Purpose of Piping Plans

�Create a more favorable environmentfor the mechanical seal

• Flushing to remove heat

• Lowering fluid temperature

• Altering the seal chamber pressure

• Cleaning the process fluids

• Control atmospheric side of seal

Page 3: Fluiten Plan API

Purpose of Piping Plans

�Provide a means of detecting andcontrolling seal leakage

• Capture and/or prevent leakage

• Detect leakage

• Route leakage to appropriate collection

or disposal system

• Provide fluid other than process fluid for

the seal environment

Page 4: Fluiten Plan API

Requirements of Mechanical Seals

�Liquid seals

• Stable fluids

• Good lubricating properties

• Fluids do not flash or vaporize in seal

chamber

• Free from contamination and solids

• Moderate viscosities

Page 5: Fluiten Plan API

Requirements of Mechanical Seals

�Gas seals

• Gas or vapor suitable for sealing

• Constant supply of external buffer/barrier

gas

• Process fluids free from contamination

from both liquids and solids

• Process fluids which are not adversely

affected by gas leakage

Page 6: Fluiten Plan API

Methods of Achieving Goals

�Piping or routing of process fluids

�Introduction of external fluids

�Auxiliary equipment

• Seal coolers

• Cyclone separators

• Reservoirs

�Instrumentation

Page 7: Fluiten Plan API

Plan 52What• Unpressurized buffer

fluid circulationthrough reservoir.

• Fluid is circulated bya pumping ring in thedual seal assembly.

Page 8: Fluiten Plan API
Page 9: Fluiten Plan API
Page 10: Fluiten Plan API

Plan 52Why• Outboard seal acts

as a safety backupto the primary seal.

• Zero to very lowprocess emissions.

• No processcontamination isallowed.

Page 11: Fluiten Plan API

Plan 52Where• Used with dual

unpressurized seals(“tandem”).

• High vapor pressurefluids, lighthydrocarbons.

• Hazardous or toxicfluids.

• Heat transfer fluids.

Page 12: Fluiten Plan API

API 682 Type A Arrangement 2

2CW-CW

Page 13: Fluiten Plan API

Plan 52Preventative

Maintenance

• Piping loop mustself-vent to vaporrecovery/flaresystem nearatmosphericpressure.

• Process vaporpressure is generallygreater thanreservoir pressure.

• Buffer fluid must becompatible withprocess leakage.

Page 14: Fluiten Plan API

Plan 52Preventative

Maintenance

(continued)• Primary seal leakage

is indicated byincreased ventpressure.

• Reservoir level gageindicates outboardseal leakage.

Page 15: Fluiten Plan API

Plan 53AWhat• Pressurized barrier

fluid circulationthrough reservoir.

• Fluid is circulated bya pumping ring in thedual seal assembly.

Page 16: Fluiten Plan API
Page 17: Fluiten Plan API

Plan 53AWhy• Isolate process

fluids.

• Zero processemissions.

Page 18: Fluiten Plan API

Plan 53AWhere• Used with dual

pressurized seals(“double”).

• High vapor pressurefluids, lighthydrocarbons.

• Hazardous or toxicfluids.

• Heat transfer fluids.

• Dirty, abrasive orpolymerizing fluids.

• Mixers or agitators.

• Vacuum service.

Page 19: Fluiten Plan API

API 682 Type C Arrangement 33CW-FB

Page 20: Fluiten Plan API

Plan 53APreventative

Maintenance

• Piping loop mustself-vent to reservoirlocated at highestelevation.

• Pressurize reservoirat all times,maximum gascharge 150 - 200 psi(10 - 14 bar)

• Barrier fluid must becompatible withprocess.

• Reservoir level gageindicates both IB andOB seal leakage.

Page 21: Fluiten Plan API

Plan 53BWhat• Pressurized barrier

fluid circulation witha bladderaccumulator.

• Fluid is circulated bya pumping ring in thedual seal assembly.

Page 22: Fluiten Plan API
Page 23: Fluiten Plan API
Page 24: Fluiten Plan API
Page 25: Fluiten Plan API
Page 26: Fluiten Plan API

Plan 53BWhy• Isolate process fluid.

• Zero processemissions.

• Higher pressure thanPlan 53A.

