Draft January 2012 Workbook…..1 EFFECTIVE 1-12 LETTING
Revised 56789-2-19273920389308201791258910121516172256281-1112
Proposed Letting: Front Review / Date:
Contract Time: Days Back Review / Date:
Acquisition: No Yes Days PE Review / Date:
Flexible Start: No Yes Cal. Days Time Sheet Charge No.:
Special Start: No Yes Date Road No(s):
Total Length:
Alternative Contracting: No Yes Primary Work:
# of Technical SP’s (Total sheets )
This Contract plan set includes: (Other)
Roadway Plans Advance / Job File Checked
Structure Plans All Sheets in Plans
Signing Plans 20 Standard Index
Signal Plans
Landscaping Plans
Lighting Plans
Utility Plans
(Other) Plans
INCLUDES MANDATORY REVISION NO(S).:
STATE OF FLORIDA
DEPARTMENT OF TRANSPORTATION
FINANCIAL PROJECT ID: __________________
FEDERAL FUNDS: YES NO
DISTRICT ______
________________________ COUNTY
The 2010 Edition of the Florida Department of Transportation Standard Specifications is revised
as follows:
Draft January 2012 Workbook…..2
SPECIFICATIONS WORKSHEET Resolved: Notes, Comments, Questions: _________ _________________________________________________________________________
_________ _________________________________________________________________________
_________ _________________________________________________________________________
_________ _________________________________________________________________________
_________ _________________________________________________________________________
_________ _________________________________________________________________________
_________ _________________________________________________________________________
_________ _________________________________________________________________________
_________ _________________________________________________________________________
_________ _________________________________________________________________________
_________ _________________________________________________________________________
_________ _________________________________________________________________________
_________ _________________________________________________________________________
_________ _________________________________________________________________________
_________ _________________________________________________________________________
_________ _________________________________________________________________________
_________ _________________________________________________________________________
_________ _________________________________________________________________________
_________ _________________________________________________________________________
_________ _________________________________________________________________________
_________ _________________________________________________________________________
_________ _________________________________________________________________________
_________ _________________________________________________________________________
_________ _________________________________________________________________________
_________ _________________________________________________________________________
_________ _________________________________________________________________________
_________ _________________________________________________________________________
_________ _________________________________________________________________________
_________ _________________________________________________________________________
_________ _________________________________________________________________________
Draft January 2012 Workbook…..3
Draft January 2011 Workbook.....1
SPECIAL PROVISIONS SP0000001 All Jobs Remarks
EXAMINATION OF CONTRACT DOCUMENTS AND SITE OF WORK. (REV 12-9-10) (FA 1-27-11) (7-11) Insert Information Required. Changes to: 2-4.
SP0020400 All Jobs (add contact
person and phone no.)
PREPARATION OF PROPOSALS. (REV 6-22-04) (FA 7-13-04) (1-05) Changes to: 2-5.1.
SP0020501AB
A+B Bidding. (Use with the approval of the Chief
Engineerproper authority). Use with
SP0030100AB, SP0030203AB,
SP0081300AB and SP0080701AB
PREPARATION OF PROPOSALS. (REV 2-21-05) (FA 3-31-05) (1-06) Insert Information Required. Changes to: 2-5.1.
SP0020501LR
Lane Rental. (Use with the approval of the Chief
Engineerproper authority). Use with
SP0030100LR, SP0081300LR and SP0081300LRDR
CONSIDERATION OF BIDS – SCOPE ALTERNATES. (REV 2-15-07) (7-07) Changes to: 3-1.
SP0030001 Use with proper authority.
*Notify Contracts Office on Transmittal Memo
AWARD AND EXECUTION OF CONTRACT. (REV 11-5-97) (FA 1-20-98) (7-00) Insert Information Required. Changes to: 3-1.
SP0030100AB
A+B Bidding. (Use with the approval of the Chief
Engineerproper authority). Use with
SP0020501AB, SP0030203AB,
SP0080701AB and SP0081300AB
BUDGETARY CONSTRAINTS. (REV 9-26-06) (FA 10-6-06) (1-07) Changes to: 3-1.
SP0030100BC Use with proper authority.
*Notify Contracts Office on Transmittal Memo
AWARD AND EXECUTION OF CONTRACT. (REV 7-20-10) (FA 8-12-10) (1-11) Insert Information Required. Changes to: 3-1, 3-2.2, 3-5.1.
SP0030100DC
District Let Construction Contracts less than
$250,000 and all Maintenance Contracts,
excluding Lump Sum
Draft January 2012 Workbook…..5
AWARD AND EXECUTION OF CONTRACT. (REV 4-11-97) (FA 5-7-97) (7-00) Changes to: 3-1.
SP0030100LR
Lane Rental. (Use with the approval of the Chief
Engineerproper authority). Use with
SP0020501LR, SP0081300LR and SP0081300LRDR
AWARD AND EXECUTION OF CONTRACT. (REV 8-1-00) (1-01) Changes to: 3-1.
SP0030100LS Lump Sum Projects
AWARD AND EXECUTION OF CONTRACT. (REV 7-26-01) (7-10) Insert Information Required. *Contracts Office must approve Changes to: 3-2, 3-6 and 3-7.
SP0030200 When necessary to
change standard “Award and Execution”*
AWARD OF CONTRACT – A+B BIDDING. (REV 8-22-96) (FA 9-3-96) (7-11) Insert Information Required. Changes to: 3-2.
SP0030203AB
A+B Bidding. (Use with the approval of the Chief
Engineerproper authority). Use with
SP0020501AB, SP0030100AB,
SP0080701AB and SP0081300AB
Mandatory No. 1 AWARD AND EXECUTION OF CONTRACT. (REV 9-12-11) (1-12) Changes to 3-8, 3-9.
SP0030800 All Jobs.
New SP. Issued as Mandatory No. 1 to
move language relating to retention of records
from Article 3-9 to Article 3-8 to maintain
consistency with DB Div I specs and for clarity
regarding the requirements of the
Florida Public Records Laws.
SCOPE OF THE WORK – INTENT OF CONTRACT. (REV 8-19-09) (FA 8-24-09) (1-10) Insert Information Required. Changes to: 4-1.
SP0040100 All Jobs, excluding Lump
Sum. Do not use with SP0040100SLPQ.
SCOPE OF THE WORK. (REV 8-24-10) (FA 10-8-10) (7-11) Insert Information Required. Changes to: 4-1, 4-3.1, 4-3.4, 4-3.9.4.
SP0040100LS All Lump Sum Projects.
Do not use with SP0040100SLLS.
Draft January 2012 Workbook…..6 SCOPE OF THE WORK – INTENT AND SCOPE. (REV 8-24-10) (FA 10-8-10) (7-11) Insert Information Required. Changes to: 4-1, 4-3.1, 4-3.4, 4-3.9.4.
SP0040100SLLS
All Projects less than $2,000,000 and less than
2,000 tons of asphalt - Streamline Lump Sum.
Do not use with SP0040100LS.
SCOPE OF THE WORK – INTENT AND SCOPE. (REV 9-16-09) (FA 11-9-09) (7-10) Insert Information Required. Changes to 4-1, 4-3.1, 4-3.4, 4-3.9.4.
SP0040100SLPQ
All Projects less than $2,000,000 and less than
2,000 tons of asphalt - Streamline Plan Quantity.
Do not use with SP0040100.
UNFORESEEABLE WORK. (REV 9-28-98) (1-10) Changes to: 4-4.
SP0040400 999-25
CONTROL OF THE WORK. (REV 3-15-02) (1-10) Changes to: 5-1.1, 5-2, 5-7.6
SP0050501LS Lump Sum Projects
INSPECTION. (REV 2-10-94) (1-10) Changes to: 5-9.1.
SP0050901 Long bridge jobs
(1500 feet or longer); modify to suit
CONTROL OF MATERIALS. (REV 8-17-09) (FA 8-24-09) (1-10) Changes to: 6-1.
SP0060100LS Lump Sum Projects
REQUIREMENTS FOR FEDERAL JOBS – COMPLIANCE WITH FHWA 1273. (REV 2-11-10) (FA 2-17-10)(7-10) Changes to: 7-1.1
SP0070101 All Federal Aid Jobs
LAWS TO BE OBSERVED. (REV 3-31-09) (FA 6-17-09) (1-10) Change(s) to: 7-1.1.1.
SP0070111ES All American Recovery
and Reinvestment Act of 2009 Jobs
Removed from Workbook because no future ARRA lettings are anticipated.
