ZNE RESEARCH GAP ANALYSISFirst Technical Advisory Committee Meeting

Apr 5, 2017

2©2017 ITRON CONFIDENTIAL PROPRIETARY

AGENDA1:30 - 4:00pm

» Introductions [10 mins]

» Meeting objectives [5 mins]

» TAC charter [5 mins]

» Background, project scope and objectives [20 mins]

» Proposed Approach [30 mins]

» Discussion [45 mins]

» Next steps [10 mins]

» Wrap up [5 mins]

ZNE Research Roadmap |

3©2017 ITRON CONFIDENTIAL PROPRIETARY

PROJECT TEAM

ZNE Research Roadmap |

Commercial Buildings

» Neil Bulger

» Andrea Traber

» Ryan Sit

Residential Buildings

(SF + MF)

» Dave Springer

» Bill Dakin

» Alea German

Behavior, Plug Loads and other Cross Cutting

» Kristin Heinemeier

» Siva Gunda

» Katherine Bannor

DG + Grid Integration and other Cross Cutting

» Smita Gupta – Project Manager

» Jeremy Smith – assisting PM

» George Simons – Technical advisor

» Mike Ting – Technical advisor

Prime + Overall Project Coordination

Administrative and Coordination Support

Commercial Buildings

» Cathy Higgins

» Ann Edminster

» Kevin Carbonnier

» Webly Bowles

Residential Buildings

(SF + MF)

» Ram Narayanamurthy

4©2017 ITRON CONFIDENTIAL PROPRIETARY

TAC MEMBERS

ZNE Research Roadmap |

Name Organization Title Perspective Representation

Andrew Lee Architecture 2030 Project Manager Commercial design/International

Robert Raymer CBIA Senior Engineer/Technical Director CA residential builder industry

Brad Williams CEC Mechanical Engineer CEC research

Heather Bird CEC Specialist III CEC research

Joshua Croft CEC CAM – CEC PM CEC research

Danny Tam CEC Codes and Standards Codes and Standards

Sasha (Alex) Merigan CPUC ET Program and ZNE Lead CPUC Emerging Tech and ZNE Policy

Steve Selkowitz LBNL Research Lab ZNE Expert Commercial ZNE/National Lab Research

Sandy Mendler Mithun Principal Design Industry

Pat Eilert PG&E Energy Codes & Standards Lead IOU/Codes and Standards

Ramin Faramazi NREL Principal EngineerCommercial Buildings & Thermal Systems Center

Emerging Technologies

5©2017 ITRON CONFIDENTIAL PROPRIETARY

OBJECTIVES FOR THIS MEETING

» Convene TAC and communicate role of the TAC

» Introduce project, background, scope and schedule

» Get input on overall approach and immediate next steps

ZNE Research Roadmap |

6©2017 ITRON CONFIDENTIAL PROPRIETARY

Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May

TAC ROLE AND CHARTERTechnical Advisory Committee

» Advisory role

» Varied perspective to avoid skew, blight sights and pitfalls

» Shape study at various stages

ZNE Research Roadmap |

2017

2018

APRIL 2017Review initial

methodology

SEPTEMBER 2017Review landscape scan/technical

assessment + preliminary gaps

JANUARY 2018Review draft gap analysis

7©2017 ITRON CONFIDENTIAL PROPRIETARY

QUESTIONS

8©2017 ITRON CONFIDENTIAL PROPRIETARY

ZERO NET ENERGY

ZNE Research Gap Analysis |

DOE

Building America

Zero Ready Building

Ultra low energy + renewables

Site Energy

EU

Nearly zero energy buildings

Carbon Neutral

ZEBRA2020.eu

Others

USGBC

Living Futures

CA

Societal benefit

TDV

9©2017 ITRON CONFIDENTIAL PROPRIETARY

ZNE IN CALIFORNIASource: NBI ZNE Watch list

ZNE Research Gap Analysis |

10©2017 ITRON CONFIDENTIAL PROPRIETARY

2008

2013

2015

2017

PATHS TO ZNESource: Integral Group

ZNE Research Gap Analysis |

11©2017 ITRON CONFIDENTIAL PROPRIETARY

PERCEIVED BARRIERS TO ZNESource: NBI Early Adopter Workshops 2015

ZNE Research Gap Analysis |

12©2017 ITRON CONFIDENTIAL PROPRIETARY

» Develop an analysis of the most critical RDD&D gaps that

need to be addressed to achieve California’s goals of zero

net energy buildings for all new construction of residential

buildings by 2020 and for commercial buildings by 2030.

