Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
1
For discussion on 3 February 2020
Legislative Council Panel on Housing
Public Works Programme Item No. B191GK Community hall, general outpatient clinic and maternal and
child health centre at Ching Hong Road, Tsing Yi
Purpose
This paper consults Members about the Government’s proposal to upgrade B191GK to Category A.
Project proposal
2. The scope of the proposed community hall (CH), general outpatientclinic (GOPC) and maternal and child health centre (MCHC) at Ching HongRoad under B191GK includes –
(a) reprovision of a CH, including a multi-purpose hall withseating capacity of 450 persons, a conference room and otherancillary facilities, and demolition of the existing CheungChing Estate Community Centre (CCECC);
(b) provision of a GOPC, including consultation rooms, treatmentrooms, assessment rooms, a pharmacy and other ancillaryfacilities;
(c) reprovision of an MCHC, including consultation rooms,interview rooms, a treatment room, a cervical screening room,a breastfeeding room and other ancillary facilities; and
(d) ancillary works including road works, public lighting facilities,drainage, sewerage, water supply, site formation andlandscaping works, etc.
LC Paper No. CB(1)368/19-20(03)
2
3. The location and site plan of the proposed works is at Annex 1, while the artist’s impression drawings are at Annex 2 and Annex 3. 4. Subject to the timely funding approval of the Finance Committee (FC) of the Legislative Council, we anticipate that the construction of superstructure of the proposed CH can commence in the fourth quarter of 2020 for completion in 2023. After the new CH is in operation, we will demolish the existing CCECC and construct the proposed GOPC and MCHC. The whole project is anticipated to be completed in 2029.
Justification Community Hall 5. To meet the demand for facilities from the local community, residents and increasing population, we propose to reprovision a CH to meet up-to-date facility standards and to demolish the existing CCECC (including the community hall located inside). General Outpatient Clinic 6. In view of the ageing population of Tsing Yi area, it is expected that the community’s demand on publicly-funded healthcare services will continue to grow. There are difficulties at the existing Tsing Yi Cheung Hong GOPC and Tsing Yi Town GOPC to cope with the growing demand. The Food and Health Bureau/the Hospital Authority (HA) hence proposes to establish a GOPC for expanding the primary care services. 7. The proposed GOPC will provide medical consultations, a basic range of nursing and allied health services, and some patient empowerment activities. Maternal and Child Health Centre 8. At present, there is only one MCHC on Tsing Yi Island, which is located in a commercial centre of Cheung Hong Estate under tenancy, namely Tsing Yi MCHC. The existing MCHC premises cannot be expanded to meet the ever-growing service needs of the community due to space constraints. Taking the opportunity of the Ching Hong Road North development, the Department of Health proposes to reprovision and expand the Tsing Yi MCHC within the development, not only for avoidance of disruption of services arising from the
3
uncertainty in renewing tenancy with commercial entities in future, but also for continuation and long-term development of services, thereby enhancing the service delivery and meeting the demands of the community. Project implementation 9. We propose to reprovision a CH in the public housing development at Ching Hong Road North (Ching Hong Road North development, the key development parameters are at Annex 4), and to use the land vacated from the demolition of the existing CCECC to construct two public housing domestic blocks, to reprovision the MCHC and to provide a GOPC. 10. The proposed works form part of the Ching Hong Road North development, so they have to be implemented in conjunction with the public housing development. We plan to entrust the design and construction of the proposed works to the Hong Kong Housing Authority, to facilitate better design coordination and construction interface between the proposed works and the adjacent public housing development under construction in parallel. Upon completion of the works, the GOPC will be handed over to the HA for management and maintenance, whereas the CH and MCHC will be handed over to the relevant government departments for management and maintenance. Project estimate 11. The capital cost of the proposed works is estimated to be $1,033.2 million in money-of-the-day prices. Public consultation 12. We consulted the Housing Affairs Committee of the Kwai Tsing District Council (KTDC) on 3 October 2017 about the proposed development at Ching Hong Road North, which includes the public housing and the proposed CH, GOPC and MCHC, and we also consulted the Planning and District Facilities Management Committee of the KTDC on 19 February 2019 about the proposed CH. The Committees supported the proposed works.
