ENVIRONMENTAL & SOCIAL MANAGEMENT PLAN for PHCN-TCN Transmission Substation Rehabilitation/Re-enforcement Projects under the NEGIP (ABA) PHCN-PMU August 2009 E2001 v3 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

for PHCN-TCN Transmission Substation …documents.worldbank.org/curated/en/... · Aba 132/33kV Substation at Abia state was visited for direct data gathering. ESMP Goals and Objectives

Embed Size (px)

Citation preview

Page 1: for PHCN-TCN Transmission Substation …documents.worldbank.org/curated/en/... · Aba 132/33kV Substation at Abia state was visited for direct data gathering. ESMP Goals and Objectives

ENVIRONMENTAL & SOCIAL MANAGEMENT PLAN

for

PHCN-TCN Transmission Substation

Rehabilitation/Re-enforcement Projects under the NEGIP

(ABA)

PHCN-PMU

August 2009

E2001 v3 P

ublic

Dis

clos

ure

Aut

horiz

edP

ublic

Dis

clos

ure

Aut

horiz

edP

ublic

Dis

clos

ure

Aut

horiz

edP

ublic

Dis

clos

ure

Aut

horiz

edP

ublic

Dis

clos

ure

Aut

horiz

edP

ublic

Dis

clos

ure

Aut

horiz

edP

ublic

Dis

clos

ure

Aut

horiz

edP

ublic

Dis

clos

ure

Aut

horiz

ed

Page 2: for PHCN-TCN Transmission Substation …documents.worldbank.org/curated/en/... · Aba 132/33kV Substation at Abia state was visited for direct data gathering. ESMP Goals and Objectives

2

Table of Contents

1.0 INTRODUCTION 4

1.1 Project Background 4

1.2 Project Locations 5

1.3 ESMP Goals and Objectives 5

2.0 INSTITUTIONAL ARRANGEMENTS 7

2.1 Resourcing 7

2.2 Responsibilities 7

2.3 ESMP Guidelines 7

ESMP Audit Programme

ESMP Implementation Organogram 8

3.0 Details of Substation Rehabilitation/Reinforcement Work 8

4.0 Substation Risk assessment and Management 11

4.1 Project Potential and Associated Impact Identification 12

4.2 Impact Characterization 12

5.0 Impact Mitigation Measures 16

6.0 DETAILED DESIGN FOR CONSTRUCTION & INSTALLATION 27

6.1 Design Implementation 27

6.2 Land take and Vegetation Clearance 27

6.3 Foundation works/Land/Sand Filling & Surfacing 27

6.4 Use of Public Access Road 27

6.5 Sacred Archaeological Sites 27

6.6 Hydrological Properties & Drainage Protection 27

6.7 Pollution Control 28

6.7.1 Air Pollution 28

6.7.2 Water & Soil Pollution 28

6.7.3 Noise Pollution 28

6.8 Transport Operation 28

6.8.1 Pre-mobilization of Vehicles 29

6.9 Inspection & Maintenance 29

6.10 Quality Assurance / Quality Control 29

7.0 ENVIRONMENTAL MONITORING PLAN 30

7.1 Monitoring Objectives 30

Monitoring Programme 31

7.2 Regulatory Compliance Plan 32

8.0 Work, Safety & Health Plan 32

Page 3: for PHCN-TCN Transmission Substation …documents.worldbank.org/curated/en/... · Aba 132/33kV Substation at Abia state was visited for direct data gathering. ESMP Goals and Objectives