» Results of the analysis will be used by Energy Commission

staff to develop a research roadmap that strategically

targets future EPIC investments in a manner that provides

optimal benefits to Investor-Owned Utility (IOU) electric

ratepayers, and maximizes the use of public research and

development investments.

ZNE Research Roadmap |

PROJECT BACKGROUND

13©2017 ITRON CONFIDENTIAL PROPRIETARY

PROJECT OBJECTIVES

» The goal of this agreement is to develop, in consultation with stakeholders and

subject matter experts, a technical assessment and Research Roadmap that

identifies, describes, and prioritizes key RDD&D needs for achieving the state’s

goals for Zero-Net Energy (ZNE) buildings in a safe, equitable, and cost-beneficial

manner.

» Specifically, the research roadmap must synthesize the input of stakeholders and

experts in order to:

Prioritize research most needed to achieve cost-effective ZNE buildings.

Provide a detailed description of barriers.

Identify performance and cost targets for promising technologies.

Develop critical indicators of success.

ZNE Research Roadmap |

14©2017 ITRON CONFIDENTIAL PROPRIETARY

PROJECT SCOPE

» New Construction ZNE: Residential (emphasis on

multifamily) and Commercial

» Prioritize building types based on criteria with

highest impact in terms of energy and market

penetration and growth

ZNE Research Roadmap |

Source: Technical Feasibility of ZNE in California, 2012

15©2017 ITRON CONFIDENTIAL PROPRIETARY

PROJECT SCOPE

» Focus areas to be covered in technical assessment and gaps analysis include, but are not

limited to:

ZNE Research Roadmap |

» Building energy efficiency technologies

• Lighting

• Heating, Ventilation, and Air Conditioning (HVAC)

• Water efficiency and reuse technologies that also provide

electricity savings

• Building envelope

• Plug loads

• Whole-building strategies such as DC-DC and appliance

electrification

» Behavioral research of current and potential ZNE

building residents.

» Demand response

» Distributed- and community-scale renewables, as

enabler for ZNE

» Smart grid connectivity related to ZNE, such as:

• Interaction between building to electrical grid (B2G),

including system capacity.

• Smart building controls, home area networks, and

information/action displays that give real-time data and

control to the resident and/or building owner.

• Electric vehicle charging and vehicle-to-grid (V2G).

• Controllable loads.

» Energy storage, as enabler to ZNE.

» Public health and safety including indoor air

quality

» Planning and permitting of ZNE buildings

16©2017 ITRON CONFIDENTIAL PROPRIETARY

SCOPE FOR COMMERCIAL BUILDING TYPES

» Priorities driven by:

• Widely applicable

• Critical niche

• Energy use influence

• Opportunity for scaling

• Other regulatory influences

(local ordinances)

Guide future research

that targets ZNE

progression

17©2017 ITRON CONFIDENTIAL PROPRIETARY

SCHEDULE

ZNE Research Roadmap |

ACTIVITY Q1 Q2 Q3 Q4 Q1 Q2

Contract Management and Reporting

TAC team

Final report

Literature review

Interviews with SME and market actors

Compilation of Technical Assessment

Ta

sk 3 Finalize Methodology for Developing

Research Roadmap

Gap Analysis

Research Prioritization

Topical Workshops

Draft Roadmap

Ta

sk 5

Finalize ZNE Research Roadmap

2017 2018T

ask

4T

ask

1T

ask

2

TAC meeting methodolody

Public workshop to present Roadmap

Multiple meetings ontopical areas to collect input on gap analysis and prioritization

