    GUJARAT GOKUL POWER LIMITED

    1

    EXTERNAL WATER SUPPLY SCHEME

    Technical Feasibility of WaterIntake :

    GGPL is in the process of setting up a 135 MW Power Project using Lignite as fuel.Condenser cooling is proposed through a closed cooling water circuit with induced draftcooling towers (IDCT). The site has been identified and the map showing the details of

    the proposed site is attached as Ann.1

    The purpose of this study is to examine the technical feasibility of getting requisite

    water from the nearest water source. In this case the nearest water source identified is

    river Tapi which is near to proposed site. Based on preliminary information, the river is

    perennial and it is feasible to draw water from the Tapi river.

    Water requirement

    The total water requirement for the proposed Power Project will be around 15 KLD.

    The first phase, expected to be commissioned by end of 2010.

    Scope of Work :

    Part-I Technical Feasibility of Water Supply Scheme

    1. Study of the source of water : The consultant should carry out investigationsand detailed survey of proposed source i.e. TAPI river. This should include

    collection of water flow data for last 10-15 years, study the water flow levels,the river path, any variation that has taken place with the course of time. HFL,

    meteorological data, water temperature measurement, information on

    seasonality of temperature and flow, etc. The consultant should prepare month-wise water levels in the river based on the historical information. Based on the

    analysis, the consultant should draw conclusion about the possibility of getting

    the requisite ultimate quantity of water, quality of water, about seasonal

    variations, and about storage capacity requirement within the plant.

    2. Examine the feasibility of various alternatives to draw the requisite quantity of

    water from the river. This should include, but not limited to examine possibilityof getting river water by creating some storage mechanism at river end, getting

    river water directly, creating French Well etc. Based on this analysis, the

    consultant should suggest technically feasible and most cost effective option.

    3. The consultant shall carry out water analysis and shall consider any seasonal

    variations which are expected in determining the quality of the water usinghistorical data on water quality.

  • 8/7/2019 FinaL WATER investigation-final-7-9-2007

    2/12

    GUJARAT GOKUL POWER LIMITED

    2

    4. Based on the outcome of the water analysis and requirement of water quality,the consultant should suggest raw water treatment facilities such as filtering,

    clarifier (clarifloculator), chlorination etc.

    5. Suggest the most appropriate intake system, which shall;

    Provide adequate quantities of water under all conditions

    Provide water of suitable quality under all conditions.

    Flexible for gradual and incremental addition in the built up capacity

    Design the system considering the phase-wise water requirement.

    Propose the in-situ storage under worst conditions of water intake.

    6. Once the technical feasibility of getting the requisite quantity of water is

    established, the consultant should suggest the best way of transporting the waterto the site. The consultant shall consider all possible alternatives and assess the

    technical feasibility of each alternative, and suggest the technically feasible andmost economical solution.

    7. The consultant should identify the place within the proposed site where thestorage facility can be created. The consultant shall study various alternate

    locations within the site and suggest the most suitable cost effective location.

    Based on the storage capacity requirement, the consultant should suggest type ofstorage facility i.e. open pond, closed concrete tank, over ground, underground

    tank etc. The consultant should suggest the facility which is most economical.

    8. The consultant should also study the environmental aspects. The scheme by the

    consultant must meet all the environment related rules and regulations.

    9. The consultant should also study what kind of permissions will be required totake from the State Government or any other statutory authority for

    implementing the water supply scheme.

    Part-II Basic Engineering of Water Supply Scheme

    1. Based on the conclusion arrived at during part-I of the study, the consultant

    should design the water supply scheme. It is not expected to carry out a detaileddesign; however, the consultant should be able to provide the design on which

    basis EPC bids can be invited. The design should include, but not limited to,

    1.1 Broad specifications for equipments and data sheets.1.2 Layout drawings.1.3 Pipe routing.

    1.4 Storage facility details.

    1.5 Buildings envisaged.1.6 Power feeding arrangement.

    1.7 BOQ.

    1.8 Any other details required for obtaining the firm price bid on EPC basisfor complete job.

  • 8/7/2019 FinaL WATER investigation-final-7-9-2007

    3/12

  • 8/7/2019 FinaL WATER investigation-final-7-9-2007

    4/12

    GUJARAT GOKUL POWER LIMITED

    4

    the prices quoted must be inclusively of all taxes and duties, the consultant may

    specify base price and taxes and duties separately.

