Volume ‐ (I)
March 2013
Quality Inspection Report
Final Report
for Central Government Employees Welfare
Housing Organisation (CGEWHO)
by Housing & Urban Development Corporation Ltd.,
Consultancy Wing , Chennai
C o n s
In
INDE
EXEC
PREA
111
11
PLAN
2
2
INSP
3
3
INFE
4
4
3r d Party Q
u l t a n c y C h e n n
dex
EX .................
CUTIVE SUMM
AMBLE .........
.1 CONSU
.2 PROJEC
.3 SCOPE 1.3.1 Sco1.3.2 Lim
.4 DISCLA
.5 STRUCT
NNING THE Q
.1 APPRO2.1.1 App
2.1.1.1 2.1.1.2
2.1.2 Me.2 SAMPL
2.2.1 Ge2.2.2 Spe
PECTION PARA
.1 PARAM3.1.1 Ind
3.1.1.1 3.1.1.2 3.1.1.3
3.1.2 Com3.1.3 De
.2 PARAM3.2.1 Wo3.2.2 Wo3.2.3 Wo3.2.4 Pro
ERENCES .......
.1 GENER4.1.1 Ind
4.1.1.1 4.1.1.2 4.1.1.3
4.1.2 Com4.1.2.1
4.1.3 De.2 SPECIF4.2.1 Wo4.2.2 W4.2.3 Wo
Quality Inspec
n a i
.....................
MARY ............
.....................
ULTANCY ASSIGNCT ‐ KENDRIYA VAND LIMITATION
ope of Work ...mitations ........AIMER ..............TURE OF THE REP
QUALITY AUDI
OACH & METHOD
proach ..........Visual inspeVisual Inspe
ethodology ....LE SELECTION: ....neral aspects ecific aspects .
AMETER .......
METERS CONSIDEdividual Flats ..
Civil works Plumbing &Electrical W
mmon Area avelopment W
METERS CONSIDEork Specificatiork Specificatiork Specificatioduct Make ch
.....................
RAL ASPECTS: .....dividual Flats ..
Defects (NuDefects (NuPhotograph
mmon Areas aPhotograph
velopment WIC ASPECTS: ......ork Specificati
Work Specificatork Specificati
ction Report f
.....................
.....................
.....................
MENT .............VIHAR (PII) .......N ......................................................................................PORT ...............
T PROGRAMM
DOLOGY .................................ection of Generection of Specif.......................................................................................
.....................
ERED FOR INSPEC..............................................& Sanitary WorkWorks ...............nd Amenities
Works ..............ERED FOR INSPECion Check (Flaion Check (Comion Check (Devheck...............
.....................
......................
......................umber of Occurumber of Flats)hs Individual Flaand amenitieshs Common Are
Works ....................................ion Check (Flation Check (Coion Check (Dev
for CGEWHO’
.....................
.....................
.....................
......................
......................
............................................................................................................
ME ................
...........................................ral aspects .......fic Aspects: ...........................................................................................
.....................
CTION OF GENERA.............................................ks .......................................................................................
CTION OF SPECIFIats) .................mmon Areas avelopment W.....................
.....................
...........................................rrences) ....................................ats ....................s ....................eas and amenit...........................................ats) .................ommon Areas velopment W
’s Housing Pr
.....................
.....................
.....................
......................
......................
......................
......................
......................
......................
......................
.....................
......................
..............................................................................................................................................................
.....................
AL ASPECTS ................................................................................................................................................C ASPECTS .............................and Amenities
Works) ....................................
.....................
......................
....................................................................................................................ies .....................................................................................and Amenitie
Works) ..............
roject at Parut
.....................
.....................
.....................
......................
......................
......................
......................
......................
......................
......................
.....................
......................
..............................................................................................................................................................
.....................
......................
......................................................................................................................................................................................s) ...............................................................
.....................
......................
..............................................................................................................................................................................................................es) ........................................
thipattu, Chen
Final Report: P
....................
....................
....................
......................
......................
............................................................................................................
....................
................................................................................................................................................................................
....................
.......................................................................................................................................................................................................................................................................
....................
..........................................................................................................................................................................................................................................................................
nnai (PII)
age 1 of 125
............ 1
............ 3
............ 7
............. 7
............. 7
........... 10
........... 10
........... 10
........... 11
........... 11
.......... 13
........... 13
........... 13
............. 13
............. 13
........... 14
........... 14
........... 14
........... 14
.......... 16
........... 16
........... 16
............. 16
............. 24
............. 26
........... 26
........... 26
........... 27
........... 27
........... 31
........... 31
........... 31
.......... 33
........... 33
........... 33
............. 33
............. 49
............. 66
........... 88
............. 90
......... 105
......... 107
......... 107
......... 108
......... 110
C o n s
44
3r d Party Q
u l t a n c y C h e n n
4.2.4 Pro.3 REPLY T.4 SCHED
Quality Inspec
n a i
oduct Make chTO DRAFT REPOULE OF MODIFIC
ction Report f
heck...............RT ..................CATIONS ...........
for CGEWHO’
.................................................................
’s Housing Pr
......................
......................
......................
roject at Parut
......................
......................
......................
thipattu, Chen
Final Report: P
.................................................................
nnai (PII)
age 2 of 125
......... 112
......... 115
......... 123
C o n s
Cen
rece
Uni
unit
CGE
The
con
and
and
The
stag
20.0
the
376
As
the
the
cou
for
Sim
exte
As
tend
3r d Party Q
u l t a n c y C h e n n
Exec
ntral Gove
ently comp
ts at Paru
ts of the s
EWHO awa
e scope o
ntract docu
d b)Visual
d present a
e quality au
ges. As a
09.2012 to
reto, respe
6 paramete
a first stag
flats with
analyses
uld be insp
inspection
milarly, visu
ernal surfa
a second
der docum
a) The
b) Sp
specific
Quality Inspec
n a i
utive s
rnment Em
pleted Ken
uthipatu, C
said project
arded the w
of work in
uments as w
inspection
a summaris
udit of the
a precurso
o compile
ectively. Ba
ers for each
ge, data g
reference
charted o
pected as t
n despite m
ual inspect
aces of buil
stage, ad
ment was ve
tender do
ecific com
cations and
ction Report f
summar
mployees
driya Viha
Chennai. Ce
t have ma
work of qu
ncluded a
well as am
of all flat
sed report
Kendriya V
or, the a
and provi
ased on th
h flat to be
generated
to 376 pa
ut digitally
the allottee
many comm
tion of gen
lding block
dherence t
erified with
ocument
mplaints f
d response
for CGEWHO’
ry
Welfare H
r II Housin
ertain cust
de compla
uality audit
)adherence
mendments
ts / commo
on the wo
Vihar Phas
allottees a
ide a final
his input, a
e inspected
from visua
arameters w
y. Howeve
es of the
munication
neral aspe
ks was carr
to the bra
h
from allot
e thereto fr
’s Housing Pr
Housing Or
ng Scheme
tomers wh
aints of def
/ inspectio
e to spec
s made from
on ameniti
ork execute
se II by CG
and CGEW
l listing of
a data capt
d.
al inspectio
were tabul
er out of t
remaining
ns, remind
cts of com
ried out for
ands and s
tees with
rom CGEW
roject at Parut
rganization
e consisting
ho are allo
fects in the
on to HUDC
cifications
m time to
ies and de
ed.
GEWHO wa
WHO were
f complaint
ture sheet
on of gene
lated and c
the 572 fla
flats failed
ers and cl
mmon area
r all the 37
specificatio
h respect
WHO
thipattu, Chen
Final Report: P
n (CGEWH
g of 572 D
ottees of d
e quality o
CO.
provided
time by CG
evelopment
as carried o
e given ti
ts and res
was devis
eral aspect
computeriz
ats only 47
d to unloc
lose coord
as, amenit
7 blocks.
ons stated
to brand
nnai (PII)
age 3 of 125
HO) has
Dwelling
dwelling
of work.
in the
GEWHO
t works
out in 3
ime till
sponses
ed with
ts of all
zed and
71 flats
ck them
ination.
ties and
in the
ds and
C o n s
This
And
carr
and
Bro
Def
S N
1
23
* Foflats
The
3r d Party Q
u l t a n c y C h e n n
c) Visu
d) A fe
in whic
s was done
d finally a
ried out fo
d the result
oadly the oc
fects (Nu
No Core C
1 Civil 1a Colum
1b FloorinPlatfor
1c Doors 1d Toilets
2 Plumb3 Electrior example, s with defects
e deficienci
• In resp
were a
tender
a.
b.
c.
• in resp
incong
Quality Inspec
n a i
al inspecti
ew sample
ch complain
e for 16 fla
s third sta
or the com
ts tabulate
ccurrences
mber of f
Components
n, Beam Linng, Walls,rm & Windows
s bing & Sanitical Works if the floor s’ is reported
ies range f
pect of the
analysed an
schedule.
Precast RC
single reba
Deviation
PVC cister
pect of the
ruous:
ction Report f
on and
invoices s
nts have b
ats coverin
age, a sim
mon areas
ed.
s of defects
flats with
s
ntel , Ceiling, L
s
tation Work
tiles are defd as one.
from partia
e adherenc
nd some o
Some of t
CC/CC Fra
ated frame
from presc
n instead o
e common
for CGEWHO’
submitted b
been receiv
g various h
milar visua
s in the blo
s in respec
defects)
Loft, Cupbo
ks
fective in thr
al fixing of
ce to tende
of them we
the signific
ames have
es
cribed heig
of chinawa
n areas, t
’s Housing Pr
by CGEWH
ved from th
housing ty
al inspectio
ocks and a
ct of the fla
oard and
ree rooms in
hinges to
ered specif
ere found t
ant non-co
e been use
ghts in resp
are cistern.
the followi
roject at Parut
HO in respe
he allottees
pes and le
on of spec
also the de
ats are as f
Number ofFlats with defects*
145
389
393 214 268 105
n the same f
skewed wa
fications al
to be not c
onformities
ed instead
pect of elec
.
ng were a
thipattu, Chen
Final Report: P
ect of thos
s
evels of loc
cific aspec
evelopmen
follows:
f As a % number
inspe
30
82
83455622
flat, then ‘nu
alls and co
l relevant
conforming
s are:
of Presse
ctrical fittin
areas whic
nnai (PII)
age 4 of 125
se items
ation.
cts was
t works
of total of flats
ected
0
2
3 5 6 2 umber of
olumns.
clauses
g to the
ed steel
ngs
ch were
C o n s
Rem
CGE
the
3r d Party Q
u l t a n c y C h e n n
a.
b.
c.
d.
• Develo
a.
b.
c.
• Produc
Most p
tender
dated v
non-co
o
o
marks/co
EWHO was
inspection
Quality Inspec
n a i
Stilt areas
are the m
between s
Staircases
handrails,
External s
pipes and
Terrace/ro
expansion
overhead
parapet w
opment wo
Roads: no
and wearin
Storm wat
of rain wa
Sewerage
area witho
ct Make che
products us
or in a s
vide letter
onformities
Instead o
connection
Instead o
provided.
onclusion
s carrying
n. While m
ction Report f
s: poor alig
main inco
some parki
: non-uni
stair walls
urfaces of
poor plast
oof top:
/construct
water tan
walls rangin
rks
on-provisio
ng of the s
ter drainag
ter pipes a
e: Part of t
out any tre
eck
sed were o
subsequent
r 28th Septe
are as foll
of CP bras
n.
of white
:
out some
many of the
for CGEWHO’
gnment of
ngruities
ng space a
iform rise
s and damp
blocks: po
tering and
undula
ion joints
nks not c
g between
on of camb
seal coat.
ge: inadeq
and inadeq
the sewage
eatment.
of approve
t amendm
ember 201
lows:
ss, PVC p
vitreous
e rectificati
e defects
’s Housing Pr
columns a
along with
and adjace
ers, rough
pness.
oor anchor
finishing.
ations, d
s not sea
connected
n 68 and 74
ber, undul
quate slope
quate open
e being dis
ed specifica
ment (as in
12 and 21st J
pipe has
chinaware
ion works
noticed ar
roject at Parut
and inadeq
h lack of
ent roads.
h finishing
rage and a
amaged
aled, overf
to drain
4 centimet
ation in th
e and imp
section of
scharged i
ation eithe
ndicated in
January 20
been prov
e, PVC ci
which we
re rectifiab
thipattu, Chen
Final Report: P
quate car
f level dif
g in resp
alignment o
water pr
flow pipe
pipes, he
ters.
he paved
roper term
f drains.
n to nearb
r approved
n CGEWHO
013). Some
vided for
istern has
re noticed
le, some o
nnai (PII)
age 5 of 125
parking
fference
pect of
of drain
roofing,
s from
eight of
surface
mination
by open
d in the
O letter
e of the
cistern
s been
during
of them
C o n s
nam
rem
time
pert
fully
to a
A d
this
plac
atta
3r d Party Q
u l t a n c y C h e n n
mely skewe
medy. The
e taken to
tinent to p
y complete
achieve bet
draft report
s Volume.
ces. A sch
ached at th
Quality Inspec
n a i
ed and imp
overall fin
o complete
point out t
e. Savings
tter quality
t was share
This repo
chedule of
he end of t
ction Report f
properly ali
nish appea
the projec
hat the wo
on accoun
y
red with CG
port has be
f modificat
this Volume
for CGEWHO’
igned colu
red to be
ct .as far a
ork was aw
nt of time a
GEWHO an
been finaliz
tions along
me.
’s Housing Pr
mns or wa
reasonable
as the time
warded in
alone wou
nd their rep
zed incorp
g with co
roject at Parut
alls out of p
e keeping v
e overrun
June 2006
ld have en
ply is attac
porating m
omments f
thipattu, Chen
Final Report: P
plumb are
view the c
is concern
6 and is ye
nabled the
ched at the
modification
from CGEW
nnai (PII)
age 6 of 125
hard to
ost and
ned it is
et to be
agency
e end of
ns at 9
WHO is
C o n s
1
1.1
Cen
auto
Pov
spe
vari
mea
con
Cer
mad
app
to c
req
1.2
The
Roa
the
The
of 4
The
Typ
3r d Party Q
u l t a n c y C h e n n
Pream
Consu
ntral Gover
onomous b
verty Allev
ecifically fo
ious self f
asure. CGE
nsisting of 5
rtain custo
de compla
proached t
carryout 3
uest and p
Projec
e residenti
ad (SH-55)
total 26.5
e project c
4 types of
e buildings
pe of DU A
B
C
D
Quality Inspec
n a i
mble
ultancy
rnment Em
body of Go
iation. CG
or Central
financing s
EWHO has
572 Dwelli
mers who
aints of d
he Housinrd Party Q
provided co
ct - Ken
al complex
), Avadi, C
2 acres of
comprises o
dwelling u
are design
ConfiguG+
Stilt
Stilt
Stilt
ction Report f
Assign
mployees W
overnment
EWHO exe
governm
schemes o
s recently
ng Units a
are allott
efects in
g and Urb
Quality In
onsultancy
ndriya V
x is locate
Chennai. I
land. Bala
of 572 dw
units viz., A
ned as RCC
uration +3
+4
+4
+4
for CGEWHO’
nment
Welfare Ho
t of India,
ecutes hou
ent Emplo
on “No pro
completed
t Paruthipa
tees of dw
the qualit
ban Develo
nspection
service fo
Vihar (P
ed at Paru
t is execut
ance land is
elling units
A, B, C &
C framed s
No.
’s Housing Pr
ousing Org
under Min
using com
oyees all
ofit and N
d Kendriya
atu, Chenn
welling unit
ty of work
opment Co
n / Audit.
r the same
PII)
uthipatu, a
ted on app
s reserved
s (DU) and
D. The typ
structures.
. of DUs 64
248
180
80
roject at Parut
ganization
nistry of Ho
mplexes on
over the
No loss” ba
a Vihar II
nai.
ts of the s
k, due to
orporation
HUDCO
e.
abutting P
proximately
for Phase
d it is grou
pe-wise de
thipattu, Chen
Final Report: P
(CGEWHO
ousing and
ownershi
country t
asis as a
Housing S
said projec
which CG
Limited (H
has accep
oonamalle
y 11 acres
III develo
uped in 37
etail is as f
Area (Sf614
1055
1353
1672
nnai (PII)
age 7 of 125
O) is an
d Urban
p basis
through
welfare
Scheme
ct have
GEWHO
HUDCO)
pted the
e-Avadi
s out of
pment.
7 blocks
follows.
ft)
C o n s
Sate
Fac
3r d Party Q
u l t a n c y C h e n n
ellite terra
cilities and
• Each B
• The co
Quality Inspec
n a i
in maps sh
services av
Block is pro
omplex is se
ction Report f
howing the
vailable in
ovided with
ecured by
for CGEWHO’
e location a
the campu
h a lift and
compound
’s Housing Pr
and layout
us are:
staircase.
d wall and
roject at Parut
of Kendriy
security bl
thipattu, Chen
Final Report: P
ya Vihar Ph
lock.
nnai (PII)
age 8 of 125
hase II
C o n s
Oth
3r d Party Q
u l t a n c y C h e n n
• Water
thereaf
• Drinkin
kitchen
• Sewera
(STP) a
• Strom
• Power
her Project
• The pr
contrac
• Approv
obtaine
• Comple
o
Quality Inspec
n a i
is being
fter to Ove
ng water is
n of the DU
age netwo
and treated
water drai
back for co
Informatio
roject dev
ct to M/s. S
val from C
ed on 04.1
etion Certif
27 block w
ction Report f
provided
er Head Ta
s supplied
U’s.
rk of the c
d effluent
n system i
ommon ar
on:
velopment
Srico Proje
Chennai Me
2.2006
ficate from
was obtain
for CGEWHO’
by pump
anks of indi
through a
complex is
is discharg
s provided
reas also is
work was
ects (P) ltd
etropolitan
m CMDA:
ned on 10.0
’s Housing Pr
ing from
ividual bloc
reverse o
connected
ged to the
d.
s provided.
s awarded
., on 21.06
Developm
05.2012
roject at Parut
bore well
cks.
osmosis (R
d to sewag
garden.
d on the
6.2007.
ment Autho
thipattu, Chen
Final Report: P
s to sum
RO) plant to
e treatmen
basis of t
ority (CMD
nnai (PII)
age 9 of 125
ps and
o every
nt plant
turnkey
DA) was
C o n s
1.3
As
req
1.3
1.3
* as p† Cut
3r d Party Q
u l t a n c y C h e n n
o
• The Pro
Scope
a part o
uested HU
.1 Scope
1. To ass
provide
time to
2. Visual
and pre
.2 Limita
Comprehe
and report
1. Concea
work,
basis a
2. Plannin
to exa
directio
3. Releva
4. No rec
are rep
facts a
per the Project toff date bein
Quality Inspec
n a i
Balance 10
oject Cost
e and Li
of resolvin
UDCO to ta
e of Work
sess whet
ed in the
o time by C
inspection
esent a su
ations
ensive qua
ting is limit
aled items
which wer
at the time
ng, archite
mination o
ons issued
nt docume
commendat
ported and
s existed a
Brief submitted g 20.09.2012
ction Report f
0 blocks w
of Phase (
imitatio
g compla
ken up an
k
her the w
contract d
CGEWHO.
of all flat
mmarised
lity inspec
ted by:
were not
re visible t
of inspect
ctural and
of compla
by CGEWH
ents and dr
tions or op
d inference
at the time
by CGEWHO
for CGEWHO’
was obtaine
(II) is Rs. 6
on
ints receiv
audit of th
works exe
documents
ts / commo
report on
ction/audit
covered a
to the nak
tion.
engineerin
ints from
HO within
rawings ma
pinions are
es are dra
e of inspect
’s Housing Pr
ed on 27.12
62.54 Cror
ved from
he construc
cuted are
as well a
on ameniti
the work e
was not u
and inspect
ked eye an
ng aspects
beneficiar
a cutoff da
ade availab
e made th
awn based
tion.
roject at Parut
2.2012
es*.
the custo
ction.
as per t
as amendm
ies and de
executed.
undertaken
tion was li
nd also on
s of quality
ies in gen
ate†.
ble within
hrough this
on the ci
thipattu, Chen
Final Report: Pag
omers, CG
the specif
ments mad
evelopment
n. The ins
mited to it
n ‘as is w
y audit are
neral and
a cutoff da
s report. S
ircumstanc
nnai (PII)
ge 10 of 125
GEWHO
fications
de from
t works
spection
tems of
here is’
limited
specific
ate.
