Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly classified pursuant to Executive Order 13526 Ex. 2:E] Records regarding personnel rules and/or human capital administration Ex. 3 :E-- Information about the design, manufacture, or utilization of nuclear weapons DInformation about the protection or security of reactors and nuclear materials ElContractor proposals not incorporated into a final contract with the NRC ElOther Ex. 4:[-W Proprietary information provided by a submitter to the NRC -- lOther Ex. 5:u j~raft documents or other pre-decisional deliberative documents (D.P. Privilege) stlRecords prepared by counsel in anticipation of litigation (A.W.P. Privilege) JiPrivileged communications between counsel and a client (A.C. Privilege) MOther Ex. 6:]- Agency employee PII, including SSN, contact information, birthdates, etc. -Third party PII, including names, phone numbers, or other personal information Ex. 7(A):lCopies of ongoing investigation case files, exhibits, notes, ROI's, etc. [--Records that reference or are related to a separate ongoing investigation(s) Ex. 7(C): ESpecial Agent or other law enforcement PlI [-'PII of third parties referenced in records compiled for law enforcement purposes Ex. 7(D):[-- Witnesses' and Allegers' PHI in law enforcement records --1 Confidential Informant or law enforcement information provided by other entity Ex. 7(E): -Law Enforcement Technique/Procedure used for criminal investigations --- Technique or procedure used for security or prevention of criminal activity Ex. 7(F): E- Information that could aid a terrorist or compromise security Other/Comments: Portions of records that do not "mention, refer to, or are related to" the DPO are considered nonresponsive.

FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Group C

FOIA/PA NO: 2015-0071

RECORDS BEING RELEASED IN PART

The following types of information are being withheld:

Ex. 1 :[Records properly classified pursuant to Executive Order 13526Ex. 2:E] Records regarding personnel rules and/or human capital administrationEx. 3 :E-- Information about the design, manufacture, or utilization of nuclear weapons

DInformation about the protection or security of reactors and nuclear materialsElContractor proposals not incorporated into a final contract with the NRCElOther

Ex. 4:[-W Proprietary information provided by a submitter to the NRC--lOther

Ex. 5:u j~raft documents or other pre-decisional deliberative documents (D.P. Privilege)stlRecords prepared by counsel in anticipation of litigation (A.W.P. Privilege)JiPrivileged communications between counsel and a client (A.C. Privilege)MOther

Ex. 6:]- Agency employee PII, including SSN, contact information, birthdates, etc.-Third party PII, including names, phone numbers, or other personal information

Ex. 7(A):lCopies of ongoing investigation case files, exhibits, notes, ROI's, etc.[--Records that reference or are related to a separate ongoing investigation(s)

Ex. 7(C): ESpecial Agent or other law enforcement PlI[-'PII of third parties referenced in records compiled for law enforcement purposes

Ex. 7(D):[-- Witnesses' and Allegers' PHI in law enforcement records--1 Confidential Informant or law enforcement information provided by other entity

Ex. 7(E): -Law Enforcement Technique/Procedure used for criminal investigations---Technique or procedure used for security or prevention of criminal activity

Ex. 7(F): E- Information that could aid a terrorist or compromise security

Other/Comments: Portions of records that do not "mention, refer to, or are related to" the DPO areconsidered nonresponsive.

Page 2: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

From:Sent:To:Cc:Subject:Attachments:

Importance:

Oesterle, EricMonday, December 01, 2014 7:16 AMUhle, Jennifer; Evans, Michele; Wilson, GeorgeSebrosky, Joseph; Orf, Tracy, Rihm, RogerRE: Question on DCPP for EPW hearingANTICIPATED QUESTIONS AND ANSWERSDCPP_1.docx; NRR-Diablo Canyon Seismic

Studies-updated2014_1.docx

High

Jennifer,

Just getting in this morning (Monday 12/1) and seeing your email. I am reviewing the responses andaddressing your comments this morning. See also responses below.

The updated responses are included as attachments.,

FricR. O-4teie'Acting Branch ChiefNRR/DORL/LPL4-1301-4151014

From: Uhle, JenniferSent: Friday, November 28, 2014 6:01 PMTo: Evans, Michele; Wilson, GeorgeCc: Oesterte, Eric; Sebrosky, JosephSubject: Question on DCPP for EPW hearing

Non Responsive

I

Page 3: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Roger Rihm has the electronic version and you can email him the change. We need it first thing tomorrow. I amemailing you guys to verify you agree. Please cc me.

Thanks,

Jennifer

2

Page 4: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

4AIiSLUO ýbd UON

NOANVO 018 VIO

S113MSNV ONV SNOI1s~lo Ua.lVdIOI1NV

Page 5: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

zO

Page 6: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

.AMSLIOdSýý LON

Page 7: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

SI Diablo Canyon Seismic Studios

Non Responsive

Page 8: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Non Responsive

Page 9: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Non Responsive

Page 10: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

(b)(5

Non Responsive

Page 11: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

ŽAIsuodsG8 UON

Page 12: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

aA'AiSIJdsaZ U()N

Page 13: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Non ResponsivE

Page 14: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Non Responslsvf

Page 15: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Non Responsive

Page 16: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Non Responsive

Page 17: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

-10)(

From: Niedzielski-Eichner, PhillipSent: Tuesday, December 02, 2014 10:09 PMTo: Dapas, Marc; Williamson, EdwardCc Johnson, Michael; Doane, Margaret; Itzkowitz, Marvin; Kennedy, Kriss; Dacus, Eugene;

Uhle, Jennifer, Holian, BrianSubject: RE: Draft Answer to SONGS Question on Whether an LA Should Have Been Required

I forwarded the info to the Chairman earlier this evening. Best. Phil

From: Dapas, MarcSent: Tuesday, December 02, 2014 7:41 PMTo: Niedzlelskl-Eichner, Phillip; Williamson, EdwardCc: Johnson, Michael; Doane, Margaret; Itzkowitz, Marvin; Kennedy, Kriss; Dacus, Eugene; Uhle, Jennifer; Holian, BrianSubject: RE: Draft Answer to SONGS Question on Whether an LA Should Have Been Required

(b)5),(b)(6)Non Responsive

From: Dapas, MarcSent: Tuesday, December 02, 2014 6:38 PMTo: Niedzielski-Eichner, Phillip; Williamson, EdwardCc: Johnson, Michael; Doane, Margaret; Itzkowitz, Marvin; Kennedy, Kriss; Dacus, Eugene; Uhle, Jennifer; Holian, BrianSubject: RE: Draft Answer to SONGS Question on Whether an LA Should Have Been Required

I ~(bl(,5)I

I

Page 18: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Non Responsive

From: Niedzielski-Eichner, PhillipSent: Tuesday, December 02, 2014 5:46 PMTo: Dapas, Marc; Williamson, EdwardCc: Johnson, Michael; Doane, Margaret; Itzkowitz, Marvin; Kennedy, Kriss; Dacus, Eugene; Uhle, Jennifer; Holian, BrianSubject: RE: Draft Answer to SONGS Question on Whether an LA Should Have Been Required

0

0

0

S

Non Responsive

Best. Phil

From: Dapas, MarcSent: Tuesday, December 02, 2014 6:15 PM

a

Page 19: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

To: Williamson, EdwardCc: Johnson, Michael; Doane, Margaret; Itzkowitz, Marvin; Kennedy, Kriss; Niedzielski-Eichner, Phillip; Dacus, Eugene;Uhle, Jennifer; Holian, BrianSubject: RE: Draft Answer to SONGS Question on Whether an LA Should Have Been Required

(b)(5)I

3

Page 20: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

From:SentTo:

Subject:Attachments:

Rihm, RogerMonday, December 01, 2014 10:49 AMUhle, Jennifer5 one aaaers as discussed

Non Responsive

Non Responsive INRR Diablo Canvon Seism ic. . . . .. . . j . . . . . ....

Studies.docx;INon Resnonsive

| F I

Importance: High

1

Page 21: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

ANTICIPATED QUESTIONS AND ANSWERS

DIABLO CANYON

Non Responsive

(b)(5)

Non Resoonslvce

Page 22: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Non Responsive

Page 23: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Non Responsive

Page 24: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Diablo Canyon Seismic Studies

Non Responsive

Page 25: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

kl- 0.--4".

Page 26: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Non Responsive

b)(5)

Page 27: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Non Responsive

Page 28: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Non Responsive

Page 29: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Non Re~sponsive

Page 30: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Non Resc~ons3ive

Page 31: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Non Responsive

Page 32: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Non Responsive

Page 33: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Non Responsive

Page 34: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

From: Ross-Lee, MaryJaneSent: Wednesday, November 26, 2014 11:04 AMTo: Markley, Michael; Oesterle, Eric; Walker, WayneCc: Lubinski, John; Flanders, Scott; Kock, Andrea; Lingam, Siva; Pruett, Troy; Manoly, Kamal;

Bowers, Anthony; Wilson, George; Karas, Rebecca; Li, Yong; Evans, Michele; Oesterle,Eric; Uhle, Jennifer

Subject: RE: Chairman request for NRO/RES personnel to meet re: DCPP

Mike, thanks for offing to be sure the seismic guys on the operating reactor side are in the loop on Diablo. Weappreciate it!

Mary Jane Ross-Lee (MJ)Deputy Director, Division of EngineeringOffice of Nuclear Reactor RegulationOWFN 9H1US Nuclear Regulatory Commission2 Office: 301-415-32981 Mobile: l

e-mail ryane.ross-lI nrcxiov

From: Markley, MichaelSent: Wednesday, November 26, 2014 10:04 AMTo: Oesterle, Erdc; Walker, WayneCc: Lubinskl, John; Ross-Lee, MaryJane; Flanders, Scott; Kock, Andrea; Lingam, Siva; Pruett, Troy; Manoly, Kamal;Bowers, Anthony; Wilson, George; Karas, Rebecca; U, Yong; Evans, Michele; Oesterle, Eric; Uhle,.JenniferSubject: Chairman request for NRO/RES personnel to meet re: DCPP

All,

The purpose of this note is to keep you informed that the Chairman has asked to meet with Cliff Munson, JonAke, and Nilesh Choksi on December 1 or 2 regarding Diablo Canyon. It is not apparent what the details ofthis discussion will be, but the Chairman has had a long-standing and ongoing dialogue with these individualsregarding seismic at Diablo Canyon. My suspicion is that this may have some bearing on her preparation forthe upcoming hearings and preparation materials that have been compiled. We will keep you informed of anyissues or questions that may become apparent.

Mike

I

Page 35: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

From: Ross-Lee, MaryJaneSent: Thursday, November 06, 2014 4:20 PMTo: Uhle, JenniferSubject: RE: addressing manager's comments on DCPP Op Det

I just did - didn't realize they were both in training. I asked them to come to you.

Mary Jane Ross-Lee (MJ)Deputy Director, Division of EngineeringOffice of Nuclear Reactor Regulation

QWFN 9H1US Nuclear Regulatory CommissionW Office: 50 15.3298T; MObile:l ,1<)

e-mail riane.ross- ee•.nrc.qov

From: Uhle, JenniferSent: Thursday, November 06, 2014 4:19 PMTo: Ross-Lee, ManryaneSubject: RE: addressing manager's comments on DCPP Op Det

M J, can you get an admin to track them down?.

Thanks,

Jennifer

From: Ross-Lee, MarylaneSent: Thursday, November 06, 2014 3:26 PMTo: Li, Yong; Chokshi, NileshCc: Uhle, JenniferSubject: FW: addressing manager's comments on DCPP Op DetImportance: High

Can the 2 of you please go up and see Jennifer?

Mary Jane Ross-Lee (MJ)Deputy Director, Division of EngineeringOffice of Nuclear Reactor Regulation

OWFN 9H1US Nuclear Regulatory CommissionW Office: 301-415-32989) Mobile:[ .).6

e-mail: marviane ross-lee(,nrc.qov

From: Uhle, JenniferSent: Thursday, November 06, 2014 3:24 PMTo: Ross-Lee, Marylane; Dean, Bill; Holian, Brian

c26S

Page 36: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Cc: Pruett, Troy; Lubinski, JohnSubject: RE: addressing manager's comments on DCPP Op Det

Hi guys I have questions on the second paragraph on page 2. It is not making sense to me. Can we chattoday? J

From: Ross-Lee, MaryJaneSent: Thursday, November 06, 2014 1:16 PMTo: Dean, Bill; Holian, Brian; Uhle, JenniferCc: Pruett, Troy; Lubinskl, JohnSubject: FW: addressing manager's comments on DCPP Op Det

Bill/Jennifer/Brian,

Between NRR and NRO, we collectively addressed all the comments except the one below.

NRC believes that the original wording is better in describing the DDE loads.

The original reads,

'"However, the DDE tends to control the SSCs with natural frequencies only in the lower range."

The comments reads,

"However, the DOE loads are the most severe loads on the SSCs with natural frequencies only in the lowerrange,"

Therefore, it was not changed.

Mary Jane Ross-Lee (MJ)

Deputy Director, Division -of EngineeringOffice of Nuclear Reactor RegulationOWFN 9HIUS Nuclear Regulatory CommissionW Office: 301-415-32980) Mobile:.

e-mail. iriaine:ross-tee nrc.gov

From: Li, YongSent: Thursday, November 06, 2014 12:51 PMTo: Ross-Lee, MaryJaneCc: Lubinski, John; Lupold, Timothy; Manoly, KamalSubject: addressing manager's comments

M J,

We, between NRR and NRO, collectively addressed all the comments from the senior managers except theone below,

NRO believes that the original wording is better in describing the DDE loads.

The original reads,

2

Page 37: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

"However, the DDE tends to control the SSCs with natural frequencies only in the lower range."

The comments reads,

"However, the DDE loads are the most severe loads on the SSCs with natural frequencies only in the lowerrange.-

Therefore, it is not changed.

Thanks!

Yong

3

Page 38: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

From: Ross-Lee, MaryJaneSent: Thursday, November 06, 2014 7:48 PMTo: Uhie, JenniferCc Ross-Lee, MaryJane; Dean, Bill; Holian, Brian; Pruett, Troy;, Lubinski, John; Chokshi,

Nilesh; Kock, Andrea; Li, YongSubject: RE: addressing manager's comments on DCPP Op Det

Thanks. We will finalize and send to Region 4.

MJ Ross-LeeDeputy Director, Division of Engineering, NRR.Sent via My Workspace for iOS

On Thursday, November 6,2014 at 5:59:14 PM, "Uhle, Jennifer" <Jennifer.UhIefitnrc.gov> wrote:

Based on my discussion with Nilesh, Andrea and Yong, I modified it a bit and hopefully the final is attached. J

From: Ross-Lee, MaryJaneSent: Thursday, November 06, 2014 1:16 PMTo: Dean, Bill; Holian, Brian; Uhle, JenniferCc: Pruett, Troy; Lubinski, JohnSubject: FWV: addressing manager's comments on DCPP Op Det

Bill/Jennifer/Brian,

Between NRR and NRO, we collectively addressed all the comments except the one below.

NRO believes that the original wording is better in describing the DDE loads.

The original reads,.

"However, the DDE tends to control the SSCs with natural frequencies only in the lower range:'

The comments reads.

"However, the DDE loads are the most severe loads on the SSCs with natural frequencies only in the lowerrange."

Therefore, it was not changed.

Mary Jane Ross-Lee (MJ)

Deputy Director, Division of Engineering

Office of Nuclear Reactor Regulation

OWFN 9H1

US Nuclear Regulatory CommissionW Office: 301-415-32980) Mobiler

1

Page 39: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

* e-mail: marviane.ross-!ee(nrc.cov

From: LiU, YongSent: Thursday, November 06, 2014 12:51 PMTo: Ross-Lee, MaryJaneCc: Lubinskl, John; Lupold, Timothy; Manoly, KamalSubject: addressing manager's comments

MJ,

We, between NRR and NRO, collectively addressed all the comments from the senior managers except theone below.

NRO believes that the original wording is better in describing the DDE loads.

The original reads,

"However, the DDE tends to control the SSCs with natural frequencies only in the lower range."

The comments reads,

"However, the DDE loads are the most severe loads on the SSCs-with natural frequencies only in the lowerrange."

Therefore, it is not changed.

Thanks!

Yong

2

Page 40: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

From: Ross-Lee, MaryJaneSent Friday, November 07, 2014 10:09 AMTo: Pruett, Troy; Holian, Brian; Uhle, Jennifer; Dean, BillCc Lubinski, John; Kock, Andrea; Flanders, ScottSubject: FW: RG IV Diablo Canyon Seismic Operability inspection Report InputAttachments: DCPP-operabilityNRC.docx

After collaboration between NRO and NRR, the attached was transmitted to Region 4 today.

Mary Jane Ross-Lee (MJ)Deputy Director, Division of EngineeringOffice of Nuclear Reactor RegulationOWFN 9H1US Nuclear Regulatory Commission2 Office: 301-415-3298(1) Mobile :1

e-mail: n -lee nrc.,ov

From: Lupold, TimothySent: Friday, November 07, 2014 9:12 AMTo: Walker, Wayne; Alexander, Ryan; Hipschman, ThomasCc. Lubinski, John; Ross-Lee, MaryJane; Wilson, George; Ake, Jon; Manoly, Kamal; Markley, Michael; Karas, Rebecca; Li,Yong; Munson, Clifford; Oesterle, EricSubject: RG IV Diablo Canyon Selsmic Operability Inspection Report Input

Attached is information provided by the Office of Nuclear Reactor Regulation, Division of Engineering relatingto the Diablo Canyon Seismic Operability Inspection currently being conducted by Region IV. This informationis provided for inclusion into the inspection report as you deem appropriate. This information has been vettedthrough personnel in the Office of New Reactors. Division of Site Safety and Environmental Analysis,Geoscience and Geotechnical Engineering Branch 1, Office of Nuclear Regulatory Research. Division ofEngineering, and NRR, Division of Operating Reactor Licensing. If you have any questions, please contact meor Yong Li (301-415-4141).

Timothy R. LupoldChief, Mechanical & Civil Engineering BranchDivision of EngineeringOffice of Nuclear Reactor RegulationTimothy. Lupold~nrc.lov301-415-6448

I

Page 41: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

From: Sebrosky, JosephTo: Oesterle, EricSubject: FW: Info and possible action: former senior resident article dated 9/15 appears to raise issues that should be

turned over to the IGDate: Monday, September 22, 2014 7:49:00 AM

FYI - per our discussion, I should have included you on the original. If you look at the

bottom you will see the link to the former SRI's statements.

Joe

From: Case, MichaelSent: Monday, September 22, 2014 6:56 AMTo: OKeefe, Neil; Sebrosky, JosephCc: Markley, Michael; Walker, Wayne; Hipschman, Thomas; Balazik, MichaelSubject: RE: info and possible action: former senior resident article dated 9/15 appears to raise issuesthat should be turned over to the IG

Hi Joe. I agree with Neil. Although there are things in there that are not correct, I didn'tsee anything that is worthy of yet another round of examination.

From: OKeefe, NeilSent: Saturday, September 20, 2014 12:45 PMTo: Sebrosky, JosephCc: Markley, Michael; Case, Michael; Walker, Wayne; Hipschman, Thomas; Balazik, MichaelSubject: RE: info and possible action: former senior resident article dated 9/15 appears to raise issuesthat should be turned over to the IG

All,

I read Peck's response to the DPO appeal answer, and I did not identify any newinformation.

It contains the same factual errors and misunderstandings that were presented andanswered in his DPO and DPO appeal. It also contains the same kind of over-statementsabout what the regulations require and misstatements about what the NRC and licenseedid, and why. I interpret this to mean that he has dismissed the official answers the NRChas provided to his DPO and DPO appeal.

I do not believe there are any statements of impropriety on any individuals, nor do I seeany value to sending to the OIG; however. I always believe that if anyone feels itappropriate to do so, I will support them with the same energy I supported Peck's DPO.Knowing Michael, I interpret his writing as unusually patient and restrained with respect tohis statements about the NRC.

Neil O'KeefeChief, Branch BDRP, RIV(817) 200-11 ()

Page 42: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

From: Sebrosky, JosephSent: Friday, September 19, 2014 11:44 AMTo: Markley, Michael; OKeefe, Neil; Case, MichaelCc: Walker, Wayne; Hipschman, Thomas; Balazik, MichaelSubject: info and possible action: former senior resident article dated 9/15 appears to raise issues thatshould be turned over to the IG

To all,

The link below is to an article written by Michael Peck on 9/15/14. You can get to thearticle by following the link in the "NRC in the news today" summary of a San Luis Obisponew times piece. Anyway the article from the former senior resident inspector has veryunflattering things to say about Region IV, me, and the DPO panel. Taking a step back itwould appear to me that the whole thing needs to be turned over to the IG.

Let me know if I am missing something

Link to article in San Luis Obispo new times

http:l/www.newfimesslo.com/news/1 1442/solid-ground-two-reports-claim-diablo-canyon-is-safe-from-earthauakes/

Bottom of article has a link to the former senior resident inspector response to the releaseof the DPO information

httoH/issuu.com/ntmgldocs/summary of diablo canyon doo - seD/O

Page 43: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

From; Hiland. PatrickTo: Sebrnfo. JosephSubject: RE: DPO panel membersOate: Monday, September 22, 2014 7:22:14 AM

thx

From: Sebrosky, JosephSent: Friday, September 19, 2014 6:00 PMTo: Hiland, PatrickSubject: F'W: DPO panel members

Pat,

Page 3 of 164 provides who the DPO submitter wanted on the panel. The signature on thepanel report indicates that it was an SRA from Region II that was on the panel at thesubmitter's request. The name of the individual is Rudy Bernard.

Joe

From: Sebrosky, JosephSent: Thursday, September 18, 2014 9:34 AMTo: Hiland, PatrickCc: Ake, ]on; Li, Yong; Markley, Michael; Lupoldi Timothy; Karas, Rebecca; Ross-Lee, MaryJane;Oesterle, Eric; Wilson, George; Walker, Wayne; OKeefe, Neil; Hipschman, Thomas; Munson, Clifford;Manoly, Kamal; Hill, BrittainSubject: RE: Proposed Questions to PG&E

Pat,

The purpose of this email is to provide you with the reference documents that I discussedwith you this morning that serves as the basis for why I believe it is important tounderstand PG&E's position on whether or not in-structure motions (different dampingvalues and comparisons) have been done. Specifically I referenced information that is inthe DPO. The DPO case file can be found at: MLiA52 ._A4.

The case file is 164 pages long. The most important portion of the case file to me is thelast 5 pages (i.e., 159 - 164) that documents the EDO's appeal decision. The 5 pagedocument provides a concise history of the issue and also includes the followingdiscussion on page 4:

Nevertheless, your questioning attitude and perseverance were key to ensunng that thelicensee and staff fully evaluated the! implications of the Shoreline fault zone. Youcorrectlynoted that the seismic hazard should be evaluated for not only comparison of the groundmotion response spectra, but also the plant"s design and construction to ensurecontinued safe operation.

I understand that the in-structure motions calculations were not part of the basis for theoperability determination that was made in the October 2012 time frame. Nevertheless itwould appear to me that the EDO agrees that they should have been done. Based on the

Non Responsi•ve

oH

Page 44: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Non Responsive

Page 45: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Non Reseonsive,

From: Hill, BrittainSent: Wednesday, September 17, 2014 5:32 PMTo: Manoly, Kamal; Munson, CliffordCc: Ake, J1on; U, Yong; Markley, Michael; Lupold, Timothy; Karas, Rebecca; Ross-Lee, Marylane;Hiland, Patrick; Oesterle, Eric; Sebrosky, JosephSubject: Re: Proposed Questions to PG&E

Without the clarification on damping, we end up with the same confusing issues as 2 non

concurrences, a DPO, the 2014 union Conc sci report, and recent petition by FOE. If damping

clarified, stops all this confusion in its tracks and gives clear basis for decisions. This is not a pure

engineering exercise, and what you are portraying as "noise" is ano important consideration ihclearly explaining why or why not we think DCPP is safe to operate. If there still are dissenting views,

i suggest we discuss them at tomorrow's meeting before call.

Britt

Sent from Brittain Hill's PDA

From: Manoly, KamalSent: Wednesday, September 17, 2014 04:58 PM Eastern Standard TimeTo: Hill, Brittain; Munson, CliffordCc: Ake, J1on; Li, Yong; Markley, Michael; Lupold, Timothy; Karas, Rebecca; Ross-Lee, Marylane;Hiland, Patrick; Oesterle, Eric; Sebrosky, JosephSubject: RE; Proposed Questions to PG&E

I mentioned RG 1.61 to illustrate a point. I know from my involvement with Diablo since themid-eighties that the plant was licensed to damping values that are different from RG 1.61.i also knew that some components are governed by DDE and others by Hosgri. Fromdoing actual design of components in nuclear plants, designers know that somecomponents may be governed by OBE and others by SSE, Still, the argument aboutdamping should not be relevant to altering the evaluation done by PG&E in 2011 exceptfor the change of ground motion (old shoreline line vs. new shoreline hazard). That is theonly variable of significance. The rest is in the noise level from an engineering standpoint.

Page 46: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Kamal ManolySenior Level Technical Advisor for Structural MechanicsDivision of Engineering

Office of Nuclear Reactor Regulation301-415-2765

From: Hill, BrittainSent: Wednesday, September 17, 2014 4:17 PMTo: Manoly, Kamal; Munson, CliffordCc: Ake, Jon; Li, Yong; Markley, Michael; Lupold, Timothy; Karas, Rebecca; Ross-Lee, MaryJane;Hiland, Patrick; Oesterle, Eric; Sebrosky, JosephSubject: Re: Proposed Questions to PG&E

Please read ch 2,3, and 5 in DCPP SAR to see that Hosgri is not limiting demand - can be either HE or

DDE. PGE also didnt use RG 1.61 damping for all Cat1 SSCs. Please look at SAR for their mix. Unless

they identify appropriate damping etc, we simply cannot state that new info is bounded by existing

lic basis. if new Shoreline exceeds DDE, and DDE is the SSE and limiting GM (NO1 Hosgri!) for some

SSCs, we certainly need PGE to state what damping is appropriate for new info: DDE, HE, RG1.61, or

something else.

Britt

Sent from Brittain Hill's PDA

From: Manoly, KamalSent: Wednesday, September 17, 2014 04:06 PM Eastern Standard TimeTo: Munson, CliffordCc: Ake, Jon; Hill, Brittain; Li, Yong; Markley, Michael; Lupold, Timothy; Karas, Rebecca; Ross-Lee,MaryJane; Hiland, Patrick; Oesterle, Eric; Sebrosky, JosephSubject: Proposed Questions to PG&E

Cliff,

I see no relevance or value from asking PG&E question #5 about "In-structuremotions (different damping values & appropriate comparisons)". The sole focusshould be on confirming that PG&E new shoreline fault ground motion estimate isreasonable and acceptable to the staff. With such confirmation, then, the hazard fromthe shoreline fault would be bounded by the "Old" Hosgri. That should be the endpoint of our assessment of the CA report.

