25 3
1.25 1.50 4
1.50 2.00 5
2.00 3.00 6
3.00 4.00 7
4.00 6.00 8
6.00 8.00 9
8.00 10.00 10
Notes:
a. For crossings where two or more streets that are adjacent to each other that are impacted simultaneously by the operation of the train, the vehicular traffic volume on those streets is cumulative for purposes of the calculation of this congestion relief factor.
b. Average Annual Daily Traffic can be used for peak day, but ADT for weekday or week-end day may be used as appropriate if available. However, the selected day period shall be the same when counting vehicular and train traffic. As an example, if ADT for weekday is available, the highest train traffic of any day between Monday and Friday can be used for the calculations, and not the week-end day train traffic.
c. Blocking delay shall be measured as the time period beginning when the warning devices are activated to the time when the warning devices are de-activated.
Example:
At a crossing, there is an arterial with an ADT of 30,000 vehicles on weekdays, 144 daily trains in both directions also on weekdays, averaging 55 seconds per crossing.
PDEI = PD-ADT x PD-NT x ATCDF x PD-C PD-ADT` = 30,000 vehicles on weekdays PD-NT = 144 trains in both directions, on weekdays ATCDF = 2 points PDEI = 30,000 x 144 x 2 x [1/1,000,000] = 8.64
3. Rounding up to the next whole number: PDEI Score = 9
4. Accident History: Accident History in the past five years involving vehicles, pedestrians and bicycles with trains, not including accidents involved in attempted suicides.
MAXIMUM POINTS = 20
264
Assign points according to the following schedule
Number of Qualifying Accidents 1 2 3 4 5+
Points 2 4 6 8 10
Increase the number of points for an accident or accidents by 100% when heavy rail is involved.
5. Funding Request: The funding request criterion awards points for amount of funds requested from the program as an equivalent cost benefit criterion by awarding a higher score for those projects that request a lower amount of funds score points are based upon the total request for funds, with a cap of $45 million.
MAXIMUM POINTS = 20
Note: Minimum 10% participation is required.
Assign points according to the following schedule:
Funding Request
($millions)
Points
(Planning-Level Estimate)
Points
(NEPA-Level Estimate)
$0.0 – $15.0 10.0 20.0
$15.1 – $20.0 8.5 17.0
$20.1 – $25.0 7.0 14.0
$25.1 – $30.0 5.5 11.0
$30.1 – $35.0 4.0 8.0
$35.1 – $40.0 2.5 5.0
$40.1 – $45.0 1.0 2.0
NEPA: National Environmental Protection Act
6. Pedestrian Benefits MAXIMUM POINTS = 4
Assign points according to following criteria:
a. Grade separation would serve 1-50 pedestrians during top 4 hours: 1 point
b. Grade separation would serve 51-100 pedestrians during top 4 hours: 2 points
c. Grade separation would serve 101-150 pedestrians during top 4 hours: 3 points
d. Grade separation would serve more than 150 pedestrians during top 4 hours: 4 points
265
7. Bus Operations Impacts MAXIMUM POINTS = 4
Assign points according to following criteria:
a. Grade separation would serve up to four buses an hour: 1 point
b. Grade separation would serve from four to eight buses an hour: 2 points
c. Grade separation would serve from eight to sixteen buses an hour: 3 points
Additional point if the grade crossing is adjacent to a transit center.
8. Noise Reduction MAXIMUM POINTS = 4
Assign points according to following criteria:
a. Rail crossing area located within 200 feet of sensitive receptors: 4 points
b. Rail crossing area located between 200-500 feet of sensitive receptors: 2 points
c. Rail crossing area located more than 500 feet away from sensitive receptors: 0 points
d. Sensitive receptors include: Residential areas, hospital, school, house of worship.
Rail crossing area includes crossing plus 200 feet along track in either direction away from crossing.
9. Benefit to Emergency Services MAXIMUM POINTS = 4
Assign points according to following criteria:
a. Rail crossing located within ½ mile of emergency service provider and no alternate grade-separated crossing exists within ½ mile: 4 points
b. Rail crossing located between ½ and 1 mile of emergency service provider and no alternate grade-separated crossing exists within ½ mile: 2 points
c. Rail crossing located between 1 and 1½ miles of emergency service provider and no alternate grade-separated crossing exists within ½ mile: 1 point
d. Rail crossing located further than 1½ miles of emergency service provider and no alternate grade-separated crossing exists within ½ mile: 0 points
Emergency service providers include services such as police, fire, paramedic, ambulance, and hospital services. Distance is measured as driven distance from crossing.
10. Impact to Truck Freight Operations MAXIMUM POINTS = 4
Assign points according to the following criteria:
a. Rail crossing located between freeway and major truck freight transfer point (200+ trucks per day): 4 points
b. Rail crossing located between freeway and medium sized truck freight transfer point (100-200 trucks per day): 2 points
c. Rail crossing located between freeway and medium sized truck freight transfer point (0-100 trucks per day): 0 points
266
Step 2: Once the projects have been prioritized according to the criteria above, consideration for funding would include the following project readiness elements:
a. Project feasibility (e.g., physical constraints, reliability of cost estimate)
b. Environmental document status
c. Right-of-way acquisition status
d. Permits (e.g., PUC, Coastal Commission, Dep’t of Fish & Game, etc.)
Regional Housing Needs Assessment (RHNA) Criteria
As dictated in SANDAG Board Policy Number 033, rail grade separation projects must include incentive points (a minimum of 25 points out of 100 possible) to be given to projects in jurisdictions in which lower income housing units are being produced in accordance with the housing unit figures contained in Alternative 3 of the Board RHNA Memo.
A prioritized list of regional rail grade separation projects has not been created for the 2030 RTP. When a call for projects is made, local jurisdictions must satisfy the requirements of Board Policy Number 033 in order to be eligible for project funding. The Policy states that prior to January 1, 2007 jurisdictions shall have submitted a draft of its housing element to the state Department of Housing and Community Development
(HCD) or have self-certified its housing element in compliance with state law by the due date for the grant application. As of January 1, 2007, jurisdictions are required to have an adopted housing element (which has been found in compliance with state law by HCD or self-certified). Additionally, those jurisdictions that were not able to identify adequate sites to meet their RHNA goals and were required to include a program in their housing elements to identify additional sites by rezoning must be able to demonstrate that they are making progress toward implementing the rezoning program in conformance with the schedule contained in their housing elements. “Making progress” toward implementing the rezoning program is defined as having demonstrated a good faith effort in undertaking the rezoning program described in the housing element.
Incentive points shall be calculated as follows:
1. The jurisdiction has an adopted housing element (which has been found in compliance with state law by HCD or self-certified): Pass/Fail
2. Percentage of Alternative 3 low/very low income units produced to be calculated as follows: Percentage of allocated low/very low income units x 25 = Incentive Points
Example:
The score is the product of the above formula, rounded to the next whole number, up to a maximum of 25.
267
Example:
Jurisdiction
Alt. 3 – Low-/
Very-Low Income Units*
Annual Number
Year 1
Number Produced
Year 1**
Percentage of Alt. 3
Year 1** Incentive Points**
A 4,322 864 300 35% 9
Jurisdiction
Alt. 3 – Low-/
Very-Low Income Units
Cum. Annual Number
Year 2
Cum. Number
Produced
Year 2**
Percentage of Alt. 3
Cum.
Year 2**
Incentive Points
Year 2**
A 4,322 1,728 400 23% 6
* 7.5 year number in RHNA Alternative 3 may be modified based upon 5-year number included in local housing elements. ** These percentages and numbers are hypothetical for the purpose of explaining the methodology.
REGIONAL RANKING CRITERIA FOR TRANSIT CAPITAL AND REHABILITATION PROJECTS
The regional ranking criteria for transit capital and rehabilitation projects were developed by a committee of staff members from MTS, NCTD, and SANDAG. The proposed criteria are in broad categories to ensure they cover any transit-related funding sources that may become available. The twelve criteria and points assigned to each are described in Tables TA 7.16 and 7.18.
The criteria will be used to evaluate and prioritize the unfunded transit capital and rehabilitation projects for the transit operators in the San Diego region when discretionary funding becomes available, such as through the federal and state legislative processes. The transit operators will provide a list of unfunded projects to SANDAG annually in conjunction with the Capital Improvement Program (CIP) process. When funding becomes available, there will be an opportunity for the agencies to update and revise the list of unfunded projects.
The unfunded project list will be submitted each November/December which would support the annual legislative update in January. The unfunded project list shall include all known transit capital needs that are unfunded for the region. It will comprise a ten-year horizon of capital needs and will identify the state of readiness of each project. When the unfunded list is submitted, the Regional Ranking Criteria for Capital Projects Committee will reconvene to review the project rankings for consensus and consistency among the agencies then provide the final list of unfunded projects to SANDAG.
268
Table TA 7.16 Regional Ranking Criteria for Transit Capital Replacement
and Rehabilitation Projects Definitions
1. Core Transit Assets Beyond Useful Life (Per FTA Definition where available)
Projects replacing vehicles or equipment beyond its useful life will score points with the highest point value given to projects that exceed useful life by 50% or more. The useful life assumption will be provided with the project ranking.
2. Safety
Safety projects that address specific safety hazards within facilities, infrastructure, and the operation of vehicles and equipment identified through on-going system safety management programs, hazard analyses, or similar programs are considered “Major” and would score five points in these categories. Safety projects that enhance the existing safety and security measures are considered moderate and would score three points in these categories.
3. Security
Security projects that address specific, identified security deficiencies in the detection of, or response to, threats to persons, equipment, facilities, or infrastructure from planned acts of violence, life threatening emergencies, or natural disasters identified through formal Threat and Vulnerability Assessments, security audits, or security hazard analysis programs are considered “Major” and would score five points in these categories. Security projects that enhance the existing safety and security measures are considered moderate and would score three points in these categories.
4. Ridership (number of people positively impacted)
Projects would score points based upon the number of people positively impacted by the project with the highest point value given to projects that impact greater than 10 million passengers annually.
5. Type of Service Impacted
Projects would score points in accordance with Yellow, Red, Blue, and Green Route definitions with the highest point value given to projects that support regional services (Yellow Routes).
6. Regulatory Requirement
Projects that help transit properties meet regulatory requirements and legal mandates resulting from the passage of laws, such as the American's with Disabilities Act and state clean air regulations, would score points with the highest point value given to projects where service is subject to elimination.
7. Operating Cost Impact (Annual Savings/Total Cost)*
Operating cost impact would be calculated by dividing the annual savings by the total project cost with the highest point value given to projects with an operating cost impact of 25% or greater. The estimated cost savings will be provided with the project ranking.
269
Table TA 7.16 Regional Ranking Criteria for Transit Capital Replacement
and Rehabilitation Projects Definitions (cont’d)
8. Air Quality
Projects that help transit properties meet CARB Urban Bus and public transit support vehicle fleet rules would score points.
9. Contractual Commitment (i.e., shared-use agreements)
Projects that have contractual commitments would score points. Contractual commitments would be e.g., shared use agreements and FFGA's. Procurement contracts would not receive points for this category.
10. Supports Regional Transportation Plan (RTP)
Projects that support the Regional Transportation Plan would score points.
11. Travel Time Savings
Projects would score points based upon the travel time savings enhancement provided by the project.
12. Project Readiness
Projects would score points based upon how soon it would be ready to initiate the procurement process.
*Formula may be refined as the process progresses
270
Table TA 7.17 Regional Ranking Criteria for Transit Capital Replacement
and Rehabilitation Project
1. Core Transit Assets Beyond Useful Life (per FTA definition where available) Points Weight Total Score
50% beyond end of useful life 5 3 15
35 - 50% beyond the end of useful life 4 12
20 - 35% beyond the end of useful life 3 9
10 - 20% beyond the end of useful life 2 6
Less than 10% beyond end of useful life 1 3
None - new equip/expansion or does not support existing service 0 0
2. Safety Points Weight Total Score
Major 5 3 15
Moderate 3 9
None 0 0
3. Security Points Weight Total Score
Major 5 3 15
Moderate 3 9
None 0 0
4. Ridership (Number of people positively impacted) Points Weight Total Score
Impacts greater than 10 million passengers annually 5 3 15
Impacts 5 to 10 million passengers annually 4 12
Impacts 3 to 5 million passengers annually 3 9
Impacts 1 to 3 million annually 2 6
Impacts less than 1 million annually 1 3
None 0 0
5. Type of Service Impacted Points Weight Total Score
Regional Services (Yellow Routes) – Longer distance travel, 5 3 15
highest speeds with few stops, and oriented around major regional centers
Corridor Services (Red Routes) – Arterial-based inter-around 4 12
community travel, higher speeds with fewer stops, oriented both
community and regional destinations
Local Services (Blue Routes) – Provides basic community 3 9
mobility, community operating speeds with local stops, and provides
community circulation and connections to the regional and corridor
network
Neighborhood Services (Green Routes) – Provides neighborhood 2 6
circulation, network connections, and needed service coverage, and
neighborhood operating speeds with frequent stops.
None 0 0
271
Table TA 7.17 Regional Ranking Criteria for Transit Capital Replacement
and Rehabilitation Project (cont’d)
6. Regulatory Requirement Points Weight Total Score
Subject to service elimination 5 2 10
Subject to service decrease/interruption 4 8
Significant financial impact - fines/loss of funding/remediation costs 3 6
None 0 0
7. Operating Cost Impact (Annual Savings/Total Cost) Points Weight Total Score
Operating Savings greater than 25% 5 2 10
Operating savings 20% - 25% 4 8
Operating savings 15% - 20% 3 6
Operating savings 10% - 15% 2 4
Operating savings less than 10% 1 2
No cost savings or cost increase 0 0
8. Air Quality Points Weight Total Score
Project allows transit property to meet CARB Urban Bus and public 5 2 10
transit support vehicle fleet rules
Contributes to overall air quality in region 3 6
None 0 0
9. Contractual Commitment (e.g., shared-use agreements) Points Weight Total Score
Yes 5 1 5
No 0 0
10. Supports Regional Transportation Plan (RTP)** Points Weight Total Score
Meets five or more RTP Goals 5 1 5
Meets four RTP Goals 4 4
Meets three RTP Goals 3 3
Meets two RTP Goals 2 2
Meets one RTP Goal 1 1
Does not meet any of the RTP goals 0 0
** Mobility, Accessibility, Reliability, Equity, Livability, Sustainability, Efficiency
11. Travel Time Savings Points Weight Total Score
Travel time savings of 15% or greater 5 1 5
Travel time savings of less than 15% 3 3
None 0 0
12 Project Readiness Points Weight Total Score
Ready to initiate procurement within 6 months or less 5 1 5
Ready to initiate procurement within 6 - 12 months 3 3
Ready to initiate procurement within12 months or longer 0 0
Total Possible Score: 125
272
REGIONAL ARTERIAL SYSTEM
The Regional Arterial System constitutes that part of the local street and road network which, in conjunction with the system of highways and transit services, provides for a significant amount of mobility throughout the region. The Regional Arterial System defines roads eligible for SANDAG fund allocation and has been updated for the 2030 RTP. A Regional Arterial System has been included as part of the Regional Transportation Plan (RTP) since 1989.
A total of eight local jurisdictions requested additions and modifications to the Regional Arterial System for the 2030 RTP. Their requests were analyzed based upon revised screening criteria adopted by the Transportation Committee on October 20, 2008. The screening criteria are shown in detail below. Based upon the analysis, 86 arterials have been added or modified to the RAS for the 2030 RTP. These modifications increase the RAS mileage by 185 miles bringing the new Regional Arterial System total mileage to 1,038 miles.
Regional Arterial System Screening Criteria
Regional arterials are longer continuous routes that provide accessibility between communities within the region and which also may allow subregional trips to avoid freeway travel. In order to qualify for the updated RAS, arterials must meet at least one of four approved criteria shown below. The first criterion is that the arterial is already included in the existing RAS. Any additions to the network must meet one of the remaining three criteria:
Provides parallel capacity in high-volume corridors to supplement freeways, state highways, and/or other regional arterials (Corridor).
Provides capacity and a direct connection between freeways or other regional arterials, ensuring continuity of the freeway, state highways, and arterial network throughout the region without duplicating other regional facilities (Cross-corridor).
Provides all or part of the route for existing or planned regional and/or corridor transit service that provides headways of 15 minutes or less during the peak-period.
There are certain design characteristics that can help facilitate regional trip movements on the Regional Arterial System. These characteristics can help to facilitate trip movement and include:
Interconnection and systems management of traffic signals
Raised or striped medians
Limitation and separation of left-turn movements
Limited driveway access and other access controls
Grade separations at rail crossings
Shoulders and bikeways to accommodate bicycle movement
Pedestrian treatments at intersections
Priority traffic signal systems for transit service
Bypass or “queue-jumper” lanes for transit service at critical intersections
Enhanced transit stops
Pedestrian facilities designed according to the Regional Pedestrian Design Guidelines
273
Modern roundabouts and alternate intersection design where appropriate
Freeway interchange modifications in accordance with Caltrans standards
Regional Arterial System projects that have received regional funding programmed in the 2008 Regional Transportation Improvement Program (RTIP) are shown in Table TA 7.18. A complete listing of the Regional Arterial System is provided in Table TA 7.19 and shown in Figure TA 7.1. All freeway interchanges are considered part of the Regional Arterial System.
Table TA 7.18 Regionally Funded Arterial System Projects
SPONSOR ARTERIAL LIMITS/ DESCRIPTION FUNDS
($1,000s)
City of El Cajon Jamacha Road E. Main Street to South City Limit/Widen from four to
six lanes
$490
City of Encinitas Manchester Avenue/
I-5
Lomas Santa Fe Drive to Manchester Avenue/Modify
interchange, widen arterial, and add auxiliary lanes
$2,125
City of Escondido Bear Valley/
East Valley Parkway
Orleans Avenue to North City Limit/Widen from two
to six lanes
$7,969
City of Escondido Nordahl Road/SR 78 Mission Avenue to Montiel Road/Widen arterial and
modify interchange
$300
City of National City Plaza Boulevard Highland Avenue to Euclid Avenue/Widen from four
to six lanes
$2,000
City of Poway Espola Road Twin Peaks Road to Titan Way/Widen from two to
four lanes
$290
City of San Diego Friars Road/SR 163 Fashion Valley Road to Frazee Road/Widen arterial and
modify interchange
$2,252
City of San Diego I-5/Genesee Replace Genesee Avenue Overcrossing $963
City of San Diego El Camino Real Via de la Valle to San Dieguito Road/Widen arterial $2,680
City of Solana Beach Lomas Santa Fe Drive/
I-5
Via De La Valle to Lomas Santa Fe Drive/Modify
interchange, widen arterial, and add auxiliary lanes
$2,525
City of Vista West Vista Way Thunder Drive to Melrose Drive/Widen from two to
four lanes
$990
County of SD South Santa Fe Avenue Montgomery Lane to Smilax Road/Widen from two to
four lanes
$9,200
County of SD SR 67/
Bradley Avenue
Magnolia Avenue to Graves Avenue/Widen arterial
and modify interchange
$750
TOTAL: $32,534
277
Appendix E
NON-CARRYOVER PROJECTS FROM 2008 RTIP
SANDAG has a practice for RTIP project listing wherein the status for each project from the previous RTIP is identified. If a project does not show any funding during the RTIP cycle – for the 2010 RTIP, FY 2011 to FY 2015 – then that project is considered non-active for purposes of programming. However, the sponsor agency may still consider the project active because there are ongoing activities. In order to still show these projects, SANDAG has provided certain status designations as follows for purposes of programming; sponsor agency designations may differ:
Completed: the project opened to traffic or has begun construction; for federally funded projects, the project funding has been obligated; for state funded projects, the funding has been allocated;
Delayed: (1) project is ongoing but using prior year funding, or (2) the agency has determined there are other higher priority projects. Under either scenario, the project may be brought back into the RTIP as appropriate;
Deleted: indicates that the agency has decided to no longer pursue the project and requested the project be deleted from the program.
Certain grouped projects or lump sum projects such as the SHOPP show up as completed in this appendix but the same project titles may show up in Chapter 3 in the current 2010 RTIP. These completed grouped projects represent those projects within the lump sum that are complete while those that are continuing on or any new projects that were added to the lump sum are shown in Chapter 3.
The following list of projects falls under one of the above categories.
Table E-1
San Diego Region (in $000s)2008 Regional Transportation Improvement Program
MPO ID:
Project Title:
CAL42A
Caltrans
ADOPTION: 08-00
COMPLETED
Project Description: At various locations - state highway projects to repair damage caused by natural
disasters, civil unrest, or terrorist acts
Emergency Repair Program
Change Reason: Complete project
Exempt Category: Other - Damage repair caused by unusual disastersCapacity Status: NCI
Est Total Cost: $150
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
SHOPP Emergency Repair $100 $50 $150 $150
TOTAL $150 $100 $50 $150
MPO ID:
Project Title:
CAL46A AMENDMENT: 08-13
COMPLETED
Project Description: Countywide - lump sum for SHOPP mobility projects including operational
improvements, transportation management systems, weigh station, WIM, and 'Go
California' projects
SHOPP Mobility
Change Reason: Complete project
Exempt Category: Safety - Non signalization traffic control and operatingCapacity Status: NCI
Est Total Cost: $57,071
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
AMBER Plan Implementation Assist $400 $400 $400
CBI $1,200 $1,200 $1,200
Minor Program - St Cash $686 $686 $686
SHOPP (AC) $16,466 $9,876 $1,913 $4,957 $23,298 $28,255
SHOPP - State Cash $4,339 $1,280 $248 $949 $4 $4,914 $5,867
SHOPP Augmentation - Mobility $8,350 $8,350 $8,350
SHOPP NHS - Mobility $12,313 $12,313 $12,313
TOTAL $57,071 $34,318 $9,436 $11,156 $2,161 $4 $51,161 $5,906
MPO ID:
Project Title:
CAL46B AMENDMENT: 08-19
COMPLETED
Project Description: Countywide - lump sum for SHOPP collision reduction projects including safety
improvements, collision severity reduction and updating median barriers
SHOPP Collision Reduction
Change Reason: Complete project
Exempt Category: Safety - Guardrails, median barriers, crash cushionsCapacity Status: NCI
Est Total Cost: $60,838
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
SHOPP - State Cash $1,834 $338 $2,373 $2,433 $6,978 $6,978
SHOPP CR-Surface Trans Prgm(AC) $14,157 $2,612 $18,316 $14,557 $49,642 $49,642
SHOPP NHS - Collision Reduction $4,218 $4,218 $4,218
TOTAL $60,838 $15,991 $2,950 $20,689 $21,208 $60,838
Wednesday, September 15, 2010
278
San Diego Region (in $000s)2008 Regional Transportation Improvement Program
MPO ID:
Project Title:
CAL46C
Caltrans
ADOPTION: 08-00
COMPLETED
Project Description: Countywide - lump sum for roadside preservation projects including planting
restoration, freeway maintenance access, roadside enhancement, beautification
and modernization, safety rest area restoration, new safety roadside rest areas
SHOPP Roadside Preservation
Change Reason: Complete project
Exempt Category: Other - Plantings, landscaping, etcCapacity Status: NCI
Est Total Cost: $53,912
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
SHOPP (AC) $13,281 $2,500 $12,832 $1,585 $30,198 $30,198
SHOPP - State Cash $3,992 $324 $1,662 $205 $6,183 $6,183
SHOPP NHS - Roadside Preserv. $17,531 $17,531 $17,531
TOTAL $53,912 $34,804 $2,824 $14,494 $1,790 $53,912
MPO ID:
Project Title:
CAL46D AMENDMENT: 08-19
COMPLETED
Project Description: Countywide - non capacity increase bridge preservation projects including
rehabilitation, scour mitigation, rail replacement and upgrade, seismic
restoration, widening, preservation and transportation permit requirements
SHOPP Bridge Preservation
Change Reason: Complete project
Exempt Category: Safety - Non capacity widening or bridge reconstructionCapacity Status: NCI
Est Total Cost: $31,433
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
SHOPP (AC) $4,974 $14,160 $6,176 $25,310 $25,310
SHOPP - State Cash $1,835 $326 $800 $2,961 $2,961
SHOPP-HBP $644 $2,518 $3,162 $3,162
TOTAL $31,433 $5,618 $15,995 $2,844 $6,976 $31,433
MPO ID:
Project Title:
CAL46E AMENDMENT: 08-27
COMPLETED
Project Description:
RAS (4-5)
Countywide - lump sum for roadway preservation projects including
roadway/pavement rehabilitation, pavement preservation, long-life pavement
rehabilitation, roadway protective betterments, drainage system restoration, signs
and lighting rehabilitation
SHOPP Roadway Preservation
Change Reason: Complete project
Exempt Category: Safety - Pavement resurfacing and/or rehabilitationCapacity Status: NCI
Est Total Cost: $15,741
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
SHOPP (AC) $11,611 $2,325 $1,350 $12,585 $13,935
SHOPP - State Cash $1,504 $301 $175 $1,631 $1,806
TOTAL $15,741 $13,115 $2,626 $14,216 $1,525
Wednesday, September 15, 2010
279
San Diego Region (in $000s)2008 Regional Transportation Improvement Program
MPO ID:
Project Title:
CAL46I
Caltrans
AMENDMENT: 08-25
COMPLETED
Project Description: Various - projects are consistent with 40 CFR Parts 93.126 and 93.127 Exempt
Tables 2 and 3 categories -railroad/highway crossing, safer non-federal-aid
system roads, shoulder improvements, traffic control devices and operating
assistance other than signalization projects, intersection signalization projects at
individual intersections, pavement marking demonstration, truck climbing lanes
outside the urbanized area, lighting improvements, emergency truck pullovers
SHOPP Mandates
Change Reason: Complete project
Exempt Category: Other - Noise attenuationCapacity Status: NCI
Est Total Cost: $77,093
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
SHOPP (AC) $532 $1,272 $10,339 $24,359 $28,170 $210 $64,462 $64,672
SHOPP - State Cash $4,110 $165 $1,340 $3,156 $3,650 $1,624 $10,797 $12,421
TOTAL $77,093 $4,642 $1,437 $11,679 $27,515 $31,820 $75,259 $1,834
MPO ID:
Project Title:
CAL56 ADOPTION: 08-00
DELAYED
Project Description:
EA NO: 07970
PPNO: 0616From US/Mexico Border to San Ysidro Blvd. - on I-5 from US/Mexico Border to San
Ysidro Blvd.; I-5 Modification and Port of Entry Expansion
I-5/805 Port of Entry Expansion
Change Reason: Delay project
Exempt Category: Other - Truck size and weight inspection stationsCapacity Status: NCIRT:5
Est Total Cost: $12,273
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
CBI $2,198 $2,198 $2,198
SHOPP - State Cash $75 $75 $75
TCRP $600 $5,000 $4,400 $5,600 $400 $4,000 $10,000
TOTAL $12,273 $675 $7,198 $4,400 $400 $4,000 $7,873
MPO ID:
Project Title:
CAL69 AMENDMENT: 08-02
COMPLETED
Project Description:
EA NO: 00350
In La Mesa - construct soundwalls
Noise Barrier Program
Change Reason: Complete project
Exempt Category: Other - Noise attenuationCapacity Status: NCI
Est Total Cost: $3,085
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
RSTP $1,311 $177 $252 $882 $1,311
TransNet - H $170 $70 $100 $170
TransNet - MC $120 $978 $506 $794 $810 $1,604
TOTAL $3,085 $1,431 $1,148 $506 $352 $1,692 $1,041
Wednesday, September 15, 2010
280
San Diego Region (in $000s)2008 Regional Transportation Improvement Program
MPO ID:
Project Title:
CAL76
Caltrans
ADOPTION: 08-00
COMPLETED
Project Description: From Mapleview to Dye Road - study future widening of expressway from 2 to 4
lanes
SR 67 Improvements
Change Reason: Complete project
Exempt Category: Other - Engineering studiesCapacity Status: NCIRT:67
Est Total Cost: $500
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
STP $500 $500 $500
TOTAL $500 $500 $500
MPO ID:
Project Title:
CAL78A AMENDMENT: 08-06
COMPLETED
Project Description:
EA NO: 081640
PPNO: 0948
RTP PG NO: A-5
SANDAG ID: 1280506
From SR 54 to E Street - in Chula Vista from 1 km south of Bonita Road
Undercrossing to .3 km south of Sweet River Bridge, construct two southbound
Auxiliary Lanes
Interstate 805 Southbound Auxiliary
Change Reason: Complete project
Exempt Category: Non-ExemptCapacity Status: CIRT:805
Est Total Cost: $19,702 Open to Traffic: Phase 1: Apr 2010
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
SHOPP - State Cash $645 $258 $75 $312 $645
SHOPP NHS - Mobility $5,957 $1,992 $577 $3,388 $5,957
SHOPP-SHM-ARRA $13,100 $13,100 $13,100
TOTAL $19,702 $19,702 $652 $16,800 $2,250
MPO ID:
Project Title:
CAL90 ADOPTION: 08-00
COMPLETED
Project Description:
EA NO: 06380
PPNO: 0187P
RAS (4-15)From Second Street to Greenfield Drive - in El Cajon construct auxiliary lane
eastbound and remove pedestrian overcrossing bridge
I-8 Auxiliary Lane
Change Reason: Complete project
Exempt Category: Non-ExemptCapacity Status: CIRT:8
Est Total Cost: $28,823 Open to Traffic: Phase 1: Nov 2012
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
SHOPP (AC) $25,516 $4,096 $367 $21,053 $25,516
SHOPP - State Cash $3,307 $531 $48 $2,728 $3,307
TOTAL $28,823 $28,823 $415 $23,781 $4,627
Funding was advanced in order to complete project ahead of schedule*
Wednesday, September 15, 2010
281
San Diego Region (in $000s)2008 Regional Transportation Improvement Program
MPO ID:
Project Title:
CAL91
Caltrans
ADOPTION: 08-00
COMPLETED
Project Description:
EA NO: 2T081, 2T082
RTP PG NO: A-5From Citricado Parkway to Valley Parkway - construct north and southbound
auxiliary lanes
SR 15 Citracado to Valley Parkway
Change Reason: Complete project
Exempt Category: Non-ExemptCapacity Status: CIRT:15
Est Total Cost: $25,196 Open to Traffic: Phase 1: Apr 2010
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
SHOPP Prior - National Hwy System $22,306 $4,817 $633 $16,856 $22,306
SHOPP Prior - State Cash $2,890 $624 $82 $2,184 $2,890
TOTAL $25,196 $25,196 $715 $19,040 $5,441
MPO ID:
Project Title:
CAL92 ADOPTION: 08-00
COMPLETED
Project Description: San Ysidro - bicycle parking
Border Bicycle Parking (part of Lump Sum SAN21)
Change Reason: Complete project
Exempt Category: Air Quality - Bicycle and pedestrian facilitiesCapacity Status: NCI
Est Total Cost: $249
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
TransNet - B $249 $249 $249
TOTAL $249 $249 $249
MPO ID:
Project Title:
CAL103 ADOPTION: 08-00
COMPLETED
Project Description: South Grade Road from SR 76 to Canfield Drive/ East Grade Road on Mount
Palomar - rumble strip
High Risk Rural Roads Program
Change Reason: Complete project
Exempt Category: Safety - Pavement marking demonstrationCapacity Status: NCI
Est Total Cost: $144
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
High Risk Rural Road Program $130 $130 $130
Local Funds $14 $14 $14
TOTAL $144 $144 $144
Wednesday, September 15, 2010
282
San Diego Region (in $000s)2008 Regional Transportation Improvement Program
MPO ID:
Project Title:
CAL104
Caltrans
AMENDMENT: 08-01
COMPLETED
Project Description: Various locations - various projects to promote safety around schools including
replacing school signs, installing ADA-compliant pedestrian ramps and bike and
pedestrian trail, et. al.
Safe Routes to School
Change Reason: Complete project
Exempt Category: Air Quality - Bicycle and pedestrian facilitiesCapacity Status: NCI
Est Total Cost: $6,922
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
Local Funds $115 $359 $474 $474
SRTS $2,057 $1,515 $2,354 $522 $6,448 $6,448
TOTAL $6,922 $2,057 $1,630 $2,713 $522 $6,922
MPO ID:
Project Title:
CAL105 AMENDMENT: 08-19
COMPLETED
Project Description: Various locations - lump sum for safety improvement projects including
constructing medians, turn lanes, reconstruct roadway to increase vertical
clearance, installation of pedestrian head, et. al.
Highway Safety Improvement Program
Change Reason: Complete project
Exempt Category: Safety - Safety Improvement ProgramCapacity Status: NCI
Est Total Cost: $10,018
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
HSIP $1,807 $943 $3,137 $2,753 $8,640 $8,640
Local Funds $207 $235 $630 $306 $1,378 $1,378
TOTAL $10,018 $2,014 $1,178 $3,767 $3,059 $10,018
MPO ID:
Project Title:
CAL109 ADOPTION: 08-00
COMPLETED
Project Description: Selected Coaster Stations - provide access to real-time parking availability,
conduct evaluations, analysis of parking strategies and pricing
San Diego Smart Parking Pilot Project
Change Reason: Complete project
Exempt Category: Mass Transit - Construction or renovation of power, signal, and
communications systems
Capacity Status: NCI
Est Total Cost: $800
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
State Cash $53 $107 $160 $160
Value Pricing Program $211 $429 $640 $640
TOTAL $800 $264 $536 $800
Formally SAN69*
Wednesday, September 15, 2010
283
San Diego Region (in $000s)2008 Regional Transportation Improvement Program
MPO ID:
Project Title:
CAL114
Caltrans
ADOPTION: 08-00
DELAYED
Project Description:
EA NO: 17790
RTP PG NO: A-5At I-5/SR 56 interchange - in San Diego, construct freeway to freeway interchange,
associated operational improvements, and the relocation of the fiber optic cable
line
I-5/SR 56 Interchange
Change Reason: Delay project
Exempt Category: Non-ExemptCapacity Status: CIRT:5
Est Total Cost: $95,487 Open to Traffic: Phase 1: Oct 2015
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
CBI $1,942 $1,942 $1,942
DEMO - Sec 115 $1,000 $1,000 $1,000
DEMO - TEA 21 $375 $375 $375
IM $453 $453 $453
Local Funds $879 $579 $300 $879
STP $1,500 $3,000 $3,000 $1,500 $4,500
STP - Sec 112 $400 $400 $400
TOTAL $9,549 $4,696 $4,853 $400 $1,800 $7,349
formally SD88*
MPO ID:
Project Title:
CAL118 AMENDMENT: 08-10
COMPLETED
Project Description: Various non-profit organizations - purchase of modified vans for purposes of
transporting elderly and disabled
FTA Section 5310 Elderly and Disabled Vehicles Support Program
Change Reason: Complete project
Exempt Category: Mass Transit - Purchase of office, shop and operating equipment for
existing facilities
Capacity Status: NCI
Est Total Cost: $987
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
FTA 5310 $874 $874 $874
Local Funds $113 $113 $113
TOTAL $987 $987 $987
MPO ID:
Project Title:
CAL119 AMENDMENT: 08-13
COMPLETED
Project Description:
EA NO: 402900
PPNO: 0988
From San Luis Rey River Bridge to Riverside County Line - near Pala Mesa
Village and Rainbow Tree Planting
Fallbrook Tree Planting, State Transportation Enhancement (TE) Projects
Change Reason: Complete project
Exempt Category: Other - Plantings, landscaping, etcCapacity Status: NCI
Est Total Cost: $625
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
STIP-IIP STP TE $625 $625 $625
TOTAL $625 $625 $625
Wednesday, September 15, 2010
284
San Diego Region (in $000s)2008 Regional Transportation Improvement Program
MPO ID:
Project Title:
CAL121
Caltrans
AMENDMENT: 08-15
COMPLETED
Project Description:
EA NO: 07980, 2M070, 2M080,
2M090Countywide - lump sum for Highway Maintenance projects
Highway Maintenance
Change Reason: Complete project
Exempt Category: Other - Non construction related activitiesCapacity Status: NCI
Est Total Cost: $24,857
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
Highway Maintenance - NHS $22,006 $22,006 $22,006
Highway Maintenance - State Cash $2,851 $2,851 $2,851
TOTAL $24,857 $24,857 $24,857
Wednesday, September 15, 2010
285
San Diego Region (in $000s)2008 Regional Transportation Improvement Program
MPO ID:
Project Title:
CB12
Carlsbad, City of
ADOPTION: 08-00
DELAYED
Project Description:
RTP PG NO: A-6
RAS (TA 7-43)College Boulevard from Badger Lane to Cannon Road - in Carlsbad, from Badger
Lane to Cannon Road, construct a new segment of College Blvd. to provide
4-lane roadway with raised median, bike lanes and sidewalks/trails in
accordance with Major Arterial standards.
College Boulevard Reach A
Change Reason: Delay project
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $11,952 Open to Traffic: Phase 1: Dec 2012
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
Local Funds $3,731 $8,221 $2,774 $9,178 $11,952
TOTAL $11,952 $3,731 $8,221 $9,178 $2,774
MPO ID:
Project Title:
CB23 AMENDMENT: 08-15
COMPLETED
Project Description:
RAS (TA 7-43)
Palomar Airport Road from Armada Drive to Paseo Del Norte - in Carlsbad,
provide four through lanes and a right turn lane onto northbound Paseo Del Norte
Palomar Airport Road - Armada Drive to Paseo Del Norte
Change Reason: Complete project
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $1,676 Open to Traffic: Phase 1: Jun 2010
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
Local Funds $1,676 $185 $1,491 $1,676
TOTAL $1,676 $1,676 $1,491 $185
MPO ID:
Project Title:
CB25 ADOPTION: 08-00
COMPLETED
Project Description:
RTP PG NO: A-6
RAS (TA 7-43)Palomar Airport Road from Palomar Airport Road to Melrose Drive - in Carlsbad,
at the intersection of Palomar Airport Road and Melrose, widen eastbound
Palomar Airport Road to create a right turn lane to southbound Melrose Drive
Palomar Airport Road to Southbound Melrose Drive
Change Reason: Complete project
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $254 Open to Traffic: Phase 1: Jan 2011
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
Local Funds $253 $253 $253
TOTAL $253 $253 $253
Wednesday, September 15, 2010
286
San Diego Region (in $000s)2008 Regional Transportation Improvement Program
MPO ID:
Project Title:
CB27
Carlsbad, City of
ADOPTION: 08-00
COMPLETED
Project Description:
RAS (TA 7-43)
On Melrose Drive - in Carlsbad, Palomar Airport Road southerly 1000' to align with
Melrose Drive north of Palomar Airport Road, widen Melrose Drive to provide three
through lanes southbound and four through lanes northbound with dual left turn
lanes and a right turn lane northbound
Melrose Drive widening south of Palomar Airport Road
Change Reason: Complete project
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $700 Open to Traffic: Phase 1: Mar 2009
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
Local Funds $700 $700 $700
TOTAL $700 $700 $700
MPO ID:
Project Title:
CB28 ADOPTION: 08-00
COMPLETED
Project Description: Various bridge locations throughout the City - in Carlsbad, prepare a
comprehensive list of preventive maintenance activities for each bridge, as
defined by Caltrans
Carlsbad Bridge Preventive Maintenance Program
Change Reason: Complete project
Exempt Category: Safety - Non capacity widening or bridge reconstructionCapacity Status: NCI
Est Total Cost: $36
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
Local Funds $36 $36 $36
TOTAL $36 $36 $36
Wednesday, September 15, 2010
287
San Diego Region (in $000s)2008 Regional Transportation Improvement Program
MPO ID:
Project Title:
CHV25
Chula Vista, City of
AMENDMENT: 08-13
COMPLETED
Project Description: Fourth Ave. from L Street to Orange Ave. - New curb, gutter and sidewalk to be
constructed on Fourth Ave. between L Street and Orange Avenue.
Fourth Avenue Sidewalk Improvements (part of Lump Sum SAN21)
Change Reason: Complete project
Exempt Category: Air Quality - Bicycle and pedestrian facilitiesCapacity Status: NCI
Est Total Cost: $334
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
TDA - Bicycles $99 $99 $99
TransNet - L (Cash) $235 $235 $235
TOTAL $334 $99 $235 $334
MPO ID:
Project Title:
CHV27 ADOPTION: 08-00
COMPLETED
Project Description: Bay Blvd. from E Street to F Street - bike path improvements
Bay Blvd. E St. to F St (part of Lump Sum SAN21)
Change Reason: Complete project
Exempt Category: Air Quality - Bicycle and pedestrian facilitiesCapacity Status: NCI
Est Total Cost: $112
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
TDA - Bicycles $55 $55 $55
TransNet - B $57 $57 $57
TOTAL $112 $112 $112
MPO ID:
Project Title:
CHV37 ADOPTION: 08-00
COMPLETED
Project Description: TransNet - LSI: CRPalomar Street from Frontage Road to approximately 200 beyond Industrial Blvd.;
approximately 200 feet north of Palomar Street to ADA Street - street and
pedestrian improvements to Palomar transit station and its environs; includes
parkways, medians, bicycle lanes, bus stop, traffic circle roundabout, sidewalk
construction (this program augments V04)
Palomar Gateway Community Transit Area
Change Reason: Complete project
Exempt Category: Air Quality - Bicycle and pedestrian facilitiesCapacity Status: NCI
Est Total Cost: $1,075
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
Local Funds $875 $820 $30 $25 $875
TransNet - LSI $200 $100 $100 $200
TOTAL $1,075 $1,075 $30 $125 $920
Wednesday, September 15, 2010
288
San Diego Region (in $000s)2008 Regional Transportation Improvement Program
MPO ID:
Project Title:
CHV38
Chula Vista, City of
ADOPTION: 08-00
COMPLETED
Project Description: Hilltop Drive at Quintard St., I Street, J Street and ped crossing near Kingswood
Drive; Fourth Ave. at Anita St. and Palomar St.; Broadway at Flower St.; Fifth Ave. at
E St. and Palomar St.; First Ave. at E Street; Second Ave. at Orange Ave. and
Palomar St. - Upgrading of pedestrian crossing signals at 12 intersections that
serve schools in western Chula Vista
12 Schools Pedestrian Improvements (part of Lump Sum SAN21)
Change Reason: Complete project
Exempt Category: Air Quality - Bicycle and pedestrian facilitiesCapacity Status: NCI
Est Total Cost: $114
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
Local Funds $35 $35 $35
TDA - Bicycles $79 $79 $79
TOTAL $114 $79 $35 $114
MPO ID:
Project Title:
CHV50 AMENDMENT: 08-13
COMPLETED
Project Description: 882 Helix Ave., 106 El Capitan Court, 1188 Neptune Court, 1526 Grand Teton
Court, Rancho Road near the Poggi Canyon Channel. - emergency storm drain
repairs due to pipe failure at three locations in addition to a sinkhole at 1526
Grand Teton Court; the pipe at Rancho Road near the Poggi Canyon Channel
needs to be repaired before the next storm season; pipe at all locations receive
street drainage and repairs are needed to maintain safe travel conditions. If
funds remain, other urgent locations that meet these criteria may be added.
Emergency Storm Drain Repair
Change Reason: Complete project
Exempt Category: Safety - Safer non-Federal-aid system roadsCapacity Status: NCI
Est Total Cost: $1,200
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
TransNet - L (Cash) $1,200 $1,200 $1,200
TOTAL $1,200 $1,200 $1,200
Wednesday, September 15, 2010
289
San Diego Region (in $000s)2008 Regional Transportation Improvement Program
MPO ID:
Project Title:
COR08
Coronado, City of
ADOPTION: 08-00
COMPLETED
Project Description: From Orange Ave to Third Street - extend a single left turn lane for southbound
Orange Avenue from the existing location approximately mid-block to Third Street
providing a continuous left turn lane for southbound traffic for the entire length of
the block (from Third to Fourth Street)
Orange Avenue Extended Left Hand Turn Lane (300 block)
Change Reason: Complete project
Exempt Category: Other - Intersection channelization projectsCapacity Status: NCI
Est Total Cost: $145
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
Toll - Managed Lanes $145 $20 $125 $145
TOTAL $145 $145 $125 $20
MPO ID:
Project Title:
COR09 ADOPTION: 08-00
COMPLETED
Project Description: Tenth Street between C and Orange Avenues, Along C Avenue between Eighth
Street and Tenth Street, Along Sixth Street between C and Orange Avenues - will
install storm drain lines and catch basins to reduce the number of times the area
floods during minor (ten year storm events)
Sixth and Orange Drainage Improvements
Change Reason: Complete project
Exempt Category: Other - Plantings, landscaping, etcCapacity Status: NCIRT:75
Est Total Cost: $975
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
Local Funds $526 $130 $126 $530 $656
Toll - Managed Lanes $4 $220 $64 $160 $224
TransNet - L $95 $95 $95
TOTAL $975 $530 $445 $785 $190
MPO ID:
Project Title:
COR10 AMENDMENT: 08-13
DELAYED
Project Description: Study of various locations in Coronado - Bicycle Master Plan
BMP-Coronado (part of Lump Sum SAN21)
Change Reason: Delay project
Exempt Category: Air Quality - Bicycle and pedestrian facilitiesCapacity Status: NCI
Est Total Cost: $75
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
TDA - Bicycles $75 $75 $75
TOTAL $75 $75 $75
Wednesday, September 15, 2010
290
San Diego Region (in $000s)2008 Regional Transportation Improvement Program
MPO ID:
Project Title:
EL16
El Cajon, City of
ADOPTION: 08-00
COMPLETED
Project Description: citywide - Bicycle plan
Master Bicycle Plan (part of Lump Sum SAN21)
Change Reason: Complete project
Exempt Category: Air Quality - Bicycle and pedestrian facilitiesCapacity Status: NCI
Est Total Cost: $150
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
TDA - Bicycles $150 $150 $150
TOTAL $150 $150 $150
MPO ID:
Project Title:
EL17 ADOPTION: 08-00
COMPLETED
Project Description: Citywide - provide for the inspection, ranking and GIS database for the city's
pavement inventory and provide a management program to efficiently manage its
pavement infrastructure needs
Pavement Management System
Change Reason: Complete project
Exempt Category: Other - Engineering studiesCapacity Status: NCI
Est Total Cost: $300
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
TransNet - L (Cash) $300 $300 $300
TOTAL $300 $300 $300
MPO ID:
Project Title:
EL19 ADOPTION: 08-00
DELETED
Project Description: TransNet - LSI: CRIn the Fletcher Hills area: Chatham St., Hacienda Dr., Dryden Rd., and Garfield
Ave. - installation of pedestrian ramps to meet ADA regulations
Pedestrian Ramp Project - Various Locations
Change Reason: Delete project
Exempt Category: Air Quality - Bicycle and pedestrian facilitiesCapacity Status: NCI
Est Total Cost: $0
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
TransNet - LSI $0
TOTAL
MPO ID:
Project Title:
EL22 AMENDMENT: 08-12
COMPLETED
Project Description: TransNet - LSI: CRChase Avenue from Magnolia Avenue to Easterly City Limit - final pavement
surfacing utilizing rubberized asphalt pavement
Chase Avenue Reconstruction
Change Reason: Complete project
Exempt Category: Safety - Pavement resurfacing and/or rehabilitationCapacity Status: NCI
Est Total Cost: $1,300
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
TransNet - LSI $1,300 $150 $1,150 $1,300
TOTAL $1,300 $1,300 $1,150 $150
Wednesday, September 15, 2010
291
San Diego Region (in $000s)2008 Regional Transportation Improvement Program
MPO ID:
Project Title:
ENC40
Encinitas, City of
AMENDMENT: 08-19
COMPLETED
Project Description: TransNet - LSI: CRLeucadia Blvd. from Interstate 5 to Coast Hwy. 101 - Install curbs, sidewalks, bike
lanes and minor reconstruction including one modern roundabout.
