25
FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) EVALUATION PIN 0054.05.103 NY Route 347 Safety and Mobility Improvement Project Northern State Parkway to NY Route 25A Towns of Smithtown, Islip & Brookhaven Suffolk County May 2007 Asbestos Containing Materials Volume II, Appedix C U.S. Department of Transportation Federal Highway Administration NEW YORK STATE DEPARTMENT OF TRANSPORTATION ELIOT SPITZER, Governor ASTRID C. GLYNN, Acting Commissioner

FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) … · 2012-12-06 · FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) EVALUATION PIN 0054.05.103 NY Route 347 Safety and Mobility

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) … · 2012-12-06 · FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) EVALUATION PIN 0054.05.103 NY Route 347 Safety and Mobility

FINAL DESIGN REPORT/FINALEIS/FINAL SECTION 4(F)

EVALUATION

PIN 0054.05.103NY Route 347 Safety and Mobility Improvement

Project

Northern State Parkway to NY Route 25ATowns of Smithtown, Islip & Brookhaven

Suffolk County

May 2007

Asbestos Containing Materials

Volume II, Appedix C

U.S. Department of TransportationFederal Highway Administration

NEW YORK STATE DEPARTMENT OF TRANSPORTATIONELIOT SPITZER, Governor ASTRID C. GLYNN, Acting Commissioner

Page 2: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) … · 2012-12-06 · FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) EVALUATION PIN 0054.05.103 NY Route 347 Safety and Mobility

TABLE OF CONTENTS Section Description Page EXECUTIVE SUMMARY i 1.0 INTRODUCTION 1.1 Purpose and Limitations 1-1 1.2 Geographic Location 1-2 1.3 Methodology 1-4 1.4 Identification 1-4 2.0 NECESSITY TO IDENTIFY ASBESTOS CONTAINING MATERIALS 2-1 3.0 DETERMINATION OF SUSPECT ASBESTOS CONTAINING 3-1 MATERIALS ALONG PROJECT CORRIDOR

3.1 Determination of Buildings with Suspect Asbestos Containing Material 3-1 3.2 Determination of Suspect Asbestos Containing Utilities 3-3 3.3 Determination of Asbestos Containing Materials on NYSDOT Record 3-10 Plans 3-4 Determination of Suspect Asbestos Containing Roadway Surface 3-11 FIGURES Figure 1-1 Project Corridor Site Location Map 1-3 APPENDICES Appendix A - Correspondence with Public Utility Companies Appendix B – Select Record Plans Appendix C – Select Verizon Drawings Appendix D – Photo of Suspect Asbestos Containing Materials at Veteran’s Memorial

Highway Bridge Appendix E - Suffolk County Department of Water and Sanitation Drawings Appendix F – NYSDOT Design Memo No. 92(27) - Roadways Suspect of Asbestos- Containing Asphalt

Page 3: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) … · 2012-12-06 · FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) EVALUATION PIN 0054.05.103 NY Route 347 Safety and Mobility

i

EXECUTIVE SUMMARY Environmental Planning & Management, Inc. (EPM) conducted a preliminary asbestos assessment in accordance with the New York State Department of Transportation’s Environmental Procedures Manual, in connection with the reconstruction of Route 347 from the west terminus of Northern State Parkway /New Highway in the Town of Islip for approximately 15 miles east on Route 347 to the east terminus of Westgate Drive in the Town of Brookhaven (PIN 0054.05.103). The preliminary asbestos assessment was conducted along the project corridor to identify all properties which may contain asbestos containing materials. The purpose of this assessment was to 1) aid in the alignment studies for the procurement of the Right of Way (ROW); 2) determine whether or not a site would pose a threat to the health and welfare of personnel on site during construction and; 3) if asbestos is ultimately determined to be present at a property intended for demolition, conduct all abatement activities in accordance with all applicable federal and state regulations. Materials typically suspected of containing asbestos have also been included where visual observation was too limited to adequately assess materials. A summary of the bridge, highway, and roadway components, underground utilities and buildings with the potential to be disturbed by construction activities that were evaluated during the asbestos screening include: Suspect Asbestos Containing Roadway and Bridge Components Based upon a review of the record plans of the Veterans’ Memorial Bridge and the roadway, and limited field observation, the following suspect asbestos containing materials were identified. Veteran’s Memorial Bridge:

Compressed asbestos sheet packing present at both abutment back walls;

Suspect asbestos protective coating for concrete may be present between the concrete deck and asphalt wearing surface of the bridge span;

Suspect asbestos bituminous material coating may be present on the earthen side of the abutment back walls and wingwalls;

Suspect Caulk and filler material present at vertical joints located at each wingwall;

Suspect Caulk and filler material present at upper curb joint of sidewalk; Suspect Black Mastic sealant present at lower curb joint and armored

joints.

Page 4: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) … · 2012-12-06 · FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) EVALUATION PIN 0054.05.103 NY Route 347 Safety and Mobility

ii

Project roadway:

Asbestos containing cement conduit Type II (3” transite), used for roadway lighting is buried in the roadways at the following intersections:

o Brooksite Drive; o Terry Road; o Mt. Pleasant Road; o Route 112.

