Price & Myers
April 2020
Flood Risk Assessment and Sustainable Drainage Report
Rayners Lane
Flood Risk Assessment and Sustainable Drainage Report
Prepared by:
Reviewed by:
Approved by:
Job Number:
Report Reference:
Dominic Heyna-Francis BEng MSc
Sabrina Ram MEng
Dimitris Linardatos BEng MSc CEng MICE FIHE
28202
445-PAM-XX-XX-RP-C-0001-1
Date Revision Notes/Amendments/Issue Purpose
February 2020 Draft For LBH Review
April 2020 1 For planning
Rayners Lane Page 2 of 28
28202 / Flood Risk Assessment
Revision 1
Contents Page
1.1 Policy Overview
2.1 Existing Drainage
4.1 Flood Risk from Watercourses 4.2 Flood risk from Groundwater 4.3 Flood Risk from Surface Water and Overland Flows 4.4 Flood Risk from Reservoirs 4.5 Summary of Flood Mitigation Measures
5.1 Existing Run-off 5.2 Climate Change 5.3 Proposed Run-off
6.1 Store Rainwater for Later Use 6.2 Infiltration 6.3 Attenuation 6.4 Discharge to Watercourse / Surface Water Sewer / Combined Sewer
Rayners Lane Page 3 of 28
28202 / Flood Risk Assessment
Revision 1
Appendix A Topographical Survey Appendix B Thames Water Sewer Records Appendix C CCTV Drainage Survey Appendix D Development Proposals Appendix E Initial Surface Water Drainage Sketches Appendix F Surface Water Calculations Appendix G Drainage Connection Options Report
Contains Ordnance Survey material © Crown copyright. All rights reserved. Licence number 0100058197
Contains British Geological Survey materials © NERC 2020 All rights reserved.
Acronyms
AEP Annual Exceedance Probability
AOD Above Ordnance Datum
CDA Critical Drainage Area
CIRIA Construction Industry Research and Information Association
EA Environment Agency
FRA Flood Risk Assessment
LBH London Borough of Harrow
LFRMS Local Flood Risk Management Strategy
LLFA Lead Local Flood Authority
NGR National Grid Reference
NPPF National Planning Policy Framework
PPG Planning Practice Guidance
SFRA Strategic Flood Risk Assessment
SINC Sites of Importance for Nature Conservation
SWMP Surface Water Management Plan
TfL Transport for London
TW Thames Water
Rayners Lane Page 4 of 28
28202 / Flood Risk Assessment
Revision 1
Executive Summary
Project Brief
Price & Myers were commissioned by Catalyst Housing and Transport for London to produce a
Flood Risk Assessment (FRA) and Sustainable Drainage Report for the proposed development
at the Rayners Lane Station Car Park, within the London Borough of Harrow (LBH).
The site is situated within a Critical Drainage Area (CDA) and part of the site is in Flood Zone 3a
for Surface water, as defined by the Local Authority. Therefore an FRA is required to assess
the risk of surface water flooding. Furthermore as a result of the development proposals, levels
will be raised in the north-west corner of the site, where there is high surface water flood risk.
Therefore the FRA also assesses flood water storage compensation.
The purpose of this report is to summarise flood risk from all sources, focussing on surface
water flooding and floodwater storage, taking into consideration the land raising. The
proposed drainage strategy for the site is then outlined including a detailed SUDS assessment.
Key Findings
A CCTV drainage survey was completed in October 2019. Surface water from the site was
found to discharge to the ‘Sites of Importance for Nature Conservation’ (SINC) land, where
Smart’s Brook is located. Surface water drainage that serves the retail units to the east of the
site was also found to run through the site. Thames Water (TW) have confirmed that this is not
their asset, therefore TW approval is not required. This surface water drainage will be diverted
to avoid the proposed building footprint and will be maintained by Catalyst Housing.
A foul water drain serving adjacent properties runs through the eastern portion of the site,
close to the vehicular entrance. This drain clashes with the proposed tree pits. Therefore, a TW
sewer diversion application has been submitted to divert this foul water drain run.
The north-west corner of the site is at high risk of surface water flooding and levels will be
raised at this location. A flood compensation scheme has been designed to ensure that surface
water is not displaced elsewhere, on a level for level, volume for volume basis. Therefore, it is
demonstrated that the development proposals will increase flood storage provision, reducing
surface water flood risk at the site location and the surrounding areas. Calculations are
provided within this report.
The site is underlain with London Clay which has very poor porosity properties. Therefore,
infiltration systems are not appropriate at the site location.
Drainage Strategy Summary
The existing surface water outfall to Smart’s Brook could not be located and this will be
investigated further for re-use. However, the initial assessment concludes that a new
connection to Smart’s Brook may be required. The existing outfall will be repaired and if this is
not possible, a new outfall will be constructed. Any new outfall structures require LBH
approval.
Rayners Lane Page 5 of 28
28202 / Flood Risk Assessment
Revision 1
In regards to foul water drainage, as advised by the London Borough of Harrow (LBH) the
preferred option is to pump foul water drainage from the site to the TW public sewers in High
Worple. This does not affect the neighbouring SINC land.
TW may prefer a gravity drainage connection, as the public sewer in High Worple is small in
diameter (229mm). The pumped solution would result in higher peak flows to the public
sewers in comparison to a gravity drainage system. Therefore, an alternative foul water
drainage option has been developed going through the SINC land, in case further investigation
and assessment indicates that this option is feasible and acceptable to the Local Planning
Authority.
The SUDS Hierarchy has been applied to the development proposals and following SUDS
systems will be incorporated: blue roofs, permeable paving, below ground cellular storage and
tree pits for surface water storage. A flow control will be used to restrict surface water runoff
rates to 5 l/s per ha (4.90 l/s for this site), which is less than the Greenfield runoff rate for the
site. Surface water will be restricted to 4.90 l/s up to the 1 in 100 year plus 40% climate change
storm event.
The proposed development will be at low risk of flooding from all sources considering the
mitigation measures and the development proposals significantly reduce surface water runoff
rates from the site. Therefore, the proposals will reduce flood risk at the site location and also
in the surrounding areas, including the neighbouring SINC land.
Rayners Lane Page 6 of 28
28202 / Flood Risk Assessment
Revision 1
1 Introduction
Price & Myers have been commissioned to undertake a Flood Risk Assessment (FRA) for the
proposed development at the Rayners Lane Station Car Park site, within the London Borough
of Harrow (LBH).
This report has been carried out in accordance with the National Planning Policy Framework
(NPPF) and the accompanying Planning Practice Guidance (PPG) “Flood Risk and Coastal
Change”. This report also incorporates advice and guidance from the Environment Agency
(EA), the West London Strategic Flood Risk Assessment (SFRA, February 2018), the Harrow
Local Flood Risk Management Strategy (LFRMS, May 2016) and Surface Water Management
Plan (SWMP, October 2011) as well as CIRIA documents.
The NPPF states that an appropriate FRA will be required for all development proposals of 1 ha
or greater in Flood Zone 1 and for any development within Flood Zones 2 or 3. The EA’s
indicative floodplain map shows that the site is in Flood Zone 1 and the site area is greater than
1 ha.
Part of the site falls within Flood Zone 3a for surface water, as defined in the SWMP and the
site is also situated within a Critical Drainage Area (CDA). Levels will be raised where there is a
high risk of surface water flooding. Therefore, an FRA is required.
This FRA will therefore focus on flooding from surface water and flood water displacement.
This report will also summarise flood risk from all sources and outline the proposed drainage
strategy for the site, including a detailed SUDS assessment.
The Harrow SUDS Proforma can be found at the end of this report, in Appendix J.
1.1 Policy Overview
1.1.1 National Planning Policy (2019)
The National Planning Policy Framework states:
“Major developments should incorporate sustainable drainage systems unless there is clear
evidence that this would be inappropriate. The systems used should:
a) take account of advice from the lead local flood authority;
b) have appropriate proposed minimum operational standards;
c) have maintenance arrangements in place to ensure an acceptable standard of operation for
the lifetime of the development; and
d) where possible, provide multifunctional benefits.”
Rayners Lane Page 7 of 28
28202 / Flood Risk Assessment
Revision 1
Planning Practice Guidance, ‘Flood Risk and Coastal Change’ states:
“The decision on whether a sustainable drainage system would be inappropriate in relation to
a particular development proposal is a matter of judgement for the local planning authority. In
making this judgement the local planning authority will seek advice from the relevant flood risk
management bodies, principally the lead local flood authority, including on what sort of
sustainable drainage system they would consider to be reasonably practicable.”
Planning Practice Guidance, ‘Flood Risk and Coastal Change’ refers to the ‘Non-statutory
technical standards for sustainable drainage systems’. This guidance, produced by DEFRA,
states the following:
“For developments which were previously developed, the peak runoff rate from the
development to any drain, sewer or surface water body for the 1 in 1 year rainfall event and the
1 in 100 year rainfall event must be as close as reasonably practicable to the greenfield runoff
rate from the development for the same rainfall event, but should never exceed the rate of
discharge from the development prior to redevelopment for that event.”
1.1.2 Regional Policy
The current London Plan (2016), Policy 5.13 states:
“A Development should utilise sustainable urban drainage systems (SUDS) unless there are
practical reasons for not doing so, and should aim to achieve greenfield run-off rates and
ensure that surface water run-off is managed as close to its source as possible in line with the
following drainage hierarchy:
1 store rainwater for later use
2 use infiltration techniques, such as porous surfaces in non-clay areas
3 attenuate rainwater in ponds or open water features for gradual release
4 attenuate rainwater by storing in tanks or sealed water features for gradual release
5 discharge rainwater direct to a watercourse
6 discharge rainwater to a surface water sewer/drain
7 discharge rainwater to the combined sewer.”
The draft Intend to Publish London Plan (2019), amends the drainage hierarchy slightly,
splitting attenuation above and below ground. Whilst the Secretary of State has issued a range
of directions on this document, these directions do not relate to this policy.
“ 1. rainwater harvesting (including a combination of green and blue roofs) 2. infiltration techniques and green roofs 3. rainwater attenuation in open water features for gradual release 4. rainwater discharge direct to a watercourse (unless not appropriate) 5. rainwater attenuation above ground (including blue roofs) 6. rainwater attenuation below ground 7. rainwater discharge to a surface water sewer or drain 8. rainwater discharge to a combined sewer”.
Rayners Lane Page 8 of 28
28202 / Flood Risk Assessment
Revision 1
1.1.3 Local Policy
Harrow’s Core Strategy (2012) states that “proposals should aim to achieve Greenfield run off
rates. It is recognised that the feasibility of achieving greenfield run off rates in new
development will be influenced by a range of considerations, including site conditions and
financial viability”.
The West London SFRA (February 2018), Table 4-1 ‘Planning Application and Development
Requirements for Major Developments’ states that “The drainage strategy requires information on the proposed SuDS and surface water runoff discharge destination in line with Policy 5.13 of the London Plan. It also requires supporting calculations on the greenfield and proposed development's peak discharge rates and water storage volumes for different rainfall events. These calculations need to ensure that proposed developments are designed to the Non-statutory technical standards for sustainable drainage systems”.
Section 4.2.4 of the West London SFRA refers to the LBH ‘Standard Drainage Requirements’.
This states the following:
“The development is subject to a limitation on a discharge to no more than 5 l/s/ha from all
impermeable areas, consequently there will be a storage implication and the system should be
checked for no flooding for a storm of critical duration and period of 1 in 100 years”.
Section 5.3.2 of the West London SFRA sets out the requirements for developments within
Flood Zone 3a for surface water:
“Where development is proposed for sites within Flood Zones 3a (surface water), evidence
must be submitted to demonstrate that:
1. There will be no increase of flood risk to properties outside of the development boundary.
2. Consultation has been undertaken with the relevant LLFA to consider potential wider
impacts or benefits the development could have on the local surface water catchment.
3. Relevant strategic documents (such as the Thames CFMP, LFRMS and SWMP) have been
reviewed.
4. The LLFA has been consulted to determine if the development should contribute to any
catchment wide flood alleviation schemes being considered by the LLFA (such as a S106
contribution to wider catchment flood risk management infrastructure).”
Rayners Lane Page 9 of 28
28202 / Flood Risk Assessment
Revision 1
2 Site Description and Location
The site is located within the LBH and is situated to the west of Rayners Lane Underground
Station. The site postcode is HA2 9SJ, with National Grid Reference (NGR) TQ127874, with the
following eastings and northings: 512712, 187494. The nearest watercourse to the site is
Smart’s Brook that runs within the Sites of Importance for Nature Conservation (SINC) land.
Smart’s Brook in turn discharges to Yeading Brook to the west of the site (a tributary of the
River Crane). The site location can be seen below in Figure 2.1 below.
Figure 2.1: Site location (West London SFRA, February 2018)
The site is currently in use as a station car park comprising 251 car parking spaces and the
remaining site area is formed of SINC land. Whilst the SINC land is included within the red line
boundary for this application, the proposals within the SINC are limited to drainage works only.
The site is bounded by Transport for London (TfL) railway lines to the north and residential
gardens to the south and west. Rayners Lane Underground Station and retail units bound the
site to the east.
The development site area assessed for the purposes of surface water runoff calculations in
line with standard methodology and practice is 0.965ha. This area is indicated with a red line
Figure 2.2 overleaf. The SINC land, indicated with a blue line, will drain as existing.
Yeading Brook
Smart’s Brook
Site Boundary
Rayners Lane Page 10 of 28
28202 / Flood Risk Assessment
Revision 1
Figure 2.2: Application boundary areas (KCA, 2020).
The development site falls from east to west, towards the SINC land with levels ranging from
50.68m AOD to 45.01m AOD and the full topographical survey can be found in Appendix A.
The SINC land is accessible from the car park, although it is overgrown and in most areas it
was inaccessible. The Environment Agency LIDAR data was used to assess levels within the
SINC land as spot levels were verified on site where there was access to do so. The LIDAR data
and levels verification can be found in Appendix A.
2.1 Existing Drainage
The TW public sewer records (Figure 2.3 and in Appendix B) show that there are foul and
surface water public sewers in High Worple, beyond the site’s access road to the south. The
TW records do not show any foul water drainage within the site boundary. Several surface
water public sewers discharge to Smart’s Brook upstream of the site.
Figure 2.3: Thames Water Sewer Records (December, 2017).
Smart’s Brook
SINC Land boundary
Development site boundary
Rayners Lane Page 11 of 28
28202 / Flood Risk Assessment
Revision 1
A below ground CCTV drainage survey was carried out in October 2019 (refer to Appendix C)
and this found that the existing car park is served by a piped surface water drainage water
drainage system that drains unrestricted flows to the SINC land, where Smart’s Brook is
located.
The surface water outfall within the SINC land was not identified, as the SINC land was
overgrown. The final drain from the car park was found to have standing water in it, that
prevented these runs from being surveyed. The outfall downstream of the site should be
cleared to enable these runs to be fully surveyed.
It was found that a surface water drain running through the site serves the adjacent properties
to the east of the site. This clashes with the proposed buildings, therefore this sewer is to be
diverted. TW have confirmed that this is not their asset. Therefore, the shared surface water
drainage will remain private and will be maintained by Catalyst.
A 150mm diameter foul water drain was identified in the CCTV drainage survey, that runs
through the south-east entrance of the site. The drain serves the neighbouring properties to the
east of the site. It is therefore classified as a public sewer and it requires diversion, to avoid
clashing with the proposed tree pits. At the time of writing, a TW sewer diversion application
had been submitted for the foul sewer diversion.
Rayners Lane Page 12 of 28
28202 / Flood Risk Assessment
Revision 1
3 Development Proposal
It is proposed that the existing car park is developed to provide new residential
accommodation (Use Class C3) and Sui Generis unit at ground floor and public car park along
with associated works. 128 residential units are proposed in total, in four blocks (A to D).
Blocks B, C and D are all six storeys in height and Block A is five storeys. 75 car parking spaces
are proposed along with 82 TfL Cycle Hub spaces. The existing vehicular access will be
modified to serve the new apartments, commuter car parking and the crane access required by
London Underground. No blocks have basement levels and Figure 3.1 shows the development
proposals. The full plans can be found in Appendix D.
It should be noted that no built form is proposed within the SINC land, to the west of the
development area. Therefore this area has not been considered in this section.
Figure 3.1: Proposed layouts (Top Block Layout, KCA 2020, Bottom Landscape Plan Townshend, 2020)
A small area in the north-west corner of the site will be raised as part of the development
proposals. The existing levels in this area range from 45.010m– 45.500m AOD and this will be
raised to 45.800m– 46.050m AOD, to ensure the building is not at risk of surface water flooding
and to allow access into the building at this location.
Rayners Lane Page 13 of 28
28202 / Flood Risk Assessment
Revision 1
4 Flood Risk Assessment
4.1 Flood Risk from Watercourses
4.1.1 Main Rivers
The EA’s indicative floodplain map shows that the site is located in Flood Zone 1, an area at
low risk of flooding from watercourses. Developments in this flood zone do not have any
restrictions, provided they do not increase the risk of flooding elsewhere.
Figure 4.1: from EA Flood Map for Planning (Flood map for planning service, 2019).
Furthermore, the West London SFRA shows that the site is not at risk of flooding from any of
the main rivers identified (Upper Colne, River Lee, Silk Stream, River Brent, River Crane or
River Pinn).
Therefore, it is concluded that the flood risk from main rivers at the site location is low.
4.1.2 Ordinary Watercourses
The SINC land to the west of the site is known to have flooded in recent years and this was
identified through the public consultation process. When the SINC land was visited on the 20th
January 2020, there was evidence that the SINC land had flooded recently, as plants covered
with silt were observed during the site visit. Smart’s Brook is located within the SINC land and
it is culverted to the north and south of the site location (refer to the TW sewer records in
Appendix B). The SINC land is overgrown and difficult to access. Therefore, any drainage
features within the SINC are not maintainable at present.
Site boundary
Rayners Lane Page 14 of 28
28202 / Flood Risk Assessment
Revision 1
The West London SFRA states that “the risk of flooding from ordinary watercourses is covered
within the ‘surface water’ terminology. This aligns with the inclusion of ordinary watercourse
flood risks within the EA’s Risk of Flooding from Surface Water mapping”. Therefore, the
surface water flood maps have been used to assess the risk of flooding from Ordinary
Watercourses (Smart’s Brook).
The surface water flood maps obtained from the West London SFRA (Figure 4.2) shows the 1 in
100 year flood extents. The surface water flood maps were overlaid onto the topographical
survey to obtain the 1 in 100 year surface water flood level within the development area. This
was found to be 45.500m AOD.
Figure 4.2 West London SFRA Surface Water flood maps - 1% AEP (SFRA, accessed April 2020)
The finished floor levels of block D in this area are raised above this design flood level to
46.050m AOD. To gain access into the building, external levels will also be raised in this area
from 45.010m – 45.500m AOD to 45.800m – 46.050m AOD.
As agreed with LBH, a flood compensation scheme has been provided for displaced flood
water between the levels of 45.010 and 45.500m AOD on a level for level, volume for volume
basis. The table below states the volumes of displaced floodwater in 200mm increments.
Band depth (m AOD) Existing volume within band (m3)
45.010-45.210 1.959
45.210-45.410 18.271
45.410-45.500 16.691
Table 4.1 Volumes of water displaced within the floodplain
The flood compensation tank has been designed in accordance with CIRIA C624 and the
storage tank will provide at least the storage volumes in Table 4.1, to match the site’s existing
flood water storage capacity. The vertical impermeable geomembranes within the
Site boundary
Rayners Lane Page 15 of 28
28202 / Flood Risk Assessment
Revision 1
compensation tank will allow flood water to overtop, once flood water reaches the full height of
the impermeable membrane. This ensures that the volume in the crates behind the
geomembrane remains available for the flood water level it is designed to store water for,
ensuring a level for level flood compensation is provided.
Once the flood water level drops, surface water pipes beneath the tank will take this flood
water to the final private manhole within the development site. This discharges directly to
Smart’s Brook. Therefore, flood water will be returned to the floodplain and the tank will be
emptied for any subsequent flood events.
Manhole covers above access hatches will be provided above each section of the flood
compensation tank to ensure access for cleaning and routine maintenance. Refer to Appendix E
for the initial surface water drainage sketches that show the flood compensation tank
arrangements.
The majority of the proposed storage crates are located within the existing floodplain aiming to prevent flood displacement in the first instance. The voids in the crates will allow water to be stored on site at the same location where it is currently stored. Flood water displacement will occur only where the building is proposed. Therefore, surface water storage crates are provided outside the floodplain to compensate this displaced floodwater.
It should be noted that the surface water flood water maps show that there is no connectivity between the watercourse’s floodplain and the site in the 1 in 30-year storm event within the development area. This shows that the ponded water on site is due to the drainage’s inability to transfer surface water from the site to the watercourse. The flood maps also confirm that the watercourse floods a part of the SINC land in this storm event, confirming that there is not sufficient capacity in its channel to accommodate the flows from the incoming drainage pipes. Therefore, floodwater will drain back to the watercourse through the site’s existing drainage system after the flood event. In the proposed scenario, while some of the floodwater will be able to return directly to the watercourse via the 50mm crates (particularly during storm events with a return period higher than 1 in 30 years), most of it will be temporarily trapped on site (as the flood maps currently show). The proposed outlet pipes for the compensation tank mimic existing conditions, allowing flood water from the crates to return to the watercourse after the flood event.
The existing outfall from the car park to Smart’s Brook could not be identified during the SINC
land site visit. This indicates that surface water from the car park either discharges directly to
the SINC land, or that the pipe is below the water level and possibility below the watercourses
bed (partly or overall). It is also possible that the surface water drain has collapsed or is
overgrown and is not functional. As part of the proposals, this outfall will be repaired if
possible, or replaced.
The existing car park currently discharges unrestricted flows to Smart’s Brook. The existing
runoff rate from the car park is 71.07 l/s for the 1 in 1 year rainfall event and 226.91 l/s for the 1
in 100 year rainfall event. It is proposed to attenuate surface water from the car park to 4.9 l/s,
up to the 1 in 100 plus 40% climate change storm event. This is 46 times less than the existing
rate, for the 1 in 100 year storm scenario. Therefore, the development proposals will
significantly reduce surface water runoff rates from the site, reducing flood risk within the SINC
land.
Rayners Lane Page 16 of 28
28202 / Flood Risk Assessment
Revision 1
To conclude, the land raising and compensatory flood storage, the surface water outfall repair
and SUDs will reduce flood risk from Ordinary Watercourses from ‘high’ to ‘low’.
4.2 Flood risk from Groundwater
Groundwater flooding occurs when water originating from sub-surface permeable strata
emerges from the ground, typically after prolonged rainfall.
GEA Ltd carried out ground investigation works at the Rayners Lane site and this report has
been submitted with the planning application. Beneath a rough asphalt surface course and
subbase, made ground was found to depths of 0.7m to 1.40m below ground level. Beneath
this, a thin layer of firm black, brown and dark grey silty gravelly clay was found across the site
and this was underlain with London Clay.
London Clay generally has a low hydraulic conductivity and therefore does not allow free
movement of groundwater. Furthermore, the SFRA shows that the site has less than 25%
susceptibility to groundwater flooding or increased potential for elevated groundwater, see
Figure 4.3 below.
Figure 4.3: West London SFRA, Areas Susceptible to Groundwater Flooding (West London SFRA, accessed Apr 2020).
As no basement levels are proposed and the SFRA classifies this area as the lowest risk
category, it has been concluded that the flood risk from groundwater is low.
Rayners Lane Page 17 of 28
28202 / Flood Risk Assessment
Revision 1
4.3 Flood Risk from Surface Water and Overland Flows
Surface water flooding occurs when intense rainfall is unable to soak into the ground or enter a
drainage system due to blockages or the capacity of the system being exceeded. Overland
flows can also be generated by burst water mains, failed dams and any failure in a system
storing or transferring water.
The EA’s indicative Surface Water Flooding Map, Figure 4.4 below, shows that the majority of
the development site is at “low” and “very low” risk of surface water flooding. The SINC land
is at high risk of surface water flooding, although no built form is proposed in this area. The
map shows that the northwest corner of the development site is at “high” risk of flooding from
surface water, where levels are locally lower. Figure 4.5 overleaf shows that this area of high
surface water flood risk corresponds to the area denoted as Flood Zone 3a for surface water.
This area will be raised above the 1 in 100 year flood level (45.500m) and a flood compensation
scheme has been designed to ensure that flood water is not displaced elsewhere.
The existing car park is formed of hardstanding, generating high overland flows. This causes
surface water ponding, where the levels are locally lower within the development site. A new
positive surface water drainage system will be installed that can accommodate the 1 in 100
year storm event, plus 40% increase due to climate change. SUDS measures, such as blue
roofs, permeable paving, below ground cellular attenuation and tree pits will reduce overland
flows and surface water flood risk.
Proposed levels have been designed to ensure that in an extreme storm event (greater than the
1 in 100 plus 40% climate change), there are no localised low spots that would be prone to
ponding. Overland flow paths will direct surface water towards the SINC land, where levels are
lower.
Figure 4.4 Environment Agency Surface Water Flood Risk Map (Flood Warning and Information Service, 2020)
Site boundary
Rayners Lane Page 18 of 28
28202 / Flood Risk Assessment
Revision 1
Figure 4.5 West London SFRA Policy Map (West London SFRA, accessed April 2020)
To conclude, the land raising and compensatory flood storage, levels design and SUDS
measures will reduce flood risk from surface water and overland flows from ‘high’ to ‘low’.
Flood Zone 3a Surface Water Site boundary
Rayners Lane Page 19 of 28
28202 / Flood Risk Assessment
Revision 1
4.4 Flood Risk from Reservoirs
The EA provides information on flood risk from reservoirs. Figure 4.6 below shows that the site
is not at risk of reservoir flooding.
Figure 4.6 Environment Agency Risk of Reservoir Flooding Map (Flood warning and Information Service, 2020)
4.5 Summary of Flood Mitigation Measures
New surface water drainage will be installed for the proposed development, that can
accommodate the 1 in 100 year plus 40% climate change storm event. Surface water will be
restricted to 5 l/s per hectare (4.90 l/s for this site). The car park currently discharges
unrestricted flows to the SINC, therefore the proposed development will significantly reduce
surface water run off rates and SUDS will reduce overland flows.
