1
26.04.2005
PRESENTATION BY THE CHAIRMAN NATIONAL HIGHWAY AUTHORITY
FOR PAKISTAN DEVELOPMENT FORUM-2005
ROADS NETWORK DEVELOPMENT
2
MODEMODE PASSENGERSPASSENGERS FREIGHT *FREIGHT *
ROADS 90% 107,000
RAIL 8% 5,000
AIR 2% 25
* NOTE:FREIGHT IN MILLION TON KM PER ANNUM
TRAFFIC LOAD SHARE IN PAKISTAN
3ROAD TRANSPORT DATACOMPARISON
UNIT 1947 2005
TOTAL ROADS KM 50,367 258,000 +
REGD VEHICLES NO 21,209 5,000,000 +
MOTORWAYS KM NIL 457
NAT HIGHWAYS KM NIL 9031
DENSITY KM/KM² 0.06 0.32
4
3.07
1.62 1.701.62
1.04 1.00
0.65 0.68
0.20 0.32 0.23 0.17 0.15 0.08
0.00
0.50
1.00
1.50
2.00
2.50
3.00
3.50Ja
pan
Fran
ce
Hun
gary UK
Ital
y
Indi
a
USA
Spai
n
Mal
aysi
a
Paki
stan
Bra
zil
Indo
nesi
a
Chi
na
Arg
enti
na
Road Density
Roa
d Le
ngth
/ S
q.K
m o
f A
rea
Countries
ROAD DENSITYCOMPARISON
MISSION STATEMENTMISSION STATEMENT
NHA is a relatively new institution established under an Act of the Parliament in 1991. It’s mission statement is
TO SECURE DELIVERY OF EFFICIENT RELIABLE SAFE AND ENVIRONMENT FRIENDLY NATIONAL HIGHWAY NETWORK WITH THE VIEW TO IMPROVE QUALITY OF LIFE IN PAKISTAN
5
6NHA - FIRST DECADETHRUST WAS ON CONSTRUCTION OF NEW ROADS / HIGHWAYS AND
DUALIZATION OF EXISTING HIGHWAYS PARTICULARLY N-5
NHA - SECOND DECADENHA HAS MATURED AND GAINED RECOGNITION BECAUSE OF
SIGNIFICANT DEVELOPMENT AND IMPROVEMENT OF PAKISTAN’S INTER-
PROVINCIAL NATIONAL HIGHWAY NETWORK. NHA’S CURRENT YEAR’S
PSDP ALLOCATION IS Rs 17 BILLION PLUS
CURRENT THRUST IS ON CONSTRUCTION OF PROJECTS LINKING REMOTE
AREAS PARTCULARLY ON WEST OF RIVER INDUS & PROVISION OF
LINKAGES BETWEEN GWADAR AND CENTRAL ASIA
THRUST IS ALSO ON MAINTENANCE, OPERATION AND PRESERVATION OF
ROAD ASSETS FOR HIGH QUALITY SERVICE
7
K A Z A K H S T A N
UZBEKISTAN
TURKMENISTAN
P A K
I S T
A N
AFGHANIS
TAN
I R A NI N D I A
C H I N AKYRGYZSTAN
TAJIKISTANGEORGIAB L A C K S E A
T U R K E Y
UKRAINE
AZARBIJANARMINIA
C A S P I A N S E A
URALSK AKTYUBINSK TURGAY
CHELKAR
GURYEV
ARALSK
DZHURALYKZYL - ORDA
ARAL SEA
KARAGANDA KARKARALINKS
AYOGUZ
TALDY KURGAN
ALMA ATA
SARY - SHAGAR
KARSAKPAY
FRUNZE
NARYNE
KASHGHAROSHI
CHIMKENT
TASHKENT
LENINABAD
TAMDYHULAKNUKAS
URGENCH
BUKHARANAVOI
SAMARKAND
KARSHI
TERMEZ
DUSHAHB
FAIZABADKHUNJERABPASS
MAZAR - I - SHARIF
MARYASHKHABAD
KABULPESH
AWAR
ISLAMABAD
JAMMU&
KASHMIRDISPUTED
TERRITORY
LAHORE
KANDHAR
HERAT
MULTAN
SUKKAR
HYDERABAD
BAM ZAHIDAN
BANDAR ABBAS
SHEERAZ
ESFAHAN
QOM
TEHRAN
TABRIZ
ERZURUM
SIVASANKARA
ISTANBOL
SHEVCHENKO
KANSNOVODSK
KERMAN
