9
FOR LEASE > DOWNTOWN 131 Orange Building DOWNTOWN MIXED USE BUILDING 131 N ORANGE AVE | ORLANDO, FL 32801 RED BELL PARTNERS RED BELL PARTNERS 62 W Colonial Dr. #209 Orlando, FL 32801 www.RedBellPartners.com NICK JONES MANAGING MEMBER 206-931-0526 [email protected] 131 Orange is a prominent downtown Orlando retail building in the heart of the Central Business District. The 15,000 SF single story multi-tenant retail building is located on the South East corner of Orange Ave and Jefferson St. providing a well known and visible location to both pedestrian and drive by traffic. BUILDING SF: 15,000 AVALIABLE SPACE: 1,500 - 7,300 SF RATE: Call for Details Orange & Jefferson St

FOR LEASE D OWNTOWN 131 Orange Building · FOR LEASE D OWT OW 131 Orange Building Land-mark II - 227,000 SF Residential Bldgs Office Bldgs Points of Interest Schools Amway Cornerstone

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: FOR LEASE D OWNTOWN 131 Orange Building · FOR LEASE D OWT OW 131 Orange Building Land-mark II - 227,000 SF Residential Bldgs Office Bldgs Points of Interest Schools Amway Cornerstone

For LEASE > DoWNToWN

131 Orange Buildingdowntown Mixed use building131 n orange ave | orlando, Fl 32801

RED BELL

PART

NER

S

RED BELL PARTNERS62 W Colonial Dr. #209 Orlando, FL 32801www.RedBellPartners.com

nick JonesManaging [email protected]

131 Orange is a prominent downtown Orlando retail building in the heart of the Central Business District. The 15,000 SF single story multi-tenant retail building is located on the South East corner of Orange Ave and Jefferson St. providing a well known and visible location to both pedestrian and drive by traffic.

BUILDING SF: 15,000

AVALIABLE SPACE: 1,500 - 7,300 SF

RATE: Call for Details

Orange & Jefferson St

Page 2: FOR LEASE D OWNTOWN 131 Orange Building · FOR LEASE D OWT OW 131 Orange Building Land-mark II - 227,000 SF Residential Bldgs Office Bldgs Points of Interest Schools Amway Cornerstone

For LEASE > DoWNToWN

131 Orange Building

Creative VillageMixed Use

Development

ThePlaza

- 500,000

55 West- 465 Units

The Vue375 Units

SKYHouse

320 Units

SuntrustCenter - 666,000

Amway Arena

Bank of AmericaOffice Building -

421,000 SF

RegionsBank Bldg - 246,511

Orange CountyCourthouse900,000 SF

Seacoast Bank -

130,000 SF

CornerstoneBuilding - 135,612 SF

Washington StSeacoast

Bank Bldg.

Wells FargoTower -

267,262 SF

Citrus Center - 260,751

Central Station - Future Apartment

Development

The Metro-politan

147 Units

City Parking Garage1,045

Spaces

Site

Dr. Phillips Performance Arts Center

$500MM - Opened Fall

TheSolaire-

306 Units

County Admin. Bldg.

Proposed Residential Highrise - 450 units

Planned Residential

Midrise - 325 units

The Aspire165 Units & 165,000

Central Station - 275 Units

Eola Central - 170,000 SF

Landmark I - 227,000

SF

St. James Catholic Church

St. Luke Cathed-

Magic Entertainment

Center Redevelopment

Lake Eola

Modera Apartments -

306 Units

Robinson St.

South St.

City Parking Garage 1,100

Spaces

Land-mark II - 227,000

SF

N Magnolia Ave

Jefferson St

CityHall

Florida A&M University

Residential Bldgs

Office Bldgs

Points of Interest

Schools

Orange County Library

C a p i t a l Plaza I - 243,000 SF

C a p i t a l Plaza I - 300,000 SF

Fairwinds Tower -

170,000 SF

FL Bank of Commerce

Orange County Historic Center

The Grande - 364 Units

Orange Ave

Central Blvd

Church St.

UCF Downtown7,700 StudentsOpen Fall 2019

BannerPlanned

389 Units

200k SF180 keys

Page 3: FOR LEASE D OWNTOWN 131 Orange Building · FOR LEASE D OWT OW 131 Orange Building Land-mark II - 227,000 SF Residential Bldgs Office Bldgs Points of Interest Schools Amway Cornerstone

For LEASE > DoWNToWN

131 Orange Building

Land-mark II - 227,000

SF

Residential Bldgs

Office Bldgs

Points of Interest

Schools

Amw

ay

Aren

aCorn

erst

one

Office

Bui

ldin

g

On Site Parking

28+/- Spaces

Oran

ge A

ve (2

4,00

0 +/

- AA

DT)

St. James Catholic Church

Regions Bank Office Building246,511 SF

AVALIABLE3,768 SF

St. Luke Cathederal

Jefferson St. 30+/- Surface Parking Spaces

with Smart Street Meters

3,600 SFWells Fargo

Insomnia Cookies

3,300 SF

Brewery

AVALIABLE 2,100 SFAVALIABLE 1,500 SF

Page 4: FOR LEASE D OWNTOWN 131 Orange Building · FOR LEASE D OWT OW 131 Orange Building Land-mark II - 227,000 SF Residential Bldgs Office Bldgs Points of Interest Schools Amway Cornerstone

For LEASE > DoWNToWN

131 Orange Building

City Parking Garage:

1,045 Spaces

City Parking Garage:

500 Spaces

City Parking Garage:

600 Spaces

Regions Parking Garage

28+/- Onsite Spaces

Robinson St.

Orange Ave

Washington St

Jefferson St17 Angled Metered Parks 20+/- Parallel Metered Parks

Proposed City Center Apartments450 Units

South Lot (under I-4)100 Spaces

Downtown Orlando Parking Map

Surface Parking Lot

Planned Apart-ment Develop-

ment325 Units

Page 5: FOR LEASE D OWNTOWN 131 Orange Building · FOR LEASE D OWT OW 131 Orange Building Land-mark II - 227,000 SF Residential Bldgs Office Bldgs Points of Interest Schools Amway Cornerstone

For LEASE > DoWNToWN

131 Orange Building

20+/- Parallel Metered Parks

1.5

" THIC

K B

UTC

HER

BLO

CK H

EAVY D

UTY

WATER

PR

OO

F F

ILM

. PR

OVID

E 1

-1/2

" GR

IDCAR

BO

N F

IBER

GR

ID R

EIN

F. M

ID-D

EPTH.

WELD

ED

TO

PLATE 4

"x24"x

3/8

" THK S

TEEL

PLATE T

O F

RAM

ING

SER

VIC

E S

IDE

CLIE

NT S

IDE

BAR

EQ

UIP

MENT

REFER

TO

SHEET A

4.0

20"

CEM

ENT B

OAR

D

METAL R

UNNER

ATTACHED T

O S

LAB W

ITH

1-1

/2" P

OW

ER

DR

IVEN

PIN

SW

ITH W

ASHER

S @

32"

O.C

. (TYP)

BR

ACIN

GM

ID H

EIG

HT

CO

NT. M

ETAL T

OP &

BO

TTO

M T

RACK

6" 2

0 G

A F

RAM

ING

@ 1

6" O

.C.

34" MAX

36"

8"

WELD

(2) 4

"x24x1/2

" THK.

STL. P

LATE T

O P

OST

WD

1

PT2

FR

P1

3"

17"

33"

BACK-L

IT P

ANEL.

REFER

TO

DETAIL

ANC

HO

R T

OC

ONC

SLAB

PR

OVID

E P

OW

ER

FO

R S

IGN

BO

X

4" S

TEEL P

OST S

EC

UR

ED

TO

CO

NC

. @ 4

0" O

C

CEM

ENT B

OAR

D

16 G

A 6

" METAL

STUD

S @

16" O

.C.

SER

VIC

E S

IDE

CLIE

NT S

IDE

BAR

EQ

UIP

MENT

SHEETSTEEL T

UBE

1.5

" THIC

K B

UTCHER

BLO

CK H

EAVY D

UTY

WATER

PR

OO

F F

ILM

. PR

OVID

E 1

-1/2

" GR

ID C

AR

BO

NFIB

ER

GR

ID R

EIN

F. M

ID-D

EPTH. W

ELD

ED

TO

PLATE

4"x

24"x

3/8

" THK S

TEEL P

LATE T

O F

RAM

ING

45"

8"

15"

30"

8"

3"

5"

2" O

.D. B

RASS

FO

OTR

AIL

WD

1

BACK-L

IT P

ANEL.

REFER

TO

DETAIL

METAL R

UNNER

ATTACHED

TO

SLAB W

ITH

1-1

/2" P

OW

ER

DR

IVEN

PIN

SW

ITH W

ASHER

S @

32"

O.C

. (TYP)

CO

NT. M

ETAL T

OP &

BO

TTO

M T

RACK

ANCHO

R T

OC

ONC

SLAB

PR

OVID

E P

OW

ER

FO

R S

IGN

BO

X

WELD

(2)

4"x

24x1/2

" THK.

STL. P

LATE T

OPO

ST

FR

P1

4" S

TEEL P

OST S

EC

UR

ED

TO

CO

NC

. @ 4

0" O

C

FR

P F

INIS

H IN

SID

EBAR

AR

EA

ATTACH L

ED

GER

W/

STAG

GER

ED

THR

OUG

HBO

LTS @

12" O

.C.

FIR

E R

ATED 3

/4" P

LYW

OO

D

3'-9"

1.5

" THIC

K B

UTCHER

BLO

CK H

EAVY D

UTY

WATER

PR

OO

F F

ILM

. PR

OVID

E 1

-1/2

" GR

IDCAR

BO

N F

IBER

GR

ID R

EIN

F. M

ID-D

EPTH.

WD

1M

T1

MT1

KIT

CHEN S

IDE

SER

VIC

E S

IDE

1'-1"1 '-1" 1'-1"

1.5

" THIC

K B

UTCHER

BLO

CK

HEAVY D

UTY W

ATER

PR

OO

FFIL

M. P

RO

VID

E 1

-1/2

" GR

IDCAR

BO

N F

IBER

GR

ID R

EIN

F.

MID

-DEPTH.

ATTACH L

ED

GER

W/

STAG

GER

ED

THR

OUG

HBO

LTS @

12" O

.C.

ATTACH L

ED

GER

W/

STAG

GER

ED

THR

OUG

HBO

LTS @

12" O

.C.

CEM

ENT B

OAR

D

BACK-L

IT P

ANEL.

REFER

TO

DETAIL

16 G

A 6

" METAL

STUD

S @

16" O

.C.

METAL R

UNNER

ATTACHED T

O S

LAB

WIT

H 1

-1/2

" PO

WER

DR

IVEN P

INS

WIT

H W

ASHER

S @

32" O

.C. (T

YP)

SER

VIC

E S

IDE

CLIE

NT S

IDE

BAR

EQ

UIP

MENT

REFER

TO

SHEET A

4.0

FR

P F

INIS

HIN

SID

EBAR

AR

EA

STEEL T

UBE

1.5

" THIC

K B

UTCHER

BLO

CK

HEAVY D

UTY W

ATER

PR

OO

FFIL

M. P

RO

VID

E 1

-1/2

" GR

IDCAR

BO

N F

IBER

GR

ID R

EIN

F.

MID

-DEPTH. W

ELD

ED

TO

PLATE 4

"x24"x

3/8

" THK

STEEL P

LATE T

O F

RAM

ING3'-9"

1"

3"

1"

1'-0

"

8"

3"

5"

2" O

.D. B

RASS

FO

OTR

AIL

WD

1

CAT II S

AFETY G

ALZIN

G

ADA 3

4" H

AFF

CO

UNTER

45" H

AFF

TABLE

30" H

AFF

BO

X L

IGHT. R

EFER

TO

BR

AND

ING

SHEET F

OR

SPEC

CO

UNTER

45" H

AFF

SPACE IN

BETW

EEN

TABLE L

EG

IS 3

0" M

IN

TB

2

A1.2

4

A1.2

3

A1.2

A4.0

1

3'-3

"H

C

ADJA

CENT

TENA

NT (N

IC)

ADJA

CENT

TENA

NT (N

IC)

WALL W

ITH

BR

AND D

ESIG

NS

OVER

HEAD W

ALL W

ITH

BR

AND D

ESIG

N

HC

FF1FF1

FF1 FF1FF4

FF4

FF4

FF4

FF4

FF4

FF1

FF4

FF4

FF1 FF1

FF1

FF1 FF1

FF1FF1

FF1 FF1

FF1FF1

FF1 FF1

FF1FF1

FF4

FF4

FF4

FF4

FF1

FF1

FF1

FF1

FF4

FF4

FF4

FF4

FF1

FF1

FF4

FF1

FF2

FF2

FF2

FF2

FF2

FF2

FF2

FF2

FF3

FF2

FF2

FF2

CO

UNTER

34" H

AFF

7

A1.2

STAIN

LESS S

TEEL

TO

PW

/ WELD

ED

SPLASH

GUAR

D O

N A

LL

SID

ES

REC

ESSSED

SS P

ULL

HAND

LE

RUBBER

MAID

TR

ASH

CAN 3

5G

AL (#

3958-7

3)

LIF

T-O

FF

HIN

GES (T

YP)

1/2

" UND

ER

CUT

DO

OR

3/8

" LEVER

S x

4

OPEN

3'-8"

2'-8" 8" 2" 3"1'-10 5/8"

2'-0

1/4

"

1 1

/2"

1 1

/2"

HC

ADA A

CCESSIB

LESE

AT SY

MBO

L

ADA A

CCESSIB

LE SE

ATS

NUM

BER O

F W

HEELC

HAIR

LOCATIO

NS:

REQ

UIR

ED

: 2* (1

DIN

ING

+1 C

OUN

TER)

PRO

VID

ED: 3

(2 D

ININ

G+

1 C

OUN

TER)

*AS F

LORID

A A

CCESSIB

ILITY C

ODE (5

TH E

D), 2

26.13'-0"

4'-5"

3'-0" CLEARANCE

CLEA

RANCE

2'-6

"

1 '-5"

3'-0

"

2'-6"

2'-4"

2'-6

"

2'-3"

PLA

N V

IEW

ELE

VATIO

N V

IEW

NO

TE:

ALL H

C D

ININ

G SU

RFACES M

UST

BE F

ABRIC

ATED

WIT

HTHE C

LEARANCES O

N T

HIS

GRAPHIC

.