Statuses
ces and
C o n s
1.4
HUD
This
visi
not
or o
This
info
pre
rely
unc
This
Hou
or d
1.5
This
the
3r d Party Q
u l t a n c y C h e n n
Discla
DCO (Cons
s report c
ble parts o
intended t
of its parts
s inspectio
ormation a
sent in aud
ying or act
certainty.
s report is
using Orga
duplicated
Struct
s 3rd Party
structure
Vol
Vol
Quality Inspec
n a i
aimer
sultant) ha
captures de
of the proje
to certify,
.
on/ auditi
nd that co
diting evid
ting upon t
prepared
anization (C
without th
ture of
y Inspectio
is given he
lume (I)
lume (II)
ction Report f
as exercise
efects/defi
ect achieve
express or
ng is bas
nsequently
ence, whic
the audit r
at the req
CGEWHO),
he express
the Re
n/audit rep
ereunder:
:
) :
for CGEWHO’
d due care
iciencies a
ed through
r implied, a
sed on a
y there wil
ch may be
results and
quest of Ce
the client
written pe
port
port is arra
o Metho
o Selec
o Inspe
o Analy
o Filled
Gene
o
o
o Filled
Speci
Work
’s Housing Pr
e in conduc
ssessed th
h a process
adequacy o
sampling
l always be
reflected
d conclusio
entral Gove
. No part o
ermission o
anged in th
odology,
ction of Ins
ection Form
ysis and Infe
-up Format
eral aspects
Individua
Common
-up Format
ific aspects
k Specificatio
roject at Parut
cting this q
hrough vis
s of sampl
or inadequ
process
e an eleme
in the aud
ons should
ernment Em
of this repo
of CGEWHO
hree volum
pection Par
ats,
erences.
ts for Visual
al Flats
area and A
ts for Visual
on Check (F
thipattu, Chen
Final Report: Pag
quality insp
sual inspec
ing. This r
acy of the
of the av
ent of unce
dit findings
be aware
mployees W
ort may be
O.
mes. An ou
rameters,
inspection
Amenities
inspection
Flats)
nnai (PII)
ge 11 of 125
pection.
ction of
eport is
project
vailable
ertainty
. Those
e of this
Welfare
e copied
utline of
of
of
C o n s
3r d Party Q
u l t a n c y C h e n n
Vol
Quality Inspec
n a i
In D
lume (III
ction Report f
DVD :
I) :
for CGEWHO’
o Copy
o Copie
HUDC
o Relev
from
’s Housing Pr
of Photogr
es of import
CO and CGE
vant Drawin
CGEWHO.
roject at Parut
aphs
tant commu
EWHO
ng and Docu
thipattu, Chen
Final Report: Pag
unications b
uments rece
nnai (PII)
ge 12 of 125
between
eived
C o n s
2
2.1
2.1
An
con
Wri
obt
ent
Bas
som
Gen
2.1
2.1
3r d Party Q
u l t a n c y C h e n n
Plann
Appro
.1 Appro
initial su
nstruction w
tten comp
ained. Bas
ire project
sed on all
mewhat dis
neral Asp
.1.1 Visua
• Parameomissioaspects
• Considwas deall the
.1.2 Visua
• Paramediamet
• These and ba
• As thisin for a
Quality Inspec
n a i
ning th
oach &
oach
rvey/inspe
which wou
plaints from
sic docume
were obta
the above
stinct, sets
pects and S
al inspectio
eters suchon of buils.
ering the fecided thatdwelling u
al Inspecti
eters suchter, make o
were planasic measu
s is a mucha represent
ction Report f
he Qual
Method
ection was
uld need at
m the allott
ents and dr
ained from
e informati
s of param
Specific A
on of Gene
h as, finding parts
fact that mt inspectio
units.
on of Spec
h as, thickof items et
nned to berements.
h more intetative sam
for CGEWHO’
l ity Aud
dology
s carried
ttention. D
tees and re
rawings to
CGEWHO
on, the ne
meters was
Aspects.
eral aspect
ishes, oves or syste
most of theon to cover
cific Aspec
kness of dtc. are cove
e evaluated
ense proceple.
’s Housing Pr
dit Pro
out to id
Discussion
elated resp
achieve a
.
eed for co
s establishe
ts
erall geomems etc. a
e flat owner General a
cts:
door paneered under
d on the b
ess of evalu
roject at Parut
gramm
dentify va
s were he
ponses fro
broad und
nducting i
ed. They a
metry, damare covere
ers had maaspects sh
els, thickner Specific a
basis of vi
uation, it w
thipattu, Chen
Final Report: Pag
me
rious aspe
ld with CG
m CGEWH
derstanding
nspection
are: inspec
mpness, oed under G
ade complhould be d
ess of tileaspects.
sual obser
was decide
nnai (PII)
ge 13 of 125
ects of
GEWHO.
HO were
g of the
in two,
ction of
obvious General
aints, it one for
es, pipe
rvations
ed to go
C o n s
2.1
2.2
Upo
com
size
2.2
2.2
3r d Party Q
u l t a n c y C h e n n
.2 Metho
Fin
Ide
GenParamfinishegeomobviobuildisystem
Samp
on analyzin
mplaints we
es for Gene
.1 Gener
1.
2.
3.
.2 Specif
1.
Quality Inspec
n a i
odology
Initia
nal Report o
ntif icat ion of
eral Aspectsmeters such as, es, overall etry, dampness, us omission of ng parts or ms etc
Visua
Analysis ofrom
ple Sele
ng the na
ere repetit
eral and Sp
ral aspect
Individual
Large num
about def
decided to
Common a
All the blo
Developm
All develop
fic aspect
Individual
ction Report f
l Inspection
on Inference
f Inspection
Specif icParameterthickness othickness odiameter, etc
l Inspect ion
of Data obtai Inspect ion
ction:
ture of co
ive in natu
pecific aspe
ts
flats -100
mber of all
fects in th
o inspect a
area and A
cks
ent works
pment wor
ts
flats
for CGEWHO’
n
es Drawn
Parameters
c Aspectsrs such as, of door panels, of tiles, pipe make of items
ned
omplaints
ure it was d
ects for Vis
%
ottees had
e quality
ll the flats
Amenities
rks
’s Housing Pr
• In• Co• De
1. C2. P3. E
it was infe
decided to
sual Inspec
d expresse
of work e
in the com
roject at Parut
ndividual Flat ommon Area &evelopment Wo
Civil Plumbing & SanElectrical
erred that
adopt the
ction
ed varying
executed a
mplex.
thipattu, Chen
Final Report: Pag
& Amenitiesorks
nitary
t as many
e following
levels of c
and hence
nnai (PII)
ge 14 of 125
of the
sample
concern
it was
C o n s
3r d Party Q
u l t a n c y C h e n n
2.
3.
Quality Inspec
n a i
Random s
totaling to
i. A1-
ii. B15
iii. C1-
iv. D1-
Common a
Com
Am
Developm
A Sample
ction Report f
sample of
o 16 flats w
-1, A2-21, A
5-219, B16
-15, C10-14
-16, D4-52
area and A
mmon area
Stilt Ar
for all t
enities
Lift, Ele
ent works
of all deve
for CGEWHO’
four flats
was chosen
A3-41, A4-
6-240, B13-
40, C11-15
2, D5-69, D
Amenities
as:
rea, Stairca
the blocks
ectrical and
elopment w
’s Housing Pr
s per cate
n. The flats
-62
-194, B14-
52, C12-17
D13-42
ase Area,
d commun
works were
roject at Parut
egory spre
s chosen ar
-214
75
Terrace, a
nications.
e inspected
thipattu, Chen
Final Report: Pag
ead in all
re
and Extern
d.
nnai (PII)
ge 15 of 125
floors,
nal Wall
C o n s
3
3.1
3.1
3.1
Foll
In
par
ran
insp
3.1
3r d Party Q
u l t a n c y C h e n n
Inspe
ParamAspec
.1 Indivi
.1.1 Civil w
lowing fou
1.
2.
3.
4.
order to
ameters u
ge of com
pection.
.1.1.1 Colu
Code
A2a
A2b
Quality Inspec
n a i
ection
meters cts
idual Flats
works
r core para
Column &
Floor, Wal
Doors, Win
Toilets
capture d
nder each
mplaints a t
umn & Bea
Compone
Beam / L
Column
ction Report f
Param
Conside
ts
ameters we
Beams
ls Ceiling,
ndows and
data cogen
heads me
total of 37
am
ent P
intel
BBBBBDHLoR
CC
for CGEWHO’
eter
ered fo
ere conside
Loft Cupbo
d Grills
ntly the f
ntioned ab
7 paramet
Parameters
eam above leam not leveeam soffit toeam soffit uneam undulat
Door soffit noHorizontal craobby opening
Reinforcemen
olumn not inolumn skewe
’s Housing Pr
r Inspe
ered for in
oard and P
following w
bove. Keep
ters as list
s inspecte
oft sloppy el o be finishedndulated ting ot level acks at roof bg soffit not le
nt bar protrud
n plumb ed
roject at Parut
ection o
spection o
Platform
were the
ping in view
ted below
d
beam soffit evel ding from be
thipattu, Chen
Final Report: Pag
of Gene
of civil work
list of ind
w the numb
were selec
eam
nnai (PII)
ge 16 of 125
ral
ks
dividual
ber and
cted for
C o n s
3.1
3r d Party Q
u l t a n c y C h e n n
.1.1.2 Floo
Code
A1a
A1b
A1c
A1d
A2c
Quality Inspec
n a i
or, Walls, C
Compone
Floor Tile
Wall TilesSkirting T
Flooring
Spout
Cracks in
ction Report f
Ceiling, Lo
ent P
es
DDFeFlFlFlFlFlFlFlTiVe
s / Tiles
GGPoSkSkSkSkSk
FlFl
SpSpSp
Wall
CrCrDH
for CGEWHO’
oft Cupboa
Parameters
oor Sill not foor Sill to beew tiles brokoor tiles damoor tiles joinoor tiles pacooring incomooring patteooring tile shooring tiles uiles laid unevertical tile at
ap in grill doaps in skirtinointing not dkirting tile nokirting tiles jkirting tiles dkirting tiles nkirting top un
oor not leveooring patte
pout groutingpout impropepout not pro
rack in wallsracks at linteiagonal crackorizontal cra
’s Housing Pr
rd and Pla
s inspected
finished e finished ken maged nts not finishecking/seatingmplete ern not alignehade mismatuneven levelvenly t door sill not
oor ng tiles done in wall tot provided joints not findamaged not finished neven/not fin
l ern not aligne
g not properer vided.
el level ks near lintecks at roof b
roject at Parut
atform
d
ed g not proper
ed to wall tch
t provided
tiles
nished
nished
ed to wall
r
l/openings beam soffit
thipattu, Chen
Final Report: Pag
nnai (PII)
ge 17 of 125
C o n s
3r d Party Q
u l t a n c y C h e n n
Code
A2d
A2e
A2f
A2g
Quality Inspec
n a i
Compone
DampnesWall
Exhaust FLocation Shape
PlasteringPainting aFinishing
Wall Align/ Plumb
ction Report f
ent P
ss in
DDDDDDDDRaRa
Fan /
ExExExEx
g, and
CeFiFiFiFiFiFiLoLoPaPaPlPlWWWWWW
nment
SuTiWWWW
for CGEWHO’
Parameters
ampness aboampness belampness belampness in bampness in eampness in iampness in wampness in wainwater seeainwater see
xhaust fan loxhaust hole ixhaust openixhaust openi
eiling finishininal coat of pinishing abovinishing incominishing to beinishing workinishing workoft top not fioft top not fiatchwork in watchwork to laster patchwlastering spla
Wall finish rouWindow jamb Window sill noWindow sill toWindow sill toWindow soffit
upporting wailes damaged
Wall not alignWall skewed Walls below pWalls not in P
’s Housing Pr
s inspected
ove skirtinglow sink low wash babeam external wallinternal wallwall wall (Toilet)epage at windepage at wind
ocation improimproper ing not finishings not in sh
ng incompletpainting not dve wall tiles nmplete in wae done neark around venks not done inished nished propewalls incompbe painted
work to be reash not scrubugh not finished
ot level o be finishedo be painted
not level
all of platformd - near vented
platform not plumb
roject at Parut
d
sin
l
dow sill dow sills
oper
hed hape
te done. not done alls door frame
ntilator not din kitchen be
erly plete
epainted bbed
d
m skew tilator
plumb
thipattu, Chen
Final Report: Pag
one properlyelow beam.
nnai (PII)
ge 18 of 125
y.
C o n s
3r d Party Q
u l t a n c y C h e n n
Code
A3a
A3b
A3c
A5a
A5b
A5c
Quality Inspec
n a i
Compone
Ceiling Alignmenlevels
DampnesCeiling
Crack in
Loft Leve
Cupboard
Platform
ction Report f
ent P
nt & CeCeCe
ss in DSe
Ceiling Cr
el
KiLoLoLoLoLoLoLo
d
CuCuCuCuCufinCuDHPlW
GPlPlplPlplPlSu
for CGEWHO’
Parameters
eiling above eiling not leveiling undula
ampness in ceepage in ce
rack in ceilin
itchen loft nooft beam notoft not leveloft not level oft space is toft thickness oft top not fioft top not fi
upboard soffupboard soffupboard soffupboard platupboard sofnished/bentupboard top ampness in cinges not fixlatform-cupb
Walls not in P
ap between latform belowlatform edgelatform not lelatform skewlatform supplatform-cupbupporting pla
’s Housing Pr
s inspected
loft not levevel ating
ceiling eiling
g
ot level t level (kitche
and to be patoo small. not uniform
nished nished prope
fit not level fit to be finisfit undulatingtform to be fffit finished
not level cupboards
xed properlyboard to be flumb
kitchen slab w sink to be e not smoothevel
w porting walls board to be fatform wall
roject at Parut
d
l
en)
ainted
m
erly
hed g finished
with AC s
inished
and wall finished
skew inished not in plum
thipattu, Chen
Final Report: Pag
sheet - join
b
nnai (PII)
ge 19 of 125
nts not
C o n s
3.1
3r d Party Q
u l t a n c y C h e n n
.1.1.3 Doo
Code
A4a
A4b
Quality Inspec
n a i
ors, Window
Compone
Door Hard
Window Hardware
ction Report f
ws and Gr
ent P
dware
AlAlAlAlAlAlAlAlBuDDDDDGGHHHHHHHLeNSaSaShToToToToToToViVi
e
AlHHHToTo
for CGEWHO’
rills
Parameters
ldrop holder ldrop holder ldrop hole noldrop missingldrop not cloldrop not fixeldrop not paildrop not proush/buffer noor fixtures oor shutter foor stopper oor stopper oor-fixtures odrej lock noodrej lock noandle and toandle not fixandle not pringe damageinge not fixeinges looselyinges not fixess screws iname plate noafety latch nafety latch ruhutter damagower bolt daower bolt noower bolt noower bolts aower bolts nower bolts niew finder coiew finder no
ll glass pane andle not pringes not fixooks not fixeower bolts nower bolt bro
’s Housing Pr
s inspected
fixed outsideto be provid
ot provided g osing properlyed properlyinted ovided ot fixed missing fixtures missdamaged not fixed missing ot fixed ot fixed propower bolt misxed properlyovided ed ed y fixed xed properlyn hinges ot providedot providedusted ged maged
ot aligned ot provided re not operaot fitted propot fixed
overed with pot fixed
shutter hanovided
xed properlyed properly ot fitted propoken/damag
roject at Parut
d
e ded
y
ing
perly/damagessing
table perly
paint
dles are hitti
perly ed
thipattu, Chen
Final Report: Pag
ed
ing the grill
nnai (PII)
ge 20 of 125
C o n s
3r d Party Q
u l t a n c y C h e n n
Code
A4b
A4d
Quality Inspec
n a i
Compone
Window Hardware
Door Shu
ction Report f
ent P
e
ToToWWW
BaCrDDDDDDDExFrFrFrFrGG
utter
DDDDDDDFiGGGNShShShShShShShShSh
for CGEWHO’
Parametersower bolt noower bolts n
Window handWindow hooksWindow tower
ackside of doracks in Doooor frame daoor frame inoor frame jooor frame nooor frame nooor frame paoor frame puxtra Holes onrame damagrame improprame not horrame rear sidap between ap in frames
oor painting oor shutter door shutter noor shutter noor shutter noor shutter noor shutter ninal coat of pap between ap between ap in door sho lipping hutter damaghutter not clohutter not clohutter not fixhutter side lihutter side lihutter side tohutter sides hutter/ frame
’s Housing Pr
s inspectedot aligned ot fixed le missing s missing r bolt damag
oor frame - rr frame amaged clined
oints to be finot finished ot painted ainting incomutty work non frame not fed
per vertical alrizontal de not finisheframe and w
s
incompletedamaged not closing not fixed pronot painted not painted pnot providedpainting not ddoor shuttershutter and hutter
ged osing osing properxed pping damagpping paintino be paintedto be finishee is damaged
roject at Parut
d
ged
rough
nished
mplete t finished profilled
lignment
ed wall
operly
properly
done. r and frame flooring
rly
ged ng not done
ed d
thipattu, Chen
Final Report: Pag
operly.
