Upload
scarlett-berg
View
16
Download
0
Tags:
Embed Size (px)
DESCRIPTION
Firefighter Door Operations. Kirkland / Redmond 4 th Quarter 2014. Firefighter Door Operations. Assess structure and point of entrance How far from apparatus Obstructions Working length needed for occupancy type Select deployment method “Accordion FWD / Accordion REV / V-Split”. - PowerPoint PPT Presentation
Citation preview
Firefighter Door Operations
Kirkland / Redmond 4th Quarter 2014
Firefighter Door Operations
• Assess structure and point of entrance– How far from apparatus– Obstructions–Working length needed for occupancy
type– Select deployment method • “Accordion FWD / Accordion REV / V-Split”
Firefighter Door Operations
• Deploy line and call for water• Secure line while being charged• Assess “AVPP” – Air bled– Volume appropriate and sustained– Pattern set/known– Pressure appropriateAVPP Check on the door you’re about to access
Firefighter Door Operations
• Assess feedback from AVPP/Door appearance– Steam– Door discoloration– Smoke seepage
• Assess door for possible Forcible Entry – Locked– Construction
• (metal / wood / solid / hollow /double or single)• Type and number of lock(s)
– Swing• (inward or outward swing)
– Irons Set appropriate or other tools needed
Firefighter Door Operations
• SCBA–Mask up– Use hood– Check mask seal – Check gauge – Use flapsPUT GLOVES BACK ON
Firefighter Door Operations
• Open door– Look for victims near door*– Assess interior layout– Assess fire location– Assess smoke
• Volume /Velocity / Density / Color
CLOSE DOOR- WAIT FOR OFFICER RELAY INFORMATION GAINED IN ASSESSMENT
BUDDY CHECK BEFORE ENTRY*Best Practices “Front Door Tactics”
HOSE DEPLOYMENTS
Further Reading:1. Got to the RFTD/EMTG site2. Login3. Click (Forms/Docs/SOG’s)4. Click (MISC)5. Click Nozzle Forward “Da Manual of
Hose”
ACCORDION FORWARD
ACCORDION REVERSE
V - SPLIT