Introducing a question as to whether the damping values to be used for the 2014hazard estimate of the shoreline fault may be different from that used in the 2011evaluation would be pointless and shifting the focus to a totally unrelated issue. Youwill never find any documented reference that correlates slight change in hazard vsdamping values for structural materials. Remember, in RG 1.61 we prescribe (for aspecific structural material) a single damping value to be used by ALL plants in theUS for OBEs and another for ALL SSEs regardless of the location. The reason isbased on acceptable understanding that viscous structural damping would generally

Page 47: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

be lower at lower deformation level. We know that ground motion estimates for OBEsand SSEs vary greatly from low seismic regions such as the Gulf States vs. highseismic regions such as CA. For this reasoning, asking the question about the effectof different damping values on in-structural response due to slight change in hazardwould be worthless and totally distracting from the central issue in the CA report.

Kamal Manoly

Senior Level Technical Advisor for Structural Mechanics

Division of Engineering

Office of Nuclear Reactor Regulation

301-415-2765

Page 48: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

From: Sebrosk/, JosephTo, Wilson, GeomeSubject: FW: Info and possible action: former senior resident article dated 9/15 appears to raise issues that should be

turned over to the IGDate: Monday, September 22, 2014 5:11:00 AM

George,

The email chain below includes a link to Mr. Peck's response to the DPO appeal beingpublished. My read of it was not the same as Neil's read on it.

Joe

From: OKeefe, NeilSent: Saturday, September 20, 2014 12:45 PMTo: Sebrosky, JosephCc: Markley, Michael; Case, Michael; Walker, Wayne; Hipschman, Thomas; Balazik, MichaelSubject: RE: info and possible action: former senior resident article dated 9/15 appears to raise Issuesthat should be turned over to the IG

All,

I read Peck's response to the DPO appeal answer, and I did not identify any newinformation.

It contains the same factual errors and misunderstandings that were presented andanswered in his DPO and DPO appeal. It also contains the same kind of over-statementsabout what the regulations require and misstatements about what the NRC and licenseedid, and why. I interpret this to mean that he has dismissed the official answers the NRChas provided to his DPO and DPO appeal.

I do not believe there are any statements of impropriety on any individuals, nor do I seeany value to sending to the OIG; however, I always believe that if anyone feels itappropriate to do so, I will support them with the same energy I supported Peck's DPO.Knowing Michael, I interpret his writing as unusually patient and restrained with respect tohis statements about the NRC.

Neil O'KeefeChief, Branch BDRP, RIV(817) 200-1141 (o)

IjI(c)

from; Sebrosky, JosephSent: Friday, September 19, 2014 11:44 AMTo: Markley, Michael; OKeefe, Neil; Case, MichaelCc: Walker, Wayne; Hlpschman, Thomas; Balazik, MichaelSubject: info and possible action: former senior resident article dated 9/15 appears to raise issues thatshould be turned over to the IG The rest of this string may be found as document C18.

Page 49: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

From: Sebrosky. JosephTo: Bowers. Anthony; Dudek. Michael; Karas, Rebecca; Buchanan, Theresa; Walker. Wayne; Hinschman. Thomas;

anoly. Kama L1 n Williams. Megan; e i . L lQd TimoJhy Farnhol1z. Thomas ITomHloschman Lund, Louise PruetTroyI Hay, Michael HUland, Patrick Wilson, George Kock, AndreaRoth(OGC. David Young, Mtz Harris. Brian; Kanatas. Catherine; Brnell. Scott

Cc: Flanders. ScottSubject: internal meeting to discuss Diablo operability determination associated with new seismic information In the State

of California reportStart. Friday, September 19, 2014 1:00:00 PMEnd: Friday, September 19, 2014 2:00:00 PMLocation; HQ-OWFN-09B06-12pAttachments. PGE soectral comUa=ison.ootx

Bridge: 8BL§ZZ.(90Passcode.

Purpose: Internal meeting with SES managers to discuss process going forward for Diablo Canyon operability determination associatedwith new seismic information in the State of California report

Outcome: Decision made on how to proceed

Agenda:

Non ResoonsivePublic released DPO and DPO appeal suggests in the 2012 time frame the licensee should have also compared the new hazards to theDDEDPO decision do=iuments the additional analysis that was done hv the licenepn

Non ResponsiveIssue - what is the NRC's position on the caics that the licensee should do to verify operabilityPosition that no additional calcs are neededPosition that calcs or comparisons are needed baEed on orecedence set in DPO-

E - Non Responsive

III. Recommendation

Non Responsive

Next stepsWrapup

Non Responsive

Page 50: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Non Responsive

Page 51: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

N'onl Responstve

Page 52: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

From: Sebrosky, JosephSent: Tuesday, September 23, 2014 6:05 AMTo: Stovall, Scott; Munson, Clifford; Williams, Megan; Li, Yong; Hipschman, Thomas; Walker,

Wayne; Oesterle, Eric; Singal, Balwant; Markley, Michael; Jackson, Diane; DiFrancesco,Nicholas; Whaley, Sheena; Uselding, Lara; Ake, Jon; Burnell, Scott; OKeefe, Neil;Farnholtz, Thomas; Kanatas, Catherine; Roth(OGC), David; Manoly, Kamal; Reynoso,John; Hill, Brittain; Dudek, Michael; John Stamatakos ([email protected]); Stirewalt, Gerry;Buchanan, Theresa; Weaver, Thomas; Karas, Rebecca; Graizer, Vladimir; Hiland, Patrick;Ross-Lee, MaryJane; Lupold, Timothy; Wilson, George; Bowers, Anthony; Alexander,Ryan; Hay, Michael; Pruett, Troy; Kock, Andrea; Young, Mitzi; Harris, Brian

Subject: RE: info: status of diablo operability review 9-23-14

To all,

The purpose of this email is to provide you with the results of an inspection phone call with the licenseeyesterday (9/22) regarding the Diablo Canyon operability review.

During the call PG&E provided the following information:

Non Responsive

PG&E indicated that based on a question from RIV last Friday (9/19) it was rerunning the calculationsused to support the resolution of the DPO (see description in DPO case file pdf page 62 of 164 atML14252A743 which discusses the scaling factors used in the March 2014 PG&E analysis). PG&Eindicated that it did not believe that the analysis was needed to demonstrate operability. Nevertheless,PG&E was rerunning the analysis with the data from the 2014 State of California report and shouldhave the results for the Region to review by the end of this week.

c/K

Page 53: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Non Responsive

Please let me know if you have any questions.

Thanks,

Joe

Page 54: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

From: Sebrosky, JosephSent Thursday, September 25, 2014 12:51 PMTo: Stovall, Scott; Munson, Clifford; Williams, Megan; Li, Yong; Hipschman, Thomas; Walker,

Wayne; Oesterle, Eric; Singal, Balwant; Markley, Michael; Jackson, Diane; DiFrancesco,Nicholas; Whaley, Sheena; Uselding, Lara; Ake, Jon; Burnell, Scott; OKeefe, Neil;Farnholtz, Thomas; Manoly, Kamal; Reynoso, John; Hill, Brittain; Dudek, Michael; JohnStamatakos ([email protected]); Stirewalt, Gerry; Buchanan, Theresa; Weaver, Thomas;Karas, Rebecca; Graizer, Vladimir; Hiland, Patrick; Ross-Lee, MaryJane; Lupold, Timothy;Wilson, George; Bowers, Anthony; Alexander, Ryan; Hay, Michael; Pruett, Troy; Kock,Andrea; Harris, Brian; Vaidya, Bhalchandra; Klett, Audrey; Smith, Chris

Subject: info: status of diablo operability review 9-25-14

To all,

The purpose of this email is to provide you with updated status regarding the Diablo Canyon operability review.This email includes updates on the status of NRC inspection information requests and the assignment ofadditional headquarters PMs to help with the workload.

Based on discussions RIV had with PG&E today, PG&E is targeting providing information that wasrequested on 9/22 either late today or sometime tomorrow to support the NRC's review of theoperability determination. The information that RIV requested was in the following 3 areas:

Non Responsiv

3) Provide the results of the calculations that were rerun based on the calculations used to supportthe resolution of the DPO (see description in DPO case file pdf page 62 of 164 at ML14252A 743which discusses the scaling factors used in the March 2014 PG&E analysis). PG&E indicatedthat it did not believe that the analysis was needed to demonstrate operability, Nevertheless,PG&E was rerunning the analysis with the data from the 2014 State of California report.

te

Non Responsivc

Page 55: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Non Responsive

Please let me know if you have any questions.

Thanks,

Joe

2

Page 56: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Non Responsive

Page 57: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Subject:Location:

internal meeting to discuss assessment of diablo canyon operability informationHQ-OWFN-09B06-12p

Start:End:Show Time As:

Recurrence:

Meeting Status:

Wed 10/01/2014 12:45 PMWed 10/01/2014 1:45 PMTentative

(none)

Not yet responded

Organizer:Required Attendees:

Optional Attendees:

Sebrosky, JosephMunson, Clifford; Li, Yong; Hipschman, Thomas; Walker, Wayne; Oesterle, Eric; Markley,Michael; Karas, Rebecca; DiFrancesco, Nicholas; Farnholtz, Thomas; Smith, Chris; Manoly,Kamal; Reynoso, John; Hill, Brittain; Kock, Andrea; Vaidya, Bhalchandra; Klett, Audrey;Harris, Brian; Ake, Jon; Alexander, Ryar; Lupold, Timothy; Graizer, Vladimir; JohnStamatakos ([email protected]); Weaver, ThomasStovall, Scott; Williams, Megan

Note: scheduler updated to include new information under item Agenda item II below. The new information isbased on input from Cliff Munson

Bridge: 888-677-0690Passcode: j

Purpose: For Britt Hill, Kamal Manoly, Yong Li, Cliff Munson, Jon Ake, Chris Smith and Ryan Alexander to briefthe diablo canyon operability review team on the preliminary assessment of the additionalinformation PG&E provided via certrec and to determine the next steps in the process

Non Responsive

Agenda:

•I. Background - Information needs identified to PG&E

The information that RIV requested was in the following 3 areas:

Non Responsive

3) Provide the results of the calculations that were rerun based on the calculations used to supportthe resolution of the DPO (see description in DPO case file pdf page 62 of 164 at ML 14252A 743

I

Page 58: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

which discusses the scaling factors used in the March 2014 PG&E analysis). PG&E indicatedthat it did not believe that the analysis was needed to demonstrate operability. Nevertheless,PG&E was rerunning the analysis with the data from the 2014 State of California report.

II. I

Non Responsive

Non Responsive

2

Page 59: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

III.

IV.

V.

Non Responsive

VI. Other assessmentsa. DPO update?

Non Responsiveý

VII. Wrapup

3

Page 60: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

From: Oesterle, EricSent: Thursday, October 09, 2014 7:03 AMTo: Stovall, Scott; Munson, Clifford; Williams, Megan; Li, Yong; Hipschman, Thomas; Walker,

Wayne; Markley, Michael; George, Andrea; Jackson, Diane; DiFrancesco, Nicholas;Whaley, Sheena; Uselding, Lara; Ake, Jon; Burnell, Scott; OKeefe, Neil; Farnholtz, Thomas;Manoly, Kamal; Reynoso, John; Hill, Brittain; Harris, Brian; Klett, Audrey; Dudek, Michael;John Stamatakos; Stirewalt, Gerry; Buchanan, Theresa; Weaver, Thomas; Karas, Rebecca;Graizer, Vladimir; Hiland, Patrick; Ross-Lee, MaryJane; Lupold, Timothy; Wilson, George;Bowers, Anthony; Alexander, Ryan; Hay, Michael; Pruett, Troy; Kock, Andrea

Subject: Status of Diablo Canyon ActivitiesAttachments: Status Update on DCPP for Jennifer Uhle.docx

The purpose of this email is to provide a status on the multitude of Diablo Canyon activities that staff has beenworking on this week.

N'on RespoflsivE

Page 61: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Non Responsive

Ill. Filings associated with Friends of the Earth (FOE) Hearing Requesta. NRC response to FOE hearing request filed 10/6b. Additional filings also made by PG&E, NEI, and PG&E Senior Civil Engineer on 10/6c. 'Next steps - FOE response within 7 days and, also within 10 days of the PG&E's answer and

NEI's motion and brief, everybody else (NRC Staff included) can file a motion asking theCommission to take some action against the other filings (e.g. strike part of the answer) - reviewof the other 3 filings underway

IV. FOE FOIA request on timing of PG&E Seismic Report and DPO Appeal decisiona. Information from various offices received by FOIA coordinator - going through duplication

reviewb. Expected release of documents in packages - first one expected this weekc. Review of remaining packages for withholding to be performed to support releases expected

week of 10/13.

V. EPW Questions - DORL staff continues to work with Region IV and NRR/DE on finalizing draftresponses - coordinating with OCA - target issuance by 10/22

There continues to be a lot of activity associated with Diablo Canyon and I appreciate everyone's support. Weare making good progress on these challenging issuesI I

ý,Res;osv ý,, I I haemse oehn htyuaeprticula'rly inte'resting ýin ple~ase do~n't hes~itatet

contact me. Thanksl

ErCcR. Oe4te#ieNRC Project ManagerDiablo Canyon Power PlantCooper Nuclear StationNRR/DORL/LPL4-1301-415-1014

2

Page 62: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

From: Sebrosky, JosephSent: Monday, March 03, 2014 12:12 PMTo: Kim, James; Markley, MichaelCc: Hipschman, Thomas; Walker, Wayne; Regner, Lisa; Wilson, George; Harris, Brian; OKeefe,

Neil; Munson, Clifford; DiFrancesco, Nicholas; Hale, JerrySubject RE: Request for phone call with DCPP to discuss guidance regarding seismic licensing

basis relative to the 2/20/14 seismic eric leeds letter

Jim and Mike,

Non Responsive

Page 63: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Non Responsive

From: Sebrosky, JosephSent: Monday, March 03, 2014 8:13 AMTo: Kim, James; Markley, MichaelCc: Hipschman, Thomas; Walker, Wayne; Regner, Lisa; Wilson, George; Harris, Brian; OKeefe, Neil; Munson, CliffordSubject: RE: Request for phone call with DCPP to discuss guidance regarding seismic licensing basis relative to the2/20/14 seismic eric leeds letter

Jim and Mike,

Non Responsive,

BackQround

I am not sure the exact nature of PG&E's question below but because of a license renewal contention in thisarea and an ongoing DPO, I am extremely sensitive to providing feedback on this issue. Non Rev

Non Responsive

2

Page 64: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Non Responsive

Please let me know if you have any questions or if you think I am missing something.

Thanks,

Joe SebroskyNon Responsive

3

Page 65: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Non Responsie

4

Page 66: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Alexander, Ryan

From: Holian, BrianSent Wednesday, December 10, 2014.2:09 PMTo: OKeefe, NellCc: Walker, Wayne; Pruett, Troy; Alexander, RyanSubject: Re: Seismic Design and Licensing Basis Question

NeilGreat email and summary! III plan to discuss at nrr, with your email in frt of me... And will schedule a call to discuss.Thx muchGood seeing all of you-brian

From: OKeefe, NellSent: Wednesday, December 10, 2014 10:42 AM Eastern Standard TimeTo: Holian, BrianCc: Walker, Wayne; Pruett, Troy; Alexander, RyanSubject: Seismic Design and Licensing Basis Question

Brian,

)

Page 67: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Neil O'KeefeChief, Branch BDRP, RIV(817) 200-1141 (ol

S (b)() Ic)

2

Page 68: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

•qLPWl•l•| AI II•Pu •&ll ID n• ..............

a.r~n aa ~t ~ .... ,. .'.~. rL iru vbL NEII-TLiNA INFORMATIQI+-

Revision: 1 (11/26/14) Page 5OFIC'IAL USE O'!--EtJITIVE INTERNAL INFPRMAiiOn--

Page 69: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Vg W gVg• Vy• Vg• U Ig gm~g~ I.IIWV AT20N gW~

Revision: 1 (11/26/14)OFFICIAL USE ONLY.

Page-6=11lih1 I.TUSITIV I '! '.-FrIJ.ýF".=I kIrJ:faRA -,,,7%irl 4 ,

• gglu vg •gvl• B gvg•

Page 70: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

OFFIIAL SE O.U NS19FSIIVE INTERNAL INFeRMATIONl%&

Revision: 1 (11/26/14).....ie.A .USE L'E "

Page 47MM':!Mý"'1 , 2i - dPUT:J IJ IJ.-. 3 rr , -,I1t

Viii IVU ilVll • Vl i1•lb g • ¥11•llIFln IIVil

Page 71: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

CIF IA jmfKI e=tori I~I A I&~~.i.-.. '- ~~= i~ Iuv p1 = m...RIPIjL.. iiw ijiiiuA I iN

Revision: 1 (11/26/14)1 OFFICIAL USE ONLY

(b)(5)

Page 48- ISITIVE WNERNAL INFORMOTIOW

Page 72: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

IVI-i UIAL U45F ONLY - RFN'RfTIVr ~U IIrnMTnI-.f M-09 A.r~ *r 9^Lll **............... ml III•• 1 I Vbe jl l,1'i= 1w11 rl- %ll I1.11

If

Revision: 1 (11/26/14)eFFICIAL USE. ONLY - %?"IV.SITIV." INTE-RNAL Il%'FWkATION Page 49

Page 73: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

a. . ,n.- -. k.. -.

WoiL~ OlIV LiNfJERNALRIGNFORMATION

(b)Lf)

Revision: 1 (11126/14)OFFICIAL USE ONLY - SENSITIVE

Page 50INTFRNA! ItJrnRI'iiTFnI~'........

R N V ir"l it |•11

Page 74: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

OFFICIAL USE ON~LY - SSNSITIVE INTERI~kE IN~FORMATION-w

Revision: 1 (11/26114)l OFFICIAL USE ONLY

Page 51SENSITWIE INTERNAL IlNFORMATION

Page 75: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Alexander, Ryan

From: Pedersen, ReneeSent: Friday, March 07, 2014 1:10 PMTo: Powell, AmyCc: Rothschild, Trip; Shane, Raeann; Solorio, Dave; Campbell, Andy; Zimmerman, Roy;

Sewell, MargaretSubject RE: HELP!! DPO Response to Boxer

Amy,

Thanks for the response. Just to be clear, the DPO submittal is 1 scanned NRC record (it may include severalreferences or parts) from the employee.

We can provide the record if the Commission approves. There may be value in including some basicinformation on our process in the response, including that the DPO Program supports openness andtransparency when the process is complete. Just a thought.

Please let us know the path forward and please provide guidance with respect to the document marking. (TheDPO submittal is included on a form which doesn't have a big margin.)

Ren6e

From: Powell, AmySent: Friday, March 07, 2014 12:11 PMTo: Pedersen, ReneeCc: Rothschild, Trip; Shane, RaeannSubject: RE: HELP!! DPO Response to Boxer

You ask a complicated question. I am cc'ing Trip in OGC as this wades into legal territory; I understand thatyou two have talked about this as well.

We'll keep you in the loop as Commission conversations continue via the daily Chiefs of Staff meetings. I amon the Hill all afternoon but in Monday if you want to discuss.

Thanks,Amy

Amy PowellActing DirectorU. S. Nuclear Regulatory CommissionOffice of Congressional Affairs

c(,q

Page 76: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Phone: 301-415-1673

From: Pedersen, ReneeSent: Friday, March 07, 2014 9:06 AMTo: Powell, AmySubject: FW: HELP!! DPO Response to BoxerImportance: High

Amy,

Raeann is out. Can you tell me what our practice is with a Congressional request for a predecisionaldocument?

From: Pedersen, ReneeSent: Friday, March 07, 2014 8:56 AMTo: Shane, RaeannCc: Solorio, Dave; Sewell, MargaretSubject: HELP!I DPO Response to BoxerImportance: High

Raeann,

You are probably away of the letter we just got from Boxer.

2. Please provide me with a copy of the Differing Professional OpiniCanyon Power Plant (DCPP) prepared by NRC's former Senior R(Dr. Michael Peck) that is currently pending before the Commissk

We previously talked about this type of scenario. In particular, this DPO is still being processed within ourDPO process. It is currently being evaluated by a DPO Panel. The DPO Panel issues a report and then theDirector, NRR issues a DPO Decision to the individual. The individual has an opportunity to appeal to the EDOand then the EDO evaluates and issues a DPO Appeal Decision. At this point the process is consideredclosed and we ask the individual if he would like the DPO Case file public. If he says yes, NRR performs areleasability review and includes a link to the DPO Case File along with a summary of the case that is postedon the WIR. This could be several months.

The document is considered pre-decisional and not for public release, So, does this mean we can tellCongress, no? Premature release of the document could have a potentially negative impact on the DPOprocess.

Thoughts?

2

Page 77: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Alexander, Ryan

From: Markley, MichaelSent: Wednesday, March 19, 2014 9:26 AMTo: Walker, Wayne; Alexander, RyanSubject. FW: ACTION: Issue OEDO Ticket for Responses to Senate EPW QFRsAttachments: RE: HELP!! DPO Response to Boxer

From: Pedersen, ReneeSent: Monday, March 10, 2014 12:27 PMTo: Markley, MichaelCc: Solorlo, Dave; Sewell, MargaretSubject: RE: ACTION: Issue OEDO Ticket for Responses to Senate EPW QFRs

Mike,

The DPO is not rublicly available and has limited distribution within the NRC. Please see my email exchangewith OPA.

Ren~e

From: Markley, MichaelSent: Monday, March 10, 2014 12:21 PMTo: Pedersen, ReneeSubject: FW: ACTION: Issue OEDO Ticket for Responses to Senate EPW QFRsImportance: High

Renee,

Please see Boxer's requested items 2 and 3. OE is tasked with responding to item 2, but we (NRR) are taskedwith responding to item 3.

Question: Is the DPO and associated documents publicly available?

Mike

From: Orf, TracySent: Friday, March 07, 2014 7:52 AMTo: NRRDORLBCs DistributionCc: Evans, Michele; Monninger, John; Lantz, Ryan; Lund, LouiseSubject: FW: ACTION: Issue OEDO Ticket for Responses to Senate EPW QFRsImportance: High

Heads up! Attached are questions that came out of the Commission's Senate EPW oversight hearing. Someof these questions will take a while to answer and resemble a FOIA. Others will require the PMs to check theirtech specs and search ADAMS.

Looks like a major effort.

Thanks,

1

C,) ( QP6

Page 78: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Trace

From: Wertz, TrentSent: Thursday, March 06, 2014 2:44 PMTo: Orf, Tracy; Anderson, Shaun; Moore, Ross; Jessup, William; Schmitt, Ronald; Lian, Jocelyn; Mahoney, Michael;Lyons, SaraSubject: FW: ACTION: Issue OEDO Ticket for Responses to Senate EPW QFRsImportance: High

Heads Up.

The ticket will be issued shortly with a due date of March 28. These will be due to me by COB March 26. I'llpass along the TAC as soon as I get it.

Here are the assignments. Let me know if you think something should be changed:

ChairmanBoxer 1,3,5 - DORLBoxer 6 - DSSCarper 1 - DIRS support NSIR as neededGillibrand 1 - DLRGillibrand 2 - DORLGillibrand 3 - JLDGillibrand 4- DIRSVitter 1-12- DLR/DORL/DE support NRO as neededVitter 14-26 - JLDVitter 36 - DORLVitter 37 - DEVitter 39, 41-45,53 - DPRVitter 55 - DORL/DIRSVitter 61,62 - DORLVitter 63-67 - DPRVitter 79-85 - DORL/DIRS support NRO as neededSessions 1 - DORLSessions 2b,c - DPRSessions 2d - JLD/DPRFischer 1 - DPRFischer 2 - DRA

For Comm SvinickiCarper 2 - JLDSessions 2 - JLD

For Comm OstendorffCarper 1,2 - JLDSessions 2a - DIRS

Thanks,Trent

From: Rihm, RogerSent: Thursday, March 06, 2014 2;04 PMTo: Jaegers, Cathy

2

Page 79: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Cc: Landau, Mindy; Wertz, Trent; Orf, Tracy; Hudson, Jody; Atack, Sabrina; Williams, Donna; Trocine, Leigh; Rini, Brett;Sun, RobertSubject: ACTION: Issue OEDO Ticket for Responses to Senate EPW QFRsImportance: High

Attached are ticket instructions, response template, and copy of C.FRs with office assignments. If you needanything else, let me know.

3

Page 80: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

From:To:CC:SubjectuDate:Attachments,

Multlins. CharlesOestedle, Eric: lxne.Ra} Markley. Michael

Walker, Waynle

RE: DCPP Communications PlanTuesday, November 25, 2014 5:25:47 PMImage.0a1ong

I fb (5I1

From: Oesterle, EricSent: Tuesday, November 25, 2014 4:46 PMTo: Mullins, Charles; Alexander, Ryan; Markley, MichaelCc: Walker, WayneSubject: RE: DCPP Communications PlanImportance: High

Chuck,

(b)(5

Hope that summary helps. You may want to consider using some of it in your response.

Ertc'R. Oe~terle/NRC Project Manager

Diablo Canyon Power Plant

Cooper Nuclear Station

NRR/DORL/LPL4-1

301-415-1014

COO

Page 81: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

From: Mullins, CharlesSent: Tuesday, November 25, 2014 4:15 PMTo: Alexander, Ryan; Markley, MichaelCc: Oesterle, Eric; Walker, WayneSubject: RE: DCPP Communications Plan

Ryan;

Thanks. I think this will be quite helpful.

Chuck Mullins

From: Alexander, RyanSent: Tuesday, November 25, 2014 3:46 PMTo: Markley, Michael; Mullins, CharlesCc: Oesterle, Eric; Walker, WayneSubject; FW: DCPP Communications Plan

Mike:

The full internally available Diablo Canyon Comm Plan (Revision 0) is available at theOEDO Comm Plan SharePoint site at:

ht p:ltfusion~nrc.gov/edoiteam/CPMICommPlans/l.ayouts/listform.aspx?PageType=4&Listld={52972D7A-EDC-4DE2-984B-6A8AAE78C74CA&ID=63&ContentTypelD=0xO10043278097A1424145B8EF8AC452B1OF19

However, attached is the current "working version" of the Diablo Ca Van Gomm P Lean __eDraft Revision 1). This draft revision includes updates regarding (1)| Non Responsive]

n (3) Answers to Senate E W Questions, (4)

Non Res.onsive

The updated text in the attached is typically in red, or in the case of new sections there is anote in .r.ed. text statincg that the entire section was replacedl/added.I J

•- Non Responsive

Hope this helps!

Ryan D. AlexanderSenior Project Engineer

Page 82: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

NRC Region IV, Div. of Reactor Projects, Branch A

Office: (817) 200-1195

Cell:

-- Please consider the environment before printing this e-mail.