nnai (PII)
ge 21 of 125
C o n s
3r d Party Q
u l t a n c y C h e n n
Code
A4e
A4f
A4g
A4h
Quality Inspec
n a i
Compone
Window Mesh
Window S
Window F
Grill Door
ction Report f
ent P
Grill &
GGGGMMMScWWW
Shutter
BeBeGGGGGGGGShShShSh
Frame
FrGGGWWWWW
r
BoDFrGGGGGG
for CGEWHO’
Parameters
rill not fixedrill not fixed rill not painterill rusted
Mesh damageMesh not fixedMesh rusted crews missin
Window grill nWindow grill sWindow mesh
eading not peading not pap in frame lass brokenlass not provlass pane brolass pane nolass shutter lass Shutter lass shutter hutter framehutter not clohutter not clohutter not fix
rame not horap in frame ap in frame ap in frames
Window frameWindow frameWindow frameWindow frameWindow not fi
olt protrudinoor frame inrame improprill door sagrill door aldrorill door aldrorill door aldrorill door bentrill door rust
’s Housing Pr
s inspected
properly/lesed
ed d
ng in grill not finishedspacing unevh shutter dam
proper provided and shutter
vided oken
ot fixed propenot closing not fixed not fixed pro
e is damagedosing osing properxed
rizontal and grill and shutters e damaged.e joints to bee not finishede not paintedixed properly
g clined
per vertical algged op holder fixop holder miop not closint ed
roject at Parut
d
s screws
ven maged
erly
operly
rly
e finished d d y
lignment
xed outside issing ng
thipattu, Chen
Final Report: Pag
nnai (PII)
ge 22 of 125
C o n s
3.1
3r d Party Q
u l t a n c y C h e n n
Code
A4i
A5j
.1.1.4 Toile
Code
B2a
B2b
B2c
Quality Inspec
n a i
Compone
Ventilato
Railing
ets
Compone
BathroomTiles
Bathroom
BathroomTile
ction Report f
ent PGGGMMMMMW
rs
GGGLoVeVeVe
Ra
ent P
m Floor
FeFlFlFlFlFlGJoSlTiTiVe
m Floor Sl
m Wall
DDDPaPoSk
for CGEWHO’
Parametersrill not fixedrill rusted rill door obst
Mesh damageMesh not fixedMesh not fixedMesh rusted MS flats not fiWelding not p
lass louvers lass louvers lass louvers ouvers not fixentilator jamentilator jamentilator mes
ailings to be
Parameters
ew tiles brokooring damaooring incomooring tile shooring Tiles ooring tiles uaps in Tiles joint in wall tilope not propiles damagediles laid unevertical tile at
lope not mai
ado - few tileado tile top nado tiles joinatchwork in wointing not dkirting tile no
’s Housing Pr
s inspected
tructs staircaed d d properly
xed properlyproper
broken not in positionot fixed xed properly
mb not finishemb not finishesh rusted
painted
s inspected
ken aged due to smplete hade mismatnot packed puneven leveljoints/partly les open per d in W/C platvenly door sill not
ntained
es broken not finishednts not finishwalls incomp
done in wall tot provided
roject at Parut
d
ase
y/missing
on
y ed ed/painted
d
seepage
tch properly not fixed
tform
t provided
ed properly plete tiles
thipattu, Chen
Final Report: Pag
nnai (PII)
ge 23 of 125
C o n s
3.1
3r d Party Q
u l t a n c y C h e n n
Code
1.1.2 Plum
Code C
B1a
Quality Inspec
n a i
Compone
bing & San
Componen
Plumbing F
ction Report f
ent PSkTiTiTiTiTiTiW
nitary Wor
nt P
Fixtures
ABBBBBCCCCCCCCCCCCCEGGGGGLPPPPPPPS
for CGEWHO’
Parameterskirting tiles nile cut out foile cut out foile cut outs file cutout foriles being re-iles top to be
Wall tiles brok
rks
Parameter
All Fixtures ruBib cock imprBib cock not fBib cock rusteBib cock slantBottle trap noCement packCistern damaCistern damaCistern jointsCistern missinCistern not fixCistern not fixCistern pipe lControl valveControl valveControl ValveControl valveCP Grating foEWC connectGrating damaGrating locatiGrating not fiGrating not pGrating to beLong BibcockPipe and tap Pipe fittings Pipes missingPlumbing cutPlumbing fixtPlumbing fixtPlumbing joinShower rose
’s Housing Pr
s inspectednot finished or electrical por electrical pfor plumbing r electrical fix-laid e finished ken
rs inspecte
usted roper fixed ed ting ot fixed propking not doneged / not fixged/not fixe to be finisheng xed xed properlyeaking broken knob missin
e not fixed not fixed
or kitchen sintion not finishaged ion improperixed
provided e finished k not fixed missing missing
g out not proptures not protures rustednts to be finisnot fixed
roject at Parut
d
point to be cpower points
not proper xtures not fin
ed
erly e for cistern pxed d properly ed
y
ng
nk missing hed properly
r
per ovided
shed
thipattu, Chen
Final Report: Pag
closed not proper
nished
pipe.
y
nnai (PII)
ge 24 of 125
C o n s
3r d Party Q
u l t a n c y C h e n n
Code C
B1b
B1c Sa
Quality Inspec
n a i
Componen
Pipe
Sanitary and Fixture
ction Report f
nt PSSTTTTTTWWWWWWWWWW
L
Fittings es
C
CCFFGGISWWWWWWWWWW
for CGEWHO’
ParametersSink drain assSink rusted Tap not proviToilet geyser Toilet geyser Towel ring ruTowel rod noTowel rod rusW/C joints noWash basin dWash basin nWash basin nWash basin pWashbasin anWaste pipe isWaste pipe nWater mixer Water mixer t
Leakage in pi
Cistern not co
Cistern pipe lCistern pipe tFloor trap notFloor trap to Grating locatiGrating rusteWC finish no
Sanitary fittinW/C blockedW/C cracked W/C damagedW/C foot restW/C location W/C not fixedWC cover misWC joints notWC not finishWC pipe miss
’s Housing Pr
s inspectedsembly not f
ided connecting connecting
usted ot fixed sted ot finished prdrain pipe nonot connectednot fixed pipes rustedngles not pais leaking ot fixed position impto be connec
ipe fixtures
onnected
eaking too long t provided be finishedion improperd
ot proper ngs missing
/ broken d t broken not proper
d ssing t finished prohed sing
roject at Parut
d fixed
pipe missingpipe missing
roperly ot connected d
inted
roper cted
r
operly
thipattu, Chen
Final Report: Pag
nnai (PII)
ge 25 of 125
C o n s
3.1
3.1
Foll
ame
3.1
Bro
3r d Party Q
u l t a n c y C h e n n
.1.3 Electr
Code C
Ca
.2 Comm
lowing are
enities suc
Compo
• Civil • Plum• Elect
.3 Develo
oadly follow
1. Water s
2. Waste W
3. Roads
4. Storm W
5. Solid W
Quality Inspec
n a i
rical Work
Componen
Electrical
mon Area a
e the para
ch as: Stilt
nents
mbing trical & Com
lopment W
wing are th
supply
Water Treat
Water Drain
Waste Manag
ction Report f
ks
nt P
15ACCaDDElElElElElElElElElElLaMMPoPoSwSwSw
and Amen
meters co
Area, Stair
mmunication
Works
he developm
tment Facili
ns
gement
for CGEWHO’
Parameters
5 Amp poweC point coveable conduit
DB cover not Dummies in Electrical poinlectrical box lectrical Condlectrical DB Blectrical junclectrical openlectrical poinlectrical poinlectrical powlectrical switcarge gap in s
MCB cover miMCB not fixedower point sower point switch board witch box to witches miss
enities
onsidered f
rcase Area
Par
n
•••
ment work
ity
’s Housing Pr
s inspected
er point to beer not provide
box missingfixed
Electrical DB nt openings to cover plate duits not proBox not fixedction box covning to be clont missing nt to be finishwer point hol
ch board covswitch boardssing
d ocket missinocket not pronot finished be fixed
sing
for inspect
, Terrace,
rameters i
Building elePlumbing fiElectrical fi
ks consider
roject at Parut
d
e fitted ed g
provided lesso be filled not fixed
operly concead properly ver not fixed osed
hed der not fixedver not fixed cutouts.
g ovided properly
tion of co
External W
inspected
ements: quaixtures and xtures and
red for qua
thipattu, Chen
Final Report: Pag
s
aled
properly
d
mmon are
Wall & Lift.
ality and finquality quality
ality inspec
nnai (PII)
ge 26 of 125
eas and
nish
tion:
C o n s
3.2
Bas
con
pro
time
The
Com
3.2
Wo
The
Sl No.
1
2
3
45
6
7
3r d Party Q
u l t a n c y C h e n n
6. Electrifi
ParamAspec
sed on the
nducted to
vided in th
e by CGEW
1. Work S
2. Produc
e formats
mmon area
.1 Work
rk Specific
e format of
Contractclause No
6.2.4
7.3.1.1
7.3.1.2
4 7.3.1.3 7.3.2.7
7.4.0/7.4.5
7.4.3
Quality Inspec
n a i
cation
meters cts
e prelimina
assess w
he contrac
WHO.
Specificatio
ct Make che
are so des
as & amen
k Specifica
ation with
f the table
t o.
SCHEDU
Arrangebelow thFLOORINMarble circulatioMosaic EquivaleNon SkidNon Skidcorners of the flo100mm providedKitchen kitchen platform
ction Report f
Conside
ary survey
hether the
ct documen
on check
eck
signed so
ities and d
ation Chec
respect to
used is as
ULE AS PER CO
ment for fixhe window cNG Flooring inon space tiles with ligent) d Ceramic Tild ceramic tiand cut tilesoor only high Skirtingd and adjusteshall be proplatform an
m
for CGEWHO’
ered fo
y, following
e works ex
nts as wel
as to capt
evelopmen
ck (Flats)
o internal w
s follows:
ONTRACT AG
ing of an Airill in Drawing
n Drawing,
ght coloured
les in Toiletsles shall be s if required
g /dado matced to avoid covided with tnd in wet a
’s Housing Pr
r Inspe
g two spe
xecuted ar
l as amen
ture all th
nt works.
)
works for th
GREEMENT
r Conditioneg and Bedroo
Dining and
d cement AC
and Kitchencut to beve shall be laid
ching with flcut tiles in datiles up to 6area below
roject at Parut
ection o
cific visua
re as per
dments m
e items co
he flats are
er/Air Cooleroms
connected
CC Jamul or
n eled edge atd at the end
ooring to beado 60 cm abovethe kitchen
thipattu, Chen
Final Report: Pag
of Speci
l inspectio
the specif
ade from
overed viz.
e tabulated
ACTUALSYES /
r
d
r
t d
e
e n
nnai (PII)
ge 27 of 125
ific
on were
fications
time to
., Flats,
d.
S AT SITE / NO
C o n s
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
3r d Party Q
u l t a n c y C h e n n
7.5.0
7.5.0
7.5.0
7.6.0
8.2.1
8.2.1
4 8.2.1
8.2.1
8.2.2
8.2.2
8.2.3
8.2.3
8.2.3
8.3.0 8.3.1
8.3.1
8.3.1
4 8.3.1
8.3.2
9.2.0
Quality Inspec
n a i
Kitchen 20mm inon a RCCRoundin75 MM above kjointed wProvidin
Arrangein the kitWOOD/AAll door centre sWindowsectionsWindowsectionsproof. Flush do(externaToilets smm withToilets thicknesbe proviThe fronproof doThe frondoor of MThe frondoor of MHardwaDoors sshall havAll Doorwall The maifitted wiLatch The dooand Termm alumDouble hand 75 xC.P MS sprovidedSTEEL WAll DUs doors an
ction Report f
of all typen thickness C Counter anng off edges(wide (appritchen countwith white ceg hole for Ga
ment Includtchen for Exh/ALUMINIUMshutters in chall be Solid
w shutters sh with 4mm t
w frames sha having bot
oor shutters al door) & 31shall have FRh FRP thickneshall have ss with FRPded. nt door of thoor as requirnt door shalMS with fly pnt door shalMS with fly pre Fittings hall have bve aluminumrs shall have
n entrance ith an 180 d
or shutters oraces Shall minum slidinhanging floox 12 mm alumsafety chain d in all type o
WORK with Presse
nd double re
for CGEWHO’
s shall haveof approvednd laid in lenHalf roundinrox) matchinter as well aement as pipe in Gr
ing electricahaust fan geM WORK ANDcomplex exccore flush dhall be madthick glazing ll be doubleh shutters i
shall be 35 m mm thick (iRP molded fress of 2 mm.FRP moul
P thickness o
he DU s shaled by Local al have doubproof gauge l have doubproof gauge
rass oxidisem oxidesed fite Protective
door of eacdegree Spy g
opening ontbe additionng bolt on thor door stoppminum baby in main entof DUs
ed steel singbated for ex
’s Housing Pr
e polished gd colour & qngths of 1meng), ng granite sas front edge
ranite slab an
al points to yser D JOINERY cept those inoor shutterse up of Alu(10 kg/sqm)e rebated Alui.e., glaze as
mm thick exnternal doorrames of sec. ded shutteof 1.5mm to
l be a flush authority. ble rebate anshall be provble rebate an shall be pro
d fittings anttings rubber buf
h dwelling uglass and a G
to Balconiesnally provideheir outside.pers on all dlatch in toilerance door s
gle rebated xternal doors
roject at Parut
granite slabquality fixedetre approx.
slab skirtinge of counter
nd RCC slab
be provided
n communitys uminum box uminum boxs well as fly
xterior grader) IS Marked ction 90 x 45
ers 28 mmo 2 mm shall
door or Fire
nd a securityvided nd a securityovided
nd windows
fer fixed on
unit shall beGodrej Night
, Verandahsed with 300
oor shutterset doors andshall also be
for internals
thipattu, Chen
Final Report: Pag
b d .
g r
d
y
x
x y
e
5
m l
e
y
y
s
n
e t
s 0
s d e
l
nnai (PII)
ge 28 of 125
C o n s
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
3r d Party Q
u l t a n c y C h e n n
9.2.0
9.3.1
9.4.1
9.6.0
9.6.0
11.2.1
11.2.2
4 11.2.3
11.2.6
11.2.7
11.2.8
11.7.0
11.8.0
11.9.0
12.3.0
12.4.1A‐I
12.4.1A‐ii
Quality Inspec
n a i
Windowproof arThe douprovidedshuttersrebated PVC andpacking woodentower boRailings handrailOne winrooms slockableconditioFINISHINStraight walls abStraight junctionPlaster t
Floating sunshadcills/top Plaster oon wallbalconieOil bounprovidedPlaster oFINISHINAll holesbe filledwith theA grooveas specifNUMBERSteel letindividuaentranceSANITARCP fitting/deluxe to wall rawl plugOrissa tycistern‐1
Stainless
ction Report f
ws shall have rangementuble rebated hinges on . Exterior d
d MS Circuof plywood shutters resolts, Aldropsshall be pro in Balconiesndow of eacshall be pre grill withner/Air coolNG cut runningove skirting cut /Runnins of ceiling wto be laid flus
coat of nes and kitof loft slab eof Paris puns and ceilines nd distemped in all Dus.of Paris PunnNG s, openings , up with CCe rest of the we at the jointfied by the ORING OF Dustters of appal DUs shale doors. RY WORK gs shall be Cknobs, heavwith CP Brag of matchinype Indian W1 s steel sink w
for CGEWHO’
side hung A
ed Frames both sides
door and wi
lar sleeves shall be prospectively fos etc., ovided with s ch bed roomovided withh frame foer
g grooves pand junctionng 8 mm wiwith walls/RCsh with surfa
neat cementchen shelvetc., ning shall bngs inside
er in to give . Ceilings toning
breakages etC and patch wall ts of RCC anOrganisations proved size ll be fixed
Chromium plvy gauge /weass screws ang size drilledW.C‐580 x 4
without drain
’s Housing Pr
Aluminum fra
and mullionfor fixing ofndows shal
of matchinovided in ther firmly fixin
50 mm MS
m and livingh a MS opor installat
provided at ns with RCC Mde grooves CC Membersace of Dado i
nt on top ves, project
e provided all dwelling
an even sha have white
tc made in tplastered in
d B/W may
showing nuwith adhesi
ated brass ,weight brass sand washersd in the wall440 mm wit
n board‐1
roject at Parut
ame with Fly
ns shall bef wire gaugel be double
ng size, ande frames andg the sliding
(Light) pipe
g and diningpenable andion of Air
junction ofMembers provided ats in Toilets
surface ofed window
over plasterg units and
ade shall bee wash over
he wall shalln conformity
be provided
umbering ofives on the
with eleganthall be fixeds fixed in to
th low level
thipattu, Chen
Final Report: Pag
y
e e e
d d g
e
g d r
f
t
f w
r d
e r
l y
d
f e
t d o
l
nnai (PII)
ge 29 of 125
C o n s
44
45464748495051525354
55
56
57
58
59
60
6162636465
666768697071
72
73
3r d Party Q
u l t a n c y C h e n n
4 iii
iv v vi vii viii ix x xi xi
4 12.4.0
12.5.6‐ii
12.7.8
13.1.0
13.4.2j
13.5.0‐ii
13.6.0
4
13.8.0‐a
13.10.2‐b(x
14.2.0
Quality Inspec
n a i
550 x 40cock‐I C.P. Tow600 x 45550 mmC.P Towe100 mmC.P AnglC.P ConcC.P LongC.P Bib cprovisionmachinefresh wa
rain watin to thgratings to dischainternal jobs cocutting/detc., anconditioAll DUs esame shTV sockeeach bedTelephoMaster binternal Socket foBuzzer/BSwitch b5 amps s5/15 am3 feet 6 Tube lighWall braDistribut15 Amp AC pointJunctionbe provicover
x) All DB s anti‐rustshade ScheduleLight po
ction Report f
00 mm wash
wel ring‐1 50 mm mirro chinaware sel rail 600 x1 dia C.P Showe valve with cealed stop cg body bib cocock 15 mm n for plume shall be maater connect
ter from balche rainwateshall be proarge the rainelectrical wnnected widrilling of hond making n except for tyall have to bet one pointd room‐2 pone socket obed room‐Toelectrical wor exhaust faBell = 6 feet 6boards =4 feesocket = 6 f
mps power poinches ht in kitchenacket point =tion boards power pointt = 3 feet 6 in boxes of sizided with 4
shall be stovt conditionin
e of Electricaints = 12 nos
for CGEWHO’
h basin with
r with PVC Fsoap tray‐112 mm‐1 wer rose witC.P Brass pcock‐15/20 mock 15 mm ==1 no mbing conade ion to be pro
conies ,landr pipes 150ovided at thnwater works th electricaoles , chases good to re
ype A shall hbe provided wt in Living/Dints total ne in living otal=2 nos works‐Moutinan= 7 feet 6 6 inches et (bottom)feet (bottomoint in rooms
=5 feet = 6 feet 6 inc=4 feet 6 inct for geyser =nches ze more thanmm thick ph
ve Enameledng etc., com
al points s
’s Housing Pr
single 15 m
FRAME‐1
th 380 mm aipe‐2 nos mm‐5 nos 4 nos
nections fo
ovided in the
ings shall be0 x 150 mme mouth in
al installatiothrough walestore to t
have an AC pwith separatDining and tw
cum dining
ng heights inches
) s and kitchen
ches ches =5 feet 6 inch
n 100 mm x 1henolic lami
d ,duly Phospmplete, finish
roject at Parut
mm C.P pillar
rm‐1
or washing
e kitchen
e dischargedm cast ironthe khurrah
on, such asls and floorsthe original
oint and thee MCB wo points in
and one in
n=6 feet and
hes
150mm shallnated sheet
phated, withhed to Ivory
thipattu, Chen
Final Report: Pag
r
g
d n h
s s l
e
n
n
d
l t
h y
nnai (PII)
ge 30 of 125
C o n s
747576777879
7980
3.2
In r
Wa
3.2
3.2
Insp
Fac
insp
item
-15
3.2
The
list
item
the
3r d Party Q
u l t a n c y C h e n n
4
.2 Work
respect of
ll, visual in
.1.
.3 Work
pection of
cility, Roads
pection, de
m given in
9).
.4 Produ
e identifica
of compla
ms to be v
project.