Although the record plans do not always identify asbestos containing cement conduits, it should be cautioned that other intersection may contain buried ACM conduits.

Experimental asbestos asphalt material that may be present in the right

lane of the west bound Route 347, approximately 500 feet west of Arrowhead lane. This is a limited stretch of roadway of approximately 370 feet.

Suspect Asbestos Containing Utilities The following utilities were evaluated for the suspected presence of asbestos:

• Cablevision; • Keyspan; • Suffolk County Water Authority; • Suffolk County Department of Water Sanitation; • Verizon

According to Cablevision representatives there are no known asbestos containing materials on Cablevision utilities located within the Route 347 project corridor. Review of Keyspan utility plans did not identify the presence of asbestos containing materials. In addition, according to Keyspan representatives, the insulating material used on the insulated flanges, coupling and joints are typically phenolic and to the best of the Gas Engineering Department’s Knowledge, the materials do not contain asbestos. However, high and low pressure steel gas lines may have been coated from the factory with a black/brown material which is suspect for asbestos content. According to Suffolk County Water Authority (SCWA) representatives, there are no known asbestos containing materials on SCWA utilities located within the Route 347 project corridor. According to Suffolk County D.P.W. Sanitation representatives, Asbestos Cement may have been used in the construction of 10 inch Force Sewer mains that pass beneath

Page 5: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) … · 2012-12-06 · FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) EVALUATION PIN 0054.05.103 NY Route 347 Safety and Mobility

iii

Route 347 at the following locations:

1) Approximately 500 feet east of Northfield Road two 42-foot sections of 20-inch steel sleeved mains with 10-inch asbestos cement inserts each cross the west bound Route 347 and the south bound Route 347.The two mains run north to south for a total of approximately 110 feet and 122 feet each. These mains branch from the 10-inch force main that runs approximately 1500 feet east to west from the corner of North Drive and Route 347 to the branch. On the south side of route 347, these converge into one 10-inch main continues south approximately 790 feet to an office complex.

2) Adjacent to the recharge basin /pump station west of Nicolls Road, and next

to Blackwell Court, a 10 inch force main crosses Route 347 to Teak Court on the south side. This 10-inch force main is also runs from the pump station along the north side of Route 347, beneath Bonnie Lane to Balfour Lane. A total of approximately 1700 feet of Asbestos Cement force Sewer mains may be impacted by the reconstruction.

A review of Verizon utility plans, indicated the presence of significant quantities of concrete composite transite conduit for the telephone lines situated throughout much of the project corridor . Detailed descriptions of locations are indicated in the Preliminary Asbestos Containing Materials Assessment Report. Structures to be Potentially Demolished which May Contain Asbestos Three sets of criteria were utilized for inclusion of structures suspect for the presence of asbestos containing materials; As per Industrial Code Rule 56, a survey for the presence of asbestos containing materials is required on any building constructed prior to January 1, 1974, where demolition will occur. As per OSHA’s Asbestos Construction Standard 29 CFR 1926.1101, any thermal system insulation or surfacing material in structures constructed prior to 1980 are presumed asbestos containing materials, unless proven otherwise. Additionally, all structures regardless of construction date are suspected of potentially containing non-friable asbestos containing materials. All asbestos containing materials must be identified, and removed in accordance with all applicable regulations prior to demolition. Based upon Environmental Planning & Management's preliminary assessment, there are potentially 12 properties where structures are anticipated to be demolished under Design Build Alternative 10, A detailed investigation in the form of bulk sampling and analysis to confirm the presence/absence of asbestos is required. They are:

Page 6: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) … · 2012-12-06 · FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) EVALUATION PIN 0054.05.103 NY Route 347 Safety and Mobility

iv

TRN Number

Address Description Construction Date

Rehabilitation Date

Structures to be investigated for asbestos

TOWN OF ISLIP

50 500 Veteran’s Memorial Highway

Knights of Columbus

Section 002, Block -1, Lot -1

Prior to 1950 No Records available

2-story wood frame

51 501 Veteran’s Memorial Highway

Carvel Ice Cream

Section 002, Block -1, Lot -1

Prior to 1960 No Records available

1-story cinder block structure

52 551 Veteran’s Memorial Highway

Chemex Pool Supply

Section 002 Block -1 Lot 7.5

Prior to 1960 No Records available

Brick structure

53 555 Veteran’s Memorial Highway

DIT Dry Cleaners

Section 002, Block -1, Lot 7.3

Unknown No Records Available

Brick structure

54 579 Veteran’s Memorial Highway

Paradise Diner

Section 002, Block -1, Lot 7.2

Prior to 1978 No Records Available

Brick structure

TOWN OF SMITHTOWN

9 637 Veteran’s Memorial Highway

Private Residence

Sect 154, Block -1, Lot -56.5

Prior to 1986 No Records available

1-story wood frame structure

Page 7: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) … · 2012-12-06 · FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) EVALUATION PIN 0054.05.103 NY Route 347 Safety and Mobility

v

TRN Number

Address Description Construction Date

Rehabilitation Date

Structures to be investigated for asbestos

173 148 Terry Road

Woman’s Personal Care

Section, 134, Block -2, Lot 4.1

Prior to 1986 No Records available

1-story wood frame structure

174 150 Terry Road

RJD Construction

Section 134, Block -2, Lot -20

Unknown No Records available

2-story wood frame structure

300 109 S. Hillside Avenue

Private Residence

Section 114, Block -8, Lot 3

Unknown No Records available

Brick structure

310 945 Jericho Turnpike

Bruno’s Garage

District 0800 Sect 114, Block -3 Lot 10.1

Prior to 1946 No Records available

1-story brick and cinder block structure

311 26 Hillside Avenue

Private Residence

Section 114, Block -3, Lot 10.2

Unknown Unknown Unknown

312 969 Jericho Turnpike

Law Offices of Jakubowski, Robertson & Goldsmith LLP

District 0800 Sect114 Block -3 Lot 9.1

Prior to 1946 1988 Wood frame and brick structure

Summary of Suspected Asbestos Containing Materials Asbestos containing materials are suspected and /or known to be present within the project limits. More detailed field investigation inclusive of sampling and analysis will be required to confirm and delineate the extent of these suspect asbestos containing materials.

Page 8: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) … · 2012-12-06 · FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) EVALUATION PIN 0054.05.103 NY Route 347 Safety and Mobility

1-1

SECTION 1.0 – INTRODUCTION 1.1 - Purpose and Limitations This report and its appendices, comprise a Preliminary Asbestos Assessment and details the investigations conducted in order to determine which properties along the Route 347 project corridor may contain asbestos containing materials. This report is prepared in connection with the proposed New York State Department of Transportation (NYSDOT), Region 10 reconstruction of Route 347 from the west terminus of Northern State Parkway /New Highway in the Town of Islip for approximately 15 miles east on Route 347 to the east terminus of Westgate Drive in the Town of Brookhaven (PIN 0054.05.103). This report is intended to assess the potential for encountering sites with asbestos containing materials for three purposes: 1) in order to aid in alignment studies for procurement of a Right of Way (ROW) along the project corridor; 2) determining whether or not the site would pose a threat to the health and welfare of personnel on the site during construction; and 3) to comply with New York State’s Industrial Code Rule 56 which states that before all or part of the building is demolished, the owner of the building must conduct a survey or have one done by the appropriate personnel to determine whether the building contains asbestos. Three sets of criteria were utilized for inclusion of structures suspect for the presence of asbestos containing materials; As per NYS Industrial Code Rule 56, a survey for the presence of asbestos containing materials is required on any building constructed prior to January 1974, where demolition will occur. As per OSHA’s Asbestos Construction Standard 29 CFR 1926.1101, any thermal system insulation or surfacing materials in structures constructed prior to 1980 are presumed asbestos containing materials, unless proven otherwise. Additionally, the potential exists for the presence of non-friable asbestos containing materials to be present in structures, regardless of the construction date; therefore all structures to be demolished will require investigation.

Page 9: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) … · 2012-12-06 · FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) EVALUATION PIN 0054.05.103 NY Route 347 Safety and Mobility

1-2

1.2 - Geographic Location The project corridor is located along Route 347 beginning 1/8 mile west of Wyandanch Boulevard on Routes454/347 in the Town of Islip and extending east for approximately 15 miles to Westgate Drive in the Town of Brookhaven. The project corridor passes through the town of Smithtown. The following intersections are also part of the corridor study:

• Northern State Parkway/ New Highway • Northern State Parkway/Route 347 interchange • Ledgewood Drive/Autumn Drive • New Highway/Route 347 • Old Willets Path • Blydenburgh Park Drive/H. Lee Dennison Bldg. Drive • Southgate Rd/ Schoolhouse Lane / Route 454 -347 interchange Area • Brooksite Drive • Hauppauge Road (Route 111) • Plaisted Avenue • Mt. Pleasant Road • Helen Avenue • Terry Road • Town Commons Drive • Southern Blvd. • South Lake Road • Gibbs Pond Road. • Browns Road • Middle Country Road/Route 25 interchange • Moriches Road • New Moriches Road • Hallock Road • Stonybrook Road • Nicolls Road • Mark Tree Road • Pond Path Drive • North Bell Meade Road • Wireless Road • Arrowhead Lane • Old Town Road • Broadway / Crown Street • Terryville Avenue • Jane Blvd/ (Rout112) Patchogue –Port Jefferson Road Area • Crystal Brook Hollow Road • Route 25A

The project corridor is depicted in the Figure on page 1-3.

Page 10: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) … · 2012-12-06 · FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) EVALUATION PIN 0054.05.103 NY Route 347 Safety and Mobility

Copyright (C) 1997, Maptech, Inc.