PERMITS PROCURED BY THE DEPARTMENT. (REV 8-7-01) (FA 4-14-05) (1-10) Changes to: 7-2.1.
SP0070201A Jobs with permits procured by DOT
Draft January 2012 Workbook…..7 DISCHARGE TO OR WORK OR STRUCTURES IN NAVIGABLE WATERS OF THE U.S., WATERS OF THE U.S. AND WATERS OF THE STATE. (REV 7-16-09) (FA 7-30-09) (1-10) Changes to: 7-2.2
SP0070202 When DEP Generic
Permit is required
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC. (REV 1-9-01) (1-10) Insert Information Required. Changes to: 7-7.1, 7-13.2, 7-13.3.
SP0070701DC District Let Contracts less
than $250,000 and all Maintenance Contracts.
LEGAL REQUIREMENTS AND RESPONSIBILITIES TO THE PUBLIC – OPERATIONS WITHIN RAILROAD RIGHT-OF-WAY. (REV 11-5-10) (FA 11-9-10) (7-11) Changes to 7-11.5.
SP0071105 Projects Involving CSX
Transportation.
UTILITY WORK. (REV 2-10-94) (1-10) Changes to: 7-11.6.3.
SP0071163A When there are no utility
work schedules
UTILITY SCHEDULES. (REV 8-27-01) (FA 4-14-05) (1-10) Changes to: 7-11.6.3.
SP0071163B When there are utility
work schedules
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - WAGE RATES FOR FEDERAL-AID PROJECTS. (REV 12-21-09) (FA 12-28-09) (7-10) Insert Information Required. Changes to: 7-16.
SP0071600 All Federal Aid Jobs
EQUAL EMPLOYMENT OPPORTUNITY REQUIREMENTS. (REV 4-25-02) (FA 7-17-02) (1-10) Changes to: 7-26.
SP0072600 Non-Federal Aid Projects
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC – PREFERENCE TO STATE RESIDENTS. (REV 6-15-10) (9-10) Changes to: 7-27.
SP0072700 Non-Federal Aid Projects
– Construction Projects Only
Draft January 2012 Workbook…..8 LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC – E-VERIFY. (REV 6-13-11) (FA 6-16-11) (8-11) Changes to 7-28.
SP0072800 All Jobs
New SP. These changes are the result of
Executive Order 11-116. Issued as Mandatory No.
1for the July 2011 WB.
LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC – SCRUTINIZED COMPANIES. (REV 6-17-11) (7-11) Changes to Section 7.
SP00729000 All Jobs
New SP. This change is a result of a newly created
Statute. Issued as Mandatory No. 2 for the
July 2011 WB.
PROSECUTION AND PROGRESS - SUBMISSION OF WORKING SCHEDULE. (REV 6-3-091-11-11) (FA 6-10-095-12-11) (1-102) Changes to: 8-3.2.
SP0080302A
Use only when CPM is authorized by District
Construction Engineer. Do not use with SP0080302DC
New SP. Merged in text from SP0080302 &
changed dates. To clarify the time frame for
submitting monthly updates and to add
language to encourage meeting with the
Contractor during review of the baseline schedule.
PROSECUTION AND PROGRESS. (REV 2-27-01) (1-10) Changes to: 8-3.2, 8-8, 8-9.1.
SP0080302DC
District Let Contracts (including Lump Sum) less than $250,000. Do
not use with SP0080302A
PROSECUTION OF WORK - FLEXIBLE START TIME. (REV 2-15-10) (FA 2-17-10) (7-10) Insert Information Required. *Contracts Office must be notified Changes to: 8-3.3.
SP0080303A When called for by the
District Construction Engineer.*
BEGINNING WORK. (REV 7-10-95) (1-10) Insert Information Required. Changes to: 8-3.3.
SP0080303B
When called for by the District Construction
Engineer. Use with the approval of the Chief
Engineer.
BEGINNING WORK. (REV 10-22-98) (FA 11-5-98) (1-10) Insert Information Required. *Contracts Office must be notified Changes to: 8-3.3.
SP0080303C
When called for by the District Construction
Engineer. Use with the approval of the Chief
Engineer.
PROSECUTION OF WORK – PARTNERING. (REV 3-4-98) (FA 5-26-98) (1-10) Insert Information Required. *Contracts Office must be notified Changes to: 8-3.6.
SP0080306 999-16*
Draft January 2012 Workbook…..9 PROSECUTION OF WORK - DISPUTES REVIEW BOARD. (REV 1-4-11) (FA 1-21-11) (7-11) *Contracts Office must be notified Changes to: 8-3.
SP0080307DRB 999-20 Items*
PROSECUTION OF WORK – REGIONAL DISPUTES REVIEW BOARD. (REV 1-4-11) (FA 1-21-11) (7-11) Changes to: 8-3.
SP0080307RDRB Jobs without 999-20
Items
PROSECUTION OF WORK – STATEWIDE DISPUTES REVIEW BOARD. (REV1-4-11) (FA 1-21-11) (7-11) Changes to: 8-3.
SP0080308SDRB 334, 337, 350, 570, 580 or
649 Items
PROSECUTION AND PROGRESS. (REV 8-1-00) (1-10) Changes to: 8-4.1, 8-7-3.1.
SP0080401LS Lump Sum Projects
LIMITATIONS OF OPERATIONS – FENCING. (REV 6-17-04) (FA 7-13-04) (1-10) Changes to: 8-4.8.
SP0080408 Jobs on Limited Access
Highways
CONTAMINATED MATERIAL – MERCURY-CONTAINING DEVICES AND LAMPS. (REV 11-6-95) (FA 12-27-95) (7-11) Insert Information Required. *Insert Hazardous Waste Coordinator and contact number Changes to: 8-4.9.
SP0080409 Jobs with lighting*
COMPUTATION OF CONTRACT TIME. (REV 12-22-98) (FA 1-19-99) (1-10) Insert Information Required. Changes to: 8-7.1.
SP0080701A Use when requested by
proper authority, (must be modified)
COMPUTATION OF CONTRACT TIME. (REV 7-24-96) (FA 9-3-96) (1-10) Changes to: 8-7.1.
SP0080701AB
A+B Bidding. (Use with approval of the Chief
Engineerproper authority). Use with
SP0020501AB, SP0030100AB,
SP0030203AB and SP0081300AB
Draft January 2012 Workbook…..10 COMPUTATION OF CONTRACT TIME. (REV 2-14-94) (1-10) Insert Information Required. Changes to: 8-7.1.
SP0080701B
Only Use when called for requested by the District
Construction Engineer (must be modified).
COMPUTATION OF CONTRACT TIME. (REV 12-22-98) (FA 2-1-99) (1-10) Changes to: 8-7.1.
SP0080701C
Use when requested by proper authoritythe
District Construction Engineer.
DAMAGE RECOVERY. (REV 2-4-04) (1-10) Insert Information Required. Changes to: 8.
SP0081300
Use when requested by proper authorityDistrict Construction Engineer. (Do not use with Lane
Rental)
PROSECUTION AND PROGRESS. (REV 7-28-97) (1-10) Changes to: 8-13.
SP0081300A
All Jobs with Alternative Bidding. Use with the approval of the Chief
Engineer.
8-13. Incentive – Disincentive for A+B. (REV 7-27-04) (FA 7-28-04) (1-05) Insert Information Required. Changes to: 8-13.
SP0081300AB
A+B Bidding. Use with the approval of the Chief
Engineer. Use with SP0020501AB, SP0030100AB,
SP0030203AB and SP0080701AB
8-13. “Bonus” Payment and Waiver of Contractor Claims. (REV 5-19-04) (FA 7-13-04) (1-05) Insert Information Required. Changes to: 8-13.
SP0081300ABB A+B Jobs with Bonus.
Use with the approval of the Chief Engineer.
8-13. “Bonus” Payment and Waiver of Contractor Claims. (REV 7-27-04) (FA 7-28-04) (1-05) Insert Information Required. Changes to: 8-13.
SP0081300B Bonus (Date Specific).
Use with the approval of the Chief Engineer.
8-13. “Bonus” Payment and Waiver of Contractor Claims. (REV 7-27-04) (FA 7-28-04) (1-05) Insert Information Required. Changes to: 8-13.
SP0081300BCD Bonus (Calendar Days).
Use with the approval of the Chief Engineer.
8-13. Incentive - Disincentive. (REV 7-27-04) (FA 7-28-04) (1-05) Insert Information Required. Changes to: 8-13.