From: Walker, WayneSent Tuesday, November 25, 2014 2:22 PMTo: Alexander, RyanSubject: FW: DCPP Communications Plan

Ryan,

Can you send him the plan that is online and also the draft portions. Thanks.

Wayne

From: Markley, MichaelSent: Tuesday, November 25, 20i4 2:21 PMTo: Walker, WayneCc: Mullins, Charles; Oesterle, EricSubject: DCPP Communications Plan

Wayne,

Can you send the latest version of the DCPP communications plan. He is addressing alawsuit by FOE.

Mike

Page 83: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

From:To:Cc;Subject:Date:

Oestedle. Eric: BafrPtrLoFe

RE: Documents for the lawsuitMonday, November 24, 2014 12:50:36 PM

Ok.

Here is the procesgi I am in

(b)(5)

I Do you have ML numbersfor these documents? And do you have any thoughts on where they came in the overallprocess?

I know you are busy today. I also know it is a holiday week and the contact in RIV is alsoout today. Is there anyone else who might be able to work with me?

(and yes, that is a CRAZY meeting schedule!!)

From: Markley, MichaelSent: Monday, November 24, 2014 12:37 PMTo: Mullins, CharlesCc: Oesterle, Eric; Bamford, Peter; Lyon, FredSubject: RE: Documents for the lawsuit

This is a holiday week. Sorry...

My availability is only before 1:00 pm. I am going to grab some lunch but will be back in afew minutes. I have meetings:

1-2:00pm1:30-3:30pm3:00-4:00pm

Have you checked with Rene Pedersen in OE? She was the DPO manager.

I am confused by the process we are in now. These documents are all in ADAMs, except

C/C2I

Page 84: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

possibly e-mail. Are these official requests under "discovery"?

For the FSAR revision 21. You would need to check with Peter Bamford. Fred Lyon willbe back tomorrow.

Mike

From: Mullins, CharlesSent: Monday, November 24, 2014 12:22 PMTo: Markley, MichaelSubject: Documents for the lawsuit

Michael;

The petitioners want to include a list of documents in the record of the case. Do you havea few minutes this afternoon to discuss them?

Chuck

From: John Bernetich [mailto:bernetichj(&ayreslawgroua.com]Sent: Monday, November 24, 2014 12:01 PMTo: Mullins, CharlesCc: Richard E. Ayres; Jessica OlsonSubject: Re: My current view of the Record

Chuck,

We intend to ask for the following documents:

1. Two inspection reports cited in the June 23, 2014 memo from Peter Bamford to MichaelMarkley (IR 2012004, IR 2011005)2. A "change report" submitted by PG&E to accompany its submission of FSAR Revision 21(in addition to the cover letter)3. Documents cited by Dr. Peck in his appeal of the Panel Report issued in DPO-2013-0024. Any documents related to a 50.59 review prepared for Revision 21, including emailsbetween PG&E and NRC, and between NRC Staff members

In addition, we do not agree with your suggestion that the documents from the de factolicensing proceeding before the Commission should be included in the record for the Court ofAppeals on the Revision 21 issue.

Thanks,John

John BernetichAssociate AttorneyAyres Law Group LLPPh: (202) 452-9200

Page 85: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Dir: (202) 416-0241maymayreslawgroup.corm

Page 86: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Wertz, Trent

From:Sent:To:Cc:

Subject:Attachments:

Sewell, MargaretWednesday, March 19, 2014 10:29 AMCase, MichaelSheron, Brian; West, Steven; Hill, Brittain; Bernhard, Rudolph; Leeds, Eric; Gitter, Joseph;Wertz, Trent; Pedersen, Renee; Solorio, DaveRE: DPO Status UpdateDPO Panel Report.doc; Milestones and Timeliness Goals.docx

Hi Mike,

Thanks for the update on the DPO. Just in case you need it, I'm attaching some DPO panel report instructionsalong with a template for your use. Just let me know if you need anything else.

In light of the activities that still need to be done by the panel, it seems likely that you will need anotherextension. The current Milestones & Timelineness goals (attached) indicate that Eric will issue his decision bynext Fri., 3/28, which may not be realistic. If you decide to request an extension, please let me know as quicklyas possible so that I can submit it to EDO.

(b)ý5)

Please let me know if you have any questions and/or if you'll need the extension.

Thanks!Marge

From: Case, MichaelSent: Monday, March 10, 2014 2:01 PMTo: Wertz, Trent; Sewell, Margaret; Glitter, Joseph; Leeds, EricCc: Sheron, Brian; West, Steven; Hill, Brittaln; Bernhard, RudolphSubject: DPO Status Update

I just wanted to keep you all informed about DPO status. Britt and I made it to CA to review some informationthat PG&E developed for us (see attached status I gave the DPO submitter), I thought was we saw was verygood evidence with respect to the issues in the DPO and very much worth the "wait". (Easy for me to say, butwe do really appreciate the support you have given us to fully illuminate the issues). Britt deserves a greatdeal of credit because he was prime architect behind our thoughts.

Still have to formally write up what we saw.Do a minimal amount of polishingGet Joe to give us a sanity checkGet the report to Eric.

Thanks again for your support.I

Page 87: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

MEMORANDUM TO: Panel ChairPanel MemberPanel Member

FROM: (Name of Office Director or Regional Administrator)

SUBJECT: AD HOC REVIEW PANEL - DIFFERING PROFESSIONAL OPINION ON(use subject description from tasking) (DPO-20YY-nnn)

In accordance with Management Directive (MD) 10.159, "The NRC Differing ProfessionalOpinions Program," I am appointing you as members of a Differing Professional Opinion (DPO)Ad Hoc Review Panel (DPO Panel) to review a DPO that was forwarded to me to disposition.

The DPO (Enclosure 1) raises concerns (subject).

I have designated (name) chairman of this DPO Panel and (name) as a DPO Panel member.(Name) was proposed by the DPO submitter and serves as the third member of the DPO Panel.[Optional: Because this issue addresses enforcement, (name) is serving as the fourth

.member.] In accordance with the guidance included in MD 10.159 and consistent with the DPOProgram objectives, I task the DPO Panel to do the following:

El Review the DPO submittal to determine if sufficient information has been provided toundertake a detailed review of the issue.

LI Meet with the submitter, as soon as practicable, to ensure that the DPO Panelunderstands the submitter's concerns and scope of the issues. (Normally within 7 days.)

11 Promptly after the meeting, document the DPO Panel's understanding of the submitter'sconcerns, provide the Statement of Concerns (SOC) to the submitter, and request thatthe submitter review and provide comments, if necessary. (Normally within 7 days.)

LI Maintain the scope of the review to not exceed those issues as defined in the originalwritten DPO and confirmed in the SOC.

LI Consult with me as necessary to discuss schedule-related issues, the need for technicalsupport (if necessary), or the need for administrative support for the DPO Panel'sactivities.

LI Perform a detailed review of the issues and conduct any record reviews, interviews, anddiscussions you deem necessary for a complete, objective, independent, and impartialreview. The DPO Panel should re-interview individuals as necessary to clarifyinformation during the review. In particular, the DPO Panel should have periodicdiscussions with the submitter to provide the submitter the opportunity to further clarifythe submitter's views and to facilitate the exchange of information.

Page 88: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Multiple Addressees 2

11 Provide monthly status updates on your activities via email to Renee Pedersen, DifferingViews Program Manager (DVPM) about the last day of the month. This information willbe reflected in the Milestones and Timeliness Goals for this DPO. Please provide a copyof email status updates to the submitter and to me.

El Issue a DPO Panel report, including conclusions and recommendations to me regardingthe disposition of the issues presented in the DPO. The report should be a collaborativeproduct and include all DPO Panel member's concurrence. Follow the specificprocessing instructions for DPO documents.

LI Consult me as soon as you believe that a schedule extension is necessary to dispositionthe DPO.

LI Recommend whether the DPO submitter should be recognized if the submitter's actionsresult in significant contributions to the mission of the agency.

Disposition of this DPO should be considered an important and time sensitive activity. Thetimeliness goal included in the MD for issuing a DPO Decision is 120 calendar days from the daythe DPO is accepted for review. The timeliness goal for issuing this DPO Decision is (date).

Process Milestones and Timeliness Goals for this DPO are included as Enclosure 2. Thetimeframes for completing process milestones are identified strictly as g.oals-a way of workingtowards reaching the DPO timeliness goal of 120 calendar days. The timeliness goal identifiedfor your DPO task is 70 calendar days.

Although timeliness is an important DPO Program objective, the DPO Program also sets out toensure that issues receive a thorough and independent review. The overall timeliness goalshould be based on the significance and complexity of the issues and the priority of otheragency work. Therefore, if you determine that your activity will result in the need for anextension beyond the overall 120-day timeliness goal, please send me an email with the reasonfor the extension request and a new completion date. I will subsequently forward this request tothe DVPM who will forward it to the EDO for approval.

Please ensure that all DPO-related activities are charged to Activity Code ZG0007.

Because this process is not routine, the DVPM will be meeting and communicating with allparties during the process to ensure that everyone understands the process, goals, andresponsibilities. The DVPM will be subsequently sending you information intended to aid you inimplementing the DPO process.

An important aspect of our internal safety culture includes respect for differing views. As such,you should exercise discretion and treat this matter sensitively. Documents should bedistributed on an as-needed basis. In an effort to preserve privacy, minimize the effect on thework unit, and keep the focus on the issues, you should simply refer to the employee as theDPO submitter. Avoid conversations that could be perceived as "hallway talk" on the issue. Weneed to do everything that we can in order to create an organizational climate that does not chillemployees from raising dissenting views. It is appropriate for employees to discuss the detailsof the DPO with their co-workers as part of the evaluation; however, as with other predecisional

Page 89: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Multiple Addressees 3

processes, employees should not discuss details of the DPO outside the agency.

As a final administrative note, please ensure that all correspondence associated with this caseinclude the DPO number in the subject line, be profiled in accordance with ADAMS template OE-011, be identified as non-public with limited viewer rights to those included on distribution ofcorrespondence and declared an official agency record when the correspondence is issued.Please email the ADAMS accession number for the record to DPQOPM.R'esource(,nrcqo, andthe record will be filed in the applicable DPO case file folder (DPO-YYYY-NNN) in the ADAMSMain Library. Following this process will ensure that a complete agency record is generated forthe disposition of this DPO. If the submitter requests that the documents included in the DPOCase File be made public when the process is complete, you will be provided specific guidanceto support a releasability review.

I appreciate your willingness to serve and your dedication to completing an independent andobjective review of this DPO. Successful resolution of the issues is important for NRC and itsstakeholders. If you have any questions, you may contact me, Ren6e Pedersen, DVPM, at(301) 415-2742, or Marge Sewell, Safety Culture Specialist at (301) 415-8045.

I look forward to receiving your independent review results and recommendations.

Enclosures:1. DPO-20YY-nnn2. Milestones and Timeliness Goals

cc w/o Enclosure:SubmitterDVPM

Page 90: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

From- Mulllns, CharlesTo: ,arklh ael

Subject: ObservationDate: Friday, November 21, 2014 5:15:41 PM

Michael;

petiionm II will bring it d'own on Monday and you can read it

Have a great weekend.

Chuck

Cji)-

Page 91: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

From;To;Cc:Subject:Date:Attachments:

Sebroskv. JosephDudek, Michael

Bowers, Anthony; Markley, Michael; etere, Eric IAttached email is publicly a

RE: Proposed Questons to PG8.E documents D/25 and D/26

Friday, September 19, 2014 6:35:22 AM #2 in FOIA-2014-0488 (ML

FW O)ld PGE and the NRC work to=ether to spin news on Diablo Canyon avake safetv.msa

ivailable as part ofin interim response14322A779). I......... t"

Thanks -1 I I will work with Tony to discuss the issue below, and toensure the EDO staff is aware that in the attached email NRR DORL management h•cn

Joe

From: Dudek, MichaelSent: Friday, September 19, 2014 6:18 AMTo: Sebrosky, Joseph; Bowers, AnthonySubject: Re: Proposed Questions to PG&E

Morning Joe!I kco I willnot be in the office. Tony Bowers will carry the ball for this. He'll be able to break down any barriersthat you need.

Sent from an NRC BlackberryMichael I. Dudek

From: Sebrosky, JosephSent: Thursday, September 18, 2014 05:20 PM Eastern Standard TimeTo: Dudek, MichaelCc: Walker, Wayne; OKeefe, Neil; Oesterle, Eric; Markley, Michael; Karas, Rebecca; Lupold, TimothySubject: FW: Proposed Questions to PG&E

Mike,

I am going to give you a call on this. We need to confirm with the EDO's office that theposition taken in the DPO appeal is that the operability determination for Diablo shouldhave also included a comparison to the DDE.I

Non Responsive

I have been asked by my management to check with the EDO's office on this.

I will try to call you later tonight or early tomorrow to discuss.

Thanks,

Joe

C/lah

Page 92: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

From: Sebrosky, JosephSent: Thursday, September 18, 2014 9:34 AMTo: Hiland, PatrickCc: Ake, Jon; Li, Yong; Markley, Michael; Lupold, Timothy; Karas, Rebecca; Ross-Lee, MaryJane;Oesterle, Eric; Wilson, George; Walker, Wayne; OKeefe, Neil; Hipschman, Thomas; Munson, Clifford;Manoly, Kamal; Hill, BrittairSubject: RE: Proposed Questions to PG&E

Pat,

The purpose of this email is to provide you with the reference documents that I discussedwith you this morning that serves as the basis for why I believe it is important tounderstand PG&E's position on whether or not in-structure motions (different dampingvalues and comparisons) have been done. Specifically I referenced information that is inthe DPO. The DPO case file can be found at: ML1A252A743

The case file is 164 pages long. The most important portion of the case file to me is thelast 5 pages (i.e., 159 - 164) that documents the EDO's appeal decision. The 5 pagedocument provides a concise history of the issue and also includes the followingdiscussion on page 4:

Nevertheless, your questioning attitude and perseverance were key to ensuring that thelicensee and staff fully evaluated the! implications of the Shoreline fault zone. Youcorrectlynoted that the seismic hazard should be evaluated for not only comparison of the groundmotion response spectra, but also the plant"s design and construction to ensurecontinued safe operation.

I understand that the in-structure motions calculations were not part of the basis for theoperability determination that was made in the October 2012 time frame. Nevertheless itwould appear to me that the EDO agrees that they should have been done. Based on the

Non Responsive

Page 93: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Non Responsive

From: Hill, Brittain

Page 94: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Sent: Wednesday, September 17, 2014 5:32 PMTo: Manoly, Kamal; Munson, CliffordCc, Ake, Jon; Li, Yong; Markley, Michael; Lupold, Timothy; Karas, Rebecca; Ross-Lee, MaryJane;Hiland, Patrick; Oesterle, Eric; Sebrosky, JosephSubject. Re: Proposed Questions to PG&E

Without the clarification on damping, we end up with the same confusing issues as 2 nonconcurrences, a DPO, the 2014 union Conc sci report, and recent petition by FOE. If damping

clarified, stops all this confusion in its tracks and gives clear basis for decisions. This is not a pureengineering exercise, and what you are portraying as "noise" is ano important consideration inclearly explaining why or why not we think DCPP is safe to operate. If there still are dissenting views,i suggest we discuss them at tomorrow's meeting before call.

Britt

Sent from Brittain Hill's PDA

From: Manoly, KamalSent: Wednesday, September 17, 2014 04:58 PM Eastern Standard TimeTo: Hill, Brittain; Munson, CliffordCc: Ake, Jon; Li, Yong; Markley, Michael; Lupold, Timothy; Karas, Rebecca; Ross-Lee, MaryJane;Hiland, Patrick; Oesterle, Eric; Sebrosky, JosephSubject: RE: Proposed Questions to PG&E

I mentioned RG 1.61 to illustrate a point. I know from my involvement with Diablo since themid-eighties that the plant was licensed to damping values that are different from RG 1.61.I also knew that some components are governed by DDE and others by Hosgri. Fromdoing actual design of components in nuclear plants, designers know that somecomponents may be governed by OBE and others by SSE. Still, the argument aboutdamping should not be relevant to altering the evaluation done by PG&E in 2011 exceptfor the change of ground motion (old shoreline line vs. new shoreline hazard). That is theonly variable of significance, The rest is in the noise level from an engineering standpoint.

Kamal ManolySenior Level Technical Advisor for Structural Mechanics

Division of Engineering

Office of Nuclear Reactor Regulation301-415-2765

From: Hill, BrittainSent:. Wednesday, September 17, 2014 4:17 PMTo: Manoly, Kamal; Munson, CliffordCc: Ake, Jon; LI, Yong; Markley, Michael; Lupold, Timothy; Karas, Rebecca; Ross-Lee, MaryJane;Hiland, Patrick; Oesterle, Eric; Sebrosky, JosephSubject: Re: Proposed Questions to PG&E

Please read ch 2,3, and 5 in DCPP SAR to see that Hosgri is not limiting demand - can be either HE orDDE. PGE also didnt use RG 1.61 damping for all Cati SSCs. Please look at SAR for their mix. Unlessthey identify appropriate damping etc, we simply cannot state that new info is bounded by existinglic basis, If new Shoreline exceeds DDE, and DDE is the SSE and limiting GM (NOT Hosgri!) for someSSCs, we certainly need PGE to state what damping is appropriate for new info: DDE, HE, RG1.61, or

Page 95: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

something else.Britt

Sent from Brittain Hill's PDA

w(b)(6)From: Manoly, KamalSent: Wednesday, September 17, 2014 04:06 PM Eastern Standard TimeTo: Munson, CliffordCc: Ake, Jon; Hill, Brittain; Li, Yong; Markley, Michael; Lupold, Timothy; Karas, Rebecca; Ross-Lee,MaryJane; Hiland, Patrick; Oesterle, Eric; Sebrosky, JosephSubject: Proposed Questions to PG&E

Cliff,

I see no relevance or value from asking PG&E question #5 about "In-structuremotions (different damping values & appropriate comparisons)". The sole focusshould be on confirming that PG&E new shoreline fault ground motion estimate isreasonable and acceptable to the staff. With such confirmation, then, the hazard fromthe shoreline fault would be bounded by the "Old" Hosgri. That should be the endpoint of our assessment of the CA report.

Introducing a question as to whether the damping values to be used for the 2014hazard estimate of the shoreline fault may be different from that used in the 2011evaluation would be pointless and shifting the focus to a totally unrelated issue. Youwill never find any documented reference that correlates slight change in hazard vsdamping values for structural materials. Remember, in RG 1.61 we prescribe (for aspecific structural material) a single damping value to be used by ALL plants in theUS for OBEs and another for ALL SSEs regardless of the location. The reason isbased on acceptable understanding that viscous structural damping would generallybe lower at lower deformation level. We know that ground motion estimates for OBEsand SSEs vary greatly from low seismic regions such as the Gulf States vs. highseismic regions such as CA. For this reasoning, asking the question about the effectof different damping values on in-structural response due to slight change in hazardwould be worthless and totally distracting from the central issue in the CA report.

Kamal Manoly

Senior Level Technical Advisor for Structural Mechanics

Division of Engineering

Office of Nuclear Reactor Regulation

301-415-2765

Page 96: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

* From: QTo:Cc: lud Ln.Jouise Wilson, GorSubject: Additional Q&As for Diablo CanyonDate: Tuesday, November 25, 2014 12:37:05 PMAttachments: ANTECIPATUD OUESTIONS AND ANSWERS DCPP.Eocx

Jeff,

I've incorporated Mike Markley's comments on the subject Q&As for EPW Hearing supportand have provided the updated responses.

ErrcR. Oe re4-WNRC Project Manager

Diablo Canyon Power Plant

Cooper Nuclear StationNRR/DORL/LPL4-1301-415-1014

h%, ••""•m4

Page 97: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

ANTICIPATED QUESTIONS AND ANSWERS

DIABLO CANYON

Non Respornsilv

2. I(b)(•i)

3.

Non Resnonsive

Page 98: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Non ResponsivE

Page 99: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

5.

Non ResponsiviE

Page 100: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

From:To: Klett, AudreyCc Markley. Michael; Oesterle. Erc Wilson, GeomeSubject: thanks for developing TER shell for Diablo CanyonDate: Thursday, October 23, 2014 7:42:12 AMAttachments: Diablo Canyon o-erability evaluation 2014 seismic information technciat evaluation,doox

Path forward for Diablo operability assessment:.msa

Audrey,

The purpose of this email is to thank you for developing the outline for the Diablo Canyonseismic TER. I used it to develop the attached TER which was used as a strawman formanagement discussions yesterday. Attached is a summary of the outcome of themeeting. Although it looks like the attached TER is going to be heavily revised it did servea purpose as the basis for a starting point to get the ball rolling on the evaluation. It alsoappears to me that the general outline for the TER (which you developed) is going to beused.

I just thought you should know that I very much appreciated not having to start fromscratch on developing the TER and how I used what you developed.

Thanks again for the help.

Joe

From: Sebrosky, JosephSent: Tuesday, October 21, 2014 8:10 AMTo: Wilson, George; Oesterle, Eric; Markley, MichaelSubject: info: latest version of Diablo Canyon TER

To all,

Attached is the latest version of the Diablo Canyon TER. It incorporates comments fromEric and has other minor editorial changes from previous versions. Per direction fromGeorge I have stopped work on the effort pending the outcome of the meeting later today.

Thanks,

Joe SebroskySenior Project ManagerJapan Lessons-Learned DivisionOffice of Nuclear Reactor RegulationJoseph.sebrosky~nrc.gov301-415-1132

Page 101: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

TECHNICAL EVALUATION REPORT BY THE OFFICES OF NEW REACTORS,RESEARCH, AND NUCLEAR REACTOR REGULATION

CENTRAL COASTAL CALIFORNIA SEISMIC IMAGING PROJECTPACIFIC GAS AND ELECTRIC COMPANY

DIABLO CANYON POWER PLANT, UNITS 1 AND 2October 21, 2014, 8:00 am version

(b?(5)

1

Page 102: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

(0)(0

2

Page 103: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

3

Page 104: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

4

Page 105: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

5

Page 106: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

/t .....(b)(5 I

6

Page 107: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

7

Page 108: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

8.

Page 109: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

9

Page 110: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

(bV5)

10

Page 111: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

(D)(5

11

Page 112: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

12

Page 113: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Table 6-23

DIABLO CANYON STRUCTURE FRAGILITIES

(Based on hazard defined over 3 to 8.5 hertz range.)

Fundaamenta Spectral Accoleration CapacityFrequpncy x

Structure Hertz Failure Mode HCLPF (O)

Contalnment BudingConuete Internal StmrctureIntake StMnOuMAU,•t1 BuldingTurblne BuUding

R•fueling Weatu Storege TankCoadensa Storage TankDO ftel-Ofn Stornge TankAwdilv atwatu Piping

4.1 P xtedor Shell Sbeu

8.9 nternal Structure Shear23.3 North Wall Shee8.2 Northlouth Shgazwals8.6 Shen W&1, ColW= 319.0 Black Wall7.6 CoaeretefBedroek Pflac t- Compason io RWST

8.426.918.45

5.794.87

> 10.0

9.92>10.0

0.260.200.280.21

0.26

0.300.310.310.260.33

3.34

2.983.232.66

1.84

3.40

4.•5

0.29 0.36

Buried RuptarRupture

>10,0 - -

9.23 0.18 0.21

13

Page 114: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

U

lb

IF*

.4 F

is'.

I!

Table 6-24

DIABLO CANYON EQUIPMENT FRAGILITIES(Basod on hazard dethned'over 3 to 1.S hemt rmea.)

(o1

8S falm and Comeene~ti Callo~n

Rester 9rettuse Vassal cbsuda~ma - (Lot*)haciter ltirmall Coatdatafm - (tar)Seasm Castrate Cmetuhumm 014P)freptucr cMouamafne 04140)Vrmmel.sr safely Valves cauiafeuas - (14r)?nwet Opertaed 5.11sf Valves 0.01shmsot - OWS)3eaecuc ahe CombtPal fltatettt - 0!v)4,cam, a" o Drives CeesItsmal (t (10*"m31 Ppiteg Co.teltautl - (14011

ani pump$ Aualllee (31)am3 no"4 Eitabagets Anxillmy (too.)

SoPmpa fl uTatAsufflar (73-1

,CCW huet. AW'Jut&I ('31)ccw ueta Sockespet Taux's (W)1CCW AWa Tea Ausslltavy (143-)

Coerglhs Pump (caawftsoag1 Asaultty (711)

cbartmil hept (,vctpuece) AWWWVcr (71))

6m 559 vALTWJL~f

Acaitlaty Saltwaftru tsms lattka Vi

CS fump. Ausillsy (721)Spa diieTaut Asuuitn~ (731)

PuindameniwalFrequency

11-1411an

7 RZ (to7-316 a00

7-fl Its (10

s-11 Ru (Hy)

13-3 Rx (a)

1-32 11 (if)

43 It: (U)

"3 att 01)

24 met M)

Method or StlamicQua1Itcat~n Pilure Mode

VotatmW Assitysis SWPparim5 SimrKijanwe ARAtII. Iaavre Caue PflauDysawi Amalpatt Vapne Lau"e SuppertDyparpi Aaaiyll Sata* 09"0 Sqipolt9Suck) Assfyofetva usarM peacticalSuite Aastrufestd~ MOWN, 1ub"Istme0"Waci Aaat"Is Lowtr Mewi StandGlavelto Anatole lkadMAdpir Tk~dDyaamfe Analysis Itimet

Viaemlc Ananlysis ramp Rold DownS SaltsStaIde Asamyata Anterw Selta A Kppr

"atent Suapport

Sack A"osayt Amcber Sleds

sulki Acalotst Ifap "aml Dows; ftltvStatc Avajlots Andeta 110,11

Static Analosts ramp Itoh Down saltsDy21nal = V.tyI. Ststakwael" Sisal Not,#Static Anabel.s Stlammi Laet" Uftom

Staic Aualysl. Motw Held Dow% WitlStatic ASAlysfS ftmp HOWd Doa Socls

SpectralAcIecradon Cpsact

Informatlon x) HCLFF

W Sumaly Data 80.71 0.25 0.33 2.14WStarma Data 10 14 040 3. .

F~aiammaktyDafa 4.94 Wt1 0.25t" 2.35Wx is y Del6 1t.44 0.11 0.44 3.212so". Mal05 310. - -so"11. 14401 7.42 0.31 0.42 21.2JOSS. b ,28. u429 i.r1 0.7 0.32 2.6)V Suumarr Vat.s 11.71 0.41 0.54 3.40W S•mmary Data 2,10.4 -

W Sumtt ,ay Dta 1.31 04)) 0.72 3.1$W Smamay Data, 1."1 0.24 0.21 3.41r4413. 474

De Sm ir Vm. 19.01 0."I 0.19 4.33W1,114 -

Ws•,1tIB1'y Doim 10,941 0.14 0.13 4.44W•Iate.me mIft. 8.44 0.21 0.19 3.16

M004. um0, )4318 1.53 0.19 0.11 1.14Mm01,514. I 447 4.11 0&27 0.2cm 2.45J2I319 7.32 0.13 0.32 2.0l

Wsenga'y Vate 10.16 0.11 0.11 4.41w' Stmma• y Olt. :10.0 -

m4oo0 A10.0 -

)WSVus ra Dats 8.45 0.29 0.20 3.41W 5mmary Diatl 4.711 D.A 0.10 1.07

Static Aftelo It

Static AnayisfrlStatic Analott

Pvast mouuntn colts

Foundation SaltsSappmt makiS~el

0a.

