20
Westgold Resources Limited Australia’s Newest Gold pure-play Denver Gold - September 2016 For personal use only

For personal use only - · PDF fileFor personal use only. Simplifying a complex corporate structure . 3 ... Thanks for listening! 20 . For personal use only. Title: PowerPoint Presentation

Embed Size (px)

Citation preview

Page 1: For personal use only - · PDF fileFor personal use only. Simplifying a complex corporate structure . 3 ... Thanks for listening! 20 . For personal use only. Title: PowerPoint Presentation

Westgold Resources Limited Australia’s Newest Gold pure-play

Denver Gold - September 2016

For

per

sona

l use

onl

y

Page 2: For personal use only - · PDF fileFor personal use only. Simplifying a complex corporate structure . 3 ... Thanks for listening! 20 . For personal use only. Title: PowerPoint Presentation

Metals X Limited Is a diversified Australian Miner with

significant gold and base metals operations.

1. Rapidly expanding gold producer (current r/r 250,000 oz pa).

2. Globally significant Tin producer (~3,500 tpa Sn).

3. Significant Copper Producer (~35,000tpa Cu).

4. Development ready - world class nickel-cobalt project.

5. Strong Balance Sheet & Fiscal Position ~A$180M cash & WC, strong cash-flow across commodities.

2

For

per

sona

l use

onl

y

Page 3: For personal use only - · PDF fileFor personal use only. Simplifying a complex corporate structure . 3 ... Thanks for listening! 20 . For personal use only. Title: PowerPoint Presentation

Simplifying a complex corporate structure

3

For

per

sona

l use

onl

y

Page 4: For personal use only - · PDF fileFor personal use only. Simplifying a complex corporate structure . 3 ... Thanks for listening! 20 . For personal use only. Title: PowerPoint Presentation

Creating a significant gold pure-play Company

4

For

per

sona

l use

onl

y

Page 5: For personal use only - · PDF fileFor personal use only. Simplifying a complex corporate structure . 3 ... Thanks for listening! 20 . For personal use only. Title: PowerPoint Presentation

Top 10 Domestic Gold Producer Total Mineral Resources Estimates – JORC 2012

Total Ore Reserves – JORC 2012

Current Gold Production run-rate – 250,000ozpa Steady State gold production run-rate – 400,000+ p.a

Target Cash Operating Cost – US$840/oz (A$1100/oz) Target AISC – US$950/oz (A$1250/oz)

Group Total (excl. Rover) Tonnes (Mt) Grade (g/t) Gold (koz)

Measured 2.97 3.32 0.32

Indicated 130.1 2.20 9.2

Inferred 89.8 2.04 5.9

TOTAL 222.9 2.15 15.4

Group TotaL (excl. Rove Tonnes (Mt) Grade (g/t) Gold (koz)

Proved 1.14 3.02 0.11

Probable 36.9 2.34 2.78

TOTAL 222.9 2.15 2.89

For detail, refer to ASX Announcement August 18, 2016 – ASX:MLX 5

For

per

sona

l use

onl

y

Page 6: For personal use only - · PDF fileFor personal use only. Simplifying a complex corporate structure . 3 ... Thanks for listening! 20 . For personal use only. Title: PowerPoint Presentation

5 Processing Plants – 5.5mtpa capacity

Higginsville Gold Operations (5.8yrs) Resource - 33.6 Mt @ 2.0g/t = 2.2 million ounces Reserves - 7.57 Mt @ 1.78 g/t = 0.43 million ounces

South Kalgoorlie Gold Operations (3yrs) Resource - 50.9 Mt @ 2.3g/t = 3.7 million ounces Reserves - 3.5 Mt @ 3.7 g/t = 0.34 million ounces

Central Murchison Gold Project (10+ years) Resource - 108.7 Mt @ 2.2g/t = 7.74 million ounces Reserves - 22.8 Mt @ 2.6 g/t = 1.93 million ounces

Fortnum Gold Project (5yrs) Resource - 29.7 Mt @ 1.8g/t = 1.75 million ounces Reserves - 5.4 Mt @ 2.0 g/t = 0.34 million ounces

6

For

per

sona

l use

onl

y

Page 7: For personal use only - · PDF fileFor personal use only. Simplifying a complex corporate structure . 3 ... Thanks for listening! 20 . For personal use only. Title: PowerPoint Presentation

• Higginsville Gold Operations (incl. Mt Henry)