SP0081300ID
Incentive – Disincentive. Use with the approval of
the Chief Engineer. Do not use with
SP0081300MID
Draft January 2012 Workbook…..11 8-13. Incentive – Disincentive for Lane Rental Days. (REV 9-25-03) (FA 12-24-03) (7-04) Insert Information Required. Changes to: 8-13.
SP0081300IDLR
Incentive-Disincentive for Lane Rental Days. Use
with the approval of the Chief Engineer. Do not
use with SP0081300LR or SP0081300LRDR
8-13. Liquidated Savings for Early Completion. (REV 5-18-99) (FA 6-10-99) (7-00) Insert Information Required. Changes to: 8-13.
SP0081300LQS Liquated Savings. Use
with the approval of the Chief Engineer.
8-13. Pay Adjustment For Fewer-More Lane Rental Days. (REV 4-29-97) (FA 5-7-97) (7-00) Insert Information Required. Changes to: 8-13.
SP0081300LR
Lane Rental. Use with the approval of the Chief
Engineer. Use with SP0020501LR,
SP0030100LR, and SP0081300LRDR
8-13. Damage Recovery. (REV 9-25-03) (FA 12-24-03) (7-04) Insert Information Required. Changes to: 8-13.
SP0081300LRDR
Lane Rental. Use with the approval of the Chief
Engineer. Use with SP0020501LR,
SP0030100LR, and SP0081300LR
?
8-13. “Bonus” Payment and Waiver of Contractor Claims. (REV 4-12-06) (FA 4-25-06) (1-07) Insert Information Required. Changes to: 8-13.
SP0081300MB
Milestone Bonus. Use with the approval of the Chief Engineer. Do not
use with SP0081300B or SP0081300BCD
8-13. Incentive - Disincentive. (REV 2-9-06) (FA 4-25-06) (1-07) Insert Information Required. Changes to: 8-13.
SP0081300MID
Milestone Incentive-Disincentive. Use with
approval of the Chief Engineer. Do not use with
SP0081300ID
MEASUREMENT AND PAYMENT. (REV 9-9-105-2-11) (FA 9-27-105-12-11) (7-111-12) Changes to: 9-1.3, 9-2, 9-3, 9-5.5.2, 9-9, 9-11.
SP0090103LS Lump Sum Projects. Do
not use with SP0090103SLLS.
New SP. Merged in text from SP0091100LS & changed dates. To add language requiring the
Contractor to submit and obtain approval of a
schedule of values for LS projects within 21 days after contract award or
at the preconstruction meeting, whichever is
earlier.
Draft January 2012 Workbook…..12
MEASUREMENT AND PAYMENT. (REV 11-18-105-2-116-22-11) (FA 1-21-116-10-116-26-11) (7-111-12) Changes to 9-1.3, 9-2, 9-3, 9-5.1, 9-8.1, 9-9, 9-11.
SP0090103SLLS
All Projects less than $2,000,000 and less than
2,000 tons of asphalt - Streamline Lump Sum.
Do not use with SP0090103LS.
New SP. Merged in text from SP0090501SLLS &
changed dates. To comply with the
Department’s Electronic Estimates Disbursement (EED) payment system.
Merged in text from SP0090501SLLS &
changed dates. To add language requiring the
Contractor to submit and obtain approval of a
Schedule of Values for SLLS Projects within 21
days after the contract award or at the preconstruction
conference, whichever is earlier.
MEASUREMENT AND PAYMENT. (REV 11-18-10) (FA 1-21-11) (7-11) Changes to: 9-1.3.2, 9-2, 9-3.2.3, 9-5.1, 9-8.1, 9-9.
SP0090103SLPQ
All Projects less than $2,000,000 and less than
2,000 tons of asphalt - Streamline Plan Quantity.
Do not use with SP0090501DC.
MEASUREMENT AND PAYMENT. (REV 10-29-08) (FA 1-16-09) (1-10) Changes to: 9-5.1, 9-5.4, 9-9.
SP0090501DC
District Let Contracts. Excluding Lump Sum
Projects. Do not use with SP0090103SLPQ.
PARTIAL PAYMENTS-WITHHOLDING PAYMENT. (REV 2-11-09) (FA 6-16-09) (1-10) Change(s) to: 9-5.3
SP0090503ES All American Recovery
and Reinvestment Act of 2009 Jobs
MEASUREMENT AND PAYMENT-ACCEPTANCE AND FINAL PAYMENT DOCUMENTS. (REV 11-18-10) (FA 1-21-11) (7-11) Change(s) to: 9-8.1
SP0090801ES
All American Recovery and Reinvestment Act of
2009 Jobs. Do not use with SP0090801ESSL.
MEASUREMENT AND PAYMENT - ACCEPTANCE AND FINAL PAYMENT DOCUMENTS. (REV 5-12-10) (FA 7-29-10) (1-11) Change(s) to: 9-8.1
SP0090801ESSL
All ARRA of 2009 Projects less than
$2,000,000 and less than 2,000 tons of asphalt -
Streamline. Do not use with SP0090801ES
Draft January 2012 Workbook…..13
Mandatory No. 1 MAINTENANCE OF TRAFFIC. (REV 8-3-11) (FA 8-9-11) (1-12) Changes to 102-13.12.
SP1021312
Use on Work Mix types – Add Lanes and
Reconstruction, Add Lanes and Rehab
Pavement, Interchanges, and New Road
Construction102-89-17 Items.
New SP. Issued Mandatory No. 1 to
revise usage note, dates did not change. To
delete the additional payment for restoring
damaged crash cushions.
ENGINEER’S FIELD OFFICE. (REV 2-17-101-4-11) (FA 4-26-102-17-11) (1-111-12) Changes to: 109.
SP1090000 109-71 Items
New SP. Merged in text from SP1090000 &
changed dates. To make the Engineer’s Field
Office available sooner. REMOVAL OF EXISTING STRUCTURES – STRUCTURES TO BE REMOVED. (REV 9-10-07) (FA 2-15-08) (1-10) Insert Information Required. Changes to: 110-6.1.
SP1100601
Use when requested by proper authority (Must have signed agreement
with Local Agency)
REMOVAL OF EXISTING STRUCTURES. (REV 5-13-05) (FA 8-18-05) (1-10) Changes to: 110-6.6.
SP1100606 Use when areas of
Asbestos Abatement are identified in the Plans
MATERIAL FOR REEF ESTABLISHMENT. (REV 7-10-95) (FA 6-21-99) (1-10) Changes to: 110-11.2, 110-12.7.
SP1101102 110-84
EXCAVATION – IDENTIFIED AREAS OF CONTAMINATION. (REV 1-3-94) (FA 6-21-99) (1-10) Changes to: 120-1.
SP1200100A Use when contaminated
areas are delineated in the plans
EXCAVATION AND EMBANKMENT – ACCEPTANCE PROGRAM. (REV 9-16-09) (FA 11-9-09) (7-10) Changes to: 120-10.3.1
SP1201003SL
All Projects less than $2,000,000 and less than
2,000 tons of asphalt – Streamline.
EXCAVATION FOR STRUCTURES AND PIPE – ACCEPTANCE PROGRAM. (REV 9-16-09) (FA 11-9-09) (7-10) Change(s) to: 125-9.3.1
SP1250903SL
All Projects less than $2,000,000 and less than
2,000 tons of asphalt – Streamline.
STABILIZED SUBBASE UNDER CONCRETE PAVEMENT. (REV 1-3-94) (1-10) Changes to: 160-3.
SP1600300 Only when called for
Spec is deleted as it is no longer used as per Pavement Design
Section.
Draft January 2012 Workbook…..14 STABILIZING – ACCEPTANCE PROGRAM. (REV 9-16-09) (FA 11-9-09) (7-10) Changes to: 160-4.2.4
SP1600402SL
All Projects less than $2,000,000 and less than
2,000 tons of asphalt – Streamline.
PREDESIGNED STABILIZED SUBGRADE. (REV 3-12-07) (FA 3-14-07) (1-10) Changes to: 161.
SP1610000
Non-Traffic and Shoulder-Only
Construction. Do Not Use on Widening Projects
ROCK BASE – ACCEPTANCE PROGRAM. (REV 9-16-09) (FA 11-9-09) (7-10) Changes to: 200-7.2.2
SP2000702SL
All Projects less than $2,000,000 and less than
2,000 tons of asphalt – Streamline.
GRADED AGGREGATE BASE. (REV 8-8-07) (1-10) Changes to: 204.
SP2040000 Non-FA Jobs with
285 Items
MILLING OF EXISTING ASPHALT PAVEMENT. (REV 8-31-99) (FA 2-14-00) (1-10) Insert Information Required. Changes to: 327-1, 327-6.