0.

-'5

14

Page 115: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

UII

£2.

'U.1

11Ii

Table 6-24 (CoadInued)DIABLO CANYON EQUtP1I4ENT PRAGILMTES(Easad an hzevrd derfoed over 3 to 8.5 teftu range.)

systeM aGCmootL~t

so t.Ifillg Valve Otulm. enfAa*8*mn

Us Solelty Vuiwm AszWANY (940')US FOSYS Asl0ltk (1401)

AYW 1uap (3MOW Dii.. ARUfIMATy (0001ArW 11 , (I UtMtt DOhti) AmZOay (10')

0.0.L F~l on3 0" TinS 21051. (W5)Ma0. Nd01 ?ou pipatum Wdidsrgzoe vasl (77.)0.0. f.ia on Skls'sa vanv gaQgeas~d Weft C77120.0. Aft saun coupnamto 110M. MWI

DAN. Alt Slut 26colve Tutll (151'),keel (octoamlu Touiim 42r')D.C. MadlModVMut Vtp 1111law (01130.0. bai tt 5Ihroult Wilfr "b"11. (104q

P.A. C..MW t~kt91 TeAS. (AS'S.

0.0. Main* Load 12.mlool/o, TOW"1. (85'I)

0,otat'amve Vs. w CoSCasnabMeit (3401)

Sop~pt ft" AwaJIIary (1S4,41)AC UstauCattpitivio. Aua~i~ny S4

ComWeIU C fbti Aaal437 (1631)

B114mtt arnd &W.-011 Duampen Mxsma (1631)

Pundsmental-Frequency

Rlazlb 1b8go

.41 111a (1)

to MA (V)

26 MR 00I? H& (noultilbte V1pftis a&* (M1a ufs 01)

10 me (H)

13 NI (M1

M.othod otsf S.1mic4Quuaf~caltou

Dy"iius AUWWlhT4t

-ros -mlla~POrwnk~ Alaa~ssl.Ies

U91510 AttulyIaSMIll Aagyise~

SWStC 5.8*17.1smaile Asslys1iN...Oftlal Anaahxago 5.5.1014Dluawk AsazijstoOveasiak Aat~paD7.aosticA~ssbDyssonk AnslyellTOO3T.4

lIviSlativ A.8.al1

D2'wuak Asslysis

Paillor. Mods

AUMO 3(80 p .BeM

Pumo Kola0 DownM atto

Botto pustt RipleyeHit. ArAcitr ball.310.351 UoltHold DOW sollsa"1 Do"* salt1518 Atichor acheAanlo* fa111mgWilies, Suftrnt god Welds10acftrn.01stst

shutmoomlAno.heMz-WWft Weld

PCOt PIzA119101ed. Wgtd

sup""t 3soiuaAscht NM4Isveusalui

tntortnatiosiSource

AcveSpeoOalAcollan~t Capacity

.L2LHCLPF

U5067. M463. 51461 MO1.0

US"8 2410.0

55105 240.0165". Null1 1.71

M133 >.10.01134. U132 8.31veto ban O.11132.0.Uny2 2.50.01(42)5414 7.10miss) 8.78M1111. 34441 A41.01(54. L0344 1.4010124. U3)44, 1494. .711(482

4.3160(1321.

10M* 1"911. M0410. alsoM1421. 1444

MOSIS 1.7115M8. wi31 ola.011455 M61.0

0.3 0.38,

0.27

0.3*

0.30

0.200.24

8.14

0.13

3.35

4084

L24

2.•82

1-12

0.21 0.11

0.31 0.243,33 HEz (K) Sluk Asatyst11:01) liz (34) S94lut.5..1 s321 He* 00 Tell

:133 I. (o) Stad. Aat ylpuSteaf Aahlysit

**x**.ton Arnabr bol10smsuhtfil lost

51.34 0.31I 0.30 3.$S•2.10.0 - - a,

,,o

15

Page 116: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Sysiem and Component Location

swickle" rojm 1" 01111 ~r

Table 6-Z4 (Ccmttiutd)DIABLO CANYON EQUIPMENT FRtAGIL4TIES(Based on hazard dtiltned ever 3 to 9.3 horts rancti.) 4,

a,

Fundamental Method of Seismic

IAccelerainCpacIty

FaiureInformation Z CL.PFFailur__ Sure Mods5 IL som k IlPt -L (R)

F4,1'atal Treaa lrm a. CPU$F

tant a& IQ~

galtqnl RMaa ftaml

wtttbpaMe"Mk 1:12101

Ia~matrRe

slaynla Palsy trito

Main Coutma "eatd,

not1 stuwowu Pauli

A4911161V eatkgw~f* ablaaI

Twist" (III-)

vartS. (1111

A"WaI6y PIS-)

Aaaak Pts-)

Auoistaly 0(l.)

MAegftt PIS-)

AW01111y 0001Aazdiil (100')

Aux"tll (140*)

Aiwfllui (too0)

AMRS111 (IU*I

7 us* 10

2S Hz (M)

it SIX (10

"S1 SIX (to

12 111 MN

711 z(100

3,2 oft On1

Tell

Staga As"Vats

Static Andypi.

smtalf Abtist"J

Tat

rut

ttadv A414tpb

ran

0aws Rod Usauttag

Sappan Lesizab.

WINAschar Wte&&

It"Iostat

lo4v4. us$$. 1435. S.0)us?$!. 1417?..5n 7.441668110149. M4371 W1441. WAS8K4451,05 47,1641. SI 41. 710.0144501422. 31073. 16404. ec.1IM440

01110, 1U014. 1U344 41.0414a1l. U1402. 1010G. 11.111M242714014, W)64, Ma4ss. *.IS1011"I3141114. 100111. 1434 4.47

0.3$ 0.2S

0.1o 0.1,

0.14 0.36

0,.70 o, 1a

0.26 0.12

0.14 0.40

O.JS 0.21

0.11 0.14

0.26 0.20

I'll2.01S

3.47

3.39

2.74

9.40

2.16

2,45

1.41

2j;l

7.213.71

21AP-Hat Paftit 1081A 210.6Itrenat.) 1401. 040%4. was7. 6.83

16411. 14416, MSt.31U4467

a

somtrestAsctler SlultS Weld111161ua1

switch Ittento

Switch FbEnda"

1513. Waadw S.3413,017. 14764 7,10.0hIol. U1464 1.21

5"WrAw yawp nt , ma0.W 6456. 1441 7.1740317. 0047). 01342. 1.401447*, 441 7.2171WI7. d11.13 0S$9 •ia.*0

DyOpaa Aastsela

SaeAnatv"is1413 Nas CHI Toml

0.310-310.10

0.270.27S0.8,1

0~

16

Page 117: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

U

I

Table 6-14 (Corntbwned)DIABLO CANYON PQUWMfEI4T IRAGILfl1ES(Based on harnard deffned over 3 to 8.5 hertz rants.)

Speltfo

Fundamental MtAbiod of Seismic iZnformation 1CL1Lilcadfof PS'0Q320cy Q"WIfficstta" Failure Mo~de Seaurvt, ( .. 2 .

Aaetuai OW) Ir-30of 30* 3 Tellittwa 3685?. 305% 30.70 0.1f 4.25 3.3?AMAX1111 03409 5-11 us00 3 Tat )aw1r138? 0317 1m1.43 0.37 0.35 4.130ai11pC~) V 00 ast Stracjiul bull, 11554 1.as 0.38 6.111 3.14ASXiy (0401) Na ~. Tom 24ciu :~ 2.30,Ckttaolslu (117') 233 on 13 Ten URIccus S04 .9 0.113 Q.10 4.11

&Sisrtp and Conapogent

Brawn, Caaw" "4 em'mralftslaoSauid simsPrt. ecting 2#84cm

lainsAM & Tempamutu DowalonIfasans & Alp w1mnIaters

tam3 scan BombMaotied Cas O3"it lbtalag"tallp13 Suttin"

Ott-Wit rower 2349V

used, Battlef sousuCE, a cbkckVVW rnAir and Kalov 09.talld Valt..CAU1 Trmo and sappostsRVAC BW.Xlus call XqapbM

Axa~llf-7 (Vitis*)

coalawoasta (YwAricut)

COtflaanta 41131)

vat*".

32.20 Iu 0313".3 a (in)

"I1 Its ("lV)

tA 31*(33PlgeAtd NEODSFlexible fiplug

11aAgt, "1Pinl1,x~i TrI"FPjleae Vocting

stalfn AnalyticTan

TontNo".041110 Analtic

Man.

TV"Dynamic AasltrikDynmaicl Amilroib

Dynamic LAnlpklsaitic AIIsailStitl, AMMihi

Amber DeltaStzaWQaStusarawl0arnal. P33aimale201=u0 Prem ImpactActaalo AoacAL. Dolls

(kamano Pastfnr

000"10 softamllOeagte SjapmtnGeawi frtetleft

64awle Prattle,Crawils 5159t"(resewt Support

loll?. miss. W339has#mod71044Data Urn,31433

Date "Ma

31354W"*2. 33351VMSta Boa

806?. 854f1woq,-wllW314-b3315

:#10.02110102411.0

1.60

0,94

0,40CO.J0.33

0.300.503317

0.10

0.00

2.63

0.56.29

2.933.M

347

2.4f

0~3

ii

17

Page 118: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

I PG&E Single. Station'sigma Approach

1.5 1----Hosgri

-Los Osos

-San Luis Bay

11 -Shorefine

- -Shoreine- Hosgri Linked

-- Design

0.1 1 10 100

Frequency (Hz)

Figure 1 - Deterministic Response Spectrum Single Station Approach

(b)(5:

18

Page 119: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

From: Oesterle, EricSent: Wednesday, October 22, 2014 3:55 PMTo: Wilson, GeorgeCc: Alexander, Ryan; Walker, Wayne; Sebrosky, Joseph; Markley, MichaelSubject: Path forward for Diablo operability assessment

George,

As you know, members of NRO/DSEA and NRR/DE met this afternoon to discuss a proposed pathforward. Everyone agreed that there is no immediate safety concern and that whatever approach we take onlyneeds to be able to provide reasonable assurance until the NRC completes its review of the 50.54(f) responsefollowing the March 2015 submittal. The 50.54(f) response will still be the information that NRC ultimatelyhangs its hat on with respect to additional actions, if necessary, because it is expected to provide moreaccurate information.

The proposal from Nilesh Chokshi was to allow staff to consider all available and recognized methodologies forassessing response and not be limited to either single station correction (SSC) or Ergodic. This would alsoallow the staff to take into account knowledge gained from assessments of CEUS plants and develop a sort ofaveraged approach between SSC and Ergodic. The seismologists are on board with this approach and in facthad even considered at one point previously. This approach would result in curves that would tend to fall moreto the right of the PG&E developed SSC curves and more to the left of the NRC back-calculated Ergodiccurves. The resultant curves would be compared against Hosgri and also LTSP, if needed, and would factor insome qualitative discussions about fragility and capacity that were included in SSER 34. Everyone was inagreement with Nilesh's approach. Kamal was OK with it if the results still showed that the new curves were ator below Hosgri.

It was agreed that we need to get Region IV on board with this approach before we brief it to Jennifer. I amproviding this email to Ryan Alexander and Wayne Walker as well.

Er-cR. Oe-4tireNRC Project ManagerDiablo Canyon Power PlantCooper Nuclear StationNRR/DORL/LPL4-1301-415-1014

tý,.4w

1

Page 120: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

From: Ge2elI.1IdTo: Sr.=. MichaelCc: Pedersen. Renee: WiLsonGere Marklev. Michael: Br iJ2.jogSUbject: RE: Now AskManagement SubmissionDate. Monday, November 10, 2014 8:20:05 AMAttachments: Mini-Comm Plan on DCPP DPO final.docx

Mike,

We prepared a mini Comm-plan associated with the EDO Decision on the Appeal of the DPO (seeattached) and the release of the DPO Case file for public availability. Perhaps the attached will addressthe question. Like Mike Markley indicated, there is no indication that we will be responding directly tothe 9/19 article.

Eric R. OestedeNRC Project ManagerDiablo Canyon Power PlantCooper Nuclear StationNRR/DORL/LPL4-1301-415-1014

-----Original Message-----From: Markley, MichaelSent: Monday, November 10, 2014 8:10 AMTo: Scott, Michael; Broaddus, DougCc: Oesterle, Eric; Pedersen, Renee; Wilson, GeorgeSubject: RE: New AskManagement Submission

Mike,

We had all kinds of stuff going at the time of the DPO Director's Decision and EDO Appeal. The DCPPPM, Eric Oesterle can provide you with the information subject to our communications plan, but OEowns the DPO process. Rene Pedersen would be the right person to discuss the DPO. I do not believethere is a Sharepoint link.

There were a lot of articles. Some making assertions about how the DPO was handled and timing. Wehave referred some to the OIG. In DCPP space, September 19 is a long time ago. We are respondingto about 10 DCPP Congressional/concerned citizen items right now. I will have the PM, Eric Oesterletake a look, but my guess is we are not responding explicitly to the September 19 article.

Mike

-----Original Message -----From: Scott, MichaelSent: Friday, November 07, 2014 5:42 PMTo: Markley, Michael; Broaddus, DougSubject: FW: New AskManagement Submission

Gentlemen:

Can whichever of you has cognizance of Diablo Canyon please help me out? Can you please ask the PMto send me a link to a Sharepoint site or wherever else that we have compiled information on the DiabloCanyon seismic DPO and the Agency's review and response to it? The below question was submitted

Page 121: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

anonymously by someone on the Region I staff, I would like to answer it with a simple link to whereverthe info can be found, if such a link exists.

Thanks in advance for your help.

Michael (Mike) ScottDeputy DirectorDivision of Reactor ProjectsRegion I(610) 337-5126

-----Original Message -----From: [email protected] [mailto:r1askmanagement(•nrc.gov)Sent: Friday, October 31, 2014 7:29 AMTo: RIASKMANAGEMENT RESOURCESubject: New AskManagement Submission

On September 19, The Santa Barbara Independent ran an article, which was also put on the Riwebsite, about the former Diablo Canyon SRI who had a concern about how Diablo Canyon's newseismic information was handled and did not feel that Is DPO about this concern was adequatelyaddressed. Does the NRC plan to do anything additional to address his concern in light of the recentarticle? If so, please inform us of the resolution to this when It is concluded.

Page 122: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

-OFfICAL USE ONLY-SENSITIVE INTERNAL INFORMATION - NOT FOR PUBLIC RELEASE

Communications Plan -Diablo Canyon Power Plant Topics of Interest

Differing Professional Opinion and Appeal

(b)(5

Page 123: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

OWFFICiALAP4E IJNLY-ADI mltldm fw Dil•n•i m i ISENSITIVE INTRu NALj~ ijirORuM,~AHO--Kn .irtr rzLIV ELLLASi

Page 124: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

OF.'CL•, .USE.ONLY RRSENSITIVE INTERNAL INFO-RMATION NOT FOR PUBLIC RELEASE

(b)(5'

Page 125: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

OFFIGIAL USE ONLY.SENSITIVE INTERNAL IN FORMATON - NO *OR PUBIic RELEASE

Page 126: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

OFFCIL SEON'V-YSENStI'!E- MUTRNAL INFORM.ATION ---NOT FOR PUSLMIZ ELEASE

Page 127: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

OFFICIAL USE ONLYSIENSIITIVE INTERNAL INFORMATION NOT FOR PUBLIC RELEASE

Page 128: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

From: Qestere. EricTo: ,ebrk. h Marklev. Michael; Lupold, Timo:hy Wilson. George

Cc: Karas. RebeccaSubject: Final Briefing SlidesDate: Tuesday, October 21, 2014 10:04:17 AMAttachments: Final Diablo Canyon Seismic Status Briefina 210ct2014.ootx

imaoeQQi.Dn!3

Attached are the finalized briefing slides for the 11AM briefing. Thanks everyone for yourinputs!

Ertc R, Oegterle

NRC Project ManagerDiablo Canyon Power PlantCooper Nuclear StationNRR/DORL/LPL4-1301-415-1014

a,,

Page 129: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

SU.S.NRC

United States Nuclear Regulatory Commission

Protecting People and the Environment

Assessment ofPG&E Operability Determination

forNew Seismic Information

NRR, NRO and Region IV Status Briefing

October 21, 2014

Contacts: J. Sebrosky (NRR/JLD), T. Lupold (NRR/DE), R. Alexander (RIV), W. Walker (RIV),M. Markley (NRR/DORL), and E. Oesterle (NRR/DORL)

1

Page 130: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

r U.S.NRCUnited Satec Nuclear Regulatory Commi.sitm

Protecting People and the Environment

Briefing Agenda

0

0

0

0

0

0

0Non Responsivi

• Decisional Environment

2

Page 131: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

rl U.S.NRCUnited Stmtecs Nudcar Regolazory C(snmisioni

Protecting People and the Environment

Non Responsive

3

Page 132: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

--U.S.NRCUnited S.jics Nticlear ,cgulhnry (ommissiIn

Protecting People and the Environment

Non Responsi,

4

Page 133: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

United Staics Nudlea Rctgulatroe (nnrnsision

Protecting People and the Environment

Non Responsilcl

5

Page 134: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

kljvU.S.NRC-SUnhcd t Nxiskv Rcepuhcory Commnission

Protecting People and the Environment

Non Responsmv

6

Page 135: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

e<ki U.S.NRCUn~ited Stato Nudclr.Regutr I Guvn (4mkýiia

Protecting People and tbe Entdronmient

Non Responsive

7

Page 136: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

(I<U.S.NRCUnited S•tate- Nttlce.ir Rcgulatory Commission

Protecting People and the Environment

Non ResponsIvc

8

Page 137: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

r'U.S.NRCUnited States Nuclear Rcgulmiorv Commkision

Protecting People and the Environment

Non Responsivw

9

Page 138: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

(-<-U.S.NRCU nited State Nuceao~r Rtgtlxjttory C(tirtrui-ioin

f'rtecdwig Peopis' and tbe EnvironIMent

Non Responsmv

10

Page 139: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

< U.S.NRC1n SttctlNoes Nunclear Regulatory (Commnision

Protecting People and the Environment

Non Responsmw

11

Page 140: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

•< U.S.NRCUnjited Stfes Nuclear Rrgularory Co:mmi.siodn

Protecting People and the Environment

Non ResponsIVE

12

Page 141: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

r.i U.S.NRCUnized StJtes Nuclear Regulatory (i'mnitjsiorn

Protecting People and the Environment

Non Responsive

13

Page 142: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

(j US.NRCUnitcd States NucIktr Regultd ,ry (2ornmissirin

Protecting People and the Environment

Non Rosponsiw

14

Page 143: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

rtUS.NRCUiitcd State,. Nuclear Iegpilaroty Commission

Protecting Peopk and the Enfirorment

Non Responsivt

15

Page 144: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

e<2'<ýU.S.NRCUnitd Swe Nucle\~dar Regail atoy (Cosnmis~ia

Protecting People and the Environment

Decisional Environment

0

Non Responsive

• FOIA - timing of PG&E issuance of seismic report andNRC EDO decision on DPO appeal

0I

Non Responsive

Leak of DPO and publication in PressNon Responsive

• December 2014 Hearings - Senate & House

16

Page 145: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

From: SebrosKt JosenlTO. Wilson, Geoe ihe: QOstede EricSubject; FW: info: rough draft of DCPP seismic evaluationDate: Tuesday, October 21, 2014 5:50:12 AMAttachments. Dablo CanVon operabflitv evaluation 2014 seismic information technoal evaluation~docx

imacme001 pn

George, Mike and Eric

The purpose of this email is to ask for help from people who understand seismic margins better thanme on whether or not the attached technical evaluation should include references to how SSER 34confirmatory items were resolved, and the HCLPF values found in PG&E's IPEEE submittal. Thereferences are provided below, Any insights on whether or not this information should also beincluded would be appreciated - thanks joe

4/17/92 letter ML1 4279A1 32 Is publicly available.

View ADAMS P8 Properties ML 14279A132Onen ADAMS P8 Documnent IForwards Safety Evaluation Closing Out Plant Long-Term Seismic Progjam StaffFinds That Confirm-atory Item From SSER 34 Has Been Satisfactorily Resolved,)

I am also not sure if the IPEEE HCLPF values should be included in the discussion. The IPEEE can be found at:View ADAMS P8 Properties ML073600371Open ADAMS P8 Document (Diablo Canyon Units I & 2. Response to Generic Letter 88-20.Supplement 4. "Individual Plant Examination of External Events for Severe Accident Vulnerabilities.")

The IPEEE contains HCLPF values for Component and Structures. Below is an example table from the IPEEE

Page 146: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Table 3-8. IDCPP Component and Structure Fragility and HCLPF Values

RISKMAN Daeviptotwn medan I 4CLPF sets set Fueer Made wodt 1) Acct(q) R U Source of Ftmgolty

3810 ONTAPIMP1 SUILIW44 ".2 3m 0.38 0.30 Carceig cve1l u W1w

FU&BS'Tf CokemCUTE m7XML 910STRUCTIJRE 6,01 2W0 0.20 0.31 S~SG" wa st ohmCFO68000ed tOPSwwv& 6149t

2wUO TAKt SThgcTUM ae. 234 oa" 011 M~w. -20 ol. akme poy

AURX.ARVW SUPU4 5,79 2AT ".1 0.28 1Warmsokok ~ we few

?T8Si4 ItM*OJ StJGfllDtO WEAR WViL 447 1 v 0.24 043 Stew was a .draw 31 01g.

ho55timA twai ItmS I*k

ZfiifMV AtACTR00P8S4)Al VISMI 7 3.38 0.4% 0.2 tie hmog, mm of co0maO.

ftWlIIATOI) OfTERMPALS 1)142 4.04 0.40 0.73 ClAD.# of Iste, oev V9oW9 c~o~orq 0eo~etr

ZSTMG7I M1AM CMEPATOR 1.20 2.83 0 21 0,30 hlw 01.Ym ov ~O Gr_____________b~ms. semesero. LocA.

2PORA #Ovvm OFATED rV4#Y ALVES 142 *2-2 020 0,42 #w% 4a . bwm",

7ncpM RftACTOft COOLANT PSI4WS £9,2 2.33 0137 9,23 [Ao..... mod 664k._____________LOCA.

Ma02%*f ,1 3.36i 0.3) "2 pbaffs to hirwier. we hdi%.

zRiw 14f SEAT £XCNGM4GR 909 34 026 q027 Imake seo0 elsarg 0

ZOCCP cmW PUMP 9 43 3.74 0.21 0il Loo of w.s~ tutevjn OW a

2CCW4X CCW#4tAT VCwMkFS fit 1.66 ell 0.29 Le b-b6IM. 1g g w CCW0

ZCCWTX CCW 54*01 TOME 413 3176 0.33 0.22 Low C l,#; ISM SW 0081

ZCSPMP COUTAMdAW W~fAY PUMPS 6,00 248 0219 021. LW MW. IVw Of COWlt.

UPA76 IPPY AcwtiV TOML 076 307 0.30 0.14 Low of Dwoms441 wo

*M1GM LW WIMPS 61Aw fvUvP' 74 3-3 CL"02 0121 LO9W br~d. so" of twe436I

301U 04 fIm2 OIL PUMPSftI~flf 9.33 3AS 0oil 0.33 two W96%. 4Mg orwsva.

ZDSLON 0688K 14. 0N"#A702 7,7 3e6 0.21 017 28 'ý to&. 00441ws

30wv4p DG P.AMAOAL0WATIM PIAWS 1.78 SAS 0.20 044 imo~ eowM. kas of coofir..*wVI .sL

Z03XC Do ExviATIOW CUSICAL 7A4 2697 0-29 0.AK Fqiwqto funrws

zoacnt 00 CON#740L PANEL 4.8 2.24 0.30 0.13 Fea*w to hmfesw

Page 147: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

From: Sebrosky, JosephSent: Monday, October 20, 2014 8:55 PMTo: Oesterle, Eric; Wilson, George; Markley, MichaelSubject: info: rough draft of DCPP seismic evaluation

George, Mike, and Eric,

Attached is a very rough draft of the Technical Evaluation of the 2014 California CoastalCommission Seismic Imaging Project for DCPP Units 1 and 2. It is a very rough draft which Ericand I intend to develop further in the morning. We hope to have a more refined product to you by9:00 am.

Please let me know if you have any questions on the approach.

Thanks,

Joe

Page 148: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

TECHNICAL EVALUATION REPORT BY THE OFFICES OF NEW REACTORS,RESEARCH, AND NUCLEAR REACTOR REGULATION

CENTRAL COASTAL CALIFORNIA SEISMIC IMAGING PROJECTPACIFIC GAS AND ELECTRIC COMPANY

DIABLO CANYON POWER PLANT, UNITS I AND 2October 20, 2014, 6:00 pm version

(b)(5)

1

Page 149: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

2

Page 150: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

(b)(5)

3

Page 151: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Cb)(S~

4

Page 152: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

(b)(5'

5

Page 153: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

6

Page 154: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

7

Page 155: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

b k\fr)'I I

8

Page 156: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

•,,oIt. A. II

9

Page 157: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

(MV5I

10

Page 158: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

11

Page 159: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

(b)(5

12

Page 160: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Table 6-23

DIABLO CANYON STRUCTURE FRAGILITIES

(Based on hazard defined over 3 to 8.5 hertz range.)

Fundamental Spectral Accoleration CapacityFrequency X

Structure Hertz Failure Mode S () O HCLPF (g)

Containvient BunftigConcrete Internal Structuretnta~kt StructureAwdilaxy BuildingTurbine Building

RefuIeling Water Storage TankCondensate Storage TankDO Fbel-Oil Storage TankAuxiliary Saltwater Piping

4.1 Exterfor Shell Shear

8.9 Internal Structure Shear

23.3 North Wall Shear8.2 North/South Shearwalls

8.6 Shear Wail, Column 31

9.0 Block Wall7.6 ConcretelBedrock Flexure- Comparison to RWST

Buried RuptureBuried Rupture

8.426.918.5$5.794.87

>10.09.92

0,260.200.280.210.26

0.29

0.300.310.310.260.33

0.36

3.34

2.983.232.661.84

3.40

4.85

>10.0 - -

,.10,0 -- --

9.23 0.18 0.21

13

Page 161: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

-u'I

Co

iU'aC)

= a.o -

'a-:* 0

Table 6-24

DIABLO CANYON EQUIPMENT FRAGILITIES(Based on hazard defined over 3 to 8.S hertz range.)