    Bid Submission date

    Please submit your bids to the following address, on or before 1

    st

    October, 2007.

    GUJARAT GOKUL POWER LTD.

    3RD

    FLOOR, GOKUL HOUSE,

    43, SHRIMALI SOCIETY, NAVARANGPURA,

    AHMEDABAD -380009. GUJARAT.

  • 8/7/2019 FinaL WATER investigation-final-7-9-2007

    5/12

    GUJARAT GOKUL POWER LIMITED

    5

    ANNEXURE-1

  • 8/7/2019 FinaL WATER investigation-final-7-9-2007

    6/12

    GUJARAT GOKUL POWER LIMITED

    6

    ANNEXURE-1(a)

    Project Site

    ProjectSite

  • 8/7/2019 FinaL WATER investigation-final-7-9-2007

    7/12

    GUJARAT GOKUL POWER LIMITED

    7

    ANNEXURE-1(b)

    Project Study Area

  • 8/7/2019 FinaL WATER investigation-final-7-9-2007

    8/12

    GUJARAT GOKUL POWER LIMITED

    8

    ANNEXURE-2

    General Terms And Conditions:

    1. Time is the essence of this contract. You are required to mobilize and visit

    the site upon receipt of the work order.

    2. Strict compliance of safety rules and regulations as prescribed is required

    to be adhered to while executing the work.

    3. The offers should be submitted along with EMD calculated at 5 % of the

    offered price, in the form of DD in favour of Gujarat Gokul Power Ltd,

    payable at Ahmedabad, issued by any nationalized or scheduled bank .

    SECURITY DEPOSIT

    The security deposit shall be furnished within 15 days from the date of issue of order or

    before commencement ofthe work whichever is earlier. The owner deserves the right to

    cancel the work contract on the failure to furnish the security deposit and to lay thepenal interest of the delay of the security deposit. The security deposit paid by the

    tenderer will be released to the tenderer only when for the contract is completed to the

    satisfaction of the owner. If there is any other liability of the contractor that arises as aresult of any of the clauses mentioned herein or any amount arising out of the contract

    becomes payable by you to GGPL, then GGPL will in addition such other rights that itmay have under law appropriate the whole or part of the security deposit and such

    amount as appropriated will not be refunded to you.

    No interest shall be payable by OWNER on the Security Deposits.

    On due performance and completion by the works of CONTRACT in all

    respects the Security Deposit under the said CONTRACT will be returned without any

    interest thereon after the expiry of the warranty as per clause .

    Agreement with successful tenderer shall be executed on a Non-Judicial Stamp paper of

    Rs. 100/-.

    No payment will paid for the defective works

    Income tax, Service-tax, Wealth-tax, Works Contract Tax and other deductions will bemade from the bills as per rules and regulations, if applicable. The payment will be

    made by cheque of any of the Nationalized or Schedule Banks in Gujarat. Anycommission for the issue of bank draft will be to the account of the tenderer.

  • 8/7/2019 FinaL WATER investigation-final-7-9-2007

    9/12

    GUJARAT GOKUL POWER LIMITED

    9

    STATUATORY LEVIES

    Sales Tax, Excise Duty and other statutory levies shall be paid as applicable.

    The prices shall be firm and fixed during the period of CONTRACT. The TENDRER

    shall quote on the basis as specified in the Invitation to Tender.

    The validity of the quotation should be three (3) months from the due date for opening

    of TENDER.

    Institution of Suits

    No suits or any processing with regard to any matter arising in any respect under this

    contract shall be instituted in any court.

    Subletting of the Contract

    The contract is not transferable. No part of the contract shall be sublet without writtenpermission of the owner.

    The contract is liable to be terminated by GGPL at any time during the course of thecontract giving one week notice in case of performance or progress of the contractors is

    not satisfactory.

    Contract Labour Licence

    The contractors will fulfill all of the conditions stipulated in the Contract Labour

    Regulations and Abolition Act 1970 and rules made under the same., Contract shall be

    terminated if the contractor fails to obtain licence under section 12 of the ContractLabour Regulations and Abolition Act 1970 within 30 days from the date of the award

    to contract.

    Group Insurance

    The contractors should take Group Insurance according to the nature/elevation of work

    for all his workmen who are engaged in work at site before commencement of the work.