S.N
Civi
1
234567
Quality Inspec
n a i
Ceiling fa5 A sock15 A socCall bell Exhaust Air cond
cable pophone p
k Specifica
common a
nspection w
k Specifica
developm
s, Storm W
esign criter
the tender
uct Make c
tion of com
ints receiv
verified wit
No. Item
il Compone
1 Flush
2 Iron 3 Locks4 Glaze5 Ceram6 Glass 7 Alumi
7.a Windo
ction Report f
ans point = 3et + switch =cket + switchswitch ==1 nfan point =itioner point
oint oint
ation Chec
area such a
was carrie
ation Chec
ent works
Water Drain
ria and tes
r documen
check
mponents
ved from th
h respect
s for which
ents
Doors
Mongery s d Tiles
mic Tiles
num Fittingsow
for CGEWHO’
3 nos =6 nos =5 nos no ===2 nos t 1
2 2
ck (Comm
as Stilt, Sta
d out on t
ck (Develo
such as W
ns Electrific
st reports f
nt ( Specifi
to be visu
he allottee
to that wh
h complaint
s ( hardware
’s Housing Pr
mon Areas
aircase, L
the basis o
lopment W
Water supp
cation was
furnished b
ically Page
ally verifie
s. The follo
hether the
t received f
)
roject at Parut
s and Ame
Lift, Terrac
of following
Works)
ply, Waste
s carried ou
by CGEWH
e 32 -34, 1
ed was limi
owing tabl
specific br
rom Allotte
thipattu, Chen
Final Report: Pag
enities)
ce and E
g format g
Water Tre
ut based o
HO on the b
04 – 109 a
ited based
le gives th
rands are
ee
nnai (PII)
ge 31 of 125
External
given at
eatment
n visual
basis of
and 151
on the
e list of
used in
C o n s
The
3r d Party Q
u l t a n c y C h e n n
San
Elec
e verificatio
1. The ten
2. Visual
3. Few sa
compla
4. List of
vide let
Quality Inspec
n a i
7.b Doors
nitary
8.a Vitreo8.b Stainl8.C CP Fit8.d CP Wa8.e Brass 8.f PVC C
ctrical
9.a MCB 9.b Switch
on of this w
nder docum
inspection
ample invo
aints have
approval s
etter dt: 28
ction Report f
s and window
ous China waess Steel Sinttings, Accesaste and FluStop and Bi
Cistern
hes
was done b
ment
and
oices from
been recei
status furn
8.09.2012 a
for CGEWHO’
w fixtures
are nks sories & Valvsh pipes b cock
by based o
CGEGWHO
ived from t
nished be C
appended i
’s Housing Pr
ve
on
O in respe
the allottee
CGEWHO (
in Vol.II)
roject at Parut
ect of thos
es
(Updated li
thipattu, Chen
Final Report: Pag
se items in
list from CG
nnai (PII)
ge 32 of 125
n which
CGEWHO
C o n s
4
4.1
4.1
4.1
3r d Party Q
u l t a n c y C h e n n
Infer
Gener
.1 Indivi
• Total 4
• 101 oulocked given inspect
• Results
.1.1 Defec
Work
Civil
Quality Inspec
n a i
rences
ral Aspe
idual Flats
471 no of H
ut of the 5at the tim
additional tion was di
s of the an
cts (Numb
CoreCom
ColuBeam
FlooCeiliCupbPlatf
ction Report f
ects:
ts
Houses insp
572 flats come of sche
opportuniiscontinued
alysis are
ber of Occu
e mponents
umn &m
or, Wallsing, Loftboard &form
for CGEWHO’
pected out
ould not beeduled inspities to opd, under in
presented
urrences)
Parame
& Beams/L
Column
s, t, &
Dampne
Floor Tile
Cupboar
Spout
Loft Lev
Painting,
Wall Alig
Wall Tile
Cracks in
Ceiling A
Dampne
Exhaust
Flooring
Platform
’s Housing Pr
t of 572 Fla
e inspectedpection datpen their fntimation to
as tables a
eters Look
Lintel
ss in Wall
es
rd
vel
, Plastering a
gnment/Plum
es/Skirting Til
n Wall
Alignment an
ss in Ceiling
Fan Locatio
roject at Parut
ats
d as the hotes. Furtheflats for ino CGEWHO
and charts
ked at
and Finishing
b
les
d Levels
n/Shape
thipattu, Chen
Final Report: Pag
ouses wereer, allotteenspection. O.
s
No of Occurr*
16
6
66
50
30
30
29
g 27
26
21
18
14
12
6
2
2
nnai (PII)
ge 33 of 125
e found es were
Finally
rences
60
63
65
05
05
01
97
77
65
13
81
42
29
67
29
29
C o n s
3r d Party Q
u l t a n c y C h e n n
Work
Plumbin
ElectricWorks
Quality Inspec
n a i
CoreCom
Door& Gr
Toile
ng PlumSani
cal ElectWor* Foflat, t
ction Report f
e mponents
r, Windowrills
et
mbing &itary Works
trical rks r example, ifthen ‘numbe
for CGEWHO’
Parame
w
Door Har
Door Shu
Window G
Grill Doo
Window
Door Fra
Window S
Ventilato
Window
Railing
Bathroom
BathroomBathroomMaintaine
& s
Plumbing
Sanitary
Pipe
Electrical
f the floor tier of occurren
’s Housing Pr
eters Look
rdware
utter
Grill, Mesh
r
Frame
ames
Shutter
rs
Hardware
m Wall Tiles
m Floor Tilesm Floor ed
g Fixtures
Fittings And
les are defecnces’ is repo
roject at Parut
ked at
Slope Not
Fixtures
ctive in threerted as three
thipattu, Chen
Final Report: Pag
No of Occurre
226
87
68
56
43
37
24
23
15
25
27
19t 2
56
92
1
14
e rooms in te
nnai (PII)
ge 34 of 125
ences*
60
76
82
61
36
74
41
33
51
5
77
91
2
64
2
40
he same
C
o n s u l t a n c y C h e n n a
Painting, PlasWaWa
Ceiling AlD
Exhaust
W
BB
Bathroom Floor Slo
Sanitary F
i
Beams/LintelColumn
Dampness in WallFloor TilesCupboard
SpoutLoft Level
tering and Finishingall Alignment/Plumbll Tiles/Skirting Tiles
Cracks in Walllignment and LevelsDampness in CeilingFan Location/Shape
FlooringPlatform
Crack In Ceiling
Door HardwareDoor Shutter
Window Grill, MeshGrill Door
Window FrameDoor Frames
Window ShutterVentilators
Window HardwareRailing
Bathroom Wall TilesBathroom Floor Tilesope Not Maintained
Plumbing FixturesFittings And Fixtures
Pipe
Electrical
16063
22
213181
142129
672929
5
24233
15125
2191
2
921
140
0 200
D
50530530129727765
561436
37413
277
564
400 600
Defects ‐ To
3r d Party Quality I
665
876682
1
4
800 10
otal Numbe
Inspection / Audit
000 1200
er of occur
for CGEWHO’s Ho
1400 1600
rences
ousing Project at Pa
1800 20
aruthipattu, Chenna
Final Report: Page
22
000 2200
ai (PII)
35 of 125
260
2400
C
o n s u l t a n c y C h e n n a
Painting, PlasWaWa
Ceiling AlD
Exhaust
W
BB
Bathroom Floor Slo
Sanitary F
i
Beams/LintelColumn
Dampness in WallFloor TilesCupboard
SpoutLoft Level
tering and Finishingall Alignment/Plumbll Tiles/Skirting Tiles
Cracks in Walllignment and LevelsDampness in CeilingFan Location/Shape
FlooringPlatform
Crack In Ceiling
Door HardwareDoor Shutter
Window Grill, MeshGrill Door
Window FrameDoor Frames
Window ShutterVentilators
Window HardwareRailing
Bathroom Wall TilesBathroom Floor Tilesope Not Maintained
Plumbing FixturesFittings And Fixtures
Pipe
Electrical
0 200
Defects ‐ T
400 600
Total numb
Type
3r d Party Quality I
800 1000
ber of occu
e A Type
Inspection / Audit
1200 1400
rences Typ
e B Type
for CGEWHO’s Ho
1600 1800
pe‐wise
e C Type
ousing Project at Pa
2000 220
e D
aruthipattu, Chenna
Final Report: Page
0 2400
ai (PII)
36 of 125
C o n s
3r d Party Q
u l t a n c y C h e n n
Number
Work
Civil
uality Inspect
n a i
r of Occurr
CoreCom
ColuBeam
FlooCeiliCupbPlatf
Door& Gr
t ion / Audit f
rences - Ty
e mponents
umn &m
or, Wallsing, Loftboard &form
r, Windowrills
for CGEWHO’
ype wise
Parame
& Beams/L
Column
s, t, &
Dampne
Loft Lev
Wall Tile
Floor Tile
Dampne
Painting,Finishing
Ceiling A
Wall Alig
Cupboar
Spout
Flooring
Cracks in
w
Door Har
Window G
Grill Doo
Door Shu
Door Fra
Ventilato
Window
Window S
Window
Railing
’s Housing Pr
- A Block
eters Look
Lintel
ss in Wall
vel
s/Skirting Til
es
ss in Ceiling
Plastering ag
Alignment an
gnment/Plum
rd
n Wall
rdware
Grill, Mesh
r
utter
ames
rs
Hardware
Shutter
Frame
roject at Parut
ked at
les
and
d Levels
b
thipattu, Chen
Final Report: Pag
No of Occurre
1
0
8
5
3
3
2
2
1
9
9
8
5
4
25
9
9
8
6
5
2
2
1
8
nnai (PII)
ge 37 of 125
ences*
1
0
9
2
2
0
4
3
7
9
9
8
5
4
51
3
2
8
2
7
2
2
0
8
C o n s
3r d Party Q
u l t a n c y C h e n n
Work
Plumbin
ElectricWorks
uality Inspect
n a i
CoreCom
Toile
ng PlumSani
cal ElectWor* Forflat, t
t ion / Audit f
e mponents
et
mbing &itary Works
trical ks r example, ifthen ‘numbe
for CGEWHO’
Parame
Bathroom
BathroomBathroomMaintaine
& s
Plumbing
Pipe
Sanitary
Electrical
f the floor tiler of occurren
’s Housing Pr
eters Look
m Wall Tiles
m Floor Tilesm Floor ed
g Fixtures
Fittings And
les are defecnces’ is repor
roject at Parut
ked at
Slope No
Fixtures
ctive in threerted as three
thipattu, Chen
Final Report: Pag
No of Occurr
5
1ot 0
4
1
1
1
e rooms in te
nnai (PII)
ge 38 of 125
rences*
8
7
0
0
1
1
5
he same
C
o n s u l t a n c y C h e n n a
Da
Wall Til
DamPainting, Plasterin
Ceiling AlignmWall Al
Win
WinW
BathBathr
Pl
Sanitary Fittin
i
0
Beams/Lintel
ampness in WallLoft Level
es/Skirting TilesFloor Tiles
mpness in Ceilingng and Finishingment and Levelsignment/Plumb
CupboardSpout
FlooringCracks in Wall
Door Hardwaredow Grill, Mesh
Grill DoorDoor ShutterDoor FramesVentilators
ndow HardwareWindow ShutterWindow Frame
Railing
hroom Wall Tilesroom Floor Tiles
umbing FixturesPipe
ngs And Fixtures
Electrical
11
330
2423
17998
54
2222
108
17
11
15
10 20 30
Defe
5220
6257
58
40
40 50 60 70
ects ‐ Numb
3r d Party Quality I
89
9392
88
80 90 100 1
ber of occu
Inspection / Audit
10 120 130 140
urences ‐ Ty
for CGEWHO’s Ho
150 160 170 18
ype A
ousing Project at Pa
80 190 200 210 2
aruthipattu, Chenna
Final Report: Page
2
220 230 240 250
ai (PII)
39 of 125
251
0
C o n s
3r d Party Q
u l t a n c y C h e n n
Number
Work
Civil
uality Inspect
n a i
r of OccurrCoreCom
Colu
FlooCeiliCupPlat
Doo& Gr
t ion / Audit f
rences - Tye
mponents
umn & Beam
or, Wallsing, Loftboard &
tform
or, Windowrills
for CGEWHO’
ype wise
Param
m Column
Beams/L
s, ft, &
Dampne
Floor Til
Painting
Cupboar
Wall Tile
Spout
Cracks i
Wall Alig
Loft Lev
Dampne
Ceiling A
Platform
Flooring
Exhaust
Crack I
w
Door Ha
Door Sh
Grill Doo
Window
Door Fra
Window
Window
Ventilato
Window
Railing
’s Housing Pr
- B Block
eters Look
Lintel
ess in Wall
es
, Plastering a
rd
es/Skirting Ti
n Wall
gnment/Plum
vel
ess in Ceiling
Alignment an
m
t Fan Locatio
In Ceiling
ardware
hutter
or
Grill, Mesh
ames
Shutter
Frame
ors
Hardware
roject at Parut
ked at
and Finishing
iles
mb
g
nd Levels
on/Shape
thipattu, Chen
Final Report: Pag
NOccur
g
2
nnai (PII)
ge 40 of 125
No of rrences*30
19
200
170
106
103
77
70
66
56
55
39
19
14
7
7
2 2
853
270
216
156
105
77
76
57
47
7
C o n s
3r d Party Q
u l t a n c y C h e n n
Work
Plumbin
ElectricWorks
uality Inspect
n a i
CoreCom
Toile
ng PlumSani
cal ElectWor* Forflat, t
t ion / Audit f
e mponents
et
mbing &itary Works
trical ks r example, ifthen ‘numbe
for CGEWHO’
Parame
Bathroom
BathroomBathroomMaintaine
& s
Plumbing
Sanitary
Pipe
Electrical
f the floor tier of occurren
’s Housing Pr
eters Look
m Floor Tiles
m Wall Tilesm Floor Slopeed
g Fixtures
Fittings And
iles are defences’ is repor
roject at Parut
ked at
e Not
Fixtures
ective in threrted as three
thipattu, Chen
Final Report: Pag
No of Occurren
80
80
0
19
280
52
ee rooms in e
nnai (PII)
ge 41 of 125
nces*
0
0
92
8
2
the same
C
o n s u l t a n c y C h e n n a
Dam
Painting, Plastering
Wall Tile
Wall Alig
DampCeiling Alignm
Exhaust Fan LC
D
Wind
WW
Wind
BathroBathro
PlumSanitary Fitting
i
772
7
0
ColumnBeams/Lintel
mpness in WallFloor Tiles
g and FinishingCupboard
s/Skirting TilesSpout
Cracks in Wallgnment/Plumb
Loft Levelpness in Ceilingent and Levels
PlatformFlooring
ocation/ShapeCrack In Ceiling
Door HardwareDoor Shutter
Grill Doorow Grill, MeshDoor Frames
Window ShutterWindow Frame
Ventilatorsdow Hardware
Railing
oom Floor Tilesoom Wall Tiles
mbing Fixturesgs And Fixtures
Electrical
3019
106103
777066
5655
39191477
1057776
5747
7
8080
28
52
50 100 150
Defect
200170
27216
156
192
0 200 250 3
ts ‐ Numbe
3r d Party Quality I
70
300 350 400
er of occure
Inspection / Audit
450 500 550
ences ‐ Typ
for CGEWHO’s Ho
0 600 650 7
pe B
ousing Project at Pa
00 750 800
aruthipattu, Chenna
Final Report: Page 4
853
850 900
ai (PII)
42 of 125
C o n s
3r d Party Q
u l t a n c y C h e n n
Number
Work
Civil
uality Inspect
n a i
r of OccurrCoreComColu Bea
FlooCeiliCupPlat
Doo& Gr
t ion / Audit f
rences - Tye
mponentsumn & am
or, Wallsing, Loftboard &
tform
or, Windowrills
for CGEWHO’
ype wise
Param
Beams/L
Column
s, ft, &
Dampne
Floor Til
Spout
Cupboar
Wall Alig
Loft LevPaintingFinishingCeiling A
Cracks i
Exhaust
Dampne
Wall Tile
Platform
Flooring
Crack In
w
Door Ha
Door Sh
Window
Window
Grill Doo
Door Fra
Window
Ventilato
Window
Railing
’s Housing Pr
- C Block
eters Look
Lintel
ess in Wall
es
rd
gnment/Plum
vel , Plastering ag Alignment an
n Wall
t Fan Locatio
ess in Ceiling
es/Skirting Ti
m
n Ceiling
ardware
hutter
Grill, Mesh
Frame
or
ames
Shutter
ors
Hardware
roject at Parut
ked at
mb
and
nd Levels
on/Shape
g
iles
thipattu, Chen
Final Report: Pag
NoOccurre
9
1
26
15
13
12
11
10
9
8
6
5
4
3
1
3
3
55
29
23
19
15
8
5
3
3
1
nnai (PII)
ge 43 of 125
o of ences*
95
8
65
50
39
23
13
08
92
89
68
53
4
37
1
3
3
54
94
36
94
57
83
50
38
32
1
C o n s
3r d Party Q
u l t a n c y C h e n n
Work
Plumbin
Electric
uality Inspect
n a i
CoreCom
Toile
ng PlumSani
cal ElectWor* Forflat, t
t ion / Audit f
e mponents
et
mbing &itary Works
trical ks r example, ifthen ‘numbe
for CGEWHO’
Parame
Bathroom
BathroomBathroomMaintaine
& s
Plumbing
Sanitary Pipe
Electrical
f the floor tiler of occurren
’s Housing Pr
eters Look
m Wall Tiles
m Floor Tilesm Floor ed
g Fixtures
Fittings And
les are defecnces’ is repor
roject at Parut
ked at
Slope No
Fixtures
ctive in threerted as three
thipattu, Chen
Final Report: Pag
No of Occurr
7
3ot
1
15
10
3
e rooms in te
nnai (PII)
ge 44 of 125
rences*
0
5
1
55
6 0
1
he same
C
o n s u l t a n c y C h e n n a
D
Wall A
Painting, PlasteCeiling Alig
Exhaust FaDa
Wall T
W
W
BatBat
Bathroom Floor Slop
PSanitary Fitt
i
33
1
1
0
Beams/LintelColumn
Dampness in WallFloor Tiles
SpoutCupboard
Alignment/PlumbLoft Level
ring and Finishingnment and Levels
Cracks in Walln Location/Shapempness in CeilingTiles/Skirting Tiles
PlatformFlooring
Crack In Ceiling
Door HardwareDoor Shutter
indow Grill, MeshWindow Frame
Grill DoorDoor Frames
Window ShutterVentilators
Window HardwareRailing
throom Wall Tileshroom Floor Tilese Not Maintained
Plumbing Fixturestings And Fixtures
Electrical
18
868
5344
3711
33
8350
3832
1
7035
1
16
31
50 1
Defe
95
150139
123113108
9289
1573
155
00 150
ects ‐ Num
3r d Party Quality I
236194
200 250
ber of occu
Inspection / Audit
265
294
300 35
urences ‐ T
for CGEWHO’s Ho
50 400
Type C
ousing Project at Pa
450 500
aruthipattu, Chenna
Final Report: Page 4
554
550 600
ai (PII)
45 of 125
0
C o n s
3r d Party Q
u l t a n c y C h e n n
Number
Work
Civil
uality Inspect
n a i
r of OccurrCoreComColu Bea
FlooCeiliCupPlat
Doo& Gr
t ion / Audit f
rences - Tye
mponentsumn & am
or, Wallsing, Loftboard &
tform
or, Windowrills
for CGEWHO’
ype wise
Param
Beams/L
Column
s, ft, &
Floor Til
Dampne
Wall Alig
Spout
Loft Lev
Cupboar
Wall Tile
Painting
Cracks i
Dampne
Ceiling A
Flooring
Exhaust
Platform
w
Door Ha
Door Sh
Window
Window
Door Fra
Grill Doo
Window
Ventilato
Window
Railing
’s Housing Pr
- D Block
eters Look
Lintel
es
ess in Wall
gnment/Plum
vel
rd
es/Skirting Ti
, Plastering a
n Wall
ess in Ceiling
Alignment an
t Fan Locatio
m
ardware
hutter
Grill, Mesh
Frame
ames
or
Shutter
ors
Hardware
roject at Parut
ked at
mb
iles
and Finishing
g
nd Levels
on/Shape
thipattu, Chen
Final Report: Pag
NOccur
g
nnai (PII)
ge 46 of 125
No of rrences*
35
15
155
111
87
84
82
70
67
56
43
22
17
14
7
4
602
224
197
156
124
96
92
81
50
9
C o n s
3r d Party Q
u l t a n c y C h e n n
Work
Plumbin
Electric
uality Inspect
n a i
CoreCom
Toile
ng PlumSani
cal ElectWor* Forflat, t
t ion / Audit f
e mponents
et
mbing &itary Works
trical ks r example, ifthen ‘numbe
for CGEWHO’
Parame
Bathroom
BathroomBathroomMaintaine
& s Plumbing
Sanitary Pipe
Electrical
f the floor tiler of occurren
’s Housing Pr
eters Look
m Wall Tiles
m Floor Tilesm Floor Sed
g Fixtures
Fittings And
les are defecnces’ is repor
roject at Parut
ked at
Slope Not
Fixtures
ctive in threerted as three
thipattu, Chen
Final Report: Pag
No of Occurren
69
59
1
177
470
42
e rooms in te
nnai (PII)
ge 47 of 125
nces*
9
9
7
7
2
he same
C
o n s u l t a n c y C h e n n a
Wa
WalPainting, Plast
DCeiling Al
Exhaust F
W
BBa
Bathroom Floor Slo
Sanitary F
i
Beams/LintelColumn
Floor TilesDampness in Wall
ll Alignment/PlumbSpout
Loft LevelCupboard
l Tiles/Skirting Tilestering and Finishing
Cracks in WallDampness in Ceilingignment and Levels
FlooringFan Location/Shape
Platform
Door HardwareDoor Shutter
Window Grill, MeshWindow FrameDoor Frames
Grill DoorWindow Shutter
VentilatorsWindow Hardware
Railing
Bathroom Wall Tilesathroom Floor Tilesope Not Maintained
Plumbing Fixturesittings And Fixtures
Electrical
3515
7067
5643
221714
74
509
6959
1
47
42
0 50
Defe
155111
8784820
156124
9692
81
100 150
ects ‐ Num
3r d Party Quality I
224197
6
177
200 250
mber of occ
Inspection / Audit
300 350
urences ‐ T
for CGEWHO’s Ho
400 450
Type D
ousing Project at Pa
0 500 55
aruthipattu, Chenna
Final Report: Page 4
602
50 600 6
ai (PII)
48 of 125
650
C o n s u l t a n c
Conclus
Analysis
• D
• T
4.1.1.2
W
C
3r d Party Q
y C h e n n a i
sion:
of the occ
Door hardw
he least oc
Defects (N
Works
Civil
uality Inspect
currences o
ware has m
ccurrences
Number of
Core Compo
Column
Floor, WCeiling,CupboaPlatform
t ion / Audit f
of defects
aximum am
s of defects
f Flats)
onents
n & Beam
Walls, , Loft, ard & m
for CGEWHO’
indicates t
mount of d
s are in ele
ParameterLooked at
Beams/Lintel
Column
Dampness in
Floor Tiles
Loft Level
Cupboard
Spout
Painting, Plasand Finishing
Wall Alignme
Wall Tiles/SkTiles
Dampness in
Cracks in Wa
Ceiling AlignmLevels Exhaust Fan Location/Sha
Platform
Flooring
Crack In Ceil
’s Housing Pr
he followin
defects.