MASHAD
KARACHI
GWADAR
ARABIAN S E A
QUETTA
PAKISTAN’S GEO-STRATEGIC LOCATION
In the current geo-political & socio-economic situation, Pakistan is ideally located to cater for the emerging economic challenges at regional/ international level
8TOTAL ROADS : 258,000 KMROAD DENSITY : 0.32NATIONAL HIGHWAYS : 9031 KM CHINA
KASHMIR
IRAN
DISPUTED TERRITORY
ARABIAN SEA
AFGHANISTAN
KHUNJERAB
(N -
35)
(N - 70)
(N - 50)
(N - 40)
(N -
25)
TORKHAM
Multan
KARACHI
CHAMAN
TAFTAN
QilaSaifullah
WAGAH
(N - 65)
N - 5
GWADAR
Quetta
Ratodero
Turbat
Lakpass
Peshawar
IslamabadRawalpindi
D.G. Khan
Hyderabad
N - 5
5
Kotri
Indu
s Rive
r
Jhelum River
Lahore
Ravi River
Sutlej River
D.I. Khan
Bahawalpur
Sukkur
Rohri
Nok Kundi
Faisalabad
Hub
Shorkot
M-5
M-6
Tarbela Dam
Mangla Dam
Okara
Mian Channu
Rahim Yar Khan
HalaHas
sana
bdal
Nowshera
Chenab RiverKharia
n
ChenabBridge
NATIONAL HIGHWAYS
(N - 10)
ONLY 3.5 % OF ENTIRE ROAD NETWORKTAKES 80 % OF COMMERCIAL ROAD TRAFFICCARRY 90% OF FREIGHT & PASSENGER TRAFFIC ONLY ONE COMPLETE NORTH-SOUTH LINK N-5
9
CHINA
PESHAWAR
ISLAMABAD
MULTAN
SADIQABAD
MORO
HALA
HYDERABADKARACHI
GWADAR
IRAN
PINDI BHATTIANFAISALABAD
LAHORE
D.G.KHAN
KHUZDAR
KAKKAR
AWARANTARBAT
M-4
M-5
M-6
M-1
M-2
M-3
M-8
M-7
ARABIAN SEA
N - 5
N - 5
N - 5
N - 5
M-9PLANNEDM-4: FAISALABAD-MULTAN 243
(LAND ACQUISITION HAS COMMENCED)M-5: MULTAN-DG KHAN 84 M-6: DG KHAN - KAKKAR 467M-7: KAKKAR - KARACHI 280 M-8: RATODERO – GWADAR 895M-9: KARACHI-HYDERABAD 136
MOTORWAYS ACCESS CONTROLLED, SAFE, FAST, GRADE-SEPARATED HIGHWAYS CONNECTING MAJOR CITIES WITHIN THE MAIN TRANSPORT CORRIDOR THROUGH SHORTEST POSSIBLE ROUTE
RATODERO
Quetta
COMPLETED M-1 ISLAMABAD - BURHAN 37M-1 RASHAKAI -CHARSADDA 23M-2 LAHORE - ISLAMABAD 367 M-3 PINDI BHATTIAN-FAISALABAD 53 ONGOINGM-1: BURHAN - PESHAWAR 94
10
KASHMIR
DISPUTED TERRITORY
ARABIAN SEA
Khunjrab Pass
(N -
35)
(N - 70)(N - 50)
(N - 40)
(N -
25)
MULTAN
KARACHI
Chaman
Taftan
QilaSaifullah
Wahgah
(N - 65)(N
-5)
Gwadar
Quetta
Ratodero
Turbat
Lakpass
PESHAWARRAWALPINDI
(N - 5)D.G. Khan
HYDERABAD(N
- 55)
Kotri
Indu
s Rive
r
Jhelum Rive
r
LAHORERavi River
Sutlej River
D.I. Khan
BWP
Sukkur
Rohri
Nok Kundi
Faisalabad
Hub
M-2
M-3
M-4Shorkot
M-5
M-6
M-7
M-8
M-9
Tarbela Dam
Mangla Dam
Okara
Mian Channu
RYK
Hala
Hassa
nabd
al
Nowshera
Chenab
River
Kharia
n
ChenabBridge
NATIONAL HIGHWAY N-5 (1819 KM)
TMP
CHINA
IRAN
INDIA
11
ONLY DUALIZED SOUTH - NORTH LINK FROM KARACHI TO TORKHAM THAT CARRIES ABOUT 65% OF GOODS AND PASSENGERS TRAFFIC OF THE COUNTRY AND CATERS FOR 80% OF PAKISTAN’S ECONOMIC ACTIVITY
