Fiscal Year 2018 Construction Contract Reporting CONTRACT SERVICES DIVISION February 2019

Fiscal Year 2018 Construction Contract Reporting · Number and Dollars (In million) of Projects Awarded During FY18, 735 projects were awarded with $2.12 billion in total contract

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Fiscal Year 2018 Construction Contract Reporting · Number and Dollars (In million) of Projects Awarded During FY18, 735 projects were awarded with $2.12 billion in total contract

Fiscal Year 2018

Construction Contract Reporting

CONTRACT SERVICES DIVISION

February 2019

Page 2: Fiscal Year 2018 Construction Contract Reporting · Number and Dollars (In million) of Projects Awarded During FY18, 735 projects were awarded with $2.12 billion in total contract

FY 2018 Letting Statistics INDEX

Page

❑ Construction Contract Activity 3

❑ Distribution of Letting and Projects 4

❑ Top 10 Prime Contractors 5

❑ Distribution of Prequalified Contractors by Financial Rating 6

❑ Top 10 Work Type Classifications 7

❑ Projects Let by Program Area 8

❑ Project Dollars Let by Program Area 9

❑ Accuracy of Engineer’s Estimates–All program projects Let 10

❑ Accuracy of Engineer’s Estimates – State Trunkline projects Awarded 11

❑ State Trunkline projects vs. All Bids Rejected 12

❑ Development of Design Plans – Number and Dollars 13-14

❑ Unbalanced Bid Review 15

❑ Distribution of Projects Awarded by Region 16

❑ Innovative Contracting – Reported Classifications 17

❑ FY 2018 Project Projections 18

❑ Contract Services Accomplishments and Future Goals 19

◼2

Page 3: Fiscal Year 2018 Construction Contract Reporting · Number and Dollars (In million) of Projects Awarded During FY18, 735 projects were awarded with $2.12 billion in total contract

FY 2018 Construction Contract ActivityBID LETTING FY 2018* FY 2017*

STATS Number of Lettings: 35 27

Projects Let: 768 691

Eng. Est: $2.35 billion $1.34 billion

Low Bid Total: $2.23 billion $1.27 billion

Bids Received: 2,833 2,965

Individual Bidders-Bids Received: 228 229

STATE TRUNKLINE FY 2018* FY 2017*

(Projects Let) 343 projects, 44.7% of total projects 291 projects, 42.1% of total projects

$1.76 billion, or 78.7% of total projects $902.4 million, or 71.3% of total projects

PROGRAM AREA (Projects Let)*

2018 409 Local, 14 Aeronautics, 2 Office of Rail, or 55.3% of the overall 768 projects Let

and $475.2 million in low bid dollars

2017 388 Local, 10 Aeronautics, 2 Office of Rail, or 57.9% of the overall 691 projects Let

$363.1 million in low bid dollars

PROJECTS UNSUCCESSFUL FOR AWARD

Low Bid Rejection/Appeal Low Bid Withdrawals No Bids Received Not Considered Bids All Bids Rejected

2018 0 1 1 3 33 (7 State Trunkline)

2017 5 3 0 5 15 (7 State Trunkline)

PREQUALIFICATION FY 2018 FY 2017

Number of Prequalified Contractors 664 648

CONTRACTS*

Number – Contracts Awarded 735* 676

Contract Total $2.12 billion* $1.27 billion

Top 10 Contracts 72.1% of total dollars* 62.7% of total dollars

PAYMENTS

Payment Estimates 9,434 10,957

Dollars Paid $1.17 billion $1.26 billion

*Data presented in this report includes innovative contract activity◼3

Page 4: Fiscal Year 2018 Construction Contract Reporting · Number and Dollars (In million) of Projects Awarded During FY18, 735 projects were awarded with $2.12 billion in total contract

◼ 35 lettings were held during FY 2018

◼ Number of projects ranged per letting from 1 to 97

OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP

OFFICE OF RAIL 0 0 0 0 1 0 0 0 0 1 0 0

AERO 0 1 0 0 2 0 2 0 7 1 1 0

LOCAL 8 37 15 22 27 35 48 79 67 34 21 16

STATE 15 22 42 28 44 49 28 17 31 38 18 10

Lettings per Month 2 2 3 3 2 4 3 3 3 3 4 3

1

2

3

4

0

10

20

30

40

50

60

70

80

90

100

110

120

NU

MB

ER O

F LE

TTI

NG

S P

ER M

ON

TH

NU

MB

ER O

F P

RO

JEC

TS P

ER M

ON

TH

Distribution of Lettings and Projects

◼4

Page 5: Fiscal Year 2018 Construction Contract Reporting · Number and Dollars (In million) of Projects Awarded During FY18, 735 projects were awarded with $2.12 billion in total contract

