3
FLETE RURAL Cantidad 1 Cantidad 2 Total a tra PIEDRA CHANCADA 1/2" 5.852 0.81 6.662

Flete Rural

Embed Size (px)

DESCRIPTION

flete

Citation preview

Page 1: Flete Rural

FLETE RURALCantidad 1 Cantidad 2 Total a transportar

PIEDRA CHANCADA 1/2" 5.852 0.81 6.662

Page 2: Flete Rural

LUGAR

CERRO DE PASCO

DESVIO DE HUACHON

HUACHON

1 BALDE DE 20 LTS. = 0.02 M3 1 M3 = 54 LATAS

1 M3 = 50 BALDES

6.66 M3 = 333 BALDES = 1665 SOLES

FLETE TERRESTRETROCHA DE

60CM - CERRO

FLETE RURAL