The surface water flood maps show that the 1 in 30 year flood extents within the development
site does not have connectivity to the Smart’s Brook floodplain. Therefore, this flooding is
generated from the car park and the proposed SUDS measures within the development site
will reduce this significantly.
Levels will be raised in the north-west corner of the development site, where there is a high risk
of surface water flooding. This will ensure the proposed building is not at risk of flooding. A
flood compensation scheme has been designed, to match the site’s existing flood water
storage capacity.
The proposed levels have also been designed to ensure there are no localised low spots, prone
to surface water flooding. In an extreme rainfall event (greater than the 1 in 100 plus 40%
climate change), surface water will flow towards Smart’s Brook, where levels are lower.
The outfall from the existing car park to Smart’s Brook was found to be flooded. This will be
investigated further and at the time of writing, the relevant conversations were underway and
ongoing. The surface water drain will be repaired if possible, or replaced. This repair or
replacement will reduce flood risk.
Site boundary
Rayners Lane Page 20 of 28
28202 / Flood Risk Assessment
Revision 1
5 Surface Water Run-off Assessment
5.1 Existing Run-off
The total site area is approximately 1.61ha, however there is no built form within the SINC land
and this will drain as existing. Therefore, this area has not been considered in the surface
water run off calculations. The development area is 0.965 ha of this 0.784 is impermeable.
The existing run-off rate for the design storm events was calculated using the modified rational
method for the impermeable site areas, as shown below:
Qx = 2.78 x i x A
Where ‘x’ is the return period in years, ‘A’ is the catchment area in ha and ‘i’ is the rainfall
intensity in mm/hr as estimated from MicroDrainage software.
Q1ex = 2.78 x 32.61 x 0.784 = 71.07 l/s
Q30ex = 2.78 x 80.07 x 0.784 = 174.51 l/s
Q100ex = 2.78 x 104.11 x 0.784 = 226.91 l/s
5.2 Climate Change
The current EA guidance states that for the years 2070 to 2115 there is a 50% chance the peak
rainfall intensity will increase by 20% or more and that there is a 10% chance it will increase by
40% or more. For this residential development, which is classed as ‘More Vulnerable’, with a
design life of 100 years an allowance of an additional 40% is considered appropriate. This
climate change allowance was confirmed to be appropriate through pre-planning consultation
with the London Borough of Harrow. SUDS will be used to reduce peak surface water flow
rates and this is detailed in Section 6.
5.3 Proposed Run-off
The development proposals will increase impermeable areas on site to 0.85 ha. The Lead Local
Flood Authority has confirmed that surface water runoff rates should be restricted to 5l/s her
hectare and for this site, this is 4.9 l/s. The design rainfall event is the 1 in 100 year plus 40%
climate change.
As requested by the LLFA, the following rainfall characteristics were used in the MicroDrainage
calculations (refer to Appendix F):
M5-60(mm) is 21
Ratio “r” is 0.43
Volumetric Run-off Coefficient is 0.95 for winter and summer.
UCWI of 150 is appropriate when calculating Percentage Runoff (PR) for storage purposes.
Rayners Lane Page 21 of 28
28202 / Flood Risk Assessment
Revision 1
6 SUDS Assessment
In accordance with the London Plan, EA guidelines, the SFRA, and CIRIA documents, surface
water run-off should be managed as close to its source as possible. The London Plan states
that all new developments should aim to reduce run-off to greenfield rates “utilising SUDS
unless there are practical reasons for not doing so”.
The LLFA have stated that surface water should be restricted to 4.9 l/s; this is less than the
greenfield runoff rate for the site (7.39l/s, refer to Appendix F).
The possibility of implementing SUDS at the site was assessed using a hierarchy of preferred
surface water management methods. The following paragraphs discuss the various methods in
order of that hierarchy and evaluate the site’s suitability for each method. Refer to Appendix E
for the initial surface water drainage sketches, showing the arrangement of SUDS.
6.1 Store Rainwater for Later Use
Rainwater harvesting promotes the storage and re-use of rainwater collected from roofs and
hard surfaced areas. This type of system contributes to the reduction of runoff rates and
volumes within a development. However, the capacity of rainwater harvesting systems to
attenuate rainwater depends on the water use within the buildings these systems serve. If there
is no activity in the building and the harvester is full, no attenuation will be provided during a
subsequent storm event. In the worst case scenario, the rainwater harvester will provide no
attenuation.
As blue roofs are being incorporated, there is insufficient space at roof level to accommodate a
rainwater harvesting system. If the blue roofs were replaced with a rainwater harvesting
system, a below ground storage tank would be required to store grey water and a pump would
be required to take grey water up 6 storeys to the flats. It would be difficult to specify and
accommodate such pumps within the building. Considering energy consumption of the pump
and associated risk of failure, the sustainability benefits of the system were not considered to
outweigh the disadvantages, concluding that rainwater harvesting was not deemed
appropriate for the new development.
6.2 Infiltration
The site is underlain with London Clay which is impermeable. Therefore, infiltration systems
are not appropriate at the site location.
6.3 Attenuation
It is proposed to attenuate surface water runoff using blue roofs, permeable paving and tree
pits. 1,292.6m2 of blue roofs will be provided, that are 120mm deep. Permeable pavements will
Rayners Lane Page 22 of 28
28202 / Flood Risk Assessment
Revision 1
be used for all car parking bays, excluding areas where HGV access is required for London
Underground. Eleven tree pits will provide 3.6m3 of surface water storage each and all of the
aforementioned systems will provide additional surface water treatment benefits.
The remaining attenuation volume will be provided in 2 below ground cellular attenuation
tanks (with a total volume of 412m3). There is insufficient space within the site to
accommodate open water features although raingardens have been incorporated into the
development proposals.
6.4 Discharge to Watercourse / Surface Water Sewer / Combined Sewer
Attenuated surface water will discharge to Smart’s Brook, at a peak rate of 4.9 l/s up to the 1 in
100 plus 40% climate change storm event. The existing outfall will be investigated for re-use
and if it is not possible to repair, a new outfall will be constructed. The least intrusive route
from the development site to Smart’s Brook has been agreed with the Ecological Consultant,
should a new outfall be required. Refer to Appendix G that further details the surface water
drainage connection options.
Rayners Lane Page 23 of 28
28202 / Flood Risk Assessment
Revision 1
7 Surface Water Maintenance Strategy
The successful implementation and operation of a SUDS system depends on a robust and clear
maintenance strategy being implemented. The following measures should form part of the
site’s proposed management plan.
It is envisaged that the site drainage will be private and will be owned and maintained by
Catalyst. However, all shared drainage will be constructed to adoptable standards. SUDS will
be maintained by Catalyst and the following will form part of the overall maintenance regime
for the site.
SUDS
Element
Maintenance
Maintenance
Schedule
Required Action Typical Frequency
Blu
e R
oo
fs
Monitoring /
Inspections
Inspect all components including soil
substrate, vegetation, drains, irrigation
systems, membranes and roof
structure for proper operation, integrity
of waterproofing and structural
stability
Annually and after
severe storms
Inspect soil substrate for evidence of
erosion channels and identify any
sediment sources
Inspect drain inlets to ensure
unrestricted runoff from the drainage
layer to the conveyance or roof drain
system
Inspect underside of roof for evidence
of leakage
Regular
Maintenance
Remove debris and litter to prevent
clogging of inlet drains and
interference with plant growth
Half yearly and
annually or as
required
During establishment i.e. year one,
replace dead plants as required
Monthly -but usually
responsibility of
manufacturer
Post establishment, replace dead
plants where > 5% of coverage
Annually in autumn
Remove fallen leaves and debris from
deciduous plant foliage
Half yearly or as
required
Remove nuisance and invasive
vegetation, including weeds
Mow grasses, prune shrubs and
manage other planting (if appropriate)
as required – clippings should be
removed and not allowed to
accumulate
Rayners Lane Page 24 of 28
28202 / Flood Risk Assessment
Revision 1
SUDS
Element
Maintenance
Maintenance
Schedule
Required Action Typical Frequency
Remedial
Actions
If erosion channels are evident, these
should be stabilised with extra soil
substrate similar to the original
material, and sources of erosion
damage should be identified and
controlled
As required
If drain inlet has settled, cracked or
moved, investigate and repair as
appropriate
Rain
Ga
rden
s Regular
Maintenance
Weed spray with environmentally
friendly chemicals
Half yearly
Clear leaves and litter Half yearly
Road sweeping to ensure rain garden
inlets are swept
Half yearly
Plants to be pruned Half yearly
Tre
e p
its
Monitoring /
Inspections
Inspect silt accumulation rates and
establish appropriate removal
frequencies
Half yearly
Regular
Maintenance
Remove litter and debris Monthly, or as
required)
Manage other vegetation and remove
nuisance plants
Monthly at start, then
as required
Inspect inlets and outlets Monthly
Occasional
Maintenance
Check tree health and manage tree
appropriately
Annually
Remove silt build-up from inlets and
surface and replace mulch as
necessary
Annually, or as
required
Water As required - in
periods of drought
Perm
eab
le P
avin
g
Monitoring /
Inspections
Initial inspection Monthly for three
months after
installation
Inspect for evidence of poor operation
and/or weed growth – if required, take
remedial action
Three-monthly, 48
hours after large
storms in first six
months
Inspect silt accumulation rates and
establish appropriate brushing
frequencies
Annually
Monitor inspection chambers Annually
Regular
Maintenance
Brushing and vacuuming -standard
cosmetic sweep over whole surface
Once a year after
autumn leaf fall
Rubbish and litter removal As required
Rayners Lane Page 25 of 28
28202 / Flood Risk Assessment
Revision 1
SUDS
Element
Maintenance
Maintenance
Schedule
Required Action Typical Frequency
Remedial
Actions
Remediate any landscaping which
through vegetation maintenance or
soil slip, has been raised to within
50mm of the level of the paving.
As required
Remedial work to any depressions,
rutting and cracked or broken blocks
considered detrimental to the
structural performance or a hazard to
users, and replace lost jointing
material
Rehabilitation of surface and upper
substructure by remedial sweeping
Every 10 to 15 years or
as required
Att
en
uati
on
Tan
k
Monitoring /
Inspections
Inspect all inlets, outlets, vents,
overflows and control structures to
ensure they are working as they should
Annually or after
severe storms
Regular
Maintenance
Inspect and identify any elements that
are not operating correctly.
Monthly for three
months, then Half
yearly or as required.
Remove sediments / debris from catch
pits / gullies and control structures
Annually, after severe
storms or as required
Remedial
Actions
Repair inlets, outlets, vents, overflows
and control structures.
As required
S
ma
rts B
roo
k O
utf
all
Regular
Maintenance
Remove litter and debris Monthly, or as
required
Cut the grass/ vegetation Monthly during
growing season
Inspect marginal and bankside
vegetation and remove nuisance plants
(for first 3 years)
Monthly, at start, then
as required
Inspect inlets, outlets, banksides,
structures, pipework etc. for evidence
of blockage and/or physical damage
Monthly
Inspect water body for signs of poor
water quality
Monthly from May –
October
Hand cut submerged and emergent
aquatic plants (at minimum of 0.1 m
above pond base; include max 25% of
pond surface)
Annually
Remove 25% of bank vegetation from
water’s edge to a minimum of 1 m
above water level
Tidy all dead growth before start of
growing season
Rayners Lane Page 26 of 28
28202 / Flood Risk Assessment
Revision 1
Remove sediment from any forebay. Every 1–5 years, or as
required
Remove sediment and planting from
one quadrant of the main body of
ponds without sediment forebays.
Every 5 years, or as
required
Occasional
Maintenance
Remove sediment from the main body
of Smart’s Brook when cross sectional
area is reduced by 20%.
With effective pre-
treatment, this will
only be required
rarely, e.g. every 25–
50 years
Remedial
Actions
Repair erosion or other damage As required
Replant, where necessary
Realign rip-rap or repair other damage
Repair / rehabilitate inlets, outlets and
overflows. Table 7.1 SUDS Maintenance Strategy as taken from the CIRIA SUDS Manual
Effective SUDS design must assess all foreseeable risks during construction and maintenance.
These must be mitigated during the detailed design stages where effective design will aim to
avoid, reduce and mitigate risks.
This process will also require input from the principal contractor who will ensure the
construction of SUDS components are carried out in a safe and sustainable manner.
Rayners Lane Page 27 of 28
28202 / Flood Risk Assessment
Revision 1
8 Foul Water Assessment
As outlined in Section 2.1, the site has no foul water drainage at present, with the exception of
the foul water public sewer that crosses the entrance to the site. This discharges to the TW
foul water sewer within High Worple. This is at the high point of the site therefore a gravity
connection to the public sewers is not possible at this location.
As advised by LBH, the preferred foul water drainage option pumps foul water drainage from
the development to this existing connection to the public sewers.
The foul water public sewer in High Worple is small in diameter (229mm). Therefore, TW may
not approve a pumped solution to the public sewers, as this will result in higher peak flows to
the public sewers in comparison to a gravity drainage system. Therefore, the alternative foul
water drainage option has been developed that passes through the SINC land. This would
allow a gravity connection to the foul water sewers in High Worple. Refer to the Drainage
Connection Options report in Appendix G for further details.
For the purposes of this application, the pumped solution has been progressed and this has
been agreed with LBH.
All proposed shared networks will be designed to Adoptable Standards as outlined in Sewers
for Adoption – 7th Edition and in accordance with Build Regulations Part H.
The proposed peak foul water flows from the site are calculated using the figure of 4000
l/dwelling/day as outlined in Sewers for Adoption 7th Edition.
The development will include the construction of 128 residential dwellings which, assuming
total gravity connection, equates to a potential proposed peak foul water flow of:
4000 l/dwelling/d x 128 dwellings x 3 =17.7 l/s
Note: A peaking factor of 3 is used as it is assumed that the building is in use for 8 hours over
a 24 hour time period.
A ‘Pre-development Enquiry’ was submitted to TW to confirm capacity exists within the
receiving public sewers. Their response, contained in Appendix H, shows that the existing foul
water public sewer can accommodate the foul water discharge from the proposed
development with a gravity drainage solution. Further consultation is required with TW to
confirm if the pumped solution is acceptable.
A sewer connection application to TW will be required at the detailed design stages (under
Sections106 of the Water Industry Act 1991) for consent to connect to the public sewers.
Rayners Lane Page 28 of 28
28202 / Flood Risk Assessment
Revision 1
9 Conclusions
The EA’s flood map for planning shows site is situated in Flood Zone 1 and is at low risk of
flooding from main watercourses.
The north-west corner of the site is at high risk of flooding from surface water (Surface Water
Flood Zone 3a) and Ordinary watercourses (Smart’s Brook). The entire site is situated within a
CDA, as defined by the local Borough.
The following flood mitigation measures will be put in place, to reduce flood risk from Smart’s
Brook and from surface water flooding:
• Levels will be raised in the northwest corner of the site, to ensure the building finished
floor levels are above the 1 in 100 year flood level
• A flood compensation tank has been designed to ensure the existing floodplain volume is
maintained
• The existing surface water connection to Smart’s Brook will be repaired, as this was found
to be flooded. If this cannot be repaired, a new fully functional connection from the site to
Smart’s Brook will be formed.
• Blue roofs, permeable paving, below ground cellular storage and tree pits will be used to
attenuate surface water to 4.9l/s, up to the 1 in 100 year storm event, plus 40% climate
change.
The above mitigation measures will reduce surface water and ordinary watercourse flood risk
from ‘high’ to ‘low’. The site is at low risk of flooding from all other sources. Additionally, the
above mitigation measures will also deliver an improvement within the SINC land.
Further investigation is required to confirm if the existing surface water outfall to Smart’s
Brook can be re-used. Any works in close proximity to Smart’s Brook requires LBH consent.
The preferred foul drainage option will pump foul water drainage to the high point of the site,
as agreed with LBH. This will then discharge to the public sewers in High Worple. If TW confirm
a pumped solution is not acceptable, a new gravity connection to the foul water sewer could be
constructed, through the SINC land, that eventually discharges to the public sewer in High
Worple. LBH approval would be required in this instance.
A Section 106 agreement (under the Water Industry Act 1991) is required from TW for all new
connections, prior to construction. All works within the SINC land should be carried out in
accordance with the Ecological Consultants recommendations.
Therefore, the proposed redevelopment has an acceptable flood risk within the terms and
requirements of NPPF. The proposed development surpasses the draft London Plan
requirements, that states developments should discharge at greenfield runoff rates. The
proposed redevelopment also meets LBH requirements, as stated in the West London SFRA
and the Harrow ‘Sustainable Drainage Requirements’ document.
Rayners Lane
28202 / Flood Risk Assessment
Revision 1
Appendix A Topographical Survey
4
5
.
5
0
4
7
.
5
0
4
5
.
5
0
4
7
.
5
0
4
7
.
0
0
4
5
.
5
0
4
7
.
5
0
4
7
.
0
0
4
5
.
5
0
4
7
.
0
0
4
7
.
5
0
4
5
.
5
0
4
7
.
0
0
4
7
.
5
0
4
7
.
5
0
4
7
.
0
0
4
7
.
0
0
4
7
.
5
0
4
5
.
5
0
4
5
.
5
0
4
8
.
0
0
4
8
.
0
0
4
7
.
5
0
4
7
.
0
0
4
6
.
5
0
4
6
.
5
0
4
6
.
0
0
4
6
.
0
0
Sloping ceiling arrows point up
Stair/step arrows point up
LEGEND
STANDARD ABBREVIATIONS
See www.plowmancraven.co.uk for full terms and conditions of contract.
Roof arrows point down
Assumed detail
Silver DCC
3D Topographical Survey
This survey is commensurate with band F accuracy, as outlined in theRICS survey detail accuracy banding table
CLIENT
PROJECT TITLE
80 Cannon StreetLondonEC4N 6HL
Rayners Park StationCar Park
The survey grid shown on this drawing is positioned on Ordnance Survey(OS) National Grid, obtained by multiple network RTK GPS observations
All levels are in metres and are above Ordnance Survey Newlyn Datumderived by multiple network RTK GPS observations
CHECKED
PRESENTATION
DRAWING No.
PC PROJECT No.
SCALE
38949-001T-RAYN-01-1
1:200 @ A0
38949-001 DGR
A
DATE OF ORIGINAL SURVEY June 2019
ISSUE
Due to the inherent instability of paper materials, drawings plotted on paper may bestretched and distorted - dimensions scaled from paper plots should therefore betreated with caution
This drawing has been produced for the purpose of the original commissioning agent.Plowman Craven Limited will accept no responsibility for details that are subsequently found to be theconsequence of undisclosed facts or that were obscured from view at the time of survey or that havebeen altered since the survey.
Inspection Cover
Hand Basin
Fire HydrantFire Hose Reel
Fire Extinguisher
Fire Alarm
GullyG
IC
HBh height
FHR
FEFH
FA
Typ Typical
VP
V
Vent Pipe
Vent
T Tiles
Sky Skylight
Rolled Steel Joist
Recessed Door Mat
Rain Water Pipe
Notice Board
Sump Level
Junction Box
Cover LevelCL
Cables
Cupboard
Concrete Paving Slabs
Duct CoverDuct Height
Down Pipe
Concrete
Electrical Inspection Cover
Electrical Switchgear
Drainage ChannelDrC EIC
ESG
DCDH
DP
CPS
Cup
Cab
Conc RSJ
SL
SB
RWP
Sign Board
RDM Rad Radiator
Brick Retaining Wall
Brick WallBeam Soffit Level
Break Glass Point
Air Conditioner
Arch Level
Arch Spring Level
Cable Television ICCTV
BW BSL
ATM Automated Telling Machine
BRW
BGP
AL
ASL
Pl P
PlasterPost
NBO/H Overhead
MinMax
MinimumMaximum
LJB
Light
A/C
Closed Circuit TelevisionCCTV
HandrailHR
ColumnCol
Water HeaterWH
Pavement LightPLt
AlarmAlm
Illuminated Advertising BoardABIAdvertising BoardAB
BollardB
ConduitCon
Fire Alarm Control PanelFACPFire BellFB
Fire Exit SignFX
Gate Line AttendantGLA
Help PointHP
LIB Line Indicator BoardLP Lamp Post
Passenger Operated MachinePOM
SignS
SCe Sloping CeilingSD Smoke Detector
Smoke OutletSOElectrical SocketSo
Spr SprinklerSTN Survey Control Station (PGM)Sw Electrical Switch
VM Vending Machine
Control PanelCP
CabinetCa
Cable TrayCT
Se Sensor
WorktopWt
Rodding EyeRE
Emergency Train StopETS
Fire Protection EquipmentFPE
Spk Speaker
SAP Station Announcement Point
Tel Public TelephoneTIB Train Indicator Board
Tr Transformer
Electricity MeterEM
Beam HeightBH
Arch HeightAH
Spring HeightSH
FuseF
Hand DrierHD
Electrical Distribution BoardDBDuctD
BatteryBatt
Control BoxCB
M Monitor
CounterCtr
Blanking PlateBP
Data OutletDO
TSo Telephone Socket
LT LUL Telephone
AerialAe
ISSUES & REVISIONS
SHEET LAYOUT
Issue Details By Date
A prov1 01/07/19PCL
38949-001T-RAYN-01-1
Drawing Incomplete and Unchecked
Unless otherwise stated, levels have been taken to finished floor surface
All quoted dimensions are in metres
Drawing units are metres
2 Lea Business ParkLower Luton Road
Plowman Craven House
Tel: +44 (0)1582 765566Email: [email protected]: www.plowmancraven.co.uk
LondonSE1 0AX
115 Southwark Bridge Road
Tel: +44 (0)207 490 7700
HarpendenHertfordshireAL5 5EQ
38949-001T-RAYN-01-2
N
This drawing utilises, and extends, drawing '38949T-RAYN-01A',surveyed by Plowman Craven in December 2017
A prov2 04/07/19PCLDrawing Incomplete and Unchecked
SERVICE ABBREVIATIONS
(AR) Assumed RouteCR Cable Riserd Depth of service (approx)Dd Depth to top of duct(e) Empty Duct
IL Invert Level
(R) From Records(UTL) Unable to Lift without damage(UTT) Unable to Trace
HV High Voltage
(NFI) No Further Information
WD Way Duct
UNKNOWN SERVICE
SURFACE WATER DRAINAGE
INFORMATION CANNOT BE GUARANTEED.
ELECTRO-DETECTION TECHNIQUES HAVE BEEN USED IN THELOCATION OF UNDERGROUND SERVICES. THE RESULTS ARE NOT INFALLIBLE AND TRIAL EXCAVATIONS MUST BE CARRIEDOUT TO CONFIRM SERVICE IDENTIFICATION, POSITIONS ANDPARTICULARLY DEPTHS. ALTHOUGH ALL REASONABLE EFFORTHAS BEEN MADE IN SEARCHING AVAILABLE RECORD DRAWINGS,THE COMPLETENESS OF THE UNDERGROUND SERVICE
Note: Pipe sizes in mmAll drainage 100 unless otherwise stated
ELECTRICITYTELEPHONE
GASWATER
CAUTIONARY NOTES
SERVICE LEGEND
UNDERGROUND CHAMBER
FOUL DRAINAGE
CABLE TV
A 23/07/19PCLOriginal Issue
5
1
.
5
0
5
2
.
5
0
5
2
.
0
0
5
2
.
0
0
5
1
.
0
0
5
1
.
0
0
5
0
.
5
0
5
0
.
5
0
5
0
.0
0
4
8
.
5
0
4
8
.
5
0
4
8
.
5
0
4
8
.
5
0
4
8
.
5
0
4
8
.
5
0
48.50
4
8
.
5
0
4
8
.
5
0
4
8
.
5
0
4
8
.
5
0
48.50
4
9
.
5
0
4
9
.
0
0
4
9
.
0
0
4
8
.
0
0
4
8
.
5
0
4
8
.
5
0
Sloping ceiling arrows point up
Stair/step arrows point up
LEGEND
STANDARD ABBREVIATIONS
See www.plowmancraven.co.uk for full terms and conditions of contract.
Roof arrows point down
Assumed detail
Silver DCC
3D Topographical Survey
This survey is commensurate with band F accuracy, as outlined in theRICS survey detail accuracy banding table
CLIENT
PROJECT TITLE
80 Cannon StreetLondonEC4N 6HL
Rayners Park StationCar Park
The survey grid shown on this drawing is positioned on Ordnance Survey(OS) National Grid, obtained by multiple network RTK GPS observations
All levels are in metres and are above Ordnance Survey Newlyn Datumderived by multiple network RTK GPS observations
CHECKED
PRESENTATION
DRAWING No.
PC PROJECT No.
SCALE
38949-001T-RAYN-01-2
1:200 @ A0
38949-001 DGR
A
DATE OF ORIGINAL SURVEY June 2019
ISSUE
Due to the inherent instability of paper materials, drawings plotted on paper may bestretched and distorted - dimensions scaled from paper plots should therefore betreated with caution
This drawing has been produced for the purpose of the original commissioning agent.Plowman Craven Limited will accept no responsibility for details that are subsequently found to be theconsequence of undisclosed facts or that were obscured from view at the time of survey or that havebeen altered since the survey.