SP3270100
When the plans provide a location for stockpiling milled material. Insert
quantity to be retained. Use all, tons, square yards
MILLING OF EXISTING ASPHALT PAVEMENT. (REV 12-1-93) (1-10) Changes to: 327-2.
SP3270200 Use when requested by
districts
PORTLAND CEMENT CONCRETE – ACCEPTANCE SAMPLING AND TESTING. (REV 6-25-10) (FA 7-8-10) (1-11) Changes to: 346-9.2.
SP3460902SL
All Projects less than $2,000,000 and less than
2,000 tons of asphalt – Streamline.
INTEGRAL PILE JACKETS. (REV 6-20-08) (FA 6-26-08) (1-10) Changes to: 457.
SP4570000 457 Items
Mandatory No. 2 STRUCTURAL STEEL AND MISCELLANEOUS METALS. (REV 1-25-12) (2-12) Changes to 460-7.2, 460-8.8.
SP4600702 When weathering steel is
used
New SP. Issued as Mandatory No. 2. These
specification changes are part of the increased use
of weathering steel as outlined in Structures
Design Bulletin C12-02 and Roadway Design
Bulletin 12-04.
Draft January 2012 Workbook…..15
Mandatory No. 1 CRASH CUSHIONS. (REV 8-4-11) (FA 8-9-11) (1-12) Changes to 544-4.
SP5440400
Use on Work Mix types – Add Lanes and
Reconstruction, Add Lanes and Rehab
Pavement, Interchanges, and New Road
Construction.544-75-1AA Items
New SP. Issued Mandatory No. 1 to
revise usage note, dates did not change. To
delete the additional payment for restoring
damaged crash cushions.
FENCING. (REV 1-6-98) (1-10) Changes to: 550-2, 550-3.5, 550-6.2.
SP5500200 Type A fencing on non-
NHS Projects only
SP removed from the Workbook as it is no
longer needed.
PAINTED PAVEMENT MARKINGS. (REV 1-22-10) (FA 1-25-10) (7-10) Change(s) to: 710-2, 710-4.3, 710-4.5
SP7100200 Maintenance Projects
Only
SP removed from Workbook because it will
be a Developmental specification.
Mandatory No. 2 COATING STRUCTURAL STEEL. (REV 1-25-12) (2-12) Changes to 560-1, 560-9.7.
SP5600100 When weathering steel is
used
New SP. Issued as Mandatory No. 2. These
specification changes are part of the increased use
of weathering steel as outlined in Structures
Design Bulletin C12-02 and Roadway Design
Bulletin 12-04. MOTORIST AID CALL BOX RELOCATION. (REV 8-24-10) (1-11) Changes to: 714.
SP7140000 714-1-500
TRAFFIC MONITORING SITE VEHICLE SENSOR (CLASS II). (REV 6-16-99) (FA 7-20-99) (1-10) Changes to: 741.
SP7410000 741-70 Items
TRAFFIC MONITORING SITE VEHICLE SPEED/CLASSIFICATION UNIT. (REV 6-16-99) (FA 7-20-99) (1-10) Changes to: 743.
SP7430000 743-70 Items
TRAFFIC MONITORING SITE SOLAR POWER UNIT. (REV10-22-10) (FA11-22-10) (7-11) Changes to: 744.
SP7440000 744-70 Items
TRAFFIC MONITORING SITE INDUCTIVE LOOP ASSEMBLY. (REV 6-22-10) (FA11-22-10) (7-11) Changes to: 745.
SP7450000 745-70 Items
Draft January 2012 Workbook…..16 TRAFFIC MONITORING SITE CABINET. (REV 5-6-08) (FA 10-14-08) (1-10) Changes to: 746.
SP7460000 746-7A-BCD Items
TRAFFIC MONITORING SITE MODEM. (REV 5-20-99) (FA 7-20-99) (1-10) Changes to: 747.
SP7470000 747-70 Items
GENERAL REQUIREMENTS FOR THE EVALUATION OF TRAFFIC MONITORING SITE EQUIPMENT AND MATERIALS. (REV 5-12-99) (FA 7-20-99) (1-10) Changes to: 748.
SP7480000 Jobs with Traffic Monitoring Sites
Mandatory No. 2 STRUCTURAL COATING MATERIALS. (REV 1-25-12) (2-12) Changes to 975-6.1.
SP9750601 When weathering steel is
used
New SP. Issued as Mandatory No. 2. These
specification changes are part of the increased use
of weathering steel as outlined in Structures
Design Bulletin C12-02 and Roadway Design
Bulletin 12-04. TRAFFIC MARKING MATERIALS. (REV 1-21-107-5-11) (FA 1-25-107-18-11) (7-101-12) Change(s) to: 971-4
SP9710400 Maintenance Projects
Only
SP removed from Workbook because it will
be a Developmental specification.
Draft January 2012 Workbook…..17
DEVELOPMENTAL SPECIFICATIONS
SPY000008 When called for
Draft January 2012 Workbook…..18
SUPPLEMENTAL SPECIFICATIONS
SS0000001 All Jobs Remarks
001 DEFINITIONS AND TERMS - DEFINITIONS. (REV 6-8-105-16-11) (FA 7-29-108-16-11) (1-111-12) Changes to: 1-3
SS0010300 All Jobs
New SS. Merged in text from SS0010300 & changed dates. To
include a definition for Special Events.
002 PREQUALIFICATION OF BIDDERS. (REV 12-28-105-24-11) (FA 1-4-116-7-11) (7-111-12) Changes to: 2-1, 2-2.1, 2-2.2.
SS0020100 All Jobs
New SS. Merged in text from SS0020201 & changed dates. To
modify the language to accommodate online
ordering and the download of electronic
files containing bidding documents for
advertised projects.
003 AWARD AND EXECUTION OF CONTRACT. (REV 8-10-093-9-11) (FA 8-13-095-12-11) (1-1012) Changes to: 3-5.4, 3-6, 3-7, 3-9.
SS0030600SS0030504 All Jobs
New SS. Merged in text from SS0030900; dates
are same as for SS0030504. To move the retained records
requirement from 5-13 to 3-9. Merged in text
from SS0030504 & changed dates. To
clarify the indemnity limits of the Surety. Text merged in text
from SS0030600 and used latest dates.
004 SCOPE OF THE WORK. (REV 7-19-108-2-11) (FA 9-20-108-16-11) (7-111-12) Changes to: 4-3.1, 4-3.9, 4-6.
SS0040301 All Jobs
New SS. Merged in text from SS0040309 & changed dates. To
clarify that the Department will pay for reasonable documented
engineering costs associated with Cost
Saving Initiative Proposals.
Draft January 2012 Workbook…..19
005 CONTROL OF THE WORK (REV 6-16-103-9-116-10-11) (FA 7-29-105-12-116-26-11) (1-112) Changes to: 5-1.4.5.6, 5-1.4.8, 5-1.5.4, 5-12.2.2, 5-12.6.2, 5-13.
SS0050104 All Jobs
New SS. Merged in text from SS0050105 & changed dates. To
require any Specialty Engineers inspecting
the work affecting public safety to attend
the pre-erection meeting with the
Specialty Engineer and Engineer. Merged in
text from SS0051300 & changed dates. To move the retained
records requirement from 5-13 to 3-9.
006 CONTROL OF MATERIALS. (REV 6-23-10) (FA 7-29-10) (1-11) Changes to: 6-4, 6-5.3.
SS0060400 All Jobs
007 LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC. (REV 11-24-106-28-11) (FA 1-21-117-18-11) (7-111-12) Changes to: 7-1.4, 7-2, 7-7.5, 7-11.4, 7-11.6.1, 7-24, 7-25.
SS0070104 All Jobs
New SS. Merged in text from SS0070104 & changed dates. To
clarify the use of the Department’s
Endangered Wildlife Guidelines when an
endangered species is encountered on the
project.
Draft January 2012 Workbook…..20
008 PROSECUTION AND PROGRESS. (REV 7-22-103-9-115-23-115-9-11) (FA 9-20-105-12-117-21-118-16-11)(7-111-12) Changes to8-3.3, 8-4.9, 8-6.4, 8-7.3.2, 8-10.2.
SS0080303 All Jobs
New SS. Merged in text from SS0080303 & changed dates. To
include direction to the Contractor regarding
Special Events. Merged in text from SS0080102
& changed dates. To revise the liquidated
damages rates in accordance with
Section 337.18(2) F.S. Merged in text from
SS0080409 & changed dates. To state the
Department will indemnify the
contractor if unforeseen contamination is
discovered, provided the contractor
immediately stops work in these areas and
notifies the Department.