4
Way forward 13. We plan to submit the funding proposal of the proposed works to FC for funding approval after the consultation of Public Works Subcommittee. Advice sought 14. Members are invited to note the paper and provide views. Transport and Housing Bureau January 2020
PIP
ELIN
E
ESTATE ROAD /
EMERGENCY VEHICULAR ACCESS
E
M
E
R
G
E
N
C
Y
C
H
U
N
G
M
EI R
O
AD
CH
ING
HO
NG
RO
AD
長康邨第一商場CHE UNG HONG COMMERC IAL
CENTRE NO. 1
佛教葉紀南紀念中學BUDDHIST YIP KEI NAM
MEMORIAL COLLEGE
青楊樓CHING YEUNG HOUSE
青梅樓CHING MUI HOUSE
V
E
H
IC
U
L
A
R
A
C
C
E
S
S
E
S
T
A
T
E
R
O
A
D
/
擬議的社區會堂(設置在公營房屋發展平台上)
PROPOSED COMMUNITY HALL
(ON THE PODIUM OF PUBLIC
HOUSING DEVELOPMENT)
郭怡雅神父紀念學校FATHER CUCCHIARA
MEMORIAL SCHOOL
E
S
T
A
T
E
R
O
A
D
/
E
M
E
R
G
E
N
C
Y
V
E
H
I
C
U
L
A
R
A
C
C
E
S
S
邨
路
/
緊
急
車
輛
通
道
ES
TA
TE
R
OA
D
計劃中平台上的公營房屋住宅大樓(由香港房屋委員會承造)
PLANNED PUBLIC HOUSING
DOMESTIC BLOCKS
ABOVE PODIUM
(BY HKHA)
涌美路
邨路
邨路
/ 緊急
車輛
通道
擬議的普通科門診診所及母嬰健康院(設置在公營房屋發展平台上)
PROPOSED GENERAL OUTPATIENT
CLINIC AND MATERNAL AND CHILD
HEALTH CENTRE
(ON THE PODIUM OF PUBLIC
HOUSING DEVELOPMENT)
邨路 / 緊急車輛通道長康邨CHEUNG HONG ESTATE
現有巴士總站上計劃中的平台(由香港房屋委員會承造)
PLANNED PODIUM DECK
ABOVE EXISTING BUS TERMINUS
(BY HKHA)
青康路
行人隧道
隧
道
口
隧道口
隧
道
口
P
o
rta
l
T
u
n
n
e
l
Portal
Tunnel
P
o
r
t
a
l
T
u
n
n
e
l
渠
渠
Steps
C
A
N
O
PY
CA
NO
PY
CANO
PY
BN
BN
BN BN
BN
BN
BN
BN
BN
BN
BNBN
BN
HD
HD
HD
HD
HD
HD
HD
HD
20.09
19.90
18.84
HD
HD
HD
HD
HD
HD
耕
地
C
u
lt
iv
a
ti
o
n
行
人
隧
道
B
N
BN
B
N
青衣工業中心第二期
TSING Y I
INDUSTRIAL
CENTRE
PHASE 2
青
康
路
C
H
I
N
G
H
O
N
G
R
O
A
D
T
S
I
N
G
Y
I
H
E
U
N
G
S
Z
E
W
U
I
R
O
A
D
長康邨第一商場CHE UNG HONG
COMMERCIAL
CENTRE NO. 1
C
H
I
N
G
Y
I
R
O
A
D
青衣鄉事會路
佛教葉紀南紀念中學BUDDHIST YIP KEI NAM
MEMORIAL COLLEGE
涌美
路
長青
隧道
C
H
E
U
N
G
T
S
I
N
G
T
U
N
N
E
L
葵青區警察總部暨青衣警署KWAI TSING DISTRICT
POLICE HEADQUARTERS
AND TSING YI
POLICE STATION
青衣消防局TSING YI
FIRE STATION
RAMBLER CHANNEL
藍巴勒海峽
T
S
I
N
G
Y
I
S
O
U
T
H
B
R
I
D
G
E
青衣南橋
CH
UN
G M
EI R
OA
D
青康路遊樂場CHING HONG ROAD
PLAYGROUND
郭怡雅神父紀念學校FATHER CUCCHIARA
MEMORIAL SCHOOL
青衣
交匯
處
T
S
I
N
G
Y
I
I
N
T
E
R
C
H
A
N
G
E
⼯地SITE
⼯地SITE
C
H
IN
G
H
O
N
G
R
O
AD
青康路
青衣
路
長青邨CHEUNG CHING
ESTATE
長康邨CHEUNG HONG ESTATE
LOCATION PLAN位置圖
N
圖例 LEGEND
工地界線SITE BOUNDARY
無障礙出入口BARRIER-FREE ENTRANCE / EXIT
行人出入口PEDESTRIAN
ENTRANCE / EXIT