Inspection Cover
Hand Basin
Fire HydrantFire Hose Reel
Fire Extinguisher
Fire Alarm
GullyG
IC
HBh height
FHR
FEFH
FA
Typ Typical
VP
V
Vent Pipe
Vent
T Tiles
Sky Skylight
Rolled Steel Joist
Recessed Door Mat
Rain Water Pipe
Notice Board
Sump Level
Junction Box
Cover LevelCL
Cables
Cupboard
Concrete Paving Slabs
Duct CoverDuct Height
Down Pipe
Concrete
Electrical Inspection Cover
Electrical Switchgear
Drainage ChannelDrC EIC
ESG
DCDH
DP
CPS
Cup
Cab
Conc RSJ
SL
SB
RWP
Sign Board
RDM Rad Radiator
Brick Retaining Wall
Brick WallBeam Soffit Level
Break Glass Point
Air Conditioner
Arch Level
Arch Spring Level
Cable Television ICCTV
BW BSL
ATM Automated Telling Machine
BRW
BGP
AL
ASL
Pl P
PlasterPost
NBO/H Overhead
MinMax
MinimumMaximum
LJB
Light
A/C
Closed Circuit TelevisionCCTV
HandrailHR
ColumnCol
Water HeaterWH
Pavement LightPLt
AlarmAlm
Illuminated Advertising BoardABIAdvertising BoardAB
BollardB
ConduitCon
Fire Alarm Control PanelFACPFire BellFB
Fire Exit SignFX
Gate Line AttendantGLA
Help PointHP
LIB Line Indicator BoardLP Lamp Post
Passenger Operated MachinePOM
SignS
SCe Sloping CeilingSD Smoke Detector
Smoke OutletSOElectrical SocketSo
Spr SprinklerSTN Survey Control Station (PGM)Sw Electrical Switch
VM Vending Machine
Control PanelCP
CabinetCa
Cable TrayCT
Se Sensor
WorktopWt
Rodding EyeRE
Emergency Train StopETS
Fire Protection EquipmentFPE
Spk Speaker
SAP Station Announcement Point
Tel Public TelephoneTIB Train Indicator Board
Tr Transformer
Electricity MeterEM
Beam HeightBH
Arch HeightAH
Spring HeightSH
FuseF
Hand DrierHD
Electrical Distribution BoardDBDuctD
BatteryBatt
Control BoxCB
M Monitor
CounterCtr
Blanking PlateBP
Data OutletDO
TSo Telephone Socket
LT LUL Telephone
AerialAe
ISSUES & REVISIONS
SHEET LAYOUT
Issue Details By Date
A prov1 01/07/19PCL
38949-001T-RAYN-01-1
Drawing Incomplete and Unchecked
Unless otherwise stated, levels have been taken to finished floor surface
All quoted dimensions are in metres
Drawing units are metres
2 Lea Business ParkLower Luton Road
Plowman Craven House
Tel: +44 (0)1582 765566Email: [email protected]: www.plowmancraven.co.uk
LondonSE1 0AX
115 Southwark Bridge Road
Tel: +44 (0)207 490 7700
HarpendenHertfordshireAL5 5EQ
38949-001T-RAYN-01-2
N
This drawing utilises, and extends, drawing '38949T-RAYN-01A',surveyed by Plowman Craven in December 2017
A prov2 04/07/19PCLDrawing Incomplete and Unchecked
SERVICE ABBREVIATIONS
(AR) Assumed RouteCR Cable Riserd Depth of service (approx)Dd Depth to top of duct(e) Empty Duct
IL Invert Level
(R) From Records(UTL) Unable to Lift without damage(UTT) Unable to Trace
HV High Voltage
(NFI) No Further Information
WD Way Duct
UNKNOWN SERVICE
SURFACE WATER DRAINAGE
INFORMATION CANNOT BE GUARANTEED.
ELECTRO-DETECTION TECHNIQUES HAVE BEEN USED IN THELOCATION OF UNDERGROUND SERVICES. THE RESULTS ARE NOT INFALLIBLE AND TRIAL EXCAVATIONS MUST BE CARRIEDOUT TO CONFIRM SERVICE IDENTIFICATION, POSITIONS ANDPARTICULARLY DEPTHS. ALTHOUGH ALL REASONABLE EFFORTHAS BEEN MADE IN SEARCHING AVAILABLE RECORD DRAWINGS,THE COMPLETENESS OF THE UNDERGROUND SERVICE
Note: Pipe sizes in mmAll drainage 100 unless otherwise stated
ELECTRICITYTELEPHONE
GASWATER
CAUTIONARY NOTES
SERVICE LEGEND
UNDERGROUND CHAMBER
FOUL DRAINAGE
CABLE TV
A 23/07/19PCLOriginal Issue
43.179m
45.210m
46.194m
46.688m
44.637m
46.108m
46.602m
43.340m
44.219m
46.025m
46.683m
43.567m
44.181m
46.232m
46.845m
43.864m
44.089m
46.482m
43.363m
43.797m
46.735m
44.452m
44.809m
43.868m
47.195m
44.613m
45.188m
44.577m
47.320m
45.222m
45.765m
45.377m
45.576m
45.302m
46.948m
46.022m
45.825m
45.9
45.75
45.75
45.9
45.6
46.8
1. This drawing is to be read in conjunction with allrelevant Architect's, Engineer's and specialists' drawingsand specifications.
2. Do not scale from this drawing in either paper or digitalform. Use written dimensions only. To check that thisdrawing has been printed to the intended scale this barshould be 50mm long @ A1 or 25mm long @ A3.
3. Health & Safety :All specific drawing notes are to be read in conjunctionwith the project "Information Pack" and "Site Rules".
4. All existing ground levels are taken from theEnvironment Agency LiDAR DSM © Open GovernmentLicenec
Issued for Information1 19.09.19 PJ SR
Ver AmendmentDrawn EngDate
Drawn Eng
Scales
Drawing No Ver
Consulting Engineers37 Alfred Place London WC1E 7DPT 020 7631 5128 F 020 7462 1390E [email protected] www.pricemyers.com
Notes :
Status
RAYNERS LANE
SINC LANDRAYNERS LANE
PJ SR
1:250 at A1 1:500 at A3
SK607 1
FOR INFORMATION NOT FOR CONSTRUCTION
Rayners Lane
28202 / Flood Risk Assessment
Revision 1
Appendix B Thames Water Sewer Records
Thames Water Utilities Ltd Property Searches, PO Box 3189, Slough SL1 4WW DX 151280 Slough 13
[email protected] www.thameswater-propertysearches.co.uk
0845 070 9148
Groundwise Searches Ltd Suite 8 Chichester House 45Chichester Road SOUTHEND ON SEA SS1 2JU
Search address supplied Rayners Lane, High Worple, Harrow, HA2 9SX
Your reference 20883JS Our reference ALS/ALS Standard/2017_3702528 Search date 4 December 2017
Keeping you up-to-date
Knowledge of features below the surface is essential in every development. The benefits of this not only include ensuring due diligence and avoiding risk, but also being able to ascertain the feasibility for any commercial or residential project. An asset location search provides information on the location of known Thames Water clean and/or wastewater assets, including details of pipe sizes, direction of flow and depth. Please note that information on cover and invert levels will only be provided where the data is available.
Thames Water Utilities Ltd, Property Searches, PO Box 3189, Slough SL1 4WW, DX 151280 Slough 13 T 0845 070 9148 E [email protected] I www.thameswater-propertysearches.co.uk
Page 2 of 33
Search address supplied: Rayners Lane, High Worple, Harrow, HA2 9SX, Dear Sir / Madam An Asset Location Search is recommended when undertaking a site development.It is essential to obtain information on the size and location of clean water and sewerage assets to safeguard against expensive damage and allow cost-effective service design. The following records were searched in compiling this report: - the map of public sewers & the map of waterworks. Thames Water Utilities Ltd (TWUL) holds all of these. This searchprovides maps showing the position, size of Thames Water assets close to the proposed development and also manhole cover and invert levels, where available. Please note that none of the charges made for this report relate to the provision of Ordnance Survey mapping information. The replies contained in this letter are given following inspection of the public service records available to this company. No responsibility can be accepted for any error or omission in the replies. You should be aware that the information contained on these plans is current only on the day that the plans are issued. The plans should only be used for the duration of the work that is being carried out at the present time. Under no circumstances should this data be copied or transmitted to parties other than those for whom the current work is being carried out. Thames Water do update these service plans on a regular basis and failure to observe the above conditions could lead to damage arising to new or diverted services at a later date. Contact Us If you have any further queries regarding this enquiry please feel free to contact a member of the team on 0845 070 9148, or use the address below: Thames Water Utilities Ltd Property Searches PO Box 3189 Slough SL1 4WW Email: [email protected] Web: www.thameswater-propertysearches.co.uk
Thames Water Utilities Ltd, Property Searches, PO Box 3189, Slough SL1 4WW, DX 151280 Slough 13 T 0845 070 9148 E [email protected] I www.thameswater-propertysearches.co.uk
Page 3 of 33
Waste Water Services
Please provide a copy extract from the public sewer map. The following quartiles have been printed as they fall within Thames' sewerage area: TQ1287NE TQ1287NW TQ1287SE TQ1387SW TQ1387NW Enclosed is a map showing the approximate lines of our sewers. Our plans do not show sewer connections from individual properties or any sewers not owned by Thames Water unless specifically annotated otherwise. Records such as "private" pipework are in some cases available from the Building Control Department of the relevant Local Authority. Where the Local Authority does not hold such plans it might be advisable to consult the property deeds for the site or contact neighbouring landowners. This report relates only to sewerage apparatus of Thames Water Utilities Ltd, it does not disclose details of cables and or communications equipment that may be running through or around such apparatus. The sewer level information contained in this response represents all of the level data available in our existing records. Should you require any further Information, please refer to the relevant section within the 'Further Contacts' page found later in this document. For your guidance: • The Company is not generally responsible for rivers, watercourses, ponds, culverts
or highway drains. If any of these are shown on the copy extract they are shown for information only.
• Any private sewers or lateral drains which are indicated on the extract of the public sewer map as being subject to an agreement under Section 104 of the Water Industry Act 1991 are not an ‘as constructed’ record. It is recommended these details be checked with the developer.
Clean Water Services
Please provide a copy extract from the public water main map. Following examination of our statutory maps, Thames Water has been unable to find any plans of water mains within this area. If you require a connection to the public
Thames Water Utilities Ltd, Property Searches, PO Box 3189, Slough SL1 4WW, DX 151280 Slough 13 T 0845 070 9148 E [email protected] I www.thameswater-propertysearches.co.uk
Page 4 of 33
water supply system, please write to: New Connections / Diversions Thames Water Network Services Business Centre Brentford Middlesex TW8 0EE Tel: 0845 850 2777 Fax: 0207 713 3858 Email: [email protected] The following quartiles have not been printed as they are out of Thames' water catchment area. For details of the assets requested please contact the water company indicated below: TQ1287NE Affinity Water TQ1287NW Affinity Water TQ1287SE Affinity Water TQ1387SW Affinity Water TQ1387NW Affinity Water Affinity Water Ltd Tamblin Way Hatfield AL10 9EZ Tel: 0845 7823333 For your guidance: • Assets other than vested water mains may be shown on the plan, for information
only. • If an extract of the public water main record is enclosed, this will show known public
water mains in the vicinity of the property. It should be possible to estimate the likely length and route of any private water supply pipe connecting the property to the public water network.
Payment for this Search A charge will be added to your suppliers account.
Thames Water Utilities Ltd, Property Searches, PO Box 3189, Slough SL1 4WW, DX 151280 Slough 13 T 0845 070 9148 E [email protected] I www.thameswater-propertysearches.co.uk
Page 5 of 33
Further contacts:
Waste Water queries
Should you require verification of the invert levels of public sewers, by site measurement, you will need to approach the relevant Thames Water Area Network Office for permission to lift the appropriate covers. This permission will usually involve you completing a TWOSA form. For further information please contact our Customer Centre on Tel: 0845 920 0800. Alternatively, a survey can be arranged, for a fee, through our Customer Centre on the above number. If you have any questions regarding sewer connections, budget estimates, diversions, building over issues or any other questions regarding operational issues please direct them to our service desk. Which can be contacted by writing to:
Developer Services (Waste Water) Thames Water Clearwater Court Vastern Road Reading RG1 8DB Tel: 0800 009 3921 Email: [email protected]
Clean Water queries Should you require any advice concerning clean water operational issues or clean water connections, please contact:
Developer Services (Clean Water) Thames Water Clearwater Court Vastern Road Reading RG1 8DB
Tel: 0800 009 3921 Email: [email protected]
Thames Water Utilities Ltd, Property Searches, PO Box 3189, Slough SL1 4W, DX 151280 Slough 13 T 0845 070 9148 E [email protected] I www.thameswater-propertysearches.co.uk
Page 6 of 33
Asset Location Search Sewer Map - ALS/ALS Standard/2017_3702528 TQ1287NE
The width of the displayed area is 500m and the centre of the map is located at OS coordinates 512750,187750 The position of the apparatus shown on this plan is given without obligation and warranty, and the accuracy cannot be guaranteed. Service pipes are not shown but their presence should be anticipated. No liability of any kind whatsoever is accepted by Thames Water for any error or omission. The actual position of mains and services must be verified and established on site before any works are undertaken. Based on the Ordnance Survey Map with the Sanction of the controller of H.M. Stationery Office, License no. 100019345 Crown Copyright Reserved.
229
229
229
229
229
229
229
229
229
229
229
229
229
229
229
229
229
229
229
914
229
229
229
229
229
914
229
229
914
914
915 SM
AR
TS B
RO
OK
225229
229
229
229
SM
AR
TS B
ROO
K
229
229
914
22
229
914
9501340 SMARTS BROOK
229
914
9501340
229
229
229
229
914
225
229
914229
2 29
229229
229
229
229
229
229
229
229229
229
229
229
229
229
229
229
WW
WW
WW
WWW
WW
WW
W
WWWWWWW
WWWWWWW
WW
WW
WW
WW
WW
WW
WW
WW
WWWWWWWWWWW
WWWWWWWW
!
WW
WW
WW
W0
1
.
%
%
%
%
%
%
%
%
%%
%%
% %
%%
%%
%
% %
%
%%
%%
%%
%%
%%
%
% %
%%
%%
%
%
%%
%%
%
%%
%%
%%
%
%
%
%
%
% %
%%
%
%
%
%
%%
%
%
%
%
%
%
7902
581F
581E
581D58015802
581C
78017802
581B
581A
68016802
59015903
59047904
7903
6901 79016902
88018802
980698049803
9805 98079808
9810980199108804 88058803
9908 9907
990489029902 9905
99068901
9504
9503
86038602 8604
96029601
9603
97069705
9704 9707
9701
6701
6601
6702
6602
7701 7702
7601
7602
8607
8701
8605
8601
9501
95059502
551A
561A
5501
5701
5502
5702
5503
!
!!
= !!!
!
!
!!
!
!
!
!
!
!
!
!
!
!
=
!
!
!
=!
!!
=!
!
=!
!
!
!
!
!
!
!
= !! !
!
!
!!!
!!
! !! !!
!!
=
! ! ! !
!
!
!
!
!
!!
!
!
!
!
!
! ! !
!
!
!
!
!
!
!
!
=
!!
!!
!
!
!
!
!
!
!
=
!
!
!
!
!
!
!
!
=
!
!
=
!
!
=
! !!
!
!
!
!
!
!
!
!
! !
!
=!
=!
!
!
!
!
!
!
! !
! ! !
!=
!!
!
!
!
!
!
!
=!
!
!
! !!!
!!!!
!! !!!
!
!!
!!!!
=! =!=
= !! !!
!!
!
= !!
!! ! !!! !
!!!
! !! !
!!
!
!
!
!
!
!
!
!
!
!
!
= !
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
=!!
! !
!!
!!
! !! !
!!
! !!
!!
! !
!!!!
!
! !
!
!
!
!
!
!
!
=
=
!
=
!
!
!!=!=
!!
!
!
!
!
!
!
!
!
!
!
!
!
!
=!
=!
!
=!! =! =!
!!=! !! =!
!
!
!!! !
! !! ! !
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
=!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!! !
!
!!!
!!
!
! =! =!
!
!
=
!
!
!!
!
!! !
!
!
!
!
!
!!
!!
!!
!!
=
!
=
=
!
!
!
!
=
!
!!
!
!
!
!
!
!
!
!
!
!!
!
!
!
!
!
!
!
!
!
=
!!
= !
!!
=
!!
=
=
!
!
=
! !
=
=
=
!
1
6
8
2
4
7
to
11
Allotment Gardens
(LU)
10
28
3515
57
21
20
42
54
34
56
52
47
37
36
46
14
13
65
25
49
18
33
55
23
31
79
12
68
41
40
66
69
77
87
74
62
53
45
59
43
24
32
27
Pond
House
LB
SL
WorksAlpha
WAY
Friends
SB
Car Park
346
416
375371
428
424
377381
395433
297
467
396
301
456
325
374352
463
348
345
422
461
450434
454
430
437464
458
448
THE
AVE
NU
E
Und
SOU
TH CLOSE
WE
ST AV
EN
UE
CE
NTR
AL AVE
NU
E
RAYNERS LAN
E
426aN
EWLY
N G
ARD
ENS
Bank
TCB
45.1m
46.0m
49.7m
46.9m
Shelter
SchoolCollege
MP 1.25
Sand Drag
THE CROFT
THE
CLO
SE
11
1
54
1
14
Bank
18
1
SL
35
2
52
37
46.0m35
331
SL
15
47
15
66
1
42
10
45.1m
15
21
SL
11
28
25
35
28
21
2
1
15
2
69
11
11
1
1
20
21
18
11
11
20
28
35
142
14
SL
Meeting
344340
431
387385
367369
305303
33
323
376
350
418
343
420
459
414
412
436
394
432
435
446
VILLAGE
Rayners Lane Station
DO
WN
S A
VEN
UE
387 to
to 426c
3334a
El Sub Sta
BuckinghamPreparatory
to
THE
CLO
SE
to
Thames Water Utilities Ltd, Property Searches, PO Box 3189, Slough SL1 4W, DX 151280 Slough 13 T 0845 070 9148 E [email protected] I www.thameswater-propertysearches.co.uk
Page 7 of 33
NB. Levels quoted in metres Ordnance Newlyn Datum. The value -9999.00 indicates that no survey information is available
Manhole Reference Manhole Cover Level Manhole Invert Level 971D 99FH 9906 9907 99BF 99BG 99BI 99BH 991A 99FD 99FE 88CE 88CD 88BG 88BI 88BH 88BF 88AD 89AE 88AE 88CH 8805 88AF 9810 98AG 9804 9803 99AF 99AH 9801 9910 98AF 9806 9805 991B 991C 98FC 9908 98FA 98FB 98ED 9807 98DH 9808 98DJ 98DI 98CB 98CF 98CE 98CD 98CC 98BG 97MD 97EC 97LA 97EB 97ME 97MF 97MG 8801 87NR 87NS 87NT 97NQ 97NP 97OC 97OB 97OD 97OA 97BE 97BF 97BG 97BH 97BI 97BJ 97CA 97DA 97DB 97MI 981A 9707 971B 9701 971A 97MH 87AH 86BA 86BG 87LR 87LW 86AJ
n/a n/a 47.74 46.17 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 46.43 n/a 46.41 n/a 45.64 45.62 n/a n/a 46.47 46.47 n/a 45.64 45.64 n/a n/a n/a 46.18 n/a n/a n/a 45.6 n/a 45.59 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 46 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 46 n/a 45.77 n/a n/a n/a n/a n/a n/a n/a n/a
n/a n/a 45.65 45.08 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 45.07 n/a 44.54 n/a 44.78 44.14 n/a n/a 45.2 44.76 n/a 44.6 43.83 n/a n/a n/a 44.56 n/a n/a n/a 44.85 n/a 44.15 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 44.57 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 43.67 n/a 43.02 n/a n/a n/a n/a n/a n/a n/a n/a
Thames Water Utilities Ltd, Property Searches, PO Box 3189, Slough SL1 4W, DX 151280 Slough 13 T 0845 070 9148 E [email protected] I www.thameswater-propertysearches.co.uk
Page 8 of 33
Manhole Reference Manhole Cover Level Manhole Invert Level 86JA 86MA 86CD 87LY 96ME 97LZ 96MD 96BJ 9706 97LX 97MC 9705 9704 96SB 96SG 96SF 96SD 96CI 96CB 96CD 9603 79BD 79BE 8901 89BG 89BH 89FF 69BB 69BJ 69BD 69BF 69AF 69BC 69BE 79GC 79FG 79FH 79GD 7901 7902 7904 7903 79EA 79DF 79DH 79DJ 79DG 79DI 79CE 79CD 59BG 59BF 59BE 5903 5904 591B 591A 69CJ 69DC 69CI 69DA 69DD 69DB 6901 6902 99AE 99ED 89CD 89CC 89DC 79AJ 89EI 89EH 99DC 89EG 99DD 89CB 89CA 89DB 79BA 89EF 89EE 79BB 89BI 89BJ 89AB 79BC 8902 89FE 9904 9902 9905 7801
n/a n/a n/a n/a n/a n/a n/a n/a 45.32 n/a n/a 45.33 45.39 n/a n/a n/a n/a n/a n/a n/a 49.11 n/a n/a 48.52 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 48.8 48.81 48.15 48.17 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 47.68 47.67 n/a n/a n/a n/a n/a n/a n/a n/a 49.04 49.05 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 47.59 n/a 47.81 47.85 47.81 47.44
n/a n/a n/a n/a n/a n/a n/a n/a 44.1 n/a n/a 43.45 42.96 n/a n/a n/a n/a n/a n/a n/a 47.45 n/a n/a 46.83 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 46.67 46.49 46.38 46.15 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 45.66 45.87 n/a n/a n/a n/a n/a n/a n/a n/a 46.65 46.62 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 45.88 n/a 45.96 45.58 46.19 45.78
Thames Water Utilities Ltd, Property Searches, PO Box 3189, Slough SL1 4W, DX 151280 Slough 13 T 0845 070 9148 E [email protected] I www.thameswater-propertysearches.co.uk
Page 9 of 33
Manhole Reference Manhole Cover Level Manhole Invert Level 78CD 78FE 7802 78FF 68DG 68BD 78CC 6801 78FD 78FC 6802 68EI 68EJ 78DE 78DF 68CD 68CC 79FB 69DF 69DE 79CG 79CF 69BH 69BG 79FA 79EJ 78AI 78BA 78AJ 79AI 88FI 88FJ 88GA 89DA 88GH 88FH 88FG 8803 8804 8802 89CF 88EI 89CE 88EJ 88EC 88ED 88EF 88EH 88EB 88EE 88EG 88CG 88CF 77BJ 7701 7702 77DC 67BA 67AJ 77FA 77EF 77EE 67AH 78EC 78ED 78BE 78BD 68AE 68AD 78FI 78FJ 78CH 78CG 68BG 78FG 78FH 78CE 78CF 68BE 68BF 57BC 57BB 57AE 581A 581B 581F 581G 581D 581E 581C 5701 5901 57AF
n/a n/a 47.45 n/a n/a n/a n/a 48.01 n/a n/a 48.03 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 47.35 47.32 46.03 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 46.5 46.53 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 46.56 47.64 n/a
n/a n/a 45.6 n/a n/a n/a n/a 45.86 n/a n/a 45.72 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 45.73 45.47 44.33 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 44.79 44.54 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 42.9 45.97 n/a
Thames Water Utilities Ltd, Property Searches, PO Box 3189, Slough SL1 4W, DX 151280 Slough 13 T 0845 070 9148 E [email protected] I www.thameswater-propertysearches.co.uk
Page 10 of 33
Manhole Reference Manhole Cover Level Manhole Invert Level 5801 5702 5802 57AG 56BD 56BA 56BC 56AJ 56AH 56BB 68DH 68DJ 68DI 671B 68EA 68EB 67CF 67CD 68CH 67CC 67CE 671A 67CG 6701 6702 6601 6602 67AI 66AI 66AH 66AE 66AG 66AF 7601 7602 76OG 66BE 66BD 66BC 76OF 66BA 66BB 66BH 77DG 77DF 67BD 77CE 77CC 77CD 77DE 77DD 67BC 67BB 77CB 77CA 76NB 76NO 771BTQ 76NA 76MU 76NC 76MX 76MV 76MY 76MS 76MW 76MT 76KI 76KJ 76KH 76MP 76MR 76MQ 76MN 761STQ 76AJ 87NH 87NK 86FH 87NG 87NF 86FG 86FF
47.31 46.62 47.32 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 47.25 47.26 46.35 46.22 n/a n/a n/a n/a n/a n/a 44.87 44.78 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
45.37 42.6 45.07 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 44.74 44.56 43.21 42.72 n/a n/a n/a n/a n/a n/a 43.53 42.68 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
The position of the apparatus shown on this plan is given without obligation and warranty, and the accuracy cannot be guaranteed. Service pipes are not shown but their presence should be anticipated. No liability of any kind whatsoever is accepted by Thames Water for any error or omission. The actual position of mains and services must be verified and established on site before any works are undertaken.
Thames Water Utilities Ltd, Property Searches, PO Box 3189, Slough SL1 4W, DX 151280 Slough 13 T 0845 070 9148 E [email protected] I www.thameswater-propertysearches.co.uk
Page 11 of 33
Asset Location Search Sewer Map - ALS/ALS Standard/2017_3702528 TQ1287NW
The width of the displayed area is 500m and the centre of the map is located at OS coordinates 512250,187750 The position of the apparatus shown on this plan is given without obligation and warranty, and the accuracy cannot be guaranteed. Service pipes are not shown but their presence should be anticipated. No liability of any kind whatsoever is accepted by Thames Water for any error or omission. The actual position of mains and services must be verified and established on site before any works are undertaken. Based on the Ordnance Survey Map with the Sanction of the controller of H.M. Stationery Office, License no. 100019345 Crown Copyright Reserved.
22922
9
229
229
9
29
762
991
762
229
762
458
991
PIN
NE
R R
EL I
EF
SE
WE
R
381
762
229
178
381
229
762
229
178
229
229
305
229
229
229
229
229
229305
229
152
152
305
229
229229
229
229
1067
1067
PIN
NE
R R
ELI
EF
SE
WE
R
458
458
381
914
914
RO
XBO
UR
NE P
ARK
SEW
ER
229
914
RO
XBO
UR
NE P
ARK
SEW
ER
229
229
229
229
1350
150
150
300
150
229
1067
229
229
1067
PIN
NER
REL
IEF
SEW
ER
914 ROXBOURNE PARK SEWER914
2291350 STORAGE PIPE
150
225
225
150
1350 STORAGE PIPE
150
150
VV
! !
!
!
!
"
.
1
%
1
11
1
1
%
%
%
%
%
%
%
%
%
%
%%
%%
%%
%%
%%
%%
%
%
%
%%
%
%
%
%
%
%
%
%
%
%
%
%
% %
%
%
%%
%
%
%
%
%
%
%
%%
%
%
%
%
%
%
%
%
%%
%
%
%
%
%%
%
%
% %
%%
% %
48014802
3901 49023902 49013903
01
0906
0905
091B
0903
0902
0901091C
18071806
1901B
1801B
1802
1804
191B
1805
2803
191A
2802
1801A
2905
2804
291A
2902B
2801
2901B
2903
2805
2902A
2807
2901A
271A
281A
2808
3904
2701
381C
381B
381A
4502A
0509 1509 4502B 4501B
1501B
45050502
05061507
461A1601A
1601B
1603
1706
1701A
371A371B
1701B1702
1705
3701371C17030702
17040701
34021512 1519
0508
050415061521 1518
4506
1502B 2501A
4601B
4501A
4701A
4703
0505
0501
0503
0507
3
! !