Name: ST JAMESDate: 4/26/2006Scale: 1 inch equals 4444 feet

Location: 040° 52' 55.82" N 073° 09' 24.24" WCaption: Route 347 Corridor Study: From Northern State Parkway to Rt 347/ 25A

14° W

mherschfeld
Text Box
WESTERN TERMINUS
mherschfeld
Text Box
EASTERN TERMINUS
mherschfeld
Text Box
1-3
Page 11: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) … · 2012-12-06 · FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) EVALUATION PIN 0054.05.103 NY Route 347 Safety and Mobility

1-4

1.3 - Methodology A preliminary asbestos assessment was conducted in accordance with the New York State Department of Transportation’s Environmental Procedures Manual. The conclusions presented in this report are based on research into local and state agency archives, and a review of utility plans and roadway plans for the project corridor. Building department records were requested for twelve (12) properties where structures are proposed for demolition so that construction dates of the structures could be ascertained. With respect to utility and roadway plans, asbestos containing materials were suspected only if they were specifically indicated on the plans or in the specifications as having been used. EPM did not perform on-site visual inspections of the interiors of buildings suspected of containing asbestos-containing materials (see section 1.1). In addition, at this project stage, there was no sampling conducted in any building that would confirm the presence or absence of asbestos containing materials. 1.4 - Identification The properties have been categorized by the Town, Address and by their Section, Block, and Lot numbers. The properties chosen as suspect asbestos containing structures, were selected based on their construction dates. As indicated in Industrial Code Rule 56, structures constructed before 1974 must be surveyed for the presence of asbestos. OSHA’s Asbestos Construction Standard 29 CFR 1926.1101 indicates that, any thermal system insulation or surfacing materials in structures constructed prior to 1980 are presumed asbestos containing materials unless proven otherwise. Any sites where the construction date was unavailable (due to an absence of this information in local building department or tax assessor files) were also included since EPM could not make an assumption as to when the buildings were constructed.

Page 12: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) … · 2012-12-06 · FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) EVALUATION PIN 0054.05.103 NY Route 347 Safety and Mobility

1-5

SECTION 2.0 - NECESSITY TO IDENTIFY ASBESTOS CONTAINING MATERIALS Asbestos containing materials must be identified for several reasons. The Federal regulatory environment has regulations which set limits for worker exposure to asbestos on the job as set forth by the Occupational Safety and Health Administration (OSHA); The Department of Transportation considers asbestos a hazardous substance and regulates its transportation; and the USEPA regulates the use and disposal of toxic substances in air, water and land and has banned all uses of sprayed asbestos material. On the state level, New York State has adopted regulations which govern the method by which asbestos containing materials are abated and has outlined the certifications required for various asbestos disciplines, as stated in New York State's Industrial Code Rule 56. All asbestos containing materials must be properly identified, handled, removed, transported and disposed of.

Page 13: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) … · 2012-12-06 · FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) EVALUATION PIN 0054.05.103 NY Route 347 Safety and Mobility

3-1

SECTION 3.0 - DETERMINATION OF SUSPECT ASBESTOS CONTAINING MATERIALS ALONG PROJECT CORRIDOR 3.1 - Determination of Buildings with Suspect Asbestos Containing Materials Hundreds of properties exist along the Route 347 project corridor. Based upon the preliminary assessment and review of the roadway design drawings, it is anticipated that twelve properties will potentially require demolition of buildings under Design Build Alternative 10. These properties were identified according Town, Address and Section, Block, and Lot numbers (where available). As a result, structures on nine properties will require additional investigation in the form of bulk sampling and analysis to confirm the presence/absence of asbestos. Building Department records provided information on the construction date and descriptions of alterations of the structures on the properties along the Route 347 project corridor where building demolitions are proposed. TRN Number

Address Description Construction Date

Rehabilitation Date

Structures to be investigated for asbestos

TOWN OF ISLIP

50 500 Veteran’s Memorial Highway

Knights of Columbus

Section 002, Block -1, Lot -1

Prior to 1950 No Records available

2-story wood frame

51 501 Veteran’s Memorial Highway

Carvel Ice Cream

Section 002, Block -1, Lot -1

Prior to 1960 No Records available

1-story cinder block structure

52 551 Veteran’s Memorial Highway

Chemex Pool Supply

Section 002 Block -1 Lot 7.5

Prior to 1960 No Records available

Brick structure

Page 14: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) … · 2012-12-06 · FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) EVALUATION PIN 0054.05.103 NY Route 347 Safety and Mobility

3-2

TRN Number

Address Description Construction Date

Rehabilitation Date

Structures to be investigated for asbestos

TOWN OF ISLIP

52 551 Veteran’s Memorial Highway

Chemex Pool Supply

Section 002 Block -1 Lot 7.5

Prior to 1960 No Records available

Brick structure

53 555 Veteran’s Memorial Highway

DIT Dry Cleaners

Section 002, Block -1, Lot 7.3

Unknown No Records Available

Brick structure

54 579 Veteran’s Memorial Highway

Paradise Diner

Section 002, Block -1, Lot 7.2

Prior to 1978 No Records Available

Brick structure

TOWN OF SMITHTOWN

9 637 Veteran’s Memorial Highway

Private Residence

Sect 154, Block -1, Lot -56.5

Prior to 1986 No Records available

1-story wood frame structure

173 148 Terry Road

Personal Woman’s Care

Section, 134, Block -2, Lot 4.1

Prior to 1986 No Records available

1-story wood frame structure

174 150 Terry Road

RJD Construction

Section 134, Block -2, Lot -20

Unknown No Records available

2-story wood frame structure

300 109 South Hillside Avenue

Private Residence

Section 114, Block -8, Lot 3

Unknown No Records available

Brick structure

310 945 Jericho Turnpike

Bruno’s Garage

District 0800 Sect 114, Block -3 Lot 10.1

Prior to 1946 No Records available

1-story brick and cinder block structure

Page 15: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) … · 2012-12-06 · FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) EVALUATION PIN 0054.05.103 NY Route 347 Safety and Mobility