WD

1

6" D

IA S

TAIN

LESS S

TEEL

TUBE

TO

PR

OVID

E 3

0"

CLEAR

ANCE H

OR

IZO

NTALLY

MEASUR

ED

BETW

EEN E

ACH

PO

ST

1.5

" THIC

K B

UTCHER

BLO

CK

CO

UNTER

TO

P W

ITH 4

" SQ

UAR

EED

GE D

RO

P O

VER

HEAVY D

UTY

WATER

PR

OO

F F

ILM

BETW

EEN S

LAT

AND

PLYW

OO

D. P

RO

VID

E 1

-1/2

"G

RID

CAR

BO

N F

IBER

GR

ID R

EIN

F.

MID

-DEPTH.

3/4

" FIR

E R

AED P

LYW

OO

D

FO

RM

ICA L

AM

INATE W

HIT

E

MTL P

LATE A

NCHO

RED

W/

SC

REW

TO

CO

NC

RETE

MTL B

AR

FO

R S

UPPO

RT

1'-6

"

2'-10"

16

1

5

14

1

3

12

11

10

9

8

7

6

5

4

3

2

A

B C

D

E

F G

H

I

J K L

1

1

M

2

3

4

5

6

7

8

9

10

11

12

13

1

4

15

16

1

7

17

CA

RLO

S A

NTH

ON

Y M

IND

REA

UA

R 9

2197

Revis

ions

Arc

hite

ct:

Project:

THESE PLANS ARE AND SHALL REMAIN THE PROPERTY OF ARCHIMIA, P.A. AND SHALL NOT BE SOLD OR REPRODUCED WITHOUT PRIOR WRITTEN CONSENT. THESE PLANS ARE NOT VALID WITHOUT APPROPRIATE ARCHITECT'S RAISED SEAL AND SIGNATURE AND ARE FOR BUILDING DEPARTMENT REVIEW ONLY. PLANS ARE NOT TO BE CONSTRUED AS CONSTRUCTION DOCUMENTS UNTIL ALL BUILDING

DEPARTMENT APPROVALS ARE OBTAINED. THESE PLANS MAY BE SUBJECT TO MODIFICATION AS REQUIRED BY EXISTING FIELD CONDITIONS WHICH MAY NOT BE REFLECTED IN THESE PLANS. THE ARCHITECT SHALL BE NOTIFIED OF ANY FIELD DISCREPANCIES OR OTHER CONCERNS FOR CLARIFICATION PRIOR TO BEGINNING CONSTRUCTION OR BIDDING.

Pro

ject No.

Date

:

ARCHIMIA, P.A. | AA26003423|3250 NE 1st AVE SUITE 309 | MIAMI, FL 33137 | 786.663.3056| ARCHIMIAPA.COM

INTERIOR + ARCHITETCTURE

ARCHIMIA

C:\Users\A2B\Documents\ARCHIMIA\PROJECTS\A170428 - BURGERIM\180213 VINELAND ORLANDO\DWGS\BURGERIM ORLANDO PD2.rvt

11/13/2018 5:45:21 PM

BURGERIM ORLANDO #102 @ ORANGE BUILDING

A1.2

A18

0213

131 N ORANGE AVE SUITE102,ORLANDO, FL 32801

FURNIT

URE PLA

N

11/0

6/2

018

FUR

NIT

UR

E S

CHEDULE

Type M

ark

Desc

riptio

n

FF1

METAL C

HAIR

PEW

TER

CO

LO

R (M

7771)

FF2

METAL S

WIV

EL B

AR

RSTO

OL (2

920) A

SHW

OO

DSEAT

FF3

CUSTO

M B

OO

TH (4

2"H

25"D

)

FF4

TABLE 3

0x30 B

UTCHER

-BLO

CK A

SHW

OO

D (T

64)

W/ (B

ASE O

B2222 B

LACK 2

8"H

)

1 1

/2" =

1'-0

"2

ADA B

AR

CO

UNTER

DETAIL

SECTIO

N

1 1

/2" =

1'-0

"3

BAR

CO

UNTER

DETAIL

SECTIO

N

1 1

/2" =

1'-0

"4

BACK B

AR

CO

UNTER

DETAIL

SECTIO

N 1

1/2

" = 1

'-0"

5

SHAKE S

TATIO

N C

OUNTER

DETAIL

SECTIO

N

TO

TAL S

EAT C

OUNT: 4

5 P

PL

1/4

" = 1

'-0"

1FUR

NIT

UR

E P

LAN

1" =

1'-0

"8

TR

ASH B

IN D

ETAIL

3/4

" = 1

'-0"

9

BACK-L

IT P

ANELS @

BAR

DETAIL

SECTIO

N

No.

Desc

riptio

nDate

1/2

" = 1

'-0"

6ADA A

CCESIB

LE S

EAT

1 1

/2" =

1'-0

"7

WALL C

OUNTER

DETAIL

Dig

itally sig

ned b

yCarlo

s Anth

ony

Min

dre

auDN: cn

=Carlo

sAnth

ony M

indre

au,

o=Arch

imia P

A,

ou=Registe

red

Arch

itect State of

Flo

rida,

em

ail=carlo

s@arch

im

iapa.co

m, c=

US

Date: 2

018

.12.2

012

:10:5

4 -0

5'00'

12/2

0/2

018

1

OW

NER

CHANG

ES

1

12/2

0/2

018

BLD

2018-2

1610

03/2

8/1

9

131 N

OR

AN

GE

AV

E O

RLA

ND

O F

LC

AR

LO

S A

VA

LD

ER

RA

MA

2,143 Sq. Ft.

$70k of Impact Fees Prepaid

Plans fully approved, ready for construction

1,500 Gallon Grease Trap

Patio Seating Avaliable

Suite Plan 102

Page 6: FOR LEASE D OWNTOWN 131 Orange Building · FOR LEASE D OWT OW 131 Orange Building Land-mark II - 227,000 SF Residential Bldgs Office Bldgs Points of Interest Schools Amway Cornerstone

For LEASE > DoWNToWN

131 Orange Building

ALIGN

14'-6"

1A501

1A601

A601

A601

A601

103A

103B

DIN

ING

CIRCULATIO

N

KITCHEN

/PREP

RESTROO

MRESTRO

OM

6

2

75

PM3.11.0

PM3.11.0

PM3.11.0

A6014

A601

3

12A601

10A601

11A601

3'-2"

1'-0"

13'-0"

3'-0"

10.P10.P

6'-0"

23'-0"94'-4"

61'-0"

FRA

MIN

G LEG

END

PM00.00.0(S)CT =

X

FIRE RATING

(hrs)IN

SULATIO

N (if used)

# G

YP. BD. LAYERS / SID

ESTU

D SIZE

TOP PLATE CO

NN

ECTION

TYPE,SEE LEG

END

A201

STUD

MATERIAL:

M=

METAL, W

=W

OO

D

EXISTING

WALL TO

REMAIN

NEW

WALL

NO

INSU

LATION

INSU

LATION

1

1

16'-1"

3

22

3

103A

103B

EXISTING

WALL TO

REMAIN

WALL TO

BE DEM

OLISH

ED

NEW

WALL

WA

LL PH

ASIN

G LEG

END

Respective to the phase in these views, w

alls are depicted as shown:

NO

INSU

LATION

INSU

LATION

AE

STRUCTU

RE

CEILING

LINE

(IF OCCU

RS)

FIRE BARRIERSILICO

NE SEALAN

T

F

BRACING

ASREQ

UIRED

MAX45°

CL

CL

CLIP ANG

LE ATTACHED

W/ TH

READED

FASTENER

OR PO

WD

ER ACTUATED

FASTENER

METAL STU

D

METAL KICKER

NO

TE:G

ENERAL CO

NTRACTO

R SHALL EN

GAG

E A FLORID

AREG

ISTERED SPECIALTY EN

GIN

EER TO D

ETERMIN

E METAL

STUD

GAU

GES AN

D D

ESIGN

STUD

FRAMIN

G. M

ETAL STUD

GAU

GES SH

ALL MEET RECO

MM

END

ATION

S AND

/OR

REQU

IREMEN

TS OF TH

E STUD

MFR'R AN

D ALL APPLICABLE

COD

ES. SHO

P DRAW

ING

S SHALL BE SU

BMITTED

TO TH

EARCH

ITECT FOR REVIEW

.