=!
!
!! ! !!==! =! ! !! =
! !!! !
!!!
! = !!
!
!!
!! !
= !! =
=!
= !!!
!
!!
! !!
! !!!
!
!
!!!
! !!!
!!
!
!!
=!
!!
=! !!!
!!
! !
!!
!
! !
!
!
!
!
!
=
=
!
!
!
!
!
!
=
!
=
!
!
!
!
! ! !
=!
=!
!
!
=!
!
!
=!
!=
!
!
=
=
!
!
= !
!=
!=
! !
=
!!=!!
!!
!
=
!
!
=
!
!
!!
!
!
!!
!
!
!
!
!!
!
!
!
!
!
!
!!
!
!!
=
!
!
!
!
!
!
!
!
!
!
!
!
=
!
!
!
! =
!
!!
!
!
!
=
!
!
=
!
!
=
=
!
!
=
!
!
!
!!
!
!
= =
!
=
!
=
=!!
!
!
!!
!!
!!
!=!
!
=
=
!!
!
!
!
!
!!!!!
!! !!!
=
!
!!!
!!!
!!!!! !! !!
!
!
!=
!
!
!
!
=
!
!
!
=
!!
!
!
=
!
!
!
!
!!
!!
=
=
=
!
! !
!
!
!
!!
! !!
!
!
!
!!
!
!
!
!=
!
! !!
!
!
!
!
=
!!!!
!!!!
1
2
6
7
3
5
8
4
9
Broo
k
Yead
ing
11
Telephone Exchange
PW
29
3026
22
16
24
91
80
14
15
90
70
33
43
12
37
10
20
38
21
32
78
1325
28
Lodge
LB
SL
115FB
CS
227
101
225
155
130
120
251
157
10024
4139
149
245
103
235
140
132
129
159
232
243
242
AVENUE
THE
GLE
N
Al lotment Gardens
Und
DURLEY AVENUE
LULWORTH DRIVE
CAN
NO
N L
AN
E
101a
STIRLING AVENUE
TRES
COE
GAR
DENS
VILLAGE WAY
EXCHANGE WALK
1 to 8
ESS
Outfal l
Nursery
9 to
20
47.9m
45.1m
47.5m
45.4m
21 to
44
Play Area
MP .75
El Sub Sta
RAYN
TON
CLO
SE
RO
DN
EY
CLO
SE
SOU
THBO
URNE
CLO
SE
1
30
6
10
2
15
3
14
5
4
1
1
1
22
80
Und
FB
1
47.9m
1
21
CS
11
37
11
29
2
Und
1
11
1
CS
2
29
33
5
3
1
1
12
11
11
20
2
2
1
4
1
11
12
2
2
29
3
4
15
1
15
CS
Postmasters
254
219
EASTERN
EDINBURGH CLOSE
CARL
ISLE
CLO
SE
WIMBORNE DRIVE
TCB
47.9m
Boro
Con
st &
War
d Bd
y
HAWLAN
DS DRIVE
16
Thames Water Utilities Ltd, Property Searches, PO Box 3189, Slough SL1 4W, DX 151280 Slough 13 T 0845 070 9148 E [email protected] I www.thameswater-propertysearches.co.uk
Page 12 of 33
NB. Levels quoted in metres Ordnance Newlyn Datum. The value -9999.00 indicates that no survey information is available
Manhole Reference Manhole Cover Level Manhole Invert Level 39CE 49AH 4901 4902 49AG 39BF 29CG 39BJ 39DC 39DB 39DG 3901 29CH 3902 29CI 39BG 3903 39BI 39CA 29DH 39CD 39CB 29DI 39CC 39BH 29DJ 29EA 2902A 29DF 39EF 39EG 29FH 38BC 28FE 28CE 28CF 38BB 2808 38BA 28CD 381C 381B 38AJ 381A 38AI 28CC 28CB 38AH 38DF 28CA 28JA 38DG 38DH 29AJ 39CI 39CJ 29BA 39DA 29CF 371D 27BA 27BB 27BC 371F 27BD 27BF 27AJ 271B 271A 2701 27BI 3801 381E 38CE 381D 2807 28EA 38CF 38CG 28FH 38CH 38CI 28FG 28DJ 281A 28FF 37AC 37AH 47DH 47CB
n/a n/a 46.47 46.44 n/a n/a n/a n/a n/a n/a n/a 44.36 n/a 44.43 n/a n/a 44.43 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 47.11 n/a n/a n/a n/a n/a n/a n/a n/a n/a 44.81 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 44.7 n/a n/a n/a n/a n/a 45.16 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
n/a n/a 44.28 44.08 n/a n/a n/a n/a n/a n/a n/a 43.05 n/a 42.86 n/a n/a 43.47 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 43.02 n/a n/a n/a n/a n/a n/a n/a n/a n/a 43.61 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 43.26 n/a n/a n/a n/a n/a 42.67 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
Thames Water Utilities Ltd, Property Searches, PO Box 3189, Slough SL1 4W, DX 151280 Slough 13 T 0845 070 9148 E [email protected] I www.thameswater-propertysearches.co.uk
Page 13 of 33
Manhole Reference Manhole Cover Level Manhole Invert Level 47DF 47CA 47DD 47DB 4802 4701A 4801 4703 47AD 4502B 461A 4502A 4505 4501B 4506 4501A 4601B 07CH 07DC 07CJ 07DA 07DB 0508 0504 0509 1509 17BB 17CH 1512 1521 1703 17CC 1519 1518 1702 1701B 17CD 17EH 17CJ 1506 17EE 17CG 0505 0501 0502 0506 0503 0507 07CG 07CI 2901A 29EE 39FB 39FF 29GA 29FJ 3904 29EF 1804 1805 1801A 2803 2804 2802 2801 28BE 28BD 291A 28HJ 28HI 28HH 28HG 2805 28HF 28HE 28BC 27BE 28JC 28FB 29CD 27BH 29CE 27BG 28FC 28FD 19HE 19ID 19IC 1901B 19HA 19BF 19BD 191B
n/a n/a n/a n/a 46.06 45.71 46.06 45.77 n/a 45.19 n/a 45.31 n/a 45.63 n/a 44.68 45.78 n/a n/a n/a n/a n/a 47.25 47.21 47.54 47.57 n/a n/a 47.02 47.02 47.56 n/a 46.87 47.24 47.34 47.35 n/a n/a n/a 47.1 n/a n/a 47.72 47.72 47.66 47.71 47.98 48.07 n/a n/a 46.93 n/a n/a n/a n/a n/a 46.66 n/a 47.4 47.55 47.21 47.5 47.45 47.5 47.73 n/a n/a n/a n/a n/a n/a n/a 46.54 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 48.19 n/a n/a n/a n/a
n/a n/a n/a n/a 43.61 42.16 43.35 42.42 n/a 42.24 n/a 42.59 n/a 42.24 n/a 42.71 42.38 n/a n/a n/a n/a n/a 42.46 42.48 45.85 45.48 n/a n/a 42.4 42.15 43.07 n/a 44.48 42.05 45.45 45.61 n/a n/a n/a 45.56 n/a n/a 42.6 42.75 45.59 45.97 45.96 46.45 n/a n/a 45.28 n/a n/a n/a n/a n/a 43.11 n/a n/a 43.62 40.83 n/a 42.34 42.58 42.76 n/a n/a n/a n/a n/a n/a n/a 42.96 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 46.34 n/a n/a n/a n/a
Thames Water Utilities Ltd, Property Searches, PO Box 3189, Slough SL1 4W, DX 151280 Slough 13 T 0845 070 9148 E [email protected] I www.thameswater-propertysearches.co.uk
Page 14 of 33
Manhole Reference Manhole Cover Level Manhole Invert Level 19BE 19BC 191A 29AC 29AB 29AD 2905 2902B 2901B 2903 29GB 29GF 29FE 29FF 29FG 29FI 17ED 17CE 1507 17CF 17CI 1601A 1501B 17EC 1603 1706 1502B 1601B 1705 1701A 2501A 27AI 37BH 371C 37BG 371E 371B 371A 3701 09AH 091C 09BB 09AI 09EB 09BA 09AJ 09BF 09BE 19IJ 19II 19IB 19IA 19IH 19GI 19IG 19HJ 19GH 19HI 19HH 19IF 19HG 19IE 19HF 18CI 18CJ 18CH 08BC 08BB 08BA 08AJ 18BF 08BJ 18DE 1806 1807 19CA 19ED 19BJ 19EC 19EA 19EB 19DJ 19DI 19DG 19DH 09DE 19BG 09DD 19BH 09DC 08EB 07BE 0702
n/a n/a n/a n/a n/a n/a 48.05 47.8 48.09 48.11 n/a n/a n/a n/a n/a n/a n/a n/a 47.96 n/a n/a 49.32 48.43 n/a 51.58 51.99 48.55 48.76 49.67 45.63 47.26 n/a n/a n/a n/a n/a n/a n/a 44.21 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 48.2 48.2 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 47.89
n/a n/a n/a n/a n/a n/a 43.96 41.12 41.24 42.84 n/a n/a n/a n/a n/a n/a n/a n/a 46.64 n/a n/a 48 40.58 n/a 50.38 50.45 42.09 40.58 48.16 40.7 42.14 n/a n/a n/a n/a n/a n/a n/a 43.29 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 45.25 44.24 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 43.32
Thames Water Utilities Ltd, Property Searches, PO Box 3189, Slough SL1 4W, DX 151280 Slough 13 T 0845 070 9148 E [email protected] I www.thameswater-propertysearches.co.uk
Page 15 of 33
Manhole Reference Manhole Cover Level Manhole Invert Level 0701 07BB 08EA 08EC 07AJ 07BH 07BC 071A 17AE 1704 18EC 18EH 17EF 18DA 17EG 18EI 18DB 18FA 18EJ 18DC 18DD 18BD 18BE 1801B 1802 0903 0902 09CJ 09CI 09GG 09CG 09GF 09CH 09DB 09GE 09GD 09GC 0901 09BG 08DE 08CG 08CF 08DF 07AC 07AB 09EJ 0906 0905 08CE 08CD 08CC 08CB 08ED 07BD 08CA 07DG 091B 09EF 09EG 09EH 09HA 09GJ 09GI 09GI
47.88 n/a n/a n/a n/a n/a n/a n/a n/a 47.58 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 47.5 47.72 47.46 47.51 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 47.8 n/a n/a n/a n/a n/a n/a n/a n/a 47.15 47.15 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
44.13 n/a n/a n/a n/a n/a n/a n/a n/a 43.85 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 42.57 44.9 45.86 45.01 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 45.41 n/a n/a n/a n/a n/a n/a n/a n/a 45.61 44.71 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
The position of the apparatus shown on this plan is given without obligation and warranty, and the accuracy cannot be guaranteed. Service pipes are not shown but their presence should be anticipated. No liability of any kind whatsoever is accepted by Thames Water for any error or omission. The actual position of mains and services must be verified and established on site before any works are undertaken.
Thames Water Utilities Ltd, Property Searches, PO Box 3189, Slough SL1 4W, DX 151280 Slough 13 T 0845 070 9148 E [email protected] I www.thameswater-propertysearches.co.uk
Page 16 of 33
Asset Location Search Sewer Map - ALS/ALS Standard/2017_3702528 TQ1287SE
The width of the displayed area is 500m and the centre of the map is located at OS coordinates 512750,187250 The position of the apparatus shown on this plan is given without obligation and warranty, and the accuracy cannot be guaranteed. Service pipes are not shown but their presence should be anticipated. No liability of any kind whatsoever is accepted by Thames Water for any error or omission. The actual position of mains and services must be verified and established on site before any works are undertaken. Based on the Ordnance Survey Map with the Sanction of the controller of H.M. Stationery Office, License no. 100019345 Crown Copyright Reserved.
13701270 SMARTS BROOK30
5
381
152
176
150
229
229
229
229
176
176
229
229
229
229
229
229
229
229
229
229
229
229
176
229
229229
229
229
229
229
229229
229
229
229
229
229
229
229
229229
229
229
229
229
229
229
229
229
229
229229
229229
229229
229
229
229
176229
176
229229
9
229229
229229
229
229
229
229
WW
WW
WWW
WW
WW
WW
W
%
%
%%
%%
% %
%%
%%
%
%
%%
%
%
%%
%
%
%%%
%
%
%
%
%
%
%
%%
%
%
%%
%%
%
%
%%
% %
%
%
%
%%%
%%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
531B
641B
6401 6402
64036404
6304
7304
7303
7402
7306
7401
7305
8401
8402
93069302 9307
9308831A 9309
83038304
9319412
9404 9410
9405 94069401
9407
9408
9409
5405
53035304
5401
5305
531A
9004
8102
8103
9101
9102
821A
8201 920292059201
8202
921A
9206 9207
83018302
9304 9305
9301
501I
501M
501J
1A 5101
5201
5204
5302
7002501G 601E 6002
7001
51026103
71026101
71017103
62017201
62036202
7202721A
5203
621A
63015301 7301
6302 731B7302
731A
6303
701F601D 701G 801F701C701D 801G601A601C
601B701E
6001 701H
801E
801D8001
901A90028002
9001
9003
5001
5002501D
501K
501E 501C501A501B501L
!
!
=
!!
!
=!
!
!
!!
=
!
!!
!
!
!
!!
!!=
!!
!!
!
!
!
!
!
!
!
!
!
!
!
!=
!!
!!
! !
!
!! !!
!!! !
!! = !
!
!!
!!!
!
!
!
!
!
=
! ! ! !
!
!
=
!
!
=
!
!
!
!
!!
=
!
!
!
=!
=
!
!
!
!
=
!!
!
!!=
!
!!
!!=
=
!
!=
!
!=
!
!
!
!=
=
!!
=!=
!
= !
! !!=! !
=!!!! =!
!
!
!
=
!
!!
!
!
!
!
! ! !!!
=
=!
!
!
!
! !
!! !
!
!
!
!
!
!
!
!
!
!
!
! !
!
!
!
!
!
!
!
! !
!
!
=
!
!
!
!
==
!
!
=
=
=
=
=
=!
=
=
!!
=
!!=
!!
!=!
!
! !!
!=!==
!
!!
! !!!
!!
!
!
!!!
! !
!! !!
!=!!
!
!
!
=
=
=
=!
!! !
!
!
!
!
!
=
!
!
!
!
!
!
!
!
!!
!
!!
!
!
!
!
!
!
=
!
!!= ==
!!= !
!! =!=== =! !
!!
!
! !!
=
=!
!
!!
! !
!
!!! !
= !
!!! !
! ! !!
!
!
=
=
!
!
!!!
!
!
!
!
!
!
!
=
!
! =
=
!
!
!
!!
!!
!!===
!=
=!
!
!
!
!
!
!
!
!
=
!
!
!
!
!
!
!
!
!
=
=
= =
==
!
!
= !
!
!
=
! !!
=
!!
=
!
!
=!
!
=
!
!
!
!
!
=!!
!
!
=
!
!
!
=
=!
=
=
==
=
==
!
!
! ! ! !
!
!
=
!
!
!!
!
!!
!
=
RAYNERS LANE
12
7
9
8
3
11
1c
2a50
26
48
62
16
32
69
95
17
14
1a
45
81
89
34
59
56
12
18
25
76
85
29
77
31
20
15
21
70
4252
63
49
79
7a
1b
72
13
10
22
27
80
24
19
92
47
83
91
84
74
33
98
28
46
5741
23
38
58
37
96
35
36
75
WARDEN AVENUE
El
LB
.68
113
118 112
11a
Sta
31A
401
280
298
248
262
289
389
355
277
422
286
399387
438
377
275
15a
126
349
260
367
236
428
397
357
420
318
379
455
463
427
104
404
441
310
265
223
473
453
418
303
221
308
363
103
72a
413
272
Liby
31B
PERWELL AVENUE
WORPLE WAY
SPINNELLS R
OAD
223a
BER
RITO
N R
OA
D
CAPTHORNE AVENUE
1 to
6
ALE
XAN
DR
A A
VE
NU
E
TCB
Court
TCBs
Surgery
Perwell
7 to
12
47.2m
53.9m
48.8m
51.2m
52.7m
55.2m
Shelter
Shelters
Cyc
le W
ay
El Sub Sta
WO
RP
LE CLO
SE
22
1
Shelter
2
28
69
62
24
42
1a
LB
50
25
8
12
2
1
15
14
49
28
1
Shelter
2
2
Shelter
2
35
Surg
ery
56
14
2
LB
11
9
52.7m
16
62
1
TCB95
2
1
1
50
1
34
19
14
14
LB
7
7
26
32
34
84
11
11
59
48
95
13
2
22
377
1a
314316
394392
Sub
PO
HIGH WORPLE
KING
S RO
AD
86a
TORBA
Y RO
AD
OVESDON AVENUE
Lodge
53.6m
55.5m
Chichester
128
424
to 4
26
31
1a
Thames Water Utilities Ltd, Property Searches, PO Box 3189, Slough SL1 4W, DX 151280 Slough 13 T 0845 070 9148 E [email protected] I www.thameswater-propertysearches.co.uk
Page 17 of 33
NB. Levels quoted in metres Ordnance Newlyn Datum. The value -9999.00 indicates that no survey information is available
Manhole Reference Manhole Cover Level Manhole Invert Level 64BH 64BJ 641B 64BC 64BD 64BE 6403 6404 64EB 64EA 64DB 64DA 52EC 5301 53GG 53GF 53EF 53HI 53HA 53GE 53GD 53GC 53GB 53GJ 53HH 53GA 63BC 63BB 62DC 62DB 63EF 63EE 63ED 63CH 63EC 63AH 63AG 63AF 62AB 63FE 53EH 53EE 63FF 531B 63FG 53IG 531A 54CH 64GB 54CG 64GC 54CF 64GD 64GF 54CE 64GE 64AJ 54CD 6401 6402 54BH 64EF 54CC 64BA 64BB 54CB 501K 501L 501I 501N 5001 5002 501E 501A 501B 501C 501D 501G 601C 601E 6001 6002 601D 601B 601A 701I 701J 7001 7002 701F
n/a n/a n/a n/a n/a n/a 45.66 45.59 n/a n/a n/a n/a n/a 47.78 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 47.27 47.3 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 46.05 46.06 n/a n/a n/a n/a n/a n/a n/a n/a 46.95 47.12 n/a n/a n/a n/a n/a 47.62 47.75 n/a
n/a n/a n/a n/a n/a n/a 44.22 43.98 n/a n/a n/a n/a n/a 45.63 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 45.51 45.18 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 45.28 43.9 n/a n/a n/a n/a n/a n/a n/a n/a 46.06 43.66 n/a n/a n/a n/a n/a 44.78 46.69 n/a
Thames Water Utilities Ltd, Property Searches, PO Box 3189, Slough SL1 4W, DX 151280 Slough 13 T 0845 070 9148 E [email protected] I www.thameswater-propertysearches.co.uk
Page 18 of 33
Manhole Reference Manhole Cover Level Manhole Invert Level 701H 53CB 53BE 5302 53BF 52CH 53DD 53BG 53DH 52CI 52CJ 53BI 53DC 53DB 53DF 53DI 5303 5304 53DA 53CJ 53DG 5305 53CI 53GI 53HD 52EF 53GH 53EG 501M 501J 5102 6103 6101 7101 5201 6201 6203 7201 6202 721A 5203 62DG 52EG 62CI 52CE 52DB 52CF 52DJ 52ED 52EA 62CJ 62DA 52CG 52EE 52EB 52DA 52DC 5204 53AB 53BA 53BB 53BC 53BD 5405 54CA 5401 54AF 54AG 54AH 64BI 5101 7402 7401 84CG 84CF 84CE 84CD 84CC 84CB 84EA 94BA 94AJ 64GH 64EH 64EG 64EE 64EI 64ED 64GG 64EC 63FJ 63FI 74EF
n/a n/a n/a 47.37 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 46.33 46.33 n/a n/a n/a 46.29 n/a n/a n/a n/a n/a n/a n/a n/a 48.27 49.56 48.74 49.98 48.7 50.13 49.51 52.39 51.39 n/a 48.84 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 47.68 n/a n/a n/a n/a n/a 45.05 n/a 46.33 n/a n/a n/a n/a 46.96 48.41 48.46 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
n/a n/a n/a 45.79 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 43.33 43.5 n/a n/a n/a 44.61 n/a n/a n/a n/a n/a n/a n/a n/a 46.44 47.58 46.95 46.68 45.55 47.53 47.27 49.44 49.59 n/a 46.73 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 43.76 n/a n/a n/a n/a n/a 43.16 n/a 43.56 n/a n/a n/a n/a 45.2 45.56 45.27 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
Thames Water Utilities Ltd, Property Searches, PO Box 3189, Slough SL1 4W, DX 151280 Slough 13 T 0845 070 9148 E [email protected] I www.thameswater-propertysearches.co.uk
Page 19 of 33
Manhole Reference Manhole Cover Level Manhole Invert Level 74EE 73BG 73BH 74DF 741B 74AI 74DG 74AJ 74DH 74DI 7303 74BA 7304 74DJ 74BB 74EA 74BC 9410 9405 E 9406 9411 9407 9412 9409 9408 9308 9309 9312 93FG 93DA 93DB 93FH 93DC 93DD 93FI 941B 94CA 94CB 94CG 94DJ 94EE 94EF 941A 94FA 9401 9404 94EH 94FB 94BH 94EJ 94BD 94DI 94EA 94BC 94BB 94EB 83EH 83DI 83GC 83GE 83GF 83GG 83GH 83CA 83GD 83FE 831A 83FF 83CD 83HI 8303 83HG 8304 n/a 84FE 94EG 84EG 94FC 94FD 84EH 8402 84DI 84ED 84DJ 74BD 73CC 74EB 74BE 73CD 7306 741A 7305
n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 51.13 n/a 51.11 n/a n/a n/a n/a 52.43 52.15 n/a 52.14 52.97 52.56 52.69 55.49 54.23 52.97 52.97 53.23 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 51.27 51.19 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 51.2 n/a 51.16 n/a n/a n/a n/a n/a n/a n/a 49.55 n/a n/a n/a n/a n/a n/a n/a n/a 50.79 n/a 50.86
n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 48.99 n/a 49.25 n/a n/a n/a n/a n/a 48.47 n/a 48.07 51.97 n/a 48.76 54.75 49.8 49.91 49.55 49.68 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 48.73 49.03 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 49.65 n/a 49.79 n/a n/a n/a n/a n/a n/a n/a 46.07 n/a n/a n/a n/a n/a n/a n/a n/a 48.99 n/a 48.74
Thames Water Utilities Ltd, Property Searches, PO Box 3189, Slough SL1 4W, DX 151280 Slough 13 T 0845 070 9148 E [email protected] I www.thameswater-propertysearches.co.uk
Page 20 of 33
Manhole Reference Manhole Cover Level Manhole Invert Level 73CE 74BJ 73CF 83AB 84AB 83AE 83AD 83AC 84BA 83DF 83DE 831B 84AJ 83DG 83DH 83CC 83CB 8401 84AH 93CC 93CD 93FD 9305 9304 93CE 93CF 93FE 9313 93CG 93CH 9314 93DE 9301 93DF 93FF 9306 9302 9307 93CI 93CJ 721B 72BC 72BB 72BA 621A 6301 6302 731B 731C 63BD 63DF 731A 63DG 63DH 63CI 63DI 631A 6303 6304 63DJ 73BJ 73BI 73CA 63EA 73BE 73CB 73BF 63EB 63FH 7301 7202 7302 73CG 72AJ 72AI 72AH 821A 8201 82AD 83AF 82AE 82CI 821B 82CF
n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 49.53 n/a n/a n/a n/a 53.99 53.92 n/a n/a n/a n/a n/a n/a n/a n/a 51.8 n/a n/a 53.26 51.7 53.31 n/a n/a n/a n/a n/a n/a n/a 50.06 50.03 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 49.24 49.27 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 51.78 53.44 51.77 n/a n/a n/a n/a n/a 54.58 n/a n/a n/a n/a n/a n/a
n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 46.36 n/a n/a n/a n/a 51.6 51.47 n/a n/a n/a n/a n/a n/a n/a n/a 50.32 n/a n/a 50.65 49.96 49.81 n/a n/a n/a n/a n/a n/a n/a 47.98 47.66 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 47.01 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 48.63 51.59 48.37 n/a n/a n/a n/a n/a 51.14 n/a n/a n/a n/a n/a n/a
The position of the apparatus shown on this plan is given without obligation and warranty, and the accuracy cannot be guaranteed. Service pipes are not shown but their presence should be anticipated. No liability of any kind whatsoever is accepted by Thames Water for any error or omission. The actual position of mains and services must be verified and established on site before any works are undertaken.
Thames Water Utilities Ltd, Property Searches, PO Box 3189, Slough SL1 4W, DX 151280 Slough 13 T 0845 070 9148 E [email protected] I www.thameswater-propertysearches.co.uk
Page 21 of 33
Asset Location Search Sewer Map - ALS/ALS Standard/2017_3702528 TQ1387SW
The width of the displayed area is 500m and the centre of the map is located at OS coordinates 513250,187250 The position of the apparatus shown on this plan is given without obligation and warranty, and the accuracy cannot be guaranteed. Service pipes are not shown but their presence should be anticipated. No liability of any kind whatsoever is accepted by Thames Water for any error or omission. The actual position of mains and services must be verified and established on site before any works are undertaken. Based on the Ordnance Survey Map with the Sanction of the controller of H.M. Stationery Office, License no. 100019345 Crown Copyright Reserved.
10-67448
229
229
229
900
229
305
229900
229
229229
305
229
229
305
229229
229229
305
375
229300
525 305
229
229
229
229229
305
229
229
229
152
229
229229
229
229
229
229
229
229
152
229
229
229
229
229
229
225
229
229229
229
99!
!
!
! !