Improvements include: construction of a modern roundabout at Hymettus and
Hermes Avenue(s); street improvements of curb, gutter, sidewalk, and
landscaping from Hermes to Vulcan; construction of left-hand turn pockets on
Vulcan and an asphalt pathway on the north side of Leucadia in any missing
sidewalk links
Leucadia Boulevard Improvements (I-5 to Vulcan Avenue)
Change Reason: Complete project
Exempt Category: Safety - Pavement resurfacing and/or rehabilitationCapacity Status: NCI
Est Total Cost: $2,822
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
Local Funds $72 $72 $72
TDA - Bicycles $179 $179 $179
TransNet - L (Cash) $2,394 $2,394 $2,394
TransNet - L Carry Over $177 $177 $177
TOTAL $2,822 $2,573 $72 $177 $2,822
MPO ID:
Project Title:
ENC42 ADOPTION: 08-00
COMPLETED
Project Description: Citywide - develop a pavement maintenance schedule to set priorities for streets
to be paved within the next several fiscal years
Pavement Management Plan
Change Reason: Complete project
Exempt Category: Other - Engineering studiesCapacity Status: NCI
Est Total Cost: $100
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
TransNet - L $100 $100 $100
TOTAL $100 $100 $100
MPO ID:
Project Title:
ENC43 AMENDMENT: 08-01
COMPLETED
Project Description: 3000 Block of from Lone Jack Road to Camino del Rancho - provide trail link
between two existing trails - Brookside Trail and Trail 93 - consisting of a 380
linear foot non-motorized, recreational/all-purpose trail; will eliminate equestrian
shortcutting along private property and further progress on the City’s Trails Master
Plan.
Encinitas Recreational Trail
Change Reason: Complete project
Exempt Category: Air Quality - Bicycle and pedestrian facilitiesCapacity Status: NCI
Est Total Cost: $37
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
Local Funds $4 $4 $4
RTP $33 $33 $33
TOTAL $37 $37 $37
Wednesday, September 15, 2010
292
San Diego Region (in $000s)2008 Regional Transportation Improvement Program
MPO ID:
Project Title:
ESC02
Escondido, City of
AMENDMENT: 08-13
DELAYED
Project Description:
RAS (TA 7-44)
TransNet - LSI: CRBear Valley/East Valley from Citrus Avenue to Beven Drive - realignment and
widening from 2 to 4 lanes
Bear Valley/East Valley/Valley Center
Change Reason: Delay project
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $10,700 Open to Traffic: Phase 1: Jul 2010
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
Local Funds $2,431 $229 $802 $1,400 $2,431
RSTP $7,969 $1,771 $6,198 $7,969
TransNet - LSI $300 $300 $300
TOTAL $10,700 $10,400 $300 $7,000 $1,700 $2,000
MPO ID:
Project Title:
ESC23 ADOPTION: 08-00
COMPLETED
Project Description: At the intersections of Valley Parkway/Maple Street and Second Avenue/Maple
Street - construct two new traffic signals
Valley/Maple and 2nd/Maple Traffic Signals
Change Reason: Complete project
Exempt Category: Other - Intersection signalization projectsCapacity Status: NCI
Est Total Cost: $874
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
Local Funds $74 $15 $59 $74
TransNet - L $400 $400 $400
TransNet - L (Cash) $400 $400 $400
TOTAL $874 $474 $400 $859 $15
MPO ID:
Project Title:
ESC29 ADOPTION: 08-00
DELAYED
Project Description: Citracado from I-15 to West Valley Pkwy - environmental and preliminary
engineering, designated in the General Plan as a Major Road, 102-ft Right-of-way,
82-ft curb to curb
Citracado Parkway I-15 to West Valley Parkway,
Change Reason: Delay project
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $1,396 Open to Traffic: Phase 1: Nov 2014
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
TCSP $245 $245 $245
TransNet - L (Cash) $581 $570 $1,151 $1,151
TOTAL $1,396 $581 $570 $245 $1,396
Wednesday, September 15, 2010
293
San Diego Region (in $000s)2008 Regional Transportation Improvement Program
MPO ID:
Project Title:
ESC31
Escondido, City of
ADOPTION: 08-00
COMPLETED
Project Description: Across Lake Hodges - construction of a bicycle and pedestrian bridge across
Lake Hodges on the west side of I-15
Lake Hodges Bicycle and Pedestrian Bridge
Change Reason: Complete project
Exempt Category: Air Quality - Bicycle and pedestrian facilitiesCapacity Status: NCI
Est Total Cost: $1,875
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
TDA - Bicycles $1,696 $1,696 $1,696
TransNet - BPNS $179 $179 $179
TOTAL $1,875 $1,875 $1,875
project being implemented by the San Dieguito River Park*
MPO ID:
Project Title:
ESC32 AMENDMENT: 08-13
COMPLETED
Project Description: Escondido Transit Center Bridge over Creek Channel; Ash Street (SR78);
Escondido Creek Path from Broadway to Ash - 3 bike projects from FY10
allocation
Escondido Creek Bike Path (ESBP)/Ash Street Undercrossing/ECBP Lighting and
Restriping (part of Lump Sum SAN21)
Change Reason: Complete project
Exempt Category: Air Quality - Bicycle and pedestrian facilitiesCapacity Status: NCI
Est Total Cost: $1,139
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
TransNet - BPNS $1,139 $1,139 $1,139
TOTAL $1,139 $1,139 $1,139
Wednesday, September 15, 2010
294
San Diego Region (in $000s)2008 Regional Transportation Improvement Program
MPO ID:
Project Title:
IB10
Imperial Beach, City of
ADOPTION: 08-00
COMPLETED
Project Description: Palm Ave Between Seacoast Drive and 3rd Street - widened/upgraded sidewalks
and crosswalks, improved landscaping, street furnishing and signage, traffic
claming features
Old Palm Ave. Streetscape improvement (part of Lump Sum V04)
Change Reason: Complete project
Exempt Category: Safety - Pavement resurfacing and/or rehabilitationCapacity Status: NCI
Est Total Cost: $0
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
TOTAL
Wednesday, September 15, 2010
295
San Diego Region (in $000s)2008 Regional Transportation Improvement Program
MPO ID:
Project Title:
LAM16
La Mesa, City of
AMENDMENT: 08-02
COMPLETED
Project Description: University Avenue/Yale Avenue - pedestrian enhancements
University Avenue/Yale Avenue Pedestrian Enhancements (part of Lump Sum
SAN21)
Change Reason: Complete project
Exempt Category: Air Quality - Bicycle and pedestrian facilitiesCapacity Status: NCI
Est Total Cost: $218
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
TDA - Bicycles $208 $10 $218 $218
TOTAL $218 $208 $10 $218
Wednesday, September 15, 2010
296
San Diego Region (in $000s)2008 Regional Transportation Improvement Program
MPO ID:
Project Title:
NC07
National City, City of
ADOPTION: 08-00
COMPLETED
Project Description: National City Blvd. from 6th. St. to 2nd St. - reahbilitation of 6 1/2 block are of
National City Blvd., including replacement of sidewalks, installation of decorative
street lights, trees, tree grates, shrubbery and bus benches
National City Blvd Sidewalk and Street Lighting Improvement Project (part of Lump
Sum V04)
Change Reason: Complete project
Exempt Category: Other - Transportation enhancement activitiesCapacity Status: NCI
Est Total Cost: $0
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
TOTAL
Wednesday, September 15, 2010
297
San Diego Region (in $000s)2008 Regional Transportation Improvement Program
MPO ID:
Project Title:
NCTD07
North County Transit District
AMENDMENT: 08-20
DELAYED
Project Description: NCTD service area - upgrade bus shelters & bus stops
Fixed Route - Bus Shelters & Stops
Change Reason: Delay project
Exempt Category: Mass Transit - Construction of small passenger shelters and
information kiosks
Capacity Status: NCI
Est Total Cost: $1,634
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
FTA 5307 $216 $160 $376 $376
FTA 5316 - JARC $736 $100 $636 $736
FTA Funds - AR-5307 $245 $245 $245
Local Funds $237 $40 $25 $252 $277
TOTAL $1,634 $1,189 $445 $1,509 $125
MPO ID:
Project Title:
NCTD16 AMENDMENT: 08-01
COMPLETED
Project Description:
EA NO: R599FB
PPNO: 8192AFrom Oceanside to Escondido - design & construct 22 mile light rail (Sprinter)
including 15 stations and maintenance facility
Oceanside-Escondido Rail Project
Change Reason: Complete project
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $366,445
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
CMAQ $4,900 $4,900 $4,900
FTA 5309 (NS) $152,100 $7,930 $2,097 $142,073 $152,100
HBRR $61 $61 $61
Local Funds $14,623 $14,623 $14,623
PTMISEA (Prop1B) $8,603 $8,603 $8,603
Prop. 108 $17,615 $17,615 $17,615
STIP-GF RIP State Cash $6,600 $3,600 $3,000 $6,600
TCRP $80,000 $80,000 $80,000
TransNet - MC $34,000 $7,235 $41,235 $41,235
TransNet - Transit $40,708 $40,708 $40,708
TOTAL $366,445 $325,210 $34,000 $7,235 $19,712 $335,203 $11,530
MPO ID:
Project Title:
NCTD115 ADOPTION: 08-00
COMPLETED
Project Description: NCTD service area - Transit Center Bike parking
Transit Center Bike Parking (part of Lump Sum SAN21)
Change Reason: Complete project
Exempt Category: Air Quality - Bicycle and pedestrian facilitiesCapacity Status: NCI
Est Total Cost: $121
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
TransNet - B $121 $121 $121
TOTAL $121 $121 $121
Wednesday, September 15, 2010
298
San Diego Region (in $000s)2008 Regional Transportation Improvement Program
MPO ID:
Project Title:
O08
Oceanside, City of
AMENDMENT: 08-16
DELETED
Project Description:
RAS (TA 7-45)
College Boulevard from Plaza Drive to Lake Boulevard - In Oceanside, reconstruct
box culvert of College Blvd over Buena Vista Creek to raise the highway above the
flood level
College Boulevard Raising
Change Reason: Delete project
Exempt Category: Other - Plantings, landscaping, etcCapacity Status: NCI
Est Total Cost: $300
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
TransNet - L $300 $300 $300
TOTAL $300 $300 $300
MPO ID:
Project Title:
O12 ADOPTION: 08-00
DELETED
Project Description: Pala Road from Foussat Road to Los Arbolitos Blvd - future construction of 4-lane
arterial
Pala Road Extension
Change Reason: Delete project
Exempt Category: Other - Engineering studiesCapacity Status: NCI
Est Total Cost: $470
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
Local Funds $370 $370 $370
TransNet - L $100 $100 $100
TOTAL $470 $100 $370 $470
MPO ID:
Project Title:
O16 ADOPTION: 08-00
COMPLETED
Project Description: master planning study for all of Oceanside - Completion of bicycle master plan
Oceanside Pedestrian Master Plan (part of Lump Sum SAN21)
Change Reason: Complete project
Exempt Category: Air Quality - Bicycle and pedestrian facilitiesCapacity Status: NCI
Est Total Cost: $275
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
TDA - Bicycles $275 $275 $275
TOTAL $275 $275 $275
MPO ID:
Project Title:
O19 ADOPTION: 08-00
COMPLETED
Project Description: various throughout Oceanside - door-to-door transportation service to seniors
over 65 years of age living within Oceanside
Oceanside Senior Shuttle Program (part of Lump Sum SAN58)
Change Reason: Complete project
Exempt Category: Mass Transit - Transit operating assistanceCapacity Status: NCI
Est Total Cost: $96
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
FTA 5317 - NF $23 $23 $23
Local Funds $23 $50 $73 $73
TOTAL $96 $46 $50 $96
Wednesday, September 15, 2010
299
San Diego Region (in $000s)2008 Regional Transportation Improvement Program
MPO ID:
Project Title:
POW01A
Poway, City of
AMENDMENT: 08-10
COMPLETED
Project Description: TransNet - LSI: CRPomerado Road from Stowe Drive to Old Pomerado Road and Bowron Road from
Civic Center Drive to southern terminius (FY 2009). - In Poway, city wide, on an
annual basis provide rehabilitation of existing streets with an overlay of asphalt
concrete 1" or greater. Locations will be updated on an annual or semi-annual
basis as re-construction limits are identified.
City Wide Major Reconstruction
Change Reason: Complete project
Exempt Category: Safety - Pavement resurfacing and/or rehabilitationCapacity Status: NCI
Est Total Cost: $4,834
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
Local Funds $780 $780 $780
TransNet - L $3,108 $3,108 $3,108
TransNet - LSI $946 $946 $946
TOTAL $4,834 $3,108 $1,726 $4,834
MPO ID:
Project Title:
POW03 ADOPTION: 08-00
COMPLETED
Project Description:
RAS (114)
Pomerado Road from Creek Road to Bernardo Hights Pkwy - in Poway, upgrade
signal system, QuikNet4, to a responsive system, install traffic data stations and
provide wireless communication between data stations and signal controllers
which will provide additional traffic flow capacity on Pomerado Road through
changes in coordination timing plans during peak periods (responsive). The
traffic data stations will also provide arterial traffic data to the region RAMS and
I-15 ICM systems and potentially commuters in the area
Pomerado Road Signal Responsive System
Change Reason: Complete project
Exempt Category: Other - Traffic signal synchronization projectsCapacity Status: NCI
Est Total Cost: $589
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
Local Funds $489 $489 $489
TransNet - L (Cash) $100 $50 $50 $100
TOTAL $589 $100 $489 $539 $50
MPO ID:
Project Title:
POW04 AMENDMENT: 08-10
COMPLETED
Project Description: TransNet - LSI: MaintCitywide from Zone 1 to Zone 8 - In Poway, city wide, maintenance of local streets
consisting of slurry seal, patching and other various forms of treatment to
rehabilitate and extend the service life of the existing pavement.
City Wide Street Maintenance
Change Reason: Complete project
Exempt Category: Safety - Pavement resurfacing and/or rehabilitationCapacity Status: NCI
Est Total Cost: $2,429
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
Local Funds $800 $800 $1,600 $1,600
TransNet - LSI $406 $423 $829 $829
TOTAL $2,429 $1,206 $1,223 $2,429
Wednesday, September 15, 2010
300
San Diego Region (in $000s)2008 Regional Transportation Improvement Program
MPO ID:
Project Title:
POW05
Poway, City of
AMENDMENT: 08-10
COMPLETED
Project Description: TransNet - LSI: CRPoway Road from Espola Road to SR 67 - In Poway, reconstruction and
rehabilitation of Poway Road consisting of removal and reconstruction of failed
pavement sections and overlay between Esploa Road and SR 67.
Poway Road Pavement Reconstruction
Change Reason: Complete project
Exempt Category: Safety - Pavement resurfacing and/or rehabilitationCapacity Status: NCI
Est Total Cost: $1,487
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
Local Funds $500 $500 $500
TransNet - LSI $987 $987 $987
TOTAL $1,487 $1,487 $1,487
Wednesday, September 15, 2010
301
San Diego Region (in $000s)2008 Regional Transportation Improvement Program
MPO ID:
Project Title:
SAN22
San Diego Association of Governments
ADOPTION: 08-00
COMPLETED
Project Description:
SANDAG ID: 1145700
Regionwide - design, procure, and install fare collection system for transit
operators in the county
Regional Fare Technology
Change Reason: Complete project
Exempt Category: Mass Transit - Purchase of vehicle operating equipmentCapacity Status: NCI
Est Total Cost: $47,800
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
FTA 5307 $18,620 $18,620 $18,620
Local Funds $1,580 $1,580 $1,580
STIP-RIP (AB3090) $19,500 $19,500 $19,500
STIP-RIP State Cash $800 $800 $800
TransNet - MC $4,359 $1,344 $1,597 $7,300 $7,300
TOTAL $47,800 $44,859 $1,344 $1,597 $47,800
STIP-TransNet swap*
MPO ID:
Project Title:
SAN31 AMENDMENT: 08-13
COMPLETED
Project Description:
PPNO: 1142300
Escondido at Washington and Centre City - improvements to maintenance facility
including electronic gates, surveillance systems, video cameras, security
Escondido Maintenance Facility
Change Reason: Complete project
Exempt Category: Mass Transit - Const of new bus or rail storage/maint facilities excluded
in 23 CFR part 771
Capacity Status: NCI
Est Total Cost: $7,544
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
FTA 5307 $3,183 $411 $2,772 $3,183
FTA 5309 (Bus) $681 $222 $902 $902
Local Funds $1,171 $55 $107 $1,120 $1,227
TransNet - MC $1,983 $249 $2,232 $2,232
TOTAL $7,544 $5,035 $2,260 $249 $7,026 $518
STIP-TransNet swap*
MPO ID:
Project Title:
SAN39 AMENDMENT: 08-25
DELAYED
Project Description:
SANDAG ID: 1142000
MTS service area - cantenary improvements, substation standardization, and
improvements related to fixed guideway electrification and power distribution.
