by the Department of Public Works and Highways (DPWH)presented by DPWH Secretary Rogelio Singson
Citation preview
FLOOD MANAGEMENT MASTER PLAN
FOR METRO MANILA AND SURROUNDING AREAS
-‐ September 2012 -‐
Republic of the Philippines Department of Public Works and Highways
Manila
1
Master Plan for Flood Management in Metro Manila and Surrounding Areas
ObjecMve The Master Plan is prepared to establish the road map/vision for sustainable and effec:ve Flood Management in Metro Manila and Surrounding Areas un:l 2035.
2
Boundary of Study Area and the River Basins
Based on river basins: Pasig-‐Marikina River Basin and Laguna Lake Basin. Total area: 4,354 km2
Total Popula:on: 17.1 M 635 km2
72 km2
69 km2 169 km2
3280 km2
95 km2
15 km2
19 km2
3
Guiding Principles for Master Plan Development
1) Adopt Integrated Water Resources Management Principles and River Basin Approach
2) Develop safe society with resiliency to floods through: • Structural measures for the rivers basins and waterways • Structural measures for Laguna Lakeshore, and • Improvement of urban drainage system 3) Improvement of the Flood Informa:on and Warning System (FIWS) 4) Establish integrated and consistent Flood Risk Management (FRM)
ins:tu:onal system 5) Strengthen community-‐based flood risk management – Land use and
solid waste 6) U:liza:on of runoff waters as water resources, etc. 7) Reforesta:on and watershed management
4
5
Three Major Flooding Occurrence: (1) Huge volume
of water coming from Sierra Madre
(2) Drainage capacity constraints in core area of Metro Manila
(3) Low lying communi:es around Manila Bay & Laguna Lake
1,000
850(750**)
600
Dredging
Heightening of Wall
Small Marikina Dam
Retarding Basin
Flood Wall
Dike and Excavation
RAM & Small Wall
RAM & FPM
FPM
Flood Wall
900
2,000
1,000
Rehabiritation ofFloodway
3,600
RAM & Small Wall
Retarding Basin
1,750
2,900
3,000
1,200
800 (600*)
1,800
2,400
Dam
6
RAM – River Area Management FPM – Flood Plain Management
Rehabilitation of Floodway
Level-‐1 Low
Level-‐2 Medium
Level-‐3 High
Level-‐4 Very High
Total 1-‐4
Overflow from Major rivers 1,210 929 696 175 3,010
Around Laguna Lake 140 7 294 0 441
Flood Risk Map on Danger of Casualty-Risk Level (100-year Flood for the Rivers, and 2009 water level for Laguna Lake)
Population exposed to Flood Risk (unit:1000)
Note: Estimated population in Flood Risk Level-3 & 4.: 773,940 in NCR 294,000 in Laguna Lake
7
Flood CondiMon without Project Exis%ng Condi%on (100-‐year Return Period)
Flood CondiMon with Project River Improvement and Large Flood Control Dam (100-‐year Return Period)
Pasig-‐Marikina River Pasig-‐Marikina River
8
9
Proposed Components and Measures in DICAMM Ø RehabilitaMon of 15 Major
Pumping StaMons
Ø Rehab. of Drainage Channel • Removal of Obstruc:ons
within drainage channels with se`lements
• Dredging and Declogging • Rehab. of Drainage Mains
Ø AddiMonal Drainage Mains / Box Culverts
Laguna Lakeshore: Long-‐list of AlternaMves
River Channel Improvement with RAM (C)Spillway or FloodwayExisting River Channel ConditionLand Reclamation with FPMDike or Land Reclamation with FPMDredgingControl GateDiversion TunnelDiversion ChannelWater Pipe LineRiver FlowExisting RoadRing Road DikeFloodway(Marikina R. to Laguna)
Underground Water StorageImprovement of Drainage System
Marilao
Malabon
Meycauayan
Tullahan
San Juan
Pasig
Marikina
Mangahan
Mahaba
Cainta
Tanay
Sta. MariaParañaque
Zapote
P'que Spillway
Sta. RosaSta. Cruz
Pagsanjan
San Cristobal
San Juan
Im provem ent of St.M aria River
Im provem ent ofPagsanhan River
Spillway to PacificO cean by Tunnel
Im provem ent of Sta.C ruz River
Im provem ent of Sta.Rosa River
Parañaque RiverIm provem ent
Im provem ent of Sta.Rosa River
Parañaque RiverIm provem ent
Im provem ent of SanFuan
Ring Road Dike
Parañaque Spillway
:Partial Land Reclamation
Dredging
Partial Lake Shore Dike &Land Rising
Im provem ent of TanayRiver
10
Improvement of San Juan River
Improvement of Sta. Maria River
OpMons for the Lakeshore Area from Taguig to MunMnlupa
Op:on-‐1: Image of Lakeshore Dike with Road
Op:on-‐2: Image of Raising Lakeshore Land with Road and Future Developments
11
Short-‐listed Structural Mi:ga:on Measures (1/3) No. Item High-
est Flood Risk Level
Target Flood Safety (R.P.)