-Systemn and Component L.ocation

Reactor rboume Vassal canlalamoan - (10?')Reactorc lalecatli Conainmalent - (1071Stcanx Gecratalra coaualaweal - (140*1I'axrwtfrt Coantsamalt - (140')Presutclecr Saetly Va1vtx Caateltuagat - (16V)rower Operated Relief Valves C-taloaxeoz - (1491'Reactor Coolant Pumops conainelont - (114')Conroirl 110d ODres conalalrsual 0(140)NSSS piping Containment - (140')

RESIDUAL HaAr PPI4OVAL

ARPumps Auxlliary (S0')

Win Next RExheatief Atuzilary (1001)

SI Accumllatall coalalonovat (911)

St Pups Auxiliay (83')Doran Ine.cdlop Took A-11lle" (731)

.CCW tPumps Auxil~ary (73')CCW lit"e! xchangers Turbine (051CCW Surge Tank Auxillaty (1631)

C~harging Pumpao (centrilatat) Auxiliary (73')charging Pumps (redipraocr) Auxiliary (73')

Auxiliary Saltwater Pumps Inalke (2'.2')

CS Pumps Auxiliary (3Spray Additive Tank Auxiliary (73')

Fundamnirtal Method of SeismicFrequency Qualification

32-34 Itz (it) Dynamic AnalysisI8-4 Heo (V) Dynanic Anaelysis9 lHz (10 Dynamic Azalysts.is Hez (10 Dysenamc felysaliFlextble VViing Static AuslystafTeuiFlexible Piping Static Analysisnota7 lit (H8) Dyeaanle Attatyall7-16 liz (ai) Dynamtc Analysts7-9 31z (l&V) Dynamic Anslyets

Flexlble Piping DyasralO Analysis12 liz. (H) Static AnalyzE.

23-34 lKa (IH)

>33s Its (11)

115-1 lit (it)

Flexlblq Piping11 He (11)S132 ux U)

>33 SEX (M0>33 Hez (HI)

43 Hz (Hi)

>3) Its (R)24 itz (1)

Static Analysts

Static Analyata

Static AnalysltDynamic Analyala

$;&(tc Anaolysts

Stalti AaalysisStaic A0alyse

Stalic Analyti1

Static AnalylitStatic Analysts

Failure Mode

Suppori Pla ShaerLower Came PlatoUpper LAtI"l SupportSeismic Supporl L•gGeneric FnctlionOcaiic PuhastiuxLower Motor Stand.lied A44pize YtildRupture

Pump Held Down BedtaA.chor aflta & tipperLateral Support

Aachor Studs

Pump Hold Down BaetsAnchor Bolto

Pump Held Down SokU

Longitudinal Sruni BoltlSelsant Lateral grace

Motor Hold Down salts

PUmp Held Down Blolt

pump Mounting Bolts

Foundatilon 8ll0Support Pedishell

SpectralAcceleration Capacity

Information I HCLPFSource - SA) OR. ., (a)

W Summary Date 9.71 0.7Z 0.33 1.34Esumwory Datl 10.54 0.40 0.25 3.55a 8ntmnazy DAl 6.96 0.31 0.29 2.51W Seminry Datia 11.46 0.31 0.44 3.33W397, M340 >10.0 - - -in"o. 16401 7.62 0."0 0-42 5.32W351. H4211. 429 8.82 0.37 0.32 1.83

"SainiMMMY Dale 11.71 0.4t 0.14 3.40

Saummary Data >10.0 -

Sunmmary Data 8.11 0.31 0.2 3.35WSummary Datl, 8.0 0.24 0.27 3.43M461. W474

W Summary Dale. 10.01 0.29 0.19 4.53r_316W Summoaay Dart 10.94 0.34 0.3I 4.94WSammanrs Data 8."6 0.27 0.19 3.98

t006. M ,007. WI8 8.53 0.29 0,21" 3.14M00S, U336, 2475 6.31 0.27 O0Z8 2.55U319 7.22 0.-3 0.M 2.91

Wsunmmary Date 10.16 0.31 0.18 4.45WSumeeary Doat >10.0 -

meow0 >t0.0 -

A Su•mare, Dole 8.65 0.29 0.20 3.81W Summary Dal. 6.78 0.30 0.18 3.01

14

Page 162: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

U.3

C.

-a

Table 6-24 (Continued)

DIABLO CANYON EQUIPMENT FRAGILITIES(Binsed on hazard defined over 3 to 8.5 hertz range.)

Fundamental Mvethod of SelomicLocat ion .Firequoncy - Qualificatlion

SpectralAcceleration Capacity

Information yHCL1PPSoure 5(s)0 0 (it)System and Co ponent

UNNIscelaeVle

MS Isolatio Valve$

US Saftyv'8vt

AFW POOP. 0190a" 00"0onAM Putups (lbzblew Drivns)

0.0. Pool Oil Day TackD.G. PunI Off PUMsPIaeeM0.0. Is"! Oil Shutort ValveD.G. Alt Stani Causprnlsoz0.0. AlfSa Miuc ReneuaDieWn GeneratorsD.0, RadiatnclWslerf Pump0.G. Inlet SileacsslAir Riot0.0. 8Exctation Cubical0.M. Control pane

M.0. Vo1te Loot Termanln~Iost

Containmeet Pon Ceonte

supply Pans,AC Vanlsis*Ceouptelor,cenleol Cabineu.

Patluro Mode

Ac~tuato SUpport

Genneric FunctionOnneacti FUmctqn

Outside Conatlinmtal p1nidblo piping

Auxillas (1401) Flexible PiplosAuslilt~y (140') Flexible piping

Auxwlxry (lCOW)

nu~itflC (as')Uodoereunod Vault (771)Un4egotsail~ Vault C771)'iwbtua (SP')Turitene (01')Turbine (81')Turbine (851)Tultelae (1041)Turbinec (W5)iburbina (851)

Turbine (WS)

Canisdamntno (1w')

Awdillary EIS41-6")Auxiliary (134'-61Ausillan, (357')

TIOl

Auxiliary (1361)Auxiliary (163')

.42 Fix (Ito43 112 (it)

to Hit (1')Flexible PipingFlexible Piping>33 liz (Hi)" III (to17 na: CIS)17 liz (10)Flexible iping;1FIX 3(HCl)a Hz (11)

to lii (if)

23 Hz 01)

313 liZ (H).3)3 li (H1)

2318 (lizi

ý303 UZ (Ht)>30 lix (1t)

Dynsmin Avenaiyiluti

lDynnmlo Azlyalttrhel

D"camle ilwulrlsfrsll

Sizilc Analysis

Static Analysis

Static AnalysisNonle eylGcood n itl AayiDenerto Analystsg nayi

Dyonamic AnalysisDynamic AnalysisDynamic AnalysisTrestTest

TestStaills Analysis

Dynansle Analysis

Sladec AnalysiStatic AnalysisTeti

Static AnalysisStaic Analysis

1406". 14463. 14469 >3).0 .

1]9?7 310.0 -1,587 11.$I 0.34 0.38

Pump MIolt Down Rohs US.OAPump Hold Down ]molt W.420. 14321

>10.0 - -7.71 0.29 0.21

Balioan l1ieu SepitumFilier Anchsor SuitsFu~sible Link)told Dow* foths"oid Down. DellsSkid Anulsor DothtAsonbr aDltict&Fililg support Red WcldStructumalCbsitcr

StructuralAttachmeai-Fllnt Weld

M1323 3.30.0 - -

M324, b1326 8.33 0,17 0.27Dwia SDaem 2,0.0 - -

3243 • >10.0 - -

1M329 MI0.0 - -1421-M4426 7.79 0.16 0.201.323 6.70 0.29 0.24M271. M449 0.1.0 - -

MM346. U1364 1.40 0.29 C.I5W4347. M364. U464. 7.77 0.21 A.14

4.5• 0.30 0.131U434 010.0

]1.51

3.6531.64

2.57

4.08

2.24

2.83

3.12

Foot PlitelEmbed. Weld 1U399. U4499, M4424. 8.30 0.31 0.3131U421, M448

all0

$uppoit BOciling 140.6Anchor Ball Mug81Stsmniural 1.4455

Expraniont Anckat M1410Structural MIE8R

9.79 0.13 0.24.M32 -10.0 -

0.10.0

Supplyfacinmn FeelB~nkd~ati and Shut-ofl Dampers

11.16 0.33 0.100l.10. --

15

Page 163: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

m

Systemn and Compo~nenmt

. _4140V MAAIO 2?WX9M pW 9R

Potential Tlasfoouolf 0414 P)

(Bus a & H)

Sarnusved Babuy pane

Table 6-24 (Contfnued)

DIABLO CANYON EQUIPMENT FRAGILITIES(Based on hazard defined over 3 to 8.5 hertz range.)

. SpectralAcceleration Capacity

Information 11 11CLPFý Surc 56s8 () PitPR

Fundzimental Method of SesmicFrequency QualificationlLocatton

Turbine (119')

Turbine (lir)

TZrblar.(1lP)

Tubinte (339')

sonth? chailmgu

Switcbpulrareker Plants

It' 2aC FLECTRIC 901359

lantuanamt Breaker Panels

414OV1480V Tramilor99fgreater Cebtoela %L44 Camralt)Awluxttyi Relay Panel

main czamtral booooda

not Shuttdown aFnel

Auxiliary S~ctearthd Cabinet

AmilltuzY (ITS')Auxiliary als.)

A"Ittory (135')

AuzrnIty ft S')

Auxi~lay (101'Auxtultuy OW25)

Auzllaly DtOW)MAutluay (H00')

Aouztttaly (t40')

AlsataloY (100')

Aztlktly 03211)

I Hm (H)

31 its (It)

is HR (t)

It3 ift (m)

>33 tit all

12 Ht (1)

:.20 Hts (H)

13 lit (H029 UK1 (H)

Static Avalyodv

Slaide Azolytt

Slatlo Aft~ltyst

Static AndIuol

Static Aitatyat

Static Analyat;Static Analysis

Iiyntnic Ajtlyal

Stati Awuyll.

Failure Mode

OudoiRoilPndn

Suppoort Legliatted.Waldll."art Zag1-totsd.*weld

SloacatralEooolztotlnal BudRestraintSwtrutural

Structlaral

Slip-flat FaiblurSinetobw,

StructuralAnchor S~tetb WeldStructural

Switch FunctionStructuralSwatch ftaltion

Structural

10349. WItS. MIS6. 3.5)m"l, mm.l-330. 7.44

U(0491. HItS, M414. 10.93

U049. WISl. WKS1, >19.0U6454M1432. WIS7. M4154. 10.7614430

UPS*0, U0$tA. 1(044 6.04MIS.1 W302. 11850. 11.91

1(054. U.364. 16433. 9.931(462U(014, MOSt. 336.4 6.67

IOOSIA :40,18U1235. MOW1. 1*355, .6.51X1(3. U43,5. I(45t."(467

M652?. Walkdown 5.34M(017. 14364 :110.0U315. 1(364 7.25

'WSwutmsl Data. :40A0U456. 1(402 7.77WIT,? MISS, U1342. 7.601(471. U4t2 7.27MIT. W634. 1,4159 310,0

0.350.31

0.311

0.25

0.31

0.314 0.26

2.31

3,4.

Jý 39

0.,00.26

0.34

0.L.

0.190.22

0.40

0.29

0.31 0.Z4

2.745.00

2.93

2.36

2.10

2.47

W -V

.. 4

3 UP

0.26

0.26

0.310.270.30

0.200.250.t4

>'33 tHz (

>31 lau(t

2.933.223.52

9-13HlZ (1) Tetel! 'UIt00(I0~.

0

16

Page 164: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

U

a Sys~tem end Component L[cation

Table 6-24 (Continued)

DIABLO CANYON EQUIPMENT FRAGILITIES(Based on hazard defined over 3 to O.S hertz range.)

Fundamental Method of SeismicFrequency Qualification

SpectralAcceleration Capacity

Irnormation a " CLPF.Failure Mode Source , (a) 0 (

9

true*" Otatrel and Protection System Aw4Ilrjr (1214)solid Sltat Itosettlo Syutem A"Illtay (IIA0)lkisomo Trip Switebteecr A-airluy 011S')11eshlson,0 & 79OCIseAMM* Defteclur Anxillaty 0140')

trewasr &. AP Tratislatnia 41taotalamrat (II?')

Anotmliay Ralay Back AexIltary (128*)tocal Starte outdoiriuktieded Ck"~ Circuit flcoskorn Aoxilflha (1151)Vatve uitaI Switzieso Aozfllarr (Vaimes)impulse lies Coeultmeot (yuleuCantatumoeui ?rgxe Valves C0Ootnacieol (1)1')

Ott-Site rower 2330V Yard554KV

?eoeealsftetsflo ao*i Conainlment (1351180?, Piping and Support Various)limit Relief. Solentolt, & check VariousjVaetoeAir and Motor Opehal4 Valves VaioustCable Tral, and Smpperu VaidousItYAC Ducting and Support# Various

1)

A-10 Itz CF[)

>33 l1k (II)

1-33 Hez 01)

>133 liX WlV)

>33 li (1&V

Flexible Ppn

Flexible Piping

Firitible pipingflexible TrarysFletidble Ductins

TellTestTestTestTest

StructuralStruturoalStenicuralSteecleralStructural

MIT1. 14355 10.7611017. M3SS M26314317, 143SA 7.90L0435 0.

W4141 9

M317. MI1.5. 49>00U.454 0.18476 0.W4344 M10.0D~ata Base 7.0994432 M10.0

0.39 0.21 3.70.37 0.28 4C-I0.30 0.26 1.14

0.27 0.20 4:11

Static AnnaleNTo"t

eattTeatN4odeStatge Arualrals,

Hnae

TestDyeeeole AnalysisDyneamic Awslywle

Dy~asatl AnalyswsStatic AnalystsStatic Analysis

Anchor BeatsStructural

Geassuic FoicttanRupture, Froms tinpouActualtr Attach. Bull$

Generic Failure

Gleaerric StructuralOsoeiri SoppeetGarners puattlos

Gecarc FutoneteGeneric SupportGeneric Sutpport

0.24 0.21

DataBat

10S4MID20 14141

Daas Base

W1067, 3640194209-M14214214-M1214

1.690.427.38It.03

>10.0

"17.10>10.0

9.78

0.24

0.140.310.40

0.15

0.35

0.100.200.270.39

0.60

0.48

2.61

0.39I."13.00

2.49

400

17

Page 165: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

2.5 PG&E Single Station Sigma Approach

2

1.5 / - Hosgri

-Los Osos

----;- San Luis Bay

1 ]-.- Shoreline

- Shoreline-Hosgri Linked

-Design0.5

0.1 1 10 100

Frequency (Hz)

Figure 1 - Deterministic Response Spectrum Single Station Approach

(b)(E

18

Page 166: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

From: Oesterle, EricTo: Lu ,Tmothy Alexander.n; Karas, Rebecca; Marklev. Michael; ayne

Cc: Li, Yong l M LKmalW G ; Sebrosky, Joseoh

Subject: RE: Draft Briefing package for 10/21

Date: Tuesday, October 21, 2014 6:53:07 AM

Attachments: draft Diablo Canyon Seismic Status Briefing 21Oct2014.ootXimaoeQ0glon.0

.Importance: High

Thanks Tim! I appreciate your input on the briefing slides. This new approach has beenincorporated into the slides.

Everyone - Please review the attached updated briefing slides based on DE's input. The

changes have been denoted in RED. Please get back to me with any changes no than

9AM. Thanks!

Eric

From: Lupold, TimothySent: Monday, October 20, 2014 6:04 PMTo: Oesterle, Eric; Alexander, Ryan; Karas, Rebecca; Markley, Michael; Walker, WayneCc: Li, Yong; Manoly, KamalSubject: RE: Draft Briefing package for 10/21

Non Responsive

From: Oesterle, EricSent: Monday, October 20, 2014 10:31 AMTo: Alexander, Ryan; Karas, Rebecca; Lupold, Timothy; Markley, Michael; Walker, WayneSubject: FW: Draft Briefing package for 10/21

Good morning,

Just in case my email from home ended up in your spam or trash folder, I wanted to make

sure everyone knew that I sent out a draft briefing package for the briefing on 10/21.Please also refer to email below. Thanks.

Ericl IR. Oe4tieteNRC Project Manager

Diabio Canyon Power PlantCooper Ntuclear StationNRR/DORL/I..PL4-1

C/3D

Page 167: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

301-415-1014

From: ERIC OESTERLE .Sent: Sunday, October 19, 2014 7:53 AMTo: Sebrosky, Joseph; Alexander, Ryan; Karas, Rebecca; Lupold, Timothy; Markley, Michael; Oesterle,Eric; Walker, WayneSubject: Draft Briefing package for 10/21

Hey Folks,

The purpose of this email is to provide you with a draft of the briefing package for the 10/21breifing of NRR, NRO and Region IV management. I figured that they only way I could get thisout for your review and comment in a timely manner was to cobble something together over theweekend. Attached please find the draft that I've prepared and please provide me yourcomments by COB Monday. Thanks for all your help and support!

. Eric

Page 168: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

< U.S.NRCUnited States Nuclear Regulatory Commission

Protecting People and the Environment

Assessment ofPG&E Operability Determination

for.New Seismic Information

NRR, NRO and Region IV Status Briefing

October 21, 2014

Contacts: J. Sebrosky (NRR/JLD), T. Lupold (NRR/DE), R. Karas (NRO/DSEA), R. Alexander (RIV),W. Walker (RIV), M. Markley (NRR/DORL), and E. Oesterle (NRR/DORL)

1

Page 169: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

SU.S.NRCUnited Statte% Nuclear Rcgup:hrory (nitu~ission

Protecting People and the Environnient

Briefing Agenda

0

0

0Non Responsive

* Decisional Environment

2

Page 170: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

r<U.S.NRCULited SoIte Nudeat RI-gulm fory C(m ijitsj<gT

Protecting People and the Environment

Non ResponsivE

3

Page 171: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

3•U.S.NRC13inited Scitv Nucicau Regulatory Crommission

Protecting People and the Environment

Non ResponsivE

4

Page 172: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

•<U.S.NRCUttited Staics Nuc'lear Rt-gubwa1ry Commision

Protecting People and the Enuironment

Non IRespciisiv

5

Page 173: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

<' U.S.NRCUnited Sta+tc, Nuclear ReIllatul•ory C:+oltlli%ýtionn

Protecting People and the Environment

Non ResponsivE

6

Page 174: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

<U.S.NRCUinied Stlate Nu leiti Rcgilvtorr)( ( sm>nn io,

Protecting People and the Environmen!

Non Responsiv

7

Page 175: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Lkrinciz Statei Nucleatr Regiiihrorv (urim.,64n

Protecting People and the Envi ronpient

Non Remosootw

8

Page 176: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

I U.S.NRCUntfited Simtcs Nuclear Regularory Commission

Protecting People and the Environment

Non Responsive

9

Page 177: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

r<ý,;U.S.NRCU nitet Scaites Nuclear Regularp o mmis(.Uffhsio(n

IPrnaeday,w Brooki and the Eniirenmnent

Non Responsivw

10

Page 178: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

rj U.S.NRCt'ni,-ed Strmes Nuclea¢r Re.gutlmory, (.ommis..ion

Protecting People and the Evironment

Non Responsiv(

11

Page 179: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

rl U-S.NRCUnsiied States Nuclear Rc~guiiIry ottv do

Prote~ctilig People and the Enw'iaroi~ent

Non Respon~sive

12

Page 180: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

<<U. S.NR CUntetcd StateN Nuclear Regulaw.rv Comm1iss~ion1

Protecting Peopk and tile En vironmnent

Non Responsive

13

Page 181: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

<iU.S.NRCUn•fli•eid St.ayes Nuclear I~c gt id. , Commissio n

Protecting People and the Environment

Non Responsiv(

14

Page 182: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

< U.S.NRCULitetd St'aris N•ucica Regultti•y) ('omme, i.n

Protecting People and the Environment

Non Responsive

15

Page 183: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

<-4< ;U.S.NRCUnite Staio Nuclear R1, I tory Commision

Protecting People and the Environmwnt

Decisional Environment

0

Non ResponSIVE

* FOIA - timing of PG&E issuance of seismic report andNRC EDO decision on DPO appeal

0 Non ResponsiveJ

Leak of DPO and publication in Press

Non Responsive

* December 2014 Hearings - Senate & House

16

Page 184: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

From: isterle. EricTo: Sebrosky, JosephCc: Karas, Rebecca Alexand.r n; Llffiold, Timothy; Walker. Wayne; MarkteyMich1,J- Wilson, GeorgeSubject: Briefing slidesDate: Monday, October 20, 2014 11:00:22 AMAttachments: Diablo Canyon Seismic Status Briefing 21Oct2014.og=

Joe,

Thanks for your comments this morning on the briefing slides. I've updated the slides toincorporate your comments and include some other minor tweaks. All changes except fortable added on slide 8 are in RED,

ErtclR. Oe~tere-NRC Project Manager

Diablo Canyon Power Plant

Cooper Nuclear Station

NRR/DORL/LPL4-1

301-415-1014

'I13

Page 185: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

<;< .S.NRCUnited States Nuclear Regulatory Commission

Protecting People and the Environment

Assessment ofPG&E Operability Determination

forNew Seismic Information

NRR, NRO and Region IV Status BriefingOctober 21, 2014

Contacts: J. Sebrosky (NRRIJLD), T. Lupold (NRR/DE), R. Karas (NRO/DSEA), R. Alexander (RIV),W. Walker (RIV), M. Markley (NRR/DORL), and E. Oesterle (NRR/DORL)

1

Page 186: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

k'U.S.NRCUnIrtl I ;rt Nui ILt Regu itory Comis.n i mi

Protecting People and the Environ ment

Briefing Agenda

0

0

0

0

0

0

Non Responsive

* Decisional Environment

2

Page 187: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

<-j U.S.NRCUnited Siates Niudcar Regulutnry Coinnti%-on

P'rotecting People and gtie Environment

Non Responsive

3

Page 188: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

(,U.S.NRCUnitcd States Nuclear Regulatc~ry Cornni'mommin

Protecting People and the Environment

Non Responsive

4

Page 189: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

<?<US.NRCIUnited Stares Nuc i Rguda t R ru .orv G:IInn•r sion

Protecting People and the Enviromnment

Non Responsive

5

Page 190: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

<-<U.S.NRCUnied Staie% Nuclear Regulatory (ommissioin

Protecting People and the En vironment

Non Responsive

6

Page 191: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

3j U.S.NRCUnited Srates Nucdear Revgulircory (Cainrmisuio

Protecting People and the Environment

Norl Responsive

7

Page 192: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

r< IU.S.NRCLnitcd Nrccs Nuiclcar Rqguatrory Camwiýin

Protecting People and the Environment

Non Responsive

8

Page 193: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

7t U.S.NRCUni:cd SrrgjiL N IId.tr ReguilatoryI o (.in,, iti

Protecting People and the Environment

Non Responsive

9

Page 194: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

r< U.S.NRC(Lnitced Staics tcca ~~iov(oInjoProt:ecting People and the Environment

Non ResponsivE

10

Page 195: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

(12 U.S.NRCU'oited ýuis il Niclealr Regutla~oty Commtision

erotectiheg People and the Environment

Non Responsive

11

Page 196: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

rlýU.S.NRCUnited Srmtc- Nuclear Regulatory Comnision

Protecting People and the Environment

Non Responsivw

12

Page 197: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

ý< U.S.NRCUnized States Nuclear Regulatory (ommis-ion

Protecting People and the Environnent

Non Responsive

13

Page 198: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

•jU.S.NRCUnited States Nucle'ar Repla1•tmy 0.)mmisisio~n

Protecting People and the Environment

Non Responsive

14

Page 199: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

l. U.S.NRCUnited Stjiecs Nuckicr l.eguliry (Conmissimn

Protecting People and the Environment

Non Responsive

15

Page 200: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

<.< U.S.NRCUite cd State, Nucler Reguatory( mrnlvtnisiw

Potecting People and the Environmnnt

Decisional Environment

0

Non Responsrmi

" FOIA --timing of PG&E issuance of seismic report andNRC EDO decision on DPO appeal-

* Leak of DPO and publication in Press0

Non. Responsive

0

* December 2014 Hearings - Senate & House

16

Page 201: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

From: Oesterle, EricTo. : Munsoný Clifford: Williams, Megan; ULXon Hioichma.. Thomas; VWkeJy Marne;

Georl e A eJackson. Diane; DiFran f. Whale. Sheena Useldini. ra A. ]n;BDmcftL cQtt;L QKmee. Nell; Farnholtz. Thomas; Manoly. Karnal; Regnoso. John; BMQIt; ta~rkJr~isWran

LItt.Augr.y Dude Mhael; John Starnatakos; Stirewalt. Gerry Buchanan. Theresa; 2eavfgJThoasK~a.Ea& 1 Gralzer. V/ladlir: Hiland. Patrick; Ross-Lee. MarvJane. WIlson. Georg e;Bws. Alander. Ryan; Hay. Michael; T ; Kock. Andrea

Subject: Status of Diablo Canyon ActivitiesDate: Thursday, October 09, 2014 7:02:34 AM

Attachments: Status Undate on DCPP for Iennifer Uhle.docxlmagae03,unn

The purpose of this email is to provide a status on the multitude of Diablo Canyon activitiesthat staff has been working on this week.

II.

Non Responsive

Cl3

Page 202: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

N~on ResponsIve

Ill. Filings associated with Friends of the Earth (FOE) Hearing Requesta. NRC response to FOE hearing request filed 10/6b, Additional filings also made by PG&E, NEI, and PG&E Senior Civil Engineer

on 1016c. Next steps - FOE response within 7 days and. also within 10 days of the

PG&E's answer and NEI's motion and brief, everybody else (NRC Staffincluded) can file a motion asking the Commission to take some actionagainst the other filings (e.g. strike part of the answer) - review of the other 3filings underway

IV. FOE FOIA request on timing of PG&E Seismic Report and DPO Appealdecisiona. Information from various offices received by FOIA coordinator - going

through duplication reviewb, Expected release of documents in packages - first one expected this weekc. Review of remaining packages for withholding to be performed to support

releases expected week of 10/13.

V. EPW Questions - DORL staff continues to work with Region IV and NRR/DE onfinalizing draft responses - coordinating with OCA - target issuance by 10/22

There continues to be a lot of activity associated with Diablo Canyon and I appreciateeveryone's support. We are making good progress on these challenging issues and havecompleted some tasks associated with making portions of the DCPP UFSAR publiclyavailable and getting two very important SSERs into the main ADAMS library. If I havemissed something that you are particularly interesting in please don't hesitate to contactme. Thanks!

