2©2017 ITRON CONFIDENTIAL PROPRIETARY
AGENDA1:30 - 4:00pm
» Introductions [10 mins]
» Meeting objectives [5 mins]
» TAC charter [5 mins]
» Background, project scope and objectives [20 mins]
» Proposed Approach [30 mins]
» Discussion [45 mins]
» Next steps [10 mins]
» Wrap up [5 mins]
ZNE Research Roadmap |
3©2017 ITRON CONFIDENTIAL PROPRIETARY
PROJECT TEAM
ZNE Research Roadmap |
Commercial Buildings
» Neil Bulger
» Andrea Traber
» Ryan Sit
Residential Buildings
(SF + MF)
» Dave Springer
» Bill Dakin
» Alea German
Behavior, Plug Loads and other Cross Cutting
» Kristin Heinemeier
» Siva Gunda
» Katherine Bannor
DG + Grid Integration and other Cross Cutting
» Smita Gupta – Project Manager
» Jeremy Smith – assisting PM
» George Simons – Technical advisor
» Mike Ting – Technical advisor
Prime + Overall Project Coordination
Administrative and Coordination Support
Commercial Buildings
» Cathy Higgins
» Ann Edminster
» Kevin Carbonnier
» Webly Bowles
Residential Buildings
(SF + MF)
» Ram Narayanamurthy
4©2017 ITRON CONFIDENTIAL PROPRIETARY
TAC MEMBERS
ZNE Research Roadmap |
Name Organization Title Perspective Representation
Andrew Lee Architecture 2030 Project Manager Commercial design/International
Robert Raymer CBIA Senior Engineer/Technical Director CA residential builder industry
Brad Williams CEC Mechanical Engineer CEC research
Heather Bird CEC Specialist III CEC research
Joshua Croft CEC CAM – CEC PM CEC research
Danny Tam CEC Codes and Standards Codes and Standards
Sasha (Alex) Merigan CPUC ET Program and ZNE Lead CPUC Emerging Tech and ZNE Policy
Steve Selkowitz LBNL Research Lab ZNE Expert Commercial ZNE/National Lab Research
Sandy Mendler Mithun Principal Design Industry
Pat Eilert PG&E Energy Codes & Standards Lead IOU/Codes and Standards
Ramin Faramazi NREL Principal EngineerCommercial Buildings & Thermal Systems Center
Emerging Technologies
5©2017 ITRON CONFIDENTIAL PROPRIETARY
OBJECTIVES FOR THIS MEETING
» Convene TAC and communicate role of the TAC
» Introduce project, background, scope and schedule
» Get input on overall approach and immediate next steps
ZNE Research Roadmap |
6©2017 ITRON CONFIDENTIAL PROPRIETARY
Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May
TAC ROLE AND CHARTERTechnical Advisory Committee
» Advisory role
» Varied perspective to avoid skew, blight sights and pitfalls
» Shape study at various stages
ZNE Research Roadmap |
2017
2018
APRIL 2017Review initial
methodology
SEPTEMBER 2017Review landscape scan/technical
assessment + preliminary gaps
JANUARY 2018Review draft gap analysis
8©2017 ITRON CONFIDENTIAL PROPRIETARY
ZERO NET ENERGY
ZNE Research Gap Analysis |
DOE
Building America
Zero Ready Building
Ultra low energy + renewables
Site Energy
EU
Nearly zero energy buildings
Carbon Neutral
ZEBRA2020.eu
Others
USGBC
Living Futures
CA
Societal benefit
TDV
9©2017 ITRON CONFIDENTIAL PROPRIETARY
ZNE IN CALIFORNIASource: NBI ZNE Watch list
ZNE Research Gap Analysis |
10©2017 ITRON CONFIDENTIAL PROPRIETARY
2008
2013
2015
2017
PATHS TO ZNESource: Integral Group
ZNE Research Gap Analysis |
11©2017 ITRON CONFIDENTIAL PROPRIETARY
PERCEIVED BARRIERS TO ZNESource: NBI Early Adopter Workshops 2015
ZNE Research Gap Analysis |
12©2017 ITRON CONFIDENTIAL PROPRIETARY
» Develop an analysis of the most critical RDD&D gaps that
need to be addressed to achieve California’s goals of zero
net energy buildings for all new construction of residential
buildings by 2020 and for commercial buildings by 2030.