Page 27: Fluiten Plan API

Plan 53BWhere• Used with dual

pressurized seals(“double”).

• High vapor pressurefluids, lighthydrocarbons.

• Hazardous or toxicfluids.

• Heat transfer fluids.

• Dirty, abrasive orpolymerizing fluids.

Page 28: Fluiten Plan API

API 682 Type C Arrangement 3

3CW - BB

Page 29: Fluiten Plan API

Plan 53BPreventative

Maintenance

• Piping loop must befully vented beforestarting.

• Accumulator must bepressurized at alltimes, usually by gascharge.

• Barrier fluid must becompatible withprocess.

• Regularly monitorbarrier pressure –manually add barrierfluid when pressuredecays.

Page 30: Fluiten Plan API

Plan 53CWhat• Pressurized barrier

fluid circulation witha pistonaccumulator.

• Fluid is circulated bya pumping ring in thedual seal assembly.

Page 31: Fluiten Plan API
Page 32: Fluiten Plan API

Plan 53CWhy• Isolate process fluid.

• Zero processemissions.

• Higher pressure thanPlan 53A.

• Dynamic tracking ofsystem pressure.

Page 33: Fluiten Plan API

Plan 53CWhere• Used with dual

pressurized seals(“double”).

• High vapor pressurefluids, lighthydrocarbons.

• Hazardous or toxicfluids.

• Heat transfer fluids.

Page 34: Fluiten Plan API

API 682 Type A Arrangement 33CW - BB

Page 35: Fluiten Plan API

Plan 53CPreventative

Maintenance

• Piping loop must befully vented beforestarting.

• Reference line musttolerate processcontaminationwithout plugging.

• Barrier fluid must becompatible withprocess.

• Reservoir level gageindicates bothinboard andoutboard sealleakage.

Page 36: Fluiten Plan API

Plan 54What• Pressurized barrier

fluid circulation by anexternal system.

Page 37: Fluiten Plan API
Page 38: Fluiten Plan API

Plan 54Why• Isolate process fluid.

• Zero processemissions.

• Seal cannot inducecirculation.

Page 39: Fluiten Plan API

Plan 54Where• Used with dual

pressurized seals(“double”).

• High vapor pressurefluids, lighthydrocarbons.

• Hazardous or toxicfluids.

• Heat transfer fluids.

• Dirty, abrasive, orpolymerizing fluids.

• Mixers or agitators.

Page 40: Fluiten Plan API

API 682 Type C Arrangement 3

3CW - BB

Page 41: Fluiten Plan API

Plan 54Preventative

Maintenance

• Piping loop must befully vented beforestarting.

• Circulating systemmust be pressurizedand energized at alltimes.

• Barrier fluid must becompatible withprocess.

• Circulation systemlevel gage indicatesboth inboard andoutboard seal leakage.

Page 42: Fluiten Plan API

Plan 72What• Unpressurized buffer

gas control system.

• Containment sealsupport typically withnitrogen buffer gas.

Page 43: Fluiten Plan API
Page 44: Fluiten Plan API

Plan 72Why• Zero to very low

process emissions.

• Safety backup toprimary seal.

Page 45: Fluiten Plan API

Plan 72Where• Used with dual

unpressurizedcontainment seals(“tandem”).

• High vapor pressurefluids, lighthydrocarbons.

• Hazardous or toxicfluids.

• Clean, non-polymerizing, non-oxidizing fluids.

• Used in combinationwith Plan 75 and/orPlan 76.

Page 46: Fluiten Plan API

API 682 Type A with Containment

2CW - CS

Page 47: Fluiten Plan API

Plan 72Preventative

Maintenance

• Clean, reliable, lowpressure gas must besupplied to seal at alltimes.

• Bottled gas supply isnot recommendedexcept as part of anemergency backupsystem.

• Primary seal leakage isindicated by pressurein the vent line.

Page 48: Fluiten Plan API

Plan 72Preventative

Maintenance

(continued)

• Vent or drain areusually connected tolow pressure vaporrecovery/flare system.

Page 49: Fluiten Plan API

Plan 74What• Pressurized barrier gas

control system.

• Gas seal supporttypically with nitrogenbarrier gas.