9!
!
99!
99 99! !9
K
%
%
K
K
% %
%
%
%
%
%%
% %%%
%
%%% %
% %
%
%%
%
%
%
%%
%
%
%
%
%
%
%
% %
%
%%
%%
%
%%
%%
%
%
%
%%
%%
%
%
%
%%
%
%
%
%
%
%
%%
%
% %
%
%
%% %
4303430
43074308
440
440
2
04020401
1202
2301
2205
23032304
2203
2201
3302
3207
3301
3205
3208
3206
32023203
3204
3209
4205
4204
4209
4208
42064207
4201
4305
4202
4306
0102
0101
0201
0202
0203
0303 03020304
30033001
3105
31042102 41043108 410331093107 4105
31022103 3110311A
4108 4106
3101 41014102
41094107
4110
4203
221A
001B
0005
101C
1101
1201
1002
1003
1102
1004
111A
111B
101B 101A 201A
2002
2206
201B
2101
201C
000300010004 0002
4001
201D
4002201E2001 2005
2003 40073005404003 5400430022004
! =!
=
!
!
!
=
=! ! !!!
= !!!! !
!=
! != !!!
=!
!!= ! !
!
! !
!
!
!
!
=
!
=
=
=
! !
!
!
!
!
=
! !
!
!
!
!
!
!
!= === !== !
!
! !
=!
=
!
!
!
! !
!
!
!!
= =
!
=
!
=
=
!
!
=
!
!
!
=
!
!
!
!
! !
=
!
=
=
=
!
!
!
=
!
!
!=
=
=
=
=
!
!
!
=
=
=
=
!
!
=
!
!
!! ! !
!
! !
! !
!
!
!
!
!
!
!
!
!
! !
!
!
!!!
=
=
=!
===
=!!! !
=
=
!
!
!
!
=
!
!
=
!
!
!=!
!
!! !
=
!
!
!!
!
! ==
!
=!
=! =
!
!
!
! =!
!
!!
!!
!
!
!!
!
!
! ! ! !
!
!
=
=
! ! ! !
!
!! !
=
!! !
=
!== = =
!=
!
= !
!
!!! !
= =
!
! ! ! ! ! !! ! !
!
=
!
=
=
!!
!
!
!
!
!
!!
!!=
!
!
!
!
!
!
! !
!
2
1
8
3
9
6
7
Garage
to
Rayners
Pavilion
FB
Sports Ground
11
21
26
38
81
83
25
15
14
16
71
37
51
8674
1363
1262
29
17
39
95
50
48
19
61
9973
31
49
27
20
32
23
85
96
10
Path
House
SL
Terrace
Byford
Def
Lime Terrace
CF
362
216
378
218
256
279
386
237
295
249
210
213
291
250
225
470
454
472
228
462
100
370
63b
248 238
368
201
263
Uni
on T
erra
ce
AVE
NU
E
CR
Stockton House
CW
PC
Und
MacMillan Court
PRO
VID
ENC
E
RAY
NE
RS
LA
NE
216a
CLITHEROE AVENUE
APPLE GROVE
OXLEAY ROAD
ESS
1 to
8
1 to
34
1 to 49
1 to 14
2 to 16
7 to 18
1 to
20
1 to 32
1 to 38
Swan
51.2m
Shelter
33 to 63
18 to
32
19 to
30
57 to 7435 to 56
13 to
20
Temple
Ward Bdy Play Area
464
to 4
68
Sports Court
Tennis Courts
El Sub Sta
Jupiter House
15
19
61
1915
2
RAYNERS LANE
49
74
15
13
25
50
14
1
El Sub Sta
CF
23
16
86
13
APP
LE GRO
VE
SL
1
El Sub Sta
SL
1
27
16
2
31
14
El Sub Sta
El Sub Sta
CR
71
El Sub S
ta
23
SL
Pavilion
14
6
APPL
E G
ROVE
26
9
El Sub Sta
26
1
2
2
11
SL
38
1
1
SL
2
37
RAY
NE
RS
LA
NE
3
9
38
14
63
13
SL
21
26
62
25
16
1
SL
Shelter
Lane Junction
LB
Millet
Quartz
63a
Harmony Terrace
368c
RAYNERS LANE
218a
368e
216b
GOODWILL DRIVE
KARMA WAY
FAIRVIEW CRESCENT
Rayners La
1 to 22
54.6m
55.2m
Cour
t
25 to
39
15 to 28Childrens Ce
Heat
hfie
ld
Clitheroe Court
Pearmain House
Cycle W
2
House
War
d B
d y
1 to 14
1
House
Thames Water Utilities Ltd, Property Searches, PO Box 3189, Slough SL1 4W, DX 151280 Slough 13 T 0845 070 9148 E [email protected] I www.thameswater-propertysearches.co.uk
Page 22 of 33
NB. Levels quoted in metres Ordnance Newlyn Datum. The value -9999.00 indicates that no survey information is available
Manhole Reference Manhole Cover Level Manhole Invert Level 4305 4306 4307 4308 4303 4405 4304 4402 23AC 13BC 23DI 33BI 23FF 23DJ 23EC 33BB 23FG 33BC 13BB 23EA 33BD 23ED 13BA 33BE 2303 2304 23GE 13AJ 23GH 23GF 23GG 23CI 23BG 231A 23CB 1202 12CI 12CJ 12DD 12DC 12DF 13BD 22FF 22FE 2206 2301 2205 22DG 22DH 22GB 22GC 23DH 22GD 22EA 22DJ 22DI 23FE 22DF 2203 22DE 23FD 22EI 4202 3202 4201 4206 3209 4207 4204 3203 4208 3204 32CI 32CH 4205 4209 2201 23FC 221A 22EJ 32EI 32EH 32DF 32EE 32EG 32EF 33AB 3302 32DG 32FA
53.91 52.23 52.67 51.44 51.44 51.26 51.38 51.37 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 52.61 52.52 n/a n/a n/a n/a n/a n/a n/a n/a n/a 54.91 n/a n/a n/a n/a n/a n/a n/a n/a 54.93 54.2 54.88 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 54.72 n/a n/a n/a 54.36 54.6 54.3 54.44 54.73 54.46 54.47 54.75 54.47 54.77 n/a n/a 53.91 53.9 54.76 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 53.52 n/a n/a
51.3 50.4 51.21 49.9 50.7 50.49 50.68 49.62 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 51.39 51.11 n/a n/a n/a n/a n/a n/a n/a n/a n/a 52.48 n/a n/a n/a n/a n/a n/a n/a n/a 52.89 53.21 52.8 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 52.99 n/a n/a n/a 51.91 52.17 51.54 51.52 53.07 52.12 51.77 50.08 52.23 49.85 n/a n/a 52.13 52.6 52.66 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 50.71 n/a n/a
Thames Water Utilities Ltd, Property Searches, PO Box 3189, Slough SL1 4W, DX 151280 Slough 13 T 0845 070 9148 E [email protected] I www.thameswater-propertysearches.co.uk
Page 23 of 33
Manhole Reference Manhole Cover Level Manhole Invert Level 3301 3207 3205 3208 3206 33CD 33BJ 32CJ 33CA 32DA 32FG 32FF 33CB 32BH 31DD 31DE 3001 3105 3101 3107 3005 3104 3109 3003 3002 3009 3008 3110 3108 4109 4203 4108 4104 4107 4105 4106 4003 421A 4007 4002 21EG 201E 2003 21EH 2004 21EI 21EJ 31CE 31CF 311A 32BA 32BB 31CG 31CH 32BC 31CI 32BD 31CJ 32BE 3102 31DA 32BF 3006 31DB 31DC 32BG 3007 4005 4004 4103 411B 4101 4102 4110 411A 421B 4001 201C 201B 201A 201D 04AJ 04BA 04BE 04BF 03BB 04CA 03BD 04BG 04BH 04AI 04BI 04AG
53.5 54.16 54.55 54.2 54.54 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 47.97 50.06 53.08 51.08 48 50.4 51.29 48.02 n/a n/a n/a 51.2 51.29 53.19 54.1 52.64 51.76 53.26 51.86 52.71 n/a 54.35 47.47 n/a n/a n/a n/a n/a 48.26 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 51.17 n/a n/a n/a n/a n/a n/a n/a 48.19 47.22 51.54 52.83 53.37 53.39 53.65 53.83 54 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
50.47 50.55 50.28 50.35 50.03 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 45.99 47.1 49.85 48.33 45.77 n/a 49.06 46.03 n/a n/a n/a 49.19 49.27 51.01 51.25 50.84 49.2 51.61 49.66 51.21 n/a 51.16 45.57 n/a n/a n/a n/a n/a 45.27 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 50.43 n/a n/a n/a n/a n/a n/a n/a 45.41 44.65 49.14 51.06 50.8 51.37 50.94 50.98 51.61 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
Thames Water Utilities Ltd, Property Searches, PO Box 3189, Slough SL1 4W, DX 151280 Slough 13 T 0845 070 9148 E [email protected] I www.thameswater-propertysearches.co.uk
Page 24 of 33
Manhole Reference Manhole Cover Level Manhole Invert Level 04BJ 0402 0401 23CH 23CG 23CF 23CE 23BH 23CD 23CC 03AD 03AE 03AF 0303 0302 0304 01CI 0201 0202 02CB 02BH 02CC 02BG 02BF 02BE 02BJ 0203 02BD 02CE 02CF 02CG 03AB 03AC 11ED 101D 11EE 11EF 111A 111B 11EG 11EH 11EI 11EJ 2002 21DF 2101 2001 21DG 21DH 21DI 21DJ 2103 21EA 21EB 21EC 2005 21ED 21EE 21EF 2102 0001 1004 0002 0005 1003 1002 00CJ 101C 00CI 001B 101E 11EC 11EA 11DJ 11EB 0102 1101 1102 n/a 0206 0205 0204 1204 1203 1205 1206 1207 021B 1201 0003 0004 00DA 00CF
n/a 52.15 52.11 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 52.81 52.9 52.81 n/a 55.59 55.38 n/a n/a n/a n/a n/a n/a n/a 55.2 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 48.11 n/a 51.09 n/a n/a n/a n/a n/a 50.97 n/a n/a n/a 48.37 n/a n/a n/a 51.03 48.77 n/a 48.72 48.2 n/a 47.94 n/a n/a n/a n/a n/a n/a n/a n/a n/a 52.39 51.64 51.63 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 55.24 48.82 48.94 n/a n/a
n/a 51.07 50.59 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 49.95 50.98 50.84 n/a 53.81 51.91 n/a n/a n/a n/a n/a n/a n/a 53.24 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 44.85 n/a 49.08 n/a n/a n/a n/a n/a 49.95 n/a n/a n/a 46.02 n/a n/a n/a 48.94 47.94 n/a 46.27 46.49 n/a 46.87 n/a n/a n/a n/a n/a n/a n/a n/a n/a 49.02 49.71 49.19 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 53.75 47.66 45.92 n/a n/a
Thames Water Utilities Ltd, Property Searches, PO Box 3189, Slough SL1 4W, DX 151280 Slough 13 T 0845 070 9148 E [email protected] I www.thameswater-propertysearches.co.uk
Page 25 of 33
Manhole Reference Manhole Cover Level Manhole Invert Level 00CE 00CD 00CC 00CB 01EB 01EA 01EC 01DJ 0101 01DB 01DE 01DA 01CJ 00DG 00DJ 00DH 00DI 101B 101A 00EB
n/a n/a n/a n/a n/a n/a n/a n/a 52.5 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
n/a n/a n/a n/a n/a n/a n/a n/a 48.6 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
The position of the apparatus shown on this plan is given without obligation and warranty, and the accuracy cannot be guaranteed. Service pipes are not shown but their presence should be anticipated. No liability of any kind whatsoever is accepted by Thames Water for any error or omission. The actual position of mains and services must be verified and established on site before any works are undertaken.
Thames Water Utilities Ltd, Property Searches, PO Box 3189, Slough SL1 4W, DX 151280 Slough 13 T 0845 070 9148 E [email protected] I www.thameswater-propertysearches.co.uk
Page 26 of 33
Asset Location Search Sewer Map - ALS/ALS Standard/2017_3702528 TQ1387NW
The width of the displayed area is 500m and the centre of the map is located at OS coordinates 513250,187750 The position of the apparatus shown on this plan is given without obligation and warranty, and the accuracy cannot be guaranteed. Service pipes are not shown but their presence should be anticipated. No liability of any kind whatsoever is accepted by Thames Water for any error or omission. The actual position of mains and services must be verified and established on site before any works are undertaken. Based on the Ordnance Survey Map with the Sanction of the controller of H.M. Stationery Office, License no. 100019345 Crown Copyright Reserved.
762
229
229
229
229229
29229
229
229
152
152
229
229229
305
229
3051220 x 915
229
225
229
229
229
229
229
229
229
229
152
152
152
152
229
229
229
229
229
229
229
229
229
229
229
229
229
229
229
229
229
229
229
229
229
229
229
229
229
1219x915 2292291219915
914
229
1219915
229
229
229
912 229
229
229
9121219915
229
229
229
229
229
229
1219
915
1219
1219
915
SMAR
TS B
ROO
K
229
229
WW
WW
WW
WW
W
WW
WW
WW
W
WW
WW
WW
WW
WW
W
WW
WW
W
W
WW
W
W
W
W
WW
W
W
W
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
W
WW
W
W
1
1
%
..
.
%
0
1
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%%
%
%
%
%%
%
%
%
%
%
%
%
%
%
%%
% %
%
%%
%
%
%
% %
%%%
%
%
%
%
%%
%
%%
%%
%
%
%
%
%%
%
%%
%
%
%
%
%
%
%
%
%%
%%
%%
%%
%%
4701
3705 47063801
4801
3802 3803 4802
4902
490
4901
0706
08010802
09010902
1704
1802 1801
2802
28032804
2901
2801
2704
3902
3901
3903
0504
0501
051A051B051C
061C061B
061A
0601
0701
0702
07030704
0707
2602
2601
251A
2503
251B
2502
251D
351A
37043703
36043603
3502
3501
3702
3601
3701
4605
47054704
4601
4602
471A 4703
46044603
0506
0705
0602
1502
1602
1501
1601
1702
1701
1505
1611
1506
1508
1503
1610
1705
1606
1706
1607
2501
1603
1509
1609
2702
251E
2701
2703
0502
05050503051D
!
!!
!
!!
!!
! !!
!!=
! !!!!
!!
!!!!
!
!
!
!
!
!
!
=
!
==
!
!
!
!
!
!
!
!
!!
!
!
!
!
!
!
!
!!
!!!
!!!
!!
!!!!
=
!!! !!!
!!!
!= !
=!! !!! !!!
!!!
!!
!!
!
!=!
!!
!
!
!
!!!!
!= !!
! ! !=! !
!
= !
!!
!!
!!
!!! !!
!
!! !!
!!
! !!!
!
!!!
!!
!! !!
!!!
!
! !
!
!
!!
!
!
!=
!
!!
!
!
!
!
!
= !
!
!!
!!
!!
!!
!!!!
!
!
!
!
!
!
!
!
!
!
= !=
!
!!
!
!! !
!
=! !!=!!
!
!
!
!!
!!
!!
!!
!!
!
!
!
!
!!
=
=
!
!
!
!
!
!
!
!
!
!!
!!
!
!!
!
=
!
!
!
!
!
=
!
!
!
!
!
!
!
! ! !!
!
!!
!!
!
!! != =!
!
=!
!
!
!
!
=
!
!!
!
!
!!
!!
!
!
!
!!
=
!! !
!
== !
!!
!!=
!
!!
! !!
!!!
! !!
!! !!
! !
! = !!
!
!
!! !!=
!
!!
!
! !!=
!
!
=!
!
!
!
!
!
!
!
!
!
!!
!
!
!
!
!
!
!
!
!
=
=!
!!
!
! !!! !!
!! !!
=!
!! = = !
!!!
!!!
!!!!
!
!
!
!
! =!
!
! = !
!!!
!
! =!
!
!!
!
!!
=!
!
!
=!
!
=!
!
!
!
!
=
=
=
!
=!
= !
!=
=!
!=
!=
!
!
!
!
!
!
!
!
!
!
!=
!
!
!
!!
!
=!
!
1
5
92
76
3
8
4
Depot
Library
Ground
Talbot House
Imperial Court
1113
9
IMPE
RIA
L D
RIVE
24
26
10
18
42
32
21
58
51
68
33
78
16
37
75
12
46
25
27
29
28
31
74
36
35
96
14
87
34
70
72
22
41
55
15
43
39
1a
2063
44
13
60
52
SL
LB
College
112
119
118
Garage
Def
CF
247
241
244
232
330
202
240
127
252
136
35a
233
322
124
140
236
109
137
167
238
King
ston
Hou
se
FW
Carmine Court
Veneto House
Rayners LaneBaptist Church
CR
CW
Allotment GardensTHE
DR
IVE
PARK D
RIV
E
ELM GROVE
BEEC
HCR
OFT
AVE
NUE
RO
MN
EY D
RIV
E
TCB
Sinks
Issues
VICARAGE WAY
1 to
10
11 to 16
46.9m
54.3m
Shel
ter
War
d Bd
y
175
to 2
05
204
to 2
26
Car Park
Tennis Courts
Ulls
wat
er C
ourt
OAKINGTON AVENUE
RO
MN
EY C
LOS
E
THE RETREAT
1
34
24
25
2
37
14
15
27
24
29
3
1
1
CW
1
14
CF
11
Def
CF
2818
Ward B
dy
Shelter
2
24
Tennis Courts
Def
2
1
3
2
CF
1 to 10
FW
1
24
1
4
1
11
3
39
18
21
CF
7
6
11
26
12
58
Def
8
11
12
11
10
34
2
15
Ambulance
Recreation
11
11
141
23
94
72
50
Regent
242
231
245
234
328
142
250
120
32033
233
4
VILLAGE WAY EAST
1 to 31
50.6m
Mon
arch
s Co
urt
27
46.9m
21
22
532
26
2
16
FW
Thames Water Utilities Ltd, Property Searches, PO Box 3189, Slough SL1 4W, DX 151280 Slough 13 T 0845 070 9148 E [email protected] I www.thameswater-propertysearches.co.uk
Page 27 of 33
NB. Levels quoted in metres Ordnance Newlyn Datum. The value -9999.00 indicates that no survey information is available
Manhole Reference Manhole Cover Level Manhole Invert Level 49EH 49AG 49AH 49AI 49FD 49FE 49CH 49CG 49FF 49DC 49FG 49CF 49CE 4902 49FH 4903 49CD 49FA 49FB 4901 49DF 49BA 49EJ 49BE 49EI 49AJ 39BA 38AJ 39BC 3901 39EF 39AE 3802 38BC 39GF 39EJ 39GC 3803 39EC 39EB 39EA 39FF 39GA 39GB 39FI 39FJ 39FH 39FG 38CE 38CD 38DB 38DC 38DD 48EC 48BI 48EB 48BG 48BH 48EA 48BF 48CJ 48BE 4801 48DA 48BD 48DB 48BC 4802 49DB 49GG 49GA 49DA 49GE 49FC 49CJ 49CI 49GD 37GH 2704 27EF 3705 38IE 28BG 38EH 3801 38ID 38HC 38IC 38EI 38HJ
n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 47.91 n/a 47.92 n/a n/a n/a 47.21 n/a n/a n/a n/a n/a n/a n/a n/a n/a 46.85 n/a n/a 47.13 n/a n/a n/a n/a 47.14 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 47.45 n/a n/a n/a n/a 47.37 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 46.69 n/a 48.21 n/a n/a n/a 48.19 n/a n/a n/a n/a n/a
n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 46.07 n/a 45.54 n/a n/a n/a 45.4 n/a n/a n/a n/a n/a n/a n/a n/a n/a 45.39 n/a n/a 45.8 n/a n/a n/a n/a 45.36 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 45.77 n/a n/a n/a n/a 46.08 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 44.69 n/a 46.16 n/a n/a n/a 45.81 n/a n/a n/a n/a n/a
Thames Water Utilities Ltd, Property Searches, PO Box 3189, Slough SL1 4W, DX 151280 Slough 13 T 0845 070 9148 E [email protected] I www.thameswater-propertysearches.co.uk
Page 28 of 33
Manhole Reference Manhole Cover Level Manhole Invert Level 28AE 28AF 28BF 28BE 38EJ 28BD 38FA 38FB 38DH 38DG 38DF 38AH 38AI 38DE 471D 47EG 47EH 47DA 47DB 471E 4705 47EI 47EJ 4704 471G 471A 4703 471F 47BE 4701 4706 48EI 48EH 48CD 48EG 48CC 48EF 48CB 48EE 48EJ 48CA 48ED 48BJ 46GG 46FA 46AG 46EJ 46AF 46GF 46GE 46BI 46EI 46EH 46BJ 46GD 46CA 46EG 46CB 47CF 47EB 47EC 47CG 47ED 47CH 47EE 47CI 47CJ 47EF 471C 471B 36CB 3703 36AH 36AG 37ED 37AB 3603 3604 37EC 37AH 37BD 37AG 37EB 36DB 37BE 36DE 3702 3701 36DG 37CF 37CD 47AH 47AG
n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 48.86 n/a n/a 48.91 n/a n/a 49.07 n/a n/a 49.09 48.87 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 47.94 n/a n/a n/a n/a 47.78 47.77 n/a n/a n/a n/a n/a n/a n/a n/a 48.7 48.67 n/a n/a n/a n/a n/a
n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 47.2 n/a n/a 47.17 n/a n/a 46.88 n/a n/a 46.46 46.45 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 46.1 n/a n/a n/a n/a 46.08 46.27 n/a n/a n/a n/a n/a n/a n/a n/a 46.63 46.32 n/a n/a n/a n/a n/a
Thames Water Utilities Ltd, Property Searches, PO Box 3189, Slough SL1 4W, DX 151280 Slough 13 T 0845 070 9148 E [email protected] I www.thameswater-propertysearches.co.uk
Page 29 of 33
Manhole Reference Manhole Cover Level Manhole Invert Level 47AF 47AE 47AD 46CC 09DE 29AI 29AH 09DD 09AF 09AG 29CD 29CE 29CF 20BD 3903 39EE 39ED 09DB 0901 09CH 0902 09BC 09BI 09BH 09BG 09BF 091F 091G 09BE 091D 091A 09BD 091B 091E 091C 091H 28CA 2801 29EA 29ED 29EE 29DJ 29DI 29DH 29DG 29DF 29DE 39CD 39CE 39CH 39CF 39CI 39AD 38GI 38GH 39DA 3902 39CG 38BB 39BB 38BA 1802 18AC 19BG 1801 19BF 19BD 19BC 19BB 19BA 19BE 19AJ 19AI 2802 2803 29BA 2804 29AJ 28CE 28CH 2901 28CF 28CB 28CG 28CC 29EI 28CD 29BB 07CB 07LS 07CD 07CC 07LZ
n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 47.08 n/a n/a n/a 46.2 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 46.24 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 47.03 n/a n/a n/a n/a 46.47 n/a n/a 46.37 n/a n/a n/a n/a n/a n/a n/a n/a 46.21 46.46 n/a 46.47 n/a n/a n/a 46.27 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 44.71 n/a n/a n/a 44.71 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 44.54 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 45.88 n/a n/a n/a n/a 43.19 n/a n/a 44.37 n/a n/a n/a n/a n/a n/a n/a n/a 44.46 44.49 n/a 43.92 n/a n/a n/a 44.83 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a
Thames Water Utilities Ltd, Property Searches, PO Box 3189, Slough SL1 4W, DX 151280 Slough 13 T 0845 070 9148 E [email protected] I www.thameswater-propertysearches.co.uk
Page 30 of 33
Manhole Reference Manhole Cover Level Manhole Invert Level 07LT 07LU 08BH 08DE 08DF 0801 08DG 0802 07WS 0707 0704 0702 08DA 0703 08DB 0706 08DC 08BB 08BC 08CJ 0705 08BE 08BD 08BG 08BF 081A 18BD 1702 18BC 18BB 1701 18BA 18AJ 18AI 1704 07FF 07FG 07EG 07EF 07EE 07ED 07EC 07EB 0701 97MB 07MC 07AC 07BF 07LX 07BH 07LW 07LV 07BI 07BJ 07CA 26AI 26BA 36CD 26AJ 27CJ 27CI 2702 2701 27BA 27BB 27BC 27AJ 27BD 1706 27BE 27BF 1705 27AI 37EE 27EC 27ED 27FH 27EE 27FG 3704 27FF 2703 07FC 07FB
n/a n/a n/a n/a n/a 46 n/a 46.04 n/a 46.16 46.18 46.24 n/a 46.22 n/a 46.36 n/a n/a n/a n/a 46.4 n/a n/a n/a n/a n/a n/a 46.72 n/a n/a 47.59 n/a n/a n/a 46.75 n/a n/a n/a n/a n/a n/a n/a n/a 45.69 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 47.22 47.22 n/a n/a n/a n/a n/a 47.14 n/a n/a 47.14 n/a n/a n/a n/a n/a n/a n/a 47.91 n/a 46.7 n/a n/a
n/a n/a n/a n/a n/a 44.19 n/a 44.62 n/a 44.32 43.68 44.16 n/a 43.28 n/a 44.18 n/a n/a n/a n/a 43.88 n/a n/a n/a n/a n/a n/a 44.22 n/a n/a 44.89 n/a n/a n/a 43.28 n/a n/a n/a n/a n/a n/a n/a n/a 44.04 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 44.47 45.12 n/a n/a n/a n/a n/a 45.11 n/a n/a 45.27 n/a n/a n/a n/a n/a n/a n/a n/a n/a 44.12 n/a n/a
The position of the apparatus shown on this plan is given without obligation and warranty, and the accuracy cannot be guaranteed. Service pipes are not shown but their presence should be anticipated. No liability of any kind whatsoever is accepted by Thames Water for any error or omission. The actual position of mains and services must be verified and established on site before any works are undertaken.
Thames Water Utilities Ltd, Property Searches, PO Box 3189, Slough SL1 4W, DX 151280 Slough 13 T 0845 070 9148 E [email protected] I www.thameswater-propertysearches.co.uk
Page 31 of 33
ALS Sewer Map Key
Foul: A sewer designed to convey waste water from domestic andindustrial sources to a treatment works.