Transportation Development Credit of $981,175 will used used to match FY10
federal funds for the construction phase
Rail Electrification & Power Distribution 125-00
Change Reason: Delay project
Exempt Category: Mass Transit - Track rehabilitation in existing right of wayCapacity Status: NCI
Est Total Cost: $20,498
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
FTA 5307 $640 $300 $3,925 $4,865 $4,865
FTA 5309 (FG) $2,682 $2,682 $2,682
FTA Funds - AR-5307 $12,000 $12,000 $12,000
Local Funds $876 $75 $951 $951
TOTAL $20,498 $4,198 $12,375 $3,925 $20,498
Wednesday, September 15, 2010
302
San Diego Region (in $000s)2008 Regional Transportation Improvement Program
MPO ID:
Project Title:
SAN41
San Diego Association of Governments
AMENDMENT: 08-11
COMPLETED
Project Description:
PPNO: 2006
From Stuart Mesa to Fallbrook Passing Track - Near Oceanside - within the
boundaries of Pendleton USMC Base at the Santa Margarita River - replace
bridge and construct double track to Stuart Mesa and Fallbrook passing tracks
Replace Santa Margarita Bridge
Change Reason: Complete project
Exempt Category: Mass Transit - Reconstruction or renovation of transit structuresCapacity Status: NCI
Est Total Cost: $42,700
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
STIP-IIP PTA $987 $16,206 $987 $16,206 $17,193
STIP-IIP STP $2,213 $2,213 $2,213
STIP-IIP State Cash $287 $287 $287
TCRP $23,007 $23,007 $23,007
TOTAL $42,700 $26,494 $16,206 $39,213 $3,487
MPO ID:
Project Title:
SAN43A ADOPTION: 08-00
COMPLETED
Project Description: Various - subsidy for reduced price passes required by TransNet
Reduced Price Pass Subsidy
Change Reason: Complete project
Exempt Category: Mass Transit - Transit operating assistanceCapacity Status: NCI
Est Total Cost: $11,000
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
TransNet - TSI $5,500 $5,500 $11,000 $11,000
TOTAL $11,000 $5,500 $5,500 $11,000
MPO ID:
Project Title:
SAN49 AMENDMENT: 08-02
COMPLETED
Project Description:
EARMARK NO: 3537
Counties of San Diego, Imperial, and Los Angeles - conduct feasibility study for a
dedicated intermodal east-west link between San Diego and Imperial Valley and
and the study of alternatives along the North South Corridor
Feasibility Study - MAGLEV to New Regional Airport
Change Reason: Complete project
Exempt Category: Other - Engineering studiesCapacity Status: NCI
Est Total Cost: $1,000
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
HPP $320 $480 $800 $800
Local Funds $80 $120 $200 $200
TOTAL $1,000 $400 $600 $1,000
Wednesday, September 15, 2010
303
San Diego Region (in $000s)2008 Regional Transportation Improvement Program
MPO ID:
Project Title:
SAN50
San Diego Association of Governments
AMENDMENT: 08-13
COMPLETED
Project Description: Regionwide - convert mechanical bike locker spaces to electronic, on-demand
spaces
Regional Bicycle Locker Program (part of Lump Sum SAN21)
Change Reason: Complete project
Exempt Category: Air Quality - Bicycle and pedestrian facilitiesCapacity Status: NCI
Est Total Cost: $433
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
FTA 5316 - JARC $168 $168 $168
TDA - Bicycles $50 $50 $50
TransNet - B $215 $215 $215
TOTAL $433 $383 $50 $433
MPO ID:
Project Title:
SAN52 AMENDMENT: 08-25
DELAYED
Project Description: In El Cajon - construction of new bus facility to provide capacity for operation and
maintenance for 100-150 vehicles. Transportation Development Credit of
$194,400 will used used to match FY10 federal funds for the construction phase
East County Bus Maintenance Facility
Change Reason: Delay project
Exempt Category: Mass Transit - Const of new bus or rail storage/maint facilities excluded
in 23 CFR part 771
Capacity Status: NCI
Est Total Cost: $13,970
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
CMAQ $50 $50 $50
FTA 5307 $5,595 $4,910 $685 $5,595
FTA 5309 (Bus) $3,145 $1,097 $778 $5,020 $5,020
FTA 5311 $200 $200 $200
Local Funds $2,136 $274 $194 $1,628 $977 $2,605
STA $500 $500 $500
TOTAL $13,970 $11,626 $1,371 $972 $7,432 $6,538
MPO ID:
Project Title:
SAN56 AMENDMENT: 08-20
DELAYED
Project Description: Countywide - provide for signal and communication for bus and fixed guideway
operations including, but not limited to, signal cases, train location, train control,
and radios
Signal and Communication Equipment (Bus and Fixed Guideway)
Change Reason: Delay project
Exempt Category: Mass Transit - Construction or renovation of power, signal, and
communications systems
Capacity Status: NCI
Est Total Cost: $350
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
FTA 5307 $204 $204 $204
FTA 5309 (FG) $76 $76 $76
Local Funds $70 $70 $70
TOTAL $350 $350 $350
Wednesday, September 15, 2010
304
San Diego Region (in $000s)2008 Regional Transportation Improvement Program
MPO ID:
Project Title:
SAN57
San Diego Association of Governments
AMENDMENT: 08-25
DELAYED
Project Description: MTS service area - provide for work on transitways and transit lines including but
not limited to, drainage work, tie replacement, grade crossing improvements,
switches, rail straightening and grinding. Transportation Development Credit of
$50,000 will used used to match FY10 federal funds for the construction phase
Fixed Guideway Transitways/Lines 122-00
Change Reason: Delay project
Exempt Category: Mass Transit - Track rehabilitation in existing right of wayCapacity Status: NCI
Est Total Cost: $1,663
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
FTA 5307 $350 $720 $200 $1,270 $1,270
FTA 5309 (FG) $100 $100 $100
Local Funds $113 $180 $293 $293
TOTAL $1,663 $563 $900 $200 $1,663
MPO ID:
Project Title:
SAN60 ADOPTION: 08-00
COMPLETED
Project Description: five planning activities - FACT - five planning activities in preparation for
implementing centrally dispatched coordinated transportation system
New Freedom Program for FY 2007 (part of Lump Sum SAN58)
Change Reason: Complete project
Exempt Category: Mass Transit - Transit operating assistanceCapacity Status: NCI
Est Total Cost: $134
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
FTA 5317 - NF $107 $107 $107
Local Funds $27 $27 $27
TOTAL $134 $134 $134
MPO ID:
Project Title:
SAN61 ADOPTION: 08-00
COMPLETED
Project Description: City of Oceanside - City of Oceanside - Volunteer Driver Program - provide
transportation assistance to seniors with disabilities
New Freedom Program for FY 2007 (part of Lump Sum SAN58)
Change Reason: Complete project
Exempt Category: Mass Transit - Transit operating assistanceCapacity Status: NCI
Est Total Cost: $34
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
FTA 5317 - NF $17 $17 $17
Local Funds $17 $17 $17
TOTAL $34 $34 $34
Wednesday, September 15, 2010
305
San Diego Region (in $000s)2008 Regional Transportation Improvement Program
MPO ID:
Project Title:
SAN63
San Diego Association of Governments
AMENDMENT: 08-25
DELAYED
Project Description:
SANDAG ID: 1095400
MTS service area - provide for station stops and terminals including construction,
rehabilitation, equipment, and support items (station platform. Transportation
Development Credit of $56,000 will used used to match FY10 federal funds for the
construction phase
Bus and Fixed Guideway Stations Stops and Terminals 113-00 / 123-00
Change Reason: Delay project
Exempt Category: Mass Transit - Construction of small passenger shelters and
information kiosks
Capacity Status: NCI
Est Total Cost: $883
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
FTA 5307 $333 $226 $559 $559
FTA 5309 (Bus) $113 $113 $113
FTA 5309 (FG) $80 $80 $80
Local Funds $20 $111 $131 $131
TOTAL $883 $100 $557 $226 $883
MPO ID:
Project Title:
SAN71 AMENDMENT: 08-01
COMPLETED
Project Description: countywide - Develop a centralized ride scheduling center
for FACT: Mobility Management Center (part of Lump Sum SAN58)
Change Reason: Complete project
Exempt Category: Mass Transit - Purchase of office, shop and operating equipment for
existing facilities
Capacity Status: NCI
Est Total Cost: $1,670
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
FTA 5317 - NF $558 $779 $1,336 $1,336
Local Funds $139 $195 $334 $334
TOTAL $1,670 $697 $974 $1,670
MPO ID:
Project Title:
SAN72 ADOPTION: 08-00
COMPLETED
Project Description: countywide - Pruchase vehicle with lift capability
Community Linkage Transportation (part of Lump Sum SAN58)
Change Reason: Complete project
Exempt Category: Mass Transit - Purchase of vehicle operating equipmentCapacity Status: NCI
Est Total Cost: $80
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
FTA 5317 - NF $64 $64 $64
Local Funds $16 $16 $16
TOTAL $80 $80 $80
Wednesday, September 15, 2010
306
San Diego Region (in $000s)2008 Regional Transportation Improvement Program
MPO ID:
Project Title:
SAN76
San Diego Association of Governments
AMENDMENT: 08-11
DELETED
Project Description:
SANDAG ID: 1220001
Along Orange Line Trolley - design and construction for Trolley wayside and
trackway modifications including stations to support new low-floor vehicle
operations
Orange Line Upgrade
Change Reason: Delete project
Exempt Category: Mass Transit - Track rehabilitation in existing right of wayCapacity Status: NCI
Est Total Cost: $26,926
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
Local Funds $23 $352 $767 $5,885 $3,151 $4,233 $5,946 $10,179
TransNet - MC $23 $352 $767 $5,885 $9,719 $4,233 $12,514 $16,747
TOTAL $26,926 $46 $704 $1,534 $11,770 $12,870 $18,460 $8,466
MPO ID:
Project Title:
SAN77 AMENDMENT: 08-13
DELETED
Project Description:
SANDAG ID: 1220002
Along Orange Line Trolley - New low-floor vehicle procurement and existing light
rail vehicle rehabilitation for the Orange Line
Orange Line Vehicles
Change Reason: Delete project
Exempt Category: Mass Transit - Purchase new buses and rail cars to replace existing
vehicles or minor expansions of fleet
Capacity Status: NCI
Est Total Cost: $22,759
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
TransNet - MC $292 $3,324 $9,386 $9,757 $962 $21,797 $22,759
TOTAL $22,759 $292 $3,324 $9,386 $9,757 $21,797 $962
Project completion outside of programming cycle*
MPO ID:
Project Title:
SAN81 ADOPTION: 08-00
COMPLETED
Project Description: Along Bayshore Bikeway from Main Street to 32nd Street - final design
Bayshore Bikeway - Main to 32nd (part of Lump Sum SAN21)
Change Reason: Complete project
Exempt Category: Air Quality - Bicycle and pedestrian facilitiesCapacity Status: NCI
Est Total Cost: $450
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
TransNet - BPNS $450 $450 $450
TOTAL $450 $450 $450
Wednesday, September 15, 2010
307
San Diego Region (in $000s)2008 Regional Transportation Improvement Program
MPO ID:
Project Title:
SAN82
San Diego Association of Governments
AMENDMENT: 08-01
COMPLETED
Project Description: countywide - promote, enhance and faciliate access services for older adults,
veterms with disabilities, etc.
for Accessible San Diego - Accessible Tourism Transportation Infomration
Network (part of Lump Sum SAN58)
Change Reason: Complete project
Exempt Category: Mass Transit - Transit operating assistanceCapacity Status: NCI
Est Total Cost: $166
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
FTA 5317 - NF $133 $133 $133
Local Funds $33 $33 $33
TOTAL $166 $166 $166
MPO ID:
Project Title:
SAN83 AMENDMENT: 08-01
COMPLETED
Project Description: within SCCD - purchase accessible vans for students with mobility disabilities
for Southwest Community College District - Accessible Van Purchase (part of
Lump Sum SAN58)
Change Reason: Complete project
Exempt Category: Mass Transit - Purchase new buses and rail cars to replace existing
vehicles or minor expansions of fleet
Capacity Status: NCI
Est Total Cost: $50
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
FTA 5317 - NF $40 $40 $40
Local Funds $10 $10 $10
TOTAL $50 $50 $50
MPO ID:
Project Title:
SAN89 AMENDMENT: 08-01
COMPLETED
Project Description: various - launch affliate community of national Indiependent Transprotation
Network program
for ITNSan Diego (part of Lump Sum SAN84)
Change Reason: Complete project
Exempt Category: Mass Transit - Transit operating assistanceCapacity Status: NCI
Est Total Cost: $156
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
Local Funds $81 $81 $81
TransNet - SS $75 $75 $75
TOTAL $156 $156 $156
Wednesday, September 15, 2010
308
San Diego Region (in $000s)2008 Regional Transportation Improvement Program
MPO ID:
Project Title:
SAN93
San Diego Association of Governments
AMENDMENT: 08-02
COMPLETED
Project Description: Chula Vista, National City and San Diego - east side of San Diego Bay in Chula
Vista, National City and San Diego
Bayshore Bikeway Extension (part of Lump Sum SAN21)
Change Reason: Complete project
Exempt Category: Air Quality - Bicycle and pedestrian facilitiesCapacity Status: NCI
Est Total Cost: $327
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
Local Funds $287 $287 $287
TransNet - B $40 $40 $40
TOTAL $327 $327 $327
MPO ID:
Project Title:
SAN95 AMENDMENT: 08-10
COMPLETED
Project Description: countywide - offers newly arrived refugees increased access to exisiting transit
system
Employment for Transportation for Refugees (part of Lump Sum SAN84)
Change Reason: Complete project
Exempt Category: Mass Transit - Transit operating assistanceCapacity Status: NCI
Est Total Cost: $75
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
Local Funds $15 $15 $15
TransNet - SS $60 $60 $60
TOTAL $75 $75 $75
MPO ID:
Project Title:
SAN96 AMENDMENT: 08-08
COMPLETED
Project Description:
SANDAG ID: 1143600
In Oceanside - construct new multi-modal transit center as a component of a
transit-oriented, mixed-use development which would include retail, commercial,
residential and office space; this project was formally done by NCTD through the
desgin phase
San Luis Rey Transit Center
Change Reason: Complete project
Exempt Category: Other - Bus terminals and transfer pointsCapacity Status: NCI
Est Total Cost: $8,939
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
FTA 5307 $3,876 $676 $3,200 $3,876
FTA 5309 (Bus) $1,485 $358 $358 $297 $1,079 $825 $2,201
FTA Funds - AR-5307 $1,500 $1,500 $1,500
Local Funds $520 $842 $74 $446 $842 $1,362
TOTAL $8,939 $5,881 $1,858 $1,200 $2,201 $6,367 $371
Wednesday, September 15, 2010
309
San Diego Region (in $000s)2008 Regional Transportation Improvement Program
MPO ID:
Project Title:
SAN98
San Diego Association of Governments
AMENDMENT: 08-13
COMPLETED
Project Description: county-wide - for All Congregations Together provide shuttle service fro
low-income individuals
Comlink Transportation (part of Lump Sum SAN97)
Change Reason: Complete project
Exempt Category: Mass Transit - Transit operating assistanceCapacity Status: NCI
Est Total Cost: $120
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
FTA 5316 - JARC $60 $60 $60
Local Funds $60 $60 $60
TOTAL $120 $120 $120
MPO ID:
Project Title:
SAN99 AMENDMENT: 08-13
COMPLETED
Project Description: county-wide - for International Rescue Committee: increased access to existing
transit systems to newly arrived refugees
Employment Transportation for Refugees (part of Lump Sum SAN97)
Change Reason: Complete project
Exempt Category: Mass Transit - Transit operating assistanceCapacity Status: NCI
Est Total Cost: $120
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
FTA 5316 - JARC $60 $60 $60
Local Funds $60 $60 $60
TOTAL $120 $120 $120
MPO ID:
Project Title:
SAN100 AMENDMENT: 08-13
COMPLETED
Project Description: county-wide - for St. Madeline Sophie's Center
Mobility Management for Adults with Disabilities (part of Lump Sum SAN97)
Change Reason: Complete project
Exempt Category: Mass Transit - Transit operating assistanceCapacity Status: NCI
Est Total Cost: $465
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
FTA 5316 - JARC $126 $126 $126
Local Funds $339 $339 $339
TOTAL $465 $465 $465
Wednesday, September 15, 2010
310
San Diego Region (in $000s)2008 Regional Transportation Improvement Program
MPO ID:
Project Title:
SAN101
San Diego Association of Governments
AMENDMENT: 08-13
COMPLETED
Project Description: county-wide - for Alpha Project - provide residential substance abuse treatment
program
Casa Raphael services (part of Lump Sum SAN97)
Change Reason: Complete project
Exempt Category: Mass Transit - Transit operating assistanceCapacity Status: NCI
Est Total Cost: $208
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
FTA 5316 - JARC $104 $104 $104
Local Funds $104 $104 $104
TOTAL $208 $208 $208
MPO ID:
Project Title:
SAN102 AMENDMENT: 08-26
COMPLETED
Project Description: in Chula Vista from Stella to H - FY10 allocation
Bayshore Bikeway Segments 7 & 8 (part of Lump Sum SAN21)
Change Reason: Complete project
Exempt Category: Air Quality - Bicycle and pedestrian facilitiesCapacity Status: NCI
Est Total Cost: $2,630
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
STIP-RIP STP TE $2,164 $2,164 $2,164
STIP-RIP State Cash $281 $281 $281
TransNet - BPNS $185 $185 $185
TOTAL $2,630 $2,630 $2,445 $185
MPO ID:
Project Title:
SAN103 :
COMPLETED
Project Description:
SANDAG ID: 1143500
Along coastal ROW from Orange County Line to downtown station at Santa Fe
Depot and along inland ROW from Oceanside Transit Center (Oceanside, CA) to
Escondido Transit Center (Escondido, CA). - bridges & other infrastructure
improvements along rail ROW; FTA ARRA funds will be used by SANDAG to
replace the Trestle Bridge 207.6,
Trestles Bridge
Change Reason: Complete project
Exempt Category: Safety - Railroad/highway crossingCapacity Status: NCI
Est Total Cost: $8,000
CONRWPEPRIORTOTAL
FTA Funds - AR-5307 $8,000 $8,000 $8,000
TOTAL $8,000 $8,000 $8,000
Wednesday, September 15, 2010
311
San Diego Region (in $000s)2008 Regional Transportation Improvement Program
MPO ID:
Project Title:
SAN112
San Diego Association of Governments
AMENDMENT: 08-13
COMPLETED
Project Description: Regional - Bicycle Locker Wireless Communication
Bike Lockers (part of Lump Sum SAN21)
Change Reason: Complete project
Exempt Category: Air Quality - Bicycle and pedestrian facilitiesCapacity Status: NCI
Est Total Cost: $50
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
TDA - Bicycles $50 $50 $50
TOTAL $50 $50 $50
MPO ID:
Project Title:
SAN113 AMENDMENT: 08-13
COMPLETED
Project Description: Regional - Bicycle Map Printing and Distribution
Bike Maps (part of Lump Sum SAN21)
Change Reason: Complete project
Exempt Category: Air Quality - Bicycle and pedestrian facilitiesCapacity Status: NCI
Est Total Cost: $25
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
TDA - Bicycles $25 $25 $25
TOTAL $25 $25 $25
Wednesday, September 15, 2010
312
San Diego Region (in $000s)2008 Regional Transportation Improvement Program
MPO ID:
Project Title:
CNTY19
San Diego County
AMENDMENT: 08-16
COMPLETED
Project Description:
RAS (TA 7-50)
TransNet - LSI: CRValley Center Road from city of Escondido to Cole Grade Road - widen and
reconstruct with 14-ft striped center 2-way lane, bike lanes and pathways
Valley Center North & South
Change Reason: Complete project
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $63,736 Open to Traffic: Phase 1: Jun 2008 Phase 2: Dec 2009
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
Local Funds $15,634 $15,634 $15,634
TransNet - L $30,679 $3,667 $5,292 $4,600 $24,454 $34,346
TransNet - L (Cash) $5,585 $5,585 $5,585
TransNet - L Carry Over $1,590 $730 $2,320 $2,320
TransNet - LSI $3,293 $2,550 $950 $4,893 $5,843
TransNet - LSI (Cash) $8 $8 $8
TOTAL $63,736 $51,898 $8,550 $3,288 $4,600 $52,894 $6,242
MPO ID:
Project Title:
CNTY25 AMENDMENT: 08-16
COMPLETED
Project Description:
RAS (TA 7-50)
TransNet - LSI: CRMission Road from Hill St to Main - in Fallbrook, reconstruct road
East Mission Road
Change Reason: Complete project
Exempt Category: Safety - Pavement resurfacing and/or rehabilitationCapacity Status: NCI
Est Total Cost: $2,519
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
TransNet - L $1,724 $1,724 $1,724
TransNet - L Carry Over $759 $759 $759
TransNet - LSI $36 $36 $36
TOTAL $2,519 $1,724 $795 $2,483 $36
MPO ID:
Project Title:
CNTY31 ADOPTION: 08-00
COMPLETED
Project Description: Olive Vista Drive from Oak Grove MS to Lyons Valley Road - Oak Grove M.S. to
Lyons Valley Rd.
Olive Vista Dr./Jefferson Rd. (part of Lump Sum SAN21)
Change Reason: Complete project
Exempt Category: Air Quality - Bicycle and pedestrian facilitiesCapacity Status: NCI
Est Total Cost: $225
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
TransNet - B $100 $125 $100 $125 $225
TOTAL $225 $100 $125 $125 $100
Wednesday, September 15, 2010
313
San Diego Region (in $000s)2008 Regional Transportation Improvement Program
MPO ID:
Project Title:
CNTY45
San Diego County
AMENDMENT: 08-12
COMPLETED
Project Description: TransNet - LSI: MaintCentral Ave (Sweetwater River); Willows Rd (Viejas Crk); Wildwood Glen Ln
(Sweetwater River); Buckman Springs Rd (Cottonwood Crk); Steele Canyon R
(Sweetwater River); Old River Rd (Moosa Crk) - protective coat sealing of the
decks of seven different bridges across the unincorporated portion of San Diego.
Bridge Methacrylate
Change Reason: Complete project
Exempt Category: Safety - Pavement resurfacing and/or rehabilitationCapacity Status: NCI
Est Total Cost: $1,000
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
TransNet - LSI $20 $980 $1,000 $1,000
TOTAL $1,000 $20 $980 $1,000
MPO ID:
Project Title:
CNTY48 AMENDMENT: 08-12
COMPLETED
Project Description:
RAS (TA 7-49 and 50)
TransNet - LSI: MaintAvocado Blvd, Dehesa Rd, Old Highway 80, Sunrise Highway, Tavern Rd, Buena
Rosa, De Luz Road, Live Oak Park Rd and Del Dios Highway. - rehabilitation of
drainage culverts beneath County Maintained Roads across the unincorporated
portion of San Diego County
Culvert Rehabilitation/Repair
Change Reason: Complete project
Exempt Category: Other - Plantings, landscaping, etcCapacity Status: NCI
Est Total Cost: $360
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
TransNet - LSI $20 $340 $360 $360
TOTAL $360 $20 $340 $360
MPO ID:
Project Title:
CNTY49 AMENDMENT: 08-12
COMPLETED
Project Description:
RAS (TA 7-49 and 50)
TransNet - LSI: MaintOld Highway 80, Pino Dr (various sections), Sweetwater Rd, Sweetwater Springs
Blvd, Winter Gardenrs Blvd, Lakeview Rd, Del Dios Highway (various sectons),
and East Vista Way. - rehabilitation of drainage culverts beneath County
Maintained Roads across the unincorporated portion of San Diego County
Culvert Lining
Change Reason: Complete project
Exempt Category: Other - Plantings, landscaping, etcCapacity Status: NCI
Est Total Cost: $684
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
TransNet - LSI $600 $600 $600
TransNet - LSI (Cash) $84 $84 $84
TOTAL $684 $684 $684
Wednesday, September 15, 2010
314
San Diego Region (in $000s)2008 Regional Transportation Improvement Program
MPO ID:
Project Title:
CNTY61
San Diego County
AMENDMENT: 08-12
COMPLETED
Project Description:
RAS (TA 7-49)
TransNet - LSI: CRJamacha Blvd from Sweetwater Rd to Sweetwater Springs Blvd - interconnect
signals to improve signal timing and traffic flow on Jamacha Blvd in Spring Valley.
Jamacha Blvd Signal Interconnect - Spring Valley
Change Reason: Complete project
Exempt Category: Other - Intersection signalization projectsCapacity Status: NCI
Est Total Cost: $299
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
TransNet - LSI $10 $254 $264 $264
TransNet - LSI (Cash) $35 $35 $35
TOTAL $299 $10 $289 $299
Wednesday, September 15, 2010
315
San Diego Region (in $000s)2008 Regional Transportation Improvement Program
MPO ID:
Project Title:
MTS27A
San Diego Metropolitan Transit System
AMENDMENT: 08-02
COMPLETED
Project Description: Blue Line - Start-up cost for the 5.8 mile extension of Blue Line
Mission Valley East LRT Operating
Change Reason: Complete project
Exempt Category: Mass Transit - Transit operating assistanceCapacity Status: NCI
Est Total Cost: $18,914
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
CMAQ $16,737 $16,737 $16,737
Local Funds $2,177 $2,177 $2,177
TOTAL $18,914 $18,914 $18,914
MPO ID:
Project Title:
MTS29 AMENDMENT: 08-20
DELAYED
Project Description: MTS service area - Maintenance, improvements, upgrades, and retrofits of bus
and trolley stations and stops throughout the San Diego area.