AISC estimate US$950/oz (A$1250/oz)

• South Kalgoorlie Operations (incl. Cannon) AISC estimate US$900/oz (A$1180/oz)

• Central Murchison Gold Project AISC estimate US$920/oz (A$1200/oz)

• Fortnum Gold Project AISC estimate US$950/oz (A$1250/oz)

Resource - 45 Mt @ 2.3g/t = 3.3 million ounces Reserves - 2.2 Mt @ 2.5 g/t = 0.2 million ounces

7

~ 100,000 oz per annum (steady 5.8+ yrs life)

~ 100,000 oz per annum (building to 200,000oz pa+ with 10+ yrs mine life)

~ 100,000 oz per annum (steady 3.0+ yrs life)

~ 70,000 oz per annum (under construction end 2016 start)

250,000 oz pa going to 450,000 oz pa + at ~US$925/oz (A$1225/oz)

Outstanding Growth Profile F

or p

erso

nal u

se o

nly

Page 8: For personal use only - · PDF fileFor personal use only. Simplifying a complex corporate structure . 3 ... Thanks for listening! 20 . For personal use only. Title: PowerPoint Presentation

WESTGOLD CORPORATE SNAPSHOT – ON LISTING

Shares on Issue ~ 606 million Share Price ~ $1.00 Market Cap. US$ 460 million (~A$600 million) Enterprise Value US$ 375M (~A$500 million) Debt Nil Hedging ~150,000oz @ US $1260/oz (A$1660/oz)

Un-merged Co.

Market Cap = US$685m ($A$900m)

Less ½ cash US$68M (A$90M)

Less Base Metals Assets US$ 150M (A$200M)

Residual Gold Co Value

US$467M (A$615M)

Price per share = US$0.77 (A$1.02)

8

For

per

sona

l use

onl

y

Page 9: For personal use only - · PDF fileFor personal use only. Simplifying a complex corporate structure . 3 ... Thanks for listening! 20 . For personal use only. Title: PowerPoint Presentation

Source Data PCF Aug 2016

Mineral Resources (Million Oz’s)

Average 9.95Moz

9

For

per

sona

l use

onl

y

Page 10: For personal use only - · PDF fileFor personal use only. Simplifying a complex corporate structure . 3 ... Thanks for listening! 20 . For personal use only. Title: PowerPoint Presentation

Source Data PCF Aug 2016

Ore Reserves (Million Oz’s )

Average 3.3Moz

10

For

per

sona

l use

onl

y

Page 11: For personal use only - · PDF fileFor personal use only. Simplifying a complex corporate structure . 3 ... Thanks for listening! 20 . For personal use only. Title: PowerPoint Presentation

Source Data PCF Aug 2016

% of Resource in Reserves

Average 33%

11

For

per

sona

l use

onl

y

Page 12: For personal use only - · PDF fileFor personal use only. Simplifying a complex corporate structure . 3 ... Thanks for listening! 20 . For personal use only. Title: PowerPoint Presentation

EV / Oz of Gold Resource

Source Data PCF Aug 2016

Average US$120/oz (A$157/oz)

12

For

per

sona

l use

onl

y

Page 13: For personal use only - · PDF fileFor personal use only. Simplifying a complex corporate structure . 3 ... Thanks for listening! 20 . For personal use only. Title: PowerPoint Presentation

EV /Oz of Gold Reserves

Source Data PCF Aug 2016

Average US$370/oz (A$489/oz)

13

For

per

sona

l use

onl

y

Page 14: For personal use only - · PDF fileFor personal use only. Simplifying a complex corporate structure . 3 ... Thanks for listening! 20 . For personal use only. Title: PowerPoint Presentation

Source Data PCF Aug 2016

Price/NAV

Average 0.93x

14

For

per

sona

l use

onl

y

Page 15: For personal use only - · PDF fileFor personal use only. Simplifying a complex corporate structure . 3 ... Thanks for listening! 20 . For personal use only. Title: PowerPoint Presentation

15

Market is US$ Gold Price Reactive (6mth view)

15

For

per

sona

l use

onl

y

Page 16: For personal use only - · PDF fileFor personal use only. Simplifying a complex corporate structure . 3 ... Thanks for listening! 20 . For personal use only. Title: PowerPoint Presentation

Westgold Resources Limited

1. 15.4+ million oz Resource base (excl. polymetallic equiv’s).