Surface Water: A sewer designed to convey surface water (e.g. rainwater from roofs, yards and car parks) to rivers or watercourses.
Combined: A sewer designed to convey both waste water and surfacewater from domestic and industrial sources to a treatment works.
Trunk Surface Water
Storm Relief
Vent Pipe
Proposed Thames SurfaceWater Sewer
Gallery
Surface Water RisingMain
Sludge Rising Main
Vacuum
Public Sewer Types (Operated & Maintained by Thames Water)
Notes:1) All levels associated with the plans are to Ordnance Datum Newlyn.2) All measurements on the plans are metric.3) Arrows (on gravity fed sewers) or flecks (on rising mains) indicate direction of
flow.4) Most private pipes are not shown on our plans, as in the past, this information has
not been recorded.5) ‘na’ or ‘0’ on a manhole level indicates that data is unavailable.
Trunk Foul
Trunk Combined
Bio-solids (Sludge)
Proposed Thames WaterFoul Sewer
Foul Rising Main
Combined Rising Main
Proposed Thames WaterRising Main
Sewer FittingsA feature in a sewer that does not affect the flow in the pipe. Example: a ventis a fitting as the function of a vent is to release excess gas.
Operational ControlsA feature in a sewer that changes or diverts the flow in the sewer. Example:A hydrobrake limits the flow passing downstream.
Air Valve
Dam Chase
Fitting
Meter
Vent Column
Control Valve
Drop Pipe
Ancillary
Weir
End ItemsEnd symbols appear at the start or end of a sewer pipe. Examples: anUndefined End at the start of a sewer indicates that Thames Water has noknowledge of the position of the sewer upstream of that symbol, Outfall on asurface water sewer indicates that the pipe discharges into a stream or river.
Outfall
Undefined End
Inlet
Other SymbolsSymbols used on maps which do not fall under other general categories
Summit
Public/Private Pumping Station/
Invert Level
Change of characteristic indicator (C.O.C.I.)
Other Sewer Types (Not Operated or Maintained by Thames Water)
AreasLines denoting areas of underground surveys, etc.
Agreement
Chamber
Operational Site
Conduit Bridge
Foul Sewer
Combined Sewer
Culverted Watercourse
Surface Water Sewer
Gulley
Proposed
Abandoned Sewer
Tunnel
6) The text appearing alongside a sewer line indicates the internal diameter ofthe pipe in milimetres. Text next to a manhole indicates the manholereference number and should not be taken as a measurement. If you areunsure about any text or symbology present on the plan, please contact amember of Property Insight on 0845 070 9148.
P P
M
W
Terms and Conditions
Thames Water Utilities Ltd, Property Searches, PO Box 3189, Slough SL1 4W, DX 151280 Slough 13 T 0845 070 9148 E [email protected] I www.thameswater-propertysearches.co.uk
Page 32 of 33
All sales are made in accordance with Thames Water Utilities Limited (TWUL) standard terms and conditions unless previously agreed in writing.
1. All goods remain in the property of Thames Water Utilities Ltd until full payment is received. 2. Provision of service will be in accordance with all legal requirements and published TWUL policies. 3. All invoices are strictly due for payment 14 days from due date of the invoice. Any other terms must
be accepted/agreed in writing prior to provision of goods or service, or will be held to be invalid. 4. Thames Water does not accept post-dated cheques-any cheques received will be processed for
payment on date of receipt. 5. In case of dispute TWUL`s terms and conditions shall apply. 6. Penalty interest may be invoked by TWUL in the event of unjustifiable payment delay. Interest
charges will be in line with UK Statute Law ‘The Late Payment of Commercial Debts (Interest) Act 1998’.
7. Interest will be charged in line with current Court Interest Charges, if legal action is taken. 8. A charge may be made at the discretion of the company for increased administration costs.
A copy of Thames Water’s standard terms and conditions are available from the Commercial Billing Team ([email protected]). We publish several Codes of Practice including a guaranteed standards scheme. You can obtain copies of these leaflets by calling us on 0800 316 9800 If you are unhappy with our service you can speak to your original goods or customer service provider. If you are not satisfied with the response, your complaint will be reviewed by the Customer Services Director. You can write to her at: Thames Water Utilities Ltd. PO Box 492, Swindon, SN38 8TU. If the Goods or Services covered by this invoice falls under the regulation of the 1991 Water Industry Act, and you remain dissatisfied you can refer your complaint to Consumer Council for Water on 0121 345 1000 or write to them at Consumer Council for Water, 1st Floor, Victoria Square House, Victoria Square, Birmingham, B2 4AJ.
Ways to pay your bill
Credit Card Call 0845 070 9148 quoting your invoice number starting CBA or ADS / OSS
BACS Payment Account number 90478703 Sort code 60-00-01 A remittance advice must be sent to: Thames Water Utilities Ltd., PO Box 3189, Slough SL1 4WW. or email [email protected]
Telephone Banking By calling your bank and quoting: Account number 90478703 Sort code 60-00-01 and your invoice number
Cheque Made payable to ‘Thames Water Utilities Ltd’ Write your Thames Water account number on the back. Send to: Thames Water Utilities Ltd., PO Box 3189, Slough SL1 4WW or by DX to 151280 Slough 13
Thames Water Utilities Ltd Registered in England & Wales No. 2366661 Registered Office Clearwater Court, Vastern Rd, Reading, Berks, RG1 8DB.
Thames Water Utilities Ltd, Property Searches, PO Box 3189, Slough SL1 4W, DX 151280 Slough 13 T0845 070 [email protected] I www.thameswater-propertysearches.co.uk
Page 33 of 33
Search Code IMPORTANT CONSUMER PROTECTION INFORMATION This search has been produced by Thames Water Property Searches, Clearwater Court, Vastern Road, Reading RG1 8DB, which is registered with the Property Codes Compliance Board (PCCB) as a subscriber to the Search Code. The PCCB independently monitors how registered search firms maintain compliance with the Code. The Search Code:
• provides protection for homebuyers, sellers, estate agents, conveyancers and mortgage lenders who rely on the information included in property search reports undertaken by subscribers on residential and commercial property within the United Kingdom
• sets out minimum standards which firms compiling and selling search reports have to meet • promotes the best practise and quality standards within the industry for the benefit of consumers and
property professionals • enables consumers and property professionals to have confidence in firms which subscribe to the
code, their products and services. By giving you this information, the search firm is confirming that they keep to the principles of the Code. This provides important protection for you. The Code’s core principles Firms which subscribe to the Search Code will:
• display the Search Code logo prominently on their search reports • act with integrity and carry out work with due skill, care and diligence • at all times maintain adequate and appropriate insurance to protect consumers • conduct business in an honest, fair and professional manner • handle complaints speedily and fairly • ensure that products and services comply with industry registration rules and standards and relevant
laws • monitor their compliance with the Code
Complaints If you have a query or complaint about your search, you should raise it directly with the search firm, and if appropriate ask for any complaint to be considered under their formal internal complaints procedure. If you remain dissatisfied with the firm’s final response, after your complaint has been formally considered, or if the firm has exceeded the response timescales, you may refer your complaint for consideration under The Property Ombudsman scheme (TPOs). The Ombudsman can award compensation of up to £5,000 to you if he finds that you have suffered actual loss as a result of your search provider failing to keep to the Code. Please note that all queries or complaints regarding your search should be directed to your search provider in the first instance, not to TPOs or to the PCCB. TPOs Contact Details The Property Ombudsman scheme Milford House 43-55 Milford Street Salisbury Wiltshire SP1 2BP Tel: 01722 333306 Fax: 01722 332296 Email: [email protected] You can get more information about the PCCB from www.propertycodes.org.uk PLEASE ASK YOUR SEARCH PROVIDER IF YOU WOULD LIKE A COPY OF THE SEARCH CODE
Rayners Lane
28202 / Flood Risk Assessment
Revision 1
Appendix C CCTV Drainage Survey
Tower Surveys CCTV Ltd
Rayners Lane Station Car Park CCTV Condition Report Project Ref: TS-349 Rayners Lane Station Car Park CCTV Report_306_Issue02 Dominic White – Tower Surveys CCTV Ltd 04/11/2019
Tower Surveys CCTV Ltd
NottinghamNottinghamshire
Tel: 07917 435 897, Fax:
Price & Myers
Project-informationProject name: Contract number: Contact: Date:
Rayners Lane Station Car Park TS-349 Dominic White 04/10/2019
TS-349 Rayners Lane Station Car Park CCTV Report_306_Issue02.mdb // page: 1
ClientContact:Position:RoadTownCountyTelephone:Fax:Mobile:E-Mail:
Price & MyersSabrina RamCivil Engineer37 Alfred PlaceLondon, WC1E 7DPGreater London020 7631 5128
SiteContact:Position:RoadTownCountyTelephone:Fax:Mobile:E-Mail:
Rayners Lane Station Car ParkSabrina RamCivil engineer5 High WorpleHarrow, HA2 9SJLondon Borough of Harrow020 7631 5128
ContractorContact:Position:RoadTownCountyTelephone:Fax:Mobile:E-Mail:
Tower Surveys CCTV LtdDominic WhiteDirector1 Kendale GroveNottinghamNottinghamshire07917 435 897
07917 435 [email protected]
Tower Surveys CCTV Ltd
NottinghamNottinghamshire
Tel: 07917 435 897, Fax:
Price & Myers
Defect Grade DescriptionProject name: Contract number: Contact: Date:
Rayners Lane Station Car Park TS-349 Dominic White 04/10/2019
TS-349 Rayners Lane Station Car Park CCTV Report_306_Issue02.mdb // page: 2
1: Brick: No Structural DefectsPipe: No Structural Defects
Acceptable Structural Condition
2: Brick: Minor cracking, Surface mortar loss, Spalling slight, wear slightPipe: Circumfrential crack, Moderate joint defects, Spalling slight, Wear slight
Minor collapse risk in short term but potential for further deterioration
3: Brick: Total mortorloss without other defects, single brick displaced, Deformation up to 5%,Spalling medium, Wear mediumPipe: Fractures with deformation up tp 5%, Longitudinal cracking or mulitlpe cracking, Minorloss of level, More severe joint defects, Spalling medium, Wear medium
! Collapse unlikely in near future but future deterioration likely !
4: Brick: Total mortorloss with deformation greater than 10%, Deformation up to 10% andfractured, Displaced/hanging brickwork, Small number of missing bricksPipe: Broken, Deformation up to 10% and broken,, Fractured with deformation 5 - 10%,Multiple fractures, Serious loss of level, spalling large, wear large
!! Collapse likely in foreseeable future !!
5: Brick: Already Collapsed, Missing invert, Deformation over 10% and fractured,Displaced/hanging brickwork and deformation over 10%, Extensive missing bricksPipe: Already collapsed, Deformation over 10% and broken, Extensive areas of fabricmissing, Fractured with deformation over 10%
!!! Collapsed or collapse imminent !!!
Tower Surveys CCTV Ltd
NottinghamNottinghamshire
Tel: 07917 435 897, Fax:
Price & Myers
Inspection reportDate: Job N°: Weather: Operator: section number: PLR:
Present: Vehicle: Camera: Preset: Cleaned: Grade:
Road: Division: start MH:
Place: District: end MH:
Location: Tape No.: Total length:
Location details:Location details:
Purpose: Shape/Size:
Use: Material:
Catchment:Lining:Category:
Comment:
04/10/2019 TS-349 Light rain SG 1 MH1 X X
LG18 VTJ Ibos Rover Yes
5 High Worple
Rayners Lane Station
Car park
MH1 X
Outfall?
18.9 m
Asset condition
Surface water
Circular dia 825 mmConcrete Pipe length:
1:150 position code observation counter photo grade
TS-349 Rayners Lane Station Car Park CCTV Report_306_Issue02.mdb // page: 3
0.00 MH 00:00:00 0Manhole Remark: MH1 X
0.00 WL 00:00:00 0Water level, 5 % height/diameter, Remark: Water standing in sewer
0.00 GP 00:00:00 3_3a 0General Condition photograph
6.90 WL 00:00:00 4_4a 0Water level, 20 % height/diameter, Remark: Water standing in sewer
10.60 WL 00:00:00 5_5a 0Water level, 25 % height/diameter
14.40 WL 00:00:00 7_6a 0Water level, 35 % height/diameter, Remark: Waters tanding in sewer
15.10 CN 00:00:00 1_7a 0Connection, at 01 o´clock, dia 150 mm
18.90 GO 00:00:00 0General Observation, Unable to clear standing water via high pressurewater jetting/waste disposal
18.90 WL 00:00:00 1_9a 0Water level, 40 % height/diameter, Remark: Water standing in sewer
18.90 GO 00:00:00 0General Observation, Assumed that water is standing due toovergrown/unmaintained outfall at point of discharge downstream
18.90 GO 00:00:00 0General Observation, Assumed this sewer connects to watercourse withinneighboring prioperty downstream of this point
18.90 GO 00:00:00 0General Observation, Camera zoomed in on left deviation downstream ofthis point
18.90 GO 00:00:00 0General Observation, Outfall downstream of this point needs to be clearedto enable further CCTV inspection downstream of this point
18.90 SA 00:00:00 0Survey abandoned, Unable to drive robotic crawler camera unit any further,possible debris below water level
MH1 X
Tower Surveys CCTV Ltd
NottinghamNottinghamshire
Tel: 07917 435 897, Fax:
Price & Myers
Inspection photosPlace: Road: Date: section number: PLR:
Rayners Lane Station 5 High Worple 04/10/2019 1 MH1 X X
TS-349 Rayners Lane Station Car Park CCTV Report_306_Issue02.mdb // page: 4
Photo: 3_3a, 00:00:000m, General Condition photograph
Photo: 4_4a, 00:00:006.9m, Water level, 20 % height/diameter, Remark: Water standing in sewer
Photo: 5_5a, 00:00:0010.6m, Water level, 25 % height/diameter
Photo: 7_6a, 00:00:0014.4m, Water level, 35 % height/diameter, Remark: Waters tanding in sewer
Tower Surveys CCTV Ltd
NottinghamNottinghamshire
Tel: 07917 435 897, Fax:
Price & Myers
Inspection photosPlace: Road: Date: section number: PLR:
Rayners Lane Station 5 High Worple 04/10/2019 1 MH1 X X
TS-349 Rayners Lane Station Car Park CCTV Report_306_Issue02.mdb // page: 5
Photo: 1_7a, 00:00:0015.1m, Connection, at 01 o´clock, dia 150 mm
Photo: 1_9a, 00:00:0018.9m, Water level, 40 % height/diameter, Remark: Water standing in sewer
Tower Surveys CCTV Ltd
NottinghamNottinghamshire
Tel: 07917 435 897, Fax:
Price & Myers
Inspection reportDate: Job N°: Weather: Operator: section number: PLR:
Present: Vehicle: Camera: Preset: Cleaned: Grade:
Road: Division: start MH:
Place: District: end MH:
Location: Tape No.: Total length:
Location details:Location details:
Purpose: Shape/Size:
Use: Material:
Catchment:Lining:Category:
Comment:
04/10/2019 TS-349 Light rain SG 2 Gully X
LG18 VTJ MiniCam SoloPro No
5 High Worple
Rayners Lane Station
Car park
MH1 A
Gully
9.15 m
Asset condition
Surface water
Circular dia 150 mmVitrified clay Pipe length:
1:75 position code observation counter photo grade
TS-349 Rayners Lane Station Car Park CCTV Report_306_Issue02.mdb // page: 6
0.00 MH 00:00:00 0Manhole Remark: MH1 A
0.00 WL 00:00:00 0Water level, 0 % height/diameter
0.72 GP 00:00:00 17_3a 0General Condition photograph
1.55 JDL 00:00:00 19_4a 2Joint displaced. Large
3.70 JDM 00:00:00 20_5a 1Joint displaced. Medium
5.26 CCJ 00:00:00 22_6a 2Circumferential Crack at joint, from 07 to 11 o´clock
5.34 JDM 00:00:00 2_7a 1Joint displaced. Medium
6.92 JDM 00:00:00 23_8a 1Joint displaced. Medium
9.15 FH 00:00:00 2_9a 0Finish Survey, Gully reached
MH1 A
Gully
Tower Surveys CCTV Ltd
NottinghamNottinghamshire
Tel: 07917 435 897, Fax:
Price & Myers
Inspection photosPlace: Road: Date: section number: PLR:
Rayners Lane Station 5 High Worple 04/10/2019 2 Gully X
TS-349 Rayners Lane Station Car Park CCTV Report_306_Issue02.mdb // page: 7
Photo: 17_3a, 00:00:000.72m, General Condition photograph
Photo: 19_4a, 00:00:001.55m, Joint displaced. Large
Photo: 20_5a, 00:00:003.7m, Joint displaced. Medium
Photo: 22_6a, 00:00:005.26m, Circumferential Crack at joint, from 07 to 11 o´clock
Tower Surveys CCTV Ltd
NottinghamNottinghamshire
Tel: 07917 435 897, Fax:
Price & Myers
Inspection photosPlace: Road: Date: section number: PLR:
Rayners Lane Station 5 High Worple 04/10/2019 2 Gully X
TS-349 Rayners Lane Station Car Park CCTV Report_306_Issue02.mdb // page: 8
Photo: 2_7a, 00:00:005.34m, Joint displaced. Medium
Photo: 23_8a, 00:00:006.92m, Joint displaced. Medium
Photo: 2_9a, 00:00:009.15m, Finish Survey, Gully reached
Tower Surveys CCTV Ltd
NottinghamNottinghamshire
Tel: 07917 435 897, Fax:
Price & Myers
Inspection reportDate: Job N°: Weather: Operator: section number: PLR:
Present: Vehicle: Camera: Preset: Cleaned: Grade:
Road: Division: start MH:
Place: District: end MH:
Location: Tape No.: Total length:
Location details:Location details:
Purpose: Shape/Size:
Use: Material:
Catchment:Lining:Category:
Comment:
04/10/2019 TS-349 Light rain SG 3 Gully X
LG18 VTJ MiniCam SoloPro No
5 High Worple
Rayners Lane Station
Car park
MH1 B
Gully
7.85 m
Asset condition
Surface water
Circular dia 150 mmVitrified clay Pipe length:
1:75 position code observation counter photo grade
TS-349 Rayners Lane Station Car Park CCTV Report_306_Issue02.mdb // page: 9
0.00 MH 00:00:00 0Manhole Remark: MH1 B
0.00 WL 00:00:00 0Water level, 0 % height/diameter
0.34 JDM 00:00:00 26_3a 1Joint displaced. Medium
2.26 JDM 00:00:00 28_4a 1Joint displaced. Medium
6.19 GP 00:00:00 29_5a 0General Condition photograph
7.85 FH 00:00:00 3_6a 0Finish Survey, Gully reached
MH1 B
Gully
Tower Surveys CCTV Ltd
NottinghamNottinghamshire
Tel: 07917 435 897, Fax:
Price & Myers
Inspection photosPlace: Road: Date: section number: PLR:
Rayners Lane Station 5 High Worple 04/10/2019 3 Gully X
TS-349 Rayners Lane Station Car Park CCTV Report_306_Issue02.mdb // page: 10
Photo: 26_3a, 00:00:000.34m, Joint displaced. Medium
Photo: 28_4a, 00:00:002.26m, Joint displaced. Medium
Photo: 29_5a, 00:00:006.19m, General Condition photograph
Photo: 3_6a, 00:00:007.85m, Finish Survey, Gully reached
Tower Surveys CCTV Ltd
NottinghamNottinghamshire
Tel: 07917 435 897, Fax:
Price & Myers
Inspection reportDate: Job N°: Weather: Operator: section number: PLR:
Present: Vehicle: Camera: Preset: Cleaned: Grade:
Road: Division: start MH:
Place: District: end MH:
Location: Tape No.: Total length:
Location details:Location details:
Purpose: Shape/Size:
Use: Material:
Catchment:Lining:Category:
Comment:
04/10/2019 TS-349 Light rain SG 4 MH2 X
LG18 VTJ Ibos Rover Yes
5 High Worple
Rayners Lane Station
Car park
MH1 C
MH2
15.4 m
Asset condition
Surface water
Circular dia 750 mmConcrete Pipe length:
1:125 position code observation counter photo grade
TS-349 Rayners Lane Station Car Park CCTV Report_306_Issue02.mdb // page: 11
0.00 MH 00:00:00 0Manhole Remark: MH1 C
0.00 WL 00:00:00 31_2a 0Water level, 10 % height/diameter, Remark: Water standing in sewer
5.40 GP 00:00:00 36_3a 0General Condition photograph
10.00 GP 00:00:00 37_4a 0General Condition photograph
15.20 CNI 00:00:00 4_5a 4Connection, at 11 o´clock, dia 150 mm, intrusion 30 mm
15.40 EM 00:00:00 4_6a 4Encrustation medium, from 04 to 08 o´clock, 10% cross-sectional area loss
15.40 GO 00:00:00 0General Observation, Unable to remove encrustation via high pressurewater jetting
15.40 FH 00:00:00 0Finish Survey, Remaining section of sewer surveyed from MH2 X upstream
MH1 C
MH2
Tower Surveys CCTV Ltd
NottinghamNottinghamshire
Tel: 07917 435 897, Fax:
Price & Myers
Inspection photosPlace: Road: Date: section number: PLR:
Rayners Lane Station 5 High Worple 04/10/2019 4 MH2 X
TS-349 Rayners Lane Station Car Park CCTV Report_306_Issue02.mdb // page: 12
Photo: 31_2a, 00:00:000m, Water level, 10 % height/diameter, Remark: Water standing in sewer
Photo: 36_3a, 00:00:005.4m, General Condition photograph
Photo: 37_4a, 00:00:0010m, General Condition photograph
Photo: 4_5a, 00:00:0015.2m, Connection, at 11 o´clock, dia 150 mm, intrusion 30 mm
Tower Surveys CCTV Ltd
NottinghamNottinghamshire
Tel: 07917 435 897, Fax:
Price & Myers
Inspection photosPlace: Road: Date: section number: PLR:
Rayners Lane Station 5 High Worple 04/10/2019 4 MH2 X
TS-349 Rayners Lane Station Car Park CCTV Report_306_Issue02.mdb // page: 13
Photo: 4_6a, 00:00:0015.4m, Encrustation medium, from 04 to 08 o´clock, 10% cross-sectional area loss
Tower Surveys CCTV Ltd
NottinghamNottinghamshire
Tel: 07917 435 897, Fax:
Price & Myers
Inspection reportDate: Job N°: Weather: Operator: section number: PLR:
Present: Vehicle: Camera: Preset: Cleaned: Grade:
Road: Division: start MH:
Place: District: end MH:
Location: Tape No.: Total length:
Location details:Location details:
Purpose: Shape/Size:
Use: Material:
Catchment:Lining:Category:
Comment:
04/10/2019 TS-349 Light rain SG 5 MH2 X X
LG18 VTJ Ibos Rover Yes
5 High Worple
Rayners Lane Station
Car park
MH2 X
MH1
9.5 m
Asset condition
Surface water