Page 50: Fluiten Plan API
Page 51: Fluiten Plan API

Plan 74Why• Isolate process fluid.

• Zero processemissions.

Page 52: Fluiten Plan API

Plan 74Where• Used with dual

pressurized gas seals(“double”).

• High vapor pressurefluids, lighthydrocarbons.

• Hazardous or toxicfluids.

• Services that do nottolerate barrier fluids.

• Clean, non-polymerizing fluids.

• Moderate temperaturefluids.

Page 53: Fluiten Plan API

Plan 74Preventative

Maintenance

• Clean, reliable,pressurized gas mustbe supplied to seal atall times.

• Barrier pressure istypically at least 25 psi(1.75 bar) above sealchamber pressure.

• Flow meter indicatesboth inboard andoutboard seal leakage.

Page 54: Fluiten Plan API

Plan 74Preventative

Maintenance

(continued)

• Bottled gas supply isnot recommendedexcept as part of anemergency backupsystem.

Page 55: Fluiten Plan API

Plan 75What• Drain from containment

seal cavity to liquidcollector and vaporrecovery.

Page 56: Fluiten Plan API
Page 57: Fluiten Plan API

Plan 75Why• Leakage collection for

zero to very lowprocess emissions.

• Safety indicator forprimary seal.

Page 58: Fluiten Plan API

Plan 75Where• May be used alone or

with Plan 72 oncontainment seals.

• Fluids that condense atambient temperature.

• High pressure fluids,light hydrocarbons.

• Hazardous or toxicfluids.

• Clean, non-polymerizing, non-oxidizing fluids.

Page 59: Fluiten Plan API

API 682 Type A with Containment

2CW - CS

Page 60: Fluiten Plan API

Plan 75Preventative

Maintenance

• Collection reservoirmust be located belowseal drain anddownward-slopedpiping.

• Continuously ventcollection reservoir tolow pressure vaporrecovery/flare system.

• Drain collectionreservoir to liquidrecovery system asneeded.

Page 61: Fluiten Plan API

Plan 75Preventative

Maintenance

(continued)

• Primary seal leakage isindicated by increasedvent pressure.

• Monitor regularly forliquid level, valvesettings, and low ventpressure.

Page 62: Fluiten Plan API

Plan 76What• Vent from containment

seal cavity to vaporrecovery.

Page 63: Fluiten Plan API
Page 64: Fluiten Plan API

Plan 76Why• Leakage collection for

zero to very lowprocess emissions.

• Safety indicator forprimary seal.

Page 65: Fluiten Plan API

Plan 76Where• May be used alone or

with Plan 72 oncontainment seals.

• Fluids that do notcondense at ambienttemperature.

• High vapor pressurefluids, lighthydrocarbons.

• Hazardous or toxicfluids.

• Clean, non-polymerizing, non-oxidizing fluids.

Page 66: Fluiten Plan API

API 682 Type A with Containment

2CW - CS

Page 67: Fluiten Plan API

Plan 76Preventative

Maintenance

• Continuously vent tolow pressure vaporrecovery/flare system.

• Vent piping shouldinclude a condensatedrain.

• Primary seal leakage isdetected by increasedvent pressure.

• Monitor regularly forvalve settings, blockedlines, and low ventpressure.

Page 68: Fluiten Plan API

Good Piping Practices

�Minimize line losses

�Large diameter tubing

�Upward sloping lines

�Long radius bends

high point vent

Vertical

Equipment

Horizontal

Equipment

18 - 24 in.

(0.45 - 0.6 m)

3 ft. (0.9 m) max

low point drain

Plan 23 Example

Page 69: Fluiten Plan API

Good Piping Practices

�Minimize line losses

�Large diameter tubing

�Upward sloping lines

�Long radius bends

Vertical

Equipment

Horizontal

Equipment

18 - 24 in.

(0.45 - 0.6 m)

4 ft. (1.2 m) max

low point drain

Plan 53A Example

Page 70: Fluiten Plan API

Review

�Intended to create a more favorableenvironment for the seal

�Collect and detect seal leakage and providesafety backup

�Documented in several API, ASME, and ISOstandards

�May require auxiliary equipment or externalsources of fluids

�Necessary to improve seal reliability/Safety