009 MEASUREMENT AND PAYMENT. (REV 11-18-103-9-11) (FA 1-21-115-12-11) (7-111-12) Changes to: 9-2, 9-5.2, 9-5.6, 9-8.1.
SS0090200 All Jobs
New SS. Merged in text from SS0090506 &
dates stayed the same. To require the
Contractor to indemnify the Department related to Contractor payment
and performance issues. Merged in text
from SS0090502 & changed dates. To
delete language relating to
disqualification of the surety for failure to
perform; this language will be added to all
Department bond forms.
Draft January 2012 Workbook…..21
102 MAINTENANCE OF TRAFFIC. (REV 10-7-105-23-116-15-118-3-11) (FA 10-19-106-7-118-9-11) (7-111-12) Changes to: 102.
SS1020000 All Jobs
New SS. Text merged in from SS102131 &
kept the same dates. To restore the additional payment for damaged crash cushions. Text
merged in from SS1020504 & changed
dates. To clarify the use, method of
measurement, and basis of payment for
temporary signals, temporary detection
and traffic control officers. Additionally,
the term “arrow panel” has been changed to
“arrow board” for consistency with the
MUTCD and the additional payment for
restoring damaged crash cushions has been deleted. Text
merged in from SS1020302 & changed
dates. To emphasize compliance with the
Americans with Disabilities Act (ADA)
Standards for Transportation
Facilities. 104 PREVENTION, CONTROL, AND ABATEMENT OF EROSION AND WATER POLLUTION. (REV 11-18-10) (FA 1-21-11) (7-11) Changes to: 104.
SS1040000 All Jobs
Draft January 2012 Workbook…..22
105 CONTRACTOR QUALITY CONTROL GENERAL REQUIREMENTS. (REV 9-17-103-28-115-18-11) (FA 1-4-115-12-118-4-11) (7-111-12) Changes to: 105-3, 105-5, 105-6, 105-8.
SS1050301 All Jobs
New SS Merged in text from SS1050806 & changed dates. To
allow non-CTQP qualified asphalt
technicians to measure the temperature of the hot mix asphalt in the haul trucks under the direction of a CTQP
Plant Level II technician. Merged in
text from SS1050808 & changed dates. To
clarify the responsibilities of the
Contractor’s supervisory personnel
for concrete post-tensioned segmental
box girder construction. Usage note: All Jobs.
107 LITTER REMOVAL AND MOWING (REV 12-17-09) (FA 1-27-10) (7-10) New Section 107.
SS1070000 All Jobs
110 CLEARING AND GRUBBING. (REV 5-29-09) (FA 7-15-09) (1-10) Changes to 110-6.2.1.
SS1100602 All Jobs
120 EXCAVATION AND EMBANKMENT. (REV 7-12-10) (FA 8-16-10) (1-11) Changes to: 120.
SS1200102 All Jobs
121 FLOWABLE FILL. (REV 3-12-10) (FA 5-24-10) (1-11) Changes to: 121
SS1210000 All Jobs
125 EXCAVATION FOR STRUCTURES AND PIPE – ACCEPTANCE PROGRAM. (REV 6-3-09) (FA 8-13-09) (1-10) Changes to: 125-9.1, 125-9.1.1.
SS1250901 All Jobs
Draft January 2012 Workbook…..23
160 STABILIZING. (REV 5-20-105-24-11) (FA 7-12-106-7-11) (1-111-12) Change to 160-3.2, 160-4.3.2.
SS1600302 All Jobs
New SS. Merged in text from SS1600302 & changed dates. To
better address potential settlement issues when
these materials are used.
200 ROCK BASE. (REV 10-12-10) (FA 12-10-10) (7-11) Changes to 200-7.2.1.
SS2000702 All Jobs
234 SUPERPAVE ASPHALT BASE. (REV 6-11-105-19-11) (FA 8-16-108-4-11) (1-111-12) Changes to: 234-1, 234-4, 234-5, 234-8,.
SS2340100 All Jobs
New SS. Merged in text from SS2340400 & changed dates. To
update references to Section 320 due to a
rewrite of that section. 287 ASPHALT TREATED PERMEABLE BASE – CONTROL OF QUALITY. (REV 5-19-11) (FA 8-4-11) (1-12) Changes to 287-4.
SS2870400 All Jobs
New SS. To update references to Section
320 due to a rewrite of that section.
300 PRIME AND TACK COATS FOR BASE COURSES – RATE OF APPLICATION. (REV 6-10-10) (FA 8-16-10) (1-11) Changes to: 300-8.4.
SS3000804 All Jobs
320 HOT MIX ASHPALT – PLANT, METHODS, AND EQUIPMENT. (REV 1-8-107-19-11) (FA 2-2-108-4-11) (7-101-12) Changes to: 320-2.2, 320-5.
SS3200202SS3200000 All Jobs
New SS. Merged in text from SS3200000 &
changed dates. (Section 320 was
completely rewritten.) To provide an overall update of the Section. Section 320 will now
address plant requirements.
327 MILLING OF EXISTING ASPHALT PAVEMENT – CONSTRUCTION. (REV 1-26-106-7-11) (FA 2-2-108-4-11) (7-101-12) Changes to: 327-3.
SS3270300 All Jobs
New SS. Merged in text from SS3270302 & changed dates. To
correct references to Section 320 due to
revisions.
Draft January 2012 Workbook…..24
330 HOT MIX ASPHALT – GENERAL CONSTRUCTION REQUIREMENTS. (REV 1-12-115-18-117-20-11) (FA 1-24-118-4-11) (7-111-12) Changes to: 330.
SS3300000 All Jobs
New SS. Merged in text from SS3300000 &
changed dates. (Section 330 was
completely rewritten.) To provide an overall update of the Section. Section 330 will now
address roadway requirements.
334 SUPERPAVE ASPHALT CONCRETE. (REV 1-10-115-19-118-9-11) (FA 1-27-118-4-118-16-11) (7-111-12) Changes to: 334-3.2.6, 334-5.1.2, 334-5.4.4..
SS3340000 All Jobs
New SS. Merged in text from SS3340104 &
changed dates. To add text that was
inadvertently omitted in the original submittal of SS3340104. Merged in
text from SS3340104 & changed dates. To
update the language for consistency with
industry practice and to correct references to
Section 320 due to revisions.
336 ASPHALT RUBBER BINDER. (REV 5-24-10) (FA 8-16-10) (1-11) Changes to: 336.
SS3360000 All Jobs
337 ASPHALT CONCRETE FRICTION COURSES. (REV 7-29-105-19-11) (FA 8-16-108-4-11) (1-111-12) Changes to: 337.
SS3370000 All Jobs
New SS. Merged in text from SS3370500 & changed dates. To
correct references to Sections 320 and 330
due to revisions.338 VALUE ADDED ASPHALT PAVEMENT. (REV 2-12-10) (2-17-10) (7-10) Changes to: 338-1, 338-5.
SS3380100 All Jobs
339 MISCELLANEOUS ASPHALT PAVEMENT – METHOD OF MEASUREMENT. (REV 5-19-11) (FA 8-4-11) (1-12) Changes to 339-7.
SS3390700 All Jobs
New SS. To correct references to Sections
320 and 330 due to revisions. Text merged in from SS3390700 &
used latest dates. 341 ASPHALT RUBBER MEMBRANE INTERLAYER. (REV 7-29-09) (FA 8-11-09) (1-10) Changes to: 341-4, 341-5.
SS3410400 All Jobs
Draft January 2012 Workbook…..25
346 PORTLAND CEMENT CONCRETE. (REV 1-13-113-28-11) (FA 1-31-115-18-11) (7-111-12) Changes to: 346.
SS3460000 All Jobs
New SS. Merged in text from SS3460301 & changed dates. To
simplify the use of a higher class concrete
by including the details for doing so in the approved QC Plan
347 PORTLAND CEMENT CONCRETE – CLASS NS. (REV 11-10-10) (FA 11-22-10) (7-11) Changes to 347-2.1, 347-4.1.
SS3470201 All Jobs
350 CEMENT CONCRETE PAVEMENT. (REV 1-12-11) (FA 1-24-11) (7-11) Changes to: 350-1, 350-3.3, 350-5.4, 350-6, 350-7.2, 350-9.1, 350-12.4, 350-18.