Bus and Fixed Guideways Station Stops and Terminals
Change Reason: Delay project
Exempt Category: Mass Transit - Reconstruction or renovation of transit structuresCapacity Status: NCI
Est Total Cost: $1,363
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
FTA 5309 (Bus) $347 $347 $347
FTA 5309 (FG) $528 $528 $528
FTA 5311 $39 $39 $39
Local Funds $137 $137 $137
TDA $87 $225 $312 $312
TOTAL $1,363 $1,138 $225 $1,363
MPO ID:
Project Title:
MTS34 AMENDMENT: 08-25
DELAYED
Project Description: MTS service area - Rehabilitation of light rail vehicles (LRV), electronic control
circuit (U2), LRV HVAC retrofit, rehabilitate traction motor phase II and pilot motor
control unit drive, LRV tires; design and implement new ITS to replace failing
radio/CAD and scheduling system. Transportation Development Credit of
$200,000 will used used to match FY10 federal funds for the purchase and
maintenance of communication equipment
Bus Signal and Communications Equipments
Change Reason: Delay project
Exempt Category: Mass Transit - Reconstruction or renovation of transit structuresCapacity Status: NCI
Est Total Cost: $4,924
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
FTA 5307 $3,116 $3,116 $3,116
FTA 5309 (Bus) $800 $800 $800
FTA 5309 (FG) $120 $120 $120
Local Funds $765 $765 $765
STA $60 $60 $60
TDA $44 $19 $63 $63
TOTAL $4,924 $4,105 $819 $4,924
Wednesday, September 15, 2010
316
San Diego Region (in $000s)2008 Regional Transportation Improvement Program
MPO ID:
Project Title:
MTS42
San Diego Metropolitan Transit System
AMENDMENT: 08-15
COMPLETED
Project Description: San Ysidro to Otay Mesa (Route 905), UTC-Euclid Stattion (Route 960), Weekend
Service for 9th Ave & "B" St to UTC Transit Center(Route 30) - Transit operating
assistance to fund need identified in Welfare to Work Transit Study and SD
Regional Welfare to work transportation plan to mitigate transit service
deficiencies; service for Routes 960, 905, and 30
Job Access Reverse Commute funded Transit Operating Assistance
Change Reason: Complete project
Exempt Category: Mass Transit - Transit operating assistanceCapacity Status: NCI
Est Total Cost: $7,150
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
FTA 5316 - JARC $2,280 $1,295 $3,575 $3,575
Local Funds $2,280 $200 $2,480 $2,480
TDA $1,095 $1,095 $1,095
TOTAL $7,150 $4,560 $2,590 $7,150
Wednesday, September 15, 2010
317
San Diego Region (in $000s)2008 Regional Transportation Improvement Program
MPO ID:
Project Title:
SD04
San Diego, City of
ADOPTION: 08-00
COMPLETED
Project Description: Division Street from I-5 to 43rd Street - in San Diego, Phase I: signal additions,
drainage rehabilitation and minor street improvements; Phase II: widen from 2 to
4 lanes roadway (CIP: 52-347.0)
Division Street - I-5 to 43rd Street
Change Reason: Complete project
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $1,478 Open to Traffic: Phase 1: Jun 2010
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
Local Funds $50 $1,200 $1,250 $1,250
TransNet - L $228 $228 $228
TOTAL $1,478 $278 $1,200 $1,478
MPO ID:
Project Title:
SD11 ADOPTION: 08-00
DELAYED
Project Description:
RAS (TA7-48)
Regents Road from Lahitte Ct. to Governor Dr. - in San Diego on Regents Road
Bridge spanning the AT&SF railroad and a portion of the Rose Canyon flood plain
connecting the existing Regents Rd. on both sides of the canyon; future widening
of Regents Rd. from 100' north of Lahitte Ct. to Governor and from 100' north of
Lahitte Ct. to the south abutment of the bridge including four lane with sidewalks
and class II bike lanes (CIP 53-044.0)
Regents Road Bridge
Change Reason: Delay project
Exempt Category: Other - Engineering studiesCapacity Status: NCI
Est Total Cost: $38,343
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
Local Funds $24,109 $14,127 $38,236 $38,236
TransNet - L $107 $107 $107
TOTAL $38,343 $24,216 $14,127 $38,343
MPO ID:
Project Title:
SD17 ADOPTION: 08-00
COMPLETED
Project Description: Citywide - install new and replace old guard rails along streets (CIP 68-006.0)
Guard Rails
Change Reason: Complete project
Exempt Category: Safety - Guardrails, median barriers, crash cushionsCapacity Status: NCI
Est Total Cost: $1,250
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
Local Funds $200 $200 $200
TransNet - L $1,050 $1,050 $1,050
TOTAL $1,250 $1,050 $200 $1,250
Wednesday, September 15, 2010
318
San Diego Region (in $000s)2008 Regional Transportation Improvement Program
MPO ID:
Project Title:
SD29
San Diego, City of
AMENDMENT: 08-13
DELAYED
Project Description: 43rd Street from Logan to National - intersection realignments (CIP 52-409)
43rd/Logan/National Avenues
Change Reason: Delay project
Exempt Category: Other - Intersection channelization projectsCapacity Status: NCI
Est Total Cost: $6,090
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
Local Funds $117 $2,423 $3,000 $50 $5,490 $5,540
TransNet - L $550 $550 $550
TOTAL $6,090 $667 $2,423 $3,000 $550 $5,490 $50
MPO ID:
Project Title:
SD32 AMENDMENT: 08-13
COMPLETED
Project Description: TransNet - LSI: CRCarroll Canyon Road from Scranton Rd to I 805 - in San Diego, on Carroll Canyon
Road from Sorrento Valley to Scranton Road - extend Carroll Canyon under I-805
including improvements to on/off ramps (CIP 52-392.0) (main project under
CAL09C)
Carroll Canyon Road
Change Reason: Complete project
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $17,283 Open to Traffic: Phase 1: Jun 2012
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
Local Funds $5,583 $1,700 $4,583 $1,000 $1,700 $7,283
TransNet - LSI $10,000 $10,000 $10,000
TOTAL $17,283 $5,583 $1,700 $10,000 $1,000 $11,700 $4,583
MPO ID:
Project Title:
SD92 AMENDMENT: 08-13
COMPLETED
Project Description: TransNet - LSI: CRGolden Hill Improvement on Beech/Fern/30th (37-224), Washington Street from
San Diego Ave. to Front St.; and on Goldfinch St. from University Ave. to Ft.
Stockton (39-216), Hillcrest Improvements on University Ave. from 10th to Park;
and on Normal Street from University to Washington (39-213), North
Park/University Avenue Improvements (39-207), Azalea Park area - on Poplar
Street at Fairmount Avenue and Poplar Street at Tulip Street(39-086.0/39-086.1) -
in San Diego, installation of new medians for vehicular and pedestrian safety as
well as new sidewalks with curb ramps and curb extensions; install median for
safety improvements including pop-outs for safer pedestrian crossing of the
intersection
Streetscape Improvement Projects
Change Reason: Complete project
Exempt Category: Other - Transportation enhancement activitiesCapacity Status: NCI
Est Total Cost: $3,860
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
Local Funds $3,620 $3,620 $3,620
TransNet - L $30 $30 $30
TransNet - LSI $150 $60 $50 $160 $210
TOTAL $3,860 $3,650 $150 $60 $3,810 $50
Wednesday, September 15, 2010
319
San Diego Region (in $000s)2008 Regional Transportation Improvement Program
MPO ID:
Project Title:
SD96
San Diego, City of
ADOPTION: 08-00
COMPLETED
Project Description: Citywide - in San Diego, resurface and slurry seal city streets (590010)
Street Resurfacing Citywide
Change Reason: Complete project
Exempt Category: Safety - Pavement resurfacing and/or rehabilitationCapacity Status: NCI
Est Total Cost: $14,269
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
Local Funds $10,269 $10,269 $10,269
TransNet - L $4,000 $4,000 $4,000
TOTAL $14,269 $4,000 $10,269 $14,269
MPO ID:
Project Title:
SD101 AMENDMENT: 08-13
COMPLETED
Project Description: First Avenue from Nutmeg Street to Quince Street - in San Diego, seismic retrofit
of bridge (CIP 52-554.0)(local match to HBP, part of CAL44)
First Avenue Bridge Over Maple Canyon
Change Reason: Complete project
Exempt Category: Safety - Non capacity widening or bridge reconstructionCapacity Status: NCI
Est Total Cost: $1,325
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
Local Funds $411 $400 $811 $811
TransNet - L $514 $514 $514
TOTAL $1,325 $925 $400 $1,325
MPO ID:
Project Title:
SD105 ADOPTION: 08-00
COMPLETED
Project Description: Vista Sorrento Parkway from Sorrento Valley Rd to Lusk Blvd - In San Diego on
Vista Sorrento Parkway from Sorrento Valley Blvd to Lusk Blvd - widen roadway to
construct retaining wall and add bike lanes LOCATION: San Diego (CIP
58-157.0)
Vista Sorrento Parkway Bike Lanes (part of Lump Sum SAN21)
Change Reason: Complete project
Exempt Category: Air Quality - Bicycle and pedestrian facilitiesCapacity Status: NCI
Est Total Cost: $208
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
TDA - Bicycles $208 $208 $208
TOTAL $208 $208 $208
Wednesday, September 15, 2010
320
San Diego Region (in $000s)2008 Regional Transportation Improvement Program
MPO ID:
Project Title:
SD106
San Diego, City of
ADOPTION: 08-00
COMPLETED
Project Description: Ocean Front Walk from Balboa Ct. to Pacific Beach Dr. - in San Diego, preserves
bulkhead including replacing concrete deck and restoring wall (CIP 527190)
Mission Beach Bulkhead Preservation
Change Reason: Complete project
Exempt Category: Other - Plantings, landscaping, etcCapacity Status: NCI
Est Total Cost: $870
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
Local Funds $150 $150 $150
TransNet - L $720 $720 $720
TOTAL $870 $720 $150 $870
MPO ID:
Project Title:
SD108 ADOPTION: 08-00
COMPLETED
Project Description: Along bayshore bikeway - in San Diego at the borders of Imperial Beach (13th
Street) and Chula Vista (Main Street, design/construct Class I bike path (581400)
Bayshore Bikeway
Change Reason: Complete project
Exempt Category: Air Quality - Bicycle and pedestrian facilitiesCapacity Status: NCI
Est Total Cost: $5,206
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
PTA $90 $90 $90
TDA - Bicycles $624 $624 $624
TransNet - B $718 $275 $443 $718
TransNet - MC $3,774 $1,284 $2,490 $3,774
TOTAL $5,206 $4,582 $624 $3,557 $1,649
MPO ID:
Project Title:
SD114 AMENDMENT: 08-15
DELAYED
Project Description: TransNet - LSI: CRRose Creek to westerly end of Pacific Beach - design class I bike path (581470)
Rose Creek Beach Bikeway
Change Reason: Delay project
Exempt Category: Air Quality - Bicycle and pedestrian facilitiesCapacity Status: NCI
Est Total Cost: $5,350
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
TransNet - L $350 $350 $350
TransNet - LSI $5,000 $5,000 $5,000
TOTAL $5,350 $350 $5,000 $5,000 $350
Wednesday, September 15, 2010
321
San Diego Region (in $000s)2008 Regional Transportation Improvement Program
MPO ID:
Project Title:
SD125
San Diego, City of
AMENDMENT: 08-15
COMPLETED
Project Description:
RAS (TA7-47)
Park Boulevard from Harbor Drive to Harbor Drive - rail grade separation
Park Boulevard-Harbor Drive Rail Grade Separation
Change Reason: Complete project
Exempt Category: Safety - Railroad/highway crossingCapacity Status: NCI
Est Total Cost: $27,353
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
HPP $1,477 $560 $2,037 $2,037
Local Funds $19,316 $2,766 $16,550 $19,316
State Bond - HRCSA $6,000 $6,000 $6,000
TOTAL $27,353 $20,793 $6,560 $24,587 $2,766
MPO ID:
Project Title:
SD127 AMENDMENT: 08-16
COMPLETED
Project Description:
EARMARK NO: 09CA017, CA373,
CA827
TransNet - LSI: CRAlong Shoal Creek Drive to facilitate crossing of Ted Williams Parkway - in San
Diego; construct a pedestrian bridge at Shoal Creek Drive; (this phase includes
preliminary engineering,environmental, right of way, and construction) (CIP
54-012.0)
Ted Williams Parkway Pedestrian Bridge at Shoal Creek - Phase 1
Change Reason: Complete project
Exempt Category: Air Quality - Bicycle and pedestrian facilitiesCapacity Status: NCI
Est Total Cost: $4,719
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
HPP $633 $692 $633 $692 $1,325
Local Funds $120 $120 $120
TCSP $534 $534 $534
TransNet - L $210 $210 $210
TransNet - LSI $30 $2,500 $140 $50 $2,340 $2,530
TOTAL $4,719 $963 $30 $3,726 $50 $3,566 $1,103
MPO ID:
Project Title:
SD130 AMENDMENT: 08-25
COMPLETED
Project Description:
EARMARK NO: CA574/2479
TransNet - LSI: CRSkyline Drive from 58th St. to Sears Street - Skyline Drive from 58th Street to Sears
Avenue - in San Diego, installation of new medians for safety improvements,
intersection lighting, traffic signal upgrades and other street improvements to
enhance pedestrian and vehicular movement (CIP 52-763)
Skyline Drive - 58th Street to Sears Avenue
Change Reason: Complete project
Exempt Category: Other - Intersection channelization projectsCapacity Status: NCI
Est Total Cost: $1,755
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
HPP $800 $800 $800
Local Funds $325 $325 $325
TransNet - L $305 $305 $305
TransNet - LSI $325 $325 $325
TOTAL $1,755 $305 $325 $1,125 $1,450 $305
Wednesday, September 15, 2010
322
San Diego Region (in $000s)2008 Regional Transportation Improvement Program
MPO ID:
Project Title:
SD132
San Diego, City of
AMENDMENT: 08-13
COMPLETED
Project Description: La Jolla Boulevard from Turquoise to Bird Rock - in San Diego, construct 3
modern roundabouts on La Jolla Blvd and extensive traffic calming devices;
improve pedestrian, bicycle, and transit accessibility; provide over 30 new
on-street parking spaces (CIP 52-717.0) (augments V04)
Bird Rock Coastal Traffic Flow Improvement
Change Reason: Complete project
Exempt Category: Other - Traffic signal synchronization projectsCapacity Status: NCI
Est Total Cost: $2,400
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
Local Funds $1,400 $1,400 $1,400
TransNet - L $1,000 $1,000 $1,000
TOTAL $2,400 $2,400 $2,400
MPO ID:
Project Title:
SD136 AMENDMENT: 08-13
COMPLETED
Project Description: TransNet - LSI: CROcean Beach east to Hotel Circle along south side of San Diego River - design
class I bike path (581560)
Ocean Beach Bike Path/Hotel Circle North Bikeway Design
Change Reason: Complete project
Exempt Category: Air Quality - Bicycle and pedestrian facilitiesCapacity Status: NCI
Est Total Cost: $519
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
TransNet - L $50 $50 $50
TransNet - LSI $469 $469 $469
TOTAL $519 $50 $469 $469 $50
MPO ID:
Project Title:
SD139 AMENDMENT: 08-13
COMPLETED
Project Description: TransNet - LSI: CRon Laurel Street over SR 163 (Cabrillo Bridge) - in San Diego, preliminary
engineering relating to diagnostic testing and evaluation of the bridge to scope
the required rehabilitation work and seismic retrofitting of the bridge (CIP
53-061.0)
Laurel Street Bridge over Highway 163
Change Reason: Complete project
Exempt Category: Safety - Non capacity widening or bridge reconstructionCapacity Status: NCI
Est Total Cost: $326
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
TransNet - L $276 $276 $276
TransNet - LSI $50 $50 $50
TOTAL $326 $276 $50 $326
Wednesday, September 15, 2010
323
San Diego Region (in $000s)2008 Regional Transportation Improvement Program
MPO ID:
Project Title:
SD140
San Diego, City of
ADOPTION: 08-00
COMPLETED
Project Description:
RAS (TA7-48)
University Ave from Florida Street to MIssissippi Street - In San Diego on
University Avenue from east of Florida St to west side of Mississippi Street,
including the intersections of University and Alabama, restripe and provide center
refuge area and wider travel lanes for bicycle and pedestrian safety (CIP
58-196.0)
University Avenue Bicycle and Pedestrian Safety Improvements (part of Lump
Sum SAN21)
Change Reason: Complete project
Exempt Category: Air Quality - Bicycle and pedestrian facilitiesCapacity Status: NCI
Est Total Cost: $750
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
TDA - Bicycles $750 $750 $750
TOTAL $750 $750 $750
MPO ID:
Project Title:
SD141 AMENDMENT: 08-13
COMPLETED
Project Description:
RAS (TA7-48)
Poway Road from I-15 to Sabre Springs Pkwy - in San Diego, install Class I
bicycle lane along the south side (CIP 58-089.0)
Poway Road Bike Lane (part of Lump Sum SAN21)
Change Reason: Complete project
Exempt Category: Air Quality - Bicycle and pedestrian facilitiesCapacity Status: NCI
Est Total Cost: $1,600
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
Local Funds $1,100 $1,100 $1,100
TransNet - B $500 $500 $500
TOTAL $1,600 $500 $1,100 $1,600
MPO ID:
Project Title:
SD142 ADOPTION: 08-00
COMPLETED
Project Description:
RAS (TA7-47)
Kearny Villa Road from Miramar Way to SR 163 - In San Diego on Kearny Villa
Road between Miramar Way and State Route 163 (CIP 58-198.0) improvements
to bike lanes.
Kearny Villa Road Bike Lane Improvements (part of Lump Sum SAN21)
Change Reason: Complete project
Exempt Category: Air Quality - Bicycle and pedestrian facilitiesCapacity Status: NCI
Est Total Cost: $400
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
TDA - Bicycles $400 $100 $300 $400
TOTAL $400 $400 $300 $100
Wednesday, September 15, 2010
324
San Diego Region (in $000s)2008 Regional Transportation Improvement Program
MPO ID:
Project Title:
SD143
San Diego, City of
ADOPTION: 08-00
COMPLETED
Project Description:
RAS (TA7-49, TA7-46)
West Bernardo Drive from Rancho Bernardo Road to Aguamiel Road, Bernardo
Center Drive from West Bernardo Drive to Rancho Bernardo Road - In San Diego
on West Bernardo Drive from Rancho Bernardo Road to Aguamiel Road, and
Bernardo Center Drive from West Bernardo Drive to Rancho Bernardo Road (CIP
58-199.0)
install three miles of Class II bikeways on West Bernardo Drive and Bernardo
Center Drive.
Rancho Bernardo Bikeway (part of Lump Sum SAN21)
Change Reason: Complete project
Exempt Category: Air Quality - Bicycle and pedestrian facilitiesCapacity Status: NCI
Est Total Cost: $250
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
TransNet - B $250 $250 $250
TOTAL $250 $250 $250
MPO ID:
Project Title:
SD144 ADOPTION: 08-00
COMPLETED
Project Description: various locations citywide - In San Diego - citywide, conduct safety and education
classes specifically tailored for commanders (CHIP 58-201.0)
Traffic Safety and Education Program (part of Lump Sum SAN21)
Change Reason: Complete project
Exempt Category: Air Quality - Bicycle and pedestrian facilitiesCapacity Status: NCI
Est Total Cost: $50
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
TransNet - B $50 $50 $50
TOTAL $50 $50 $50
MPO ID:
Project Title:
SD145 ADOPTION: 08-00
COMPLETED
Project Description: various locations citywide - In San Diego at various locations citywide -
development of public education campaign to promote safe use of streets by
motorists, pedestrians and bicyclists (CIP 58-202.0)
Safety in Traffic Education Program (STEP) I & 2 (part of Lump Sum SAN21)
Change Reason: Complete project
Exempt Category: Air Quality - Bicycle and pedestrian facilitiesCapacity Status: NCI
Est Total Cost: $220
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
TDA - Bicycles $200 $200 $200
TransNet - B $20 $20 $20
TOTAL $220 $220 $220
Wednesday, September 15, 2010
325
San Diego Region (in $000s)2008 Regional Transportation Improvement Program
MPO ID:
Project Title:
SD158
San Diego, City of
ADOPTION: 08-00
COMPLETED
Project Description: India Street from Laurel Street to Washington St - In San Diego on India Street
from Laurel Street to Washington Street (CIP 58-206.0)conduct a feasibility study
and preliminary and environmental impact evaluation for providing improved
bicycle access on India Street between Laurel Street and Washington Street. This
project will determine the needed modifications to a roadway that has heavy
bicycle use, heavy auto use, and poor visibility through a lengthy freeway
underpass.
India Street Improvement Study (part of Lump Sum SAN21)
Change Reason: Complete project
Exempt Category: Air Quality - Bicycle and pedestrian facilitiesCapacity Status: NCI
Est Total Cost: $50
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
TDA - Bicycles $50 $50 $50
TOTAL $50 $50 $50
MPO ID:
Project Title:
SD159 ADOPTION: 08-00
COMPLETED
Project Description: various locations citywide - In San Diego, install bicycle rings and racks citywide
Bicycle Rings and Racks (part of Lump Sum SAN21)
Change Reason: Complete project
Exempt Category: Air Quality - Bicycle and pedestrian facilitiesCapacity Status: NCI
Est Total Cost: $50
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
TDA - Bicycles $50 $50 $50
TOTAL $50 $50 $50
MPO ID:
Project Title:
SD164 ADOPTION: 08-00
COMPLETED
Project Description:
RAS (TA7-48)
Miramar Road from I 805 to Eastgate Mall - in San Diego, add right turn lane at
intersection; roadway design includes Class II bike lane and sidewalks (CIP
52-679.0)
Miramar Road
Change Reason: Complete project
Exempt Category: Other - Interchange reconfiguration projectsCapacity Status: NCI
Est Total Cost: $925
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
TransNet - L $925 $925 $925
TOTAL $925 $925 $925
Wednesday, September 15, 2010
326
San Diego Region (in $000s)2008 Regional Transportation Improvement Program
MPO ID:
Project Title:
SD173
San Diego, City of
AMENDMENT: 08-15
COMPLETED
Project Description: TransNet - LSI: CR38th Street from Dwight to Myrtle - this project provides for full street reconstruction
to include the installation of new sidewalk with pedestrian ramps, and roadway
drainage improvements including curbs and gutters. (CIP 52-782.0)
38th Street Improvements
Change Reason: Complete project
Exempt Category: Safety - Pavement resurfacing and/or rehabilitationCapacity Status: NCI
Est Total Cost: $2,000
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
TransNet - L $100 $100 $100
TransNet - LSI $1,900 $900 $1,000 $1,900
TOTAL $2,000 $100 $1,900 $1,000 $1,000
MPO ID:
Project Title:
SD180 AMENDMENT: 08-13
COMPLETED
Project Description: TransNet - LSI: CRon Hollister Street on the west side of the 900 block - in San Diego, install new
sidewalk including curb and gutter for drainage improvements; new asphalt
paving (CIP 52-810.0)
Hollister Street Improvements
Change Reason: Complete project
Exempt Category: Other - Intersection channelization projectsCapacity Status: NCI
Est Total Cost: $200
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
TransNet - LSI $200 $200 $200
TOTAL $200 $200 $200
MPO ID:
Project Title:
SD182 ADOPTION: 08-00
DELETED
Project Description: TransNet - LSI: CRHollister Street from Coronado to Tocayo - in San Diego, major roadway
reconstruction to include curb, gutter and sidewalk, driveways, new traffic signal
installation and drainage improvements; right of way acquisition required (CIP
52-812.0)
Hollister Street - Coronado to Tocayo - Reconstruction
Change Reason: Delete project
Exempt Category: Safety - Non capacity widening or bridge reconstructionCapacity Status: NCI
Est Total Cost: $0
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
TransNet - LSI $0
TOTAL
Wednesday, September 15, 2010
327
San Diego Region (in $000s)2008 Regional Transportation Improvement Program
MPO ID:
Project Title:
SD185
San Diego, City of
ADOPTION: 08-00
DELETED
Project Description: TransNet - LSI: CROcean View Blvd. from 40th to 32nd - in San Diego, major roadway reconstruction
which will include the installation of new curb, gutter and sidewalk, street light
relocation, drainage and pavement improvements (CIP 52-811.0)
Ocean View Boulevard
Change Reason: Delete project
Exempt Category: Safety - Non capacity widening or bridge reconstructionCapacity Status: NCI
Est Total Cost: $0
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
TransNet - LSI $0
TOTAL
MPO ID:
Project Title:
SD192 AMENDMENT: 08-13
COMPLETED
Project Description: San Ysidro, Midway, Old Town, Ocean Beach, College, Pacific Beach, and
Kensington - Pedestrian Master Plan Phase 4
Ped Master Plan - San Diego City (part of Lump Sum SAN21)
Change Reason: Complete project
Exempt Category: Air Quality - Bicycle and pedestrian facilitiesCapacity Status: NCI
Est Total Cost: $150
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
TDA - Bicycles $150 $150 $150
TOTAL $150 $150 $150
MPO ID:
Project Title:
SD197 AMENDMENT: 08-15
DELAYED
Project Description:
RAS (TA 7-47)
TransNet - LSI: CRImperial Ave from 61st Street to 62nd Street - Bus Shelter Improvements
Imperial Ave Bus Stop and Trolley Station Enhancements
Change Reason: Delay project
Exempt Category: Other - Bus terminals and transfer pointsCapacity Status: NCI
Est Total Cost: $315
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
TransNet - LSI $315 $150 $165 $315
TOTAL $315 $315 $165 $150
Wednesday, September 15, 2010
328
San Diego Region (in $000s)2008 Regional Transportation Improvement Program
MPO ID:
Project Title:
SM23
San Marcos, City of
AMENDMENT: 08-15
COMPLETED
Project Description:
RAS (TA 7-50)
TransNet - LSI: CRBarham Drive from Woodland Pkwy to SR78 On Ramp - widen Barham Drive to
secondary arterial standards; work includes undergrounding of overhead utilities.
