Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
FLASHSTACK™️CISCO INTERSIGHT INTEGRATIONYOUR DATA CENTRIC ARCHITECTURE FOUNDATION
Craig Waters | FlashStack Technical Director, Pure Storage Inc. @cswaters1
© 2018 PURE STORAGE INC.2
DevOps Hybrid
M icroservices
IMPACT OF DIGITAL TRANSFORMATION
Applications are the new business drivers.
Multicloudis the new DC paradigm.
Developersare the new customers.
LoBPublic
Virtualized
ITOn Prem
Workload locations
Application evolution
Management and operations
Bare-Metal
© 2018 PURE STORAGE INC.3
TOO MANY PARTS, MOVING TOO FAST
Edge Data center
Multicloud
Risk of silos Manual processes Limited visibility
Customer needs
Seamless data center extension to edge and clouds
Operational simplicity and automation
DevOps friendly
© 2018 PURE STORAGE INC.4
CHALLENGES WE’RE ADDRESSING
Distributed
apps and IT
Physical and virtual sprawl, IoT, microservices
Traditional management
“Building a monster to manage the monster”
Human limitations
Scale, speed, complexity that make modern data centers
unmanageable
© 2018 PURE STORAGE INC.5
STRATEGY FOR NEXT-GENERATION SYSTEMS MANAGEMENT
Connect everything Have machines manage machines
Create actionable insight
Use the cloudCombine insightwith automation
Analyze the telemetry
© 2018 PURE STORAGE INC.6
PURE1PURE STORAGE
© 2018 PURE STORAGE INC.7
GLOBAL SENSOR
NETWORK
REAL-TIME
SCANNINGDATA LAKE AI ENGINE
>20,000CLOUD-CONNECTED
ARRAYS
>TRILLIONDATAPOINTS / DAY
>7 PBTELEMETRY DATA
© 2018 PURE STORAGE INC.8
WHAT IF I UPGRADE HW?
HOW WILL PERFORMANCE & CAPACITY GROW?
HOW CAN I OPTIMIZE RESOURCE
UTILIZATION?
WORKLOAD PLANNER
POWERED BY WORKLOAD DNA
© 2018 PURE STORAGE INC.9
PREDICT THE FUTUREEFFORTLESS PERFORMANCE AND CAPACITY SIZING
HOW WILL PERFORMAN
CE & CAPACITY GROW?
• REDUCE RISK BY FORECASTING WHEN CAPACITY OR PERFORMANCE UPGRADES ARE NEEDED
• INCREASE RESOURCE UTILIZATION BY IDENTIFYING UNDER-USED SYSTEMS
• GET VISIBILITY OF CHANGES AS NEW WORKLOADS ARE DEPLOYED
© 2018 PURE STORAGE INC.10
HARDWARE UPGRADE SIMULATIONMODEL CAPACITY AND PERFORMANCE CHANGES
WHAT IF I UPGRADE HW?
• AVOID OVER PROVISIONING BY SIZING BASED ON YOUR CONSUMPTION TRENDS
• REDUCE RESPONSE TIME TO BUSINESS CHANGES
• SUPPORT STORAGE INVESTMENT DECISIONS WITH AI GENERATED MODELS
© 2018 PURE STORAGE INC.11
PREDICTIVE & PROACTIVE SUPPORTWE’LL SOLVE ISSUES BEFORE THEY IMPACT YOU
FINGERPRINTEACH KNOWN ISSUE
(NOW 100s)
SEARCH EACH ARRAYIN REAL-TIME FOR
ISSUES
MATCH!
YOU ARE NOTIFIED
SUPPORT NOTIFIED,TICKET OPENED
> >!
© 2018 PURE STORAGE INC.12
• QUICKLY IDENTIFY TOP VMS WITH LATENCY ISSUES
• FIND THE PROBLEMATIC VM QUICKLY CORRELATED WITH A VOLUME
• GET COMPLETE VISIBILITY OF LATENCY, BANDWIDTH, AND IOPS
VM ANALYTICSFULL STACK PERFORMANCE METRICS
© 2018 PURE STORAGE INC.13
>_ REST
VM ANALYTICS
META WORKLOAD S I MULATION
P ERFORMANCE AN ALYTICS
GLOBAL DASHBOARD
ACTIVECLUSTER MONITORING PREDICTIVE
SUPPORT
MOBILE DASHBOARD
SUPPORT CASES
S N APSHOT CATALOG
FULL STACK AN ALYTICS
AI -DRIVEN MAN AGEMENT
P REDICTIVE S UPPORT EXP ANDED
ARRAY VIEW
APIs
© 2018 PURE STORAGE INC.14
INTERSIGHTFLASHSTACK™️
© 2018 PURE STORAGE INC.15
CISCO INTERSIGHT DEVICE CONNECTOR
KEY FEATURES
- All FlashArray/Purity versions fully supported
- FlashArray Inventory completeness
- Active Management via Cisco Intersight
- Fixed Workflows/tasks at GA.
In tersight Assist Virtual Appliance
FLASHARRA
Y
FlashArray Device Connector
Roadmap Subject to
Change
BETA PROGRAM
- Open to all existing Essentials SaaS customers
- Not open to customers using Intersight VM
- Open to 90 day evaluation customers via new registration
- Likely open for between 8-12 weeks.
™
© 2018 PURE STORAGE INC.17
INTERSIGHT ACTIVE MANAGEMENTFLASHARRAY ORCHESTRATION AND AUTOMATION
TASKS
- Volume (Create/Resize/Copy/Destroy)
- Host (Create/Delete/Connect/Disconnect [Volume/WWN/IQN])
- HostGroup (Create/Delete/Connect/Disconnect [Volume/Host/Protection Group])
- Protection Group (Create/Delete/A dd/Remove [Host/Target/Volume])
- Snapshots (Create/Restore/Schedule/Disable/ Destroy)
- Pod (Create/Delete/Move In/Out [Volume], A dd/Remove [FlashA rray])
- VolumeGroup (Create/Delete/Move In/Out [Volume])
WORKFLOWS
1. Create VMFS Datastore
2. Delete VMFS Datastore
3. Resize VMFS Datastore
4. A dd Host to Pure Storage FlashA rray
5. Delete host from Pure Storage FlashA rray
6. Create/Delete/Rename Pure Storage FlashA rray HostGroup
7. Remove Pure Storage FlashA rray Host from HostGroup
8. vSphere OVF deployment.
™
© 2018 PURE STORAGE INC.19