IT IS COUNTRY’S MAIN ECONOMIC LIFELINE AS MOST OF THE INTER-PROVINCIAL NATIONAL HIGHWAYS EITHER TAKE OFF FROM OR TERMINATE ON IT
RESURFACING / STRENGHTHENING OF 306 KM AND REHABILITATION OF 550 KM HAS BEEN UNDERTAKEN UNDER THE WORLD BANK’S ASSISTED NATIONAL HIGHWAY IMPROVEMENT PROGRAM (NHIP)
CONSTRUCTION OF PESHAWAR – TORKHAM EXPRESSWAY HAS BEEN PLANNED
NOTE CONSTRUCTION OF TORKHAM – JALALABAD ROAD IS ALREADY IN HAND
NATIONAL HIGHWAY (N-5)
12
ARABIAN SEA
CHINA
IRAN
AFGHANISTAN
EAST WEST CORRIDOR CREATED BY RIVER INDUS
WEST CORRIDOR• VITAL MISSING/SUBSTANDARD LINKS• GWADAR PORT PROJECT• LINKAGES TO AFGHANISTAN
FUTURE PROJECTS CONCEPT - DEVELOPMENT OF LINKS AMONG NATIONAL HIGHWAYS ON BOTH SIDES OF RIVER INDUS FOR COMFORT, SPEED & SAFETY PARTICULARLY FREIGHT MOVEMENT
EAST CORRIDORHISTORICALLY AND RELATIVELY MORE DEVELOPED
INDIA
13
INDIA
CHINA
KASHMIR
IRAN
DISPUTED TERRITORY
ARABIAN SEA
Khunjrab Pass
(N -
35)
N - 70
N - 50
(N - 40)
(N -
25)
Torkham
Multan
KARACHI
CHAMAN
TAFTAN
QILASAIFULLAH
Wahgah
(N -
65)
(N - 5)
GWADAR
QUETTA
Ratodero
Turbat
Lakpass
Peshawar
IslamabadRawalpindi
(N - 5)D.G. Khan
Hyderabad
(N -
55)
Kotri
Indu
s Rive
r
Jhelum River
Lahore
Ravi River
Sutlej River
DIKHAN
Bahawalpur
Sukkur
SUKKUR
Nok Kundi
Faisalabad
Hub
M-1
M-2
M-3
M-4Shorkot
M-5
M-6
M-7
M-8
M-9
Tarbela Dam
Mangla Dam
Okara
Mian Channu
Rahim Yar Khan
Hala
Hassan
abda
l
Nowshera
Chenab RiverKharia
n
ChenabBridge
ZHOB
BALOCHISTAN ROAD LINKAGES
KHUZDAR
DEVELOPMENT PLANS OF THESE LINKAGES ARE SHOWN ON THE NEXT FEW SLIDES
14
PLANNED WIDENING AND IMPROVEMENT OF RCD HIGHWAY (N-25) :-
KALAT- QUETTA - CHAMAN (247 KM) THROUGH ADB FINANCINGHUB-UTHAL (98 KM) FOR REHAB ON AVAILABILITY OF FUNDSKARARO - WAD (96 KM) THROUGH JAPANESE ASSISTANCE
WIDENING AND IMPROVEMENT OF SUKKUR –QUETTA LINK (N-65):-
ONGOING PROJECTS
JACOBABAD-DERA ALLAH YAR BYPASS (27 KM)NUTTAL–SIBI (86 KM) CURRENT PROGRESS IS 65 % RECENTLY
EXTENDED BY 25 KM UPTO DHADAR
PLANNED PROJECTS
JACOBABAD BYPASS - SUKKUR (79 KM) DESIGNING IN PROCESS
DHADAR – QUETTA (135 KM) PC-1 IS BEING PREPARED
BALOCHISTAN ROAD LINKAGES
15
WIDENING AND IMPROVEMENT OF MULTAN - DG KHAN - QILA SAIFULLAH HIGHWAY (N-70) :-
ONGOING PROJECTSBEWATA-KHAJURI (68 KM) PROGRESS IS 90%KHAJURI-WIAGUM RUD SECTION (64 KM) PROGRESS IS 32% 4-LANE SHERSHAH BRIDGE CONSTRUCTION HAS COMMENCED