Barham Drive Widening
Change Reason: Complete project
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $9,430 Open to Traffic: Phase 1: Apr 2010
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
Local Funds $1,080 $3,250 $3,100 $630 $600 $6,200 $7,430
TransNet - L $1,000 $1,000 $1,000
TransNet - LSI $1,000 $1,000 $1,000
TOTAL $9,430 $2,080 $4,250 $3,100 $600 $8,200 $630
MPO ID:
Project Title:
SM26 AMENDMENT: 08-15
COMPLETED
Project Description: Poinsettia Avenue from Linda Vista Drive to La Mirada Drive - limited widening of
Poinsettia Ave; construct cul-de-sac east of La Mirada intersection, and install
traffic signal at Poinsettia/La Mirada intersection
Poinsettia Widening at La Mirada Drive
Change Reason: Complete project
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $2,220 Open to Traffic: Phase 1: Dec 2010
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
Local Funds $130 $50 $2,040 $350 $1,870 $2,220
TOTAL $2,220 $130 $50 $2,040 $1,870 $350
MPO ID:
Project Title:
SM28 AMENDMENT: 08-15
COMPLETED
Project Description:
RAS (TA 7-51)
TransNet - LSI: CRTwin Oaks Valley Road from Richmar Avenue to Borden Road - widen from two
lanes to four lanes including sidewalk and landscaping
Twin Oaks Valley Road Street Widening and Improvements
Change Reason: Complete project
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $1,100 Open to Traffic: Phase 1: Dec 2010
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
Local Funds $60 $40 $215 $100 $215 $315
TransNet - L $764 $764 $764
TransNet - LSI $21 $21 $21
TOTAL $1,100 $60 $825 $215 $1,000 $100
Wednesday, September 15, 2010
329
San Diego Region (in $000s)2008 Regional Transportation Improvement Program
MPO ID:
Project Title:
SM29
San Marcos, City of
ADOPTION: 08-00
COMPLETED
Project Description: Mission Road from Rancho Santa Fe Road to Pacific Street - sidewalk
Mission Road Sidewalk Improvement (part of Lump Sum SAN21)
Change Reason: Complete project
Exempt Category: Air Quality - Bicycle and pedestrian facilitiesCapacity Status: NCI
Est Total Cost: $109
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
TDA - Bicycles $109 $109 $109
TOTAL $109 $109 $109
MPO ID:
Project Title:
SM36 AMENDMENT: 08-12
DELAYED
Project Description: TransNet - LSI: CRRocks Springs Road from Woodland Parkway to Richland Road; Richland Road
from Elizabeth Street to Rock Springs Road; Richland Road from Rock Springs
Road to Mission Hills High School. - In San Marcos; construction of curb, gutter,
sidewalks, medians, roundabouts, road improvements, landscaping, and
drainage/water quality improvements related to the project and associated work
(augments CAL 104)
Rock Springs/Richland Road Improvement Project
Change Reason: Delay project
Exempt Category: Safety - Non capacity widening or bridge reconstructionCapacity Status: NCI
Est Total Cost: $1,314
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
TransNet - LSI $1,314 $1,314 $1,314
TOTAL $1,314 $1,314 $1,314
Wednesday, September 15, 2010
330
San Diego Region (in $000s)2008 Regional Transportation Improvement Program
MPO ID:
Project Title:
SNT02
Santee, City of
AMENDMENT: 08-12
COMPLETED
Project Description: Forester Creek from Prospect Avenue to Mission Gorge Road - construct Olive
Lane & Mission Gorge Road bridges over flood control channel
Forester Creek Channelization
Change Reason: Complete project
Exempt Category: Non-ExemptCapacity Status: CI
Est Total Cost: $25,456 Open to Traffic: Phase 1: Jun 2009
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
Local Funds $4,540 $484 $4,056 $4,540
RSTP $10,166 $2,966 $7,200 $10,166
TransNet - CP $3,950 $3,950 $3,950
TransNet - H $6,800 $6,800 $6,800
TOTAL $25,456 $21,506 $3,950 $3,450 $22,006
MPO ID:
Project Title:
SNT07 ADOPTION: 08-00
COMPLETED
Project Description: TransNet - LSI: MaintVarious locations - maintenance repair in the form of grind and patch failed areas
followed by Cape seal or Slurry seal of the street
Santee Slurry Seal and Minor Repair Work
Change Reason: Complete project
Exempt Category: Safety - Pavement resurfacing and/or rehabilitationCapacity Status: NCI
Est Total Cost: $300
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
TransNet - LSI Carry Over $300 $300 $300
TOTAL $300 $300 $300
MPO ID:
Project Title:
SNT08 AMENDMENT: 08-01
COMPLETED
Project Description: TransNet - LSI: CRMast Boulevard from Carlton Hills Boulevard to Cuyamaca Street - In Santee,
install street lighting on Mast Boulevard due to utility undergrounding project from
Carlton Hills Boulevard to Cuyamaca Street; pull traffic signal interconnect in
existing conduit and install pull boxes along same location
Mast Boulevard Street Lighting
Change Reason: Complete project
Exempt Category: Safety - Lighting improvementsCapacity Status: NCI
Est Total Cost: $180
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
TransNet - LSI $180 $180 $180
TOTAL $180 $180 $180
Wednesday, September 15, 2010
331
San Diego Region (in $000s)2008 Regional Transportation Improvement Program
MPO ID:
Project Title:
SNT09
Santee, City of
AMENDMENT: 08-01
COMPLETED
Project Description: TransNet - LSI: CRProspect Avenue from Fanita Drive @ to Propsect Avenue - In Santee at the
intersection of Prospect Avenue and Fanita Drive, relocate existing traffic signal
pole to allow for the installation of a dedicated south bound to west bound turn
lane; install pavement widening, curb, gutter, sidewalk and drainage
improvements
Prospect Avenue and Fanita Drive Signal Improvements
Change Reason: Complete project
Exempt Category: Other - Intersection signalization projectsCapacity Status: NCI
Est Total Cost: $194
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
TransNet - LSI Carry Over $194 $30 $164 $194
TOTAL $194 $194 $164 $30
MPO ID:
Project Title:
SNT10 AMENDMENT: 08-01
COMPLETED
Project Description: Magnolia Avenue from Mission Gorge Road to Prospect Avenue - In Santee,
Magnolia Avenue between Mission Gorge Road and Prospect Avenue replace
existing NEMA type signal controllers with 170 type controllers and provide signal
interconnect for signal coordination between Santee controllers and the signal
controllers being installed at the on and off-ramps by Caltrans for the SR 52
project
Magnolia Avenue Traffic Signal Synchronization
Change Reason: Complete project
Exempt Category: Other - Traffic signal synchronization projectsCapacity Status: NCI
Est Total Cost: $176
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
Local Funds $29 $29 $29
Local RTCIP $30 $30 $30
State Bond - TLSP $117 $117 $117
TOTAL $176 $176 $146 $30
MPO ID:
Project Title:
SNT11 AMENDMENT: 08-01
COMPLETED
Project Description: Mission Gorge Road from Magnolia Avenue to Fanita Drive - In Santee, Mission
Gorge Road between Magnolia Avenue and Fanita Drive replace existing NEMA
type signal controllers with 170 controllers and provide interconnect for signal
coordination between Santee controllers and the Caltrans signal controllers for
the SR 125 and SR 52 on/off-ramps
Mission Gorge Road Traffic Signal Synchronization
Change Reason: Complete project
Exempt Category: Other - Traffic signal synchronization projectsCapacity Status: NCI
Est Total Cost: $609
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
Local Funds $104 $104 $104
Local RTCIP $90 $90 $90
State Bond - TLSP $415 $415 $415
TOTAL $609 $609 $519 $90
Wednesday, September 15, 2010
332
San Diego Region (in $000s)2008 Regional Transportation Improvement Program
MPO ID:
Project Title:
SNT12
Santee, City of
AMENDMENT: 08-12
COMPLETED
Project Description: TransNet - LSI: CROn Magnolia Ave. from Mast Blvd. to Second St. and from Second St. to El Nopal;
on Mission Gorge Rd. from Fanita Dr. to Post Office; on Mission Gorge Rd. from
Big Rock Rd to West Hills Parkway and from Magnolia Ave. to Cuyamaca St., - In
Santee, major streets pavement rehabilitation and other traffic-related
improvements and major repairs
Major Street Rehabilitation and Improvements
Change Reason: Complete project
Exempt Category: Safety - Pavement resurfacing and/or rehabilitationCapacity Status: NCI
Est Total Cost: $918
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
TransNet - LSI $918 $92 $826 $918
TOTAL $918 $918 $826 $92
MPO ID:
Project Title:
SNT13 AMENDMENT: 08-13
COMPLETED
Project Description: Carlton Oaks from West Hills Pkway to Carlton Hills Blvd - Class III bike lanes
Carlton Oaks Bike Lanes (part of Lump Sum SAN21)
Change Reason: Complete project
Exempt Category: Air Quality - Bicycle and pedestrian facilitiesCapacity Status: NCI
Est Total Cost: $30
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
TransNet - BPNS $30 $30 $30
TOTAL $30 $30 $30
Wednesday, September 15, 2010
333
San Diego Region (in $000s)2008 Regional Transportation Improvement Program
MPO ID:
Project Title:
SB01
Solana Beach, City of
ADOPTION: 08-00
COMPLETED
Project Description:
RAS (TA 7-51)
TransNet - LSI: CRAt Lomas Santa Fe and I-5 - design and ROW for interchange and auxiliary lanes
on I-5 north & southbound
Lomas Santa Fe Drive/I-5 Interchange
Change Reason: Complete project
Exempt Category: Non-ExemptCapacity Status: CIRT:5
Est Total Cost: $3,520 Open to Traffic: Phase 1: Dec 2008
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
RSTP $2,525 $1,602 $923 $2,525
TransNet - L $945 $268 $677 $945
TransNet - LSI $50 $50 $50
TOTAL $3,520 $3,470 $50 $1,600 $50 $1,870
MPO ID:
Project Title:
SB04 ADOPTION: 08-00
COMPLETED
Project Description: Cliff Street from Highway 101 to Cedros Ave - Construct bicycle and pedestrian
bridge over the railroad tracks at Cliff Street, between Highway 101 and N. Cedros
Ave.
Cliff Street Pedestrain/Bicycle Bridge (part of Lump Sum SAN21)
Change Reason: Complete project
Exempt Category: Air Quality - Bicycle and pedestrian facilitiesCapacity Status: NCI
Est Total Cost: $1,900
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
Local Funds $750 $750 $750
TDA - Bicycles $1,150 $250 $900 $1,150
TOTAL $1,900 $1,900 $1,650 $250
MPO ID:
Project Title:
SB06 ADOPTION: 08-00
COMPLETED
Project Description: Highway 101 from Cliff St to Cliff St - Completion of Coastal Rail Trail (bike &
pedestrian trail) at newly constructed pedestrian bridge crossing railroad tracks.
Coastal Rail Trail at Cliff St. Pedestrian Bridge
Change Reason: Complete project
Exempt Category: Air Quality - Bicycle and pedestrian facilitiesCapacity Status: NCI
Est Total Cost: $120
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
TransNet - L (Cash) $120 $120 $120
TOTAL $120 $120 $120
Wednesday, September 15, 2010
334
San Diego Region (in $000s)2008 Regional Transportation Improvement Program
MPO ID:
Project Title:
V01
Various Agencies
ADOPTION: 08-00
COMPLETED
Project Description:
RTP PG NO: 6-55
From Escondido Transit Center to Oceanside Transit Center along Sprinter ROW
- joint project between NCTD and cities of San Marcos, Escondido, Vista &
Oceanside to design and construct 22 miles of regional bikeway
Inland Rail Trail
Change Reason: Complete project
Exempt Category: Air Quality - Bicycle and pedestrian facilitiesCapacity Status: NCI
Est Total Cost: $30,842
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
BTA $550 $450 $100 $550
CMAQ $21,550 $2,700 $18,850 $21,550
PTA $180 $180 $180
TDA $550 $400 $150 $550
TDA - Bicycles $959 $959 $959
TEA-R $800 $800 $800
TransNet - B $2,383 $200 $2,183 $2,383
TransNet - BPNS $3,870 $3,870 $3,870
TOTAL $30,842 $26,972 $3,870 $26,112 $4,730
MPO ID:
Project Title:
V02 AMENDMENT: 08-24
DELAYED
Project Description: Coastal Rail Trail from Oceanside to San Diego - multi-jurisdictional class I bike
& pedestrian trail along the Coaster ROW
Coastal Rail Trail
Change Reason: Delay project
Exempt Category: Air Quality - Bicycle and pedestrian facilitiesCapacity Status: NCI
Est Total Cost: $12,846
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
CMAQ $4,665 $1,399 $3,266 $4,665
RSTP $933 $933 $933
STIP-RIP STP TE $5,114 $1,220 $3,894 $5,114
TDA $651 $467 $184 $651
TransNet - B $1,211 $272 $663 $820 $1,483
TOTAL $12,846 $11,641 $1,205 $8,164 $4,682
MPO ID:
Project Title:
V03 ADOPTION: 08-00
COMPLETED
Project Description: West of Heritage Road and south of Main St - multi-jurisdictional (City & County) to
improve existing footpaths and create trails to meet local trail standards
Otay Valley Regional Park Trails
Change Reason: Complete project
Exempt Category: Air Quality - Bicycle and pedestrian facilitiesCapacity Status: NCI
Est Total Cost: $2,042
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
Local Funds $1,864 $36 $1,900 $1,900
RTP $142 $142 $142
TOTAL $2,042 $1,864 $178 $2,042
Wednesday, September 15, 2010
335
San Diego Region (in $000s)2008 Regional Transportation Improvement Program
MPO ID:
Project Title:
V06
Various Agencies
AMENDMENT: 08-09
COMPLETED
Project Description: Grossmont Trolley Station - tower with 2 elevators and stairs
Grossmont Trolley Station/Pedestrian Enhancements (part of Lump Sum V04)
Change Reason: Complete project
Exempt Category: Mass Transit - Construction of small passenger shelters and
information kiosks
Capacity Status: NCI
Est Total Cost: $4,002
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
ARRA-TE $4,002 $4,002 $4,002
TOTAL $4,002 $4,002 $4,002
MPO ID:
Project Title:
V09 AMENDMENT: 08-20
DELETED
Project Description: Along coastal ROW from Orange County Line to downtown station at Santa Fe
Depot and along inland ROW from Oceanside Transit Center (Oceanside, CA) to
Escondido Transit Center (Escondido, CA). - bridges & other infrastructure
improvements along rail ROW; FTA ARRA funds will be used by SANDAG to
replace the Trestle Bridge 207.6, all other projects will be implemented by NCTD
Bridge & Infrastructure Program. V09
Change Reason: Delete project
Exempt Category: Safety - Railroad/highway crossingCapacity Status: NCI
Est Total Cost: $50,286
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
FTA 5307 $2,840 $3,200 $1,400 $1,800 $9,240 $9,240
FTA 5309 (FG) $16,008 $560 $1,800 $3,000 $3,120 $18,248 $21,368
FTA Funds - AR-5307 $12,000 $12,000 $12,000
Local Funds $4,738 $140 $800 $800 $1,200 $780 $6,898 $7,678
TOTAL $50,286 $23,586 $12,700 $4,000 $4,000 $6,000 $46,386 $3,900
Wednesday, September 15, 2010
336
San Diego Region (in $000s)2008 Regional Transportation Improvement Program
MPO ID:
Project Title:
VISTA03
Vista, City of
AMENDMENT: 08-02
COMPLETED
Project Description: Sycamore Ave from University Dr to Business Park Dr, S. Santa Fe Ave from
Escondido Ave to Pala Vista, W. Vista Way from Melrose Dr to WB SR-78 ramp,
Vale Terrace Dr from Foothill to Vale Terrace Pl, Lada de Loma from 400ft e/o
Vista Village Dr to 900ft e/o Vista Village Dr, Foothill Dr from Vale Terrace to
southerly City Limits, Foothill Dr from Elm to Beverly - repair/rehabilitate
distressed pavement areas and overlay streets with asphalt/rubberized asphalt
where identified as priorities in street inventory
Street Rehabilitation & Maintenance CIP 8037
Change Reason: Complete project
Exempt Category: Safety - Pavement resurfacing and/or rehabilitationCapacity Status: NCI
Est Total Cost: $5,085
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
Local Funds $1,214 $2,198 $3,412 $3,412
TransNet - L $1,571 $101 $44 $1,629 $1,673
TOTAL $5,085 $2,785 $2,299 $5,041 $44
MPO ID:
Project Title:
VISTA07 AMENDMENT: 08-02
DELAYED
Project Description: From Smilax Rd to Thunder Dr - along SR 78, the project is separated into three
phases to install freeway landscaping and maintenance along SR-78 between
Smilax Road and Thunder Drive including providing 80 acres of freeway
landscaping along the SR-78 corridor, with "gateway" treatments at Vista Village
Drive and Sycamore Ave interchanges
SR-78 Corridor Enhancement CIP No. 7456
Change Reason: Delay project
Exempt Category: Other - Plantings, landscaping, etcCapacity Status: NCIRT:78
Est Total Cost: $7,666
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
Local Funds $321 $68 $389 $389
TEA-R $1,013 $1,013 $1,013
TransNet - L $957 $957 $957
TransNet - L Carry Over $716 $716 $716
TOTAL $3,075 $2,291 $716 $68 $3,075
MPO ID:
Project Title:
VISTA10 AMENDMENT: 08-02
COMPLETED
Project Description: Olive Ave from N. Melrose to Vista Village Dr - design and install improvements to
widen pavement, install bikeways & parking
Olive Avenue Sidewalks CIP 8043
Change Reason: Complete project
Exempt Category: Air Quality - Bicycle and pedestrian facilitiesCapacity Status: NCI
Est Total Cost: $1,919
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
Local Funds $859 $859 $859
TransNet - L $720 $340 $1,060 $1,060
TOTAL $1,919 $720 $1,199 $1,919
Wednesday, September 15, 2010
337
San Diego Region (in $000s)2008 Regional Transportation Improvement Program
MPO ID:
Project Title:
VISTA13
Vista, City of
AMENDMENT: 08-02
COMPLETED
Project Description: Citywide - repair/replace sidewalks, curbs & gutters, and upgrade to current ADA
standards
ADA Street Sidewalk Improvements CIP 8053
Change Reason: Complete project
Exempt Category: Other - Plantings, landscaping, etcCapacity Status: NCI
Est Total Cost: $388
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
Local Funds $75 $75 $75
TransNet - L $188 $188 $188
TransNet - L Carry Over $125 $125 $125
TOTAL $388 $263 $125 $388
MPO ID:
Project Title:
VISTA18 AMENDMENT: 08-13
COMPLETED
Project Description: West California Ave from N. Santa Fe to W. Los Angeles - Safe Routes to School
Project to install curb, gutter, and sidewalk
California Avenue Improvements CIP 8029
Change Reason: Complete project
Exempt Category: Safety - Safety Improvement ProgramCapacity Status: NCI
Est Total Cost: $1,044
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
Local Funds $937 $57 $46 $107 $841 $994
TransNet - L Carry Over $50 $50 $50
TOTAL $1,044 $937 $107 $107 $891 $46
MPO ID:
Project Title:
VISTA19 AMENDMENT: 08-02
COMPLETED
Project Description: Maryland Drive from Olive Ave to Highland Dr - Safe Route to School Program to
reconstruct road, install curb, gutter, and sidewalks
Maryland Drive Sidewalks CIP 8030
Change Reason: Complete project
Exempt Category: Air Quality - Bicycle and pedestrian facilitiesCapacity Status: NCI
Est Total Cost: $1,492
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
Local Funds $1,396 $151 $154 $1,091 $1,396
TransNet - L $96 $96 $96
TOTAL $1,492 $1,396 $96 $154 $1,187 $151
Wednesday, September 15, 2010
338
San Diego Region (in $000s)2008 Regional Transportation Improvement Program
MPO ID:
Project Title:
VISTA22
Vista, City of
AMENDMENT: 08-15
DELAYED
Project Description: TransNet - LSI: CRPart of the Inland Rail Trail from City of Oceanside to City of San Marcos - this
project includes 4.9 miles of a multi-use path along the Sprinter railroad tracks,
from the Buena Creek Station to the Melrose Station. tasks to complete the
project include: coordination with NCTD on construction of retaining walls and
drainage facilities, prepare design and construction drawings, seek grant funds,
acquire right of way
Inland Rail Trail Bike Lane Facility CIP 8088
Change Reason: Delay project
Exempt Category: Air Quality - Bicycle and pedestrian facilitiesCapacity Status: NCI
Est Total Cost: $2,196
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
BTA $500 $500 $500
Local Funds $73 $193 $750 $193 $73 $750 $1,016
TDA - Bicycles $500 $500 $500
TransNet - L Carry Over $80 $80 $80
TransNet - LSI $100 $100 $100
TOTAL $2,196 $573 $273 $1,350 $73 $1,430 $693
MPO ID:
Project Title:
VISTA23 AMENDMENT: 08-13
COMPLETED
Project Description: Escondido Ave from SR-78 to Crestview - Install landscaped medians on
Escondido Avenue
HES Escondido Avenue Medians CIP 8051
Change Reason: Complete project
Exempt Category: Other - Plantings, landscaping, etcCapacity Status: NCI
Est Total Cost: $925
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
Local Funds $655 $48 $607 $655
TransNet - L Carry Over $270 $270 $270
TOTAL $925 $655 $270 $877 $48
MPO ID:
Project Title:
VISTA26 AMENDMENT: 08-02
COMPLETED
Project Description: Taylor St from Laguna Lane to 350 w/o Laguna Lane - Construct curb, gutter,
sidewalk, and other street improvements on Taylor Street from Laguna Lane to
350 ft west of Laguna Lane towards E. Vista Way.
Taylor Street Improvements CIP 8140
Change Reason: Complete project
Exempt Category: Other - Plantings, landscaping, etcCapacity Status: NCI
Est Total Cost: $1,055
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
Local Funds $51 $815 $51 $815 $866
TransNet - L $189 $189 $189
TOTAL $1,055 $51 $189 $815 $815 $240
Wednesday, September 15, 2010
339
San Diego Region (in $000s)2008 Regional Transportation Improvement Program
MPO ID:
Project Title:
VISTA28
Vista, City of
AMENDMENT: 08-15
COMPLETED
Project Description: TransNet - LSI: MaintThibodo Rd from Mar Vista Dr to 1800 Thibodo Rd - install curb and gutter and
landscaping along the north side of Thibodo Road from Mar Vista Drive to the
existing street improvements at 1800 Thibodo Road
Thibodo Road Curb and Landscaping CIP 8151
Change Reason: Complete project
Exempt Category: Other - Plantings, landscaping, etcCapacity Status: NCI
Est Total Cost: $425
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
TransNet - L $200 $40 $160 $200
TransNet - LSI $225 $225 $225
TOTAL $425 $200 $225 $385 $40
MPO ID:
Project Title:
VISTA29 AMENDMENT: 08-02
COMPLETED
Project Description: La Mirada Dr from Poinsettia Ave to La Mirada Dr - Street reconstruction, storm
drains and traffic signals.