Finalize initial methodology

Finalize Roadmap

TAC meeting tech assessment

TAC meeting gaps and priorities

18©2017 ITRON CONFIDENTIAL PROPRIETARY

OVERALL APPROACH

ZNE Research Roadmap |

Expert Input on Research Gaps

and Prioritization

Subject Matter

Experts

Market Actors

TAC team

Public +ZNE Stakeholders

Itron team

Public WorkshopGap Analysis

Research Prioritization

Gap Identification

Landscape scanLiterature Review

& Team Experience

EPIC ZNE Research Roadmap

19©2017 ITRON CONFIDENTIAL PROPRIETARY

KEY DELIVERABLES

» Landscape assessment

• Literature database

• Stakeholder input

» Gap Analysis

• Identification of research gaps

• Prioritization of research

• Identify performance and cost targets

• Develop critical indicators of success

ZNE Research Roadmap |

Conceptualized as an interactive

and multidimensional database

20©2017 ITRON CONFIDENTIAL PROPRIETARY

PROJECT COORDINATION PORTAL

» http://zneroadmap.researchenergy.net/

» Other coordination tools

ZNE Research Roadmap |

DISCUSSION

22©2017 ITRON CONFIDENTIAL PROPRIETARY

LANDSCAPE ASSESSMENT

ZNE Research Roadmap |

Input based on area of

vocation or expertise

Subject Matter

Experts

Market Actors

Compilation of landscape assessment

Stakeholder Input

Literature Review

Residential New

Construction

Commercial New

Construction

EPRI

+

DEG

NBI

+

Integral Group

Itron

+

UC Davis

Itron team

23©2017 ITRON CONFIDENTIAL PROPRIETARY

LITERATURE REVIEW PURPOSE

ZNE Research Roadmap |

The literature review will provide information about which

focus areas already have extensive research and which

areas are in need of further investigation in order to meet

California’s ZNE goals.

Design

Paradigm

Design

Tools

Envelope HVAC Lighting Plug Loads DR Solar Storage …

24©2017 ITRON CONFIDENTIAL PROPRIETARY

LITERATURE REVIEW SOURCES

We will start with research documents from several publicly-

available databases and known resources, including:

» Applicable Laws, Policies, and Background Documents

» CEC EPIC Project Reports

» DOE Office of Scientific and Technical Information Database

» California Measurement Advisory Council (CALMAC) Searchable Database

» Emerging Technologies Coordinating Council (ETCC) Project Reports

» Electric Power Research Institute (EPRI) Research Portfolio

» …

ZNE Research Roadmap |

25©2017 ITRON CONFIDENTIAL PROPRIETARY

LITERATURE REVIEW PROCESS

ZNE Research Roadmap |

Research documents for review will be recommended by both

project team members and stakeholders through the project

website. Reviews will be completed by project team members

based on expertise.

26©2017 ITRON CONFIDENTIAL PROPRIETARY

LITERATURE REVIEW PROCESS

Each document will be reviewed, catalogued,

and tagged by keywords based on which ZNE-

related topic area(s) are addressed.

GENERAL FOCUS AREA(S)BUILDING TYPE(S)

Title

Author

Publisher/Funder

Resource Type

ZNE Research Roadmap |

Grocery ×

Restaurant ×

Process Loads ×

Controls ×

27©2017 ITRON CONFIDENTIAL PROPRIETARY

LITERATURE REVIEW PROCESS

A short write up will be provided to describe how

each focus area was addressed and what

research has been done.

Summary addressing process loads…

FOCUS AREA SUMMARIES

ZNE Research Roadmap |

FOCUS AREA(S)

Process Loads ×

Controls ×

Summary addressing controls…

28©2017 ITRON CONFIDENTIAL PROPRIETARY

RESEARCH LITERATURE DATABASE

All literature reviews will be stored in a database,

searchable by fields and keywords, and available to the

public on the project website.