ements suc
rs N
l
n Wall
stering g
ent/Plumb
kirting
n Ceiling
all
ment and
ape
ing
roject at Parut
ng
ch as colum
Number of Flats with
defects*
106
58
273
214
199
193
177
171
141
135
98
96
95
54
27
25
5
thipattu, Chen
Final Report: Pag
mn and bea
As a % onumber
inspe
23
12
58
45
42
41
38
36
30
29
21
20
20
11
6
5
1
nnai (PII)
ge 49 of 125
ams.
of total of flats cted
3
2
8
5
2
1
8
6
0
9
1
0
0
1
C o n s u l t a n c
W
P&
E
*f
3r d Party Q
y C h e n n a i
Works
Plumbing& Sanitar
Electrical
* For exampflats’ is repor
uality Inspect
Core Compo
Door, WGrills
Toilet
g ry
PlumbiSanitar
Electric
le, if the floorted as one.
t ion / Audit f
onents
Window &
ng & ry Works
cal Works
or tiles are de
for CGEWHO’
ParameterLooked at
Door Hardwa
Grill Door
Door Shutter
Window Grill
Door Frames
Window Fram
Ventilators
Window Shut
Window Hard
Railing
Bathroom Wa
Bathroom Flo
Bathroom FloNot Maintain
Plumbing Fix
Sanitary FittiFixtures
Pipe
Electrical
efective in th
’s Housing Pr
rs N
are
r
, Mesh
s
me
tter
dware
all Tiles
oor Tiles
oor Slope ed
xtures
ngs And
hree rooms in
roject at Parut
Number of Flats with
defects*
366
326
310
262
167
145
142
141
99
23
151
135
2
253
67
1
105
n the same f
thipattu, Chen
Final Report: Pag
As a % onumber
inspe
78
69
66
56
35
31
30
30
21
5
32
29
0
54
14
0
22
flat, then ‘nu
nnai (PII)
ge 50 of 125
of total of flats cted
8
9
6
6
5
1
0
0
1
2
9
4
4
2
mber of
C o n s u l t a n c
3r d Party Q
y C h e n n a i
Painting, Plaste
Wal
Wall
D
Ceiling Alig
Exhaust Fa
W
W
B
Ba
Bathroom Floor Slo
Sanitary Fit
uality Inspect
9
0
1
9
8
2
8
1
4
12
0
0
5
0
10
14
2
8
13
0
1
1
13
7
12
7
2
6
0
0
2
3
1
1
0
0
1
0
0
Beams/Lintel
Column
Dampness in Wall
Floor Tiles
Loft Level
Cupboard
Spout
ering and Finishing
l Alignment/Plumb
Tiles/Skirting Tiles
Dampness in Ceiling
Cracks in Wall
gnment and Levels
an Location/Shape
Platform
Flooring
Crack In Ceiling
Door Hardware
Grill Door
Door Shutter
Window Grill, Mesh
Door Frames
Window Frame
Ventilators
Window Shutter
Window Hardware
Railing
athroom Wall Tiles
athroom Floor Tiles
pe Not Maintained
Plumbing Fixtures
ttings And Fixtures
Pipe
Electrical
D
t ion / Audit f
41
19
36
20
22
7
53
50
44
42
27
32
4
20
33
3
27
3
18
29
9
48
74
54
69
35
52
28
42
18
52
44
40
55
33
6
49
59
21
40
60
17
59
24
33
35
51
40
11
2
27
36
20
1
28
14
26
19
12
20
15
14
7
4
11
26
8
31
26
20 40 60 80 1
Defects ‐Num
A Typ
for CGEWHO’
91
91
144
126
114
82
102
61
71
71
73
53
43
59
6
37
7
9
4
39
42
29
39
37
45
32
43
36
32
35
6
100 120 140 160 180
mber of Flats
pe B t
25%
’s Housing Pr
4
97
96
93
84
73
44
43
44
54
51
0 200 220 240 260 28
‐ Type‐wise
type C
50%
roject at Parut
107 62
54
59
80 300 320 340 360
C Type
75%
thipattu, Chen
Final Report: Pag
380 400 420 440 46
D Type
100%
nnai (PII)
ge 51 of 125
60
% (471 DUs)
C
o n s u l t a n c y C h e n n a
B
i
Da
Painting, PlasterinWall AlWall Tile
Dam
Ceiling AlignmExhaust Fan
Win
WWi
BathBathr
athroom Floor Slope
PlSanitary Fittin
5
2
2
1
0
Beams/LintelColumn
ampness in WallFloor TilesLoft LevelCupboard
Spoutng and Finishinglignment/Plumbes/Skirting Tiles
mpness in CeilingCracks in Wall
ment and LevelsLocation/Shape
PlatformFlooring
Crack In Ceiling
Door HardwareGrill Door
Door Shutterdow Grill, Mesh
Door FramesWindow Frame
VentilatorsWindow Shutterndow Hardware
Railing
room Wall Tilesroom Floor TilesNot Maintained
umbing Fixturesngs And Fixtures
Pipe
Electrical
1058
989695
542725
9923
67
10
20 40 60 80
3r d Party Quality I
06
1177
171141
135
167145142141
151135
05
100 120 140 160 1
Defect
25%
Inspection / Audit
2214
199193
262
253
180 200 220 240 26
ts ‐Number
50%
for CGEWHO’s Ho
73
326310
60 280 300 320 34
r of Flats
7
ousing Project at Pa
366
40 360 380 400 420
5%
aruthipattu, Chenna
Final Report: Page
0 440 460
100% (471 DUs)
ai (PII)
52 of 125
C o n s
N
W
C
N
3r d Party Q
u l t a n c y C h e n n
Number of
Work
Civil
Number of
uality Inspect
n a i
Defects -
Core Compo
Column
Floor, Ceiling,CupboaPlatform
Door, & Grills
Defects -
t ion / Audit f
Type wis
onents
n & Beam
Walls, Loft, rd &
m
Window
D
W
D
D
W
W
W
G
V
R
Type wis
for CGEWHO’
se - A Blo
Paramete
Beams/Linte
Column
Floor Tiles
Wall Tiles/Sk
Flooring
Spout
Cracks in W
Dampness in
Painting, Pla
Wall Alignme
Ceiling Align
Dampness in
Loft Level
Cupboard
Floor Tiles
Wall Tiles/Sk
Door Hardwa
Window Har
Door Frames
Door Shutter
Window Grill
Window Shu
Window Fram
Grill Door
Ventilators
Railing
se - A Blo
’s Housing Pr
ock
rs Looked
el
kirting Tiles
all
n Wall
astering and
ent/Plumb
nment and Le
n Ceiling
kirting Tiles
are
dware
s
r
l, Mesh
utter
me
ock
roject at Parut
at
Finishing
evels
thipattu, Chen
Final Report: Pag
No oOccurren
9
0
89
52
32
30
24
23
17
9
9
8
5
4
89
52
53
20
27
44
42
14
10
50
32
8
nnai (PII)
ge 53 of 125
of nces*
C o n s
W
P
EW
3r d Party Q
u l t a n c y C h e n n
Work
Plumbing
lectrical Works
uality Inspect
n a i
Core Compo
Toilet
PlumbinSanitary
ElectricaWorks
t ion / Audit f
nents P
B
BBM
ng & y Works
P
P
S
al E
for CGEWHO’
Parameter
Bathroom Flo
Bathroom WaBathroom FloMaintained
Plumbing Fix
Pipe
Sanitary Fittin
Electrical
’s Housing Pr
rs Looked a
oor Tiles
all Tiles oor Slope No
xtures
ngs And Fixt
roject at Parut
at
ot
ures
thipattu, Chen
Final Report: Pag
No oOccurre
*
13
33
0
27
1
1
13
nnai (PII)
ge 54 of 125
of nces
C
o n s u l t a n c y C h e n n a i
Pain
S
Beams
FlooWall Tiles/Skirtin
F
Cracks Dampness
ting, Plastering and FiWall Alignment/
Ceiling Alignment andDampness in
LofCup
Door HarWindow Har
Door FDoor S
Window GrillWindow SWindow
GrVent
Bathroom FlooBathroom Wa
Plumbing F
Sanitary Fittings And F
Ele
5
4
11
0
s/Lintel
or Tilesng TileslooringSpout
in Wallin Wallnishing/Plumb LevelsCeilingft Levelpboard
rdwarerdwareFramesShutter, MeshShutterFrameill DoortilatorsRailing
or Tilesall Tiles
ixturesPipe
Fixtures
ectrical
3r d Party Quality I
9
8
812
17
9
1410
8
13
13
10
Defec
25%
Inspection / Audit
1922
20
7
2027
27
20
ts ‐Number
5
for CGEWHO’s Ho
36
7
32
33
7
30
of Flats ‐ Ty
50%
ousing Project at Pa
41
4442
40
ype A
75%
aruthipattu, Chenna
Final Report: Page
53
50
50
100% (54 D
ai (PII)
55 of 125
DUs)
C o n s
3r d Party Q
u l t a n c y C h e n n
Number
Work
Civil
uality Inspect
n a i
r of DefectCoreCom
Colu
FlooCeiliCupPlat
Doo& Gr
t ion / Audit f
ts - Type e
mponents
umn & Beam
or, Wallsing, Loftboard &
tform
or, Windowrills
for CGEWHO’
wise - B
Param
m Column
Beams/L
s, ft, &
Floor Til
Dampne
Cupboar
Painting
Spout
Wall Tile
Loft Lev
Cracks i
Wall Alig
Dampne
Ceiling A
Platform
Flooring
Exhaust
Crack In
w
Door Ha
Grill Doo
Door Sh
Window
Window
Door Fra
Window
Ventilato
Window
Railing
’s Housing Pr
Block
eters Look
Lintel
es
ess in Wall
rd
, Plastering a
es/Skirting Ti
vel
n Wall
gnment/Plum
ess in Ceiling
Alignment an
m
t Fan Locatio
n Ceiling
ardware
or
hutter
Grill, Mesh
Shutter
ames
Frame
ors
Hardware
roject at Parut
ked at
and Finishing
iles
mb
g
nd Levels
on/Shape
thipattu, Chen
Final Report: Pag
NOccur
g
nnai (PII)
ge 56 of 125
No of rrences*29
18
91
91
74
69
54
52
48
42
35
28
18
12
7
7
2
144
126
114
82
55
52
44
40
33
6
C o n s
3r d Party Q
u l t a n c y C h e n n
Work
Plumbin
ElectricWorks
uality Inspect
n a i
CoreCom
Toile
ng PlumSani
cal ElectWor* Forflat, t
t ion / Audit f
e mponents
et
mbing &itary Works
trical ks r example, ifthen ‘numbe
for CGEWHO’
Parame
Bathroom
BathroomBathroomMaintaine
& s
Plumbing
Sanitary
Pipe
Electrical
f the floor tiler of occurren
’s Housing Pr
eters Look
m Floor Tiles
m Wall Tilesm Floor Slopeed
g Fixtures
Fittings And
les are defecnces’ is repor
roject at Parut
ked at
e Not
Fixtures
ctive in threerted as three
thipattu, Chen
Final Report: Pag
NoOccurre
5
4
0
10
2
0
4
e rooms in te
nnai (PII)
ge 57 of 125
o of ences*
9
9
0
02
1
0
0
he same
C
o n s u l t a n c y C h e n n a i
D
Painting, Plasteri
Wall Ti
Wall ADam
Ceiling Align
Exhaust Fan
Win
W
BathBath
PSanitary Fittin
2
6
0
ColumnBeams/Lintel
Floor TilesDampness in Wall
Cupboarding and Finishing
Spoutles/Skirting Tiles
Loft LevelCracks in Wall
Alignment/Plumbmpness in Ceilingment and Levels
PlatformFlooring
n Location/ShapeCrack In Ceiling
Door HardwareGrill Door
Door Shutterndow Grill, MeshWindow Shutter
Door FramesWindow Frame
Ventilatorsindow Hardware
Railing
hroom Floor Tileshroom Wall Tiles
lumbing Fixturesngs And Fixtures
Electrical
2918
435
2818
1277
440
336
21
40
10 20 30
3r d Party Quality I
7469
5452
482
5552
44
5949
40 50 60 70
Defects ‐
25%
Inspection / Audit
9191
1182
102
80 90 100 1
Number of
50%
for CGEWHO’s Ho
144126
4
10 120 130 140
f Flats ‐ Type
ousing Project at Pa
150 160 170 18
e B
75%
aruthipattu, Chenna
Final Report: Page
80 190 200
100% (209
ai (PII)
58 of 125
DUs)
C o n s
3r d Party Q
u l t a n c y C h e n n
Number
Work
Civil
uality Inspect
n a i
r of DefectCoreComColu Bea
FlooCeiliCupPlat
Doo& Gr
t ion / Audit f
ts - Type e
mponentsumn & am
or, Wallsing, Loftboard &
tform
or, Windowrills
for CGEWHO’
wise - C
Param
Column
Beams/L
s, ft, &
Flooring
Crack In
Platform
Wall Tile
Dampne
Cracks i
Exhaust
Ceiling A
Painting
Wall Alig
Floor Til
Loft Lev
Cupboar
Spout
Dampne
w
Railing
Window
Ventilato
Window
Door Fra
Window
Window
Door Sh
Grill Doo
Door Ha
’s Housing Pr
Block
eters Look
Lintel
n Ceiling
m
es/Skirting Ti
ess in Ceiling
n Wall
t Fan Locatio
Alignment an
, Plastering a
gnment/Plum
es
vel
rd
ess in Wall
Hardware
ors
Shutter
ames
Frame
Grill, Mesh
hutter
or
ardware
roject at Parut
ked at
iles
g
on/Shape
nd Levels
and Finishing
mb
thipattu, Chen
Final Report: Pag
NOccur
g
nnai (PII)
ge 59 of 125
No of rrences*17
60
2
3
11
24
33
35
40
51
53
59
61
71
71
73
97
1
20
27
36
43
59
84
93
96
107
C o n s
3r d Party Q
u l t a n c y C h e n n
Work
Plumbin
Electric
uality Inspect
n a i
CoreCom
Toile
ng PlumSani
cal ElectWor* Forflat, t
t ion / Audit f
e mponents
et
mbing &itary Works
trical ks r example, ifthen ‘numbe
for CGEWHO’
Parame
BathroomMaintaineBathroom
Bathroom
& s
Sanitary
Plumbing
Pipe
Electrical
f the floor tiler of occurren
’s Housing Pr
eters Look
m Floor Slopeed m Floor Tiles
m Wall Tiles
Fittings And
g Fixtures
les are defecnces’ is repor
roject at Parut
ked at
e Not
Fixtures
ctive in threerted as three
thipattu, Chen
Final Report: Pag
NoOccurre
1
2
3
1
7
0
2
e rooms in te
nnai (PII)
ge 60 of 125
o of ences*
1
8
7
4
3
0
6
he same
C
o n s u l t a n c y C h e n n a
Ba
i
Da
Wall AliPainting, Plasterin
Ceiling AlignmExhaust Fan
DamWall Tile
Wind
W
Win
BathrBathr
athroom Floor Slope N
PluSanitary Fittin
32
1
1
0
Beams/LintelColumn
ampness in WallSpout
Loft LevelCupboardFloor Tiles
ignment/Plumbng and Finishingment and LevelsLocation/ShapeCracks in Wall
pness in Ceilinges/Skirting Tiles
PlatformCrack In Ceiling
Flooring
Door HardwareGrill Door
Door Shutterdow Grill, MeshWindow Frame
Door FramesWindow Shutter
Ventilatorsndow Hardware
Railing
room Wall Tilesroom Floor TilesNot Maintained
umbing Fixturesgs And Fixtures
Electrical
17
324
11
2720
28
14
26
10 20 3
D
3r d Party Quality I
6
553
5140
353
543
36
37
30 40 50
Defects ‐Nu
25%
Inspection / Audit
60
737171
6159
8459
73
60 70 80
umber of Fla
50%
for CGEWHO’s Ho
97
10796
934
0 90 100
ats ‐ Type C
75%
ousing Project at Pa
110 120 130
% 1
aruthipattu, Chenna
Final Report: Page
140
100% (142 DUs)
ai (PII)
61 of 125
C o n s
3r d Party Q
u l t a n c y C h e n n
Number
Work
Civil
uality Inspect
n a i
r of DefectCoreComColu Bea
FlooCeiliCupPlat
Doo& Gr
t ion / Audit f
ts - Type e
mponentsumn & am
or, Wallsing, Loftboard &
tform
or, Windowrills
for CGEWHO’
wise - D
Param
Beams/L
Column
s, ft, &
Dampne
Loft Lev
Floor Til
Spout
Wall Alig
Cupboar
Wall Tile
Painting
Dampne
Cracks i
Ceiling A
Flooring
Exhaust
Platform
w
Door Ha
Door Sh
Window
Grill Doo
Door Fra
Ventilato
Window
Window
Window
Railing
’s Housing Pr
Block
eters Look
Lintel
ess in Wall
vel
es
gnment/Plum
rd
es/Skirting Ti
, Plastering a
ess in Ceiling
n Wall
Alignment an
t Fan Locatio
m
ardware
hutter
Grill, Mesh
or
ames
ors
Shutter
Frame
Hardware
roject at Parut
ked at
mb
iles
and Finishing
g
nd Levels
on/Shape
thipattu, Chen
Final Report: Pag
NOccur
g
nnai (PII)
ge 62 of 125
No of rrences*
19
12
44
44
43
42
39
39
37
29
20
15
14
11
7
4
62
59
54
54
45
43
36
32
26
8
C o n s
3r d Party Q
u l t a n c y C h e n n
Work
Plumbin
Electric
Analysis of
Defect
Defectthe fla
Defectthe fla
uality Inspect
n a i
CoreCom
Toile
ng PlumSani
cal ElectWor
f number o
ts with in
• door ha
ts with inats inspec
• plumbi• grill do• window• door sh• dampn
ts with inats inspec
• bathroo• bathroo• Ventila• Window• Window• Door fr• Cupboa• Loft lev• Wall al• Paintin• Spout
t ion / Audit f
e mponents
et
mbing &itary Works
trical ks
of flats hav
ncidence i
hardware
ncidence cted-
bing fixturesoor, w grill, mes
shutter, ness in wal
ncidence cted –
oom wall tiloom floor tilators
ow frame ow shutterframes oard evel lignment ang plasterin
for CGEWHO’
Parame
Bathroom
BathroomBathroomMaintaine
& s
Plumbing
Sanitary Pipe
Electrical
ving the de
in more th
in more t
s,
esh ,
ll
in more t
les, tiles
and plumbng and finis
’s Housing Pr
eters Look
m Floor Tiles
m Wall Tilesm Floor ed
g Fixtures
Fittings And
efects indic
han 75 %
than 50 %
than 25 %
ishing
roject at Parut
ked at
Slope No
Fixtures
cates the fo
% of the fl
% but les
% but les
thipattu, Chen
Final Report: Pag
NoOccurr
ot
0
2
ollowing
ats inspe
ss than 75
ss than 50
nnai (PII)
ge 63 of 125
o of rences
35
32
1
51
310
6
ected –
5 % of
0 % of
C o n s
Con
The
in V
3r d Party Q
u l t a n c y C h e n n
Defect
nclusion:
• Door h
• The lea
beams
column
e data capt
Vol. (III) of
uality Inspect
n a i
• Floor ti
ts with in
• Electric• Sanitar• Railing• Crack i• Dampn• Ceiling• Exhaus• Cracks • Floorin• Column• Beams/
ardware se
ast occurre
wherein
n, undulati
ture sheets
f the repor
t ion / Audit f
tiles
ncidence i
cal ry fixtures
g in ceiling ness in ceilg alignmentst fan locats ion wall ng n s/lintel
eems to ha
ence of de
nearly 1
ng beam, c
s for all th
rt.