TOP 10 Prime ContractorsFiscal years 2017-2018 Comparison

Awarded Contracts

◼5

FY 2018 FY 2017Awarded Contractor Awarded Amount Awarded Contractor Awarded Amount

Oakland Corridor Partners $629,200,000.00 Dan's Excavating, Inc. $218,717,494.15

Dan's Excavating, Inc. $204,745,844.18 C.A. Hull Co., Inc. $170,429,751.80

Toebe Construction LLC $138,124,500.13 Toebe Construction LLC $77,234,092.24

Walsh Construction Company II, LLC $111,715,750.00 Rieth-Riley Construction Co., Inc. $63,512,465.52

Rieth-Riley Construction Co., Inc. $102,444,916.84 Angelo Iafrate Construction Company $62,494,496.12

Interstate Highway Construction, Inc. $89,121,197.57 Michigan Paving and Materials

Company$52,558,542.61

Ajax Paving Industries, Inc. $72,493,730.96 Ajax Paving Industries, Inc. $49,559,251.67

Michigan Paving and Materials Company $62,415,883.84 D. J. McQuestion & Sons, Inc. $37,752,314.50

Anlaan Corporation $60,914,194.65 Anlaan Corporation $33,597,807.52

C. A. Hull Co., Inc. $55,677,308.97 Cadillac Asphalt, L.L.C. $29,846,519.55

TOTAL - Top 10 $1,526,853,327.14 TOTAL - Top 10 $795,702,735.68

2018 Total Contract Dollars $2,118,702,485.95 2017 Total Contract Dollars $1,268,690,217.34

Percent of Total Program 72.07% Percent of Total Program 62.72%

Page 6: Fiscal Year 2018 Construction Contract Reporting · Number and Dollars (In million) of Projects Awarded During FY18, 735 projects were awarded with $2.12 billion in total contract

Distribution of Prequalified ContractorsBy Financial Rating

◼ 664 construction contractors were prequalified during FY 2018

◼ 148 contractors worked on projects as prime (unique contractors)

PREQUALIFICATION

RANGE NUMBER PERCENT NUMBER PERCENT

of Contractors of total Number of Contractors of total Number

$0 - $2,000,000 343 51.66% 322 49.69%

$2,000,001 - $10,000,000 21 3.16% 20 3.09%

$10,000,001 - $20,000,000 57 8.58% 62 9.57%

$20,000,001 - $100,000,000 137 20.63% 151 23.30%

$100,000,001 and Above 106 15.96% 93 14.35%

TOTALS 664 100.00% 648 100.00%

FY 2018 FY 2017

◼6

Page 7: Fiscal Year 2018 Construction Contract Reporting · Number and Dollars (In million) of Projects Awarded During FY18, 735 projects were awarded with $2.12 billion in total contract

TOP 10 Work Type ClassificationsNumber of Prequalified Contractors in each class

WORK

CLASSIFICATION

NUMBER OF

PREQUALIFIED

CONTRACTORS

WORK TYPE DESCRIPTION

Ea 313 Grading, Drainage Structures, and Aggregate Construction

K 226 Sewers and Watermains

J 209 Miscellaneous Concrete Items

I 193 Seeding and Sodding/Turf Establishment

N2 167 Clearing

G 111 Building Moving and Demolition

Ba 109 Concrete Pavement Patching and Widening

Fa 104 Bridges and Special Structures

Cb 97 Plant-Mixed hot Mix Asphalt/Bituminous Paving

Fd 83 Pump Stations

◼7

Page 8: Fiscal Year 2018 Construction Contract Reporting · Number and Dollars (In million) of Projects Awarded During FY18, 735 projects were awarded with $2.12 billion in total contract

◼8

0

100

200

300

400

500

600

700

800

900

1,000

FY 14 FY 15 FY16 FY17 FY18

STATE 348 277 309 291 343

LOCAL 544 490 429 388 409

AERO 31 35 2 10 14

OFFICE OF RAIL 3 3 2 2 2

NU

MB

ER O

F P

RO

JEC

TS

PROJECTS BY PROGRAM AREANumber of Projects Let

FY 2014 - FY 2018

926Totals 805 742

10.03% increase

691 768

Page 9: Fiscal Year 2018 Construction Contract Reporting · Number and Dollars (In million) of Projects Awarded During FY18, 735 projects were awarded with $2.12 billion in total contract

◼ State Trunkline projects represented $1.76 billion, or 78.7%, of the total project dollars ◼9