» Results of the analysis will be used by Energy Commission
staff to develop a research roadmap that strategically
targets future EPIC investments in a manner that provides
optimal benefits to Investor-Owned Utility (IOU) electric
ratepayers, and maximizes the use of public research and
development investments.
ZNE Research Roadmap |
PROJECT BACKGROUND
13©2017 ITRON CONFIDENTIAL PROPRIETARY
PROJECT OBJECTIVES
» The goal of this agreement is to develop, in consultation with stakeholders and
subject matter experts, a technical assessment and Research Roadmap that
identifies, describes, and prioritizes key RDD&D needs for achieving the state’s
goals for Zero-Net Energy (ZNE) buildings in a safe, equitable, and cost-beneficial
manner.
» Specifically, the research roadmap must synthesize the input of stakeholders and
experts in order to:
Prioritize research most needed to achieve cost-effective ZNE buildings.
Provide a detailed description of barriers.
Identify performance and cost targets for promising technologies.
Develop critical indicators of success.
ZNE Research Roadmap |
14©2017 ITRON CONFIDENTIAL PROPRIETARY
PROJECT SCOPE
» New Construction ZNE: Residential (emphasis on
multifamily) and Commercial
» Prioritize building types based on criteria with
highest impact in terms of energy and market
penetration and growth
ZNE Research Roadmap |
Source: Technical Feasibility of ZNE in California, 2012
15©2017 ITRON CONFIDENTIAL PROPRIETARY
PROJECT SCOPE
» Focus areas to be covered in technical assessment and gaps analysis include, but are not
limited to:
ZNE Research Roadmap |
» Building energy efficiency technologies
• Lighting
• Heating, Ventilation, and Air Conditioning (HVAC)
• Water efficiency and reuse technologies that also provide
electricity savings
• Building envelope
• Plug loads
• Whole-building strategies such as DC-DC and appliance
electrification
» Behavioral research of current and potential ZNE
building residents.
» Demand response
» Distributed- and community-scale renewables, as
enabler for ZNE
» Smart grid connectivity related to ZNE, such as:
• Interaction between building to electrical grid (B2G),
including system capacity.
• Smart building controls, home area networks, and
information/action displays that give real-time data and
control to the resident and/or building owner.
• Electric vehicle charging and vehicle-to-grid (V2G).
• Controllable loads.
» Energy storage, as enabler to ZNE.