for CGEWHO’
in less tha
ling t and leveltion and sh
ave maxim
fects woul
in 4 hous
column no
e flats insp
’s Housing Pr
an 25 % f
ls hape
mum amoun
d be in ele
ses seem
ot being plu
pected are
roject at Parut
flats insp
nt of defec
ements suc
to have
umb etc.
appended
thipattu, Chen
Final Report: Pag
ected –
cts.
ch as colum
either a
d as Annex
nnai (PII)
ge 64 of 125
mn and
skewed
xure 1.1
C
o n s u l t a n c y C h e n n a
B
i
D
Wall A
Wall TiPainting, Plasteri
Dam
Ceiling Align
Exhaust Fan
Win
W
BathBath
Bathroom Floor Slope
PSanitary Fitti
1
0
Beams/LintelColumn
Dampness in WallLoft LevelFloor Tiles
SpoutAlignment/Plumb
Cupboardles/Skirting Tilesing and Finishingmpness in Ceiling
Cracks in Wallment and Levels
Flooringn Location/Shape
Platform
Door HardwareDoor Shutter
ndow Grill, MeshGrill Door
Door FramesVentilators
Window ShutterWindow Frame
Window HardwareRailing
hroom Floor Tileshroom Wall Tilese Not Maintained
lumbing Fixturesngs And Fixtures
Electrical
12
111
74
8
10
3r d Party Quality I
19
20154
2
2
20
Defects ‐N
25%
Inspection / Audit
3729
3632
26
3532
31
26
30
Number of F
50%
for CGEWHO’s Ho
4444
4342
3939
7
4543
40
Flats ‐ Type
ousing Project at Pa
595454
51
50
D
75%
aruthipattu, Chenna
Final Report: Page
62
60
100% (66 DUs)
ai (PII)
65 of 125
)
C
4
o n s u l t a n c y C h e n n a
4.1.1.3 Photog
i
graphs Individdual Flats
3r d Party Quality I
Floor t
Inspection / Audit
tiles
for CGEWHO’s Ho
ousing Project at Paaruthipattu, Chenna
Final Report: Page
ai (PII)
66 of 125
C
o n s u l t a n c y C h e n n a i
B
3r d Party Quality I
Beams/L
Inspection / Audit
intel
for CGEWHO’s Hoousing Project at Paaruthipattu, Chenna
Final Report: Page
ai (PII)
67 of 125
C
o n s u l t a n c y C h e n n a i
3r d Party Quality I
Colum
Inspection / Audit
mn
for CGEWHO’s Ho
ousing Project at Paaruthipattu, Chenna
Final Report: Page
ai (PII)
68 of 125
C
o n s u l t a n c y C h e n n a i
Cr
3r d Party Quality I
racks in
Inspection / Audit
wall
for CGEWHO’s Hoousing Project at Paaruthipattu, Chenna
Final Report: Page
ai (PII)
69 of 125
C
o n s u l t a n c y C h e n n a i
Dam
3r d Party Quality I
mpness i
Inspection / Audit
in wall
for CGEWHO’s Hoousing Project at Paaruthipattu, Chenna
Final Report: Page
ai (PII)
70 of 125
C
o n s u l t a n c y C h e n n a i
Painnting, pla
3r d Party Quality I
astering
Inspection / Audit
g and fin
for CGEWHO’s Ho
nishing
ousing Project at Paaruthipattu, Chenna
Final Report: Page
ai (PII)
71 of 125
C
o n s u l t a n c y C h e n n a i
Walls
3r d Party Quality I
skew/no
Inspection / Audit
ot plumb
for CGEWHO’s Ho
b
ousing Project at Paaruthipattu, Chenna
Final Report: Page
ai (PII)
72 of 125
C
o n s u l t a n c y C h e n n a
i
CCeiling nnot hori
3r d Party Quality I
izontal/u
Inspection / Audit
undulati
for CGEWHO’s Ho
ing/slop
ousing Project at Pa
ping
aruthipattu, Chenna
Final Report: Page
ai (PII)
73 of 125
C
o n s u l t a n c y C h e n n a i
Damp
3r d Party Quality I
pness in
Inspection / Audit
n ceiling
for CGEWHO’s Ho
g
ousing Project at Paaruthipattu, Chenna
Final Report: Page
ai (PII)
74 of 125
C
o n s u l t a n c y C h e n n a i
Do
3r d Party Quality I
oor Fram
Inspection / Audit
me
for CGEWHO’s Ho
ousing Project at Paaruthipattu, Chenna
Final Report: Page
ai (PII)
75 of 125
C
o n s u l t a n c y C h e n n a i
D
3r d Party Quality I
Door shu
Inspection / Audit
utter
for CGEWHO’s Hoousing Project at Paaruthipattu, Chenna
Final Report: Page
ai (PII)
76 of 125
C
o n s u l t a n c y C h e n n a i
Wind
3r d Party Quality I
dow gril
Inspection / Audit
ll/mesh
for CGEWHO’s Ho
ousing Project at Paaruthipattu, Chenna
Final Report: Page
ai (PII)
77 of 125
C
o n s u l t a n c y C h e n n a i
3r d Party Quality I
Grill do
Inspection / Audit
oor
for CGEWHO’s Hoousing Project at Paaruthipattu, Chenna
Final Report: Page
ai (PII)
78 of 125
C
o n s u l t a n c y C h e n n a i
V
3r d Party Quality I
Ventilat
Inspection / Audit
tor
for CGEWHO’s Hoousing Project at Paaruthipattu, Chenna
Final Report: Page
ai (PII)
79 of 125
C
o n s u l t a n c y C h e n n a i
L
3r d Party Quality I
Loft not le
Inspection / Audit
evel
for CGEWHO’s Hoousing Project at Paaruthipattu, Chenna
Final Report: Page 8
ai (PII)
80 of 125
C
o n s u l t a n c y C h e n n a i
3r d Party Quality I
Cupboar
Inspection / Audit
rd
for CGEWHO’s Hoousing Project at Paaruthipattu, Chenna
Final Report: Page 8
ai (PII)
81 of 125
C
o n s u l t a n c y C h e n n a i
Sill not
3r d Party Quality I
finished
Inspection / Audit
d/not lev
for CGEWHO’s Ho
vel
ousing Project at Pa
aruthipattu, Chenna
Final Report: Page 8
ai (PII)
82 of 125
C
o n s u l t a n c y C h e n n a i
Lo
3r d Party Quality I
oft not fin
Inspection / Audit
nished
for CGEWHO’s Hoousing Project at Paaruthipattu, Chenna
Final Report: Page 8
ai (PII)
83 of 125
C
o n s u l t a n c y C h e n n a i
Plum
3r d Party Quality I
mbing fi
Inspection / Audit
ixtures
for CGEWHO’s Hoousing Project at Pa
aruthipattu, Chenna
Final Report: Page 8
ai (PII)
84 of 125
C
o n s u l t a n c y C h e n n a
i
Sanitary
3r d Party Quality I
y fitting a
Inspection / Audit
and fixtur
for CGEWHO’s Ho
res
ousing Project at Paaruthipattu, Chenna
Final Report: Page 8
ai (PII)
85 of 125
C
o n s u l t a n c y C h e n n a i
B
3r d Party Quality I
Bathroom
Inspection / Audit
tiles
for CGEWHO’s Ho
ousing Project at Paaruthipattu, Chenna
Final Report: Page 8
ai (PII)
86 of 125
C
o n s u l t a n c y C h e n n a i
3r d Party Quality I
Electric
Inspection / Audit
al
for CGEWHO’s Hoousing Project at Paaruthipattu, Chenna
Final Report: Page 8
ai (PII)
87 of 125
C o n s
4.1
All
stai
defe
insp
Con
3r d Party Q
u l t a n c y C h e n n
.2 Comm
the blocks
ircases, te
ects. Some
pection are
nclusion
Stilt area
1. Col
2. Ina
spa
3. Ina
adja
Staircase
1. Non
2. Com
3. Han
4. Dam
wat
5. Plas
External
1. Exte
plac
2. Dra
3. Poo
Terrace/
1. Wa
2. We
hav
3. In c
uality Inspect
n a i
mon Areas
s was chos
erraces, lift
e of the co
e indicated
as:
umns are p
dequate sp
ace at man
dequate l
acent road
es:
n-uniform
mmunicatio
ndrails not
mpness in
ter tanks.
ster Patche
surfaces
ernal wall
ces.
ain pipes ar
or alignmen
/roof top:
ter stagna
ather Proo
ve been tem
certain bloc
t ion / Audit f
s and ame
sen for ins
ts and ext
ommon and
below as
poorly alig
pace for co
y places.
level diffe
d surfaces.
riser in som
on and pow
been finis
a few sta
es remains
of blocks
surfaces
re not plac
nt and inco
tion on the
of course
mporarily c
cks, expan
for CGEWHO’
enities
spection o
ternal surf
d repetitive
conclusion
ned at ma
overed car
erence bet
me flights.
wer cable b
shed smoot
ircase hea
s to be com
s:
are not n
ces / ancho
orrect joini
e terrace d
damaged
covered wi
nsion/const
’s Housing Pr
of Common
face of bu
e defects a
n.
ny places.
parking an
tween cov
boxes not
thly in mos
d rooms, d
mpleted in
eatly plast
ored to the
ng of SCI
due to undu
and broke
ith sand an
truction joi
roject at Parut
n areas su
uildings we
as derived
nd inadequ
vered park
covered in
st places.
due to lea
a few bloc
tered and
e wall in mo
pipes.
ulations in
en on mos
nd bitumen
ints are no
thipattu, Chen
Final Report: Pag
uch as stilt
ere inspec
from the d
uate mane
king space
n some loca
kage in ov
cks.
painted in
ost places.
most plac
st terraces
n.
ot sealed.
nnai (PII)
ge 88 of 125
t areas,
cted for
detailed
uvering
es and
ations.
verhead
n some
.
es.
s which
C o n s
The
Vol
3r d Party Q
u l t a n c y C h e n n
4. Con
bloc
5. Khu
6. Ove
pipe
7. Hei
e data capt
. (III) of th
uality Inspect
n a i
nstruction
cks.
urra not pr
erflow pipe
es.
ght of para
ture sheets
he report.
t ion / Audit f
waste mat
rovided any
es from ov
apet walls
s of the blo
for CGEWHO’
terial has b
ywhere.
verhead wa
ranges be
ocks inspec
’s Housing Pr
been dump
ater tanks
tween 68 a
cted are ap
roject at Parut
ped on the
are not co
and 74 cen
ppended a
thipattu, Chen
Final Report: Pag
e terrace o
onnected t
ntimeters.
s Annexur
nnai (PII)
ge 89 of 125
of some
to drain
e 1.2 in
C
4
o n s u l t a n c y C h e n n a
4.1.2.1 Photog
Terra
i
graphs Commo
ce : Surfac
on Areas and a
ce finish d
amenities
amaged, W
3r d Party Quality I
Water stag
Inspection / Audit
gnation, In
for CGEWHO’s Ho
adequate h
ousing Project at Pa
height of P
aruthipattu, Chenna
Final Report: Page
Parapet wa
ai (PII)
90 of 125
all
C
o n s u l t a n c y C h e n n a
Terrace:
i
Malba du
umped & O
OTS not co
3r d Party Quality I
overed anddrain pip
Inspection / Audit
d overflow e
for CGEWHO’s Ho
pipe (WT
ousing Project at Pa
T) not conn
aruthipattu, Chenna
Final Report: Page
nected with
ai (PII)
91 of 125
h
C
o n s u l t a n c y C h e n n a
i
Stil
lt : Colum
mns not alig
3r d Party Quality I
gned and i
Inspection / Audit
inadequate
for CGEWHO’s Ho
e parking
ousing Project at Pa
g space
aruthipattu, Chenna
Final Report: Page
ai (PII)
92 of 125
C
o n s u l t a n c y C h e n n a i
Stilt arrea: Floor
3r d Party Quality I
sloping in
Inspection / Audit
the wrong
for CGEWHO’s Ho
g direction
ousing Project at Pa
n
aruthipattu, Chenna
Final Report: Page
ai (PII)
93 of 125
C
o n s u l t a n c y C h e n n a i
Leakagees: Stilt, St
3r d Party Quality I
taircase ro
Inspection / Audit
oom and W
for CGEWHO’s Ho
Water Tan
ousing Project at Pa
k
aruthipattu, Chenna
Final Report: Page
ai (PII)
94 of 125
C
o n s u l t a n c y C h e n n a i
Leakagees: Stilt, St
3r d Party Quality I
taircase ro
Inspection / Audit
oom and W
for CGEWHO’s Ho
Water Tan
ousing Project at Pa
k
aruthipattu, Chenna
Final Report: Page
ai (PII)
95 of 125
C
o n s u l t a n c y C h e n n a
i
Leakagees: Stilt, St
3r d Party Quality I
taircase ro
Inspection / Audit
oom and W
for CGEWHO’s Ho
Water Tan
ousing Project at Pa
k
aruthipattu, Chenna
Final Report: Page
ai (PII)
96 of 125
C
o n s u l t a n c y C h e n n a i
Commmunicatio
3r d Party Quality I
on and pow
Inspection / Audit
wer cables
for CGEWHO’s Ho
s not cove
ousing Project at Pa
red
aruthipattu, Chenna
Final Report: Page
ai (PII)
97 of 125
C
Dra
o n s u l t a n c y C h e n n a
ain pipes: N
i
Not alignedd/placed/aanchored a
3r d Party Quality I
and Poor a
Inspection / Audit
alignment/i
for CGEWHO’s Ho
incorrect j
ousing Project at Pa
joining of S
aruthipattu, Chenna
Final Report: Page
SCI pipes
ai (PII)
98 of 125
C
o n s u l t a n c y C h e n n a
Stairc
i
case: Hand
d rails nott covered /
3r d Party Quality I
finished,
Inspection / Audit
Non Unifo
for CGEWHO’s Ho
orm riser a
ousing Project at Pa
and marbl
aruthipattu, Chenna
Final Report: Page
le broken
ai (PII)
99 of 125
C
o n s u l t a n c y C h e n n a
Stai
i
rcase room
m – RC dooor frame &
3r d Party Quality I
& Door brcovered
Inspection / Audit
roken, Stepd.
for CGEWHO’s Ho
ps width re
ousing Project at Pa
educed, ha
aruthipattu, Chenna
Final Report: Page 10
and rails n
ai (PII)
00 of 125
ot
C
o n s u l t a n c y C h e n n a i
Lift:: Door enttry not fini
3r d Party Quality I
ished and
Inspection / Audit
Inadequat
for CGEWHO’s Ho
te level dif
ousing Project at Pa
fference
aruthipattu, Chenna
Final Report: Page 10
ai (PII)
01 of 125
C
o n s u l t a n c y C h e n n a
E
i
External W
Wall: Damppness, Poo
3r d Party Quality I
or Alignme
Inspection / Audit
ent and w
for CGEWHO’s Ho
wall surface
ousing Project at Pa
es not finis
aruthipattu, Chenna
Final Report: Page 10
shed
ai (PII)
02 of 125
C
R
o n s u l t a n c y C h e n n a
Road with
i
h Storm waater Drain: No Camb
3r d Party Quality I
ber provid
Inspection / Audit
ded and Op
for CGEWHO’s Ho
pen drain w
ousing Project at Pa
with inade
aruthipattu, Chenna
Final Report: Page 10
equate sect
ai (PII)
03 of 125
tion
C
o n s u l t a n c y C h e n n a
i
Expansio
3r d Party Quality I
on Joint: N
Inspection / Audit
Not covere
for CGEWHO’s Ho
ed
ousing Project at Pa
aruthipattu, Chenna
Final Report: Page 10
ai (PII)
04 of 125
C o n s u l t a n c y
4.1.3 D
Inspectio
Facility,
inspectio
are as fo
Wate
• W
de
w
42
p
• So
• A
m
bo
an
st
• A
D
• T
ca
ca
• Ea
co
W
su
10
w
(w
3r d Party Q
y C h e n n a i
Developme
on of dev
Roads , S
on, design
ollows
ter Supply
Water requ
emand @
water, requ
2,900 litre
urposes.
ource of w
s per the y
meet the p
ore wells h
nd water
torage tank
s per the
Drainage Bo
he water
arbon filte
apacity.
ach block
ompartmen
Water from
ump is pum
0 lps at 4
water & 6 l
with 1 stand
uality Inspect
ment Work
velopment
Storm Wat
criteria an
y
uirement is
135 lpcd
uirement is
es per day
water is bor
yield repor
projected d
have been
from thes
k of 1, 96,
water qu
oard dated
is treated
r. The trea
is provide
nts for sto
the centra
mped and
45m head
ps at 45 m
d by) are p
t ion / Audit f
ks
works su
ter Drains
nd test rep
s estimate
d (excludin
s estimated
y for drinki
re wells pro
rt of bore w
demand. H
dug. The
se bore we
000 litres c
uality repo
d 07.06.200
through
ated water
ed with OH
oring drink
alized unde
distributed
designed
m head des
rovided.
for CGEWHO’
ch as Wa
Electrificat
ports furnis
ed by ass
ng drinkin
d @ 15 lp
ing water
ovided wit
wells, ther
However a
bore wells
ells are pu
capacity.
ort certified
05, the wa
a system
r is stored
HT of 20,0
king water
erground s
d to the OH
d for 10 h
signed for
’s Housing Pr
ater supply
tion was c
shed by C
suming 5
ng water
pcd. The to
& 3, 86,1
hin the site
re is a requ
s addition
are interc
umped to
d by Tam
ter is chem
of RO pla
in an und
000 litres
r & other
storage tan
HTs in all b
rs of pum
2 hrs of
roject at Parut
y, Waste W
carried out
GEWHO a
persons p
requireme
otal requir
100 litres p
e boundary
uirement fo
al safegua
onnected w
a centrali
il Nadu W
mically pota
ant, sand
derground
capacity &
purpose w
nk & drink
blocks. Mo
mping for d
pumping f
thipattu, Chen
Final Report: Page
Water Tre
t based on
nd the infe
per flat &
nt). For d
ement per
per day fo
y.
or 4 bore w
ard, 8 num
with level
ized under
Water Supp
able.
filter & Ac
sump of 4
& the OHT
water sep
ing water
onoblock pu
domestic p
for drinking
nnai (PII)
e 105 of 125
eatment
n visual
erences
& water
drinking
r day is
or other
wells to
mber of
sensors
rground
ply and
ctivated
42 cum
T has 2
arately.
storage
ump of
purpose
g water
C o n s u l t a n c y
• T
ju
m
Was
Road
Stor
3r d Party Q
y C h e n n a i
he distribu
unctions. A
more than t
ste water
o Sewa
there
aerat
o In F
diffus
sludg
overf
then
o The
reduc
is use
o The
sewa
the a
plant
Part
any t
ds:
o Camb
o Pavin
o Seal
rm water
o Slope
uality Inspect
ution syste
As per the
the require
Treatmen
age from a
e the sew
tion system
BBR aerat
sion. The
ge from t
flow flow
Activated
effluent is
ction) & To
ed for gard
plant is de
age flow is
aeration sy
t is high
of the sew
treatment.
ber not pro
ng surface
coat is alre
drainage
es to facilit
t ion / Audit f
em is grid
design ca
ed head.
nt
all blocks f
wage is pu
m).
tion syste
e effluent f
the clarifie
from the
Carbon Fil
of reduce
otal Suspen
dening pur
esigned for
s only abou
ystem wit
. At prese
wage is be
ovided in r
is undulat
eady comin
e:
tate surfac
for CGEWHO’
iron patte
lculations
flow to the
umped to
m oxygen
from FBBR
er is tran
clarifier is
ter.
ed BOD (a
nded Solid
rpose.
r a capacity
ut 10% of
h the less
nt the pla
eing discha
oad surfac
ing which
ng off in m
e drainage
’s Housing Pr
ern with ne
furnished,
e collection
the Fluid
n transfer
R flows in
nsferred to
treated in
bout 90%
s (about 95
y of 350 c
the desig
ser inflow,
nt is being
arged in to
ce.
would resu
most places
e are not p
roject at Parut
ecessary is
residual h
n tank by
ized Bio R
takes pla
to the cla
o anaerob
n Pressure
reduction),
5% reductio
cum per da
ned capac
the opera
g operated
o nearby o
ult in wate
s
provided in
thipattu, Chen
Final Report: Page
solation va
height ava
gravity an
Reactor (d
ace by mo
rifier. The
bic digesto
e Sand Filt
COD (abo
ons). The e
ay. At pres
city. For op
ating cost
d on a tria
open area
r stagnatio
many plac
nnai (PII)
e 106 of 125
alves at
ilable is
nd from
diffused
olecular
settled
or. The
ter and
out 80%
effluent
sent the
perating
of the
al basis.
without
on.
ces.