3-3

TRN Number

Address Description Construction Date

Rehabilitation Date

Structures to be investigated for asbestos

TOWN OF SMITHTOWN

311 26 Hillside Avenue

Private Residence

Section 114, Block -3, Lot 10.2

Unknown Unknown Unknown

312 969 Jericho Turnpike

Law Offices of Jakubowski, Robertson & Goldsmith LLP

District 0800 Sect114 Block -3 Lot 9.1

Prior to 1946 1988 Wood frame and brick structure

3.2 - Determination of Suspect Asbestos Containing Utilities EPM contacted Cablevision, Keyspan, Suffolk County Water Authority and Suffolk County Department of Water Sanitation to determine if underground utility plans indicate that utility conduits are composed of asbestos containing materials. Correspondence with the utilities is provided as Appendix A. According to Mr. Steve Schoen of Cablevision, there are no known asbestos containing materials on Cablevision utilities located within the Route 347 project corridor. EPM was not provided with Cablevision drawings for review as of the issuance of this report. Review of Keyspan utility plans (provided by Dewbery-Goodkind) did not identify the presence of asbestos containing materials. In addition, according to Mr. Robert J. Hagendorn of Keyspan, the insulating material used on the insulated flanges, coupling and joints are typically phenolic and to the best of the Gas Engineering Department’s Knowledge, the materials do not contain asbestos. During subsequent conversations with Mr. Hagendorn, he indicated that steel gas lines (high and low pressure) may have been coated from the factory with a black/brown material which EPM is presuming to be suspect for asbestos content. Newly installed gas lines (within the twenty years) may be constructed of PVC or Plastic. Mr. Hagendorn alerted EPM to the fact that almost all removal/relocation or repairs of KeySpan gas lines would be performed by KeySpan Crews. According to Mr. Bill Jacino of the Suffolk County Water Authority (SCWA), there are no known asbestos containing materials on SCWA utilities located within the Route 347 project corridor. EPM was not provided with Water Utility Plans for review as of the issuance of this report.

Page 16: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) … · 2012-12-06 · FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) EVALUATION PIN 0054.05.103 NY Route 347 Safety and Mobility

3-4

According to Mr. Pete McClinchy of the Suffolk County D.P.W. Sanitation, Asbestos Cement may have been used in the construction of 10 inch Force Sewer mains that pass beneath Route 347 at the following locations:

3) Approximately 500 feet east of Northfield Road two 42-foot sections of 20-inch steel sleeved mains with 10-inch asbestos cement inserts each cross the west bound Route 347 and the south bound Route 347 (see Sewage Treatment Plant Location Drawing, and sketch No.3).The two mains run north to south for a total of approximately 110 feet and 122 feet each. These mains branch from the 10-inch force main that runs approximately 1500 feet east to west from the corner of North Drive and Route 347 to the branch. On the south side of route 347, these converge into one 10-inch main continues south approximately 790 feet to an office complex (“As Built” Drawing - Location Plan, sheet 1of 5).

4) Adjacent to the recharge basin /pump station west of Nicolls Road, and next

to Blackwell Court, a 10 inch force main crosses Route 347 to Teak Court on the south side. The distance from the recharge basin/pump station to teak court is approximately 300 feet. This 10-inch force main is also runs from the pump station along the north side of Route 347, beneath Bonnie Lane to Balfour Lane for approximately 1400 feet. A total of 1700 feet of Asbestos Cement force Sewer mains may be impacted by the reconstruction. (See drawings: Map of Strathmore Sec 12, Sewer District No.10, and Map of Strathmore – Sewer Staking).

EPM contacted Mr. George Zach of Verizon to assist us in the interpretation of the Verizon drawings provided by Dewberry - Goodkind. According to George Zach of Verizon, and copies of utility plans reviewed, several Verizon conduits composed of concrete composite transite are located within the Route 347 project corridor. It was reported to EPM that representative samples of the transite conduits have been collected and laboratory analysis confirmed that the transite conduits are asbestos containing materials. Copies of the utility plans provided by Verizon are provided as Appendix B. The transite conduits are denoted as 3.5" or 4" C.C.C. or T.C. on the drawings. The transite conduits must be abated if impacted by construction. Based on EPM’s interpretation of the drawings the following are the approximate locations and quantities of the transite conduits located within the Route 347 project corridor From West to East): Drawing 3065: Three 156-foot 3.5” conduits run east from manhole #164 (A) in a duct bank “a” to the west abutment (south sidewalk) of New Highway Bridge From this point six 273-foot 3.5” conduits run east across the bridge to the east abutment. Three 156-foot 3.5” conduits run east from the east abutment to manhole #165 (B).