Circular dia 750 mmConcrete Pipe length:
1:75 position code observation counter photo grade
TS-349 Rayners Lane Station Car Park CCTV Report_306_Issue02.mdb // page: 14
0.00 MH 00:00:00 0Manhole Remark: MH2 X
0.00 WL 00:00:00 39_2a 0Water level, 5 % height/diameter, Remark: Water standing in sewer
4.90 GP 00:00:00 40_3a 0General Condition photograph
8.90 EM 00:00:00 4Encrustation medium, from 05 to 07 o´clock, 10% cross-sectional area loss
8.90 GO 00:00:00 0General Observation, Unable to remove encrustation via high pressurewater jetting
9.50 CN 00:00:00 5_6a 0Connection, at 01 o´clock, dia 150 mm
9.50 FH 00:00:00 0Finish Survey, Remaining section of sewer surveyed from MH1 Cdownstream
MH2 X
MH1
Tower Surveys CCTV Ltd
NottinghamNottinghamshire
Tel: 07917 435 897, Fax:
Price & Myers
Inspection photosPlace: Road: Date: section number: PLR:
Rayners Lane Station 5 High Worple 04/10/2019 5 MH2 X X
TS-349 Rayners Lane Station Car Park CCTV Report_306_Issue02.mdb // page: 15
Photo: 39_2a, 00:00:000m, Water level, 5 % height/diameter, Remark: Water standing in sewer
Photo: 40_3a, 00:00:004.9m, General Condition photograph
Photo: 5_6a, 00:00:009.5m, Connection, at 01 o´clock, dia 150 mm
Tower Surveys CCTV Ltd
NottinghamNottinghamshire
Tel: 07917 435 897, Fax:
Price & Myers
Inspection reportDate: Job N°: Weather: Operator: section number: PLR:
Present: Vehicle: Camera: Preset: Cleaned: Grade:
Road: Division: start MH:
Place: District: end MH:
Location: Tape No.: Total length:
Location details:Location details:
Purpose: Shape/Size:
Use: Material:
Catchment:Lining:Category:
Comment:
04/10/2019 TS-349 Light rain SG 6 MH3 X
LG18 VTJ Ibos Rover No
5 High Worple
Rayners Lane Station
Car park
MH2 A
MH3
28.8 m
Asset condition
Surface water
Circular dia 525 mmConcrete Pipe length:
1:225 position code observation counter photo grade
TS-349 Rayners Lane Station Car Park CCTV Report_306_Issue02.mdb // page: 16
0.00 MH 00:00:00 0Manhole Remark: MH2 A
0.00 WL 00:00:00 0Water level, 0 % height/diameter
1.40 GP 00:00:00 49_3a 0General Condition photograph
10.00 GP 00:00:00 50_4a 0General Condition photograph
17.90 H 00:00:00 51_5a 4Hole in sewer at 11 o´clock
19.90 DE 00:00:00 52_6a 1Debris, 5 % cross-sectional area loss
24.90 DE 00:00:00 54_7a 1Debris, 5 % cross-sectional area loss
25.50 CN 00:00:00 6_8a 0Connection, at 02 o´clock, dia 100 mm
28.80 FH 00:00:00 6_9a 0Finish Survey, MH3 reached
MH2 A
MH3
Tower Surveys CCTV Ltd
NottinghamNottinghamshire
Tel: 07917 435 897, Fax:
Price & Myers
Inspection photosPlace: Road: Date: section number: PLR:
Rayners Lane Station 5 High Worple 04/10/2019 6 MH3 X
TS-349 Rayners Lane Station Car Park CCTV Report_306_Issue02.mdb // page: 17
Photo: 49_3a, 00:00:001.4m, General Condition photograph
Photo: 50_4a, 00:00:0010m, General Condition photograph
Photo: 51_5a, 00:00:0017.9m, Hole in sewer at 11 o´clock
Photo: 52_6a, 00:00:0019.9m, Debris, 5 % cross-sectional area loss
Tower Surveys CCTV Ltd
NottinghamNottinghamshire
Tel: 07917 435 897, Fax:
Price & Myers
Inspection photosPlace: Road: Date: section number: PLR:
Rayners Lane Station 5 High Worple 04/10/2019 6 MH3 X
TS-349 Rayners Lane Station Car Park CCTV Report_306_Issue02.mdb // page: 18
Photo: 54_7a, 00:00:0024.9m, Debris, 5 % cross-sectional area loss
Photo: 6_8a, 00:00:0025.5m, Connection, at 02 o´clock, dia 100 mm
Photo: 6_9a, 00:00:0028.8m, Finish Survey, MH3 reached
Tower Surveys CCTV Ltd
NottinghamNottinghamshire
Tel: 07917 435 897, Fax:
Price & Myers
Inspection reportDate: Job N°: Weather: Operator: section number: PLR:
Present: Vehicle: Camera: Preset: Cleaned: Grade:
Road: Division: start MH:
Place: District: end MH:
Location: Tape No.: Total length:
Location details:Location details:
Purpose: Shape/Size:
Use: Material:
Catchment:Lining:Category:
Comment:
04/10/2019 TS-349 Light rain SG 7 Gully X
LG18 VTJ MiniCam SoloPro No
5 High Worple
Rayners Lane Station
Car park
MH2 B
Gully
14.24 m
Asset condition
Surface water
Circular dia 150 mmVitrified clay Pipe length:
1:125 position code observation counter photo grade
TS-349 Rayners Lane Station Car Park CCTV Report_306_Issue02.mdb // page: 19
0.00 MH 00:00:00 0Manhole Remark: MH2 B
0.00 WL 00:00:00 0Water level, 0 % height/diameter
0.57 GP 00:00:00 58_3a 0General Condition photograph
5.59 GP 00:00:00 59_4a 0General Condition photograph
8.74 JDM 00:00:00 60_5a 1Joint displaced. Medium
10.32 JDM 00:00:00 61_6a 1Joint displaced. Medium
12.32 JDM 00:00:00 62_7a 1Joint displaced. Medium
14.24 FH 00:00:00 7_8a 0Finish Survey, Gully reached
MH2 B
Gully
Tower Surveys CCTV Ltd
NottinghamNottinghamshire
Tel: 07917 435 897, Fax:
Price & Myers
Inspection photosPlace: Road: Date: section number: PLR:
Rayners Lane Station 5 High Worple 04/10/2019 7 Gully X
TS-349 Rayners Lane Station Car Park CCTV Report_306_Issue02.mdb // page: 20
Photo: 58_3a, 00:00:000.57m, General Condition photograph
Photo: 59_4a, 00:00:005.59m, General Condition photograph
Photo: 60_5a, 00:00:008.74m, Joint displaced. Medium
Photo: 61_6a, 00:00:0010.32m, Joint displaced. Medium
Tower Surveys CCTV Ltd
NottinghamNottinghamshire
Tel: 07917 435 897, Fax:
Price & Myers
Inspection photosPlace: Road: Date: section number: PLR:
Rayners Lane Station 5 High Worple 04/10/2019 7 Gully X
TS-349 Rayners Lane Station Car Park CCTV Report_306_Issue02.mdb // page: 21
Photo: 62_7a, 00:00:0012.32m, Joint displaced. Medium
Photo: 7_8a, 00:00:0014.24m, Finish Survey, Gully reached
Tower Surveys CCTV Ltd
NottinghamNottinghamshire
Tel: 07917 435 897, Fax:
Price & Myers
Inspection reportDate: Job N°: Weather: Operator: section number: PLR:
Present: Vehicle: Camera: Preset: Cleaned: Grade:
Road: Division: start MH:
Place: District: end MH:
Location: Tape No.: Total length:
Location details:Location details:
Purpose: Shape/Size:
Use: Material:
Catchment:Lining:Category:
Comment:
04/10/2019 TS-349 Light rain SG 8 Gully X
LG18 VTJ MiniCam SoloPro No
5 High Worple
Rayners Lane Station
Car park
MH2 C
Gully
19.83 m
Asset condition
Surface water
Circular dia 150 mmVitrified clay Pipe length:
1:150 position code observation counter photo grade
TS-349 Rayners Lane Station Car Park CCTV Report_306_Issue02.mdb // page: 22
0.00 MH 00:00:00 0Manhole Remark: MH2 C
0.00 WL 00:00:00 0Water level, 0 % height/diameter
0.34 GP 00:00:00 65_3a 0General Condition photograph
5.89 GP 00:00:00 67_4a 0General Condition photograph
13.70 GP 00:00:00 68_5a 0General Condition photograph
19.83 FH 00:00:00 8_6a 0Finish Survey, Gully reached
MH2 C
Gully
Tower Surveys CCTV Ltd
NottinghamNottinghamshire
Tel: 07917 435 897, Fax:
Price & Myers
Inspection photosPlace: Road: Date: section number: PLR:
Rayners Lane Station 5 High Worple 04/10/2019 8 Gully X
TS-349 Rayners Lane Station Car Park CCTV Report_306_Issue02.mdb // page: 23
Photo: 65_3a, 00:00:000.34m, General Condition photograph
Photo: 67_4a, 00:00:005.89m, General Condition photograph
Photo: 68_5a, 00:00:0013.7m, General Condition photograph
Photo: 8_6a, 00:00:0019.83m, Finish Survey, Gully reached
Tower Surveys CCTV Ltd
NottinghamNottinghamshire
Tel: 07917 435 897, Fax:
Price & Myers
Inspection reportDate: Job N°: Weather: Operator: section number: PLR:
Present: Vehicle: Camera: Preset: Cleaned: Grade:
Road: Division: start MH:
Place: District: end MH:
Location: Tape No.: Total length:
Location details:Location details:
Purpose: Shape/Size:
Use: Material:
Catchment:Lining:Category:
Comment:
04/10/2019 TS-349 Light rain SG 9 Gully1 X
LG18 VTJ MiniCam SoloPro No
5 High Worple
Rayners Lane Station
Car park
MH3 A
Gully1
12.02 m
Asset condition
Surface water
Circular dia 225 mmVitrified clay Pipe length:
1:100 position code observation counter photo grade
TS-349 Rayners Lane Station Car Park CCTV Report_306_Issue02.mdb // page: 24
0.00 MH 00:00:00 0Manhole Remark: MH3 A
0.00 WL 00:00:00 0Water level, 0 % height/diameter
0.00 GP 00:00:00 71_3a 0General Condition photograph
0.00 LU 00:00:00 0Line of Sewer deviates up
5.16 GP 00:00:00 75_5a 0General Condition photograph
12.02 DC 00:00:00 9_6a 0Dimension of sewer changes, new dimension dia 150 mm
12.02 FH 00:00:00 0Finish Survey, Remaining section of sewer surveyed from Gully1 upstream
MH3 A
Gully1
Tower Surveys CCTV Ltd
NottinghamNottinghamshire
Tel: 07917 435 897, Fax:
Price & Myers
Inspection photosPlace: Road: Date: section number: PLR:
Rayners Lane Station 5 High Worple 04/10/2019 9 Gully1 X
TS-349 Rayners Lane Station Car Park CCTV Report_306_Issue02.mdb // page: 25
Photo: 71_3a, 00:00:000m, General Condition photograph
Photo: 75_5a, 00:00:005.16m, General Condition photograph
Photo: 9_6a, 00:00:0012.02m, Dimension of sewer changes, new dimension dia 150 mm
Tower Surveys CCTV Ltd
NottinghamNottinghamshire
Tel: 07917 435 897, Fax:
Price & Myers
Inspection reportDate: Job N°: Weather: Operator: section number: PLR:
Present: Vehicle: Camera: Preset: Cleaned: Grade:
Road: Division: start MH:
Place: District: end MH:
Location: Tape No.: Total length:
Location details:Location details:
Purpose: Shape/Size:
Use: Material:
Catchment:Lining:Category:
Comment:
04/10/2019 TS-349 Light rain SG 10 Gully1 X X
LG18 VTJ MiniCam SoloPro No
5 High Worple
Rayners Lane Station
Car park
Gully1 X
MH3
1.94 m
Asset condition
Surface water
Circular dia 150 mmVitrified clay Pipe length:
1:25 position code observation counter photo grade
TS-349 Rayners Lane Station Car Park CCTV Report_306_Issue02.mdb // page: 26
0.00 MH 00:00:00 0Manhole Remark: Gully1 X
0.00 WL 00:00:00 0Water level, 0 % height/diameter
0.00 LD 00:00:00 0Line of Sewer deviates down
1.38 GP 00:00:00 10_4a 0General Condition photograph
1.94 DC 00:00:00 80_5a 0Dimension of sewer changes, new dimension dia 225 mm
1.94 FH 00:00:00 0Finish Survey, Remaining section of sewer surveyed from MH3 Adownstream
Gully1 X
MH3
Tower Surveys CCTV Ltd
NottinghamNottinghamshire
Tel: 07917 435 897, Fax:
Price & Myers
Inspection photosPlace: Road: Date: section number: PLR:
Rayners Lane Station 5 High Worple 04/10/2019 10 Gully1 X X
TS-349 Rayners Lane Station Car Park CCTV Report_306_Issue02.mdb // page: 27
Photo: 10_4a, 00:00:001.38m, General Condition photograph
Photo: 80_5a, 00:00:001.94m, Dimension of sewer changes, new dimension dia 225 mm
Tower Surveys CCTV Ltd
NottinghamNottinghamshire
Tel: 07917 435 897, Fax:
Price & Myers
Inspection reportDate: Job N°: Weather: Operator: section number: PLR:
Present: Vehicle: Camera: Preset: Cleaned: Grade:
Road: Division: start MH:
Place: District: end MH:
Location: Tape No.: Total length:
Location details:Location details:
Purpose: Shape/Size:
Use: Material:
Catchment:Lining:Category:
Comment:
04/10/2019 TS-349 Light rain SG 11 MH4 X X
LG18 VTJ MiniCam SoloPro Yes
5 High Worple
Rayners Lane Station
Car park
MH4 X
Unknown
0.1 m
Asset condition
Surface water
Circular dia 225 mmVitrified clay Pipe length:
1:25 position code observation counter photo grade
TS-349 Rayners Lane Station Car Park CCTV Report_306_Issue02.mdb // page: 28
0.00 MH 00:00:00 0Manhole Remark: MH4 X
0.00 WL 00:00:00 0Water level, 0 % height/diameter
0.10 S1 RM 00:00:00 84_3a 5Mass Roots 95 % cross-sectional area loss, Start
0.10 GO 00:00:00 0General Observation, Unable to remove roots via high pressure waterjetting
0.10 SA 00:00:00 0Survey abandoned, Unable to pass mass roots
MH4 X
Tower Surveys CCTV Ltd
NottinghamNottinghamshire
Tel: 07917 435 897, Fax:
Price & Myers
Inspection photosPlace: Road: Date: section number: PLR:
Rayners Lane Station 5 High Worple 04/10/2019 11 MH4 X X
TS-349 Rayners Lane Station Car Park CCTV Report_306_Issue02.mdb // page: 29
Photo: 84_3a, 00:00:000.1m, Mass Roots 95 % cross-sectional area loss, Start
Tower Surveys CCTV Ltd
NottinghamNottinghamshire
Tel: 07917 435 897, Fax:
Price & Myers
Inspection reportDate: Job N°: Weather: Operator: section number: PLR:
Present: Vehicle: Camera: Preset: Cleaned: Grade:
Road: Division: start MH:
Place: District: end MH:
Location: Tape No.: Total length:
Location details:Location details:
Purpose: Shape/Size:
Use: Material:
Catchment:Lining:Category:
Comment:
04/10/2019 TS-349 Light rain SG 12 MH5 X
LG18 VTJ MiniCam SoloPro Yes
5 High Worple
Rayners Lane Station
Car park
MH4 A
MH5
0.04 m
Asset condition
Surface water
Circular dia 150 mmVitrified clay Pipe length:
1:25 position code observation counter photo grade
TS-349 Rayners Lane Station Car Park CCTV Report_306_Issue02.mdb // page: 30
0.00 MH 00:00:00 0Manhole Remark: MH4 A
0.00 WL 00:00:00 0Water level, 0 % height/diameter
0.04 S1 RM 00:00:00 89_3a 5Mass Roots 60 % cross-sectional area loss, Start
0.04 GO 00:00:00 0General Observation, Unable to remove roots via high pressure waterjetting
0.04 SA 00:00:00 0Survey abandoned, Unable to pass mass roots
MH4 A
Tower Surveys CCTV Ltd
NottinghamNottinghamshire
Tel: 07917 435 897, Fax:
Price & Myers
Inspection photosPlace: Road: Date: section number: PLR:
Rayners Lane Station 5 High Worple 04/10/2019 12 MH5 X
TS-349 Rayners Lane Station Car Park CCTV Report_306_Issue02.mdb // page: 31
Photo: 89_3a, 00:00:000.04m, Mass Roots 60 % cross-sectional area loss, Start
Tower Surveys CCTV Ltd
NottinghamNottinghamshire
Tel: 07917 435 897, Fax:
Price & Myers
Inspection reportDate: Job N°: Weather: Operator: section number: PLR:
Present: Vehicle: Camera: Preset: Cleaned: Grade:
Road: Division: start MH:
Place: District: end MH:
Location: Tape No.: Total length:
Location details:Location details:
Purpose: Shape/Size:
Use: Material:
Catchment:Lining:Category:
Comment:
04/10/2019 TS-349 Light rain SG 13 MH6 X
LG18 VTJ MiniCam SoloPro Yes
5 High Worple
Rayners Lane Station
Car park
MH4 B
MH6
0 m
Asset condition
Surface water
Circular dia 225 mmVitrified clay Pipe length:
1:25 position code observation counter photo grade
TS-349 Rayners Lane Station Car Park CCTV Report_306_Issue02.mdb // page: 32
0.00 MH 00:00:00 0Manhole Remark: MH4 B
0.00 WL 00:00:00 0Water level, 0 % height/diameter
0.00 RM 00:00:00 94_3a 5Mass Roots 95 % cross-sectional area loss
0.00 GO 00:00:00 0General Observation, Unable to remove roots via high pressure waterjetting
0.00 SA 00:00:00 0Survey abandoned, Unable to pass mass roots
MH4 B
Tower Surveys CCTV Ltd
NottinghamNottinghamshire
Tel: 07917 435 897, Fax:
Price & Myers
Inspection photosPlace: Road: Date: section number: PLR:
Rayners Lane Station 5 High Worple 04/10/2019 13 MH6 X
TS-349 Rayners Lane Station Car Park CCTV Report_306_Issue02.mdb // page: 33
Photo: 94_3a, 00:00:000m, Mass Roots 95 % cross-sectional area loss
Tower Surveys CCTV Ltd
NottinghamNottinghamshire
Tel: 07917 435 897, Fax:
Price & Myers
Inspection reportDate: Job N°: Weather: Operator: section number: PLR:
Present: Vehicle: Camera: Preset: Cleaned: Grade:
Road: Division: start MH:
Place: District: end MH:
Location: Tape No.: Total length:
Location details:Location details:
Purpose: Shape/Size:
Use: Material:
Catchment:Lining:Category:
Comment:
04/10/2019 TS-349 Light rain SG 14 Gully X
LG18 VTJ MiniCam SoloPro Yes
5 High Worple
Rayners Lane Station
Car park
MH6 A
Gully
2.29 m
Asset condition
Surface water
Circular dia 150 mmVitrified clay Pipe length:
1:25 position code observation counter photo grade
TS-349 Rayners Lane Station Car Park CCTV Report_306_Issue02.mdb // page: 34
0.00 MH 00:00:00 0Manhole Remark: MH6 A
0.00 WL 00:00:00 0Water level, 0 % height/diameter
0.00 LU 00:00:00 0Line of Sewer deviates up
0.57 JDM 00:00:00 14_4a 1Joint displaced. Medium
1.30 GP 00:00:00 14_5a 0General Condition photograph
1.60 JDM 00:00:00 103_6a 1Joint displaced. Medium
2.29 FH 00:00:00 14_7a 0Finish Survey, Gully reached
MH6 A
Gully
Tower Surveys CCTV Ltd
NottinghamNottinghamshire
Tel: 07917 435 897, Fax:
Price & Myers
Inspection photosPlace: Road: Date: section number: PLR:
Rayners Lane Station 5 High Worple 04/10/2019 14 Gully X
TS-349 Rayners Lane Station Car Park CCTV Report_306_Issue02.mdb // page: 35
Photo: 14_4a, 00:00:000.57m, Joint displaced. Medium
Photo: 14_5a, 00:00:001.3m, General Condition photograph
Photo: 103_6a, 00:00:001.6m, Joint displaced. Medium
Photo: 14_7a, 00:00:002.29m, Finish Survey, Gully reached
Tower Surveys CCTV Ltd
NottinghamNottinghamshire
Tel: 07917 435 897, Fax:
Price & Myers
Inspection reportDate: Job N°: Weather: Operator: section number: PLR:
Present: Vehicle: Camera: Preset: Cleaned: Grade:
Road: Division: start MH:
Place: District: end MH:
Location: Tape No.: Total length:
Location details:Location details:
Purpose: Shape/Size:
Use: Material:
Catchment:Lining:Category:
Comment:
04/10/2019 TS-349 Light rain SG 15 MH7 X
LG18 VTJ MiniCam SoloPro Yes
5 High Worple
Rayners Lane Station
Car park
MH6 B
MH7
3.91 m
Asset condition
Surface water
Circular dia 225 mmVitrified clay Pipe length:
1:50 position code observation counter photo grade
TS-349 Rayners Lane Station Car Park CCTV Report_306_Issue02.mdb // page: 36
0.00 MH 00:00:00 0Manhole Remark: MH6 B
0.00 WL 00:00:00 0Water level, 0 % height/diameter
0.00 EM 00:00:00 106_3a 4Encrustation medium, from 04 to 08 o´clock, 20% cross-sectional area loss
0.00 GO 00:00:00 0General Observation, Unable to remove encrustation via high pressurewater jetting
0.97 WL 00:00:00 108_5a 0Water level, 5 % height/diameter, Remark: Water standing due to setencrustation in sewer
3.91 EH 00:00:00 109_6a 5Encrustation heavy, from 03 to 09 o´clock, 50% cross-sectional area loss
3.91 GO 00:00:00 0General Observation, Unable to remove encrustation via high pressurewater jetting
3.91 FH 00:00:00 0Finish Survey, Remaining section of sewer surveyed from MH7 X upstream
MH6 B
MH7
Tower Surveys CCTV Ltd
NottinghamNottinghamshire
Tel: 07917 435 897, Fax:
Price & Myers
Inspection photosPlace: Road: Date: section number: PLR:
Rayners Lane Station 5 High Worple 04/10/2019 15 MH7 X
TS-349 Rayners Lane Station Car Park CCTV Report_306_Issue02.mdb // page: 37
Photo: 106_3a, 00:00:000m, Encrustation medium, from 04 to 08 o´clock, 20% cross-sectional area loss
Photo: 108_5a, 00:00:000.97m, Water level, 5 % height/diameter, Remark: Water standing due to set encrustation in sewer
Photo: 109_6a, 00:00:003.91m, Encrustation heavy, from 03 to 09 o´clock, 50% cross-sectional area loss
Tower Surveys CCTV Ltd
NottinghamNottinghamshire
Tel: 07917 435 897, Fax:
Price & Myers
Inspection reportDate: Job N°: Weather: Operator: section number: PLR:
Present: Vehicle: Camera: Preset: Cleaned: Grade:
Road: Division: start MH:
Place: District: end MH:
Location: Tape No.: Total length:
Location details:Location details:
Purpose: Shape/Size:
Use: Material:
Catchment:Lining:Category:
Comment:
04/10/2019 TS-349 Light rain SG 16 MH7 X X
LG18 VTJ MiniCam SoloPro Yes
5 High Worple
Rayners Lane Station
Car park
MH7 X
MH6
11.76 m
Asset condition
Surface water
Circular dia 225 mmVitrified clay Pipe length:
1:100 position code observation counter photo grade
TS-349 Rayners Lane Station Car Park CCTV Report_306_Issue02.mdb // page: 38
0.00 MH 00:00:00 0Manhole Remark: MH7 X
0.00 WL 00:00:00 0Water level, 5 % height/diameter, Remark: Water standing due to setencrustation downstream
0.31 B 00:00:00 114_3a 4Sewer Broken, from 08 to 05 o´clock
1.32 WL 00:00:00 115_4a 0Water level, 10 % height/diameter, Remark: Water standing due to setencrustation downstream
3.34 GP 00:00:00 116_5a 0General Condition photograph
8.02 CCJ 00:00:00 117_6a 2Circumferential Crack at joint, from 07 to 11 o´clock
8.90 WL 00:00:00 0Water level, 20 % height/diameter, Remark: Water standing due to setencrustation downstream
9.56 JDM 00:00:00 16_8a 1Joint displaced. Medium
10.10 H 00:00:00 120_9a 4Hole in sewer at 12 o´clock
11.76 EH 00:00:00 121_10a 5Encrustation heavy, from 03 to 09 o´clock, 50% cross-sectional area loss
11.76 GO 00:00:00 0General Observation, Unable to remove encrustation via high pressurewater jetting
11.76 FH 00:00:00 0Finish Survey, Remaining section of sewer surveyed from MH6 Bdownstream
MH7 X
MH6
Tower Surveys CCTV Ltd
NottinghamNottinghamshire
Tel: 07917 435 897, Fax:
Price & Myers
Inspection photosPlace: Road: Date: section number: PLR:
Rayners Lane Station 5 High Worple 04/10/2019 16 MH7 X X
TS-349 Rayners Lane Station Car Park CCTV Report_306_Issue02.mdb // page: 39
Photo: 114_3a, 00:00:000.31m, Sewer Broken, from 08 to 05 o´clock
Photo: 115_4a, 00:00:001.32m, Water level, 10 % height/diameter, Remark: Water standing due to set encrustation downstream
Photo: 116_5a, 00:00:003.34m, General Condition photograph
Photo: 117_6a, 00:00:008.02m, Circumferential Crack at joint, from 07 to 11 o´clock
Tower Surveys CCTV Ltd
NottinghamNottinghamshire
Tel: 07917 435 897, Fax:
Price & Myers
Inspection photosPlace: Road: Date: section number: PLR:
Rayners Lane Station 5 High Worple 04/10/2019 16 MH7 X X
TS-349 Rayners Lane Station Car Park CCTV Report_306_Issue02.mdb // page: 40
Photo: 16_8a, 00:00:009.56m, Joint displaced. Medium
Photo: 120_9a, 00:00:0010.1m, Hole in sewer at 12 o´clock
Photo: 121_10a, 00:00:0011.76m, Encrustation heavy, from 03 to 09 o´clock, 50% cross-sectional area loss
Tower Surveys CCTV Ltd
NottinghamNottinghamshire
Tel: 07917 435 897, Fax:
Price & Myers
Inspection reportDate: Job N°: Weather: Operator: section number: PLR:
Present: Vehicle: Camera: Preset: Cleaned: Grade:
Road: Division: start MH:
Place: District: end MH:
Location: Tape No.: Total length:
Location details:Location details:
Purpose: Shape/Size:
Use: Material:
Catchment:Lining:Category:
Comment:
04/10/2019 TS-349 Light rain SG 17 Gully X
LG18 VTJ MiniCam SoloPro Yes
5 High Worple
Rayners Lane Station
Car park
MH7 A
Gully
5.32 m
Asset condition
Surface water
Circular dia 150 mmVitrified clay Pipe length:
1:50 position code observation counter photo grade
TS-349 Rayners Lane Station Car Park CCTV Report_306_Issue02.mdb // page: 41
0.00 MH 00:00:00 0Manhole Remark: MH7 A
0.00 WL 00:00:00 0Water level, 0 % height/diameter
0.00 JDM 00:00:00 126_3a 1Joint displaced. Medium
0.90 LU 00:00:00 0Line of Sewer deviates up
1.06 CCJ 00:00:00 129_5a 2Circumferential Crack at joint, from 01 to 06 o´clock
2.07 H 00:00:00 130_6a 4Hole in sewer at 01 o´clock
2.35 CCJ 00:00:00 131_7a 2Circumferential Crack at joint, from 07 to 12 o´clock
2.35 MC 00:00:00 132_8a 0Sewer Material changes at this point, Plastic
2.35 DC 00:00:00 133_9a 0Dimension of sewer changes, new dimension dia 100 mm
3.30 WL 00:00:00 134_10a 0Water level, 10 % height/diameter, Remark: Water standing in sewer
4.40 WL 00:00:00 0Water level, 0 % height/diameter
4.54 MC 00:00:00 136_12a 0Sewer Material changes at this point, Vitrified clay
4.54 DC 00:00:00 137_13a 0Dimension of sewer changes, new dimension dia 150 mm
5.32 FH 00:00:00 17_14a 0Finish Survey, Gully reached
MH7 A
Gully
Tower Surveys CCTV Ltd
NottinghamNottinghamshire
Tel: 07917 435 897, Fax:
Price & Myers
Inspection photosPlace: Road: Date: section number: PLR:
Rayners Lane Station 5 High Worple 04/10/2019 17 Gully X
TS-349 Rayners Lane Station Car Park CCTV Report_306_Issue02.mdb // page: 42
Photo: 126_3a, 00:00:000m, Joint displaced. Medium
Photo: 129_5a, 00:00:001.06m, Circumferential Crack at joint, from 01 to 06 o´clock
Photo: 130_6a, 00:00:002.07m, Hole in sewer at 01 o´clock
Photo: 131_7a, 00:00:002.35m, Circumferential Crack at joint, from 07 to 12 o´clock
Tower Surveys CCTV Ltd
NottinghamNottinghamshire
Tel: 07917 435 897, Fax:
Price & Myers
Inspection photosPlace: Road: Date: section number: PLR:
Rayners Lane Station 5 High Worple 04/10/2019 17 Gully X
TS-349 Rayners Lane Station Car Park CCTV Report_306_Issue02.mdb // page: 43
Photo: 132_8a, 00:00:002.35m, Sewer Material changes at this point, Plastic
Photo: 133_9a, 00:00:002.35m, Dimension of sewer changes, new dimension dia 100 mm
Photo: 134_10a, 00:00:003.3m, Water level, 10 % height/diameter, Remark: Water standing in sewer
Photo: 136_12a, 00:00:004.54m, Sewer Material changes at this point, Vitrified clay
Tower Surveys CCTV Ltd
NottinghamNottinghamshire
Tel: 07917 435 897, Fax:
Price & Myers
Inspection photosPlace: Road: Date: section number: PLR:
Rayners Lane Station 5 High Worple 04/10/2019 17 Gully X
TS-349 Rayners Lane Station Car Park CCTV Report_306_Issue02.mdb // page: 44
Photo: 137_13a, 00:00:004.54m, Dimension of sewer changes, new dimension dia 150 mm
Photo: 17_14a, 00:00:005.32m, Finish Survey, Gully reached
Tower Surveys CCTV Ltd
NottinghamNottinghamshire
Tel: 07917 435 897, Fax:
Price & Myers
Inspection reportDate: Job N°: Weather: Operator: section number: PLR:
Present: Vehicle: Camera: Preset: Cleaned: Grade:
Road: Division: start MH:
Place: District: end MH:
Location: Tape No.: Total length:
Location details:Location details:
Purpose: Shape/Size:
Use: Material:
Catchment:Lining:Category:
Comment:
04/10/2019 TS-349 Light rain SG 18 Unknown X
LG18 VTJ MiniCam SoloPro Yes
5 High Worple
Rayners Lane Station
Car park
MH7 B
Unknown
11.91 m
Asset condition
Surface water
Circular dia 225 mmVitrified clay Pipe length:
Sewer disused
1:100 position code observation counter photo grade
TS-349 Rayners Lane Station Car Park CCTV Report_306_Issue02.mdb // page: 45
0.00 MH 00:00:00 0Manhole Remark: MH7 B
0.00 WL 00:00:00 0Water level, 5 % height/diameter, Remark: Water standing in sewer
0.00 CCJ 00:00:00 140_3a 2Circumferential Crack at joint, from 10 to 01 o´clock
4.71 CCJ 00:00:00 144_4a 2Circumferential Crack at joint, from 08 to 04 o´clock
5.56 CCJ 00:00:00 145_5a 2Circumferential Crack at joint, from 09 to 12 o´clock
6.88 RFJ 00:00:00 146_6a 1Fine Roots at joint
8.59 CCJ 00:00:00 147_7a 2Circumferential Crack at joint, from 01 to 04 o´clock
9.39 RF 00:00:00 148_8a 1Fine Roots
11.91 X 00:00:00 18_9a 5Collapsed Pipe, 95 % cross-sectional area loss
11.91 SA 00:00:00 0Survey abandoned, Unable to pass collapsed pipe
MH7 B
Tower Surveys CCTV Ltd
NottinghamNottinghamshire
Tel: 07917 435 897, Fax:
Price & Myers
Inspection photosPlace: Road: Date: section number: PLR:
Rayners Lane Station 5 High Worple 04/10/2019 18 Unknown X
TS-349 Rayners Lane Station Car Park CCTV Report_306_Issue02.mdb // page: 46
Photo: 140_3a, 00:00:000m, Circumferential Crack at joint, from 10 to 01 o´clock
Photo: 144_4a, 00:00:004.71m, Circumferential Crack at joint, from 08 to 04 o´clock
Photo: 145_5a, 00:00:005.56m, Circumferential Crack at joint, from 09 to 12 o´clock
Photo: 146_6a, 00:00:006.88m, Fine Roots at joint
Tower Surveys CCTV Ltd
NottinghamNottinghamshire
Tel: 07917 435 897, Fax:
Price & Myers
Inspection photosPlace: Road: Date: section number: PLR:
Rayners Lane Station 5 High Worple 04/10/2019 18 Unknown X
TS-349 Rayners Lane Station Car Park CCTV Report_306_Issue02.mdb // page: 47
Photo: 147_7a, 00:00:008.59m, Circumferential Crack at joint, from 01 to 04 o´clock
Photo: 148_8a, 00:00:009.39m, Fine Roots
Photo: 18_9a, 00:00:0011.91m, Collapsed Pipe, 95 % cross-sectional area loss
Tower Surveys CCTV Ltd
NottinghamNottinghamshire
Tel: 07917 435 897, Fax:
Price & Myers
Inspection reportDate: Job N°: Weather: Operator: section number: PLR:
Present: Vehicle: Camera: Preset: Cleaned: Grade:
Road: Division: start MH:
Place: District: end MH:
Location: Tape No.: Total length:
Location details:Location details:
Purpose: Shape/Size:
Use: Material:
Catchment:Lining:Category:
Comment:
04/10/2019 TS-349 Light rain SG 19 MH8 X X
LG18 VTJ MiniCam SoloPro Yes
5 High Worple
Rayners Lane Station
Car park
MH8 X
Main
8.35 m
Asset condition
Foul
Circular dia 150 mmVitrified clay Pipe length:
1:75 position code observation counter photo grade
TS-349 Rayners Lane Station Car Park CCTV Report_306_Issue02.mdb // page: 48
0.00 MH 00:00:00 0Manhole Remark: MH8 X
0.00 WL 00:00:00 0Water level, 5 % height/diameter
0.00 GO 00:00:00 151_3a 0General Observation, Vision limited due to steam
0.87 CCJ 00:00:00 154_4a 2Circumferential Crack at joint, from 08 to 10 o´clock
3.14 ELJ 00:00:00 155_5a 2Encrustation light at joint, from 10 to 12 o´clock
3.62 ELJ 00:00:00 156_6a 2Encrustation light at joint, from 09 to 04 o´clock
4.77 JDM 00:00:00 157_7a 1Joint displaced. Medium
7.20 LR 00:00:00 0Line of Sewer deviates right
7.20 LD 00:00:00 0Line of Sewer deviates down
7.87 JDM 00:00:00 19_10a 1Joint displaced. Medium
8.35 FH 00:00:00 19_11a 0Finish Survey, Main sewer reached within 'High Worple'
MH8 X
Main
Tower Surveys CCTV Ltd
NottinghamNottinghamshire
Tel: 07917 435 897, Fax:
Price & Myers
Inspection photosPlace: Road: Date: section number: PLR:
Rayners Lane Station 5 High Worple 04/10/2019 19 MH8 X X
TS-349 Rayners Lane Station Car Park CCTV Report_306_Issue02.mdb // page: 49
Photo: 151_3a, 00:00:000m, General Observation, Vision limited due to steam
Photo: 154_4a, 00:00:000.87m, Circumferential Crack at joint, from 08 to 10 o´clock
Photo: 155_5a, 00:00:003.14m, Encrustation light at joint, from 10 to 12 o´clock
Photo: 156_6a, 00:00:003.62m, Encrustation light at joint, from 09 to 04 o´clock
Tower Surveys CCTV Ltd
NottinghamNottinghamshire
Tel: 07917 435 897, Fax:
Price & Myers
Inspection photosPlace: Road: Date: section number: PLR:
Rayners Lane Station 5 High Worple 04/10/2019 19 MH8 X X
TS-349 Rayners Lane Station Car Park CCTV Report_306_Issue02.mdb // page: 50
Photo: 157_7a, 00:00:004.77m, Joint displaced. Medium
Photo: 19_10a, 00:00:007.87m, Joint displaced. Medium
Photo: 19_11a, 00:00:008.35m, Finish Survey, Main sewer reached within 'High Worple'
Tower Surveys CCTV Ltd
NottinghamNottinghamshire
Tel: 07917 435 897, Fax:
Price & Myers
Inspection reportDate: Job N°: Weather: Operator: section number: PLR:
Present: Vehicle: Camera: Preset: Cleaned: Grade:
Road: Division: start MH:
Place: District: end MH:
Location: Tape No.: Total length:
Location details:Location details:
Purpose: Shape/Size:
Use: Material:
Catchment:Lining:Category:
Comment:
04/10/2019 TS-349 Light rain SG 20 MH X
LG18 VTJ MiniCam SoloPro Yes
5 High Worple
Rayners Lane Station
Car park
MH8 A
MH
29.83 m
Asset condition
Foul
Circular dia 150 mmVitrified clay Pipe length:
1:225 position code observation counter photo grade
TS-349 Rayners Lane Station Car Park CCTV Report_306_Issue02.mdb // page: 51
0.00 MH 00:00:00 0Manhole Remark: MH8 A
0.00 WL 00:00:00 0Water level, 10 % height/diameter, Remark: Constant flow through sewerat time of survey
0.00 GO 00:00:00 0General Observation, Vision limited due to steam
1.03 GP 00:00:00 20_4a 0General Condition photograph
6.30 WL 00:00:00 0Water level, 5 % height/diameter
7.68 LR 00:00:00 166_6a 0Line of Sewer deviates right
13.27 JDM 00:00:00 167_7a 1Joint displaced. Medium
15.49 GP 00:00:00 168_8a 0General Condition photograph
16.46 H 00:00:00 169_9a 4Hole in sewer at 12 o´clock
20.09 CCJ 00:00:00 170_10a 2Circumferential Crack at joint, from 08 to 04 o´clock
22.50 JDM 00:00:00 171_11a 1Joint displaced. Medium
25.53 GP 00:00:00 172_12a 0General Condition photograph
28.64 JDM 00:00:00 173_13a 1Joint displaced. Medium
29.83 FH 00:00:00 20_14a 0Finish Survey, Upstream manhole reached
MH8 A
MH
Tower Surveys CCTV Ltd
NottinghamNottinghamshire
Tel: 07917 435 897, Fax:
Price & Myers
Inspection photosPlace: Road: Date: section number: PLR:
Rayners Lane Station 5 High Worple 04/10/2019 20 MH X
TS-349 Rayners Lane Station Car Park CCTV Report_306_Issue02.mdb // page: 52
Photo: 20_4a, 00:00:001.03m, General Condition photograph
Photo: 166_6a, 00:00:007.68m, Line of Sewer deviates right
Photo: 167_7a, 00:00:0013.27m, Joint displaced. Medium
Photo: 168_8a, 00:00:0015.49m, General Condition photograph
Tower Surveys CCTV Ltd
NottinghamNottinghamshire
Tel: 07917 435 897, Fax:
Price & Myers
Inspection photosPlace: Road: Date: section number: PLR:
Rayners Lane Station 5 High Worple 04/10/2019 20 MH X
TS-349 Rayners Lane Station Car Park CCTV Report_306_Issue02.mdb // page: 53
Photo: 169_9a, 00:00:0016.46m, Hole in sewer at 12 o´clock
Photo: 170_10a, 00:00:0020.09m, Circumferential Crack at joint, from 08 to 04 o´clock
Photo: 171_11a, 00:00:0022.5m, Joint displaced. Medium
Photo: 172_12a, 00:00:0025.53m, General Condition photograph
Tower Surveys CCTV Ltd
NottinghamNottinghamshire
Tel: 07917 435 897, Fax:
Price & Myers
Inspection photosPlace: Road: Date: section number: PLR:
Rayners Lane Station 5 High Worple 04/10/2019 20 MH X
TS-349 Rayners Lane Station Car Park CCTV Report_306_Issue02.mdb // page: 54
Photo: 173_13a, 00:00:0028.64m, Joint displaced. Medium
Photo: 20_14a, 00:00:0029.83m, Finish Survey, Upstream manhole reached
Tower Surveys CCTV Ltd
NottinghamNottinghamshire
Tel: 07917 435 897, Fax:
Price & Myers
Inspection reportDate: Job N°: Weather: Operator: section number: PLR:
Present: Vehicle: Camera: Preset: Cleaned: Grade:
Road: Division: start MH:
Place: District: end MH:
Location: Tape No.: Total length:
Location details:Location details:
Purpose: Shape/Size:
Use: Material:
Catchment:Lining:Category:
Comment:
04/11/2019 TS-349 Light rain SG 21 Unknown X
LG18 VTJ MiniCam SoloPro Yes
5 High Worple
Rayners Lane Station
Car park
MH5 A
Unknown
25.6 m
Asset condition
Surface water
Circular dia 150 mmPitch fibre Pipe length:
1:200 position code observation counter photo grade
TS-349 Rayners Lane Station Car Park CCTV Report_306_Issue02.mdb // page: 55
0.00 MH 00:00:00 0Manhole Remark: MH5 A
0.00 WL 00:00:00 0Water level, 10 % height/diameter, Remark: Water standing in sewer
0.00 S1 D 00:00:00 5Sewer Deformed, 5 %, Start, Remark: Vertical deformation
5.51 GP 00:00:00 21_4a 0General Condition photograph
15.51 GP 00:00:00 21_5a 0General Condition photograph
25.00 SA 00:00:00 0Survey abandoned, Unable to push camera any further
MH5 A
Tower Surveys CCTV Ltd
NottinghamNottinghamshire
Tel: 07917 435 897, Fax:
Price & Myers
Inspection photosPlace: Road: Date: section number: PLR:
Rayners Lane Station 5 High Worple 04/11/2019 21 Unknown X
TS-349 Rayners Lane Station Car Park CCTV Report_306_Issue02.mdb // page: 56
Photo: 21_4a, 00:00:005.51m, General Condition photograph
Photo: 21_5a, 00:00:0015.51m, General Condition photograph
Tower Surveys CCTV Ltd
NottinghamNottinghamshire
Tel: 07917 435 897, Fax:
Price & Myers
Inspection reportDate: Job N°: Weather: Operator: section number: PLR:
Present: Vehicle: Camera: Preset: Cleaned: Grade:
Road: Division: start MH:
Place: District: end MH:
Location: Tape No.: Total length:
Location details:Location details:
Purpose: Shape/Size:
Use: Material:
Catchment:Lining:Category:
Comment:
04/11/2019 TS-349 Light rain SG 22 Unknown X
LG18 VTJ MiniCam SoloPro Yes
5 High Worple
Rayners Lane Station
Car park
MH5 B
Unknown
34.28 m
Asset condition
Surface water
Circular dia 150 mmPitch fibre Pipe length:
1:275 position code observation counter photo grade
TS-349 Rayners Lane Station Car Park CCTV Report_306_Issue02.mdb // page: 57
0.00 MH 00:00:00 0Manhole Remark: MH5 B
0.00 WL 00:00:00 0Water level, 10 % height/diameter, Remark: Water standing in sewer
2.67 GP 00:00:00 22_3a 0General Condition photograph
8.97 D 00:00:00 22_4a 5Sewer Deformed, 5 %, Remark: Vertical deformation
10.17 GP 00:00:00 22_5a 0General Condition photograph
20.17 GP 00:00:00 22_6a 0General Condition photograph
30.21 GP 00:00:00 22_7a 0General Condition photograph
31.23 D 00:00:00 22_8a 5Sewer Deformed, 5 %, Remark: Vertical deformation
34.28 D 00:00:00 22_9a 5Sewer Deformed, 5 %, Remark: Vertical deformation
34.28 SA 00:00:00 0Survey abandoned, Unable to push camera any further
MH5 B
Tower Surveys CCTV Ltd
NottinghamNottinghamshire
Tel: 07917 435 897, Fax:
Price & Myers
Inspection photosPlace: Road: Date: section number: PLR:
Rayners Lane Station 5 High Worple 04/11/2019 22 Unknown X
TS-349 Rayners Lane Station Car Park CCTV Report_306_Issue02.mdb // page: 58
Photo: 22_3a, 00:00:002.67m, General Condition photograph
Photo: 22_4a, 00:00:008.97m, Sewer Deformed, 5 %, Remark: Vertical deformation
Photo: 22_5a, 00:00:0010.17m, General Condition photograph
Photo: 22_6a, 00:00:0020.17m, General Condition photograph
Tower Surveys CCTV Ltd
NottinghamNottinghamshire
Tel: 07917 435 897, Fax:
Price & Myers
Inspection photosPlace: Road: Date: section number: PLR:
Rayners Lane Station 5 High Worple 04/11/2019 22 Unknown X
TS-349 Rayners Lane Station Car Park CCTV Report_306_Issue02.mdb // page: 59
Photo: 22_7a, 00:00:0030.21m, General Condition photograph
Photo: 22_8a, 00:00:0031.23m, Sewer Deformed, 5 %, Remark: Vertical deformation
Photo: 22_9a, 00:00:0034.28m, Sewer Deformed, 5 %, Remark: Vertical deformation
\\2019Projects\TS-349\TS-349_304-305_Issue02CAD REFERENCE
c Tower Surveys CCTV Ltd.0 20 METRES
own the copyright of this drawing. Their written consent must be obtainedbefore this drawing is copied or used for any purpose other than the one for which it was supplied.\\CTB-files\TS-Utils-v01.ctb
CTB REFERENCE
GENERAL
APPRDRWNDATEREV
INFORMATION
A0
NOT TO SCALE
CHKDDESCRIPTION
DRAWING STATUS
· NO ALLOWANCE HAS BEEN MADE FOR SUB SURFACE ENTRY INTO MANHOLES OR OTHERCHAMBERS OR VOIDS BELOW GROUND LEVEL. THEREFORE ANY DETAILS RELATING TODEPTHS, SIZES ETC. ARE TAKEN FROM ABOVE GROUND AND AS SUCH WILL BE APPROXIMATEONLY.
· THE CONTRACTOR IS TO CHECK AND VERIFY ALL CRITICAL DIMENSIONS AND LEVELS BEFOREWORK STARTS.
· BURIED SERVICES SHOWN ON THIS DRAWING MAY BE ASSUMED ROUTES AND WILL NORMALLYBE OF UNKNOWN CONDITION, CONTRACTORS SHOULD UNDERTAKE SUITABLE VALIDATIONWORK AND TAKE PARTICULAR CARE DURING EXCAVATION WORK; SAFE DIGGING PRACTICESSHOULD BE FOLLOWED.
· SHOULD THERE BE ANY CONFLICT BETWEEN THE DETAILS INDICATED ON THIS DRAWING ANDTHOSE INDICATED ON OTHER DRAWINGS, THEN TOWER SURVEYS CCTV SHOULD BEINFORMED PRIOR TO CONSTRUCTION ON SITE.
· IT IS IMPORTANT TO NOTE THAT THE SAME ACCURACIES IMPLIED BY THE PLOTTING SCALEARE EQUALLY APPLICABLE TO DIGITAL DATA SUPPLIED FOR CAD.
· EVERY EFFORT IS MADE TO IDENTIFY ALL VISIBLE ABOVE GROUND FEATURES. HOWEVER, ITSHOULD BE BORNE IN MIND THAT THERE MAY BE ITEMS OBSCURED AT THE TIME OF SURVEY.
· VISIBLE FEATURES IN THE VICINITY OF THE BOUNDARIES, AS SHOWN ON THIS SURVEY, MAYNOT REPRESENT THE EXTENT OF LEGALLY CONVEYED OWNERSHIP.
· UNLESS OTHERWISE SPECIFIED FEATURES SHOWN USING LINE STYLES OR HATCHING AREINDICATIVE ONLY, SUCH AS; ROAD MARKINGS, HEDGE CENTERLINES, BRICK HATCHING ANDGLAZING DETAIL.
NORTHAPPROX
NORTHAPPROX
PRICE & MYERS
TS-349_304DRAWING NUMBER
PROJECT
CHECKEDENGINEER
SGDRAWN
APPROVED
REVISION
DATE
SCALE
DW
DW
DW
DRAWING DETAIL
PROJECT TITLE
CLIENT
RAYNERS LANE STATION CAR PARKHARROW
OCTOBER 2019
1:200
CCTV DRAINAGE SURVEY AS OF 03/10/19
(WHEN PLOTTED @ A0)
1 KENDALE GROVENOTTINGHAM
NG3 3BATEL: 07917 435 897
Tower Surveys CCTV LtdSurveyors - CCTV Drainage - Utilities - Land - Buildings
Associates in Nottingham | Stoke-on-Trent | Milton Keynes | Fareham
NOTES
DEPTHS TO TRACED METALLIC PIPEWORK REFER TO PIPE CENTRE.
ELECTRODETECTION AND/OR GROUND PROBING RADAR (GPR) TECHNIQUES HAVE BEEN
INTERPRETIVE METHODS AND IT IS THEREFORE RECOMMENDED THAT TRIAL
AND DEPTH OF SERVICES. ALL REASONABLE CARE HAS BEEN TAKEN AND EFFORT MADEIN SEARCHING AVAILABLE SERVICES RECORD INFORMATION. HOWEVER, THE COMPLETENESSOF INFORMATION SUPPLIED TO AND BY TOWER SURVEYS CCTV LTD CANNOT BE GUARANTEED.
IT SHOULD BE NOTED THAT CERTAIN TYPES OF SERVICES, SUCH AS PLASTIC ORCONCRETE PIPES OR CONDUITS WHERE THERE IS NO DIRECT ACCESS TO THE PIPE,ARE NOT TRACEABLE BY CONVENTIONAL ELECTRODETECTION METHODS; FOR THELOCATION OF THESE SERVICES, EITHER RECORDS DRAWINGS SHOULD BE SOUGHT
NUMBERS OF CABLES IN RUNS ARE NOT DETERMINED UNLESS SPECIFICALLYSHOWN. CABLE RUNS BETWEEN DRAWPITS ARE ASSUMED STRAIGHT UNLESS
PIPE RUNS ARE ASSUMED STRAIGHT BETWEEN CHAMBERS UNLESS OTHERWISE INDICATED.
SURFACE WATER SEWER
COMBINED SEWER
A FULL SET OF TOWER SURVEYS CCTV TERMS AND LIMITATIONS IS AVAILABLE ON REQUEST.
OR AN ALTERNATIVE MEANS OF OBTAINING THE INFORMATION USED.
DEPTHS OBTAINED USING GEOPHYSICAL TECHNIQUES SUCH AS GROUND PROBING RADARARE AFFECTED BY GROUND CONDITIONS THEREFORE MUST BE VIEWED AS INDICATIVE ONLY.
PLEASE REFER TO TOPOGRAPHIC SURVEY DRAWING 38949-001T-RAYN-01A
SERVICE LOCATION
ALL SERVICES ARE UNDERGROUND EXCEPT WHERE INDICATED.
SURFACE
OTHERWISE SHOWN.
OTHER
COMMENTS
UTILITIES ABBREVIATIONS
COMBINED
TYPE
RISING MAIN
FOUL
TYPE
SITE RECORDS
AS BUILT
SITE SPECIFIC
COMMENTS
FOUL SEWER
RISING MAIN
DRAINAGE / CCTV LEGEND
INFORMATION SHOWN AS TFR HAS NOT BEEN PROVEN ON SITE.
UTILITIES COMMENT BOX
SERVICES SURVEY AREA
INFORMATION SHOWN AS TFR HAS NOT BEEN PROVEN ON SITE
DEPTH TO SERVICE (m)
EXCAVATIONS OR SIMILAR ARE CARRIED OUT TO CONFIRM IDENTIFICATION, LOCATION
SERVICES TAKEN FROM RECORDS
AVAILABILITY OF STATUTORYUNDERTAKERS RECORDS DRAWINGS
USED TO LOCATE UNDERGROUND SERVICES SHOWN ON THIS PLAN. THESE ARE
ASSUMED ROUTES
PLEASE NOTE OUR CAD LAYERING CONVENTION CONTAINS FURTHER INFORMATION.
AR ACP CB CBC CDP
CL CPC CrL DCr dia
DTI
DTS EBD EOT FW IBD IL PCC RBC SL SW TFR UTL UTS UTT
1D 5C 1 DUCT 5 CABLESASSUMED ROUTEASSUMED CONNECTION POINTCONCRETE BENCHINGCIRCULAR BRICK CHAMBERCABLE DRAW PIT
COVER LEVELCIRCULAR PLASTIC CHAMBERCROWN LEVELDEPTH TO CROWNDIAMETER
DEPTH TO INVERT
DEPTH TO SOFFITEXTERNAL BACKDROPEND OF TRACEFOUL WATER SEWER INTERNAL BACKDROPINVERT LEVELPRECAST CONCRETE CHAMBERRECTANGULAR BRICK CHAMBERSOFFIT LEVELSURFACE WATER SEWERTAKEN FROM RECORDSUNABLE TO LIFTUNABLE TO SURVEYUNABLE TO TRACE
DEPTH TO BASEDTB
PLEASE NOTE THAT TOWER SURVEYS CCTV LTD ARE NOT PERMITTED TO INVESTIGATE ANYTELECOMMUNICATIONS APPARATUS, OTHER THAN EXISTING EXPOSED FEATURES. THEREFORETHIS INFORMATION MAY NOT APPEAR ON SURVEY DRAWINGS.
YES YES
YES
YES
YES
YES
NO
YES
IT IS INTENDED THAT THIS DRAWING BE REPRODUCED IN COLOUR.
CI CAST IRON
4. IF IN DOUBT ASK.
3. DO NOT SCALE FROM THIS DRAWING.
2. THIS DRAWING IS TO BE READ IN CONJUNCTION WITHAll OTHER RELEVANT DRAWINGS/DOCUMENTATION.PLEASE REFER TO TOPOGRAPHIC SURVEY DRAWING: 38949-001T-RAYN-01A
1. BACKGROUND PLAN INFORMATION IS BASED ON TOPOGRAPHIC SURVEY DATACREATED BY OTHERS AND SUPPLIED TO US FOR THE PURPOSES OF PRESENTINGOUR SURVEY OUTPUT. WE CANNOT BE HELD RESPONSIBLE FOR THE CONTENT,COMPLETENESS AND ACCURACY OF DATA CREATED BY OTHERS.
PLEASE REFER TO CCTV REPORT: TS-349_Raynors Lane Station Car Park CCTV Report_306_Issue02
304
305
(SHEET 1 OF 2)
BL WLBASE LEVEL WATER LEVEL
A
SGDW04.11.19A SGFurther CCTV drainage informationfor MH5 added to drawing