Total Cost (Mil. Pesos)
EIRR Resettlement
(1000 person)
Beneficiary
(1000 person)
Preliminary Environmental Assess. (except negative impact of resettlement)
1 (VH)
Pasig-Marikina River Improvement (RI) + Dam
4 100-y 198,435 16.4% 331 1,593 Moderate due to some negative
social impact by dam (possible)
2 (H)
Meycauayan RI 3 50-y 14,040 22.9% 35 199 Positive due to improve. envir. (recommended)
3 (H)
Malabon-Tullahan RI
3 50-y 21,635 22.3% 39 298 Positive due to improve. envir. (recommended)
4 (M)
South Parañaque – Las Piñas RI
3 30-y 17,335 12.2% 30 104 Positive due to improve. envir. (recommended)
5 (H)
East Mangahan Floodway (Cainta & Taytay RIs)
3 30-y 25,901 26.8% 25 227 Positive due to improve. envir. (recommended)
Priority (Tenta:ve) VH: Very High, H: High, M: Marginal 12
Short-‐listed Structural Mi:ga:on Measures (2/3) No. Item High-
est Flood Risk Level
Target Flood Safety (R.P.)
Total Cost (Mil. Pesos)
EIRR Resettlement
(1000 person)
Beneficiary
(1000 person)
Preliminary Environmental Assess. (except negative impact of resettlement)
6 (VH)
West Laguna Lakeshore Land Raising
3 60-y 25,185 17.2% 114 114 Positive due to improvement of
environment and potential of
development (recommended)
7 (H)
Land Raising for Small Cities around Laguna Lakeshore
3 60-y 7,158 17.2% 8.8 8.8 Positive (same as 6)
(recommended and to be
studied more)
8 (H)
Improvement of the Inflow Rivers to Laguna Lake
3 30-y 637 N.A. N.A. N.A. Positive due to improve. of environment
(recommended and to be
studied more)
Priority (Tenta:ve) VH: Very High, H: High, M: Marginal 13
Short-‐listed Structural Mi:ga:on Measures (3/3) No. Item High-
est Flood Risk Level
Target
Flood Safet
y (R.P.)
Total Cost (Mil. Pesos)
EIRR Resettlement (1000 person)
Beneficiary
(1000 person)
Preliminary Environmental Assess. (except
negative impact of
resettlement)
9 (H)
Manila Core Area Drainage Improvement
2 10-y 27,257 19.1% 24 270 Positive due to improvement
of environment (recommended
)
10 (M)
West Mangahan Area Drainage Improvement
2 5-y 5,522 11.1% 3.2 25.6 Positive due to improvement
of environment (recommended
)
11 Valenzuela, Obando and Meycauayan (VOM) Improve.(to be studied further)
8,613 (Est. only)
TOTAL 351,718
(1) Priority (Tenta:ve) VH: Very High, H: High, M: Marginal (2) Priority is set by considering 1) severity of floods or flood risk level, 2) cost and economic efficiency (EIRR≧15%), and 3) social and natural impacts and preliminary environmental assessment.
14
Proposed Non-‐Structural Measures 1. Strengthening of the Flood InformaMon and Warning System (FIWS)
• Effec:ve Flood Control Opera:on and Warning System (EFCOS) improvement
• New telemetric rainfall and water level gauging sta:ons
2. Capacity Building for Strengthening Community-‐based FRM • Update and implement Informa:on and Educa:on Campaign (IEC)
programs • Rainfall and water level monitoring by Barangay Disaster Risk
Reduc:on and Management Councils (BDRRMCs) • Construc:on of evacua:on routes and temporary evacua:on centers
3. Improvement of Management InformaMon System (MIS) for Disaster Risk Management • Improvement and development of MIS • Capacity building
4. ReforestaMon and Watershed Management
15
FORT BONIFACIO RETARDING TANK A Model Urban Rainwater Catchment System
The Detention Tank • is not meant to detain water for other uses • is meant to temporarily detain “post development run-‐off” only • should always be empty • is fully automated
Project Location
PADRE BURGOS CIRCLE, FORT BONIFACIO GLOBAL CITY
Apacible
Pedro Gil
13 de Agosto
U.N. Avenue
Estero de paco Pedro Gil to 13 de Agosto Segment
before
DEVELOPMENT: • Market renovation • Dredging • Riprap • slope protection and phytoremediation • Walkway and riprap • SAIR
Present
Apacible
Pedro Gil
13 de Agosto
U.N. Avenue
Estero de paco 13 de Agosto to Apacible Segment
before
After
DEVELOPMENT: • dredging • riprap • slope protection and phytoremediation • Facelifting of Residential Houses • Walkway / linear park
Apacible
Pedro Gil
13 de Agosto
U.N. Avenue
Estero de paco Apacible to UN Ave. Segment
before
Present
DEVELOPMENT: • dredging • riprap • slope protection and phytoremediation • Facelifting of Residential Houses • Walkway/Linear Park