1 November 2006 Review of Deepwater Floating Structures and Dry Tree Semi Developments

Floating Structure Review

  • Upload
    xhx1928

  • View
    28

  • Download
    1

Embed Size (px)

Citation preview

  • 1November 2006

    Review of Deepwater Floating Structuresand Dry Tree Semi

    Developments

  • 2Deepwater Structures

    Spar

    Industry Accepted Because: Proven - Many years of

    Operating history Functional - Used for a large

    variety of functions, wet or dry tree

    Scaleable Wide range of topsides payloads

    Adaptable Applications worldwide

    Tension Leg Platform (ETLP)

    Semi-submersible (Semi)

  • 3Optimum Application Ranges

    0

    10,000

    20,000

    30,000

    40,000

    50,000

    0 2,000 4,000 6,000 8,000 10,000Water Depth (ft)

    F

    a

    c

    i

    l

    i

    t

    y

    P

    a

    y

    l

    o

    a

    d

    (

    s

    t

    )

    SparsSemisTLP

    Spar

    SemiTLP

  • 4Deep Draft Semi Dry Tree Semi

    DeepDraftDeepDraftTMTM SemiSemi

    ESemi-II

  • 5TLP Design

    Low heave and pitch natural periods (less than 4 seconds)

    Minimum tether tensions

    Minimum bending loads on TLP deck structure to reduce steel

    Offset and set-down motions that can be tolerated by the riser system

    Stability during installation and quayside HUC

  • 6Extended TLP (ETLP) Construction

  • 7ETLP Transit

  • 8Quayside Topsides Installation

  • 9Structural Weight Efficiency Ratio

    Structural Weight Efficiency =

    Total Topsides Payload

    Total Hull Plus Deck Weight

    Total Topsides Payload =

    Weight of all deck equipment and facilities including quarters, drilling systems, etc. Also includes TTR loads, SCR loads and secondary deck steel. Topsides equipment or facilities carried in the hull, and hull ballast earmarked for future expansion are also included.

    Total Hull Plus Deck Weight =

    Structural steel weight of hull, hull marine systems, hull appurtenances and outfitting, and trim ballast. Also includes deck primary structural steel weight.

    Structural Weight Efficiency =

    Total Topsides Payload

    Total Hull Plus Deck WeightStructural Weight

    Efficiency =Total Topsides Payload

    Total Hull Plus Deck Weight

    Total Topsides Payload =

    Weight of all deck equipment and facilities including quarters, drilling systems, etc. Also includes TTR loads, SCR loads and secondary deck steel. Topsides equipment or facilities carried in the hull, and hull ballast earmarked for future expansion are also included.

    Total Hull Plus Deck Weight =

    Structural steel weight of hull, hull marine systems, hull appurtenances and outfitting, and trim ballast. Also includes deck primary structural steel weight.

    Total Topsides Payload =

    Weight of all deck equipment and facilities including quarters, drilling systems, etc. Also includes TTR loads, SCR loads and secondary deck steel. Topsides equipment or facilities carried in the hull, and hull ballast earmarked for future expansion are also included.

    Total Hull Plus Deck Weight =

    Structural steel weight of hull, hull marine systems, hull appurtenances and outfitting, and trim ballast. Also includes deck primary structural steel weight.

  • 10

    Efficiency Ratio Ranges for TLP Designs

    Structural Weight

    Efficiency

    Structural Weight

    Efficiency==

    Total Topsides PyldTotal Topsides PyldTotal Hull + Deck WtTotal Hull + Deck Wt

    Hull Form / LocationDesign Maturity

    Ratio Range

    TLPs in GoM As-Built 0.6 0.8

    ETLPs in GoM As-Built 1.1 1.2

    ETLPs in SE Asia Conceptual 1.4 1.5

    ETLPs in W Africa As-Built 1.3 1.4

  • 11

    Spar Design

    High heave and pitch natural periods (greater than 25 seconds without risers)

    Maximum offset of 7-9% water depth in damaged conditions

    Maximum heel angle less than 10 in intact and damaged condition.

    Wet tow draft shallow enough to offload hull if transport vessel is used

    Structural strength for up-righting during installation.