2. 2.9 million oz Reserves.

3. Production 250,000ozpa going to 450,000oz pa (next 2 years).

4. Net Cash & Working Capital $120+, Debt Free.

5. Excellent Margins – US$380/oz (A$500/oz).

6. Soon to be on your radar !!

A formidable Australian Gold Miner

16

For

per

sona

l use

onl

y

Page 17: For personal use only - · PDF fileFor personal use only. Simplifying a complex corporate structure . 3 ... Thanks for listening! 20 . For personal use only. Title: PowerPoint Presentation

Metals X remains

17

For

per

sona

l use

onl

y

Page 18: For personal use only - · PDF fileFor personal use only. Simplifying a complex corporate structure . 3 ... Thanks for listening! 20 . For personal use only. Title: PowerPoint Presentation

Metals X Limited

1. Big Resource and Reserve base in Tin, Copper Nickel, Cobalt.

2. Only listed Tin producer in the western world (~3,500tpa Sn).

3. Significant Copper Producer (~35,000tpa Cu).

4. 100% of one of largest undeveloped Ni-Co-Fe deposits in world.

5. Development ready growth projects in Tin & Copper.

6. Strong cash flow from Tin & Copper.

A formidable Diversified Base Metals Miner

18

For

per

sona

l use

onl

y

Page 19: For personal use only - · PDF fileFor personal use only. Simplifying a complex corporate structure . 3 ... Thanks for listening! 20 . For personal use only. Title: PowerPoint Presentation

2 for 1 Deal

A pure-play gold set for international re-rate

A substantial Top 10 – Australian Gold Producer A formidable diversified base metal miner

A leading tin producer (unique), copper producer, a massive option on Ni & Co.

19

For

per

sona

l use

onl

y

Page 20: For personal use only - · PDF fileFor personal use only. Simplifying a complex corporate structure . 3 ... Thanks for listening! 20 . For personal use only. Title: PowerPoint Presentation

General Disclaimer This presentation has been prepared by Metals X Limited (“Metals X” or the “Company”). It should not be considered as an offer or invitation or inducement to subscribe for or the purchase of any securities in the Company. This presentation contains forecasts and forward looking statements. Such forecasts, projections and information are not a guarantee of future performance, involve unknown risks and uncertainties. Actual results and developments may differ materially from those expressed or implied. Metals X has not audited or investigated the accuracy or completeness of the information, statements and opinions contained in this presentation. Accordingly, to the maximum extent permitted by applicable laws, Metals X makes no representation and can give no assurance, guarantee or warranty, express or implied, as to, and take no responsibility and assume no liability for, the authenticity, validity, accuracy, suitability or completeness of, or any errors in or omission, from any information, statement or opinion contained in this presentation. This overview of Metals X does not purport to be all inclusive or to contain all information which its recipients may require in order to make an informed assessment of the Company’s prospects. You should conduct your own investigation and perform your own analysis in order to satisfy yourself as to the accuracy and completeness of the information, statements and opinions contained in this presentation before making any investment decision.

JORC Compliance Statement Competent Persons Statements – Rover 1, CMGP, Tin, Nickel, Gold Projects The information in this report that relates to Exploration Results and Mineral Resources and Ore Reserves is based on information compiled Mr Peter Cook BSc (Appl. Geol) MSc (Min. Econ.) M.AusIMM, Mr Jake Russell B.Sc. (Hons) MAIG, Mr Michael Poepjes BEng (Mining Engineering), MSc (Min. Econ) M.AusIMM and Mr Paul Hucker B. Eng (Hons) MAIMM, Anthony Buckingham B.Eng (Mining Engineering) MAusIMM. All have sufficient experience which is relevant to the styles of mineralisation and types of deposit under consideration and to the activities which they are undertaking to qualify as a Competent Person as defined in the 2012 Editions of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC 2012)”. All consent to the inclusion in this report of the matters based on his information in the form and context in which it appears. All are full time senior executives of the Company and are eligible to, and may participate in short-term and long-term incentive plans of the Company as disclosed in its annual reports and disclosure documents. Exploration and Production Target Statements The information in this report that relates to exploration targets refers to targets that are conceptual in nature, where there has been insufficient exploration to define a Mineral Resource and it is uncertain if further exploration will result in the determination of a Mineral Resource. Production targets and mine designs are currently conceptual in nature.

Thanks for listening!

20

For

per

sona

l use

onl

y