Page 17: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) … · 2012-12-06 · FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) EVALUATION PIN 0054.05.103 NY Route 347 Safety and Mobility

3-5

Three 10-foot 3.5” conduits running in an east direction from manhole #164 (A) and dead ends underground. Three 10-foot 3.5” conduits running in a west direction from manhole #165 (B) and dead ends underground. Although this drawing indicates other areas with transite conduits and other transite conduits located in manholes #164 and #165, the transite conduits identified crossing the New Highway bridge and in the approaches are not anticipated to be impacted by the current scope of work since the renovation of the Northern State Parkway is below and west of the New Highway bridge to add new on/off ramps. Drawing 3825: One 195-foot 3.5” conduit running west to east in duct #2 from pole #1 on the west corner of Veterans Memorial Highway and New Highway to dead end underground near pole #159, across New Highway on the east corner. One 195-foot 3.5” conduit running east to west in duct #3 from pole #159 on the east corner of Veterans Memorial Highway and New Highway to pole #1, across New Highway on the west corner. Drawing 3723: Two 316 –foot 3.5” conduits running in ducts #1 and #2 from manhole #189 (A) north along beneath the east side of Old Willets Path and then turns west across and beneath Old Willets Path light pole #64 on the west side of Old willets Path. Drawing 2627: Two 11-foot 3.5” conduits running from manhole #197 (C) located on the north side of Veterans Memorial Highway east of Old willets path to a telephone pull box directly north of manhole #197 (C). Two 109-foot 3.5” conduits running from manhole #197 (C) located on the north side of Veterans Memorial Highway south across the highway to the south side of the highway to manhole #195 (G). There appear to be a total of 48 linear feet of 3.5” conduits running from manhole #196 (B) north across Veterans Memorial Highway through ducts # 3 and #4 to unknown termination beneath the ground. One 64-foot 3.5” conduit running from pole #171 north across Veterans Memorial Highway and dead ends underground on the north side of the highway.

Page 18: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) … · 2012-12-06 · FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) EVALUATION PIN 0054.05.103 NY Route 347 Safety and Mobility

3-6

Drawing 3261: One 30-foot 3.5” conduit on duct 4 running east from manhole #310 located on the north side of Route 347 to pole #186. A total of approximately 251 linear feet of 3.5” conduits and a total of approximately 277 linear feet of 4” conduits are present in the vicinity of manhole 325 located west of Stonebridge Drive, pole 206 located on the entrance median of Stonebridge Drive and pole #205 located on the south side of Route 347 across from the Stonebridge Drive entrance. Drawing 3494: Two 5-foot 3.5” conduits running north from manhole #125 (D) located on the corner of Route 347 and Alexander Ave to dead end underground. Two 155-foot 3.5” conduits running north from manhole #125 (D) located on the corner of Route 347 and Alexander Avenue to manhole #74 in the center median of Route 347. Two 48-foot 3.5” conduits running north from manhole #125 (D) located on the corner of Route 347 and Alexander Avenue to manhole #74 in the center median of Route 347. Drawing 2572: Two 171-foot 3.5” conduits in duct #7 running west, then north, from manhole #48 located on the north side of Middle Country Road to pole #A1. Two 90-foot 3.5” conduits in duct #8 running west, then north, from manhole #48 located on the north side of Middle Country Road to dead end underground. Although this drawing indicates other areas with transite conduits, these are the only transite conduits that are anticipated to be impacted by the current scope of work (see limits on drawing). Drawing 767: Two 84-foot 3.5” conduits running southeast from manhole #51 to manhole #96 located on the south side of Middle Country Road, east of Route 347. Two 29-foot 3.5” conduits running southeast in ducts 1 and 2 from manhole #51 to signal pole east of manhole #51 on the south side of Middle Country Road east of Route 347. Two 49-foot 3.5” conduits running southeast in ducts 3 and 4 from manhole #96 to NYT

Page 19: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) … · 2012-12-06 · FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) EVALUATION PIN 0054.05.103 NY Route 347 Safety and Mobility

3-7

sign box /pole #153 on the south side of Middle Country Road east of Route 347. Drawing 732: Two 22-foot 3.5” conduits on ducts 1 and 2 running in a west direction from manhole #103 and dead ends underground. One 118-foot 3.5” conduit on duct 4 running in an eastern direction from manhole #103 and dead ends underground. One 121-foot 3.5” conduit on duct 5 running in an eastern direction from manhole #103 to a telephone riser form the south. Drawing 3007: Two 57-foot and two 58-foot 3.5” conduits on duct 7 running in an east-northeast direction from manhole #39 to the center median of Nicolls Road and terminates at an unknown pole. One 93-foot conduit on duct 11 running in a south-southwest direction from manhole #29 to private property where it is spliced into a PVC conduit to pole 9. Drawing 2726:

A total of approximately 1040 linear feet of 3.5” conduits that are present buried in the center median of Route 347, west of Broadway from manhole #44 through the Old Town Road intersection, west to manhole #47. Drawing 2725: Four 87-foot 3.5” conduits on ducts 1 through 4 from manhole #44 located on the center median of Route 347 west of Broadway as follows:

• Ducts 1 and 3 run south on Broadway to pole #23; • Duct 2 runs north on Broadway and dead ends beneath the ground near

pole #20; • Duct 4 runs north on Broadway to pole #20.