SS3500100 All Jobs
352 GRINDING CONCRETE PAVEMENT. (REV 12-21-10) (FA 1-3-11) (7-11) Changes to 352.
SS3520000 All Jobs
353 CONCRETE PAVEMENT SLAB REPLACEMENT. (REV 12-17-10) (FA 1-3-11) (7-11) Changes to 353-2, 353-3.1.
SS3530200 All Jobs
355 VALUE ADDED PORTLAND CEMENT CONCRETE PAVEMENT. (REV 2-12-10) (FA 2-17-10) (7-10) Changes to: 355-1, 355-4, 355-5.
SS3550100 All Jobs
370 BRIDGE APPROACH EXPANSION JOINTS. (REV 6-21-10) (FA 7-29-10) (1-11) Change(s) to: 370-2.
SS3700200 All Jobs
400 CONCRETE STRUCTURES. (REV 6-14-10) (FA 7-29-10) (1-11) Changes to: 400.
SS4000100 All Jobs
407 THREE-SIDED PRECAST CONCRETE CULVERT. (REV 6-8-105-4-11) (FA 7-29-105-18-11) (1-1112) Changes to: 407.
SS4070000 407-1 Items
New SS. Merged in text from SS4070300 & changed dates. To
change “Value Engineering Cost
Proposal (VECP)” to “Cost Savings Initiative
Proposal”.
Draft January 2012 Workbook…..26 410 PRECAST CONCRETE BOX CULVERT. (REV 6-8-10) (FA 7-29-10) (1-11) Changes to:410-3.1, 410-6.1.
SS4100301 All Jobs
415 REINFORCING STEEL–BAR SUPPORTS. (REV 1-4-11) (FA 2-14-11) (7-11) Changes to 415-5.10, 415-5.13
SS4150510 All Jobs
416 INSTALLATION OF POST-INSTALLED ANCHOR SYSTEMS AND DOWELS FOR STRUCTURAL APPLICATIONS IN CONCRETE ELEMENTS. (REV 2-24-116-23-118-8-11) (FA 5-18-117-18-118-10-11) (1-12) Changes to 416-6.1.
SS4160601000 All Jobs
New SS. Merged in text from SS4160000 & changed dates. To
remove undercut anchor systems.
Undercut anchor systems will be addressed in a
developmental spec to be used on specific
projects. Merged in text from SS4160000 & changed dates. To
clarify the language and to add undercut
anchor systems. Text merged in from
SS4160601 & used latest dates. To require
at least one test per day.
443 FRENCH DRAINS. (REV 6-4-10) (FA 8-17-10) (1-11) Changes to: 443-2.3, 443-5, 443-6, 443-7.
SS4430203 All Jobs
446 EDGEDRAIN (DRAINCRETE) – CONTROL OF QUALITY. (REV 1-15-10) (FA 2-19-10) (7-10) Changes to 446-3.
SS4460300 All Jobs
Draft January 2012 Workbook…..27
450 PRECAST PRESTRESSED CONCRETE CONSTRUCTION. (REV 7-26-108-3-11) (FA 7-29-108-10-11) (1-111-12) Changes to: 450-9.2, 450-10.3.2.3, 450-12.4.
SS4500902SS4500000 All Jobs
New SS. Merged in text from SS4500000 & changed dates. To
include tolerances for Florida U-Beam
diaphragms and beam strand sheathing; change concrete
temperature requirements during
cold weather; include language relating to the disposition of products
with cosmetic and minor cracks; address
the storage of products at the plant during the curing period, and for
general formatting. Text merged in from
SS4500902.
452 PRECAST SEGMENTAL BRIDGE CONSTRUCTION. (REV 1-19-116-22-11) (FA 2-4-117-28-11) (7-111-12) Changes to: 452.
SS4520000 All Precast Segmental
Bridge Jobs
New SS. Merged in text from SS4520801 & changed dates. To
address issues relating to crane placement (both on and off the
bridge) and shop drawing submittals.
453 EPOXY JOINTING OF PRECAST SEGMENTS. (REV 11-18-10) (FA 11-24-10) (7-11) Changes to: 453.
SS4530000 All Precast Segmental
Bridge Jobs
455 STRUCTURES FOUNDATIONS. (REV 1-13-115-11-11) (FA 2-4-115-18-11) (7-111-12) Changes to: 455-4, 455-7.7, 455-11.2.2, 455-11.2.8, 455-11.8, 455-12.8.
SS4550510SS4550000 All Jobs
New SS. To rename fiberglass structurally reinforced composite
piles to the more general term polymeric
piles and move payment to Section 471. Text
merged in from SS4550510 & used
latest dates.
458 BRIDGE DECK JOINTS. (REV 6-17-11) (FA 6-21-11) (1-12) Changes to 458.
SS4580000 All Jobs
New SS. To update references to test methods for slip
resistance for sidewalk cover plates to reflect
current industry practice.
Draft January 2012 Workbook…..28 460 STRUCTURAL STEEL AND MISCELLANEOUS METALS (REV 5-18-10) (FA 6-1-10) (1-11) Changes to: 460-7.6
SS4600706 All Jobs
462 POST-TENSIONING. (REV 12-3-107-21-11) (FA 12-10-107-28-11) (7-111-12) Changes to:462.
SS4620000 462 Items
New SS. Merged in text from SS49620000 &
changes dates. To allow the use of new
materials and construction practices,
to clarify material requirements and for
general cleanup 470 TIMBER STRUCTURES. (REV 2-2-11) (FA 4-11-11) (1-12) Changes to 470-12.2.
SS4701202 All Jobs New SS. To include a
new timber preservative.
471 POLYMERIC FENDER SYSTEMS. (REV 5-10-11) (FA 5-19-11) (1-12) Changes to 471.
SS4710000 All Jobs New SS. To add
requirements for polymeric piles.
502 SHEAR CONNECTORS. (REV 2-22-10) (FA 4-15-10) (1-11) Changes to: 502-1
SS5020100 All Jobs
521 CONCRETE BARRIERS, TRAFFIC RAILING BARRIERS AND PARAPETS. (REV 5-31-11) (FA 6-10-11) (1-12) Changes to 521-7.
SS5210700 All Jobs
New SS. To add the provision regarding
cracks in unreinforced plain concrete barrier
walls as detailed in Design Index 410.
522 CONCRETE SIDEWALK. (REV 7-29-10) (FA 9-20-10) (7-11) Changes to 522-7.2.
SS5220702 All Jobs
Draft January 2012 Workbook…..29
523 PATTERNED/TEXTURED PAVEMENT. (REV 6-1-108-2-11) (FA 7-29-108-4-11) (1-111-12) Changes to: 523-2.
SS5230200SS5230000 All Jobs
New SS. Merged in text from SS5230000 & changed dates. To
clarify the applicability of products for use on asphalt and concrete
surfaces subject to vehicular and non-
vehicular traffic. The language also clarifies
manufacturer submittal and testing
requirements and documentation
necessary for evaluation for inclusion
on the Qualified Products List (QPL).
524 CONCRETE DITCH AND SLOPE PAVEMENT. (REV 8-13-09) (10-6-09) (7-10) Changes to: 524-2, 524-9, 524-10.
SS5240200 All Jobs
527 DETECTABLE WARNINGS ON WALKING SURFACES. (REV 1-12-11) (FA 1-21-11) (7-11) Changes to: 527.
SS5270000 All Jobs
534 CONCRETE SOUND BARRIERS. (REV12-22-10) (FA1-3-11) (7-11) Changes to: 534
SS5340000 All Jobs
536 GUARDRAIL. (REV 6-9-10) (FA 7-16-10) (1-11) Changes to 536-2.4.
SS5360204 All Jobs
538 RESETTING GUARDRAIL. (REV 3-1-11) (FA 5-10-11) (1-12) Changes to 538.
SS5380000 All Jobs New SS. To clarify the
reuse of materials.
Draft January 2012 Workbook…..30
544 CRASH CUSHIONS. (REV 10-7-106-15-118-4-11) (FA 10-26-108-9-11) (7-111-12) Changes to: 544.
SS5440000 All Jobs
New SS. Text merged in from SS5440400 &
kept the same dates. To restore the additional payment for damaged
crash cushions. Merged in text from SS5440000
& changed dates. To delete the additional
payment for the restoration of damaged
crash cushions. 546 RUMBLE STRIPS. (REV 7-6-09) (FA 8-31-09) (1-10) Changes to: 546-2.
SS5460200 All Jobs
548 RETAINING WALL SYSTEMS. (REV 1-27-11) (FA 2-4-11) (7-11) Changes to: 548.
SS5480000 All Jobs
550 FENCING (REV 5-14-10) (FA 7-20-10) (1-11) Changes to: 550-3.1.
SS5500301 All Jobs
555 DIRECTIONAL BORE. (REV 1-10-114-5-11) (FA 1-24-115-31-11) (7-111-12) Changes to: 555-3.1.
SS5550000 555 Items
New SS. Merged in text from SS5550301 & changed dates. To
update the language to be consistent with
changes to Section 556.
556 JACK AND BORE. (REV 6-22-105-23-11) (FA 7-29-106-10-11) (1-111-12) Changes to: 556-2, 556-3.1, 556-8.
SS5560800SS5560200 556 Items
New SS. To update the language for
consistency with current industry
standards and to reference the Design
Standards for maintaining pedestrian traffic. Text merged in
from SS5560200 & used latest dates.
557 VIBRATORY PLOWING. (REV 6-22-10) (FA 7-29-10) (1-11) Changes to: 557-6
SS5570600 557 Items
560 COATING STRUCTURAL STEEL. (REV 10-4-10) (FA 11-9-10) (7-11) Changes to: 560.
SS5600000 All Jobs
Draft January 2012 Workbook…..31 561 COATING EXISTING STRUCTURAL STEEL. (REV 1-27-10) (FA 2-10-10) (7-10) New Section 561
SS5610000 561 Items
562 REPAIR OF GALVANIZED SURFACES. (REV 3-2-11) (FA 5-10-11) (1-12) Changes to 562-2.
SS5620200 All Jobs
New SS. To clarify when QPL approved
galvanizing compounds are required.
563 ANTI-GRAFFITI COATING SYSTEM – DESCRIPTION. (REV 4-27-09) (FA 5-27-09) (1-10) Changes to: 563.
SS5630100 All Jobs
570 PERFORMANCE TURF. (REV 10-14-09) (FA 12-28-09) (7-10) Changes to: 570.
SS5700000 All Jobs
580 LANDSCAPE INSTALLATION – PLANT ESTABLISHMENT PERIOD AND CONTRACTOR’S WARRANTY. (REV 8-9-10) (FA 10-8-10) (7-11) Changes to 580-5.
SS5800500 All Jobs
603 GENERAL REQUIREMENTS FOR THE INSTALLATION AND EVALUATION OF TRAFFIC CONTROL SIGNALS AND DEVICES. (REV 1-20-106-16-11) (FA 1-28-108-5-11) (7-101-12) Change(s) to: 603.
SS6030000 All Jobs
New SS. Merged in text from SS6030202 & changed dates. To
update the specification to processes, approval
references and definitions contained in the Traffic Engineering
Manual. 608 GUARANTIES FOR TRAFFIC CONTROL SIGNALS AND DEVICES. (REV 1-20-10) (FA 1-28-10) (7-10) Changes to: 608.
SS6080000 All Jobs
611 ACCEPTANCE PROCEDURES FOR TRAFFIC CONTROL SIGNALS AND DEVICES. (REV 6-22-105-12-11) (FA 7-26-108-5-11) (1-111-12) Changes to: 611.
SS6110000 All Jobs
New SS. Merged in text from SS6110400 & changed dates. To
clarify requirements regarding acceptance
testing performed close to non-working days.
This change is related to changes in other Sections regarding
Special Events.
Draft January 2012 Workbook…..32 630 CONDUIT – FIBER OPTIC CABLE LOCATE WIRE. (REV 11-22-10) (FA 1-6-11) (7-11) Changes to 630-3.1.2
SS6300301 All Jobs
634 SPAN WIRE ASSEMBLY. (REV 11-4-10) (FA 1-3-11) (7-11) Changes to 634-2.3, 634-3.3.
SS6340203 All Jobs
635 PULL AND JUNCTION BOXES. (REV 7-28-10) (FA 8-3-10) (1-11) Changes to: 635-3.
SS6350300 All Jobs
649 GALVANIZED STEEL STRAIN POLES, MAST ARMS AND MONOTUBE ASSEMBLIES – MATERIALS. (REV 11-15-106-8-11) (FA 1-6-116-16-11) (7-111-12) Changes to 649-2, 649-4.3.
SS6490200 All Jobs
New SS. Merged in text from SS6490403 & changed dates. To
correct a cross reference to another
Article.
650 VEHICULAR SIGNAL ASSEMBLIES – INSTALLATION. (REV2-2-11) (FA2-7-11) (7-11) Changes to: 650-2, 650-3.7 thru 3.11, 650-4.2, 650-5.
SS6500200 All Jobs
690 REMOVAL OF EXISTING TRAFFIC CONTROL SIGNALS AND DEVICES. (REV 6-16-10) (FA 7-26-10) (1-11) Changes to: 690
SS6900000 All Jobs
699 INTERNALLY ILLUMINATED SIGNS. (REV 11-15-10) (FA 1-4-11) (7-11) Changes to: 699-3.
SS6990300 All Jobs
700 HIGHWAY SIGNING. (REV 11-15-10) (FA 1-4-11) (7-11) Changes to: 700.
SS7000000 All Jobs
701 AUDIBLE AND VIBRATORY PAVEMENT MARKINGS. (REV 11-4-10) (FA 1-4-11) (7-11) Changes to: 701.
SS7010000 All Jobs
702 WET WEATHER PAVEMENT MARKINGS (REV 11-4-10) (FA1-4-11) (7-11) Changes to: 702.
SS7020000 702 Items
Draft January 2012 Workbook…..33 705 OBJECT MARKERS AND DELINEATORS. (REV 5-17-10) (FA 7-16-10) (1-11) Changes to: 705-2.1
SS7050201 All Jobs
709 TRAFFIC STRIPES AND MARKINGS – TWO REACTIVE COMPONENTS. (REV11-4-10) (FA1-4-11) (7-11) Changes to: 709.
SS7090000 All Jobs
710 PAINTED PAVEMENT MARKINGS. (REV 7-9-09) (FA 7-20-09) (1-10) Changes to: 710-2, 710-4.1, 710-4.1.1, 710-4.3.
SS7100200 All Jobs
711 THERMOPLASTIC TRAFFIC STRIPES AND MARKINGS. (REV 11-4-10) (FA 1-6-11) (7-11) Changes to: 711.
SS7110000 All Jobs
713 PERMANENT TAPE STRIPES AND MARKINGS. (REV12-22-10) (FA1-4-11) (7-11) Changes to: 713.
SS7130000 All Jobs
715 HIGHWAY LIGHTING SYSTEM. (REV12-2-10) (FA 1-4-11) (7-11) Changes to: 715-1, 715-6.4, 715-16.
SS7150100 All Jobs
780 INTELLIGENT TRANSPORTATION SYSTEMS - GENERAL REQUIREMENTS. (REV 8-7-06) (FA 8-15-06) (1-10) Changes to: 780.
SS7800000 All ITS Jobs
781 INTELLIGENT TRANSPORTATION SYSTEMS - MOTORIST INFORMATION SYSTEMS. (REV 12-7-10) (FA 1-24-11) (7-11) Changes to: 781.
SS7810000 781 Items
Draft January 2012 Workbook…..34
782 INTELLIGENT TRANSPORTATION SYSTEMS - VIDEO EQUIPMENT. (REV 11-10-105-31-11) (FA 1-24-117-28-11)(7-111-12) Changes to: 782.
SS7820000 782 Items
New SS. Merged in text from SS7820202 & changed dates. To
update the specification to current approval and
interoperability requirements for
equipment and remove references to obsolete
CRT technology.
783 INTELLIGENT TRANSPORTATION SYSTEMS - FIBER OPTIC CABLE AND INTERCONNECT. (REV 1-27-115-31-11) (FA 2-4-117-28-11) (7-111-12) Changes to: 783.
SS7830000 783 Items
New SS Merged in text from SS7830302 & changed dates. To
update the specification to updated Design
Standard Index number and remove the
requirement for hex bolts.
784 INTELLIGENT TRANSPORTATION SYSTEMS - NETWORK DEVICES. (REV 11-10-105-31-11) (FA 1-24-117-28-11) (7-111-12) Changes to: 784.
SS7840000 784 Items
New SS. Merged in text from SS7840302 & changed dates. To update functional
requirements for the data rates and
programmable bit rates for encoders/decoders
based on device evaluations at the
Traffic Engineering Research Laboratory.
785 INTELLIGENT TRANSPORTATION SYSTEMS - INFRASTRUCTURE. (REV 1-31-117-29-118-5-11) (FA 2-24-118-9-11) (7-111-12) Changes to: 785.