La Mirada Drive and Poinsettia Avenue Signal and Intersection CIP 8152
Change Reason: Complete project
Exempt Category: Other - Intersection signalization projectsCapacity Status: NCI
Est Total Cost: $625
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
Local Funds $442 $39 $481 $481
TransNet - L $144 $144 $144
TOTAL $625 $442 $144 $39 $625
MPO ID:
Project Title:
VISTA35 AMENDMENT: 08-01
COMPLETED
Project Description: in Vista - provide door-to-door senior shuttle service and volunteer driver program
Out & About Vista (part of Lump Sum SAN84)
Change Reason: Complete project
Exempt Category: Mass Transit - Transit operating assistanceCapacity Status: NCI
Est Total Cost: $117
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
Local Funds $41 $41 $41
TransNet - SS $76 $76 $76
TOTAL $117 $41 $76 $117
Wednesday, September 15, 2010
340
San Diego Region (in $000s)2008 Regional Transportation Improvement Program
MPO ID:
Project Title:
VISTA38
Vista, City of
AMENDMENT: 08-15
COMPLETED
Project Description: TransNet - LSI: CRFrom SR-78 to Escondido Avenue - design and construction, under Caltrans
Encroachment Permit, of four ground mounted guide signs along State Route 78,
directing motorists to Vista's Civic Center; the signs will be located near the
interchange for Escondido Avenue, which has been re-named Civic Center Drive;
there will be two signs in each direction, one advance sign on the freeway and
one terminal sign on the off-ramp.
SR-78 Civic Center Guide Signs, CIP 8196
Change Reason: Complete project
Exempt Category: Other - Directional and infomational signsCapacity Status: NCI
Est Total Cost: $75
CONRWPEPRIORTOTAL 08/09 09/10 10/11 11/12 12/13
TransNet - LSI $75 $25 $50 $75
TOTAL $75 $75 $50 $25
Wednesday, September 15, 2010
341
San Diego Region (in $000s)2008 Regional Transportation Improvement Program
RTIP Fund Types
Federal Funding =
ARRA = American Recovery and Reinvestment Act (Federal Stimulus Program)
BIP/CBI = Border Infrastructure Program/Corridors and Borders Infrastructure Program
CMAQ = Congestion Mitigation and Air Quality
DEMO = High Priority Demonstration Program under TEA-21
DEMO-Sec 115 = High Priority Demonstration Program under FY 2004 Appropriations
DEMO-Sec 117/STP = Surface Transportation Program under FHWA Administrative Program (congressionally
directed appropriations)
DOE = Department of Energy
FRA = Federal Railroad Administration
FTA Section 5307 = Federal Transit Administration Urbanized Area Formula Program
FTA Section 5309 (Bus) = Federal Transit Administration Discretionary Program
FTASection 5309 (FG) = Federal Transit Administration Fixed Guideway Modernization Formula program
FTA Section 5309 (NS) = Federal Transit Administration Discretionary - New Starts Program
FTA Section 5310 = Federal Transit Administration Elderly & Disabled Program
FTA Section 5311 = Federal Transit Administration Rural Program
FTA Section 5316 (JARC) = Federal Transit Administration Jobs Access Reverse Commute
FTA Section 5317 (NF) = Federal Transit Administration New Freedom
HBP = Highway Bridge Program under SAFETEA-LU
HBRR = Highway Bridge Repair and Rehabilitation under TEA-21
HES = Hazard Elimination System (administered by Caltrans)
HPP = High Priority Program under SAFETEA-LU
HUD = Housing and Urban Development
IM = Interstate Maintenance Discretionary
IRR = Indian Reservation Roads program
ITS = Intelligent Transportation System
NHS = National Highway System (administered by Caltrans)
RSTP = Regional Surface Transportation Program
RTP = Recreational Trails Program
SRTS = Safe Routes to School (administered by Caltrans)
TCSP = Transportation & Community & System Preservation
TE = Transportation Enhancement Program
TIGER (ARRA) = Transportation Investment Generating Economic Recovery (Federal Stimulus)
TIGGER (ARRA) = Transit Investment for Greenhouse Gas and Energy Reduction (Federal Stimulus)
TSGP = Transit Security Grant Program
State Funding =
Wednesday, September 15, 2010
342
San Diego Region (in $000s)2008 Regional Transportation Improvement Program
BTA = Bicycle Transportation Account
CMIA = Corridor Mobility Improvement Account (State Prop. 1B)
FSP = Freeway Service Patrol
GARVEE = Grant Anticipated Revenue Vehicles
HSIP = Highway Safety Improvement Program
IRI = Intercity Rail Improvement (State Prop. 1B)
Prop 1A - High Speed Rail = High Speed Passenger Train Bond Program (State Prop. 1A)
State Funding cont. =
PTA = Public Transportation Account
SHOPP = State Highway Operation & Protection Program
SLPP = State Local Partnership Program (State Prop. 1B)
STIP-IIP = State Transportation Improvement Program - Interregional Program
STIP-RIP = State Transportation Improvement Program - Regional Improvement Program
TCRP = Traffic Congestion Relief Program
TLSP = Traffic Light Synchronization Program (State Prop. 1B)
TSM = Transportation Systems Management
Local Funding =
TDA = Transportation Development Act
TDA-B = Transportation Development Act-Bicycle & Pedestrian Facilities
TransNet-78 = Prop. A Local Transportation Sales Tax - SR 78
TransNet-ADA = Prop. A Local Transportation Sales Tax - Transit
TransNet-B = Prop. A Local Transportation Sales Tax - Bike
TransNet-Border = Prop. A Extension Local Transportation Sales Tax - Border
TransNet-BPNS = Prop. A Local Transportation Sales Tax extension - Bicycle, Pedestrian and Neighborhood
Safety Program
TransNet-BRT/Ops = Prop. A Extension Local Transportation Sales Tax - Bus Rapid Transit/New Service
TransNet-CP = Prop. A Local Transportation Sales Tax - Commercial Paper
TransNet-H = Prop. A Local Transportation Sales Tax - Highway
TransNet-L = Prop. A Local Transportation Sales Tax - Local Streets & Roads
TransNet-LSG = Prop. A Extension Local Transportation Sales Tax - Local Smart Growth
TransNet-LSI = Prop. A Extension Local Transportation Sales Tax - Local System Improvements
TransNet-MC = Prop. A Extension Local Transportation Sales Tax - Major Corridors
TransNet-REMP = Prop. A Extension Local Transportation Sales Tax - Regional Environmental Mitigation Program
TransNet-SMIP = Prop. A Extension Local Transportation Sales Tax - Regional Smart Growth Incentive Program
TransNet-SS = Prop. A Extension Local Transportation Sales Tax - Senior Services
TransNet-T = Prop. A Local Transportation Sales Tax - Transit
Wednesday, September 15, 2010
343
2030 Regional Transportation Plan – Technical Appendices TA 7-43
Table TA 7.19—Regional Arterials by Jurisdiction
Limits Jurisdiction
1 Cannon Road Carlsbad Boulevard to Buena Vista Drive Carlsbad
2 Carlsbad Boulevard Eaton Street to La Costa Avenue Carlsbad
3 Carlsbad Village Drive Interstate 5 to Coast Boulevard/Coast Highway Carlsbad
4 College Boulevard City of Oceanside to Palomar Airport Road Carlsbad
5 El Camino Real (S-11) State Route 78 to Olivenhain Carlsbad
6 Faraday Avenue Melrose Drive to College Boulevard Carlsbad
7 La Costa Avenue Interstate 5 to El Camino Real Carlsbad
8 Melrose Drive City of Vista to Rancho Santa Fe Road Carlsbad
9 Olivenhain Road Los Pinos Circle to Rancho Santa Fe Road Carlsbad
10 Palomar Airport Road Carlsbad Boulevard to Business Park Drive Carlsbad
11 Poinsettia Lane Carlsbad Boulevard to Melrose Drive Carlsbad
12 Rancho Santa Fe Road Melrose Drive to Olivenhain Road Carlsbad
13 Bonita Road 1st Avenue to Interstate 805 Chula Vista
14 Broadway C Street to Main Street Chula Vista
15 E Street Interstate 5 to Bonita Road Chula Vista
16 East H Street Hilltop Drive to Mount Miguel Road Chula Vista
17 H Street Interstate 5 to Hilltop Drive Chula Vista
18 Hunte Parkway Proctor Valley Road to State Route 125 Chula Vista
19 L Street Interstate 5 to Interstate 805 Chula Vista
20 La Media Road Telegraph Canyon Road to City of San Diego Chula Vista
21 Main Street Interstate 5 to Interstate 805 Chula Vista
22 Olympic Parkway Interstate 805 to State Route 125 Chula Vista
23 Orange Avenue Palomar Street to Interstate 805 Chula Vista
24 Otay Lakes Road Bonita Road to Wueste Road Chula Vista
25 Otay Valley Road (Main Street) Interstate 805 to Heritage Road Chula Vista
26 Palomar Street Interstate 5 to Orange Avenue Chula Vista
27 Paseo Ranchero (Heritage Road) East H Street to City of San Diego Chula Vista
28 Proctor Valley Road Mt. Miguel Road to Hunte Parkway Chula Vista
29 Telegraph Canyon Road Interstate 805 to Otay Lakes Road Chula Vista
30 Willow Street Sweetwater Road to Bonita Road Chula Vista
31 State Route 75 City of San Diego to City of Imperial Beach Coronado
32 Via de la Valle Highway 101 to Jimmy Durante Boulevard Del Mar
33 2nd Street Greenfield Drive to Main Street El Cajon
34 Avocado Avenue Main Street to Chase Avenue El Cajon
35 Avocado Boulevard Chase Avenue to Dewitt Court El Cajon
36 Ballantyne Street Broadway to Main Street El Cajon
37 Bradley Avenue Marshall Avenue to County of San Diego El Cajon
38 Broadway State Route 67 to East Main Street El Cajon
39 Cuyamaca Street City of Santee to Marshall Avenue El Cajon
40 E Main Street Broadway to Greenfield Drive El Cajon
Arterial
347
TA 7-44 2007 Regional Transportation Plan – Technical Appendices
Table TA 7.19—Regional Arterials by Jurisdiction (cont’d)
41 El Cajon Boulevard Chase Avenue to Washington Avenue El Cajon
42 Fletcher Parkway City of La Mesa to State Route 67 El Cajon
43 Greenfield Drive East Main Street to Interstate 8 El Cajon
44 Jamacha Road Main Street to Grove Road El Cajon
45 Marshall Avenue Cuyamaca to Fletcher Parkway El Cajon
46 Marshall Avenue Fletcher Parkway to West Main Street El Cajon
47 Marshall Avenue West Main Street to Washington Avenue El Cajon
48 Navajo Road Fanita Drive to Fletcher Parkway El Cajon
49 Washington Avenue El Cajon Boulevard to Jamacha Road El Cajon
50 West Main Street Interstate 8 to Marshall Avenue El Cajon
51 Coast Highway City of Carlsbad to City of Solana Beach Encinitas
52 El Camino Real Olivenhain to Manchester Avenue Encinitas
53 Encinitas Boulevard Coast Highway 101 to El Camino Real Encinitas
54 La Costa Avenue Coast Highway 101 to Interstate 5 Encinitas
55 Leucadia Boulevard Coast Highway 101 to El Camino Real Encinitas
56 Manchester Avenue El Camino Real to Interstate 5 Encinitas
57 Olivenhain Road El Camino Real to Los Pinos Circle Encinitas
58 Barham Drive Los Amigos to Mission Road Escondido
59 Centre City Parkway Country Club Lane (Interstate 15) to South Escondido Boulevard/South Centre City Parkway (Interstate 15)
Escondido
60 Citracado Parkway Centre City Parkway to State Route 78 Escondido
61 East Valley Parkway Broadway to Valley Center Grade Road Escondido
62 East Via Rancho Parkway Broadway to Sunset Drive Escondido
63 El Norte Parkway Nordahl Road to Washington Avenue Escondido
64 El Norte Parkway Woodland Parkway to Rees Road Escondido
65 Felicita/17th Avenue Interstate 15 to State Route 78 Escondido
66 Grand Avenue/2nd Avenue/Valley Boulevard West Valley Parkway to East Valley Parkway Escondido
67 Hale Avenue Washington Avenue to Interstate 15 Escondido
68 Lincoln/Ash Parkway Broadway to Washington Avenue Escondido
69 Mission Avenue Andreason Drive to Centre City Parkway Escondido
70 Mission Road Barham Drive to Andreason Drive Escondido
71 Via Rancho Parkway Del Dios Highway to Sunset Drive Escondido
72 Washington Avenue State Route 78 to East Valley Parkway Escondido
73 West Valley Parkway Claudan Road to Broadway Escondido
74 State Route 75 City of Coronado to City of San Diego Imperial Beach
75 70th Street University Avenue to Colony Road La Mesa
76 70th Street Saranac Street to Interstate 8 La Mesa
77 El Cajon Boulevard 73rd Street to Interstate 8 La Mesa
78 Fletcher Parkway Interstate 8 to City of El Cajon La Mesa
79 Grossmont Center Drive Interstate 8 to Fletcher Parkway La Mesa
80 Jackson Drive La Mesa Boulevard to North City limits La Mesa
348
2030 Regional Transportation Plan – Technical Appendices TA 7-45
Table TA 7.19—Regional Arterials by Jurisdiction (cont’d)
Limits Jurisdiction
81 La Mesa Boulevard University Avenue to Interstate 8 La Mesa
82 Lake Murray Interstate 8 to Dallas Street La Mesa
83 Massachusetts Avenue State Route 94 to University Avenue La Mesa
84 Spring Street Interstate 8 to State Route 125 La Mesa
85 University Avenue 69th Street to La Mesa Boulevard La Mesa
86 Broadway Spring Street to Lemon Grove Avenue Lemon Grove
87 College Avenue Livingston Street to Federal Boulevard Lemon Grove
88 Federal Boulevard College Avenue to State Route 94 Lemon Grove
89 Lemon Grove Avenue Viewcrest to State Route 94 Lemon Grove
90 Massachusetts Avenue Broadway to State Route 94 Lemon Grove
91 Massachusetts Avenue Lemon Grove Avenue to Broadway Lemon Grove
92 Sweetwater Road Broadway to Troy Street Lemon Grove
93 30th Street National City Boulevard to 2nd Street National City
94 Euclid Avenue Cervantes Avenue to Sweetwater Road National City
95 Harbor Drive City of San Diego to Interstate 5 National City
96 National City Boulevard Division Street to 30th Street National City
97 Palm Avenue Interstate 805 to 18th Street National City
98 Paradise Valley Road 8th Street to Plaza Boulevard National City
99 Plaza Boulevard National City Boulevard to 8th Street National City
100 Sweetwater Road 2nd Street to Plaza Bonita Center Way National City
101 Coast Highway Interstate 5 to Eaton Street Oceanside
102 College Boulevard North River Road to State Route 78 Oceanside
103 El Camino Real Douglas Drive to State Route 78 Oceanside
104 Melrose Drive State Route 76 to Rancho Santa Fe Road Oceanside
105 Mission Avenue Coast Highway to Frazee Road Oceanside
106 North River Road Douglas Drive to State Route 76 Oceanside
107 North Santa Fe Avenue State Route 76 to Melrose Drive Oceanside
108 Oceanside Boulevard Hill Street to Melrose Drive Oceanside
109 Rancho del Oro Drive State Route 78 to State Route 76 Oceanside
110 Vandegrift Boulevard North River Road to Camp Pendleton Oceanside
111 West Vista Way Jefferson Street to Thunder Drive Oceanside
112 Camino del Norte World Trade Drive to Pomarado Road Poway
113 Community Road Twin Peaks Road to Scripps Poway Parkway Poway
114 Espola Road Summerfield Lane to Poway Road Poway
115 Pomerado Road Stonemill Drive to Gateway Park Road Poway
116 Poway Road Springhurst Drive to State Route 67 Poway
117 Scripps Poway Parkway Springbrook to Sycamore Canyon Road Poway
118 Ted Williams Parkway Pomerado Road to Twin Peaks Road Poway
119 Twin Peaks Road Pomarado Road to Espola Road Poway
120 1st Avenue Harbor Drive to Interstate 5 San Diego City
Arterial
349
TA 7-46 2007 Regional Transportation Plan – Technical Appendices
Table TA 7.19—Regional Arterials by Jurisdiction (cont’d)
Limits Jurisdiction
121 4th Avenue Market Street to Washington Street San Diego City
122 5th Avenue Market Street to Washington Street San Diego City
123 6th Avenue Ash Street to State Route 163 San Diego City
124 10th Avenue State Route 163 to Imperial Avenue San Diego City
125 11th Avenue G Street to State Route 163 San Diego City
126 32nd Street Harbor Drive to Wabash Boulevard San Diego City
127 47th Street State Route 94 to Interstate 805 San Diego City
128 54th Street El Cajon Boulevard to Euclid Avenue San Diego City
129 70th Street Colony Road to Saranac Street San Diego City
130 A Street 11th Avenue to Kettner Boulevard San Diego City
131 Adams Avenue Park Boulevard to Interstate 15 San Diego City
132 Aero Drive State Route 163 to Interstate 15 San Diego City
133 Airway Road Caliente to State Route 125 San Diego City
134 Ash Street Harbor Drive to 10th Avenue San Diego City
135 Auto Circle Camino del Rio North to Camino del Rio South San Diego City
136 Balboa Avenue Mission Bay Drive to Interstate 15 San Diego City
137 Barnett Avenue Lytton Street to Pacific Highway San Diego City
138 Bernardo Center Drive Camino del Norte to Interstate 15 San Diego City
139 Beyer Boulevard Main Street to East Beyer Boulevard San Diego City
140 Beyer Way Main Street to Palm Avenue San Diego City
141 Britannia Boulevard Otay Mesa Road to Siempre Viva Road San Diego City
142 Black Mountain Road Del Mar Heights to Carroll Canyon Road San Diego City
143 Broadway Harbor Drive to 11th Avenue San Diego City
144 Cabrillo Memorial Drive Cochran Street to Cabrillo National Monument San Diego City
145 Camino del Norte Camino San Bernardo to World Trade Drive San Diego City
146 Camino del Rio North Mission Center Road to Mission Gorge Road San Diego City
147 Camino Ruiz Mira Mesa Boulevard to Miramar Road San Diego City
148 Camino Ruiz State Route 56 to Camino del Norte San Diego City
149 Camino Santa Fe Avenue Sorrento Valley Boulevard to Miramar Road San Diego City
150 Canon Street Rosecrans Street to Catalina Boulevard San Diego City
151 Carmel Mountain Road Camino del Norte to Rancho Peñasquitos Boulevard San Diego City
152 Carmel Mountain Road Sorrento Valley Road to El Camino Real San Diego City
153 Carmel Valley Road North Torrey Pines Road to El Camino Real San Diego City
154 Catalina Boulevard Canon Street to Cochran Street San Diego City
155 Clairemont Drive Clairemont Mesa Boulevard to Interstate 5 San Diego City
156 Clairemont Mesa Boulevard Interstate 15 to Regents Road San Diego City
157 College Avenue Navajo Road to Livingston Street San Diego City
158 Collwood Boulevard Montezuma Road to El Cajon Boulevard San Diego City
159 Convoy Street Linda Vista Road to State Route 52 San Diego City
160 Cesar E. Chavez Parkway Interstate 5 to Harbor Drive San Diego City
Arterial
350
2030 Regional Transportation Plan – Technical Appendices TA 7-47
Table TA 7.19—Regional Arterials by Jurisdiction (cont’d)
Limits Jurisdiction
161 Dairy Mart Road State Route 905 to Interstate 5 San Diego City
162 Del Dios Highway Via Rancho Parkway to Claudan Road San Diego City
163 Del Mar Heights Road Interstate 5 to Carmel Valley Road San Diego City
164 El Cajon Boulevard Park Boulevard to 73rd Street San Diego City
165 El Camino Real Via de la Valle to Carmel Mountain Road San Diego City
166 Euclid Avenue 54th Street to Cervantes Avenue San Diego City
167 F Street State Route 94 to 10th Avenue San Diego City
168 Fairmount Avenue Interstate 8 to State Route 94 San Diego City
169 Friars Road Sea World Drive to Mission Gorge Road San Diego City
170 Front Street Interstate 5 to Market Street San Diego City
171 G Street State Route 94 to 10th Avenue San Diego City
172 Garnet Avenue Balboa Avenue to Mission Bay Drive San Diego City
173 Genesee Avenue North Torrey Pines Road to State Route 163 San Diego City
174 Gilman Drive La Jolla Village Drive to Interstate 5 San Diego City
175 Grand Avenue Mission Boulevard to Mission Bay Drive San Diego City
176 Governor Drive Interstate 805 to Regents Road San Diego City
177 Grape Street North Harbor Drive to Interstate 5 San Diego City
178 Harbor Drive Pacific Highway to City of National City San Diego City
179 Hawthorn Street Interstate 5 to North Harbor Drive San Diego City
180 Heritage Road Otay Mesa Road to Siempre Viva Road San Diego City
181 Heritage Road Otay Valley Road to City of Chula Vista San Diego City
182 Imperial Avenue Park Boulevard to Lisbon Street San Diego City
183 Ingraham Street Sunset Cliffs Boulevard to Grand Avenue San Diego City
184 Kearny Villa Road Pomarado Road to Aero Drive San Diego City
185 Kettner Boulevard Interstate 5 to India Street San Diego City
186 La Jolla Boulevard Pearl Street to Turquoise Street San Diego City
187 La Jolla Parkway Torrey Pines Road to Interstate 5 San Diego City
188 La Jolla Shores Drive Torrey Pines Road to North Torrey Pines Road San Diego City
189 La Jolla Village Drive North Torrey Pines Road to Interstate 805 San Diego City
190 La Media Road Otay Mesa Road to Siempre Viva Road San Diego City
191 Lake Murray Boulevard Dallas Street to Navajo Road San Diego City
192 Laurel Street North Harbor Drive to Interstate 5 San Diego City
193 Lemon Grove Avenue Lisbon Street to Viewcrest San Diego City
194 Linda Vista Road Morena Boulevard to Convoy Street San Diego City
195 Lytton Street Rosecrans Street to Barnett Avenue San Diego City
196 Market Street Harbor Drive to Euclid Avenue San Diego City
197 Mercy Road Black Mountain Road to Interstate 15 San Diego City
198 Mesa College Drive Interstate 805 to Marlesta Drive San Diego City
199 Midway Drive West Point Loma Boulevard to Barnett Avenue San Diego City
200 Mira Mesa Boulevard Interstate 805 to Interstate 15 San Diego City
Arterial
351
TA 7-48 2007 Regional Transportation Plan – Technical Appendices
Table TA 7.19—Regional Arterials by Jurisdiction (cont’d)
Limits Jurisdiction
201 Miramar Road Interstate 805 to Interstate 15 San Diego City
202 Mission Boulevard Loring Street to West Mission Bay Drive San Diego City
203 Mission Bay Drive Grand Avenue to Interstate 5 San Diego City
204 Mission Center Road Camino del Rio North to Friars Road San Diego City
205 Mission Gorge Road Interstate 8 to Highridge Road San Diego City
206 Montezuma Road Fairmount Avenue to El Cajon Boulevard San Diego City
207 Morena Boulevard Balboa Avenue to Interstate 8 San Diego City
208 Navajo Road Waring Road to Fanita Drive San Diego City
209 Nimitz Boulevard Interstate 8 to Harbor Drive San Diego City
210 North Harbor Drive Rosecrans Street to Grape Street San Diego City
211 North Torrey Pines Road (S-21) Carmel Valley Road to La Jolla Village Drive San Diego City
212 Ocean View Hills Parkway Interstate 805 to State Route 905 San Diego City
213 Otay Mesa Road State Route 905 to State Route 125 San Diego City
214 Pacific Highway Sea World Drive to Harbor Drive San Diego City
215 Palm Avenue State Route 75 to Interstate 805 San Diego City
216 Paradise Valley Road Plaza Boulevard to Meadowbrook Drive San Diego City
217 Park Boulevard Imperial Avenue to Adams Avenue San Diego City
218 Picador Boulevard Palm Avenue to Interstate 905 San Diego City
219 Pomerado Road Interstate 15 (north) to Interstate 15 (south) San Diego City
220 Poway Road Interstate 15 to Springhurst Drive San Diego City
221 Qualcomm Way Intestate 8 to Friars Road San Diego City
222 Rancho Bernardo Road Interstate 15 to Summerfield Lane San Diego City
223 Rancho Carmel Drive Carmel Mountain Road to Ted Williams Parkway San Diego City
224 Rancho Peñasquitos Boulevard State Route 56 to Interstate 15 San Diego City
225 Regents Road Genesee Avenue to Clairemont Mesa Boulevard San Diego City
226 Rosecrans Street Interstate 8 to Canon Street San Diego City
227 Ruffin Road Kearny Villa Road to Aero Drive San Diego City
228 Sabre Springs Parkway Ted Williams Parkway to Poway Road San Diego City
229 San Ysidro Boulevard Dairy Mart Road to East Beyer Boulevard San Diego City