$0

$200

$400

$600

$800

$1,000

$1,200

$1,400

$1,600

$1,800

FY 14 FY 15 FY16 FY17 FY18

STATE $795.17 $874.15 $879.09 $902.36 $1,757.70

LOCAL $516.22 $424.55 $397.23 $359.40 $423.48

AERO $20.10 $15.95 $0.15 $3.09 $48.75

OFFICE OF RAIL $22.19 $4.82 $13.77 $0.62 $2.98

DO

LL

AR

S (

In M

illio

n)

PROJECT BY PROGRAM AREA Project Dollars Let - 5 Year Comparison

$1,353.68 $1,319.47 $1,290.24Totals $1,265.47

768

691742805926

$2,232.91

Total Number of

Page 10: Fiscal Year 2018 Construction Contract Reporting · Number and Dollars (In million) of Projects Awarded During FY18, 735 projects were awarded with $2.12 billion in total contract

◼ 56, or 16.3%, of the State Trunkline project low bids received were 10% over the engineer’s

estimate of the overall 768 projects let◼10

0.0%

2.0%

4.0%

6.0%

8.0%

10.0%

12.0%

14.0%

16.0%

18.0%

FY14 FY15 FY16 FY17 FY18

STATE 10.37% 10.31% 6.33% 5.50% 16.33%

LOCAL 11.66% 16.65% 7.01% 4.63% 17.85%

AERO 0.32% 0.37% 0.13% 0.43% 14.29%

OFFICE OF RAIL 0.11% 0.00% 0.00% 0.29% 0.00%

Perc

ent

of

Pro

ject

s

Total Projects 768926 805 742 691

Nu

mb

er o

f P

roje

cts

ACCURACY OF ENGINEER ESTIMATES Percent of Projects Let 10%

Over the Engineer's Estimate

Page 11: Fiscal Year 2018 Construction Contract Reporting · Number and Dollars (In million) of Projects Awarded During FY18, 735 projects were awarded with $2.12 billion in total contract

◼ This chart represents the difference of total project dollars awarded above or below the engineer’s estimates for each fiscal year

◼ 49.53% met the FHWA requirement of no greater than 50% for construction contracts to fall within 10% above and below the engineer’s estimate ◼11

Page 12: Fiscal Year 2018 Construction Contract Reporting · Number and Dollars (In million) of Projects Awarded During FY18, 735 projects were awarded with $2.12 billion in total contract

0

50

100

150

200

250

300

350

400

FY 14 FY 15 FY 16 FY 17 FY 18

NU

MB

ER

OF

CO

NT

RA

CT

SSTATE PROJECTS vs. ALL BIDS REJECTED

STATE projects ABR Percent

2.05%5.17

2.912.416.50

◼ Seven, or 2.05% of the 343 State Trunkline projects let, resulted in rejection of all bids

◼12

Page 13: Fiscal Year 2018 Construction Contract Reporting · Number and Dollars (In million) of Projects Awarded During FY18, 735 projects were awarded with $2.12 billion in total contract

274(72.5%) 232

(67.4%)

268(66.5%)

104(27.5%)

112(32.6%)

135(33.5%)

0

50

100

150

200

250

300

350

400

450

FY 2016 FY 2017 FY 2018

Design of STATE TRUNKLINE ProjectsNumber of Projects

MDOT CONSULTANT

403

344

378

◼ MDOT designed 268 projects during FY18 of the 403 projects designed

◼ During FY17, MDOT designed 232 of 344 projects designed◼13

Page 14: Fiscal Year 2018 Construction Contract Reporting · Number and Dollars (In million) of Projects Awarded During FY18, 735 projects were awarded with $2.12 billion in total contract

◼ For FY18, MDOT designed 44.4%, or $491.7 million of the $1.11 billion in total contract dollars

◼ During FY17, MDOT designed 28.0%, or $252.37 million, of the $902.1 million in contract dollars

$337.56 (48.9%) $252.37

(28.0%)

$491.72 (44.4%)

$352.69(51.1%)

$615.67(55.6%)

$0

$200

$400

$600

$800

$1,000

$1,200

FY 2016 FY 2017 FY 2018

CO

NT

RA

CT

DO

LLA

RS

Design of STATE TRUNKLINE ProjectsContract Dollars (million/billion)

MDOT CONSULTANT

$1,107.39

$902.12

$690.25$649.75(72.0%)

◼14

Page 15: Fiscal Year 2018 Construction Contract Reporting · Number and Dollars (In million) of Projects Awarded During FY18, 735 projects were awarded with $2.12 billion in total contract

Unbalanced Bid Review

“Unbalanced” Bidding

❑ State Trunkline and Local Area program projects are randomly selected from each bid letting to participate in an “unbalanced” bidding review