SCREWATTACH

MEN

T

CEILING

LINE

FLOO

R/ROO

F DECKIN

G

CEILING

LINE (SEE REFLECTED

CEILING

PLAN / FIN

ISH SCH

EDU

LE)

5/8" GYPSU

M BO

ARDBO

TH SID

ES

3 5/8" METAL STU

D

FLOO

RING

& BASE (SEE FIN

ISHPLAN

& SCH

EDU

LE)

SEALANT

BOTTO

M TRACK ATTACH

EDW

ITH PO

WD

ER ACTUATED

FASTENERS @

24" O.C.

Scale: 1 1/2" = 1'-0"

UL D

ETAIL:FIRE RATIN

G:

STC RATING

:

METAL STU

D W

ALLCO

NN

ECTION

TYPE E

METAL STU

D BRACIN

G @

48"O

.C. - ALTERNATIN

G; SEE

ATTACHM

ENT D

ETAIL

TOP TRACK

STRUCTU

RE ABOVE

(S) IN TYPE M

ARK IND

ICATESU

SE OF BATT IN

SULATIO

N

PM3.11.0

PM3.11.0(S)

CEILING

LINE (SEE REFLECTED

CEILING

PLAN / FIN

ISH SCH

EDU

LE)

5/8" GYPSU

M BO

ARDBO

TH SID

ES

3 5/8" METAL STU

D

SEALANT

BOTTO

M TRACK ATTACH

EDW

ITH PO

WD

ER ACTUATED

FASTENERS @

24" O.C.

Scale: 1 1/2" = 1'-0"

UL D

ETAIL:FIRE RATIN

G:

STC RATING

:

METAL STU

D W

ALLCO

NN

ECTION

TYPE F

TOP TRACK ATTACH

ED TO

CEILING

WITH

TEK SCREWS AT 16" O

.C.

STRUCTU

RE ABOVE

(S) IN TYPE M

ARK IND

ICATESU

SE OF BATT IN

SULATIO

N

PM3.11.0

PM3.11.0(S)

FLOO

RING

& BASE

(SEE FINISH

PLAN &

SCHED

ULE)

PROJECT

NO

RTH

A R C H I T E C T U R E + I N T E R I O R S

Written dimensions on these drawings shall have precedence over scaled dimensions. Contractor shall verify and be responsible for all dimensions and conditions on the job. Scott + Cormia Architecture and Interiors, LLC must be notified immediately in writing of any variation from the dimensions and conditions shown on these drawings. Field verify all conditions prior to laying out or fabricating associated work. Bringto the architect's attention any deviation from designed conditions and field conditions prior to ordering materials and installing work, and cooperate with architect to modify such conditions at no additional cost to the owner, architect or architect's consultants. Shop details must be submitted to the architect's office and reviewed by the architect prior to ordering materials, fabrication and delivery to the job site, unlessotherwise provided for under the specific contractual agreement between the architect and client. Scott + Cormia Architecture and Interiors, LLC expressly reserves its common law copyright and other property rights in these documents. These documents are not to be reproduced, changed, or copied in any form or manner whatsoever, nor are they to be assigned to a third party without first obtaining the writtenpermission and written consent of Scott + Cormia Architecture and Interiors, LLC In the event of unauthorized use of these documents by a third party, the third party shall hold Scott + Cormia Architecture and Interiors, LLC harmless and agrees to remunerate Scott + Cormia Architecture and Interiors, LLC for such use in an amount equal to the original fee for the original documents, plus legal fees, court costs,collection fees and other costs.

CHECKED

BY :

DRAW

N BY :

Scott + Corm

ia Architecture and Interiors, LLC429 S. Keller Road, Suite 200O

rlando, Florida 32810t. 407-660-2766

AA26002980f. 407-875-3276

ww

w.scottcorm

ia.com

Matthew

D. Corm

ia, AIAFL. REG

. # AR92227

PROJECT #

:

© copyright 2016

All Rights Reserved

p r o j e c t

s e a l

s u b m i s s i o n s

d r a w i n g i n f o

s h e e t n u m b e r

c l i e n t a p p r o v a l

SIGN

ATURE SIG

NIFIES CLIEN

T REVIEW AN

D APPRO

VAL OF D

RAWIN

GS AS SH

OW

N.

DATE:

CLIENT:

IF THIS SH

EET DO

ES NO

T MEASU

RE TO 24 x 36, IT H

AS BEEN EN

LARGED

OR RED

UCED

. ADJU

ST SCALE ACCORD

ING

LY.TH

IS SHEET IS PART O

F THE D

OCU

MEN

T SET AND

SHO

ULD

NO

T BE SEPARATED. ALW

AYS REFER TO TH

E LATEST DRAW

ING

SET.

IF THIS SH

EET DO

ES NO

T MEASU

RE TO 24 x 36, IT H

AS BEEN EN

LARGED

OR RED

UCED

. ADJU

ST SCALE ACCORD

ING

LY.TH

IS SHEET IS PART O

F THE D

OCU

MEN

T SET AND

SHO

ULD

NO

T BE SEPARATED. ALW

AYS REFER TO TH

E LATEST DRAW

ING

SET.

2017 JAN 10

2/7/2017 1:36:24 PM

A100

MD

C

16064

DEM

OLITIO

N PLAN

, CON

STRUCTIO

NPLAN

& D

ETAILS

NC

FOR

PER

MIT 131 N ORANGE AVENUE, SUITE 103

ORLANDO, FLORIDA 32801

HUBBLY BUBBLYTENANT BUILD-OUT

S#D

ATED

ESCRIPTION

12016 JU

N 10

OW

NER REVIEW

22016 SEP 12

PERMIT SU

BMITTAL

42017 JAN

10CO

MM

ENT RESPO

NSE

SCALE: 1/4" = 1'-0"

FLOO

R PLAN1

FRA

MIN

G P

LAN

NO

TES1

DIM

ENSIO

NS ARE TO

FACE OF FIN

ISHED

WALL, U

NO

.2

COO

RDIN

ATE STUD

PLACEMEN

T WITH

LIGH

T FIXTURES,

COM

MU

NICATIO

N D

EVICES, ETC.3

ALL WO

OD

FRAMIN

G IN

CON

TACT WITH

CON

CRETE OR M

ASON

RYSH

ALL BE PRESSURE TREATED

.4

ALL PARTITION

S NO

T LABELED O

N TH

E PLANS SH

ALL BEPARTITIO

N TYPE PM

3.11.0 WITH

CON

NECTIO

N TYPE E, U

NO

.5

ALL FURRIN

G N

OT LABELED

ON

THE PLAN

S SHALL BE FU

RRING

TYPE P52.6

DASH

ED LIN

ES REPRESENT ITEM

S ABOVE. REFER TO

REFLECTEDCEILIN

G PLAN

ON

SHEET A201.

7D

OO

R AND

WIN

DO

W TAG

S SHO

W N

OM

INAL SIZES. REFER TO

DO

OR AN

D W

IND

OW

SCHED

ULES/LEG

END

S FOR M

ORE

INFO

RMATIO

N.

8REFER TO

SHEET A501 FO

R RECESSED SPECIALTY EQ

UIPM

ENT

LOCATIO

NS.

SCALE: 1/4" = 1'-0"

DEM

OLITIO

N PLAN

2

1D

EMO

LITION

TO O

CCUR U

P TO D

IMEN

SION

IND

ICATED. PREPARE

EDG

E OF EXISTIN

G PARTITIO

N TO

BE CON

NECTED

WITH

NEW

PARTITION

.2

EXISTING

PLUM

BING

FIXTURES TO

BE REMO

VED AN

D SALVAG

EDFO

R REUSE. CU

T AND

CAP PLUM

BING

LINES BELO

W FIN

ISHED

FLOO

R. PATCH FLO

OR FO

R NEW

FINISH

ES. FIXTURES TH

AT AREN

OT BEIN

G REU

SED SH

ALL BE RETURN

ED TO

OW

NER O

RD

ISPOSED

OF.

3EXISTIN

G D

OO

R & FRAM

E TO BE REM

OVED

AND

SALVAGED

FOR

REUSE IN

NEW

RESTROO

MS.

DEM

OLITIO

N N

OTES

1D

EMO

LITION

WO

RK IS TO BE D

ON

E IN AD

HEREN

CE TO TH

ELAN

DLO

RD'S REQ

UIREM

ENTS FO

R TIME AN

D D

URATIO

N O

FH

EAVY NO

ISE. CON

TRACTOR TO

COO

RDIN

ATE WITH

FACILITYABO

UT H

OU

RS OF W

ORK, AN

D U

SE OF O

CCUPIED

SPACE.2

SOM

E MIN

OR D

EMO

LITION

IS NECESSARY FO

R NEW

CON

STRUCTIO

N TH

AT IS NO

T NO

TED IN

THIS PLAN

.3

REMO

VAL PROCED

URES O

F THE EXISTIN

G FIN

ISH CAN

VARYD

EPEND

ING

ON

THE CO

ND

ITION

OF TH

E EXISTING

SUBSTRATE.

NO

TIFY ARCHITECT &

OW

NER IF TH

ERE IS ANY D

ETRIMEN

TALCO

ND

ITION

SEEN BEYO

ND

THE SCO

PE OF W

ORK.

4CO

NCTRACTO

R TO PRO

TECT IN PLACE EXISTIN

G U

TILITIES OR

REPAIR AS NEED

ED FO

R NEW

CON

STRUCTIO

N.

5CO

NTRACTO

R TO REPAIR AN

Y DAM

AGE TO

EXISTING

TENAN

TFIRE RATED

WALLS O

R FIREPROO

FING

AS NECESSARY.

6ITEM

S FOR RE-U

SE TO BE CAREFU

LLY REMO

VED AN

D STO

RED AS

DIRECTED

BY THE LAN

DLO

RD.

7CAREFU

LLY REMO

VE ALL DO

ORS, FRAM

ES & H

ARDW

ARE, ASSH

OW

N D

ASHED

, FOR PO

TENTIAL RE-U

SE. DO

ORS ARE TO

BESTAG

ED IN

AREA CLEAN &

FREE OF CO

NSTRU

CTION

DEBRIS.

RETAIN ALL U

NU

SED D

OO

RS, FRAMES &

HARD

WARE PER

LAND

LORD

'S DISCRETIO

N.

8CO

NFIRM

WID

TH &

HEIG

HT O

F DO

ORS AN

D H

ARDW

ARE; ALERTARCH

ITECT OF AN

Y DISCREPAN

CIES.9

IT SHALL BE TH

E CON

TRACTOR'S RESPO

NSIBILITY TO

PROTECT

ALL EXISTING

BUILD

ING

AREAS AND

FINISH

ES FROM

DAM

AGE &

SHALL, AT H

IS EXPENSE, RESTO

RE TO O

RIGIN

AL CON

DITIO

N AN

YAREAS O

R FINISH

ES DAM

AGED

BY HIS W

ORK.

10ELECTRICAL O

UTLETS &

SWITCH

ES THAT O

CCUR IN

WALLS TO

BE REMO

VED SH

ALL HAVE TH

E WIRIN

G PU

LLED BACK TO

THE

J-BOX O

R PANEL.

11PATCH

& REPAIR W

ALLS WH

ICH ARE TO

REMAIN

WH

ENAD

JACENT PERPEN

DICU

LAR WALLS ARE REM

OVED

.12

PATCH &

REPAIR EXISTING

WALLS TO

REMAIN

WH

EN M

ILLWO

RKIS REM

OVED

.13

WH

ERE NEW

FLOO

RING

IS SCHED

ULED

, REMO

VE EXISTING

FLOO

R FINISH

AND

PREPARE SURFACE FO

R INSTALLATIO

N O

FN

EW FLO

ORIN

G, U

NO

.14

CON

TRACTOR TO

VERIFY EXISTING

CON

DITIO

NS AN

DD

IMEN

SION

S PRIOR TO

BEGIN

NIN

G W

ORK. D

IMEN

SION

S SHO

WN

ON

DEM

OLITIO

N D

RAWIN

GS ARE APPRO

XIMATE.

15REFER TO

MECH

ANICAL, ELECTRICAL, PLU

MBIN

G AN

DSTRU

CTURAL D

RAWIN

GS FO

R ADD

ITION

AL DEM

OLITIO

NIN

FORM

ATION

.16

AT ALL TIMES, M

AINTAIN

ACCESS TO EXITS IN

ALL AREAS OF

CON

STRUCTIO

N.

17CAREFU

LLY REMO

VE ALL LIGH

TING

AND

ASSOCIATED

HARD

WARE, RETAIN

FOR PO

TENTIAL RE-U

SE. LIGH

TING

FIXTURES ARE TO

BE STAGED

IN AREA CLEAN

& FREE O

FCO

NSTRU

CTION

DEBRIS. RETAIN

ALL UN

USED

FIXTURES AN

DASSO

CIATED H

ARDW

ARE PER LAND

LORD

'S DISCRETIO

N.

LAND

LORD

TO PRO

VIDE D

IRECTION

ON

PERMAN

ENT STO

RAGE

LOCATIO

N O

F UN

USED

FIXTURES

FLOO

R P

LAN

NO

TES1

FURN

ITURE PRO

VIDED

BY TENAN

T & SH

OW

N FO

R REFERENCE

ON

LY, UN

O. IT IS TH

E RESPON

SIBILITY OF TH

E FURN

ITURE

VEND

OR TO

FIELD VERIFY AN

D ASSU

RE THAT A M

INIM

UM

OF 44"

CLEAR AISLE ACCESS IS PROVID

ED TH

ROU

GH

OU

T.2

KITCHEN

EQU

IPMEN

T SHO

WN

FOR REFEREN

CE ON

LY.3

ALL EQU

IPMEN

T OW

NER PRO

VIDED

AND

OW

NER IN

STALLED.

SCALE: 1/2" = 1'-0"

TOP PLATE CO

NN

ECTION

TYPE LEGEN

DSCALE: 3" =

1'-0"

TOP O

F WALL CO

NN

ECTION

(CT-E)3

1,500 Sq. Ft.

2nd Gen Restaurant Space

Patio Seating Avaliable

Suite Plan 103

Page 7: FOR LEASE D OWNTOWN 131 Orange Building · FOR LEASE D OWT OW 131 Orange Building Land-mark II - 227,000 SF Residential Bldgs Office Bldgs Points of Interest Schools Amway Cornerstone

For LEASE > DoWNToWN

131 Orange Building

3,768 Sq. Ft.

160 Seats

Full Bar Setup

1,500 Gallon Grease Trap

Patio Seating Avaliable

Suite Plan 104

Page 8: FOR LEASE D OWNTOWN 131 Orange Building · FOR LEASE D OWT OW 131 Orange Building Land-mark II - 227,000 SF Residential Bldgs Office Bldgs Points of Interest Schools Amway Cornerstone

For LEASE > DoWNToWN

131 Orange Building

Site

Washington St Orange AveJefferson St

Robinson St.

Church St.

Pine St.

Central Blvd.

Garland Ave

Magnolia Ave

Closed * Thurs - Sunday 10 PM - 4 AM*Event Nights 10 PM - 4 AM

Always Open

Downtown Orlando Nightlife Road Closures

Page 9: FOR LEASE D OWNTOWN 131 Orange Building · FOR LEASE D OWT OW 131 Orange Building Land-mark II - 227,000 SF Residential Bldgs Office Bldgs Points of Interest Schools Amway Cornerstone

For LEASE > DoWNToWN

131 Orange Building

SunRail

4

50

408

Oran

ge Bl

osso

m Trl

Colonial Dr

Mills

Ave

East-West Expwy

17

92

17

92

441

DOWNTOWNORLANDOAmway

Center

N

07.31.15 130330.00

CREATIVE VILLAGE

LIVINGSTON ST.

PARR

AMO

RE A

VE.

INTE

RSTA

TE 4

LYNX CENTRAL STATION

W COLONIAL DR.

CONCORD ST.

TERR

Y AV

E. (

NEW

)

CONCEPTUAL MASTER PLAN

CONTENTS TABLE

OFFICE/CREATIVE EDUCATION RESIDENTIAL HOTEL FLEX/TBD

ANTICIPATED DEVELOPMENT

PROGRAM

- Office/Creative 900K-1,200K SF

- Education 500K-800K SF

- Residential 1,200-1,500 Units

- Commercial 125K-150K SF

- Hotel 150-225 Rooms

LIVINGSTON ST.

EducationalOffice / CreativeResidentialHotelFlex / TBDExisting Community Assets

Conceptual MasterLand Use Plan

OCPS

PS-

8

UCF DowntownThe University of Central Florida (UCF), in partnership with Valencia College, will create a best-in-the-nation campus for digital media, communication, public services and health-related programs located at Creative Village. The partnership will serve approximately 7,700 students on a new campus in Downtown Orlando. UCF, the second largest public university in the nation, will relocate 14 academic programs, in addition to student support services, creating a vibrant, full-service campus in the heart of Downtown Orlando. Valencia College will offer general education, job training and a world-class culinary program. To learn more, visit www.ucf.edu/downtown.

TimelineThe initial phase of infrastructure development will be completed in 2016. Vertical construction will begin in 2017, with at least seven new projects opening in 2018 and 2019, representing over $350 million in development activity.

> 165,000 square foot UCF/Valencia academic building > Renovation of the 115,000 square foot UCF Florida Interactive Entertainment Academy

(FIEA) building> 600-bed student housing development with UCF student support services, Valencia

College culinary facility, 600-space parking garage and ground floor retail> 116-unit mixed-income apartment community> 250-unit market rate apartment project> Orange County Public School’s new PS-8 school > Significant renovation of an existing property into a full service 290-room Marriott Hotel

N

May 2016

Project OverviewWhen complete, this high quality, sustainable neighborhood development will represent a diverse and dynamic mix of uses including up to 1,200,000 square feet of office/creative space, 750,000 square feet of higher education space, 1,500 residential units, 1,500 student housing beds, 150,000 square feet of retail/commercial space and 225 hotel rooms. At build-out, Creative Village encompasses over $1 billion in new development.

Creative Village is centered around education and transit, including SunRail. It will be the largest transit oriented development project in Central Florida, significantly expanding educational opportunities in Downtown Orlando (i.e., UCF and Valencia). Creative Village will showcase best practices in responsible development and will be one of the largest LEED-ND developments in Florida.

Connectivity

Proximity to SunRail and LYNX Central Station provide Creative Village and Parramore with improved regional access to jobs, education, social services, government facilities, entertainment, civic and cultural assets and many other opportunities. Creative Village is adjacent to LYNX Central Station, the primary station in Downtown Orlando for the SunRail commuter rail line. As of Fall 2016, LYNX will expand the LYMMO bus circulator system to serve Creative Village, Parramore and the west side of Downtown Orlando.

SunRail

4

50

408

Oran

ge Bl

osso

m Trl

Colonial Dr

Mills

Ave

East-West Expwy

17

92

17

92

441

DOWNTOWNORLANDOAmway

Center

N

07.31.15 130330.00

CREATIVE VILLAGE

LIVINGSTON ST.

PARR

AMO

RE A

VE.

INTE

RSTA

TE 4

LYNX CENTRAL STATION

W COLONIAL DR.

CONCORD ST.

TERR

Y AV

E. (

NEW

)

CONCEPTUAL MASTER PLAN

CONTENTS TABLE

OFFICE/CREATIVE EDUCATION RESIDENTIAL HOTEL FLEX/TBD

ANTICIPATED DEVELOPMENT

PROGRAM

- Office/Creative 900K-1,200K SF

- Education 500K-800K SF

- Residential 1,200-1,500 Units

- Commercial 125K-150K SF

- Hotel 150-225 Rooms

LIVINGSTON ST.

EducationalOffice / CreativeResidentialHotelFlex / TBDExisting Community Assets

Conceptual MasterLand Use Plan

OCPS

PS-

8

UCF DowntownThe University of Central Florida (UCF), in partnership with Valencia College, will create a best-in-the-nation campus for digital media, communication, public services and health-related programs located at Creative Village. The partnership will serve approximately 7,700 students on a new campus in Downtown Orlando. UCF, the second largest public university in the nation, will relocate 14 academic programs, in addition to student support services, creating a vibrant, full-service campus in the heart of Downtown Orlando. Valencia College will offer general education, job training and a world-class culinary program. To learn more, visit www.ucf.edu/downtown.

TimelineThe initial phase of infrastructure development will be completed in 2016. Vertical construction will begin in 2017, with at least seven new projects opening in 2018 and 2019, representing over $350 million in development activity.

> 165,000 square foot UCF/Valencia academic building > Renovation of the 115,000 square foot UCF Florida Interactive Entertainment Academy

(FIEA) building> 600-bed student housing development with UCF student support services, Valencia

College culinary facility, 600-space parking garage and ground floor retail> 116-unit mixed-income apartment community> 250-unit market rate apartment project> Orange County Public School’s new PS-8 school > Significant renovation of an existing property into a full service 290-room Marriott Hotel

N

May 2016

Project OverviewWhen complete, this high quality, sustainable neighborhood development will represent a diverse and dynamic mix of uses including up to 1,200,000 square feet of office/creative space, 750,000 square feet of higher education space, 1,500 residential units, 1,500 student housing beds, 150,000 square feet of retail/commercial space and 225 hotel rooms. At build-out, Creative Village encompasses over $1 billion in new development.

Creative Village is centered around education and transit, including SunRail. It will be the largest transit oriented development project in Central Florida, significantly expanding educational opportunities in Downtown Orlando (i.e., UCF and Valencia). Creative Village will showcase best practices in responsible development and will be one of the largest LEED-ND developments in Florida.

Connectivity

Proximity to SunRail and LYNX Central Station provide Creative Village and Parramore with improved regional access to jobs, education, social services, government facilities, entertainment, civic and cultural assets and many other opportunities. Creative Village is adjacent to LYNX Central Station, the primary station in Downtown Orlando for the SunRail commuter rail line. As of Fall 2016, LYNX will expand the LYMMO bus circulator system to serve Creative Village, Parramore and the west side of Downtown Orlando.

SunRail

4

50

408

Oran

ge B

losso

m Tr

l

Colonial Dr

Mill

s Ave

East-West Expwy

17

92

17

92

441

DOWNTOWNORLANDOAmway

Center

N

07.31.15 130330.00

CREATIVE VILLAGE

LIVINGSTON ST.

PARRAM

ORE

AVE.

INTE

RST

ATE

4

LYNX CENTRAL STATION

W COLONIAL DR.

CONCORD ST.

TERRY

AVE.

(N

EW)

CONCEPTUAL MASTER PLAN

CONTENTS TABLE

OFFICE/CREATIVE EDUCATION RESIDENTIAL HOTEL FLEX/TBD

ANTICIPATED DEVELOPMENT

PROGRAM

- Office/Creative 900K-1,200K SF

- Education 500K-800K SF

- Residential 1,200-1,500 Units

- Commercial 125K-150K SF

- Hotel 150-225 Rooms

LIVINGSTON ST.

EducationalOffice / CreativeResidentialHotelFlex / TBDExisting Community Assets

Conceptual MasterLand Use Plan

OCP

S PS

-8

UCF DowntownThe University of Central Florida (UCF), in partnership with Valencia College, will create a best-in-the-nation campus for digital media, communication, public services and health-related programs located at Creative Village. The partnership will serve approximately 7,700 students on a new campus in Downtown Orlando. UCF, the second largest public university in the nation, will relocate 14 academic programs, in addition to student support services, creating a vibrant, full-service campus in the heart of Downtown Orlando. Valencia College will offer general education, job training and a world-class culinary program. To learn more, visit www.ucf.edu/downtown.

TimelineThe initial phase of infrastructure development will be completed in 2016. Vertical construction will begin in 2017, with at least seven new projects opening in 2018 and 2019, representing over $350 million in development activity.

> 165,000 square foot UCF/Valencia academic building > Renovation of the 115,000 square foot UCF Florida Interactive Entertainment Academy

(FIEA) building> 600-bed student housing development with UCF student support services, Valencia

College culinary facility, 600-space parking garage and ground floor retail> 116-unit mixed-income apartment community> 250-unit market rate apartment project> Orange County Public School’s new PS-8 school > Significant renovation of an existing property into a full service 290-room Marriott Hotel

N

May 2016

Project OverviewWhen complete, this high quality, sustainable neighborhood development will represent a diverse and dynamic mix of uses including up to 1,200,000 square feet of office/creative space, 750,000 square feet of higher education space, 1,500 residential units, 1,500 student housing beds, 150,000 square feet of retail/commercial space and 225 hotel rooms. At build-out, Creative Village encompasses over $1 billion in new development.

Creative Village is centered around education and transit, including SunRail. It will be the largest transit oriented development project in Central Florida, significantly expanding educational opportunities in Downtown Orlando (i.e., UCF and Valencia). Creative Village will showcase best practices in responsible development and will be one of the largest LEED-ND developments in Florida.

Connectivity

Proximity to SunRail and LYNX Central Station provide Creative Village and Parramore with improved regional access to jobs, education, social services, government facilities, entertainment, civic and cultural assets and many other opportunities. Creative Village is adjacent to LYNX Central Station, the primary station in Downtown Orlando for the SunRail commuter rail line. As of Fall 2016, LYNX will expand the LYMMO bus circulator system to serve Creative Village, Parramore and the west side of Downtown Orlando.

SunRail

4

50

408

Oran

ge Bl

osso

m Trl

Colonial Dr

Mills

Ave

East-West Expwy

17

92

17

92

441

DOWNTOWNORLANDOAmway

Center

N

07.31.15 130330.00

CREATIVE VILLAGE

LIVINGSTON ST.

PARR

AMO

RE A

VE.

INTE

RSTA

TE 4

LYNX CENTRAL STATION

W COLONIAL DR.

CONCORD ST.

TERR

Y AV

E. (

NEW

)

CONCEPTUAL MASTER PLAN

CONTENTS TABLE

OFFICE/CREATIVE EDUCATION RESIDENTIAL HOTEL FLEX/TBD

ANTICIPATED DEVELOPMENT

PROGRAM

- Office/Creative 900K-1,200K SF

- Education 500K-800K SF

- Residential 1,200-1,500 Units

- Commercial 125K-150K SF

- Hotel 150-225 Rooms

LIVINGSTON ST.

EducationalOffice / CreativeResidentialHotelFlex / TBDExisting Community Assets

Conceptual MasterLand Use Plan

OCPS

PS-

8

UCF DowntownThe University of Central Florida (UCF), in partnership with Valencia College, will create a best-in-the-nation campus for digital media, communication, public services and health-related programs located at Creative Village. The partnership will serve approximately 7,700 students on a new campus in Downtown Orlando. UCF, the second largest public university in the nation, will relocate 14 academic programs, in addition to student support services, creating a vibrant, full-service campus in the heart of Downtown Orlando. Valencia College will offer general education, job training and a world-class culinary program. To learn more, visit www.ucf.edu/downtown.

TimelineThe initial phase of infrastructure development will be completed in 2016. Vertical construction will begin in 2017, with at least seven new projects opening in 2018 and 2019, representing over $350 million in development activity.

> 165,000 square foot UCF/Valencia academic building > Renovation of the 115,000 square foot UCF Florida Interactive Entertainment Academy

(FIEA) building> 600-bed student housing development with UCF student support services, Valencia

College culinary facility, 600-space parking garage and ground floor retail> 116-unit mixed-income apartment community> 250-unit market rate apartment project> Orange County Public School’s new PS-8 school > Significant renovation of an existing property into a full service 290-room Marriott Hotel

N

May 2016

Project OverviewWhen complete, this high quality, sustainable neighborhood development will represent a diverse and dynamic mix of uses including up to 1,200,000 square feet of office/creative space, 750,000 square feet of higher education space, 1,500 residential units, 1,500 student housing beds, 150,000 square feet of retail/commercial space and 225 hotel rooms. At build-out, Creative Village encompasses over $1 billion in new development.

Creative Village is centered around education and transit, including SunRail. It will be the largest transit oriented development project in Central Florida, significantly expanding educational opportunities in Downtown Orlando (i.e., UCF and Valencia). Creative Village will showcase best practices in responsible development and will be one of the largest LEED-ND developments in Florida.