Ertlc,. O9ee-•r•_NRC Project ManagerDiablo Canyon Power PlantCooper Nuclear StationNRR/DORL/LPL4-1301-415-1014

Page 203: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Status Update on NRC Activities associated with Diablo Canyon Seismic Report

Non Responswve

d. Congressional Hearings- tentatively December 2014 timeframe

Page 204: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

V. Additional NRC staff activities (5 - 6 PMs currently supporting DCPP activities)a. Friends of the Earth FOIA response- in processh. FPW Cnnvrp-innal Otipstion resnnns-- in nrnrcs•

Page 205: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

From:To:Cc:Subject:Date:

Wilson. GeorueEvans, Michele Lund, LouisMar!ley Michael; Broaddus. Douro Khanna. Meena: fBeasley. Beniamin; Eni i haaf. Robert0845 items for Monday's meetingMonday, October 06, 2014 8:34:50 Am

Region I

Non Responsive

Region 4

Diablo Canyon -

or-

Non Responsive

" Friends of the Earth request for hearing - petition response due to Commission10/6 (today) (DORL comments sent to OGC, OGC recommends not grantinghearing)

" Friends of the Earth FOIA - alleging collusion between the NRC and PG&E on DPOand AB1632 report to California expected to be finalized between OIS and NRRthis week.

* Response to EPW questions still progressing with expected response to beprovided by 10/22

Non Responsive

Page 206: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Non Responsive

George WilsonActing Deputy DirectorDivision of Operating Reactor LicensingOffice of Nuclear Reactor RegulationUSNRC301-415-1711Office 08E4

Page 207: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

From: Sebroskv, Joseph

To: Qt•d•.,EL, ; Markle, MichaelSubject: FW: The final version Attorney Client PrivilegeDate: Monday, October 06, 2014 7:52:45 AMAttachments dave cite check correction;docx

FYI - per our discussion - joe

From: Roth(OGC), DavidSent: Friday, October 03, 2014 5:53 PMTo: OKeefe, Neil; Sebrosky, Joseph; Manoly, Kamal; U, YongCc: Young, Mitzi; Roth(OGC), David; Lindell, Joseph; Mizuno, Beth; Wachutka, JeremySubject: The final version Attorney Client Privilege

Good afternoon

Attached is the document we'll be filing Monday after fixing the noted citation errors andchanging the document's name. Thank you again for your hard work.

Thank you

David Roth

NRC Blackberry bHQ Office (301) 415-2749

I nis message may contain Seriitive l infbiiti1 I UeIfw UWse Only

Attorney"C" t 'ey Work Pro t

From: OKeefe, NeilSent: Thursday, October 02, 2014 2:17 PMTo: Roth(OGC), DavidSubject: RE: DER master do not edit without dave's pemission 2012 09 22 NRC Staff Answer to FOEDiablo Petition to Intervene

i•

Dave,

Page 208: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

(b)(5)

Neil

From: Roth(OGC), DavidSent: Wednesday, October 01, 2014 2:37 PMTo: OKeefe, Neil; Sebrosky, Joseph; Manoly, Kamal; Li, YongCc: Wachutka, Jeremy; Lindell, Joseph; Young, Mitzi; Roth(OGC), David; Mlzuno, Beth; Tibbetts, JohnSubject: RE: DER master do not edit without dave's pemlsslon 2012 09 22 NRC Staff Answer to FOEDiablo Petition to Intervene

Good afternoon tech staff.

I heard from Joe (thank you) but nobody else. Attached please find the revised filing.Please review it for tech accuracy and respond back to your legal team by tomorrowmorning (10:00 is fine).

As a reminder, do not re-distribute attorney-client information (including this e-mail andattachment). Please see Yellow Announcement 2014-102 for more information. shouldn'tre-send the document.

DISSEMINATION OF DOCUMENTS ISSUED BY THE Margaret M. DoaneOFFICE OF THE GENERAL COUNSEL General Counsel

Posted: August 29, 2014 Number 2014-102

David Roth

NRC Blackberryb (0)(r)

HQ Office (301) 415-2749

ThWAmcz~ may zc;tcin sens~itiv imtetia m~l;feinat.ior condved to be15fluuial Use k: nly

Page 209: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

From: Roth(OGC), DavidSent: Wednesday, October 01, 2014 2:43 PMTo: OKeefe, Neil; Sebrosky, Joseph; Manoly, Kamal; U, YongCc: Roth(OGC), DavidSubject: RE: DER master do not edit without dave's pemlssion 2012 09 22 NRC Staff Answer to FOEDiablo Petition to Intervene

Good afternoon,

We have created an updated version of the Staffs (your) position on the Friends of theEarth request for a hearing in Diablo. The actual filing date is Monday. Neil. Joe,Kamal, Yong, are you in the office today (Wednesday)?

David Roth

NRC Blackber b rryHQ Office (301) 415-2749

0 Use OnlyAttorney ' t Privi t

From: OKeefe, NeilSent: Monday, September 22, 2014 4:25 PMTo: Roth(OGC), David; Sebrosky, Joseph; Manoly, Kamal; Li, YongSubject: RE: DER master do not edit without dave's pemission 2012 09 22 NRC Staff Answer toFOE Diablo Petition to InterveneImportance: High

Dave,

I have reviewed the document, and find no technical errors or concerns.

Neil O'KeefeChief, Branch BDRP, RIV

1('817) 200-1141 (o)j. Il~(o)

From: Roth(OGC), DavidSent: Monday, September 22, 2014 11:20 AMTo: Sebrosky, Joseph; Manoly, Kamal; OKeefe, Neil; Li, YongSubject: Fw: DER master do not edit without dave's pemission 2012 09 22 NRC Staff Answer toFOE Diablo Petition to Intervene

Page 210: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Please review attached immediately for tech accuracy. We need a very fast turnaround before

2:00 today. Sorry for the short notice. Do not forward this email or the attached document.

David Roth

Office of the General Counsel

Office (30i) 415-2749

Work Cel( (b)(6).

At to r ney Priviler Pro

','ntfrnmNItRC R acKBerry

From: Roth(OGC), DavidSent: Monday, September 22, 2014 12:07 PMTo: Tlbbetts, JohnCc: Mizuno, Beth; Young, Mitzi; Lindell, Joseph; Wachutka, Jeremy; Roth(OGC), DavidSubject: DER master do not edit without dave's pemission 2012 09 22 NRC Staff Answer to FOEDiablo Petition to Intervene

John,

As we discussed, I'm done and you now have permission finalize (for Ed) the filing.Please work from the DER master in the G: drive, so everyone knows that you have itlocked for editing.

John, the file has auto TOC and uses styles for footnotes and for heading levels I to 3.I didn't add a TOA there might be one footnote with TOA hypertext markup.

Page 211: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Draft of the "NRC Staff Answer to Petition to Intervene and

Request for Hearing by Friends of the Earth"

63 pages withheld in their entirety - exemption (b)(5)

Page 212: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

From: Sebroskv, JosephTo: Wilson GeoraeCc: Oesterle. Eric Markley, MichaelSubject: FW: draft agenda for status update for j. uhleDate: Monday, October 06, 2014 5:59:35 AMAttachments: Status Update on DCPP for lennfer Uhie.docx

diablo om work assignmentdocxDraft Oueestons for PGE - RIV Comollation.docximaoeOL0.ono

George,

Per our discussion this morning, I sent you the scheduler for the 1:30 pm briefing ofJennifer later today. Attached is the draft agenda that Eric developed over the weekendfor the briefing. In Eric's email below he mentions a plot (below is the plot that he willinclude in the agenda), Also per our discussion, attached is a list of diablo pmassignments that provides a descrintion of the various items that have been released andwill be released to the publid Non Responsive Ishortly. Lastly, I included the 3questions that were verbally provided to PG&E on Friday with the expectation that therewill be a phone call later this week.

Let me or Eric know if you have any questions.

Thanks,

Joe

c135

Page 213: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

From: ERIC OESTERLE [mailtol•oSent: Sunday, October 05, 2014 8:37 AMTo: Sebrosky, Joseph; Markley, MichaelSubject: draft agenda for status update for j. uhle

Guys,

Attached is the draft agenda for the status update to Jennifer Uhle that has been scheduled for1:30PM on 10/6/14. Thought it would be good to send out prior to tomorrow. The only thing thatI wanted to add to the agenda but can't do until I get back to office is the Shoreline linkedergodic spectra developed by NRC staff comparison to PG&E Shoreline linked SSTC andHosgri. I beleive that Jennifer will appreciate that level of detail. Please let me know ASAP if youhave any comments on draft agenda. Thanks.

Eric

Page 214: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Diablo PM Work Assianments as of 10/6/14Work assignment PM(s) rStatus - 1016114 Date Information

Released to thePublic

1~

Non Responsive

Support for response to FOE hearing request Eric Oesterle, Joe In process - target issuance 10/6(14 10/6/14- tentativeSebroskv

3

4

Non ResponsNei

Friends of the Earth (FOE) FOIA response - Eric Oesterle, Joe In process - staff collecting information, 10/8/14, partialtiming of release of DPO coincident with Sebrosky, Balwant FOIA coordinator would like to begin release with morerelease of State of California report Singal, Peter Bamford, releasing information around 10/8 in a information to follow

and Bhalchandra staggered fashion as redactions areVaidya. completed

EPW congressional question response Eric Oesterle and Joe In process - internal meeting on 10/2 to N/A will not beSebrosky discuss draft response. Target for NRR/DE released to the public

input is 10/10/14. Targeting providing-response to OCA around 10117 or 10/24

8

9

10

Non Responsive

Page 215: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

101212014 Questions for PG&E Concerning Operability Determination

Non Responsive

Page 216: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Non Responsive

Page 217: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Status Update on NRC Activities associated with Diablo Canyon Seismic Report

II.

III.

IVI.

Non Responsive

V.

(b)(5),Non Responsive

Page 218: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

fbi(5"

Page 219: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

From:To:Cc:Subject:Date:

Attachments:

Sebroslý. _osernhVaidva. Bhalchandra: Klett, Audrey; Harris, BrianOesterie, Eric: Marklev Michael Alexander. Ryan: e Hioschman. Thomasinfo: cancellation of 9:00 am diablo canyon pm meetingTuesday, October 07, 2014 7:08:06 AMdliablo gm work assionment.docx

Bhalchandra, Audrey, and Brian,

I sent you a scheduler cancelling the 9:00 am (eastern) Diablo Canyon meeting today.The reason that it was cancelled is that Jennifer Uhle requested that Eric and I attend the9:00 am Commission meeting on Fukushima seismic issues in the event questionsregarding Diablo Canyon are asked. Attached is the latest Diablo status table. We expectto hear back from Paris So today on the FOE FOIA and someonewill be provided with theopportunitv to review documents to determine whether or not they can be released. In

Non Responsive

Let me know if you have any questions.

Thanks,

Joe

C- ( 3(ýp

Page 220: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Diablo PM Work Assi gnments as of 10/6/14- Work assignment PM(s) rtatus - 1016/14 Date Information

- Released to thePublic

Non Responsive

2 Support for response to FOE hearing request Eric Oesterle, Joe In process - target issuance 10/6114 10/6/14 - tentative

3

_Non Responsive

6 Friends of the Earth (FOE) FOIA response - Eric Oesterle, Joe In process - staff collecting information, 10/8/14, partialtiming of release of DPO coincident with Sebrosky, Balwant FOIA coordinator would like to begin release with morerelease of State of California report Singal, Peter Bamford, releasing information around 10/8 in a information to follow

and Bhalchandra staggered fashion as redactions areVaidya. completed

7 EPW congressional question response Eric Oesterle and Joe In process - internal meeting on 10/2 to N/A will not beSebrosky discuss draft response. Target for NRRIDE released to the public

input is 10110/14. Targeting providingresponse to OCA around 10/17 or 10/24

9

10

Non Responsive

Page 221: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Ter

Subject:

Attachments:

Uhl Jeomfer M&WeyV Rchwel LbM Lo i ,Gm

RE: Diablo canyonMonday, Seplenvb 29, 2014 5:54:09 AM

Jennifer.

Attached is the latest on the status of Diablo Canyon issues. There are two issues that the staff believes it needs to addressbefore it can provide you with a recommendation on how to proceed (Le.. single station approach and updating calculations usedto resolve the DPO). We received data from PG&E on 9/26 on the single station approach and expect to receive more datatoday on the DPO calculations. There is a tech staff meeting on 10/1 at which time we hope to be able to make a decision onwhether or not we have enough information to make a recommendation or If we need more information or more time, The twoissues are discussed in greater detail below. You should also know that Audrey Kiett and Brian Harris (JLD PM) have beenbrought in to help to develop the recommendation letter on whether or not the licensee should proceed with assessing newseismic information using the 50.54(f) process and the communication plan associated with the issuance of an inspection reportand the letter back to the licensee based on the data in the 2014 State of California report.

Please let me know if you have any questions or if you want me to arrange a briefing for you on the current status.

Thanks,

Joe

Page 222: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

-- 1977 HE spectrum

- 1991 LTSP/SSER34 spectrum

-- PB - Linked Hosgri and San Simeon (M 7.3)

- PB - Los Osos (M 6.7)

PB - San Luis Bay (M 6.4)

-- PB - Shoreline (M 6.7)

. . 1977 HE spectrum extended to 0.5 Hz

0

(I)• ~0.5- -

0.1 1 10 100Frequency (Hz)

Deterministic Response Spectra 15% Damping)for the Power-Block Foundation Level

HAZARD SENSITIVITY AND IMPACT EVALUATION

_____ ____1Pcfi CGa ia n dE I# orto Cwt pa" Figure 2-1

Page 223: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

From: Uhle, JenniferSent: Friday, September 26, 2014 6:37 PMTo: Markley, Michael; Sebrosky, Joseph; Lund, Louise; Wilson, GeorgeSubject: Diablo canyon

Hi guys. I meant to get an update on where we were with regard to our documenting our"analysis/revew' of the information thelicensee provided to the State. I know we cannot use the defta-CDF approach, I wanted to ensure that we are not over doingour review. If the seismic experts take a look at the information and do a review and conclude that little if any change in thehazard results from the new discovery of a lengthened shoreline fault, then they can document that. That would mean there isnothing that would make us change the date of the March submittal for the licensee's reevaluation. Is that where we are and hasthat been communicated to the seismic guys? Thanks, Jennifer

Page 224: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

From: Sebrosky, JosephSent: Thursday, September 25, 2014 12:51 PMTo: Stovall, Scott; Munson, Clifford; Williams, Megan; Li, Yong; Hipschman, Thomas; Walker,

Wayne; Oesterle, Eric; Singal, Balwant; Markley, Michael; Jackson, Diane; DiFrancesco,Nicholas; Whaley, Sheena; Uselding, Lara; Ake, Jon; Burnell, Scott; OKeefe, Neil;Farnholtz, Thomas; Manoly, Kamal; Reynoso, John; Hill, Brittain; Dudek, Michael; JohnStamatakos ([email protected]); Stirewalt, Gerry; Buchanan, Theresa; Weaver, Thomas;Karas, Rebecca; Graizer, Vladimir; Hiland, Patrick; Ross-Lee, MaryJane; Lupold, Timothy;Wilson, George; Bowers, Anthony; Alexander, Ryan; Hay, Michael; Pruett, Troy; Kock,Andrea; Harris, Brian; Vaidya, Bhalchandra; Klett, Audrey; Smith, Chris

Subject: info: status of diablo operability review 9-25-14

To all,

The purpose of this email is to provide you with updated status regarding the Diablo Canyon operability review.This email includes updates on the status of NRC inspection information requests and the assignment ofadditional headquarters PMs to help with the workload.

Non Responsiv

3) Provide the results of the calculations that were rerun based on the calculations used to supportthe resolution of the DPO (see description in DPO case file pdf page 62 of 164 at ML14252A 743which discusses the scaling factors used in the March 2014 PG&E analysis). PG&E indicatedthat it did not believe that the analysis was needed to demonstrate operability. Nevertheless,PG&E was rerunning the analysis with the data from the 2014 State of California report.

Non Responsive1

Page 225: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Non ResponsIVE

Please let me know if you have any questions.

Thanks,

Joe

2

Page 226: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Work assignment PM(s) rtatus - 9/25/14Friends of the Earth (FOE) FOIA Eric Oesterle, Joe Sebrosky, n process - staffresponse Balwant Singal, Peter Bamford, ollecting information

and Bhalchandra Vaid a.EPW congressional questionresponse

Eric Oesterle and JoeSebrosky

In process - target forDroviding draft to RIV10/1/14

Non Responsive

Support for response to FOEhearing request I Eric Oesterle, Joe Sebrosky 1 n process I

Page 227: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

From: Manoiv. KamatTO, Sebr1k2 QAlsY o

Cc: J unson Clifford LL=; Markv ,H a rick Ross-Lee,. Ca Jane . ]n;Karas.-Reber-ca; Weaver Thomas: M; Wha!U, Sheena: Yom.Hti O 1;fe th(OGQ

SLUp2d.J Tmotw Williams, MeganSubject: RE: info: status of dtablo operability review 9-23-14Date: Wednesday, September 24, 2014 2:58:48 PM

Joe,(•')()

on Responsive

Kamal Manoly

From: Sebrosky, JosephSent: Tuesday, September 23, 2014 6:05 AMTo: Stovall, Scott; Munson, Clifford; Williams, Megan; U, Yong; Hipschman, Thomas; Walker, Wayne;Oesterle, Eric; Singal, Balwant; Markley, Michael; Jackson, Diane; DiFrancesco, Nicholas; Whaley,Sheena; Uselding, Lara; Ake, Jon; Burnell, Scott; OKeefe, Neil; Farnholtz, Thomas; Kanatas, Catherine;Roth(OGC), David; Manoly, Kamal; Reynoso, John; Hill, Brittain; Dudek, Michael; John Stamatakos([email protected]); Stirewalt, Gerry; Buchanan, Theresa; Weaver, Thomas; Karas, Rebecca; Graizer,Vladimir; Hiland, Patrick; Ross-Lee, MaryJane; Lupold, Timothy; Wilson, George; Bowers, Anthony;Alexander, Ryan; Hay, Michael; Pruett, Troy; Kock, Andrea; Young, Mitzi; Harris, BrianSubject: RE: info: status of diablo operability review 9-23-14FThe rest of this string may be found as

To allI document C/39.To all.

The purpose of this email is to provide you with the results of an inspection phone callwith the licensee yesterday (9/22) regarding the Diablo Canyon operability review.

Non Responsive

C!13@

Page 228: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

From:To:Cc:

Subject-Date:

SebrEU. _osenhH'ill. Brittain

Alexander. Ryan; Walker, Wayne; Kars. Aee, MJonsonn CliUr' A. Yong; MpnolvKamal:Oester. Markley. Michael Willams, Heq; Hpsch-man, Thomas.

question: status of Diablo DDE cakcs associated with operability review 9-23-14Tuesday, September 23, 2014 6:36:17 AM

Non Responsive

Please let me know if I am missing something.

Thanks,

Joe

From: Hill, BrittainSent: Tuesday, September 23, 2014 6:27 AMTo: Sebrosky, JosephSubject: RE: info: status of diablo operabilIty review 9-23-14

Non Rsponfsive

Thanks-

Britt

Cý31

Page 229: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

From: Sebrosky, JosephSent Tuesday, September 23, 2014 6:05 AMTo: Stovall, Scott; Munson, Clifford; Williams, Megan; Li, Yong; Hipschman, Thomas; Walker, Wayne;Oesterle, Eric; Singal, Balwant; Markdey, Michael; Jackson, Diane; DiFrancesco, Nicholas; Whaley,Sheena; Uselding, Lara; Ake, Jon; Bumell, Scott; OKeefe, Neil; Famholtz, Thomas; Kanatas, Catherine;Roth(OGC), David; Manoly, Kamal; Reynoso, John; Hill, Brittain; Dudek, Michael; John Stamatakos(stamaswri.ora); Stirewalt, Gerry; Buchanan, Theresa; Weaver, Thomas; Karas, Rebecca; Graizer,Vladimir; Hiland, Patrick; Ross-Lee, Marylane; Lupold, Timothy; Wilson, George; Bowers, Anthony;Alexander, Ryan; Hay, Michael; Pruett, Troy; Kock, Andrea; Young, Mitzi; Harris, BrianSubject*: RE: info: status of diablo operability review 9-23-14

To all,

The purpose of this email is to provide you with the results of an inspection phone callwith the licensee yesterday (9/22) regarding the Diablo Canyon operability review.

Yesterday (9/22) RIV led a call with the licensee to discuss information needs tosupport the Diablo Canyon operability review. The following two information needswere verbally discussed with the licensee:

Non Responsive

During the call PG&E provided the following information:

Non Responsive

0 PG&E indicated that based on a question from RIV last Friday (9/19) it wasrerunning the calculations used to support the resolution of the DPO (see descriptionin DPO case file pdf page 62 of 164 at ML14252A743 which discusses the scaling

Page 230: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

factors used in the March 2014 PG&E analysis).Non Responsive

Non Responsive

Please let me know if you have any questions.

Thanks,

Joe.

Page 231: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

From; Sebrosvy JosephTo, S; Munson, Clifford' Wiliams. Megan; I_= Hignhman, Thomas; Walker, WavnOe:QeI

E Sinal Batwant M Starkley. Whig]; JaQk DiFrancesco. Nicholas; Whaley. Sheena;Lar; Ake,. .o:l ScottS Oleefe. Nefl; Farrholtz. Thomas; .Kanaras Caterine; ;Manot, KamalB RgynosoJofn Hill. Bittain John Slamatakos (lstam(swri~orav; ýQ Bughanan. Thereao: ! a Rbc azer. Vladimir: HiianI, Pa rckMalnang; Lold. Tomotr Wilson. GAhen; Alexander. Ryan; Hay, Michael; P;Kock. Andrea: YoungM#. -.tti Harris, Brian

Subject: RE; Info: status of diablo operability review 9 -22-14Date: Monday, September 22, 2014 6:00;:30 AM The rest of this string may be found as documentAttachments: PGE soectraI comoarlson.oxt C/141.

To all,

The purpose of this email is to provide you with the latest status of the Diablo Canyonoperability review, Based on discussions with the licensee on 9/18 and an internalmeeting directly after that meeting, senior management was briefed on 9/19.

The agenda for the 9/19 meeting can be found below. The outcome of the meetingwas as follows:

Non Responsive

c/4,

Page 232: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Non Responsive

Please let me know if you have any questions.

Thanks,

Joe

>>>>>>>>>>agenda for 9/19 diablo senior managementbriefing>>>>>>>>>>>>>>>>>>>

Purpose: internal meeting with SES managers to discuss process going forwardfor Diablo Canyon operability determination associated with new seismic informationin the State of California report

Outcome: Decision made on how to proceed

Agenda:

Non Resoonsive

Page 233: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

From: StovalScTo: Gralzer, Vladimir: Sebrosky, Joseo Munson. Clifford; Williams. Mean UY ; Hloschman. Thomas; W

Wy= Oesterle. Eric Sinaal. Balwant Marklev. Michael; D DiFrancesco, Nicholas Whaiev.hnUseldin. Lara: A J; OKeene. Neil; Farnholtz. Thomas; Kanatas. Catherine;

Roth(OGC, David; ManoyKI Reynoso. Johni lritan; Dudek. Michael HO-OWFN-08802-12D:.tamatakos (IstaM = Stirewalt, Gerry Buchanan. Theresa; Weaver, Thomas; Karas. Rebecca; Hiland.

Jatric Ross-Lee. Matyiane; Lunold. Timothy JUi 5gA ; HO-OWFNI-0B06-12o

Cc: DE Calendar ResourceSubje•t: RE: Info: status of diablo operability reviewDate: Friday, September 19, 2014 9:34:24 AM

Non Responsive

Scott Stovall

From: Graizer, Vladimir Sent: Friday, September 19, 2014 8.41 AMTo: Sebrosky, Joseph; Stovall, Scott; Munson, Clifford; Williams, Megan; U, Yong; Hipschman, Thomas;Walker, Wayne; Oesterle, Eric; Singal, Balwant; Markley, Michael; Jackson, Diane; DiFrancesco,Nicholas; Whaley, Sheena; Uselding, Lara; Ake, Jon; Burnell, Scott; OKeefe, Neil; Famholtz, Thomas;Kanatas, Catherine; Roth(OGC), David; Manoly, Kamal; Reynoso, John; Hill, Brittain; Dudek, Michael;HQ-OWFN-08B02-12p; John Stamatakos (jstam@swrborg); Stirewalt, Gerry; Buchanan, Theresa;Weaver, Thomas; Karas, Rebecca; Hiland, Patrick; Ross-Lee, MaryJane; Lupold, Timothy; Wilson,George; HQ-OWFN-08BO6-12pCc: DE_Calendar ResourceSubject: RE: info: status of diablo operability review

Non Responsive

From: Sebrosky, JosephSent: Friday, September 19, 2014 6:03 AMTo: Stovall, Scott; Munson, Clifford; Williams, Megan; Li, Yong; Hipschman, Thomas; Walker, Wayne;Oesterle, Eric; Singal, Balwant; Markley, Michael; Jackson, Diane; DiFrancesco, Nicholas; Whaley,Sheena; Uselding, Lara; Ake, Jon; Burnell, Scott; OKeefe, Neil; Farnholtz, Thomas; Kanatas, Catherine;Roth(OGC), David; Manofy, Kamal; Reynoso, John; Hill, Brittain; Dudek, Michael; HQ-OWFN-08B02-12p;John Stamatakos (stam(&swri-or~a; Stirewalt, Gerry; Buchanan, Theresa; Weaver, Thomas; Karas,Rebecca; Graizer, Vladimir; Hiland, Patrick; Ross-Lee, MaryJane; Lupold, Timothy; Wilson, George; HQ-OWFN-08B06-12pCc: DEalendar ResourceSubject: info: status of diablo operability review

To all,

The purpose of this email is to provide YOU with tha .tfils of fhp riqhl a rabilib, 4revie1

No~n Responsive

Cl/,d

Page 234: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

'Jon Responsive

Senior Management Meeting Draft Agenda (subject to chang-e)

Purpose: internal meeting with SES managers to discuss process going forwardfor Diablo Canyon operability determination associated with new seismic informationin the State of California report

Outcome: Decision made on how to proceed

Agenda:Non Responsive

Page 235: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

DA!Suods~b uoK

(0 cl)

TAýISUOdsa~ WON

Page 236: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

(Ion ResponsivE

Page 237: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Nonl Responsive

Page 238: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Non Responsive

Page 239: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

From: Stuchell. SheldoTo: Dudek. Michael

Cc: Markle. MichaelSubject: RE: STARS OEDO Office Notification (LTR-14-0495-I-NRR)Date: Thursday, September 25, 2014 1:52:40 PM

Understand. The ticket was assigned to DORL, DPR will support as needed. The only point I have to make, is thatthe request does not meet 2.206 requirements. Therefore, DPR is not involved.

----- Original Message -----

From: Dudek, MichaelSent: Thursday, September 25, 2014 1:1 7 PMTo: Stuchell, SheldonCc: Markley, MichaelSubject: RE: STARS OEDO Office Notification (LTR-14-0495-I-NRR)

Sheldon: The only way that you can close the ticket is to provide the justification to NRR's Mailroom and have

them work (through the OEDO STARS System) to close it out. Unfortunately, with the new system, I cannotfacilitate closing out a ticket any longer.

Also, FYI, the justification should be in paragraph form and answer all of the who, what, and why for the

Chairman's Office.

Thanks!Michael 1. Dudek

Michael 1. Dudek I OEDO Executive Technical Assistant I U.S. [email protected] I1: (301) 415-65001 BB: F b)(6)

----- Original Message -----From: Stuchell, SheldonSent: Wednesday, September 24, 2014 5:59 PMTo: Dudek, Michael; Markley, MichaelCc: Mohseni, Aby; Banic, Merrilee; Mensah, Tanya; Khanna, Meena; Singal, Balwant; Oesterle., Eric; Pedersen,Renee

Subject: FW: STARS OEDO Office Notification (LTR-14-0495-l-NRR)

Mike & Mike,

I'd like to make sure this issue is closed, and any ticket assigned to NRR is closed. Any correspondence coming tothe NRC can be considered as a 2.206 petition, if it meets the requirements of our MD and is determined to be anactual petition. In this case, the submittal does not meet the requirements to be a 2.206 petition, and should be

considered general correspondence.

The e-mail chain below can be confusing, and I must point out that no single individual submitted thiscorrespondence. It was not Mr. Peck. Mr. Peck, one of our Sr. Resident Inspector's, did in fact have a DPO aboutDiablo, but that DPO has been dispositioned. The submitter in this case was "change.org."

Therefore, there is no individual we can respond to.

I highly recommend this be closed with.no further action. As noted in the ticket, staff is to respond "asappropriate.!' In this case, the appropriate response is no response to an organization.

Ifthere are still questions as to how to close the issue, it should be worked out between Mike and Mike. This is not

c7&

Page 240: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

a 2.206 petition and NRR'DPR is not involved,

Hope this helps,Sheldon

----- Original Message -----

From: Banic, MerrileeSent: Wednesday, September 24, 2014 1:36 PMTo: Stuchell, SheldonCc: Mensah, TanyaSubject: RE: STARS OEDO Office Notification (LTR-14-0495-1-NRR)

• A little background:If change.org is basing its petition on M. Peck's, a Sr Resident's, DPO, the NRC resolved his DPO:http:i/r ii .rcLoov/headlines/DliabloSafe.9-18-20 1 4.pdf

From: Stuchell, SheldonSent: Wednesday, September 24, 2014 12:34 PMTo: Dudek, Michael; Mensah, Tanya; Banic, Merrilee; Markley, Michael; Kokajko, Lawrence; Khanna, MeenaCc: Singal, Balwant; Oesterle, Eric; Pedersen, ReneeSubject: RE: STARS OEDO Office Notification (LTR-1 4-0495-1-NRR)

All,

The easiest solution to this, is for the DORL PM to respond by e-mail to the submitter (he is not a petitioner) and lethim know that we have received his general correspondence and thank him for his interest in nuclear safety. Thereis no need to expound or explain any further than that.

We receive numerous submittals all year long, .that require nothing more than an acknowledgement.

Sheldon

From: Dudek, MichaelSent: Wednesday, September 24, 2014 12:25 PMTo: Mensah, Tanya; Banic, Merrilee; Markley, Michael; Kokajko, Lawrence; Khanna, MeenaCc: Singal, Balwant; Oesterle, Eric; Pedersen, Renee; Stuchell, SheldonSubject: RE: STARS OEDO Office Notification (LTR-14-0495-l-NRR)

All: As a result of the past e-mails, it now appears that we (the staff) have an action to contact the petitioner (Mr.Peck) to have him formally submit the petition in hard-copy to the NRC so that we have an official record of hisconcerns.

Question: Does the staff want to take this action, or should I try to go back through the Chairman's Office for thisrequest since that is where is action originated?

Please advise.

Michael I. DudekMichael 1. Dudek I OEDO Executive Technical Assistant I U.S. NRC-: [email protected]<niiailto:M ichael. [email protected] v> 1-: (301) 415-6500 131:I (b)(6)

From: Mensah, Tanya

Page 241: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

The e-mail chain below can be confusing, and I must point out that no single individual submitted this correspondence. It wasnot Mr. Peck, Mr. Peck, one of our Sr. Resident Inspector's, did in fact have a DPO about Diablo, but that DPO has beendispositioned. The submitter in this case was "change.org."

Therefore, there Is no Individual we can respond to.

I highly recommend this be dosed with no further action. As noted in the ticket, staff is to respond "as appropriate." In thiscase, the appropriate response is no response to an organization.

If there are still questions as to how to dose the issue, it should be worked out between Mike and Mike. This is not a 2.206petition and NRR/DPR is not involved.

Hope this helps,Sheldon

----- Original Message .....

From: Banic, MerrileeSent: Wednesday, September 24, 2014 1:36 PMTo: Stuchell, SheldonCc: Mensah, TanyaSubject: RE: STARS OEDO Office Notification (LTR-14-0495-1-NRR)

A little background:If change.org Is basing its petition on M. Peck's, a Sr Resident's, DPO, the NRC resolved his DPO:

Jrn.pvl headlin sfDiabloSafe,9-18.2014.adf

From: Stuchell, SheldonSent: Wednesday, September 24, 2014 12:34 PMTo: Dudek, Michael; Mensah, Tanya; Banic, Merrilee; Markley, Michael; Kokajko, Lawrence; Khanna, MeenaCc: Singal, Balwant; Oesterle, Eric; Pedersen, ReneeSubject: RE: STARS OEDO Office Notification (LTR-14-0495-1-NRR)

All,

The easiest solution to this, is for the DORL PM to respond by e-mail to the submitter (he is not a petitioner) and let him knowthat we have received his general correspondence and thank him for his interest in nuclear safety. There is no need toexpound or explain any further than that.

We receive numerous submittals all year long, that require nothing more than an acknowledgement.

Sheldon

From: Dudek, MichaelSent: Wednesday, September 24, 2014 12:25 PMTo: Mensah, Tanya; Banic, Merrilee; Markley, Michael; Kokajko, Lawrence; Khanna, MeenaCc: Singal, Balwant; Oesterle, Eric; Pedersen, Renee; Stuchell, SheldonSubject: RE: STARS OEDO Office Notification (LTR-14-049S-I-NRR)

All: As a result of the past e-mails, it now appears that we (the staff) have an action to contact the petitioner (Mr. Peck) tohave him formally submit the petition in hard-copy to the NRC so that we have an official record of his concerns.

Question: Does the staff want to take this action, or should I try to go back through the Chairman's Office for this request

since that Is where Is action originated?

Please advise.

Michael I. DudekMichael I. Dudek I OEDO Executive Technical Assistant I U.S. NRC*: [email protected]<mailto:Michael.Dudek. •nrc.gov> I *: (301) 415-6500 1BB:J

From: Mensah, TanyaSent: Wednesday, September 24, 2014 11:24 AMTo: Banic, Merrilee; Markley, Michael; Kokajko, Lawrence; Khanna, MeenaCc: Singal, Balwant; Oesterle, Eric; Pedersen, Renee; Dudek, Michael; Stuchell, SheldonSubject: RE: STARS OEDO Office Notification (LTR-14-0495-I-NRR)

To expand on Lee's comment, in the past we've had several petitioners attempt to direct us to their personal websites or blosto "download" 2.206 petitions and other supplemental materials. =()(•)

Page 242: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Sent: Wednesday, September 24, 2014 11:24 AMTo: Banic, Merrilee; Markley, Michael; Kokajko, Lawrence; Khanna, MeenaCc: Singal, Balwant; Oesterle, Eric; Pedersen, Renee; Dudek, Michael; Stuchell, SheldonSubject: RE: STARS OEDO Office Notification (LTR-14-0495-1 -NRR)

To expand on Lee's comment, in the past we've had several petitioners attempt to direct us to their personalwebsites or blogs to "download" 2.206 petitions and other supplemental materials.I (b(5I•

=bX.)In tese

cases, the PM simply informed the petitioner of the process to. submit a 2.206 petition, in writing, if they want theirconcerns considered under that process.

Members of the public often change their website links/blogs. Their URLs may not even exist in a year. So we needan official NRC record of the petitioner's concerns, which they have to submit in writing to the NRC. If thepetitioner has videos or other electronic media to support their 2.206 petition, we advise them of the proper way tosubmit it, I think the DCD has guidance on the proper submission of electronic media to ensure that it is docketed.

Tanya

From: Banic, MerrileeSent: Wednesday, September 24, 2014 8:32 AMTo: Markley, Michael; Kokajko, Lawrence; Khanna, MeenaCc: Singal, Balwant; Oesterle, Eric; Mensah, Tanya; Pedersen, Renee; Dudek, Michael; Stuchell, SheldonSubject: RE: STARS OEDO Office Notification (LTR- 14-0495-! -N RR)

Per our MD 8.11 "Section 2.206 requires that the petition be submitted in writing and provide the grounds for takingthe proposed action...."

From: Markley, MichaelSent: Wednesday, September 24, 2014 8:11 AMTo: Kokajko, Lawrence; Khanna, Meena

Cc: Singal, Balwant; Oesterle, Eric; Mensah, Tanya; Banic, Merrilee; Pedersen, Renee; Dudek, MichaelSubject: RE: STARS OEDO Office Notification (LTR-14-0495-1-NRR)

Lawrence and Tim,

The assertion that this follows the process in 2.206 for submitting petitions to the EDO seems highly out of process.We should not have to download software to review a submittal to the NRC. Likewise, we should not have to gothrough extreme measures to access the information via an external website. I am struggling to see how the linkprovides an actual petition. It merely asserts that Michael Peck's DPO should provide the basis for a petition toshut down the plant. This is highly out of process.

From my view, we have nothing to process here. The petitioner should be referred to the regulations in 2.206 andfollow the process. NRR/DPR may disagree, but I do not see a document that we have submitted in an officialmanner that warrants the assignment of a petition manager. Let's talk. I do not see a basis for entering this into thepetition process.

Mike Markley

From: Dudek, MichaelSent: Tuesday, September 23. 2014 2:43 PMTo: Markley, MichaelCc: Singal, Balwant; Oesterle, EricSubject: RE: STARS OEDO Office Notification (LTR-14-0495-I-NRR)

I went onto my iPhone and found it on the web site.

[cid:[email protected]]

Page 243: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Petitioning Nuclear Regulatory CommissionDecommission the aging Diablo Canyon Nuclear Power Plant 1.[cid:image002.jpg@0 ICFD800.6EB578A0]<ht• ps://www.zhaa e.org/oranizations/uncoMMon.._flk>

2.

I. Petition by

Uncommon Folk <http s1:/w•"•v.change.org/ t izations/uncommon .folk>

In fault-ridden San Louis Obispo County, stands California's last two operating nuclear reactors in the aging DiabloCanyon Power Plant (circa 1973). They are located proximally to the Los Osos, Hosgri, San Andreas, and ShorelineFaults, along shores near Avila Beach.

According to a recent report by Michael Blood (ABC 30 Action News); a senior federal nuclear expert, MichaelPeck, has urged regulators to shut down the aging power plant until they can determine whether or not the facility'stwin reactors can withstand an earthquake of similar or larger size than the one that recently shook Napa. Bloodreports:

Peck, who for five years was Diablo Canyon's lead on-site inspector, says in a 42-page, confidential report that theNuclear Regulatory Commission is not applying the safety rules it set out for the plant's operation.

In light of the unfolding disaster at the Fukushima Daichii power plant, we the undersigned are asking that GovernorJerry Brown support us in demanding that the Diablo Canyon Plant be shut down until it can be properly earthquaketested and Michael Peck's charges of negligence be thoroughly investigated.

Or better yet, we ask that Jerry Brown work to shut down the Diablo Canyon Plant permanently, as it is located insuch an unsafe region.

We the undersigned ask that NRC Inspector General Hubert T. Bell, Chaiman Allison Macfarlane, and GovenorJerry Brown listen to the experts and heed the warnings of recent history, so we are not collectively doomed torepeat such catastrophic failures.

For the sake of California and its citizens, young and old. please shut down the Diablo Canyon Nuclear Power Plant!

Here is a short and enlightening PBS video that was made before several more major faultlines were found in thatarea...making it even MORE imperative that these professional opinions be heeded. Please take a few minutes towatch. There is a long history of lies and suppression of information surrounding the Diablo Canyon Nuclear Plant,at the peril of our citizens and their families->

http:/i/video.pbs.orgivideo/2056655205,,!

MORE PETITIONS TO SIGN. THIS MOVEMENT IS GAINING MOMENTUM, THANKS TO ALL OF YOU.Please sign them all and PASS IT ON! Together we can do it->

(1) http:i/action .foeor," iaction3/comrnon/public/?action. KEY= 16333

(2) http:/2petitions.moveonorusio i./nrc-stid2wni-diablo?soIrCee•s.icn tw&r byn7595393

(3) http:i/ict.eredoaction.comn/sign/diablo canlyorn

IMPORTANT TO THOSE LIVING IN NEAR DIABLO CANYON. RECENT STUDY INDICATESSIGNIFICANTLY HIGHER CANCER RATES IN RESIDENTS->

ht 1;://cal0coastnewscom2014103/1ighcancer-rates-near-d ial' o -ca ny-jn-l-

Page 244: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

litpl://lwww~helencaldicostfoiinidationn.ora/blo~ysdiealth-sttudies-explode-tbe-n1Vth-Otf-Ehe- 'safc'-nuclear-power-

plnp t < t:/v, lcia dioto da noeI g l eIh d e-u d-he nyho-ie'sf'- QIcr

11 1 : .. A-'I H ~Y(JIILIUU~I I I~~~AJI H' I IULi~4i -pUVY~I -, I~~IJ I I I l~"~'-''~ ~'

More information->

I I I - I t I1IL)/Wl up: LH mrd iva nesW.oUL s/I I I-U j111 gX-l V1j1 U111,I/ .I oae-&!)IU.II k1it'.~C kI-W

]jnp:/1/worl dbu s i nss~org/n uc Iear-regu Iators-h ear- from-an 2ra-RUN i c-on-d iab Io-can yon- p Iant/

I-++ --. I+ ...... .. . +• .++. . .... /........I+_ I, I' +. . . .lipitt V,'w',' at.~iI~~1cor.inews artX.'/ 1 II.1e ErliLI tiah-a mj uc IIWS1 II 1)it)I I L-ca/I- 11/15I ILII1 LI)c/li 5'I Li lip

http:t/www~cbsnews/coi news/ca iforn ia- earthquake-expert-urges- nuc ear-n I ant-closure-over-threatV

Xttp//www.d ai Iynews.comdAeneral-news!20140825/diablo-canvyon-nuclear-plant-should-be-closed-for-guake-

testinol-expert-says

To:Nuclear Regulatory Commission, Hubert T. Bell, Inspector General at the NRC Nuclear Regulatory Commission,

Allison Macfarlane, Chariman of the NRC Sen. Barbara Boxer, California Gov. Jerry Brown, California

Decommission Aging Diablo Canyon Nuclear Power Plant

Sincerely,[Your name]

Michael 1. Dudek I OEDO Executive Technical Assistant I U.S. NRCMichael.Dudek@nrc~gov<niailto:MichaelI.Dudkcýnrc.gov> *: (301) 415-6500 BB:

From: Markley, Michael

Sent: Tuesday, September 23, 2014 2:24 PMTo: Dudek, MichaelCc: Singal, Balwant; Oesterle, EricSubject: FW: STARS OEDO Office Notification (LTR-14-0495-1-NRR)

Mike,

Can we go back to the Chairman's office to get a hard copy of the petition.? We are having no luck in accessing thedocument via the links.

Mike

From: Singal, BalwantSent: Tuesday, September 23, 2014 12:42 PMTo: Mensah, TanyaCc: Oesterle, Eric; Markley, MichaelSubject: RE: STARS OEDO Office Notification (LTR-14-0495-I-NRR)

Cathy was unable to help (could not open the file from the link in the file). She suggested contacting CSC. CSC

Page 245: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

was on my desk yesterday, but were also unable to open the file. They believe there is a problem with the link.Hence, as oftnow we do not have a resolution and do not have a copy of the petition.

From: Mensah, TanyaSent: Tuesday, September 23, 2014 11:57 AMTo: Markley, Michael; Banic, MerrileeCc: Singal, BalwantSubject: RE: STARS OEDO Office Notification (LTR-14-0495-1-NRR)

Any resolution on this? I typically email Cathy Jaegars for the incoming when we have problems accessing it viaADAMS. Looks like Balwant already submitted an email to her.

Just following up.

Tanya

From: Markley, MichaelSent: Monday, September 22, 2014 3:41 PMTo: Banic, Merrilee; Mensah, TanyaCc: Singal, BalwantSubject: FW: STARS OEDO Office Notification (LTR- 14-0495- I-NRR)

Lee and Tanya,

We have not seen the actual petition but the OEDO tasking seems at hand.

Mike

From: Singal, BalwantSent: .Friday, September 19, 2014 2:26 PMTo: Jaegers, CathyCc: Markley, MichaelSubject: RE: STARS OEDO Office Notification (LTR- 14-0495-1 -NRR)

Cathy,

Can we get access to the actual petition please?

From: Markley, MichaelSent: Friday, 'September'l 9, 2014 12:47 PMTo: Singal, BalwantSubject: RE: STARS OEDO Office Notification (LTR-14-0495-l-NRR)

Sorry, Balwant, I am not seeing an actual petition in any of these files. Just a lot of duplicate letters, a SusquehannaSecurity-related document, and an Army document. The links do not allow asccesssx to an actual petition and it isnot in any of these ADAMS files.

From: Singal, BalwantSent: Friday, September 19, 2014 12:33 PMTo: Markley, MichaelSubject: RE: STARS OEDO Office Notification (LTR-14-0495- I-NRR)

Yes. I was able to open it. It has reference to the following two NIL numbers and I was able to get to the documentsby clicking the link:

MI.. 14245A494

Page 246: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

ML1 4245A495 (Package)

Contains ML14246A484, ML14246A496, and ML14246A494).

Couple of documents are large (30-40 pages).

I can help on Monday if needed.

From: Markley, MichaelSent: Friday, September 19, 2014 12:11 PMTo: Singal, Balwant; Oesterle. EricCc: RidsNrrMailCenter Resource; Jaegers, CathySubject: RE: STARS OEDO Office Notification (LTR-14-0495-l-NRR)

Balwant,

Can you get to the petition? I tried to open the link but it appears to require downloading software that is not

supported on NRC systems.

Mike

From:. Singal, BalwantSent: Friday, September 19, 2014 10:20 AMTo: Oesterle, EricCc: Markley, MichaelSubject: FW: STARS OEDO Office Notification (LTR- 14-0495-l -NRR)

For your information please.

From: RidsNrrDorl ResourceSent: Friday, September 19, 2014 10:11 AMTo: Singal, BalwantSubject: FW: STARS OEDO Office Notification (LTR-14-0495-1-NRR)

From: RidsNrrMailCenter ResourceSent: Thursday, September 04, 2014 1:05 PMTo: RidsNrrDorl ResourceCc: Cox, LindaSubject: FW: STARS OEDO Office Notification (LTR-14-0495-1-NRR)

The following appropriate action on Request Decommissioning of the Aging Diablo Canyon Nuclear Power Plant

has been assigned to DORL.

Please let me know if you plan to respond.

SECY would like this document released to the public in ADAMS. Please review and let me know if that is ok.

From: ADAMS p8 icm serviceSent: Wednesday, September 03, 2014 2:24 PM

To: ICMSTARS_.NRR; Dudek, MichaelSubject: STARS OEDO Office Notification (LTR-14-0495-1-NRR)

A new OEDO Ticket has been assigned to you by Jaegers, Cathy (cej) on 09/03/2014.

Page 247: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

[http://adamsicninrc.aov:908OiSTA R S/STA R Spngj]< tlns://adamsienm. nrc.govi/STA RS>

Last User Comment has been added to a Ticket by 09/03/2014 on 09/03/2014. The comment was -

09/03/2014

The Ticket information is below.

Ticket InfoActivity Information

Case Number

LTR- 14-0495- I -NRR

Status

New

Activity Type

LTR

EDO Due Date

SECY Due Date

Requested Due Date

Assigned Offices

NRR

Routing Copies to

Region IV I OGC

EDO Point of Contact

Dudek, Michael (mid)

Other Parties

Incoming ADAMS Accession

Page 248: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

ML]I 4245A494<hftp~s://adamsxt.nrc.6uov/WorkplaceXT!get(onlent?obiectStoreNanie=M in%20Ol ibrary5&ohiiectType'document&-vsd=dZ%7bCF392E2 I- I.FRE-4027.-2A2Afl.429858568D3A?6U>

Date of Incoming

09/29/2014

Incoming ADAMS Package

ML1I4245A495<hittps://aLdamtnsxt.nrc,, ov/WorkplaceX'TAicet('ontent'?ob-iectStorcNamne.--\ain%20[ ibhrry&obijectT~pe~docurnentitvsld%,!-7b814FA5 BO-3 F37-45 A I-9102-4E3394A9DC1)I %7d>

Frequency

Incoming Information

Originator

Keating M

Originator Organization

Citizens

Task

E-mail

Addressee Name

Macfarlane A M

Addressee Affiliation

NRC/Chairman

Incoming Received Date

09/02/2014

Subject

Request Decommissioning of the Aging Diablo Canyon Nuclear Power Plant

Description

Page 249: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Process Information

Special Instructions Type

Appropriate Action

Special Instructions

For Appropriate Action. Office/Region to determine if a response is needed. If response is appropriate, please besure to include your response to the ADAMS Package and process accordingly. Copies should be sent toRidsEdoMailCenter and RidsSecyMailCenter. The incoming document needs to be made publicly available inADAMS per SECY for immediate release. If this should not be made publicly available, please let us know ASAP.

Near Term Comment

Requested Action Type

Appropriate Action

Cross Reference Numbers

Signature Level

No Signature Required

OIG Recommend

OEDO Concurrence

OCM Concurrence

OCA Concurrence

Page 250: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

From: Cln. Otio-Lwi~n

To: Maqky. mictaelSubjectu: FM STARS OEDO Office Notificatio41 (LTR-14-049S-t-NRR)DIate Thursday, September 5, 2014 1:57:53 P•1.

FYI

----- Original Message -----From: Walker(NRR), SandraSent: Thursday, September 25, 2014 1:57 PMTo: Chen, Qiao-LynnSubject: RE: STARS OEDO Office Notification (LTR-14-0495-1-NRR)

Hi Lynn,

The ticket has been dosed in STARS. Since it was just an appropriate action I was able to access STARS and state that staffwill not be responding.

Thanks,Sandra

-.. Original Message----From: Chen, Qiao-LynnSent: Thursday, September 25, 2014 7:58 AMTo: Walker(NRR), SandraSubject: FW: STARS OEDO Office Notification (LTR-14-0495-1-NRR)Importance: High

Good Morning Sandra,

Would you be able to help me with this answer.

Thank you!

----- Original Message -----From: Burkhardt, JanetSent: Thursday, September 25, 2014 7:52 AMTo: Chen, Qiao-Lynn; Cox, LindaSubject: FW: STARS OEDO Office Notification {LTR-14-0495-1-NRR)Importance: High

Can either of you please respond to Mike? I have never heard of STARS and don't know how to advise him.

Jan

-----Original Message--...From: Markley, MichaelSent: Thursday, September 25, 2014 7:46 AMTo: Burkhardt, JanetCc Orf, TracySubject: FW: STARS OEDO Office Notification (LTR-14-0495-1-NRR)

Jan,

Do I close a STARS ticket in the same manner as we request extensions for due dates.'

Mike

----- Original Message -----From: Stuchell, SheldonSent: Wednesday, September 24, 2014 5:S9 PMTo: Dudek, Michael; Markley, MichaelCc: Mohseni, Aby; Banic, Merrilee; Mensah, Tanya; Khanna, Meena; Singal, Balwant; Oesterle, Eric; Pedersen, ReneeSubject: FW:. STARS OEDO Office Notification (LTR-14-0495-1-NRR)

Mike & Mike,

I'd like to make sure this issue is closed, and any ticket assigned to NRR Is dosed. Any correspondence coming to the NRC canbe considered as a 2.206 petition, if It meets the requirements of our MD and is determined to be an actual petition. In thiscase, the submittal does not meet the requirements to be a 2.206 petition, and should be considered general correspondence.

Page 251: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

The e-mail chain below can be confusing, and I must point out that no single individual submitted this correspondence. It wasnot Mr. Peck. Mr. Peck, one of our Sr. Resident Inspector's, did in fact have a DPO about Diablo, but that OPO has beendispositioned. The submitter in this case was "change.org."

Therefore, there Is no Individual we can respond to.

I highly recommend this be closed with no further action. As noted in the ticket, staff Is to respond "as appropriate." In thiscase, the appropriate response is no response to an organization.

If there are still questions as to how to dose the issue, it should be worked out between Mike and Mike. This is not a 2.206petition and NRR/DPR is not involved.

Hope this helps,Sheldon

----- Original Message -----

From: Banic, MerileeSent: Wednesday, September 24, 20.14 1:36 PMTo: Stuchell, SheldonCc: Mensah, TanyaSubject: RE: STARS OEDO Office. Notification (LTR-14-0495-1-NRR)

A little background:If change.org is basing Its petition on M. Peck's, a Sr Resident's, DPO, the NRC resolved his DPO:htt-/rIl .nrclxovlheadlines/DiabloSafe.9-1B-2014.pdf

From: Stuchell, SheldonSent: Wednesday, September 24, 2014 12:34 PMTo: Dudek, Michael; Mensah, Tanya; Banic, Merrilee; Markley, Michael; Kokaiko, Lawrence; Khanna, MeenaCc: Singal, Balwant; Oesterle, Eric; Pedersen, ReneeSubject: RE: STARS OEDO Office Notification (LTR-14-049S-1-NRR)

All,

The easiest solution to this, is for the DORL PM to respond by e-mail to the submitter (he is not a petitioner) and let him knowthat we have received his general correspondence and thank him for his interest in nuclear safety. There is no need toexpound or explain any further than that.

We receive numerous submittals all year long, that require nothing more than an acknowledgement.

Sheldon

From: Dudek, MichaelSent: Wednesday, September 24, 2014 12:25 PMTo: Mensah, Tanya; Banic, Merrilee; Markley, Michael; Kokajko, Lawrence; Khanna, MeenaCc: Singal, Balwant; Oesterle, Eric; Pedersen, Renee; Stuchell, SheldonSubject: RE: STARS OEDO Office Notification (LTR-14-0495-1-NRR)

All: As a result of the past e-mails, it now appears that we (the staff) have an action to contact the petitioner (Mr. Peck) tohave him formally submit the petition in hard-copy to the NRC so that we have an official record of his concerns.