C o n s u l t a n c y
Elect
Solid
4.2 Sp
4.2.1 W
In respe
analysed
Some of
3r d Party Q
y C h e n n a i
o Impr
o Open
ctrification
o Elect
into
Stree
requi
facto
o Three
back
d Waste M
o No G
o Muni
syste
o Main
pecific A
o A ran
each
speci
o Table
docu
Work Spec
ect of the
d and some
f the signifi
a. Preca
rebat
uality Inspect
roper termi
n drain by t
n:
tricity powe
considerat
et lighting
irement is
or (0.8) the
e DG sets
up for the
Managem
Garbage Ch
cipal Autho
em
Garbage B
Aspects
ndom repr
floor), tot
ifications a
es of obse
ments are
cification
e adherenc
e of them
icant non-c
ast RCC/CC
ted frames
t ion / Audit f
ination of r
the side of
er requirem
tion comm
) requirem
375.8KW
e total load
of 125 KV
e above po
ment:
hutes are p
orities sha
Bin outside
s:
resentative
taling to 1
as describe
rvations sh
given belo
Check (F
ce to tend
were foun
conformitie
C Frames
s
for CGEWHO’
rain water
f many roa
ment of the
mon area li
ment for
. Consider
d is worked
VA have b
ower dema
provided so
ll take car
e the comp
e sample o
16 flats wa
ed in the co
howing ite
ow.
Flats)
dered spe
nd to be no
es are:
have been
’s Housing Pr
pipes from
ads are of i
e project w
ghting (Bl
lift and a
ring divers
d out as 32
been provid
nd.
o as to avo
re of Door
plex.
of four fla
as chosen
ontract doc
ms which
ecifications
ot conform
n used inst
roject at Parut
m terraces.
inadequate
was been w
ocks, Sum
accordingly
sity factor
28.825KVA
ded to me
oid imprope
r to door g
ts per typ
for check
cument.
do not co
all releva
ming to the
tead of Pre
thipattu, Chen
Final Report: Page
e section.
worked out
mp Area, S
y the tot
(0.7) and
.
eet out the
er mainten
garbage co
pe design
king confor
nform to c
ant clause
e tender sc
essed stee
nnai (PII)
e 107 of 125
t taking
STP and
al load
d power
e power
ance.
ollection
(one in
rmity to
contract
es were
chedule.
el single
C o n s u l t a n c y
The obs
tabulated
4.2.2 W
The infe
given he
SN
3r d Party Q
y C h e n n a i
b. Devia
c. PVC c
servation
d and appe
Work Spe
erence on
ere under.
S. No.
ConClaNo.
1 5.1.
2 5.1.
3 6.2.
4 6.2.
5 6.2.
6 7.3.
uality Inspect
ation from
cistern inst
/ inferenc
ended as A
ecification
The Non c
ntract ause .
SA
.0 Pbaw
.0 Pbwufi
.0 C,braps
.1 Btebc
.2 ENefie
.4.2 PficFp14in
t ion / Audit f
prescribed
tead of chi
ce on non
Annexure 3
n Check (C
conformity
Schedule Agreement
Plinth protebe providedand be 50 wide Plinth protebe providedwith brick using AC Shinishing the
Corbelling inbelow Chajjaised ba
perforated hall be prov
Brick work errace leve
band and ccourses, all rExhaust opeNP 2 class embedded inished wit
exterior fixedPCC FLOORinished wit
cement and Flooring shapanels of 1.2metre bo40/50 mm wn between.
for CGEWHO’
d heights in
inaware cis
n-conformi
3.2.2 at Vo
Common
y of specifi
as Pert
ction laid td all round mm thick
ction laid td all round
edging wheet dividee top surfacen masonry /jas,projectio
ands, cobrick workvided
shall be el to form acornice in round the bening 350 collar of min the sa
th cement d with wire
RING IN SLh floating a coat of c
all be laid isize no
oth ways wiwide dividin
’s Housing Pr
n respect o
stern.
ty of spe
ol. (III) of t
Areas and
ication for
r Contra
to slope shthe buildi
and 610 m
to slope shthe buildi
ith C.M aers and brue /RCC on waons etc., arnices a
k in mason
projected a raised brtwo or mo
building mm dia RC
matching same, surfa
plaster amesh.
LITS shall coat on ne
cement slurn rectangut exceediith 4mm thng glass stri
roject at Parut
of electrica
ecification
the report.
nd Ameniti
16 flats a
act ObserExecu
hall ng
mm
Some
hall ng nd
ush
Not pr
alls nd nd nry
Not pr
at ick ore
Not pr
CC ize
ace nd
Exhaus300mmno wir
be eat ry. lar ng ick ips
PCC Fprovidas spestrips n
thipattu, Chen
Final Report: Page
al fittings
for 16 fla
.
ties)
are tabulat
rvations Outed At Sit
areas incom
rovided
rovided
rovided
st openinm is provide mesh pro
Flooring ined. Howeveecified andnot provide
nnai (PII)
e 108 of 125
ats are
ted and
On As te
mplete
ng of ed and
ovision
n Stilts er, size d glass ed.
C o n s u l t a n c y
SN
3r d Party Q
y C h e n n a i
S. No.
ConClaNo.
7 9.6.
8 9.8.
9 10.2
10 11.6
11 12.5
12 12.5
13 12.5
14 12.5
15 12.7
16 12.7
17 12.7
18 12.7
19 12.7
uality Inspect
ntract ause .
SA
.0 Rw
.0 Linxs
2.6 Kcd
6.0 Tcapo
5.3 AbS
5.6 Ethta
5.6 Oto
5.7 Gebcob
7.1 Aw
7.2 Nfosb
7.2 Sbps
7.6 Awpcto
7.8 Tlaac
t ion / Audit f
Schedule Agreement
Railing shawooden hanLetter boxesnjection mox 260x 95 mystem of le
Khurahs shacm unlessdescription oThe pipes cleaned of and paintedprimer and of SynthetiAll exposed be painted wSynthetic EnEach water han one dake pipe for
Over flow po be guided
GI pipes shembedded bed block ofclear thickneof 2 metersbends All exposed with Synthet
Necessary sor pipes crohall be
breakages Soil and wasbe less thapipe shall soil and waA 50 mm Swith terminprovided frconnection ao terrace pa
The PVC raaid on wallsaccess door collect water
for CGEWHO’
as Pert
all be prndrail on stas shall be
oulded ABS mm size witetter X makall be of sizs specifieof item
shall beany mort
d with a thereafter
ic Enamel p/surface G
with 2 or mnamel paint
tank shaldown take,r not more ipe from th
d to nearest
hall be laidover cemef required sess provides and addit
pipes shatic Enamel p
sleeves andossing maso
made f
ste water pan 100 mbe provid
atse pipesSand cast iral guard s
rom the sat the last arapet levelain water ps with a tee
at the ter from Khur
’s Housing Pr
r Contra
rovided waircase made out Plastic of 3h built in lo
ke e 45 cm x ed in t
e thoroughtar droppincoat of rwith 2 coapaint
GI pipes shmore coats
l have mo, each dowthan 4 DUs
he water tat Khurrah
d on terraent concresize & 75 med at intervationally at
ll be paintpaint
d provisioonry and RCfor avoidi
pipes shall nmm dia.Veded for bosron vent pishall also single branfloor level
pipes shall e junction arrace level raas
roject at Parut
act ObserExecu
with PVC Handra
of 05
ock
Not pr
45 the
Not pr
hly ngs red ats
Not pr
hall of
Not pr
ore wn s
Not pr
ank Not pr
ace ete mm als all
Not prspecifi
ted Not pr
ons CC ng
Not pr
not ent oth
Only confor
pe be
nch up
Not pr
be nd to
Providdoor
thipattu, Chen
Final Report: Page
rvations Outed At Sit
Sheet on ail is providrovided
rovided
rovided
rovided
rovided
rovided
rovided as pcations
rovided
rovided
soil pipe rmity
rovided
ed without
nnai (PII)
e 109 of 125
On As te
Steel ed
per the
is in
access
C o n s u l t a n c y
SN
4.2.3 W
The obse
are tabu
3r d Party Q
y C h e n n a i
S. No.
ConClaNo.
20 12.7
21 12.7
22 12.7
23 12.7
24 13.1
25 19.7
26 19.9
27 19.1
Work Spec
ervation /
ulated and
Sl No.
ContCla
No1 5.1.1
uality Inspect
ntract ause .
SA
7.8 Tep
7.8 1sthth
7.8.1 55s
7.9 Ap
11.1c Nsth
7.0 Mana
9.0 Nos
12.0 AawbD
cification
inference o
given here
tract ause No.
ScheAgre
a All usinginterblockOrga
t ion / Audit f
Schedule Agreement
The verticaextend up provided wit15 cm x 1hall be prohe pipe in he rain wat
50 mm dia G50mm beyohall be prov
All exposedpainted with
Normally anituated leshe building
Marking of and markednumbered area=18 sqmNumbering oof stainless hall be fixed
All units shaccessible dwell as stairback up PDiesel Gener
Check (D
on Non co
e below.
edule As Peement
pathways sg goodrlocking cemks duly appanisation
for CGEWHO’
as Pert
l rain wateto top of
th a cowl 5 cm cast ovided at tthe Khuraher GI pipe sleeond the facvided d SCI piph synthetic e
n earthing s than 150
parking ad in white
(Minimumm) of DUs -Nu
steel of d on the mahall be reqdirectly thrrcase and sPower suprator
Developm
nformity o
Per Contrac
shall be laid qualitment concretroved by th
’s Housing Pr
r Contra
er pipe shparapet a
iron gratithe mouth h to dischar
eves projecte of the w
pes shall enamel pai
shall not 00 mm fro
reas in stie paint am parki
umerals marequired sain door quired to rough lift shall also gipply throu
ment Work
of specificat
ct Observa
d ty te he
Provided
roject at Parut
act ObserExecu
hall nd
Not pr
ng in
rge
Not pr
ted wall
Not pr
be nt
Not pr
be om
Provid1500 m
ilts nd ng
Not pr
de ize
Not pr
be as ive gh
Provid
ks)
tion the de
ations On A
d only in Gard
thipattu, Chen
Final Report: Page
rvations Outed At Sit
rovided
rovided
rovided
rovided
ed at lesmm
rovided
rovided
ed
evelopmen
As Executed
den area
nnai (PII)
e 110 of 125
On As te
ss than
t works
d At Site
C o n s u l t a n c y
S
3r d Party Q
y C h e n n a i
Sl No. CC
2 12.7
3 17.1
4 16
5 16
6 16
7 16
8 16.1
9 17.1
10 18.1
11 19.1
uality Inspect
Contract Clause No. 7.8
1.2C
1.3
1.2D
1.5
1.0
t ion / Audit f
ScheduleAgreemeThe rain connecteddrains adischargeopen An arrangconnectiostorm wfuture orshall be pDeep borshall be water andinto centank Water shDUs aftethrough plant
Central Ustorage ofQuality opotable o
Scour vvalves arebottom ofemptying out sedimAn integharvestingprovided
Open paCement cArboricultprovided including
for CGEWHO’
e As Per Coent water pipe
d to the storand it she the water
gement for on with Mwater chamr existing cprovided re hole shall used as so
d the water ntral unde
hall be suppr proper tra Water tr
ndergroundf Water of water r not
valves and e to be placef all depressthe main o
ment grated raing system
arking areaoncrete Roadture shal
in openlandscaping
’s Housing Pr
ontract OA
shall be m water all not
in the
Rathwmw
making Municipal mber in chamber
N
be dug ource of shall be
erground
8 ceav
plied to eatment eatment
ThsyActruncafo
tank for Ceca
whether AsisSu02chshus
sluice ed at the sions for or letting
Asarm
water to be
Prtefrcodeca
as with ds
O
ll be n area etc
Soprop
roject at Parut
ObservationAt Site ain water pihe storm wa
water rechamany places,water flowing
ot provided
Nos. of entralized unvailable
he water isystem of ROctivated careated watenderground apacity and or drinking puentralized uapacity 196 cs per the Wsued by Tupply & Dra2.06.2005, hemically pohould be dissed' s per CGEWHre provid
maintenance
rovided, hermination oom terraceollection pitsebris and aapacity nly BT Road
ome plantatrovided in pen spaces o
thipattu, Chen
Final Report: Page
s On As Ex
pe not connater drain /
arging cham which leadin the open.
bore wellnderground
s treated thO plant, sandarbon filteer is store
sump of supplied to urpose
underground cum is providWater QualityTamil Naduainage Boar' The w
otable & thsinfected bef
HO, necessaded for
however Iof rain wates and rains are coverare not of s
s are provide
tion and lana few dem
only.
nnai (PII)
e 111 of 125
xecuted
nected to / ground mber in d to rain .
ls & a tank are
hrough a d filter & er. The ed in a 42 cum the flats
tank of ded y Report u Water rd dated
water is he water fore it is
ry valves proper
Improper er pipes n water red with sufficient
ed
dscaping marcated
C o n s u l t a n c y
S
4.2.4 P
The obs
given he
S
C
3r d Party Q
y C h e n n a i
Sl No. CC
12 19.113 19.2
14 19.2
15 19.4
16 19.6
17 19.1
18 19.1
19
20
Product M
servation /
ere below.
S.No. Itemrece
ivil
1 Flush
2 Iron
3 Locks
4 Glaze
5 Ceram
uality Inspect
Contract Clause No. 1.0 2.0
2.0
4.0
6.0
11.0
16.0
Make check
/ inference
ms for whiceived from A
h Doors
Mongery
s
ed Tiles
mic Tiles
t ion / Audit f
ScheduleAgreemeTree guarBoundary,Wicket providedBoundaryheight ploutside wgrill of 3 fCattle traat the maChequereprovidedSign boarshall be pFire fighprovided water stoetc., CommuniCommunicomplex, Pump hou
ck
e on Non
ch complainAllottees
for CGEWHO’
e As Per Coent rds shall be py wall grill, M
gate sha
y wall of lastered inswith Boundafeet heightap shall be pain gate ed tile paths
rds and guidput at variousting works
including orage arrang
ty Facilities ty Center ,SBus shelter
use, Substati
conformity
nt Brands provided
Gujran
Brand specified
Godrej
Regency
Regency
’s Housing Pr
ontract OA
provided Nain gate all be
Baco
5 feet ide and ary wall t
Oww
provided N
shall be Prop
de maps s places
G
to be pumps,
gements
N
Such as Shopping
N
on, Su
y of specif
d
Adherbr
specthe T
not d
Y
y
y Y
roject at Parut
ObservationAt Site
ot provided arbed wire ompound wa
nly one sidewire is providwall instead o
ot provided
rovided in pen spaces. uide maps n
ot provided
ot provided
ub Station no
fication of
rence to rand ified in Tender
R
No GbeTe
No Cnofo
Yes
No
C28aponex
Yes
thipattu, Chen
Final Report: Page
s On As Ex
is provideall instead of
e is plasteredded over cof grill
some dem
ot provided
ot provided
product m
Remarks
Gujran Brandeen specifieender. opy of invoot given by Cor verification
GEWHO vid8.09.2012 pproved Regne of the bxecution
nnai (PII)
e 112 of 125
xecuted
ed over grill
d. Barbed ompound
marcated
make is
has not ed in the
oice was CGEWHO n
de letter has
gency as brand for
C o n s u l t a n c y
S
S
E
3r d Party Q
y C h e n n a i
S.No. Itemsreceiv
6 Glass
7 Alum ( har
7.a Wind
7.b Doors
anitary
8.a Vitre
8.b Stai
8.C CP Valv
8.d CP W
8.e Bras
8.f PVC
lectrical
9.a MCB
9.b Swit
uality Inspect
s for whicved from Allo
s
inum Fittingsrdware )
dow
s and window
eous China w
nless Steel S
Fittings, Ave
Waste and Fl
ss Stop and B
C Cistern
B
tches
t ion / Audit f
ch complaiottees
s
w fixtures
ware
Sinks
Accessories
lush pipes
Bib cock
for CGEWHO’
nt Brands provided
Modi
Brand specified
Nulite
Cera
AMC
& Othello
Cera
Othello
Cera
Bentec
Anchor
’s Housing Pr
d
Adherbr
specthe T
Y
not d
Y
Y
Y
Y
roject at Parut
rence to rand cified in Tender
R
Yes
-
Cdtstexapte
Yes
Yes
Yes
No Capfit
No InPVpr
No Capfit
No Ashvi
No CapM
Yes
thipattu, Chen
Final Report: Page
Remarks
GEWHO Vidt 21st Jatated that txecuted happroved aender specific
GEWHO pproved ttings for exe
nstead of CVC pipe hrovided
GEWHO pproved ttings for exe
s per tendehould be itreous china
GEWHO pproved
MCBs for exec
nnai (PII)
e 113 of 125
de letter an 2013 the item as been as per cation.
has Othello
ecution*.
CP brass as been
has Othello
ecution*.
er cistern white
a ware
has Bentec
cution*.