3

8.1 Use of Work Permit 32

9.0 Waste Management Plan 33

9.1 Waste Handling 33

9.2 Waste Type & Identification 33

9.3 Waste Minimization & Reduction 34

9.4 Waste Segregation 35

9.5 Waste Disposal 35

10.0 General Site Safety Plan 35

10.1 Journey Management Plan 36

10.2 Accident / Incident Management Plan 36

10.3 Emergency Response Plan 37

10.4 Consultation Plan 38

10.5 Communication Plan 39

10.6 Commissioning / Hand over Plan 40

11.0 Decommissioning /Abandonment Plan 40

ABBREVIATIONS

ALARP As low as reasonably possible

CBOS Community Based Organisations

ERSU Environment, Resettlement & Social Unit

EPIC Engineering, Procurement, Installation and Commissioning

EER Environmental Evaluation Report

HSE Health Safety and Environment

JHA Job Hazard Analyses

NGO Non Governmental Organization

PCB Poly Chlorinated Biphenyl

PHCN Power Holding Company of Nigeria

PMU Project Management Unit

PPE Personal Protective Equipment

PRA Preparatory Rural Assessment

RCP Regulatory Compliance Plan

TCN Transmission Company of Nigeria

WWI Written Work Instructions

Page 4: for PHCN-TCN Transmission Substation …documents.worldbank.org/curated/en/... · Aba 132/33kV Substation at Abia state was visited for direct data gathering. ESMP Goals and Objectives

4

1.0 INTRODUCTION

1.1 Project Background

This document presents the Environmental & Social Management Plan (ESMP) for the

proposed Substation reinforcement/rehabilitation projects under the World Bank

sponsored National Electricity and Gas Improvement Project NEGIP.

The NEGIP by environmental screening is a category ‘A’ project according to World

Bank standards requiring a full environmental impact assessment for fresh subprojects

and environmental audit for existing Project sites. The likely over all impacts of NEGIP

considering the diversity of the scope are large scaled, covering a wide area, and

affecting a large population and diverse habitats and ecosystems. This document then

is aimed at improving the viability of investing in the Substation

rehabilitation/reinforcement from an environmental and social management perspective.

By using this tool effectively, the anticipated potential environmental and social impacts

associated with the substation projects will be minimized to the barest minimum thereby

making the projects more sustainable.

NEGIP is an Adaptable Program Loan (APL) aimed at assisting the Federal

Government of Nigeria, through a combination of partial risk guarantees (PRG), for gas

supply to generation stations and International Development Association (IDA)

investments and technical assistance aimed at improving and developing the Nigerian

power sector (substation reinforcement/rehabilitation, transformer repair shop and

distribution facilities improvement etc). It follows a programmatic approach, and will

consist of numerous investments broken into subprojects and guarantees over an

extended time period.

This ESMP provides the bases for managing the environmental and social issues

involved with the implementation of the substation subprojects activities, by

demonstrating how adverse and beneficial environmental as well as socio-economic

and health effects will be managed in all phases of the project implementation. It

therefore describes in specific terms how environmental, health and socio-economic

commitments to be encountered in the Project implementations will be handled.

1.2 Project Location

These rehabilitation projects are being carried out in the PHCN 132/33 kV transmission

Substation in Aba in Abia state. As part of the efforts to improve the Nigerian electricity

transmission infrastructure. Most of the facilities in this station are old and (on paper)

have out lived their life spans. More so, the technology used in manufacturing some of

Page 5: for PHCN-TCN Transmission Substation …documents.worldbank.org/curated/en/... · Aba 132/33kV Substation at Abia state was visited for direct data gathering. ESMP Goals and Objectives

5

the installed equipments is old and have since been phased out by the manufacturers

thereby making it almost impossible to source their spares.

As all PHCN transmission Substations are similar in lay out, equipment content and are

under the same management (TCN), the content of this ESMP is applicable to all

Substations owned and managed by TCN-PHCN. For the purpose of this write-up, the

Aba 132/33kV Substation at Abia state was visited for direct data gathering.

ESMP Goals and Objectives

The Environmental & Social Management Plan of this aspect of the NEGIP project was

developed in line with World Bank and ISO 14001 Environmental Management System

(EMS) Specifications; other national and international regulatory requirements; and

PHCN Health, Safety and Environmental & Social Management System as documented

in the filed Project ESMF with the Ministry of Environment of the Federal Republic of

Nigeria in 2009.

The ESMF Objectives are to:

Ensure that substation rehabilitation activities are carried out in such a way as to

avoid harms to PHCN employees, contractors and all other stakeholders that

may be affected directly or indirectly by the facility operations.

Ensure that all hazards associated with the S/S rehabilitation and operations

have all been properly identified and assessed. Barriers militating against the

project established and material recovery and emergency measures put in place.

Enforce safe and healthy procedures and practices in all operations and strive

towards an incident free workplace.

Ensure that appropriate trainings are given to staff and adequate equipments are

provided to enable staff work in a healthy and safe manner.

Maintain effective communication with all relevant parties and in particular

communicating ERSU issues to the entire workforce.

Demonstrate visible PHCN management commitment to ERSU issues.

Set clear ERSU targets to staff involved in the project.

Carry out regular review of ERSU performance against targets.

Ensuring that all operations are undertaken with proper regards for the

environment, and strive to reduce environmental risk to a level that is as low as

reasonably practicable.

These objectives shall be achieved by:

Ensuring compliance with all stipulated legislation on protection of the

environment.

Page 6: for PHCN-TCN Transmission Substation …documents.worldbank.org/curated/en/... · Aba 132/33kV Substation at Abia state was visited for direct data gathering. ESMP Goals and Objectives

6

Integrating social and environmental issues fully into the project development

and operational philosophies.

Promoting social and environmental awareness among workers and

communities around the project sites.

Rationalising and streamlining existing social and environmental activities to

add value, efficiency and effectiveness to the Projects

Ensuring that only environmentally sound procedures are employed during

the different project phases and associated activities

Continuous consultations with relevant regulatory bodies (FMENV, relevant

State environmental protection agencies and other stakeholders), throughout

the projects’ lifecycles.

This ESMP shall remain a dynamic working tool throughout the construction and

operational life span of these Stations. It shall be reviewed with possible changes in

regulatory regimes and in the event of new policies or guidelines from PHCN, WB or the

Nigerian Environmental regulatory bodies. Periodic reviews and updating shall also be

carried out throughout the project lifecycle, to incorporate better management systems

and economic policies.

ESMP Audit Programme

This audit shall be conducted on regular basis to monitor compliance with the project

ESMP. The scope will cover the major project activities including the overall

requirements throughout the life of the project. PHCN performance towards meeting

these requirement will be assessed.

Generally, the audit programme will be conducted bi-annually during construction and at

start up and every five (5) years during operations. The findings from these audits will be

reported to the site ERSU Manager and corrective action plans will be developed and

followed up for performance improvement.

2.0 INSTITUTIONAL ARRANGEMENTS

2.1 Resourcing

Environment, Resettlement and Social Units will be set up in PHCN-TCN and in all the

Substations to be rehabilitated. On site ERSU Manager shall be responsible for all

ERSU-related matters throughout the project period and later during project operations

in order to ensure compliance with environmental regulatory standards. For effective

project implementation, the site ERSU Manager shall work in liaison with the

Contractors’ Engineers & Environmental Officers, and TCN site Engineers to form the

Page 7: for PHCN-TCN Transmission Substation …documents.worldbank.org/curated/en/... · Aba 132/33kV Substation at Abia state was visited for direct data gathering. ESMP Goals and Objectives

7

Project Management Team (PMT) and the team will report directly to the Project

management Unit of PHCN during the construction period and later to TCN during

operations period.

The Project implementation Organogram defining the line of Communication in the

proposed Substation rehab/reinforcement (NEGIP) Project is presented below.

Responsibilities

Power Holding Company shall retain the primary responsibility of ensuring that

environmental and social commitments are met throughout the project lifespan. The

company shall establish a schedule of responsibility and improvement on matters

relating to social and the environment. Environmental and social issues shall be seen as

a line of responsibilities for which all levels of personnel are accountable.

ESMP Guidelines

The detailed preliminary ESMP guideline developed to cover the entire phases and

activities of the proposed NEGIP Project including responsibilities for implementation

are presented in the Table below.