Two 188-foot 3.5” conduits on ducts 1 and 3 run south on Broadway to pole #23. Two 132-foot 3.5” conduits on ducts 2 and 4 run north on Broadway to a dead end point and pole #20 respectively.

Two 102-foot, and two 123-foot 3.5” conduits on ducts 7 and 8 running east from manhole #45 located on the north side of Route 347 to north on Woodhull Avenue to towards pole #11. One 102-foot and one 123-foot conduits on duct 8 dead end beneath

Page 20: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) … · 2012-12-06 · FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) EVALUATION PIN 0054.05.103 NY Route 347 Safety and Mobility

3-8

the ground near pole #11.

One 37-foot conduit and one 102-foot 3.5” conduit on ducts 6 and 10 running east from manhole #45 located on the north side of Route 347 dead ends beneath the ground at the northwest corner of Woodhull Avenue.

One 9-foot, conduit of which six feet is 3.5” asbestos conduit in duct 11 runs east from manhole #45 to pole #73.

One 26-foot, 3.5” conduit in duct 9 runs south from manhole 42 located in the center median of Route 347, beneath the eastbound lanes of Route 347 to pole #69-6.

Two 29-foot, 3.5” conduits run north to south between manhole A (MH45)located on the north side of Route 347,west of Woodhull Avenue and manhole B(MH42) located on the center median of Route 347. Drawing 2723: Drawing shows a total of approximately 854 linear feet of 3.5” conduits in ducts 1, 2, and 3 that are present beneath Route 347 between Woodhull Avenue and Terryville Road. Two two-foot 3.5” conduits on duct 4 running southwest on Terryville Road from pole #34 to pole #35. One 99-foot 3.5” conduit on duct 4 running from southwest from manhole #38 located on the center median of Route 347 to pole #34 on Terryville Road. Two 239-foot 3.5” conduits on duct 5 running southwest from manhole #38 located on the center median of Route 347 to pole #34 on Terryville Road. Drawing 2094: Two 137-foot 3.5” conduits on ducts 1 and 2 running in a northern direction from manhole #48 located in the center median of Route 347 to pole #1 located on the north east corner of arrowhead lane. Drawing 1791: One 61-foot 3.5” conduit on duct 1 running in a southern direction from manhole #49 located in the center median of route 347 and Arrowhead lane to a dead end point underground on the southeast corner of Arrowhead lane. Drawing 4152:

Page 21: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) … · 2012-12-06 · FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) EVALUATION PIN 0054.05.103 NY Route 347 Safety and Mobility

3-9

One 138-foot 3.5” conduit on duct 2 running north from manhole #34 located in the intersection of Route 112 and Route 347 and dead ends beneath the ground south of manhole #89. Drawing 2803: A total of approximately 1477 linear feet of 3.5” conduits in ducts 1 through 6 that present from manhole #35 west of Jayne Boulevard and Route 347 east through the intersection of Lamport Street east through Route 112(Patchogue/Pt. Jefferson Road). Drawing 2699: Drawing note one indicates that manhole #34 was removed in 1958 and sealed. Drawing shows a total of approximately 1126 linear feet of 3.5” conduits that traversed the intersection of Route 347 and Route 112 from the location of manhole #34 to poles 4, 5, 6 and 108 and manhole #33. Some conduits dead end beneath the ground in the trenches. One 51-foot 3.5” conduit on duct 8 running north from manhole #50 to a dead end point underground in the trench at the northeast corner of Rose lane and Route 112. Drawing 2758: A total of approximately 686 linear feet of 3.5” conduits in ducts 12 and 13 that are present on the east side of Crystal Brook Hollow Road and Route 347. Duct 13 runs south to north from pole #6 to old pole location #19. Duct 12 dead ends beneath the ground near pole #6 and near old pole #19. Drawing 3651: Two 119-foot 3.5” conduits on ducts 1 and 2 running north-northwest from manhole 325 and pole #48 located on the corner of Vincent Road and Route 347 to pole # 47 located on a median at the intersection of Route 25A and Route 347. Also, one 17-foot 3.5” conduit runs east and from manhole 325 to pole # 48. One 259-foot 3.5” conduit on duct 3 running east from manhole 325 across Vincent Road and dead ends beneath the ground on the east side. An additional total of approximately 646 linear feet of 3.5” conduit is buried in the vicinity of the Route 25A and Route 347 merge. All references to “ABANDONED” conduits is abandoned in place. All references to remarks “ transfer to Drawing xxxx” is only for logistical purposes and the conduit

Page 22: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) … · 2012-12-06 · FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) EVALUATION PIN 0054.05.103 NY Route 347 Safety and Mobility

