A) POR PESO
MATERIALES UNIDAD AFECTO (IGV) PESO UNIT. PESO TOTAL
ALAMBRE NEGRO RECOCIDO # 16 kg 15.82 1.00 15.82
ALAMBRE NEGRO RECOCIDO # 8 kg 15.87 1.00 15.87
CLAVOS PARA MADERA CON CABEZA DE 1" kg 3,057.48 1.00 3,054.42
CLAVOS PARA MADERA CON CABEZA DE 3" kg 9.00 1.00 9.00
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 kg 282.09 1.00 281.81
LADRILLO K.K. DE ARCILLA 9x14x24 CM und 490.00 2.70 1,323.00
CEMENTO PORTLAND TIPO I (42.5KG) BOL 97.04 42.50 4,124.13
YESO EN BOLSAS DE 25 KG. BOL 309.81 25.00 7,744.83
GRASS ITALIANO kg 764.37 1.00 763.61
IMPERM. P/CONCRETO, CHEMA 1 EN POLVO BLS/KG und 6.27 1.00 6.27ASPERSOR EMERGENTE T-BIRD TM-30 INC. ACCESORIOS u 13.00 1.00 13.00
SOLDADURA "CELLOCORD A.P." kg 0.55 1.00 0.55
MADERA TORNILLO p2 272.97 1.45 394.44
MADERA TORNILLO 2" X 2" X 10 pza 2.00 2.50 5.00
MADERA TORNILLO DE 1/2" X 3/4" X 10' pza 1.00 0.94 0.94
MADERA EUCALIPTO p2 1,528.74 1.45 1,681.61
PINTURA ESMALTE SINTETICO gal 0.44 4.50 1.98
PINTURA ANTICORROSIVA EPOX-USO NAVAL gal 0.44 4.50 1.98
ABONO Y/O FERTILIZANTES kg 32,485.73 1.00 32,453.24
OTROS KG 1,500.00 1.00 1,500.00
OTROS: SE CONSIDERA 01 VIAJE DE MATERIALES
MATERIALES COMO: PEGAMENTO, TUBERIA, ACCESORIOS HIDRAULICOS,CORDEL, GIGANTOGRAFIA,
ARCOS, Y OTROS.
PESO TOTAL 50,027.30
B) POR VOLUMEN
EN AGREGADOS Y MADERA
DESCRIPC. UNIDAD AFECTO IGV VOL. UNIT. VOL. TOTALARENA FINA PUESTA EN OBRA m3 0.71 1.00 0.71
TIERRA AGRICOLA PUESTO EN OBRA m3 1,146.56 1.00 1,146.56
ARENA GRUESA m3 4.43 1.00 4.43
PIEDRA CHANCADA DE 3/4" m3 5.67 1.00 5.67
GRAVA PARA FILTRO 2" PUESTO EN OBRA m3 1,261.22 1.00 1,261.22
GRAVA PARA FILTRO 1" PUESTO EN OBRA m3 420.41 1.00 420.41
CANTO RODADO 4" PUESTO EN OBRA m3 1,681.61 1.00 1,681.61
HORMIGON (PUESTO EN OBRA) m3 1.45 1.00 1.45
VOLUMEN TOTAL 4,522.06
CAPACIDAD DEL CAMION (M3)
NUMERO DE VIAJES
REDONDEO 4,522.00
2- FLETE TERRESTRE
UNIDAD QUE DA COMPROBANTE
CAPACIDAD DEL CAMION ( M3 ) 15.00
COSTO POR VIAJE ( S/. ) 350.00
CAPACIDAD DEL CAMION (KG) 10,000.00
FLETE POR KG 0.04
AFECTO IGV SIN IGV
FLETE POR PESO 2,000.00
FLETE POR VOLUMEN -
COSTO TOTAL FLETE TERR. 2,000.00 -
RESUMEN FLETE TOTAL
AFECTO IGV SIN IGV
FLETE TERRESTRE 2,000.00 -
FLETE FLUVIAL -
FLETE EN ACEMILA -
FLETES TOTALES S/. 2,000.00 -
FLETE POR VOLUMEN =
# de viajes * costo/viaje
FLETE POR PESO = Peso
Total * Flete / peso
PROYECTO : "INSTALACION DE UN ESTADIO DEPORTIVO EN EL CENTRO POBLADO DE ACOPALCA, DISTRITO DE HUANCAYO, PROVINCIA DE
HUANCAYO - JUNIN"
COMPONENTE N01 : CAMPO DEPORTIVO
CALCULO DEL FLETE
UNIDAD DE TRANSPORTE
PARA EL CALCULO DEL
FLETE, NO SE
CONSIDERA EL
TRASPORTE DE LOS
AGREGADOS, PUESTO
QUE TODOS LOS
INCLUIDOS EN EL
CUADRO DE LA
IZQUIERDA PRESENTAN
PRECIOS CON EL
MATERIAL PUESTO EN
OBRA.
NOTA: