Folie 1 Quality Management in local biomass district heating plants and grids
The Austrian “klima:aktiv”-Programme
qm heizwerke
Quality Management in local biomass district heating plants and grids
Biomass energy for heating and hot water supply in Belarus23. April 2008, Minsk
F. PromitzerLandesEnergieVerein Steiermark / [email protected]
Folie 2 Quality Management in local biomass district heating plants and grids
Contents
Energy Agency “LandesEnergieVerein” The Austrian “klima:aktiv”-ProgramQuality assurance wood combustionqm heizwerke - the Austrian way
Folie 3 Quality Management in local biomass district heating plants and grids
LandesEnergieVerein SteiermarkStyrian Energy Agency
Founded in 1981 - one of the oldest regional Energy Agencies (Staff: 18 FTE)
Vision: Empower the use of renewable energies and energy efficiency in the province of Styria
Styria:Area: ~ 14.000 km2
R&D: 3,5% / GDP25% of the end energy consumption is from RES
RES: 250 SMEs, 3000 jobs, 250 researchers
Folie 4 Quality Management in local biomass district heating plants and grids
LEV - Activities
NetworkingNOEST - R&D-Cluster (providing
R&D funds and innovation transfer)
ECO&CO - SME-ClusterWIN
CENCEEU-Projects
Local energy agencies
ProjectsEnergy Efficiency
BiomassQuality Management RES
SolarWindWater
InformationInternet
PublicationsLibrary
TrainingEnergy ConsultantsFurther training for
expertsE-Learning
Styrian provincial government
Regional Energy PlanResidencial-building-fund
Environmental fund
Folie 6 Quality Management in local biomass district heating plants and grids
Forest enrichment - Division percentages in Austria
Source: Statistik Austria
agriculture
forests
alps
water surface areas
other (building land, gardens,
wine yards etc.)
Folie 7 Quality Management in local biomass district heating plants and grids
Forests enrichment
In Austria a cubic meter of wood grows every second. That is yearly 31,000000 solid cubic meters.
At the moment only 20,000000 solid cubic meters are used yearly.
Folie 8 Quality Management in local biomass district heating plants and grids
Map of Austrian biomass district heating plants and grids
Folie 9 Quality Management in local biomass district heating plants and grids
Map of Styrian biomass district heating plants and grids
Folie 10 Quality Management in local biomass district heating plants and grids
klima:aktiv
Active climate protection initiativeLaunched in 2004 by the Federal Ministry of Agriculture, Forestry, Environment and Water ManagementEmissions must be reduced from 78.9 million tonnes carbon dioxide equivalent (base year: 1990) to 68.7 million tonnes by the period of 2008-2012All klima:aktiv - programmes are managed by the Austrian Energy Agency
Folie 11 Quality Management in local biomass district heating plants and grids
klima:aktiv goals
Lower carbon dioxide emissions through higher energy efficiencyIncreased use of renewable energy sources in all climate relevant areas of lifeMeeting the Kyoto targetsStimulating the climate protection marketsCreating a strong home marketNew jobs are created and secured in the climate relevant industriesStrengthening Austria’s position as a business location in the long term
Folie 12 Quality Management in local biomass district heating plants and grids
klima:aktiv Strategy
Broad cooperation with the federal provinces and partners from the industry
23 programmes focus on four general areasrenewable energiesbuilding an energy efficiencymunicipalitiesmobility
and have been launched specifically in areas wherethe economic framework conditions are favourablemarket players are willing to cooperateadditional stimuli can yield results
“This enables us to help climate-friendly technologies, services and products to attain larger market shares in a faster and more cost-effective way.” BM Pröll
Folie 13 Quality Management in local biomass district heating plants and grids
klima:aktiv ProgrammeKategorien: Energieeffizienz, Gebäude und Kommunen
Folie 14 Quality Management in local biomass district heating plants and grids
klima:aktiv ProgrammeKategorien: Mobilität, Erneuerbare Energie
qm heizwerke
Folie 15 Quality Management in local biomass district heating plants and grids
Quality assurance wood combustion
Originated in SwitzerlandAdvanced by experts from Germany, Switzerland and AustriaModel and basis for qm heizwerke in Austria
QM Holzheizwerke = QA Wood Combustion
Folie 16 Quality Management in local biomass district heating plants and grids
Main technical deficiencies
The heat demand of the consumers is over estimatedOver estimated reserve capacity stored in the heating plantThe pipeline grid system is over dimensionedSize of the fuel silo is bigger than required
Folie 17 Quality Management in local biomass district heating plants and grids
Main technical deficiencies (2)
Low utilisation ratio of the wood boilerFuel quality does not meet the quality requirements for the installed firingFaults in the hydraulic and in the control system lead to high operation costs
Folie 18 Quality Management in local biomass district heating plants and grids
The objective of the tool „QA Wood Combustion“ is to ensure, that plants are built with
High technical and operational performanceHigh utilisation ratioLow emissionLow investment costsLow operation costs
Folie 19 Quality Management in local biomass district heating plants and grids
Assurance of the Technical QualityQ-Guideline (Q-Leitfaden)
Quality Guidelines45 single requirements are defined in the quality guidelines
Folie 20 Quality Management in local biomass district heating plants and grids
The requirements define the best available technology in the areas
Analysis of initial situationHeat productionHeat supplyDocumentationAcceptance procedureOptimisation of the plant operationFinal verification
Folie 21 Quality Management in local biomass district heating plants and grids
“Q-Plan” - Quality Control Plan
The “Q-Plan” is a tool to stipulate the quality for each specific plant.After commissioning the functionality the recorded operation data must be verified by analysis.
Folie 22 Quality Management in local biomass district heating plants and grids
Quality Manager
Responsible for the execution of QA wood combustionMaking sure that the quality is definedSupervising the project engineerMaking sure that deviations are recognised and corrected
Folie 23 Quality Management in local biomass district heating plants and grids
Tools for the Project Engineer
Planning and construction of wood combustion plantsStandard solutions part 1Standard solutions part 2Standard tender for wood boilers
Folie 24 Quality Management in local biomass district heating plants and grids
Standard Solutions
Description and diagram of the hydraulic solutionDescription and diagram of the applied control systemList of necessary data pointsDescription of data recording systems
Folie 25 Quality Management in local biomass district heating plants and grids
Outcomes of QA Wood Combustion
Project engineers with little experience in planning are forced to acquire the knowledge of the state of the art.Systematic data recording shows the actual performance of the wood boiler and the control system.
Folie 26 Quality Management in local biomass district heating plants and grids
qm heizwerke - the Austrian way
qm heizwerke general management
Quality managers QA wood combustion system
Folie 27 Quality Management in local biomass district heating plants and grids
qm heizwerke General Manager LEVmain tasks
Developing a strategy how to reach the stated goalsSupplying the frame-work and the infra-structure of the coordination of qm heizwerke programmeSelecting, training and assisting of the quality managersIntegration of plant operators, project engineers and manufacturers of plant-componentsDeveloping of a database, which collects qm projects as well as technical an economic data
Folie 28 Quality Management in local biomass district heating plants and grids
qm heizwerke General Manager LEVfurther activities
Monitoring and operation optimising of existing plants
A high-level equipment (data transmission by wireless network) was designed to record operation data of plants. This allows an efficient and cost-effective monitoring
Organisation of regular round tables for plant operators
Organisation of study-tours
Folie 29 Quality Management in local biomass district heating plants and grids
The Quality Manager
During the process of planning, the quality manager recognizes and corrects any deviations of the
stipulated quality protocol.
Folie 30 Quality Management in local biomass district heating plants and grids
Funding of local biomass district heating plants and grids
30% of the investment costs are funded by the government and the provincial governmentIn 2005 1.625 projects applications were received.1.387 projects with investment costs of € 330 millions received a funding of € 63 millions.
Folie 31 Quality Management in local biomass district heating plants and grids
“qm heizwerke” and funding
Folie 32 Quality Management in local biomass district heating plants and grids
qm Strategy
easy access to projekt data
Feedback to the subsidising authority
efficient work of the quality managers
controlled by the general manager (LEV)
heat plant
basic dataoperating data
q - manager
qm database
subsidisingauthority
generalmanager
Ve
rifyi
ng
+g
uid
ing
subs
idy
Folie 33 Quality Management in local biomass district heating plants and grids
qm database
easy access comparing the operating data
from plants plans, charts and photos Absence of documents is
immediately apparent
Folie 34 Quality Management in local biomass district heating plants and grids
ProjektdatenbankProgrammierung - Fakten
Programmieraufwand:17.000 Zeilen VB Script25.000 Zeilen HTML1.400 Zeilen JavaScript2.500 Zeilen Online-Hilfe
In Betrieb seit März 2007
Inhalte (Stand April 2008):186 Projekte (Neu und Best.) 3.340 PDF-Dokumenteca. 1.100 Anfragen6.264 Abnehmerdatensätze
Folie 35 Quality Management in local biomass district heating plants and grids
Contacts
LandesEnergieVerein SteiermarkProgram Manager qm heizwerkeBurggasse 9/IIA 8010 GrazPhone: +43 (0)316 877 3389Fax: +43 (0)316 877 3391E-Mail: [email protected]: www.lev.at
www.qm-heizwerke.at
Weblinks
www.lev.atwww.qm-heizwerke.atwww.qmholzheizwerke.atwww.klimaaktiv.at