PHCN - PMU

Site ERSU Manager

Contractor/PHCN

Project Mgt. Team (PMT)

Environmental Officer Site HSE Officer Site Engineers

Figure: Project Implementation Organogram

Page 8: for PHCN-TCN Transmission Substation …documents.worldbank.org/curated/en/... · Aba 132/33kV Substation at Abia state was visited for direct data gathering. ESMP Goals and Objectives

8

3.0 DETAILS OF THE SUBSTATION REHABILITATION WORK

These will involve overhauling of the old 1 X 45MVA 132/33kV and 2X30 MVA

Transformers, overhauling of 132kV and 33kV Circuit Breakers, overhauling of 132kV

and 33kV Isolators and earth switches, overhaul of Protection and Control Scheme of

the Station, rehabilitation of the 2KM access road to the substation and extension of 33

KV switch yard Supply and installation of 1X60 MVA 132/33kV transformers with

associated Switch-Gears to replace.

In view of these activities, if proper management of the social, environmental, health and

safety issues are not taken care of, the projects might not be as sustainable as required

according to the World Bank standard. It is based on this that this ESMP becomes very

necessary.

This ESMP is therefore designed to address the environmental and social impacts that

might arise from the rehabilitation activities at the Aba Transmission Substation. It will

also proffer solutions to the lingering environmental issues like house keeping, security,

oil spillage and disposal of scrap materials, e.t.c and also put in place a well trained

Environment, Resettlement and Social Unit (ERSU) that will ensure strict compliance

with World Bank, Nigerian and other International environmental standards in the day to

day running of the PHCN owned Substations.

4.0 Substation Project Risk Assessment and Management

For any Projects of this nature, Risk management is an integral part of the project

execution. The risks related to these projects’ execution and operations were identified

by a structured approach during the project planning stage. Risk assessment visits by

ERSU/Safeguard specialists were conducted in advance of implementation activities to

allow for risk resolution without work interruption during implementation. Results of the

risk assessments and the associated risks reduction measures were evaluated and

documented by the PMU-ERSU and appropriate levels of the TCN site management

staff in the affected substations. This document therefore is a product to be used for

reducing project risks to an acceptable level at a reasonable cost to TCN. Upon project

completion, all other unforeseen risks and their associated resolutions shall be

documented for handover to the site operations personnel who will take over the Project

and continue the operations of the completed facilities.

The responsibility of risk management for these projects during implementation shall lie

with both the Project Management Team (PMT) comprising of the PMU, the rehab

Contractors and the TCN Site management. The environmental and social monitoring

by the PMU-ERSU will reveal if the Contractor project implementation processes are

being successful.

Page 9: for PHCN-TCN Transmission Substation …documents.worldbank.org/curated/en/... · Aba 132/33kV Substation at Abia state was visited for direct data gathering. ESMP Goals and Objectives

9

The majority of the workers involved in the construction phases of the project will be

Contractors staff, therefore Contractor will pay particular attention to applying

appropriately controlled mitigation measures for their work. Contractors shall ensure that

their HSE system are in line with this ESMP Guidelines. The Contractors working with

Job specifications developed by PMU-ERSU will have direct responsibility for executing

the work using sound engineering fabrication, installation and commercial practices

while maintaining adequate controls. The designs will take into account applicable

Nigerian environmental laws and regulations, and in the absence of such, generally

accepted industry standards shall be used. The Contractors will develop operating

manuals and appropriate documentation regarding the proper operation and

maintenance of the facility for approval by PMU-ERSU. This data will be provided to the

PMU in a timely manner that facility-specific training can be given to the concerned

personnel prior to start-up. Details of what is contained in the Contractors’

environmental manuals will be used by the ERSU in monitoring the job of the

Contractors.