    The contractor is liable for all claims of such person under terms of employment, under

    any such statutes relating wages, compensation, retrial or other benefits, bonuscompensation for injuries, loss of earning capacity and any other conditions so evernow or hereafter payable to them. The contractor hereby undertakes to observe perform

    all such statutory regulations and obligations relating to the employment to such

    workmen. The contractor will certify that he deposits necessary statutory bills of his

  • 8/7/2019 FinaL WATER investigation-final-7-9-2007

    10/12

    GUJARAT GOKUL POWER LIMITED

    10

    workers before the appropriate authority under Provident Fund Act and shall complete

    with the provisions of minimum wages of workers compensation work and equal labourlaws or all applicable laws. The contractor will have to submit certified copy of all

    necessary documents to fulfill the provisions of all aforesaid laws to the company. The

    contractor will undertake that he should not employ any person as his worker who is

    below 18 years old. Workers of the contractor shall at no stage of the settlement shallclaim thereafter as the workers of the company.

    Management of GGPL has the right to change clauses and annexures of the agreement

    with the consent of the Contractor.

    AUTHORITY OF PERSON SIGNING DOCUMENT

    1) A person signing the Tender or any other documents forming a part of theContract on behalf of contractor shall be deemed to warrant that he has authority

    for the same. If, on enquiry, it appears that the person so signing had noauthority to do so, OWNER may without prejudice to other civil and criminalremedies,cancel the contract and hold the signatory liable for all costs and

    damages. Any person so signing shall give satisfactory evidence of his authority.

    2) The Contractor shall be entirely responsible for the due performance of the

    CONTRACT in all respects according to the terms and conditions of the

    CONTRACT.

    3) The work shall be of the best quality and workmanship according to the latest

    engineering practices existing at the time of acceptance of the TENDER

    4) All work shall be performed and completed in a thorough workman like manner

    and shall follow the best practice in the light of modern developments

    5) Progress reports wherever specified shall be submitted to OWNER at agreed

    intervals in three (3) copies in a form acceptable to OWNER.

    CHANGES

    1 GGPL shall have the right to make such changes and / or variation in the

    scope of work as may be necessary or desirable from time to time during the

    subsistence of the CONTRACT till the stage of completion of work.

    2 Prior to commencement of any additional work based on a change in scope

    of work as above involving compensating / reduction on the Contract price,

    Contractor shall submit to GGPL a detailed estimate in writing of the price

    for such additional / reduced works. Upon approval by GGPL, GGPL shall

    issue to Contractor a written order covering the changes in work and price,

    which shall then form part of the CONTRACT. Contractor shall not proceed

    with any additional work prior to receipt of GGPLs said written order.

  • 8/7/2019 FinaL WATER investigation-final-7-9-2007

    11/12

    GUJARAT GOKUL POWER LIMITED

    11

    TIME SCHEDULE

    1. The time and date(s) of delivery of survey/feasibility/progress report as

    agreed to between Contractor- Owner shall be deemed to be the essence ofthe CONTRACT, and delivery must be completed not later than the date (s) /

    so specified.

    2. Within fifteen (15) days of acceptance of Tender, Contractor shall submit forCompanys approval a progress schedule covering all phase of the work.

    Contractor shall allow all reasonable facilities to INSPECTORS of company and

    Companys representative(s) including free and full access to contractors facilities and

    to all records having a bearing on the progress and quality of the work and deliveries

    under the CONTRACT.

    DOCUMENTATION

    1. All drawings, specifications, data, notices and other writings required under

    the CONTRACT shall be in English language and dimensions, weight and

    volumes shall be in metric system.

    2. All drawings, specifications, reports and other data shall be delivered to:

    1) Project Manager (Technical Services)

    Gujarat Gokul Power Ltd.Ahmedabad,Gujarat,INDIA

    Copy To: -

    2) Chief Adviser (Technical Services)

    Gujarat Gokul Power Ltd.

    Ahmedabad,INDIA

    All Notices, claims, etc, shall be delivered to:

    3) Project Manager (Technical Services)

    Gujarat Gokul Power Ltd.Ahmedabad. Gujarat,INDIA

  • 8/7/2019 FinaL WATER investigation-final-7-9-2007

    12/12

    This document was created with Win2PDF available at http://www.win2pdf.com.The unregistered version of Win2PDF is for evaluation or non-commercial use only.This page will not be added after purchasing Win2PDF.

    http://www.win2pdf.com/http://www.win2pdf.com/http://www.win2pdf.com/http://www.win2pdf.com/http://www.win2pdf.com/