Connectivity

Proximity to SunRail and LYNX Central Station provide Creative Village and Parramore with improved regional access to jobs, education, social services, government facilities, entertainment, civic and cultural assets and many other opportunities. Creative Village is adjacent to LYNX Central Station, the primary station in Downtown Orlando for the SunRail commuter rail line. As of Fall 2016, LYNX will expand the LYMMO bus circulator system to serve Creative Village, Parramore and the west side of Downtown Orlando.

SunRail

4

50

408

Oran

ge Bl

osso

m Trl

Colonial Dr

Mills

Ave

East-West Expwy

17

92

17

92

441

DOWNTOWNORLANDOAmway

Center

N

07.31.15 130330.00

CREATIVE VILLAGE

LIVINGSTON ST.

PARR

AMO

RE A

VE.

INTE

RSTA

TE 4

LYNX CENTRAL STATION

W COLONIAL DR.

CONCORD ST.

TERR

Y AV

E. (

NEW

)

CONCEPTUAL MASTER PLAN

CONTENTS TABLE

OFFICE/CREATIVE EDUCATION RESIDENTIAL HOTEL FLEX/TBD

ANTICIPATED DEVELOPMENT

PROGRAM

- Office/Creative 900K-1,200K SF

- Education 500K-800K SF

- Residential 1,200-1,500 Units

- Commercial 125K-150K SF

- Hotel 150-225 Rooms

LIVINGSTON ST.

EducationalOffice / CreativeResidentialHotelFlex / TBDExisting Community Assets

Conceptual MasterLand Use Plan

OCPS

PS-

8

UCF DowntownThe University of Central Florida (UCF), in partnership with Valencia College, will create a best-in-the-nation campus for digital media, communication, public services and health-related programs located at Creative Village. The partnership will serve approximately 7,700 students on a new campus in Downtown Orlando. UCF, the second largest public university in the nation, will relocate 14 academic programs, in addition to student support services, creating a vibrant, full-service campus in the heart of Downtown Orlando. Valencia College will offer general education, job training and a world-class culinary program. To learn more, visit www.ucf.edu/downtown.

TimelineThe initial phase of infrastructure development will be completed in 2016. Vertical construction will begin in 2017, with at least seven new projects opening in 2018 and 2019, representing over $350 million in development activity.

> 165,000 square foot UCF/Valencia academic building > Renovation of the 115,000 square foot UCF Florida Interactive Entertainment Academy

(FIEA) building> 600-bed student housing development with UCF student support services, Valencia

College culinary facility, 600-space parking garage and ground floor retail> 116-unit mixed-income apartment community> 250-unit market rate apartment project> Orange County Public School’s new PS-8 school > Significant renovation of an existing property into a full service 290-room Marriott Hotel

N

May 2016

Project OverviewWhen complete, this high quality, sustainable neighborhood development will represent a diverse and dynamic mix of uses including up to 1,200,000 square feet of office/creative space, 750,000 square feet of higher education space, 1,500 residential units, 1,500 student housing beds, 150,000 square feet of retail/commercial space and 225 hotel rooms. At build-out, Creative Village encompasses over $1 billion in new development.

Creative Village is centered around education and transit, including SunRail. It will be the largest transit oriented development project in Central Florida, significantly expanding educational opportunities in Downtown Orlando (i.e., UCF and Valencia). Creative Village will showcase best practices in responsible development and will be one of the largest LEED-ND developments in Florida.

Connectivity

Proximity to SunRail and LYNX Central Station provide Creative Village and Parramore with improved regional access to jobs, education, social services, government facilities, entertainment, civic and cultural assets and many other opportunities. Creative Village is adjacent to LYNX Central Station, the primary station in Downtown Orlando for the SunRail commuter rail line. As of Fall 2016, LYNX will expand the LYMMO bus circulator system to serve Creative Village, Parramore and the west side of Downtown Orlando.

SunRail

4

50

408

Oran

ge Bl

osso

m Trl

Colonial Dr

Mills

Ave

East-West Expwy

17

92

17

92

441

DOWNTOWNORLANDOAmway

Center

N

07.31.15 130330.00

CREATIVE VILLAGE

LIVINGSTON ST.

PARR

AMO

RE A

VE.

INTE

RSTA

TE 4

LYNX CENTRAL STATION

W COLONIAL DR.

CONCORD ST.

TERR

Y AV

E. (

NEW

)

CONCEPTUAL MASTER PLAN

CONTENTS TABLE

OFFICE/CREATIVE EDUCATION RESIDENTIAL HOTEL FLEX/TBD

ANTICIPATED DEVELOPMENT

PROGRAM

- Office/Creative 900K-1,200K SF

- Education 500K-800K SF

- Residential 1,200-1,500 Units

- Commercial 125K-150K SF

- Hotel 150-225 Rooms

LIVINGSTON ST.

EducationalOffice / CreativeResidentialHotelFlex / TBDExisting Community Assets

Conceptual MasterLand Use Plan

OCPS

PS-

8

UCF DowntownThe University of Central Florida (UCF), in partnership with Valencia College, will create a best-in-the-nation campus for digital media, communication, public services and health-related programs located at Creative Village. The partnership will serve approximately 7,700 students on a new campus in Downtown Orlando. UCF, the second largest public university in the nation, will relocate 14 academic programs, in addition to student support services, creating a vibrant, full-service campus in the heart of Downtown Orlando. Valencia College will offer general education, job training and a world-class culinary program. To learn more, visit www.ucf.edu/downtown.

TimelineThe initial phase of infrastructure development will be completed in 2016. Vertical construction will begin in 2017, with at least seven new projects opening in 2018 and 2019, representing over $350 million in development activity.

> 165,000 square foot UCF/Valencia academic building > Renovation of the 115,000 square foot UCF Florida Interactive Entertainment Academy

(FIEA) building> 600-bed student housing development with UCF student support services, Valencia

College culinary facility, 600-space parking garage and ground floor retail> 116-unit mixed-income apartment community> 250-unit market rate apartment project> Orange County Public School’s new PS-8 school > Significant renovation of an existing property into a full service 290-room Marriott Hotel

N

May 2016

Project OverviewWhen complete, this high quality, sustainable neighborhood development will represent a diverse and dynamic mix of uses including up to 1,200,000 square feet of office/creative space, 750,000 square feet of higher education space, 1,500 residential units, 1,500 student housing beds, 150,000 square feet of retail/commercial space and 225 hotel rooms. At build-out, Creative Village encompasses over $1 billion in new development.

Creative Village is centered around education and transit, including SunRail. It will be the largest transit oriented development project in Central Florida, significantly expanding educational opportunities in Downtown Orlando (i.e., UCF and Valencia). Creative Village will showcase best practices in responsible development and will be one of the largest LEED-ND developments in Florida.

Connectivity

Proximity to SunRail and LYNX Central Station provide Creative Village and Parramore with improved regional access to jobs, education, social services, government facilities, entertainment, civic and cultural assets and many other opportunities. Creative Village is adjacent to LYNX Central Station, the primary station in Downtown Orlando for the SunRail commuter rail line. As of Fall 2016, LYNX will expand the LYMMO bus circulator system to serve Creative Village, Parramore and the west side of Downtown Orlando.

600Student

Beds

150,000 SF Educational Bldg.

Phase 1

296Key

Marriott

600Space Garage

408Apartments

256 Apartments

Only a 6 minute walk to the Property!