PLANNED PROJECTSMULTAN – MUZAFARGARH DUALIZATION 4-LANE MUZAFARGARH NORTHERN BYPASS MUZAFARGARH – DG KHAN – BEWATASECOND RIVER INDUS BRIDGE AT GHAZI GHAT
BALOCHISTAN ROAD LINKAGES
16
WIDENING AND IMPROVEMENT OF DI KHAN –KUCHLAC (NEAR QUETTA) HIGHWAY (N-50):-
ONGOING PROJECTS
DI KHAN-MUGHALKOT (124 KM) PROGRESS IS 71% ZIARAT MORE-KHANOZAI (9 KM) CONTRACT RECENTLY AWARDED
CONSTRUCTION OF BRIDGES IN HAND
FIVE ON ZAM TOWER - MUGHALKOT SECTIONSIX ON ZHOB - MUGHALKOT SECTIONDESIGNING OF ANOTHER 13 BRIDGES/ CAUSEWAYS IN PROCESS
PLANNED PROJECTS
KUCHLAC-ZHOB (306 KM) PC-1 COST IS RS 3556 M
BALOCHISTAN ROAD LINKAGES
17
M-8
KARACHI
Uthal
Bela
Sibbi
N-2
5
N-65
N-70N-50
Dalbandin
NokundiTaftan
LakpassSariab Chowk
QUETTA
CHAMANQ. Saifullah
LoralaiKuchlak
D.G.Khan
D.I.Khan
AWARAN
TURBAT
GWADAR
IRAN
NWFP
SINDH
HubORMARAPASNI
GWADAR LINKAGES
Wad
SORAB
Kalat
GABD
ZhobMughalkot
BASIMA
NAG
PANJGUR
HOSHAB
Sukkur
Kotri
HyderabadN
-55
N-5
Dera Allah Yar
RATODEROKHUZDAR
N-10
SORAB–BASIMA–NAG (192 KM)NEARING COMPLETION BY
ADB ASSISTANCE
GWADAR-TURBAT-HOSHABAWARDED
WANGU HILLS33 KM
AWARDED
RATODERO-QS KHAN (64 KM)
COMPLETED
KHUZDAR-KHORI (35 KM)
COMPLETED
KALAT-QUETTA-CHAMAN (247 KM)
(ADB FINANCED)
M-7
KAKKAR
KHORI-W/HILLS(50 KM)
AWARDED
NAG-PANJGUR-HOSHAB (295 KM)ALSO PLANNED THROUGH
ADB ASSISTANCE
KH
OR
I
QS
KH
AN
WA
NG
UH
ILL
SM-7 (280 KM)
ESTIMATED COST Rs 10 BILLION
N-40
Rs 850 MILLION ALLOCATED FOR
M-8 IN PSDP 2004-05
18
COMPLETED PROJECTSMAKRAN COASTAL HIGHWAY (533 KM)KHUZDAR-KHORI (35 KM)RATODERO-QS KHAN (64 KM)
ONGOING PROJECTSGWADAR-TURBAT-HOSHAB (193 KM) IN 3 SECTIONSKHORI-WANGU HILLS (50 KM)WANGU HILLS REACH (33 KM)
ONGOING PROJECT (LONG TERM)HOSHAB –RAT0DERO (410 KM)
ONGOING PROVINCIAL PROJECT (ADB FUNDING)SORAB–BASIMA–NAG (192 KM) NEARING COMPLETION
PLANNED PROVINCIAL PROJECT (ADB FUNDING)NAG-PANJGUR-HOSHAB (295 KM)
GWADAR LINKAGES
19
KASHMIR
Khunjrab Pass
(N -
35)
(N - 70)(N - 50)
(N - 40)
(N -
25)
Torkham
Multan
KARACHI
Chaman
Taftan
QilaSaifullah
Wahgah
(N - 65)
(N - 5)
Gwadar
Quetta
RATODEROTurbat
Lakpass
PESHAWARIslamabadRawalpindi
(N - 5)DG KHAN
Hyderabad(N
-55
)
Kotri
Indu
s Rive
r
Jhelum
River
LahoreRavi River
Sutlej
River
D.I. Khan
Bahawalpur
SukkurRohri
Nok Kundi
Hub
M-8
M-9
Tarbela Dam
Mangla Dam
Okara
Mian Channu
Rahim Yar Khan
Hala
Hassan
abda
l
Nowshera
Chenab
River
Kharia
n
ChenabBridge
INDUS HIGHWAY (N-55, 1265 KM)
JAMSHORO
GHULAM KHAN
KOHAT TUNNEL
COMPLETEDPLANNED
20
COMPLETED PROJECTS (JAPNESE ASSISTANCE)757 KM LENGTH IN PHASES 1 & 2 KOHAT TUNNEL