3-10

material is existing in place. EPM reviewed all Verizon drawings that were available at the time of this survey. There are section of the project corridor for which Verizon Drawings were not provided. For those Verizon drawings that do not indicate the material used in the construction of conduits, pipes, and ducts for telephone lines, or section of the project corridor that Verizon drawings were not provided for, the determination of the presence/absence of asbestos in suspect conduits must be field verified during excavation activities. 3.3 – Determination of Asbestos Containing materials on NYSDOT Record Plans The current scope of work will not impact the New Highway bridge and approaches over the Northern State Parkway. The current scope of work will impact the Northern State Parkway west of the bridge. No suspect asbestos containing materials or confirmed asbestos containing material were identified on the parkway in this area. Review of NYSDOT record plans for Contract NSP 63002 of the Veteran’s Memorial Highway Bridge (BIN 1056180) over the Northern State extension has identified the following asbestos containing materials (ACM) and suspect asbestos containing materials (SACM): ACM:

• Compressed Asbestos sheet packing, graphited both sides 1/16” thick present at both abutment back walls between top of back wall and concrete deck is identified on Drawing 0174-VM4, sheet numbers 96 and 97.

SACM:

• Protective coating for concrete (item 361 D) present between concrete deck and asphalt wearing surface on the bridge span is identified on Drawing 0174-VM2, sheets 93 and 94.

• Bituminous material coating (item 61) present on the earthen side of the

abutment back walls and wing walls is identified on Drawing 0174-VM5, sheets 93, 97R1 and 102.

Field inspection of the Veteran’s Memorial Bridge (photo #1) identified the following suspect asbestos containing materials:

• Caulk and filler material present at vertical joints located at each wing wall (photo #2);

• Caulk and filler material present at sidewalk joint curb joint on the west bound side of bridge (photo #3);

• Mastic sealant at armored joints of the bridge (photo #4); • Mastic sealant at steel curb joint where roadway meets the curb (photo #5).

Page 23: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) … · 2012-12-06 · FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) EVALUATION PIN 0054.05.103 NY Route 347 Safety and Mobility

3-11

Review of NYSDOT record plans for the 1993 repair Contract D254881 entitled “Miscellaneous Bridge repairs” did not identify any suspect asbestos containing materials at the elastomeric bearings of the Veteran’s Memorial Bridge. Review of NYSDOT record plans for the 1975 Contract D95016 entitled “HAUPPAUGE – PORT JEFFERSON S.H. 9376, identified the use of 3 inch asbestos cement conduit, Type II (item 670.22) at the following location in the project corridor:

• A total of approximately 530 linear feet of asbestos cement conduit, type II is buried on the north side of Route 347, to the east and west of intersection of Brooksite Drive, identified on sheet 28R1;

• A total of approximately 530 linear feet of asbestos cement conduit type II is buried on the northeast side and the southwest side of Route 347 and Terry Road identified on sheet 31R1;

• A total of approximately 503 linear feet of asbestos cement conduit type II is buried on the southwest side and northeast side of Route 347 and Mt. Pleasant Road intersection, identified on sheet 33.

Although the general notes/estimated quantities table on sheet 2R1 of this drawing package identifies a total of 4,328 linear feet of asbestos cement conduit , type II (item 670.22) to be used in this contract, only a total of 1,563 linear feet of asbestos cement conduit was identified from specific locations on the aforementioned sheets in this drawing package. Review of NYSDOT record plans for the 1967 Contract RC 67-21 entitled “HAUPPAUGE - PORT JEFFERSON S.H. 9376, PORT JEFFERSON – RIVERHEAD S.H. 8094, sheet 36R1, identified the use of asbestos cement conduit (item 618) at the intersection of Route 347 and Route 112 (Coram S.H. 912). Approximately 90 linear feet of buried asbestos cement conduit is located in the northwest corner and southeast corner of this intersection. The asbestos conduits are used to carry traffic signal cables. 3.4 - Determination of Suspect Asbestos Containing Roadway Surface Asphalt surfaces, particularly those applied in the 1950's and 1960's were often mixed with asbestos fibers. The NYSDOT, Region 10, has compiled a listing (Design Memo No. 92(27), dated October 1, 1992) of all of their roadways which are suspected of containing asbestos. Although this list does not identify any sections of Route 347 that may have asbestos asphalt pavement (see Appendix C), 1987 NYSDOT record plans of Contract D252571 entitled” Route 347 Route 25 to 25A, drawings GN-1 and GP-17, indicate that asbestos pavement was applied for approximately 370 feet (from station 240 +40 to station 244 +30) on the west bound right lane of route 347, approximately 500 feet west of Arrowhead lane. Although the roadway and adjacent properties have

Page 24: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) … · 2012-12-06 · FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) EVALUATION PIN 0054.05.103 NY Route 347 Safety and Mobility

3-12

undergone extensive renovation in the last seventeen years, there is no evidence that this asbestos material was removed.

Page 25: FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) … · 2012-12-06 · FINAL DESIGN REPORT/FINAL EIS/FINAL SECTION 4(F) EVALUATION PIN 0054.05.103 NY Route 347 Safety and Mobility