❑ State Trunkline and Local projects ≥ $5 million as the engineer’s estimate are automatically chosen for review

❑ An “unbalanced” bid is classified as either materially or mathematically unbalanced within the pay items of a project as bid

❖ A materially unbalanced bid, for example, would be considered pending correction of a plan quantity error

❖ A mathematically unbalanced bid is more common. For example, a unit price bid as $0.01

Fiscal Year 2018

❑ 751 State Trunkline and Local area projects were let with 261 or 34.75%, selected for review

❑ The 261 projects represented $794.6 million in total low bid dollars

❑ No projects were rejected as a result of unbalanced bidding

◼15

Page 16: Fiscal Year 2018 Construction Contract Reporting · Number and Dollars (In million) of Projects Awarded During FY18, 735 projects were awarded with $2.12 billion in total contract

Projects Awarded by REGION – FY 2018Number and Dollars (In million) of Projects Awarded

▪ During FY18, 735 projects were awarded with $2.12 billion in total contract dollars

▪ FY17 awarded a total of 676 projects with $1.27 billion as the total contract dollars

SUPERIOR, 82 contracts (11.2%)

$101.2 million,6.79%

NORTH, 79 contracts (10.7%)

$82.2 million,5.52%

GRAND, 130 contracts (17.7%)

$186.5 million,12.52%

BAY, 117 contracts (15.9%)

$197.9 million,13.29%

SOUTHWEST, 85 contracts (11.6%)

$90.2 million,6.05%

UNIVERSITY, 101 contracts (13.8%)

$220.8 million,14.82%

METRO, 141 contracts (19.2%)

$1.24 billion,58.53%

◼16

Page 17: Fiscal Year 2018 Construction Contract Reporting · Number and Dollars (In million) of Projects Awarded During FY18, 735 projects were awarded with $2.12 billion in total contract

FY 2018 Innovative ContractingA total of 24 Innovative projects awarded FY 2018 account for the reported $880.8 million in contract dollars.

❑ Contract Award Classifications

Fixed Priced Variable Scope (FPVS)

❖ 15 FPVS contracts at $10.10 million

Design|Build

❖ 3 contracts at $857.8 million (totals include the I-75 Modernization DBFM project outlined below)

Job Order Contracting

❖ 3 contracts at $1.59 million

Modified Low Bid

❖ 1 contract at $4.98 million

CMGC (Construction Manager|General Contractor)

❖ 2 contracts at $6.28 million

❑ I-75 Modernization Design-Build-Finance-Maintain (DBFM) Project

Segment 1 - I-75 Performance Based Tree Replacement

Segment 2 – Design|Build for reconstruction and realignment of I-75 mainline

Segment 3 – Final portion of this project is Design|Build|Finance|Maintain (DBFM)

❖ Selection is Preferred Bidder Designation – Oakland Corridor Partners includes a selection of three qualified contractors

❖ The DBFM procurement allows for the flexibility to fund the project with availability payments spread out over 30 years

❖ This procurement method requires the Oakland Corridor Partners to maintain the construction for 25 years after completion

❖ The construction cost for this project is estimated at $629.2 million

◼17

Page 18: Fiscal Year 2018 Construction Contract Reporting · Number and Dollars (In million) of Projects Awarded During FY18, 735 projects were awarded with $2.12 billion in total contract

FY 2019 Project ProjectionsEffective: October 2018

Let Month Number Estimated Dollars

OCT 15 $51.46

NOV 27 $87.45

DEC 63 $176.95

JAN 56 $129.58

FEB 77 $173.49

MAR 78 $221.53

APR 20 $41.07

MAY 5 $12.28

JUN 2 $0.86

JUL 5 $4.83

AUG 10 $12.84

SEP 5 $32.25

Totals 363 $944.60

◼ Project projections encompass State Trunkline program area only

◼ Projects with a total estimated dollar of $944.6 million are scheduled to be advertised during FY19

◼ Projected projects are classified under work groups of road, bridge, and traffic and safety

◼18

Page 19: Fiscal Year 2018 Construction Contract Reporting · Number and Dollars (In million) of Projects Awarded During FY18, 735 projects were awarded with $2.12 billion in total contract

Contract Services Division

Accomplishments and Future Goals

FY 2018 Accomplishments

❑ Construction prequalification applications are now being received via email

Goals for FY 2019

❑ Electronic signatures of construction contracts remains a goal for FY 2019

➢ Contracts will be electronically transferred to the prime contractor for

electronic signature. MDOT will then electronically sign the contracts to

initiate the start of a project

❑ Develop electronic means for the eligibility to bid process

➢ From paper to paper-less, this process will minimize the need for printing

and storing of hard copies

◼19