ZNE Research Roadmap |

DISCUSSION

30©2017 ITRON CONFIDENTIAL PROPRIETARY

» Proposed:

1. Review of existing surveys

2. Sage Input – Initial Interviews

3. Surveys – online and phone – formal set of question

4. Key Industry Events

5. Stakeholder Portal within the team site

Desired Survey Attributes:

» Short and focused

» Questions customized to participant role

» Hybrid style: Quantifiable and qualitative / Directed and

Open style questions

ZNE Research Roadmap |

STAKEHOLDER OUTREACHHow?

31©2017 ITRON CONFIDENTIAL PROPRIETARY

» Industry Experts/Allies representing industry based on

their:

• Body of ZNE experience

• Building type experience (office, education, institutional,

etc.)

• Industry role/perspective

» Inform Surveys:

• How many surveys needed based on granularity of data

desired

• Prioritize topics while keeping surveys short to promote

higher response rate

• Determine levels of representation of each different

audience surveyed

ZNE Research Roadmap |

HOW: 2. SAGE INPUTInitial Interviews to Vet Options

Conduct and Document Outreach

Guide future research that targets ZNE

progression

32©2017 ITRON CONFIDENTIAL PROPRIETARY ZNE Research Roadmap |

STAKEHOLDER OUTREACHWho?

Who’s new?

Who’s needed?

33©2017 ITRON CONFIDENTIAL PROPRIETARY ZNE Research Roadmap |

TAC INPUT ON STAKEHOLDER OUTREACHPossible topics for discussion

1. Methods

2. Extent of inquiry

3. Who’s perspective matters

4. Who’s new – trending in this field?

5. How to weigh and integrate inputWho’s new?

Who’s needed?

Getting beyond

‘what is too expensive’ and

‘what is cool?’

N. Bulger

DISCUSSION

35©2017 ITRON CONFIDENTIAL PROPRIETARY

VISION FOR THE RESULTING GAP ANALYSISInteractive relational database

ZNE Research Roadmap |

GAPS ANALYSIS RESULTS

36©2017 ITRON CONFIDENTIAL PROPRIETARY

GAP ANALYSIS APPROACH

ZNE Research Roadmap |

GAP ANALYSIS

LITERATURE REVIEW

STAKEHOLDER INPUT

CLIMATE ZONE

BARRIERSIDENTIFY

RESEARCH GAPS

RESEARCH PRIORITY

COST AND PERFORMANCE

TARGETS

CRITICAL SUCCESS

INPUTS SYNTHESIZE

37©2017 ITRON CONFIDENTIAL PROPRIETARY

PRIORITIZATIONExample of prioritization excercise

» Scenarios based on ZNE criteria

• All electric

• Mixed fuel

• Community ZNE (vs. site level ZNE)

ZNE Research Roadmap |

Urgent

Before

2020

2021-

2025

2026 -

2030

High

Impact

Medium

Impact

Low

Impact

38©2017 ITRON CONFIDENTIAL PROPRIETARY

KEY QUESTIONS FOR DISCUSSION AND INPUTTo further guide scope – over next 12 months

» View ZNE as more than intent based on code alone (TDV), include operational, construction and

design aspects as well

» How do we frame the scenarios? TDV - GHG based electrification, Mixed fuel (gas + elect),

community vs. individual site

» Confirm looking into Community ZNE vs. site level ZNE only

» Include emerging trends impacting ZNE not limited to technology

ZNE Research Roadmap |

DISCUSSION

40©2017 ITRON CONFIDENTIAL PROPRIETARY

NEXT STEPS

» Develop literature review structure

» Literature review

» Develop stakeholder input structure and guide

» Conduct stakeholder input through surveys, online meetings and interviews

» Compile into the landscape assessment – Jul 2017

» Preliminary gap identification – Aug 2017

» Next meeting with TAC – Sept 2017

ZNE Research Roadmap |

THANK YOU

www.itron.com

Smita [email protected]

509.891.3189