ONGOING PROJECTSDI KHAN – CRB CANAL (14 KM) PROGRESS 52 %RAJANPUR – DG KHAN (107 KM) 3 SECTIONS PROGRESS 12 %
PLANNED PROJECTSMALANA – SARA-E-GAMBILA (117 KM) ADB FUNDINGDARRA ADAM KHEL – BADABHER (29 KM) DCW ADB FUNDING SEHWAN – DADU – MEHR - LARKANA - RATODERO (200 KM) IN 4 SECTIONS ( JBIC HAS EXPRESSED INTEREST)
ANOTHER PLANNED LINKSARA-E-GAMBILA - GHULAM KHAN (118 KM) ADB FUNDING
INDUS HIGHWAY (N-55)
21
• THE ROAD LINKING RAWALPINDI WITH KOHAT (N-80) HAS RECENTLY BEEN FEDERALIZED. NHA HAS PLANNED ITS UPGRADATION TO NHA STANDARD INCLUDING CONSTRUCTION OF BRIDGE OVER RIVER INDUS AT KHUSHALGARH
• NHA HAS PLANNED DUALIZATION OF HASANABDAL - ABBOTTABAD –MANSEHRA SECTION (90 KM) OF THE KARAKORAM HIGHWAY. ADB IS WILLING TO FINANCE
• CONSTRUCTION OF MINI RAIL TUNNEL AT LOWARI PASS (N-45) FOR LINKING CHITRAL VALLEY SHALL COMMENCE SOON
• CONSTRUCTION OF MANSEHRA - NARAN SECTION (124 KM) HAS ALREADY BEEN COMPLETED AND THAT ON NARAN – JHALKHAD SECTION (48 KM) IS IN HAND (PROGRESS 70%). CONSTRUCTION OF JHALKHAD-CHILLAS SECTION (68 KM) SHALL COMMENCE SOON
• CONSTRUCTION OF ISLAMABAD – SATRA MILE - LOWER TOPA EXPRESWAY (43 KM, N-75) IS IN HAND ( PROGRESS 76%)
• CONSTRUCTION OF KARACHI NORTHERN BYPASS AND LYARI EXPRESSWAY IS IN PROCESS
SOME OTHER DEVELOPMENT PROJECTSSOME OTHER DEVELOPMENT PROJECTS
22
At least 50% programs to be based on Economic Internal At least 50% programs to be based on Economic Internal Rate of Return (EIRR)Rate of Return (EIRR)
Balanced geographic distribution of investment with Balanced geographic distribution of investment with stress on uniform/standardized specifications of all stress on uniform/standardized specifications of all highways irrespective of traffic volumehighways irrespective of traffic volume
SocioSocio--political condition and opening of remote/new areas political condition and opening of remote/new areas to major economic centers for interto major economic centers for inter--provincial harmonyprovincial harmony
Development of an alternate North South, fast track, Development of an alternate North South, fast track, planned economic corridor (Motorways)planned economic corridor (Motorways)
Poverty alleviation through enhanced economic activitiesPoverty alleviation through enhanced economic activities
Provision of environment friendly and safe road networkProvision of environment friendly and safe road network
Meeting strategic & defence requirementsMeeting strategic & defence requirements