230 Scripps Poway Parkway Interstate 15 to Springbrook Drive San Diego City
231 Sea World Drive West Mission Bay Drive to Morena Boulevard San Diego City
232 Siempre Viva Road Heritage Road to State Route 905 San Diego City
233 Sorrento Valley Boulevard Sorrento Valley Road to Camino Santa Fe Avenue San Diego City
234 Sports Arena Boulevard Interstate 8 to Rosecrans Street San Diego City
235 Sunset Cliffs Boulevard Interstate 8 to West Mission Bay Drive San Diego City
236 Ted Williams Parkway Interstate 15 to Pomerado Road San Diego City
237 Texas Street Interstate 8 to University Avenue San Diego City
238 Torrey Pines Road Girard Avenue to La Jolla Parkway San Diego City
239 University Avenue State Route 163 to City of La Mesa San Diego City
240 Valencia Parkway Market Street to Imperial Avenue San Diego City
Arterial
352
2030 Regional Transportation Plan – Technical Appendices TA 7-49
Table TA 7.19—Regional Arterials by Jurisdiction (cont’d)
Limits Jurisdiction
241 Via de la Valle Jimmy Durante Boulevard to El Camino Real San Diego City
242 Vista Sorrento Parkway Sorrento Valley Boulevard to Carmel Mountain Road San Diego City
243 Wabash Boulevard 32nd Street to Interstate 5 San Diego City
244 Washington Street Pacific Highway to Park Boulevard San Diego City
245 Waring Road College Avenue to Interstate 8 San Diego City
246 West Bernardo Drive Interstate 15 to Bernardo Center Drive San Diego City
247 West Mission Bay Drive Mission Boulevard to Sunset Cliffs Boulevard San Diego City
248 Woodman Street State Route 54 to Imperial Avenue San Diego City
249 Alpine Boulevard Interstate 8/Dunbar Lane to Interstate 8/Willows Road San Diego County
250 Avocado Boulevard Dewitt Court to State Route 94 San Diego County
251 Bear Valley Parkway City of Escondido (north) to City of Escondido (south) San Diego County
252 Bonita Road Interstate 805 to San Miguel Road San Diego County
253 Borrego Springs/Yaqui Pass Road (S-3) Palm Canyon Drive (S-22) to State Route 78 San Diego County
254 Bradley Avenue Wing Avenue to Winter Garden Boulevard San Diego County
255 Buckman Springs/Sunrise Highway (S-1) State Route 94 to State Route 79 San Diego County
256 Buena Creek Road South Santa Fe Avenue to Twin Oaks Valley Road San Diego County
257 Camino del Norte Rancho Bernardo Road to City of San Diego San Diego County
258 Campo Road Spring Street to Sweetwater Springs/State Route 54 San Diego County
259 Citracado Parkway Greenwood Place to Interstate 15 San Diego County
260 Cole Grade Road State Route 76 to Valley Center Road San Diego County
261 Deer Springs Road Twin Oaks Valley Road to Interstate 15 San Diego County
262 Dehesa Road Jamacha Road to Harbison Canyon Road San Diego County
263 Dehesa Road* Harbison Canyon Road to Sycuan Road San Diego County
264 Del Dios Highway Via Rancho Parkway to Paseo de Delicias San Diego County
265 Dye Road State Route 67 to San Vicente Road San Diego County
266 Dye Street State Route 67 to Dye Road San Diego County
267 East Vista Way State Route 76 to City of Vista San Diego County
268 El Norte Parkway Rees Road to Nordahl Road San Diego County
269 Euclid Avenue City of National City to City of National City San Diego County
270 Gamble Lane Eucalyptus Avenue to City of Escondido San Diego County
271 Gopher Canyon Road East Vista Way to Old Highway 395 San Diego County
272 Jamancha Road City of El Cajon to State Route 94 San Diego County
273 Jamancha Road State Route 125 to State Route 94 San Diego County
274 Keyes Road (Southern Traffic Bypass) San Vicente Road to State Route 78 (Julian Road) San Diego County
275 Lake Jennings Park Road State Route 67 to Interstate 8 San Diego County
276 Lake Wohlford Road Valley Center Road (north) to Valley Center Road (south) San Diego County
277 Las Posas Road City of San Marcos to Buena Creek Road San Diego County
278 Lone Star Road City of San Diego to Loop Road San Diego County
279 Mapleview Street State Route 67 to Lake Jennings Road San Diego County
280 Mar Vista Drive City of Oceanside to City of Vsita San Diego County
Arterial
353
TA 7-50 2007 Regional Transportation Plan – Technical Appendices
Table TA 7.19—Regional Arterials by Jurisdiction (cont’d)
Limits Jurisdiction
281 Melrose Drive City of Oceanside to City of Vsita San Diego County
282 Mission Road (S-13) Interstate 15 to State Route 76 San Diego County
283 Mountain Meadow Road Interstate 15/Deer Springs Road to Valley Center Road San Diego County
284 Montezuma Valley/Palm Caynon (S-22) State Route 79 to Imperial County Line San Diego County
285 Nordahl Road El Norte to City of San Marcos San Diego County
286 Old Highway 80 Buckman Springs Road to Interstate 8 (In-ko-pah) San Diego County
287 Old Highway 80 State Route 79 to Sunrise Highway San Diego County
288Old Highway 395/Champagne/North Centre City
East Mission Road to City of Escondido San Diego County
289 Otay Lakes Road Wueste Road to State Route 94 San Diego County
290 Otay Mesa Road City of San Diego to Loop Road San Diego County
291 Paradise Valley Road City of San Diego to Sweetwater Road San Diego County
292 Paseo Delicias El Camino del Norte to Via de la Valle San Diego County
293 Rancho Bernardo Road City of San Diego (west) to City of San Diego (east) San Diego County
294 San Felipe Road/Overland Route (S-2) County Route S-22 to Imperial County Line San Diego County
295 San Vicente Road/10th Street State Route 67 (Main Street) to Wildcat Canyon Road San Diego County
296 Scripps Poway Parkway Sycamore Canyon Road to State Route 67 San Diego County
297 Siempre Viva Road City of San Diego to Loop Road San Diego County
298 South Santa Fe Avenue City of Vista to City of San Marcos San Diego County
299 Sunrise Highway State Route 79 to Interstate 8 San Diego County
300 Sweetwater Road (Bonita) Willow Street to City of National City San Diego County
301 Sweetwater Road (Spring Valley) Jamacha Boulevard to Broadway San Diego County
302 Sweetwater Springs Boulevard Jamacha Boulevard to State Route 94 San Diego County
303 Valley Center Road State Route 76 to City of Escondido San Diego County
304 Valley Center New Northern E to W Road Cole Grade Road to Old Highway 395 San Diego County
305 Via de la Valle City of San Diego to Paseo Delicias San Diego County
306 Via Rancho Parkway Del Dios Highway to City of Escondido San Diego County
307 Wildcat Canyon Road* Mapleview Street to San Vicente Road San Diego County
308 Willow Glen Drive Jamacha Road to Dehesa Road San Diego County
309 Willows Road Interstate 8 to Viejas Casino San Diego County
310 Winter Gardens Boulevard State Route 67 to 2nd Street San Diego County
311 Barham Drive Twin Oaks Valley Road to Los Amigos San Marcos
312 Borden Road Las Posas Road to Woodland Parkway San Marcos
313 Buena Creek Road Twin Oaks Valley Road to Sunny Vista Lane San Marcos
314 Discovery Street San Marcos Boulevard to Twin Oaks Valley Road San Marcos
315 Las Posas Road West San Marcos Boulevard to North City Limits San Marcos
316 Mission Road Pacific Street to Barham Drive San Marcos
317 San Elijo Road Twin Oaks Valley Road to Rancho Santa Fe Road San Marcos
318 Rancho Santa Fe Road Mission Road to Melrose Drive San Marcos
319 San Marcos Boulevard Business Park Drive to Mission Road San Marcos
320 South Santa Fe Avenue Smilax Road to Pacific Street San Marcos
Arterial
354
2030 Regional Transportation Plan – Technical Appendices TA 7-51
Table TA 7.19—Regional Arterials by Jurisdiction (cont’d)
Limits Jurisdiction
321 Twin Oaks Valley Road Deer Springs Road to Questhaven Road San Marcos
322 Woodland Parkway Barham Drive to El Norte Parkway San Marcos
323 Cuyamaca Street Mission Gorge Road to City of El Cajon Santee
324 Magnolia Avenue Mast Boulevard to Prospect Avenue/State Route 67 Santee
325 Mast Boulevard State Route 52 to Magnolia Avenue Santee
326 Mission Gorge Road City of San Diego to Magonia Avenue Santee
327 Woodside Avenue Magnolia Avenue to State Route 67 Santee
328 Coast Highway City of Encinitas to City of Del Mar Solana Beach
329 Lomas Santa Fe Avenue Interstate 5 to Coast Highway Solana Beach
330 Bobier Drive North Melrose Drive to East Vista Way Vista
331 Cannon Road (Mar Vista Drive) South Melrose Drive to State Route 78 Vista
332 East Vista Way Escondido Avenue to County of San Diego Vista
333 Emerald Drive Sunset Drive to State Route 78 Vista
334 Escondido Avenue State Route 78 to E. Vista Way Vista
335 North Melrose Drive State Route 78 to Bobier Drive Vista
336 North Santa Fe Avenue Main Street to North Melrose Drive Vista
337 Olive Avenue Emerald Drive to Vista Village Drive Vista
338 South Melrose Drive City of Carlsbad to State Route 78 Vista
339 South Santa Fe Avenue Main Street to County of San Diego Vista
340 Sycamore Avenue South Santa Fe Avenue to South Melrose Drive Vista
341 Thibodo Road Mar Vista Drive (Cannon Road) to Sycamore Avenue Vista
342 Vista Village Drive State Route 78 to Escondido Avenue Vista
343 West Vista Way Thunder Drive to Vista Village Drive Vista
Arterial
bold = added to Regional Arterial System with 2030 RTP
* Included in Regional Arterial System contingent upon being designated as a four-lane arterial by the County of San Diego.
355
2010 Regional Transportation Improvement Program (RTIP) San Diego Region – Public Comments and Responses to the Draft RTIP
359
No. Date Form Name/Agency Comment (as summarized) Response 1 8/17/10 E-mail [email protected] Project CNTY35 lacks merit, would
like to suspend/stop funding for this project.
For local projects, TransNet funds are allocated based on formula as outlined in the TransNet Ordinance; the local governing body determines the use and project priorities; the email was forwarded to the County of San Diego.
2 8/18/10 Written letter transmitted via e-mail
Julie Wright: (W)right on Communications
Traffic congestion on I-5 leads to cost for small business owners including impact to productivity. There is a need for additional roads and widening of I-5 as well as providing an alternate route out of northern part of the County such as SR 241.
The environmental document for the I-5 improvement is currently out for public comment, which will lead to a preferred alternative for the freeway. The proposed 2010 RTIP includes the funding for I-5 through its environmental phase with full funding for construction included in the long range Regional Transportation Plan (RTP).
3 8/20/10 Written letter transmitted via e-mail
Gary Knight: San Diego North Economic Development Council
The widening of I-5 and additional alternative route to northern San Diego is vitally important in order to reduce congestion which will enhance productivity and improve gas mileage.
Same response as above.
4 8/23/10 Written letter transmitted via e-mail
John Whitman The 2010 RTIP should be a balanced program that builds new roads and widen existing arterials and freeways. With advances in fuel technology, cars will be the primary mode choice for commuters. Better alternatives are needed for roadway systems.
The RTIP implements the Regional Transportation Plan (RTP), which outlines a balance of transportation choices. The RTIP includes freeway improvements and widening, as well as improvements to local street and roads, transit and non-motorized projects.
360
No. Date Form Name/Agency Comment (as summarized) Response 5 8/23/10 Written
letter transmitted via e-mail
Bella Huele: World Trade Center San Diego
Increase truck capacity to handle cargo movement is an essential part of the economy and quality of life.
SANDAG concurs that transportation plays a critical role in goods movement. While the RTP includes the long range vision to improve goods movement in the region, the proposed 2010 RTIP includes projects such as SR 905, SR 11, and various port projects to address some of the challenges.
6 8/25/10 Written letter transmitted via e-mail
Hasan Ikhrata,
Southern California Association of Governments (SCAG)
SCAG supports the SANDAG Board approval of the 2010 RTIP; acknowledges great partnership between SCAG and SANDAG.
SANDAG recognizes the importance of cross-regional partnerships and agrees that SCAG continues to be is a key partner with SANDAG in developing interregional transportation solutions.
7 8/25/10 Written letter
Patricia C. Bates, Orange County Board of Supervisors
While applauding the emphasis on transit in the 2010 RTIP, SANDAG needs to be mindful of the need for all modes of transportation. San Diego, Los Angeles, and Orange are the three largest counties in the state and keeping a varied transportation network is the key to continued economic vitality.
SANDAG concurs that transportation networks cross regional boundaries; that coordination and cooperation with our neighboring counties is essential to maintaining travel mobility. The proposed 2010 RTIP includes a balance of projects between various modes including major highway, transit, local street and roads, and nonmotorized projects.
8 8/26/10 E-mail Ted Owen, Carlsbad Chamber of Commerce
Encourages SANDAG to make sure that North County is included in future plans; that transportation – local, state, and highway system is the backbone of goods movement. There are critical needs for a strong highway system, the traffic through which the region’s economy depends.
The 2010 RTIP is a balanced multimodal program of projects derived from the long range plan, the RTP. The proposed 2010 RTIP includes funding for expansion and improvements to highway, rail, roadways, and nonmotorized projects. The projects also are geographically balanced with major work currently underway along I-5, I-15, and SR 76.
361
No. Date Form Name/Agency Comment (as summarized) Response 9 8/27/10 Written
letter David Nydegger, Oceanside Chamber of Commerce
San Diego needs a holistic approach to transportation planning in order to grow our economy; study shows the region’s economic strength comes from goods movement and tourism. In order to protect the economic health of our region, foremost emphasis should be on the improvements to our roadway system.
The proposed 2010 RTIP is a balanced multimodal program of projects derived from the long range plan, the RTP. The proposed 2010 RTIP includes funding for expansion and improvements to highway, rail, roadways, and nonmotorized projects.
10 8/27/10 Written letter
Marnie O’Brien Primmer, Mobility 21
Goods movement is a key component to a strong economy; encourage SANDAG to give due consideration to the transportation infrastructure necessary to maintain the region’s economic health, including new highways, new and expanded rail freight corridors, new truck lanes.
SANDAG concurs that transportation plays a critical role in goods movement. While the RTP includes the long range vision to improve goods movement in the region, the proposed 2010 RTIP includes improvements and expansion of major highway and rail projects (along the LOSSAN corridor) that will help relieve vehicle traffic as well as provide more efficient passenger rail service and improve freight movement.
11 8/31/10 Written letter
Kia Mortazavi, Orange County Transportation Authority
Southern California region is facing transportation related challenges that are shared across borders. As part of the 2010 RTIP, SANDAG should consider the regional implications and need for further improvement in infrastructure to accommodate travel between counties of San Diego and Orange.
SANDAG considers OCTA a vital partner in cross-county transportation issues and appreciates the coordination and cooperation between the two agencies in developing interregional transportation projects.
362
No. Date Form Name/Agency Comment (as summarized) Response 12 9/2/10 Written
letter Ruben Barrales, San Diego Regional Chamber of Commerce
Two key business sectors essential to the region’s economy are goods movement and tourism, both requiring efficient multi-modal transportation network.
SANDAG concurs that an efficient multi-modal transportation network is vital to the region’s economy and recognize that goods movement plays a key role. This 2010 RTIP is a balanced multimodal program of projects derived from the long range plan, the RTP. The proposed 2010 RTIP includes funding for expansion and improvements to highway, rail, roadways, and nonmotorized projects.
13 9/3/10 SANDAG Transportation Committee Public Hearing
Gary Knight: San Diego North Economic Development Council
The region needs an effective transportation system and supports SANDAG’s balanced program.
Comment noted.
14 9/3/10 SANDAG Transportation Committee Public Hearing
Jay Powell: City Heights Community Development Corporation (CHCDC)
While CHCDC appreciates and supports SANDAG for implementing important projects, project SAN26C, I-15 BRT Mid-City In-Line Bus Rapid Transit Stations may need additional funding in order to complete.
The project is currently in the environmental phase, once a preferred alternative is determined, the SANDAG Board ultimately decides on the schedule and funding. In the mean time, SANDAG understands the importance of the projects and continues work with the community.
365
Appendix H
GLOSSARY OF TERMS AND ACRONYMS
A AC Advanced Construction ADA Americans with Disabilities Act ADT Average Daily Traffic APCB San Diego Air Pollution Control Board APCD San Diego Air Pollution Control District ARB California Air Resources Board ARRA American Recovery and Reinvestment Act ATCDF Average Train Crossing Delay Factor
B
BIA Bureau of Indian Affairs BIP Border Infrastructure Program BPWG Bicycle-Pedestrian Working Group BRT Bus Rapid Transit BTA Bicycle Transportation Account
C
CAA Clean Air Act CAAA 1990 Clean Air Act Amendments Caltrans California Department of Transportation CARB California Air Resources Board CBI Corridors and Borders Infrastructure CHP California Highway Patrol CI Capacity Increasing CIP Capital Improvement Program CMAQ Congestion Mitigation and Air Quality Program CMIA Corridor Mobility Improvement Account CO Carbon Monoxide CON Construction Phase CPI Consumer Price Index CTAC Cities/County Transportation Advisory Committee CTC California Transportation Commission CTC Centralized Train Control CWG Conformity Working Group
366
D DAR Direct Access Ramp DEFM Demographic and Economic Forecasting Model DEMO Demonstration DOT U.S. Department of Transportation
E
EAP Early Action Program EMFAC EMissions FACtors Model EPA U.S. Environmental Protection Agency EPSP Expedited Project Selection Process
F
FE Fund Estimate FHWA Federal Highway Administration FR Federal Register FRA Federal Railroad Administration FSP Freeway Service Patrol or FSP Act FSTIP Federal State Transportation Improvement Program FTA Federal Transit Administration FTIP Federal Transportation Improvement Program FWG Freight Working Group FY Fiscal Year
G
GARVEE Grant Anticipation Revenue Vehicle GIS Geographic Information System
H
HBP Highway Bridge Program HCD Housing and Community Development HES Hazard Elimination Safety HIRE Hiring Incentives to Restore Employment HOV High Occupancy Vehicle HPMS Highway Performance Monitoring System HPP High Priority Program HRCSA Highway-Railroad Crossing Safety HRRR High Risk Rural Roads HSIP Highway Safety Improvement Program HUD Housing and Urban Development
I
IIP Interregional Improvement Program IM Interstate Maintenance IRR Indian Reservation Road ITOC Independent Taxpayer Oversight Committee ITS Intelligent Transportation System
367
J JARC Jobs Access Reverse Commute JTOC Joint Transportation Operations Center
L
LOS Level of Service LOSSAN Los Angeles to San Diego (Rail Corridor Agency)
M
MPO Metropolitan Planning Organization MTS Metropolitan Transit System
N
NAAQS National Ambient Air Quality Standards NCI Non Capacity Increasing NCTD North County Transit District NEPA National Environmental Protection Act NHS National Highway System NOx Nitrogen Oxide
P
P/PE Preliminary Engineering Phase PADT Person Average Daily Traffic PM Particulate Matter POF Plan of Finance POP Program of Projects PPEI Peak-Period Exposure Index PPNO Project Number (Caltrans) PPP Public Participation Plan PTA Public Transportation Account PTMISEA Public Transportation Modernization, Improvement, and Service Enhancement
Account R
RAQS Regional Air Quality Strategy RAS Regional Arterial System RCP Regional Comprehensive Plan RHNA Regional Housing Needs Assessment RHWG Regional Housing Working Group RIP Regional Improvement Program ROG Reactive Organic Gas ROW Right-of-Way RSTP Regional Surface Transportation Program RTC Regional Transportation Commission RTIP Regional Transportation Improvement Program RTP Regional Transportation Plan or Recreational Trails Program RTPA Regional Transportation Planning Agency
368
S SAFETEA-LU Safe, Accountable, Flexible, and Efficient Transportation Equity Act: A Legacy for
Users SANDAG San Diego Association of Governments SANTEC San Diego Regional Traffic Engineers’ Council SB Senate Bill SCAT Subcommittee for Accessible Transportation SD&AE San Diego and Arizona Eastern Railway SHA State Highway Account SHOPP State Highway Operation and Protection Program SIP State Implementation Plan (for air quality) SLPP State-Local Partnership Program SOV Single Occupant Vehicle SR State Route (as in SR 52 - State Route 52) SRTS Safe Routes to School Program SS Senior Services STA State Transit Assistance STIP State Transportation Improvement Program STIP-IIP State Transportation Improvement Program – Interregional Improvement Program STIP-RIP State Transportation Improvement Program – Regional Improvement Program
(SANDAG) STP Surface Transportation Program SWG Stakeholders Working Group (Regional Planning)
T
T-1 Transportation T-tactic: Ridesharing T-2 Transportation T-tactic: Transit T-3 Transportation T-tactic: Bicycle T-5 Transportation T-tactic: Traffic Improvement TAP Transit Access Point TCI Transit Capital Improvement TCIF Trade Corridor Improvement Fund TCM Transportation Control Measure TCRP Traffic Congestion Relief Program TCSP Transportation, Community, and Systems Preservation TDA Transportation Development Act TDM Transportation Demand Management TE Transportation Enhancement TEA-21 Transportation Equity Act for the 21st Century TIF Transportation Investment Fund TIGER Transportation Investment Generating Economic Recovery TIGGER Transit Investment for Greenhouse Gas Emission Reduction TIP Transportation Improvement Program TPEC Transportation Project Evaluation Criteria TransCAD Transportation Planning Computer Package TransNet San Diego Region ½ cent Local Transportation Sales Tax Program TSM Traffic Systems Management TWG Technical Working Group