» Public health and safety including indoor air
quality
» Planning and permitting of ZNE buildings
16©2017 ITRON CONFIDENTIAL PROPRIETARY
SCOPE FOR COMMERCIAL BUILDING TYPES
» Priorities driven by:
• Widely applicable
• Critical niche
• Energy use influence
• Opportunity for scaling
• Other regulatory influences
(local ordinances)
Guide future research
that targets ZNE
progression
17©2017 ITRON CONFIDENTIAL PROPRIETARY
SCHEDULE
ZNE Research Roadmap |
ACTIVITY Q1 Q2 Q3 Q4 Q1 Q2
Contract Management and Reporting
TAC team
Final report
Literature review
Interviews with SME and market actors
Compilation of Technical Assessment
Ta
sk 3 Finalize Methodology for Developing
Research Roadmap
Gap Analysis
Research Prioritization
Topical Workshops
Draft Roadmap
Ta
sk 5
Finalize ZNE Research Roadmap
2017 2018T
ask
4T
ask
1T
ask
2
TAC meeting methodolody
Public workshop to present Roadmap
Multiple meetings ontopical areas to collect input on gap analysis and prioritization
Finalize initial methodology
Finalize Roadmap
TAC meeting tech assessment
TAC meeting gaps and priorities
18©2017 ITRON CONFIDENTIAL PROPRIETARY
OVERALL APPROACH
ZNE Research Roadmap |
Expert Input on Research Gaps
and Prioritization
Subject Matter
Experts
Market Actors
TAC team
Public +ZNE Stakeholders
Itron team
Public WorkshopGap Analysis
Research Prioritization
Gap Identification
Landscape scanLiterature Review
& Team Experience
EPIC ZNE Research Roadmap
19©2017 ITRON CONFIDENTIAL PROPRIETARY
KEY DELIVERABLES
» Landscape assessment
• Literature database
• Stakeholder input
» Gap Analysis
• Identification of research gaps
• Prioritization of research
• Identify performance and cost targets
• Develop critical indicators of success
ZNE Research Roadmap |
Conceptualized as an interactive
and multidimensional database
20©2017 ITRON CONFIDENTIAL PROPRIETARY
PROJECT COORDINATION PORTAL
» http://zneroadmap.researchenergy.net/
» Other coordination tools
ZNE Research Roadmap |
22©2017 ITRON CONFIDENTIAL PROPRIETARY
LANDSCAPE ASSESSMENT
ZNE Research Roadmap |
Input based on area of
vocation or expertise
Subject Matter
Experts
Market Actors
Compilation of landscape assessment
Stakeholder Input
Literature Review
Residential New
Construction
Commercial New
Construction
EPRI
+
DEG
NBI
+
Integral Group
Itron
+
UC Davis
Itron team
23©2017 ITRON CONFIDENTIAL PROPRIETARY
LITERATURE REVIEW PURPOSE
ZNE Research Roadmap |
The literature review will provide information about which
focus areas already have extensive research and which
areas are in need of further investigation in order to meet
California’s ZNE goals.
Design
Paradigm
Design
Tools
Envelope HVAC Lighting Plug Loads DR Solar Storage …
24©2017 ITRON CONFIDENTIAL PROPRIETARY
LITERATURE REVIEW SOURCES
We will start with research documents from several publicly-
available databases and known resources, including:
» Applicable Laws, Policies, and Background Documents
» CEC EPIC Project Reports
» DOE Office of Scientific and Technical Information Database
» California Measurement Advisory Council (CALMAC) Searchable Database
» Emerging Technologies Coordinating Council (ETCC) Project Reports
» Electric Power Research Institute (EPRI) Research Portfolio
» …
ZNE Research Roadmap |
25©2017 ITRON CONFIDENTIAL PROPRIETARY
LITERATURE REVIEW PROCESS
ZNE Research Roadmap |
Research documents for review will be recommended by both
project team members and stakeholders through the project
website. Reviews will be completed by project team members
based on expertise.
26©2017 ITRON CONFIDENTIAL PROPRIETARY
LITERATURE REVIEW PROCESS
Each document will be reviewed, catalogued,
and tagged by keywords based on which ZNE-
related topic area(s) are addressed.
GENERAL FOCUS AREA(S)BUILDING TYPE(S)
Title
Author
Publisher/Funder
Resource Type
…
ZNE Research Roadmap |
Grocery ×
Restaurant ×
Process Loads ×
Controls ×
27©2017 ITRON CONFIDENTIAL PROPRIETARY
LITERATURE REVIEW PROCESS
A short write up will be provided to describe how
each focus area was addressed and what
research has been done.
Summary addressing process loads…
FOCUS AREA SUMMARIES
ZNE Research Roadmap |
FOCUS AREA(S)
Process Loads ×
Controls ×
Summary addressing controls…
28©2017 ITRON CONFIDENTIAL PROPRIETARY
RESEARCH LITERATURE DATABASE
All literature reviews will be stored in a database,
searchable by fields and keywords, and available to the
public on the project website.