車輛出入口VEHICULAR
INGRESS / EGRESS
地面綠化AT-GRADE GREENING
天台綠化LANDSCAPED ROOF
垂直綠化VERTICAL GREENING
PWP ITEM NO. B191GK - COMMUNITY HALL, GENERAL OUTPATIENT CLINIC
AND MATERNAL AND CHILD HEALTH CENTRE AT CHING HONG ROAD, TSING YI
工務計劃項目編號 B191GK
青衣青康路社區會堂、普通科門診診所及母嬰健康院 工地平面圖SITE PLAN
青康路北公營房屋發展界線BOUNDARY OF PUBLIC HOUSING
DEVELOPMENT AT CHING HONG ROAD NORTH
現有長青社區中心EXISTING CHEUNG CHING ESTATE COMMUNITY CENTRE
N
附件
一 Annex 1
社區會堂界線COMMUNITY HALL BOUNDARY
VIEW B
普通科門診診所及母嬰健康院界線GENERAL OUTPATIENT CLINIC AND
MATERNAL AND CHILD HEALTH CENTRE BOUNDARY
視角 B
視角 AVIEW A
20 400
60m
500 150 250m
PWP ITEM NO. B191GK - COMMUNITY HALL, GENERAL OUTPATIENT CLINIC
AND MATERNAL AND CHILD HEALTH CENTRE AT CHING HONG ROAD, TSING YI
B191GK 構思圖ARTIST'S
IMPRESSION
DRAWING
附件二 Annex 2
視角A 擬議社區會堂 從北面望向大樓的透視圖
VIEW A PROPOSED COMMUNITY HALL PERSPECTIVE VIEW FROM NORTH DIRECTION
擬議社區會堂
PROPOSED
COMMUNITY HALL
PWP ITEM NO. B191GK - COMMUNITY HALL, GENERAL OUTPATIENT CLINIC
AND MATERNAL AND CHILD HEALTH CENTRE AT CHING HONG ROAD, TSING YI
工務計劃項目編號 B191GK
青衣青康路社區會堂、普通科門診診所及母嬰健康院
構思圖ARTIST'S
IMPRESSION
DRAWING
附件
三 Annex 3
擬議母嬰健康院
PROPOSED MATERNAL
AND CHILD HEALTH
CENTRE
擬議普通科門診診所
PROPOSED GENERAL
OUTPATIENT CLINIC
視角 B 擬議普通科門診診所及母嬰健康院 - 從東北面望向大樓的透視圖
VIEW B PROPOSED GENERAL OUTPATIENT CLINIC AND MATERNAL AND CHILD HEALTH CENTRE
PERSPECTIVE VIEW FROM NORTH EASTERN DIRECTION
Annex 4
Key development parameters of the public housing development at Ching Hong Road North
Site area About 3.6 hectares
Gross floor area About 172 100 square metres
Allowable building
height 155 or 170 metres above principal datum
No. of domestic block 4
Flat number About 3 200
Anticipated population About 7 800
Commencement date In phases from 2019 to 2023
Completion date In phases from 2024 to 2029
Ancillary facilities
CH, GOPC, MCHC, Social and Recreational Centre for the Disabled (Physically Handicapped), Integrated Children and Youth Services Centre, Residential Care Home for the Elderly, Day Care Centre for the Elderly, Neighbourhood Elderly Centre, Day Nursery Centre, Family Multi-Intellectual Centre, a kindergarten (6 classrooms), retail facilities, carparks, podium gardens, children play areas, basketball courts, badminton courts, open space, etc.
- END -