  • 12

    Spar Construction

  • 13

    Spar Construction

  • 14

    Spar Transportation

  • 15

    Spar Installation

  • 16

    Spar Topsides Installation

  • 17

    Relative Deck Areas

    Spar

    Semisubmersible&

    TLP

  • 18

    Wellbay Layout - TTRs

  • 19

    Riser Tensioner

  • 20

    Design Basis Comparison of Hull Forms

    GoM Environment 60 MBOPD & 200 MMCFD 20-person accommodation Work-over rig Hydro-pneumatic tensioners on TTRs

  • 21

    Metocean Conditions for Comparison

    100-Y ear H u rric an e C o n d itio n sW ATE R D E P TH (ft) 4 ,700

    W AV E SS ig n if ican t W ave H e ig h t (f t) 40 .4P eak P e riod (sec) 14 .2M axim um W ave H e ig h t (ft) 70 .2

    W IN D S - R eferen ced to 10m ab o ve M S L1 -H ou r S usta ined W ind S peed (ft/sec) 128

    C U R R E N T S P E E D (ft/s )S urface 3 .6197 ft 3 .6328 ft 0 .65490 ft 0 .65656 ft 0 .65980 ft 0 .651640 ft 0 .65N ea r-B o ttom 0 .65

  • 22

    Hull Forms and Dimensions

  • 23

    Comparison of Weights and Payloads

    0

    5,000

    10,000

    15,000

    20,000

    25,000

    Tops

    ides

    Lights

    hip

    Moori

    ngs

    SCR

    TTRs

    Balla

    st

    W

    e

    i

    g

    h

    t

    (

    s

    t

    o

    n

    s

    )

    ESEMISparETLP

  • 24

    Tensioner Characteristics

    Offset - Tension Curves

    0

    300

    600

    900

    1200

    1500

    1800

    2100

    -16.0 -12.0 -8.0 -4.0 0.0 4.0 8.0 12.0 16.0

    Stroke (ft)

    T

    e

    n

    s

    i

    o

    n

    (

    k

    i

    p

    s

    )

    TLP ESEMI Spar B-Can

  • 25

    Well Patterns

  • 26

    Surge Comparison

    Surge RAO Comparison

    0.00

    0.20

    0.40

    0.60

    0.80

    1.00

    1.20

    1.40

    0.0 3.0 6.0 9.0 12.0 15.0 18.0 21.0 24.0

    Periods (sec)

    S

    u

    r

    g

    e

    R

    A

    O

    (

    f

    t

    /

    f

    t

    )

    ETLP ESEMI Spar

  • 27

    Pitch Comparison

    Pitch RAO Comparison

    0.00

    0.05

    0.10

    0.15

    0.20

    0.25

    0.0 3.0 6.0 9.0 12.0 15.0 18.0 21.0 24.0

    Periods (sec)

    P

    i

    c

    t

    h

    R

    A

    O

    (

    d

    e

    g

    /

    f

    t

    )

    ETLP ESEMI Spar

  • 28

    Heave RAO Comparison

    0.00

    0.10

    0.20

    0.30

    0.40

    0.50

    0.0 3.0 6.0 9.0 12.0 15.0 18.0 21.0 24.0

    Periods (sec)

    H

    e

    a

    v

    e

    R

    A

    O

    (

    f

    t

    /

    f

    t

    )

    ETLP ESEMI Spar

    Heave Comparison

  • 29

    Motion Response 100-Year Hurricane Intact Condition

    0.00

    4.00

    8.00

    12.00

    16.00

    20.00

    Offset

    (% de

    pth)

    Heave

    Range

    (ft)

    Heel (

    deg)

    Yaw (de

    g)

    Deck

    Acc. (ft

    /sec2)

    R

    e

    s

    p

    o

    n

    s

    e

    ESEMISparETLP

  • 30

    Comparison of Range of Strokes

    -18.00

    -14.00

    -10.00

    -6.00

    -2.00

    2.00

    6.00

    10.00

    14.00

    max u

    pstrok

    e (ft)

    max d

    nstrok

    e (ft)

    max u

    pstrok

    e (ft)

    max d

    nstrok

    e (ft)

    max u

    pstrok

    e (ft)

    max d

    nstrok

    e (ft)

    R

    e

    s

    p

    o

    n

    s

    e

    ESEMISparETLP

    100-Yr Intact

    100-YrMooring Damage

    100-Yr Hull Damage

  • 31

    Range of Top Tension Factors (TTF)

    0.00

    0.50

    1.00

    1.50

    2.00

    2.50

    3.00

    max T

    TF

    min TT

    F

    max T

    TF

    min TT

    F

    max T

    TF

    min TT

    F

    R

    e

    s

    p

    o

    n

    s

    e

    ESEMISparETLP

    100-Yr Intact

    100-YrMooring Damage

    100-YrHull Damage

  • 32

    Selection Considerations for a Deepwater Floater

    Spar ETLP Dry Tree Semi

    Small in-place motions ; ; ;Large open deck areas : ; ;

    Dockside HUC of topsides : ; ;Water depth insensitivity ; : ;

    Minimum at-sea commissioning : : ;Redeployment ; : ;