SS7850000 785 Items
New SS. Merged in text from SS7850200 & changed dates. To
clarify and update the requirements and
expectations for ground system testing and
certifications, removing unnecessary cross
references and clarifying the
requirements for main ground bar
attachments.
Draft January 2012 Workbook…..35 786 INTELLIGENT TRANSPORTATION SYSTEMS – VEHICLE DETECTION AND DATA COLLECTION. (REV 4-26-104-5-11) (FA 6-22-104-6-11) (1-111-12) Changes to: 786-13.
SS7860000 786 Items
New SS. Merged in text from SS7861300 &
changed dates. To align the pay items listed in
the spec with the BOE.
901 COARSE AGGREGATE. (REV 12-15-095-31-11) (FA 12-21-096-7-11) (7-101-12) Changes to: 901-1.4.
SS9010104SS9010000 All Jobs
New SS. To expand the use of reclaimed Portland cement
concrete as outlined in DCE Memo 16-10 and Materials Bulletin 06-
10.Text merged in from SS9010104 & used
latest dates
914 STABILIZATION MATERIALS. (REV 5-17-11) (FA 6-7-11) (1-12) Changes to 914.
SS9140000 All Jobs
New SS. To move and modify language
regarding RAP and RAP blended material
from Section 160 to avoid potential
settlement issues by determining the actual asphalt content in the final mixed subgrade.
916 BITUMINOUS MATERIALS. (REV 1-13-115-19-11) (FA 1-27-118-4-11) (7-111-12) Changes to: 916-1, 916.3.2, 916-4.
SS9160000 All Jobs
New SS. Merged in text from SS9160100 & changed dates. To
change “mass loss” to “mass change” to be
consistent with AASHTO T 240.
919 GROUND TIRE RUBBER FOR USE IN ASPHALT RUBBER BINDER. (REV 6-22-09) (FA 6-25-09) (1-10) Changes to: 919-3.
SS9190300 All Jobs
921 PORTLAND CEMENT AND BLENDED CEMENT. (REV 10-21-10) (FA 1-4-11) (7-11) Changes to 921-1.
SS9210100 All Jobs
923 WATER FOR CONCRETE. (REV 5-20-10) (FA 6-9-10) (1-11) Changes to: 923
SS9230000 All Jobs
926 EPOXY COMPOUNDS. (REV 1-4-10) (FA 1-14-10) (7-10) Changes to: 926-1, 926-2.2.
SS9260100 All Jobs
Draft January 2012 Workbook…..36 929 POZZOLANS AND SLAG. (REV 12-17-10) (FA 1-3-11) (7-11) Changes to 929-2, 929-3.2, 929-4.2, 929-6.3.
SS9290200 All Jobs
931 METAL ACCESSORY MATERIALS FOR CONCRETE PAVEMENT AND CONCRETE STRUCTURES. (REV 3-26-103-23-117-11-11) (FA 5-26-105-12-118-10-11) (1-111-12) Changes to: 931-1.1, 931-3.6.
SS9310101SS9310000 All Jobs
New SS. Merged in text from SS9310000 & changed dates. To
update the language to current usage. The term “steel wire fabric” has been changed to “wire
reinforcement”. Merged in text from
SS9310306 & changed dates. To specify one
coat of primer instead of a rust preventative compound for metal
dowel bar assemblies used in concrete pavement joints.
932 NONMETALLIC ACCESSORY MATERIALS FOR CONCRETE PAVEMENT AND CONCRETE STRUCTURES. (REV 8-2-106-15-11) (FA 8-12-106-21-11) (1-111-12) Changes to: 932-1.
SS9320102SS9320100 All Jobs
New SS. Merged in text from SS9320100 & changed dates. To replace a MIL Specification with current ASTM Specifications and delete a field test for low modulus silicone sealants. Text merged in from SS9320102 and changed dates.
936 WIRE ROPE FOR FENDER PILE CLUSTER. (REV 8-9-11) (1-12)
SS9360000 All Jobs
Spec is deleted as it is no longer needed as per
the Structures Design Office.
Draft January 2012 Workbook…..37
937 POST-INSTALLED ANCHOR SYSTEMS FOR STRUCTURAL APPLICATIONS IN CONCRETE ELEMENTS. (REV 6-23-118-5-11) (FA 7-18-118-10-11) (1-12) Changes to 937.
SS9370000 All Jobs
New SS. Merged in text from SS9370000 & changed dates. To
clarify the language and to remove undercut
anchor systems. Undercut anchor
systems will be addressed in a
developmental spec to be used on specific
projects. SS9370000 - To clarify the language
and to add undercut anchor systems.
938 POST-TENSIONING GROUT. (REV 5-1-094-28-11) (FA 5-19-096-30-11) (1-1012) Changes to: 938.
SS9380000 462 Items
New SS. Merged in text from SS9380402 & changed dates. To
modify the limit and test method for chloride.
948 MISCELLANEOUS TYPES OF PIPE. (REV 5-19-10) (FA 6-9-10) (1-11) Changes to: 948-1.7, 948-2.3, 948-4.
SS9480203 All Jobs
955 TIMBER TREATMENT (INCLUDING TREATING MATERIALS). (REV 2-2-11) (FA 4-11-11) (1-12) Changes to 955-2.2, 955-4, 955-5.
SS9550202 All Jobs New SS. To include a
new timber preservative.
962 STRUCTURAL STEEL AND MISCELLANEOUS METAL ITEMS (OTHER THAN ALUMINUM). (REV 2-23-10) (FA 5-4-10) (1-11) Changes to: 962-1.2, 962-8.2, 962-8.4.2.
SS9620102 All Jobs
971 TRAFFIC MARKING MATERIALS. (REV 2-15-115-26-117-21-11) (FA 2-22-117-20-117-22-11) (7-111-12) Changes to:971.
SS9710000 All Jobs
New SS. Merged in text from SS9710303 & changed dates. To
include text inadvertently deleted in
original FA submittal. Merged in text from
SS9710303 & changed dates. To correct the
value for the minimum of fineness of grind, dry
opacity and remove maximum value for
fineness of grind.
Draft January 2012 Workbook…..38 972 RECYCLED PLASTIC PRODUCTS. (REV 7-8-10) (FA 7-20-10) (1-11) Changes to: 972-1, 972-3, 972-4, 972-5, 972-6.
SS9720100 All Jobs
973 STRUCTURAL PLASTICS. (REV 5-11-095-10-116-24-118-1-11) (FA 6-10-095-19-117-6-118-4-11) (1-101-12) Changes to: 973.
SS9730000 All Jobs
New SS. Merged in text from SS9730000 & changed dates. To
remove the requirement for abrasion testing. Merged in text from
SS9730300 & changed dates. To correct a
typo. Merged in text from SS9730000 & changed dates. To move the material
requirements for polymeric piles to
Section 471 and revise some of the testing
requirements for wales and dimensional
lumber.975 STRUCTURAL COATING SYSTEMSMATERIALS. (REV 7-20-10) (FA 11-9-10) (7-11) Changes to: 975.
SS9750000 All Jobs
981 TURF MATERIALS. (REV 7-1-10) (FA 8-16-10) (1-11) Changes to 981-1, 981-4, 981-5.
SS9810100 All Jobs
987 PREPARED SOIL LAYER MATERIALS (REV 1-15-10) (FA 2-17-10) (7-10) Changes to 987-1.
SS9870100 All Jobs
990 TEMPORARY TRAFFIC CONTROL DEVICE MATERIALS. (REV 11-22-106-15-11) (FA 12-10-108-9-11) (7-111-12) Changes to: 990.
SS9900000 All Jobs
New SS. Merged in text from SS9900301 & changed dates. To
modify the language for consistency with the
MUTCD and to clarify when to use Type B and
Type C arrow boards. 993 OBJECT MARKERS AND DELINEATORS. (REV 7-8-10) (7-16-10) (1-11) Changes to: 993-1.4, 993-2.3.1.
SS9930104 All Jobs
Draft January 2012 Workbook…..39 994 RETROREFLECTIVE AND NONREFLECTIVE SHEETING FOR TRAFFIC CONTROL DEVICES. (REV 2-8-10) (FA 2-10-10) (7-10) Changes to: 994.
SS9940000 All Jobs
Draft January 2012 Workbook…..40
APPENDICES
APENDIC Header
TECHNICAL SPECIAL PROVISIONS. The following Technical Special Provisions are individually signed and sealed but are included as part of this Specifications Package. Insert # ________
TSPs Jobs with TSPs