Question: Does the staff want to take this action, or should I try to go back through the Chairman's Office for this requestsince that Is where is action originated?

Please advise.

Michael L DudekMichael I. Dudek I OEDO Executive Technical Assistant I U.S. NRC I b)F1*: [email protected]< Ilto:Michael.Dudekifnrc.gov> I *: (301) 415-6500 B8:1I

From: Mensah, TanyaSent: Wednesday, September 24, 2014 11:24 AMTo: Banic, Merrilee; Markley, Michael; Kokajko, Lawrence; Khanna, MeenaCc: Singal, Balwant; Oesterle, Eric; Pedersen, Renee; Dudek, Michael; Stuchell, SheldonSubject: RE: STARS OEDO Office Notification (LTR-14-0495-1 -NRR)

To expand on Lee's comment, in the past we've had several petitioners attempt to direct us to their personal websites or bloqsto "download" 2.206 petitions and other supplemental materials. I(b)()

Page 252: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

t()A() J In these cases, the PM simply informed the petitioner

of the process to submit a 2.206 petition, in writing, if they want their concerns considered under that process.

Members of the public often change their website links/blogs. Their URLs may not even exist in a year. So we need an officialNRC record of the petitioner's concerns, which they have to submit in writing to the NRC. If the petitioner has videos or otherelectronic media to support their 2.206 petition, we advise them of the proper way to submit it. I think the DCD has guidance

.on the proper submission of electronic media to ensure that it is docketed.

Tanya

From: Banic, MerdleeSent: Wednesday, September 24, 2014 8:32 AMTo: Markley, Michael; Kokajko, Lawrence; Khanna, MeenaCc: Singal, Baiwant; Oesterle, Eric; Mensah, Tanya; Pedersen, Renee; Dudek, Michael; Stuchell, SheldonSubject: RE: STARS OEDO Office Notification (LTR-14-0495-1 -NRR)

Per our MD 8.11 "Section 2.206 requires that the petition be submitted in writing and provide the grounds for taking theproposed action...."

From: Markley, MichaelSent: Wednesday, September 24, 2014 8:11 AMTo: Kokajko, Lawrence; Khanna, MeenaCc: Singal, Baiwant; Oesterle, Eric; Mensah, Tanya; Banic, Merrilee; Pedersen, Renee; Dudek, MichaelSubject: RE: STARS OEDO Office Notification (LTR-14-0495-1-NRR)

Lawrence and Tim,

The assertion that this follows the process in 2.206 for submitting petitions to the EDO seems highly out of process. We shouldnot have to download software to review a submittal to the NRC. Likewise, we should not have to go through extrememeasures to access the information via an external website. I am struggling to see how the link provides an actual petition. Itmerely asserts that Michael Peck's DPO should provide the basis for a petition to shut down the plant. This is highly out ofprocess.

From my view, we have nothing to process here. The petitioner should be referred to the regulations in 2.206 and follow theprocess. NRR/DPR may disagree, but I do not see a document that we have submitted in an official manner that warrants theassignment of a petition manager. Let's talk. I do not see a basis for entering this into the petition process.

Mike Markley

From: Dudek, MichaelSent: Tuesday, September 23, 2014 2:43 PMTo: Markley, MichaelCc: Singal, Balwant; Oesterle, EricSubject: RE: STARS OEDO Office Notification (LTR-14-0495-1-NRR)

I went onto my iPhone and found it on the web site.

[dd:[email protected]]Petitioning Nuclear Regulatory Commission

Decommission the aging Diablo Canyon Nuclear Power Plant 1,[dd:image002,[email protected]]<https:/Iwwwm.chanae.oro/oraan'izations/Lincomnmon folk>

2.

1. Petition by

Uncommon Folk< https: //www.change.ora/oroanizations/uncommon folk>

In fault-ridden San Louis Obispo County, stands California's last two operating nuclear reactors in the aging Diablo CanyonPower Plant (circa 1973). They are located proximally to the Los Osos, Hosgri, San Andreas, and Shoreline Faults, along shoresnear Avila Beach.

According to a recent report by Michael Blood (ABC 30 Action News); a senior federal nuclear expert, Michael Peck, has urgedregulators to shut down the aging power plant until they can determine whether or not the facility's twin reactors can withstandan earthquake of similar or larger size than the one that recently shook Napa. Blood reports:

Peck, who for five years was Diablo Canyon's lead on-site inspector, says in a 42-page, confidential report that the NuclearRegulatory Commission is not applying the safety rules it set out for the plant's operation.

In light of the unfolding disaster at the Fukushima Daichii power plant, we the undersigned are asking that Governor JerryBrown support us in demanding that the Diablo Canyon Plant be shut down until it can be properly earthquake tested andMichael Peck's charges of negligence be thoroughly Investigated,

Or better yet, we ask that Jerry Brown work to shut down the Diablo Canyon Plant permanently, as it is located in such an

Page 253: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

unsafe region.

We the undersigned ask that NRC Inspector General Hubert T. Bell, Chalman Allison Macfarlane, and Govenor Jerry Brownlisten to the experts and heed the warnings of recent history, so we are not collectively doomed to repeat such catastrophicfailures.

For the sake of California and its citizens, young and old. please shut down the Diablo Canyon Nuclear Power Plant!

Here Is a short and enlightening PBS video that was made before several more major faultlines were found in thatarea...making it even MORE Imperative that these professional opinions be heeded. Please take a few minutes to watch. Thereis a long history of lies and suppression of information surrounding the Diablo Canyon Nuclear Plant, at the peril of our citizensand their families->

http:/Ivideo.=bs.ora/video/205E655205!_

MORE PETITIONS TO SIGN. THIS MOVEMENT IS GAINING MOMENTUM, THANKS TO ALL OF YOU. Please sign them all and

PASS IT ON! Together we can do it->

(1) httn:/Iaction~foe.om/Dnldialaction3tcnmmon/toublic/paction KEY= 16333

(2) httn://noetitions.moveon.orglsign/nrc-shut-down-diablo?source=s.icn.tw&r bv=7595393

(3) http:/Lact.credoaction~com/-sign`/diablo canyon

IMPORTANT TO THOSE LIVING IN NEAR DIABLO CANYON. RECENT STUDY INDICATES SIGNIFICANTLY HIGHER CANCERRATES IN RESIDENTS->

httl/Ca s com/20143/hgh -cancer-rates-near-diablo-canyon- n uclear-o)lan/

http:/Zww`w.helen~aldicottfoundatbon.or•/blogs/health-studies-exDlode-the-myth-of,-the `safe'-nuclear-power-plant~html<htti2.,/wvw'•elencaldicottfoundation.org-bboas/health-tuie-eode-the-IMvh-of-the-'safe-nudear-p2wer-

htto: lIworldbujcness.oro/nudear--ower-health-impact -studv/

More information->

httnt:/twortdbusinezssora/safe-eneroy- nro=ctdose-diablo-canyo-nuclear-nower.-nlant/

htto //worldbusiness.Qorc/nuclear-regulators-hear-fr.m-angcrv-1ubic-on-diablo-canyn-oiant/

httpl:/Iwwwl.sfate.com/newslartide/"Earthauake-concerns-1romot-call-to-shut-nudear-57 1171 7-phu

http://v'v.cbsnewsvcombewsllifomia-earthquake-expert-•ge-g9- nudear-plant--dlosure-over-threat/

h`tWt:•A•`•`°•daynews'comieneral-ne•ys201,0825/-diabloany~on-nuclear-pla-nt-should-be-dlose-forauak~e-testino-expert-

To:Nuclear Regulatory Commission, Hubert T. Bell, Inspector General at the NRC Nuclear Regulatory Commission, AllisonMacfarlane, Chariman of the NRC Sen. Barbara Boxer, California Gov. Jerry Brown, California Decommission Aging DiabloCanyon Nuclear Power Plant

Sincerely,(Your name]

Michael 1. Dudek I OEDO Executive Technical Assistant I U.S. NRC (b)(6)e: [email protected]<mailto:Michael.Dudek(rinrc.aov> I e: (301) 415-6500 I BB

From: Markley, MichaelSent: Tuesday, September 23, 2014 2:24 PMTo: Dudek, MichaelCc: Singal, Balwant; Oesterle, EricSubject: FW: STARS OEDO Office Notification (LTR-14-0495-1-NRR)

Mike,

Page 254: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Can we go back to the Chairman's office to get a hard copy of the petition.? We are having no luck in accessing the documentvia the links.

Mike

From: Singal, BalwantSent: Tuesday, September 23,-2014 12:42 PMTo: Mensah, TanyaCc: Oesterle, Eric; Markley, MichaelSubject: RE: STARS OEDO Office Notification (LTR-14+,0495-1-NRR)

Cathy was unable to help (could not open the file from the link in the file). She suggested contacting CSC. CSC was on mydesk yesterday, but were also unable to open the file. They believe there is a problem with the link. Hence, as of now we donot have a resolution and do not have a copy ofrthe petition.

From: Mensah, TanyaSent: Tuesday, September 23, 2014 11:57 AMTo: Markley, Michael; Banic, MerrileeCc: Singal, BalwantSubject: RE: STARS OEDO Office Notification (LTR-14-049s-1-NRR)

Any resolution on this? I typically email Cathy Jaegars for the incoming when we have problems accessing it via ADAMS. Lookslike Balwant already submitted an email to her.

.ust following up.

Tanya

From: Markley, MichaelSent: Monday, September 22, 2014 3:41 PMTo: Banic, Mernlee; Mensah, TanyaCc: Singal, BalwantSubject: FW: STARS OEDO Office Notification (LTR-14-0495-1-NRR)

Lee and Tanya,

We have not seen the actual petition but the OEDO tasking seems at hand.

Mike

From: Singal, BalwantSent: Friday, September 19, 2014 2:26 PMTo: Jaegers, CathyCc: Markley, MichaelSubject: RE: STARS OEDO Office Notification (LTR-14-0495-1-NRR)

Cathy,

Can we get access to the actual petition please?

From: Markley, MichaelSent: Friday, September 19, 2014 12:47 PMTo: Singal, BalwantSubject: RE: STARS OEDO Office Notification (LTR-14-0495-1-NRR)

Sorry, Balwant, I am not seeing an actual petition in any of these files. Just a lot of duplicate letters, a Susquehanna Security-related document, and an Army document. The links do not allow asccesssx to an actual petition and it is not in any of theseADAMS files.

From: Singal, BalwantSent: Friday, September 19, 2014 12:33 PMTo: Markley, MichaelSubject: RE: STARS OEDO Office Notification (LTR-14-049S-1-NRR)

Yes. I was able to open it. It has reference to the following two ML numbers and I was able to get to the documents byclicking the link:

ML1424SA494

ML1424SA495 (Package)

Contains ML14246A484, ML14246A496, and ML14246A494).

Page 255: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Couple of documents are large (30-40 pages).

I can help on Monday if needed.

From: Markley, MichaelSent: Friday, September 19, 2014 12:11 PMTo: Singal, Balwant; Oesterle, EricCc: RidsNrrMailCenter Resource; Jaegers, CathySubject: RE: STARS OEDO Office Notification (LTR-14-0495-1-NRR)

Balwant,

Can you get to the petition? I tried to open the link but it appears to require downloading software that is not supported onNRC systems.

Mike

From: Singal, BalwantSent: Friday, September 19, 2014 10:20 AMTo: Oesterle, EricCc: Markley, MichaelSubject: FW: STARS OEDO Office Notification (LTR-14-0495-1-NRR)

For your information please,

From: RldsNrrDod ResourceSent: Friday, September 19, 2014 10:11 AMTo: Singal, BalwantSubject: FW: STARS OEDO Office Notification (LTR-14-0495-1-NRR)

From: RidsNrrMailCenter ResourceSent: Thursday, September 04, 2014 1:05 PMTo: RidsNrrDorl ResourceCc: Cox, UndaSubject: FW: STARS OEDO Office Notification (LTR-14-0495-1-NRR)

The following appropriate action on Request Decommissioning of the Aging Diablo Canyon Nuclear Power Plant has beenassigned to DORL.

Please let me know if you plan to respond.

SECY would like this document released to the public in ADAMS. Please review and let me know If that is ok.

From: ADAMS p8jcm_5erviceSent: Wednesday, September 03, 2014 2:24 PMTo: ICM_STARSNRR; Dudek, MichaelSubject: STARS OEDO Office Notification (LTR-14-0495-1-NRR)

A new OEDO Ticket has been assigned to you by Jaegers, Cathy (cej) on 09/03/2014.

[tta:/Ladams¢m.nrc.gov:9OlSTARS/STARS.on ]<htts://adamsicm.nrc.goy/STR>

Last User Comment has been added to a Ticket by 09/03/2014 on 09/03/2014. The comment was -

09/03/2014

The Ticket information is below.

Ticket InfoActivity Information

Case Number

LTR-14-0495-1-NRR

Status

Page 256: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

New

ActMty Type

LTR

EDO Due Date

SECY Due Date

Requested Due Date

Assigned Offices

NRR

Routing Copies to

Region IV I OGC

EDO Point of Contact

Dudek, Michael (mid)

Other Parties

Incoming ADAMS Accession

ML14245A494 < https:lttadamsxt, nrc,9oviýLorkplaceX~letContent?

•biectStoreNae =Main% 2OLibrarv&objedTy•e document&vsld=O %7bC392F21 -iff-4027 2B-!42 56D >

Date of Incoming

09/29/2014

Incoming ADAMS Package

ML14245A495< ,'. t to eZob mbrtStoreName Main /%20brar&obiectTwe=document&vsJd%/7b814EA5B•-3F3*74-4SA1l9102-4E3394A9DCD1% 7d>

Frequency

Incoming Information

Originator

Keating M

Originator Organization

Otizens

Task

E-mail

Addressee Name

Macfarlane A M

Page 257: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Addressee Affilation

NRc/Chafrman

Incoming Received Date

09/02/2014

Subject

Request Decommissioning of the Aging Diablo Canyon Nuclear Power Plant

Description

Process Information

Special Instructions Type

Appropriate Action

Special Instructions

For Appropriate Action. Office/Region to determine if a response Is needed, If response Is appropriate, please be sure to includeyour response to the ADAMS Package and process accordingly. Copies should be sent to RidsEdoMailCenter andRldsSecyMailCenter. The fncoming document needs to be made publicly avaiable in ADAMS per SECY for immediate release. Ifthis should not be made publicly available, please let us know ASAP.

Near Term Comment

Requested Action Type

Appropriate Action

Cross Reference Numbers

Signature Level

No Signature Required

OIG Recommend

OEDO Concurrence

OCM Concurrence

OCA Concurrence

Page 258: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Wertz, Trent

From: Leeds, EricSent: Thursday, May 29, 2014 12:43 AMTo: Dapas, MarcCc: Johnson, Michael; Uhle, Jennifer, Wertz, TrentSubject: Re: Follow up from our meeting with the Mothers for Peace last Tuesday afternoon

Thanks Marc. I think you've done all you can. I'm sure my decision will elicit feedback. I've chosen to focus on the safetyaspect of the issue and will be rather short and direct in stark contrast to the DPO submittal, as well as the work done bythe DPO panel, At the least, it should be understandable to all.

Eric

From: Dapas, MarcSent: Wednesday, May 28, 2014 09:10 PMTo: Leeds, EricCc: Johnson, Michael; Krsek, RobertSubject: FW: Follow up from our meeting with the Mothers for Peace last Tuesday afternoon

In follow up to our discussion last week Eric, I am forwarding this to you so that you are aware of mycommunication with Jane Swanson of the Mothers for Peace on the subject matter. Thanks.

From: Dapas, MarcSe t1- WLnd AvdM. may 28-&.N14 8:08 PMTo:I (b)6]

Su -ect: Follow up from our meeting with the Mothers for Peace last Tuesday afternoon

Jane, I much appreciate the opportunity we had to meet with you and the other members of your Mothers'Board last week. I thought the discussion was mutually beneficial in terms of providing me with a perspectiveon the various issues/concerns you and your fellow board members have with respect to operation of theDiablo Canyon plant and affording us the chance to answer your questions.

Since the Differing Professional Opinion (DPO) filed by Mr. Peck was the subject of some of our discussion, Iwanted to follow up with you on the current status of the DPO process. Eric Leeds, who is the Director of ourOffice of Nuclear Reactor Regulation, will be signing out the DPO decision tomorrow. The DPO panel, which iscomprised of three independent staff members who have not previously worked on the seismic issues atDiablo Canyon (and one of which had been recommended by the DPO submitter), forwarded to Mr. Leeds theresults of the panel's review of the DPO. Mr. Leeds has reviewed the panel's recommendation and supportingbasis and is ready to make his decision on the DPO. Once Mr. Leeds issues his DPO decision, we will notifythe DPO submitter (in this case, Mr. Peck) of his right to appeal the decision to our Executive Director forOperations (Mark Satorius) and will remind him of our policy not to release pre-decisional information. TheDPO decision is considered pre-decisional if the DPO submitter decides to appeal the decision to the EDOsince in that circumstance, the EDO has to review the case and make a final agency determination regardingthe appeal. If Mr. Peck decides not to appeal the DPO decision, the OPO process is complete, and therefore,if Mr. Peck asked us to make his DPO public, we would honor his request. Should Mr. Peck appeal the DPOdecision, once the EDO has rendered a decision on the appeal, the DPO process would be complete and wewould make the DPO public upon Mr. Peck's request for us to do so.

I hope you find this responsive to my commitment to keep you informed of where we are in the process withrespect to Mr. Peck's DPO submittal. Thanks and please let me know if you have any questions.

c14+

Page 259: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Burnell, Scott

From: Burnell, ScottSent. Wednesday, September 03, 2014 9:14 AMTo: McIntyre, David; Brenner, Eliot; Harrington, HollySubject: Re: Chairman brief on Diablo

I can call in, of course, but if we prefer in-person then it's obviously Dave.

Sent from an NRC BlackberryScott Burnell

Original Message -

From: McIntyre, DavidSent: Wednesday, September 03, 2014 09:01 AMTo: Burnell, Scott; Brenner, Eliot; Harrington, HollySubject: RE: Chairman brief on Diablo

Per the morning meeting, this meeting has now been moved to THURSDAY at 11 am.

--- Original Message-From: Burnell, Scott,Sent: Wednesday, September 03, 2014 6:16 AMTo: Brenner, Eliot; Harrington, Holly; McIntyre, DavidSubject: RE: Chairman brief on Diablo

I've dealt with the Diablo seismic issues for years. Both Dave and I are working on the foreign ownershippaper, for whatever that's worth.

From: Brenner, EliotSent: Wednesday, September 03, 2014 12:16 AMTo: Harrington, Holly; McIntyre, David; Bumell, ScottSubject: Re: Chairman brief on Diablo

I think dave because this is a long runing operating issue.

-Original MessageFrom: Harrington, HollySent: Tuesday, September 02, 2014 10:01 PMTo: Brenner, Eliot; McIntyre, David; Bumell, ScottSubject: FW: Chairman brief on Diablo

Ok, the one we're invited to is this Friday from 3 to 3:45. Who is best to represent OPA?

Holly Harrington

Senior Level AdvisorOffice of Public AffairsU.S. Nuclear Regulatory Commission

301.415.82038

Page 260: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

---- Original Message---From: Burnell, ScottSent: Tuesday, September 02, 2014 3:20 PMTo: Harrington, Holly; McIntyre, David; Uselding, Lara; Brenner, EliotSubject: RE: Chairman brief on Diablo

Understood.

From: Harrington, HollySent: Tuesday, September 02, 2014 3:17 PMTo: Bumell, Scott; McIntyre, David; Uselding, Lara; Brenner, EliotSubject: RE: Chairman brief on Diablo

Thursday's meeting is the one we're not invited to. The one we are is yet unscheduled

Holly Harrington

Senior Level AdvisorOffice of Public AffairsU.S. Nuclear Regulatory Commission

301.415.8203

--- Original Message--From: Burnell, ScottSent: Tuesday, September 02, 2014 3:09 PMTo: McIntyre, David; Harrington, Holly; Uselding, Lara; Brenner, EliotSubject: RE: Chairman brief on Diablo

I can certainly call in to the separate meeting if it's Thursday -- both Dave and I have kept an eye on the foreignownership issue.

From: McIntyre, DavidSent: Tuesday, September 02, 2014 3:03 PMTo: Harrington, Holly; Use lding, Lara; Brenner, EliotCc: Burnell, ScottSubject: RE: Chairman brief on Diablo

Sounds like a fun day.

----Original Message---From: Harrington, HollySent: Tuesday, September 02, 2014 2:54 PMTo: Uselding, Lara; Brenner, EliotCc: McIntyre, David; Burnell, ScottSubject: RE: Chairman brief on Diablo

From Jen: It's my understanding that Thursday's meeting is going to deal with the technical issues associatedwith the Shoreline fault and an update of what's going on with the DPO, and that Phil has requested a separatemeeting (as yet unscheduled) to address messaging on Diablo and the foreign ownership issue - to which he'sasked that OPA, OCA, and assorted others be invited.

Holly Harrington9

Page 261: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Senior Level AdvisorOffice of Public AffairsU.S. Nuclear Regulatory Commission

301.415.8203

-- Original Message--From: Uselding, LaraSent: Tuesday, September 02, 2014 2:07 PMTo: Brenner, Eliot; Harrington, HollySubject: Chairman brief on Diablo

Hello: I left a voicemail for Scott as I heard from a RIV staffer that the Chairman wants a brief on all thingsDiablo this Thursday. Do you know about this and if so, will someone from HQ OPA sit in on that?Lara

-.--- Original Message---From: Burnell, ScottSent: Tuesday, September 02, 2014 1:03 PMTo: Uselding, LaraSubject: I'm out today and tomorrow

Sorry, should have updated my voicemail. Haven't heard anything about a chairman brief. Check wJHolly?

Sent from an NRC Blackberry

Scott Burnellw oo

10

Page 262: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Bumell, Scott

From: Burnell, ScottSent- Wednesday, September 10, 2014 8:34 AMTo: Brenner, Eliot; McIntyre, David; Harrington, Holly; Uselding, Lara; Dricks, VictorCc: Oesterle, EricSubject: DPO comm plan

I'm told by reliable sources that NRR is updating the plan to account for the EDO decision and we'll see it thismorning.

Sent from an NRC BlackberryScott Bumell

C/v

Page 263: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Burnell. Scott

From: Burnell, ScottSent Wednesday, September 10, 2014 9:45 AMTo: McIntyre, David; Uselding, Lara; Brenner, Eliot; Harrington, HollySubject: Re: Diablo DPO IS public in ADAMS

Yes, I agree.

Sent from an NRC BlackberryScott Burnell

From: McIntyre, DavidSent: Wednesday, September 10, 2014 09:42 AMTo: Burnell, Scott; Uselding, Lara; Brenner, Eliot; Harrington, HollySubject: RE: Diablo DPO IS public in ADAMS

But it IS public as of yesterday, They just won't be able to find it via our nrc.gov website until later today.

From: Burnell, ScottSent: Wednesday, September 10, 2014 9:42 AMTo: McIntyre, David; Uselding, Lara; Brenner, Eliot; Harrington, HollySubject: Re: Diablo DPO IS public in ADAMS

I would imagine someone's given ADAMS staff a nudge to immediately replicate it to the public site.

Sent from an NRC BlackberryScott Burnell

From: McIntyre, DavidSent: Wednesday, September 10, 2014 09:39 AMTo: Uselding, Lara; Brenner, Eliot; Harrington, Holly; Burnell, ScottSubject: Diablo DPO IS public in ADAMS

Lara, et al - The DPO is public in Adams at ML14252A743. It was dated yesterday (9/9) and date to bereleased is yesterday (9/9). It does not yet come up in web-based Adams, which has a 1-day delay;however, anyone who has direct adams access can already find it. (eg., Platts, I imagine)

C34-

Page 264: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Burnell, Scott

From:Sent:To:Subject:Attachments:

Burnell, ScottWednesday, September 10, 2014 11:39 AMUselding, Lara; Sebrosky, JosephRE: Scott/Joe; review of blog prior to sending to EliotSEP2014blogAB1632_srb.docx

Here are my edits.

From: Uselding, LaraSent: Wednesday, September 10, 2014 11:03 AMTo: Burnell, Scott; Sebrosky, JosephSubject: Scott/Joe; review of blog prior to sending to EliotImportance: High

6 C149

Page 265: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Diablo Canyon In the News

Page 266: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

(b~

Page 267: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Bumell, Scott

From: Burnell, ScottSent Wednesday, September 10, 2014 4:52 PMTo: Uselding, Lara; OPA Resource; Dricks, VictorSubject: Re: Diablo Canyon nuclear plant decision?

Thanks.

Sent from an NRC BlackberryScott Burnell

w(b)(6)

From: Uselding, LardSent: Wednesday, September 10, 2014 04:51 PMTo: Burnell, Scott; OPA Resource; Dricks, VictorSubject: RE: Diablo Canyon nuclear plant decision?

Yes. I took care of this

From: Burnell, ScottSent: Wednesday, September 10, 2014 3:17 PMToo CPA Resource; Uselding, Lara; Dricks, VictorSubject: RE: Diablo Canyon nuclear plant decision?

Lara's handling these requests.

From: OPA ResourceSent: Wednesday, September 10, 2014 4:16 PMTo: Burnell, ScottSubject: FW: Diablo Canyon nuclear plant decision?

Scott,

Can you please help with the below email.

Thanks,

Office of Public AffairsU.S. Nuclear Regulatory Commission(301) 415-8200opa. resource(,nrc.qov

From: Raab, Lauren fmailto:Lauren.Raab(alatimes.com]Sent: Wednesday, September 10, 2014 4:03 PMTo: OPA ResourceSubject; Diablo Canyon nuclear plant decision?

13

Page 268: FOIA/PA-2015-0071 - Resp 1 - Final, Group C.Group C FOIA/PA NO: 2015-0071 RECORDS BEING RELEASED IN PART The following types of information are being withheld: Ex. 1 :[Records properly

Can you confirm reports that an NRC official has rejected a call to shut down Diablo Canyon, California's last remainingnuclear power plant, until it can be determined whether the facility can stand up to an earthquake off the Central Coast?

I'd appreciate any details and/or documents you can provide.

In case it helps you route the question to the right person, the Associated Press is saying this:

A top Nuclear Regulatory Commission official has rejected a federal expert's recommendation to shut downCalifornia's last operating nuclear power plant until it can determine whether its reactors can withstandpowerful shaking from nearby earthquake faults.

In a decision released Wednesday, operations executive Mark Satorius said there is no immediate or significant

safety concern at the Diablo Canyon plant.

Thank you very much.

Lauren RaabLos Angeles Times

TCellr i rabu 1Twitter: P raablauren

14