ZNE Research Roadmap |
30©2017 ITRON CONFIDENTIAL PROPRIETARY
» Proposed:
1. Review of existing surveys
2. Sage Input – Initial Interviews
3. Surveys – online and phone – formal set of question
4. Key Industry Events
5. Stakeholder Portal within the team site
Desired Survey Attributes:
» Short and focused
» Questions customized to participant role
» Hybrid style: Quantifiable and qualitative / Directed and
Open style questions
ZNE Research Roadmap |
STAKEHOLDER OUTREACHHow?
31©2017 ITRON CONFIDENTIAL PROPRIETARY
» Industry Experts/Allies representing industry based on
their:
• Body of ZNE experience
• Building type experience (office, education, institutional,
etc.)
• Industry role/perspective
» Inform Surveys:
• How many surveys needed based on granularity of data
desired
• Prioritize topics while keeping surveys short to promote
higher response rate
• Determine levels of representation of each different
audience surveyed
ZNE Research Roadmap |
HOW: 2. SAGE INPUTInitial Interviews to Vet Options
Conduct and Document Outreach
Guide future research that targets ZNE
progression
32©2017 ITRON CONFIDENTIAL PROPRIETARY ZNE Research Roadmap |
STAKEHOLDER OUTREACHWho?
Who’s new?
Who’s needed?
33©2017 ITRON CONFIDENTIAL PROPRIETARY ZNE Research Roadmap |
TAC INPUT ON STAKEHOLDER OUTREACHPossible topics for discussion
1. Methods
2. Extent of inquiry
3. Who’s perspective matters
4. Who’s new – trending in this field?
5. How to weigh and integrate inputWho’s new?
Who’s needed?
Getting beyond
‘what is too expensive’ and
‘what is cool?’
N. Bulger
35©2017 ITRON CONFIDENTIAL PROPRIETARY
VISION FOR THE RESULTING GAP ANALYSISInteractive relational database
ZNE Research Roadmap |
GAPS ANALYSIS RESULTS
36©2017 ITRON CONFIDENTIAL PROPRIETARY
GAP ANALYSIS APPROACH
ZNE Research Roadmap |
GAP ANALYSIS
LITERATURE REVIEW
STAKEHOLDER INPUT
CLIMATE ZONE
BARRIERSIDENTIFY
RESEARCH GAPS
RESEARCH PRIORITY
COST AND PERFORMANCE
TARGETS
CRITICAL SUCCESS
INPUTS SYNTHESIZE
37©2017 ITRON CONFIDENTIAL PROPRIETARY
PRIORITIZATIONExample of prioritization excercise
» Scenarios based on ZNE criteria
• All electric
• Mixed fuel
• Community ZNE (vs. site level ZNE)
ZNE Research Roadmap |
Urgent
Before
2020
2021-
2025
2026 -
2030
High
Impact
Medium
Impact
Low
Impact
38©2017 ITRON CONFIDENTIAL PROPRIETARY
KEY QUESTIONS FOR DISCUSSION AND INPUTTo further guide scope – over next 12 months
» View ZNE as more than intent based on code alone (TDV), include operational, construction and
design aspects as well
» How do we frame the scenarios? TDV - GHG based electrification, Mixed fuel (gas + elect),
community vs. individual site
» Confirm looking into Community ZNE vs. site level ZNE only
» Include emerging trends impacting ZNE not limited to technology
ZNE Research Roadmap |
40©2017 ITRON CONFIDENTIAL PROPRIETARY
NEXT STEPS
» Develop literature review structure
» Literature review
» Develop stakeholder input structure and guide
» Conduct stakeholder input through surveys, online meetings and interviews
» Compile into the landscape assessment – Jul 2017
» Preliminary gap identification – Aug 2017
» Next meeting with TAC – Sept 2017
ZNE Research Roadmap |