Basic Planning Parameters
23
• Road construction and maintenance has now become very expensive
• NHA is fully aware that government funding alone cannot suffice to meet the growing demands of the network
• NHA has organized itself as a corporate entity through introduction of various measures
Corporate Culture
24
• NHA has introduced the fee-for-service concept in line with provisions of NHA Act
• NHA has adopted a service provider role and transformed itself into a real public service entity
• Under service provider role, NHA introduced the road user fee ie toll
• Toll is imposed on good quality road sections only and NHA ensures that the quality is always maintained and improved to a specified minimum standard
• Road users particularly heavy commercial vehicle operators have accepted the fact that payment of toll is imperative for using a good quality road
NHA Role as a Service Provider
25
• NHA has established the Road Asset Management Directorate (RAMD)
• Focus is on preservation of existing network through quality maintenance by utilizing toll revenue
• NHA has developed state-of-the-art methodology for maintenance and is moving towards self sufficiency in this field
Road Asset Management
26
To safeguard the national highway network from the damages caused by overloading weigh stations have been installed
Planned : 55 Installed : 45
Axle Load Management
27
•• To control accidents and achieve best flow of To control accidents and achieve best flow of traffic more attention and resources are being traffic more attention and resources are being diverted to highway safety diverted to highway safety
•• Highway safety devices and signs of Highway safety devices and signs of international standard have been and are being international standard have been and are being installed throughout the networkinstalled throughout the network
•• Through better engineering and management Through better engineering and management techniques safety on roads is being enhanced techniques safety on roads is being enhanced
•• Repeated public awareness campaigns are Repeated public awareness campaigns are launched launched
•• National Highways Safety Ordinance was National Highways Safety Ordinance was promulgated in 2000promulgated in 2000
• More and more national highway sections are being covered by the National Highway Police
Highway Safety
28
“NATIONS DO NOT BUILD THE ROADS; IT IS ROADS THAT BUILD THE NATIONS”