C o n s u l t a n c y
4.3 Re
3r d Party Q
y C h e n n a i
eply to
uality Inspect
Draft R
t ion / Audit f
Report
for CGEWHO’’s Housing Prroject at Parut
Replythipattu, Chen
y to Draft Rep
Final Report: Page
nnai (PII)
ort: 8 Pages
e 115 of 125
C o n s u l t a n c y
3r d Party Q
y C h e n n a i
uality Inspect
t ion / Audit ffor CGEWHO’’s Housing Prroject at Parut
Replythipattu, Chen
y to Draft Rep
Final Report: Page
nnai (PII)
ort: 8 Pages
e 116 of 125
C o n s u l t a n c y
4.2.2 W
Sl No.
Ccn
1 5
2 5
3 6
4 6
5 6
3r d Party Q
y C h e n n a i
Work Specif
Contract clause no.
Sc
5.1.0 Ptpbt
5.1.0 Ptpbeudfs
6.2.0 C/Cecbs
6.2.1 Bplbia
6.2.2 Emcmescew
uality Inspect
fication Ch
Schedule acontract ag
Plinth proteto slope shaprovided allbuilding andthick and 61
Plinth proteto slope shaprovided allbuilding witedging withusing AC shdividers andfinishing thsurface Corbelling i/ RCC on wChajjas, proetc. and raiscornices andbrick work shall be proBrick work projected atlevel to formbrick band ain two or mall round thExhaust opemm dia RCclass collar matching siembedded isurface finiscement plasexterior fixewire mesh
t ion / Audit f
heck (Comm
s per greement
ection laid all be l round the d be 50 mm10 mm wide
ection laid all be l round the th brick
h C.M and heet d brush e top
in masonry walls below ojections sed bands, d perforatedin masonry
ovided shall be
t terrace m a raised and cornice
more courseshe buildingening 350 C NP 2 of
ize in the same,shed with ster and ed with
for CGEWHO’
mon Areas
Observaas execusite
m e
Some arincompl
Not prov
d
Not prov
e s,
Not prov
,
Exhauseof 300 mprovidedwire meprovisio
’s Housing Pr
and Amen
ations on uted at
reas lete
vided
vided
vided
e opening mm is d and no
esh on
roject at Parut
Reply
nities)
Comment
Plinth protprovided inwhere Groall other blno plinth prequired. Sconnected from the bNecessary drawings h
The elevathas been dapproved d
The work ethe elevatio
Present dayexhaust fanmanufactuis providedbetween thexhaust fandeterminedday size ofwherein thalong with
thipattu, Chen
y to Draft Rep
Final Report: Page
ANNE
ts
tection has bn Type `A’
ound Floor elocks have sprotection isStilt area is through smitumen roadgrooves as
have been p
tion of the bdone as per tdrawings
executed is on drawing
ys, the smalns are being
ured and thed to avoid ahe openingsn, the size hd as per the f the exhaus
he exhaust fah louvers.
nnai (PII)
ort: 8 Pages
e 117 of 125
EXURE
been block,
exist and stilts and s
mall ramps ds. per the
provided.
building the
as per s
ller g opening
any gap and the
has been present
st fan., fans come
C o n s u l t a n c y
6 7
7 9
8 9
9 1
10 1
11 1
12 1
3r d Party Q
y C h e n n a i
7.3.4.2 PSfcasbpebtdb
9.6.0 Rph
9.8.0 Lmmoso
10.2.6 Ksud
11.6.0 TtaaotoP
12.5.3 AGpce
12.5.6 Ehdtt
uality Inspect
PCC FLOOSLITS shallfinished witcoat on neatand a coat oslurry. Floobe laid in repanels of sizexceeding 1both ways wthick 40/50 dividing glabetween. Railing shalprovided wihandrail on
Letter boxemade out ofmoulded ABof 305 X 26size with buof letter X mKhurahs shasize 45 cm Xunless specidescription The pipes shthoroughly any mortar and paintedof red primethereafter wof SyntheticPaint All exposedGI pipes shapainted withcoats of synenamel painEach water have more tdown take, take pipe fothan 4 DUs
t ion / Audit f
ORING IN l be th floating t cement of cement oring shall ectangular ze not
1.2 meter with 4 mm mm wide
ass strips in
ll be ith wooden staircase
s shall be f injection BS plastic 60 X 95 mmuilt in lock make all be of X 45 cm ified in the of item hall be cleaned of droppings
d with a coater and
with 2 coats c Enamel
d / surface all be h 2 or morenthetic nt tank shall
than one each down
or not more
for CGEWHO’
PCC flostilts proHowevespecifiedglass strprovided
PVC shesteel hanprovided
m
Not prov
Not prov
t
Not prov
Not prov
Not prov
’s Housing Pr
ooring in ovided. er, size as d and rips not d
eet on ndrail is d
vided
vided
vided
vided
vided
roject at Parut
ReplyInstead of strips wereany damagof the cars
Since lift iDUs as wepossibility water, it wprovide PVin place ofper drawinLetter box the verge othe commopilferage a
The necessprovided ohanding ovarea The work iand shall bhanding ovApartmentAssociatio
-d
Provided awater suppby the Con
thipattu, Chen
y to Draft Rep
Final Report: Page
glass, AC se provided tge while mo.
s provided iell as there i of splash o
was decided VC sheet onf wooden hangs.
shall be proof handing oon areas to aas it is a loos
sary kurrah on terrace wver of the co
is still to bebe done at thver commont Owners’
on.
do-
as per the deply scheme nsultant.
nnai (PII)
ort: 8 Pages
e 118 of 125
sheet to avoid ovement
in all is a of rain to
n hand rail andrail, as
ovided on over of avoid any se item.
shall be while ommon
e done he time of n area to
etailed finalized
C o n s u l t a n c y
13 1
14 1
15 1
16 1
17 1
18 1
19 1
20 1
3r d Party Q
y C h e n n a i
12.5.6 OtgK
12.5.7 Goobstiab
12.7.1 Abs
12.7.2 NpcRa
12.7.3 Sptpfp
12.7.6 Aitatcfp
12.7.8 TpwjdtK
12.7.8 Tptp
uality Inspect
Over flow pthe water taguided to neKhurrah
GI pipes shaon terrace eover cemenbed block osize & 75 mthickness printervals of and additionbends
All exposedbe painted wsynthetic en
Necessary sprovisions fcrossing maRCC shall bavoiding br
Soil and wapipes shall nthan 100 mmpipe shall bfor both soipipes
A 50 mm sairon vent piterminal gualso be provthe single bconnection floor level uparapet leve
The PVC rapipes shall bwalls with ajunction anddoor at the tto collect wKhurrahs
The verticalpipe shall extop of parapprovided wi
t ion / Audit f
pipe from ank to be earest
all be laid embedded nt concrete of required mm clear rovided at
f 2 meters nally at all
d pipes shallwith namel paint
sleeves and for pipes asonry and be made foreakages
aste water not be less m dia, vent e provided l and waste
and cast pe with ard shall vided from ranch at the last
up to terraceel
ain water be laid on a tee d access terrace leve
water from
l rain waterxtend upto pet and ith a cowl
for CGEWHO’
Not prov
Not prov
l
Not prov
r
Not prov
e
Only soion confi
e
Not prov
el
Providedaccess d
r Not prov
’s Housing Pr
vided
vided
vided
vided
il pipe in irmity
vided
d without door
vided
roject at Parut
ReplyShall be pr
Instead of masonry p6” has beemeter interof the pipejoints and b
Shall be doover of the
Necessary provided, wrequired asdrawings.
Vent pipe per the req
Not requirper the san
One of theto be provi
thipattu, Chen
y to Draft Rep
Final Report: Page
rovided
concrete blillars of 1’ n provided rval to avoides in additiobents.
one while he DUs.
sleeves / piwherever it s per the det
has been prquirements
ed to be exenitary detail
e two alternaided.
nnai (PII)
ort: 8 Pages
e 119 of 125
ock, 6” X 1’ @ 3 d sagging
on to
handing
ipes were is tailed
rovided as
ecuted as s.
atives is
C o n s u l t a n c y
21 1
22 1
23 1
24 1
25 1
26 1
28 1
29 1
3r d Party Q
y C h e n n a i
12.7.8 1ipiKt
12.7.8.1 5smtp
12.7.9 Ass
13.11.1c Nslf
19.7.0 Mama(=
19.9.0 NNsrf
19.14.0 Lb
19.17.0 Gobbcti
uality Inspect
15 cm X 15iron gratingprovided at in the pipe iKhurah to dthe rain wat50 mm dia Gsleeves projmm beyondthe wall shaprovided All exposedshall be painsynthetic enNormally anshall not beless than 15from the buMarking of areas in stiltmarked in wand number(minimum p= 18 sqm) Numbering Numerals mstainless sterequired sizfixed on theLightening be providedGarbage chuoutlets at eabe providedblock in casconfiguratiothan six storincluding sh
t ion / Audit f
5 cm cast g shall be
the mouth in the discharge ter GI pipe jected 50 d the face ofall be
d SCI pipes nted with
namel paintn earthing situated
500 mm uilding f parking ts and
white paint red parking area
of DUs – made of eel of ze shall be e main doorarrestors to
d utes with
ach floor to d in the se of on more reys hafts
for CGEWHO’
Not prov
f
Not prov
Not prov
Providedthan 150
a
Not prov
r
Not prov
Not prov
Not prov
’s Housing Pr
vided
vided
vided
d at less 00 mm
vided
vided
vided
vided
roject at Parut
ReplyShall be pr
Shall be de
Shall be pr
Provided wavailable
Shall be pr
PVC numb
Not requir
The garbagconsideredmore than stilt. The pG +3 / Stiland hence required anprovided.
thipattu, Chen
y to Draft Rep
Final Report: Page
rovided
ealt as per c
rovided
within the sp
rovided
ber plates pr
ed as per dr
ge chutes tod for blocks six storeys present projlt + 4 configchutes are n
nd hence no
nnai (PII)
ort: 8 Pages
e 120 of 125
contract
pace
rovided
rawing
o be having including
ject is in guration not ot
C o n s u l t a n c y
4.2.3 W
Sl No.
Ccn
1 5
2 1
3 1
4 1
5 1
13 1
14 1
3r d Party Q
y C h e n n a i
Work specif
Contract clause no.
Sc
5.1.1a Alicao
12.7.8 Tstadt
16.1.1 Fp
16.1.2 Pcap
17.1.2c Amwwfcp
19.1.0 Apie
19.1.0 Tp
uality Inspect
fication che
Schedule acontract ag
All pathwaylaid using ginterlockingconcrete bloapproved byorganizationThe rain washall be conthe storm wand it shall discharge ththe open Fire hydranprovided
Pump of reqcapacity witarrangemenprovided
An arrangemmaking conwith municiwater chamfuture or exchamber shprovided, Arboricultuprovided in including laetc. Tree guardsprovided
t ion / Audit f
eck (Develo
s per greement
ys shall be good qualityg cement ocks duly y the n ater pipe nnected to
water drains not
he water in
nts shall be
quired th stand by
nts shall be
ment for nnection ipal storm
mber in xisting all be
ure shall be open area
andscaping
s shall be
for CGEWHO’
opment wor
Observaas execusite
y Providedgarden a
Not prov
Not prov
Pumps fdrinkingsupply –workingstandby,45m heaDomestisupply –workingstandby,45 m heNot prov
Not prov
Not prov
’s Housing Pr
rks)
ations on uted at
d only in area
vided
vided
for g water – 2 nos, 1 g, a , 10 lps at ad pump ic water – 2 Nos, 1 g, a , 6 lps at ad vided
vided
vided
roject at Parut
Reply
Commen
Provided drawing aCGEWHO
The rain wbeen provthe rain wbores to hpenetratio
The providone as prequiremenot stipul+ 4 configPumps haper detailthe total n
Accordinof the plohave beenexisting s
Proper landone as p
Since it isthere wastree guardprovided
thipattu, Chen
y to Draft Rep
Final Report: Page
nts
as per the dapproved byO
water pipes vided accordwater harveshave a propeon.
isions have per statutoryents only wate fire hydguration ave been proed design toneed
g to the topot, the stormn dischargedstream.
ndscaping hper the draw
s a gated cos no requiremds and henc
nnai (PII)
ort: 8 Pages
e 121 of 125
detailed y
have ding to sting er
to be y hich does
drant for S
ovided as o cater
ography m water
d towards
has been wings
mplex, ment of e not
C o n s u l t a n c y
15 1
16 1
17 1
18 1
19 1
20 1
21 1
22
23
3r d Party Q
y C h e n n a i
19.2.0 Bms
19.2.0 Bhab3
19.4.0 Cpg
19.6.0 Cs
19.11.0 Smv
19.15.0 DaapfloDtps
19.16.0 FbpaCsCcPs
uality Inspect
Boundary wmain gate, wshall be pro
Boundary wheight plastand outside boundary w3ft height
Cattle trap sprovided at gate Chequered tshall be proSign boardsmaps shall bvarious placD G sets wiautomatic swarrangemenpower failurfor commonlighting, stronly lift perDUs, water treatment plprovided wisound proofFire fightingbe providedpumps, watarrangemenCommunitysuch as ComCentre, shopcomplex, buPump housesubstation
t ion / Audit f
wall grill, wicket gate ovided
wall of 5 ft tered inside with
wall grill of
shall be the main
tile paths ovided s and guide be put at ces ith witch over
nt (in case ore) to cater n areas reet lights, r block of and sewage
lants to be ith adequatefing g works to
d including ter storage nts etc. y facilities mmunity pping us shelter e,
for CGEWHO’
Barbed wprovidedcompouinstead oOnly onplasteredwire is pover comwall instgrill Not prov
Not prov
Guide mprovided
f
e
e
3 nos. ofof 125 Kare prov
Not prov
Not prov
Substatiprovided
’s Housing Pr
wire is d over
und wall of grill
ne side is d. Barbed provided mpound tead of
vided
vided
maps not d
f DG sets KVA each vided
vided
vided
ion not d
roject at Parut
ReplyCGEWHOfor conceboundarysecurity Both sidedone in alowning toadjoiningother plotonly be pIn modernnot provid
The pathss per the dThe guideprovided of the areDG sets arequireme
Provisionstatutory
The faciliprovided of drawin
The transrequiremeas per theand TNEBproject asscheme wchanged trequireme
thipattu, Chen
y to Draft Rep
Final Report: Page
O have decirtina coil ov
y wall to hav
es plasteringll the boundo CGEWHO
g boundary wt owning to ainted on onn time, cattlded
s have been drawings one maps shalwhile hand
ea to the Assas per the ent
ns made as prequiremen
ities shall beas per the a
ngs by CMD
formers andents were pre TNEB requB has execus per their apwhich cannoto CGEWHents.
nnai (PII)
ort: 8 Pages
e 122 of 125
ided to go ver the ve a better
g has been dary walls O. The wall of them can ne side. le trap is
provided nly. ll be
ding over sociation
per the nt
e approval DA
d other rovided uirements uted the pproved
ot be HO
C o n s u l t a n c y
4.4 Sc
4.2.2 W
Sl No.
Coclano.
1 12.
2 19.
3 19.
3r d Party Q
y C h e n n a i
chedule
Work Specif
ntract use .
Sccoag
5.7 GIlaiemcembereq75thiprointmeadben
14.0 Ligarrprobyplaaut
17.0 Gawieacprobloconmostosha
uality Inspect
e of Mod
fication Ch
chedule as pntract
greement
I pipes shallid on terrace
mbedded ovement concred block of quired size & mm clear ickness ovided at tervals of 2 eters and ditionally ands
ghtning restors to beovided as pe
ye-laws of loan approvinthority
arbage chuteith outlets atch floor to bovided in thock in case nfiguration ore than six oreys includafts
t ion / Audit f
dificatio
heck (Comm
per Obsby H
l be e er ete
&
at all
Not
e er ocal ng
Not
es t be he of
ding
Not
for CGEWHO’
ons
mon Areas
ervations HUDCO
provided
provided
provided
’s Housing Pr
and Amen
CommenCGEWH
Instead ofblock, maof 1’ 6” Xbeen provmeter intesagging oaddition tobents.
Not requirdrawing
The garbabe consideblocks havthan six stincluding present pr+3 / Stilt configurathence churequired aprovided.
roject at Parut
nities)
ts by HO
f concrete asonry pillarX 1’ 6” has vided @ 3 erval to avoif the pipes io joints and
red as per
age chutes toered for ving more toreys stilt. The
roject is in G+ 4 tion and
utes are not and hence n
thipattu, Chen
Final Report: Page
Modifin theRepor
rs
id in
d
ModifNot pas pspecif.
ModifHUDCobservis dropthe Finreport
o
G
ot
ModifHUDCobservis dropthe Finreport
nnai (PII)
e 123 of 125
fication e Final rt
fied as: provided per the fications
fied: CO’s vation pped in nal t
fied: CO’s vation pped in nal t.
C o n s u l t a n c y
4.2.3 W Sl No.
Coclano.
1 12.
2 16.
3 16.
4 19.
3r d Party Q
y C h e n n a i
Work specif
ontract ause .
Sccoag
.7.8 Thpipcostodrnowa
.1.1 Firshas by
.1.2 Pucastaarrsh
.1.0 Arshin inclan
uality Inspect
fication che
chedule as pontract greement he rain watepe shall be
onnected to torm water ains and it s
ot dischargeater in the o
re hydrants hall be provi
per the locaye-laws
ump of requapacity withand by rangements
hall be provi
rboriculturehall be provi
open area cluding ndscaping e
t ion / Audit f
eck (Develo
per Obsby H
er
the
shall the
open
Not
ided al
Not
uired h
ided
Pumdrinwate– 2 nworkstanlps aheadDomwate– 2 Nworkstanat 45
e ided
etc.
Not
for CGEWHO’
opment wor
servations HUDCO
provided
provided
mps for nking er supply nos, 1 king, a
ndby, 10 at 45m d pump mestic er supply Nos, 1 king, a
ndby, 6 lps 5 m head provided
’s Housing Pr
rks)
CommenCGEWH
The rain whave beenaccordingwater harvto have a penetratio
The provibe done astatutory ronly whicstipulate ffor S + 4 c Pumps haprovided detailed dthe total n
Proper lanbeen donedrawings
roject at Parut
nts by HO
water pipes n provided g to the rain vesting boreproper
on.
isions have as per requiremench does not fire hydrantconfiguratio
ave been as per
design to catneed
ndscaping he as per the
thipattu, Chen
Final Report: Page
Modifin theRepor
es
ModifRain wpipe nconnethe stowater groundrecharchambmany whichrain wflowinthe op
to
nts
t on
ModifHUDCobservdroppethe Finreport
ter
ModifHUDCobservdroppethe Finreport
has ModifSome plantaand landscprovidfew
nnai (PII)
e 124 of 125
fication e Final rt fied as: water not cted to orm drain / d water rging ber in places,
h lead to water ng in pen. fied: CO’s vation is ed in nal t.
fied: CO’s vation is ed in nal t.
fied as:
ation
caping ded in a
C o n s u l t a n c y
5 19.
6 19.
3r d Party Q
y C h e n n a i
.6.0 Chpapro
.15.0 D auov(infaiforligligpewatreto wiso
uality Inspect
hequered tilaths shall beovided
G sets withutomatic swiver arrangemn case of poilure) to catr common a
ghting, streeghts, only lifer block of Dater and seweatment planbe provided
ith adequateund proofin
t ion / Audit f
le e
Not
h itch
ment ower ter areas et ft DUs, wage nts d e ng
3 nosets KVAprov
for CGEWHO’
provided
os. of DG of 125
A each are vided
’s Housing Pr
The pathsprovided drawings
DG sets arequireme
roject at Parut
s have been s per the only.
as per the ent
thipattu, Chen
Final Report: Page
demaropen sonly.
ModifProvidsome demaropen s
ModifHUDCobservdroppethe Finreport
nnai (PII)
e 125 of 125
rcated spaces
fied as: ded in
rcated spaces.
fied: CO’s vation is ed in nal t.