4.1 Project Potential and Associated Impacts

The potential and associated impacts of the NEGIP Sub-station rehabilitation project is

based on observed issues during the risk assessment visits to the Substation and the

FMENV sustainability criteria. The visit to the mentioned Substation revealed the

following:

1. Poor gravelling of the switch yard.

2. Most of the cable trenches are broken and exposed.

3. Water logging of the substation and switch yard.

4. Poor condition of the access road to the station.

5. Dilapidated security fence of substation and switch yard.

6. The whole station is filled up with overgrown weeds.

7. PCB transformer oil leakages

8. There is no space for expansion.

9. The environmental management of this station is not satisfactory and ERSU unit

does not exist.

10. The environmental health and safety of the staffs is poor because the staffs do

not have personal protective equipments to work with.

The nature and duration of the various impacts of the project activities on the ecological

components were identified as follows:

Page 10: for PHCN-TCN Transmission Substation …documents.worldbank.org/curated/en/... · Aba 132/33kV Substation at Abia state was visited for direct data gathering. ESMP Goals and Objectives

10

4.2 Impact Characterisation

In order to further describe the nature and duration of the various project activities on

the biophysical and socio-economic environment, the identified impacts were further

characterised as direct / indirect, beneficial / adverse, normal / abnormal, short-term /

long-term, reversible / irreversible, cumulative and residual.

Beneficial Impacts: these are impacts that would produce positive effect on

the biophysical or socio-economic environment.

Adverse Impacts: these are impacts that may result in:

Irreversible and undesirable change(s) in the social and/or biophysical

environment;

Decrease in the quality of the biophysical or social environment;

Limitation, restriction or denial of access to or use of any component of the

environment to others, including future generations; and

Sacrifice of long-term environmental viability or integrity for short-term

economic goals.

Direct Impacts: these are impacts resulting directly (direct cause-effect

consequence) from a project activity.

Indirect Impacts: these are impacts that are at least one step removed from

a project activity. They do not follow directly from a project activity.

Normal Impacts: these are impacts that will normally be expected to follow a

particular project activity.

Abnormal Impacts: An impact is considered to be abnormal when it follows

a project activity as against sound predictions based on experience.

Short-term Impacts: these are defined as impacts that will last only within

the period of a specific project activity.

Long-term Impacts: these are impacts whose effects remain even after a

specific project activity.

Reversible Impacts: these are impacts whose effects can be addressed on

application of adequate mitigation measures.

Irreversible Impacts: these are impacts whose effects are such that the

subject (impacted component) cannot be returned to its original state even

after adequate mitigation measures are applied.

Cumulative Impacts: these are impacts resulting from interaction between

ongoing project activities with other activities, taking place simultaneously.

Incremental Impacts: these are impacts that progress with time or as the

project activity proceeds.

Page 11: for PHCN-TCN Transmission Substation …documents.worldbank.org/curated/en/... · Aba 132/33kV Substation at Abia state was visited for direct data gathering. ESMP Goals and Objectives

11

Residual Impacts: these are impacts that would still remain after mitigation

measures have been applied.

Table 4.1: Characterised Potential and Associated Impacts of the Proposed Substation

Rehabilitation/Reinforcement Project of NEGIP

Project Activities &

Environmental Aspects Potential and Associated Impacts

Character of

Impact

Mobilisation of personnel,

materials and equipment to

project site

Risk of road accidents from increased

vehicular movement on local roads and

damage to the road by heavy vehicles to be

used

Adverse, direct,

normal, reversible,

cumulative

Socio-cultural conflicts due to differences in

customs of migrant worker and local

residents

Adverse, direct,

abnormal, short-

term, reversible

Changes in demographic pattern/disruption

of socio cultural pattern

Adverse, direct,

normal, reversible,

cumulative,

residual

Introduction of communicable diseases

(STDs, HIV, hepatitis b & c, TB & gastro-

intestinal) into the project communities

Adverse, direct,

normal, short-

term, reversible,

cumulative,

residual

Air/noise pollution from increased vehicular

movement

Adverse, direct,

abnormal,

reversible,

cumulative,

residual and short

term

Preparation of the Equipment

bases clearing at construction

points, within the Substations

and necessary point along the

access roads

Damage to lawns within the Substations

and also alteration in the stone chipping

layers covering the Substation switch yards

Adverse, direct,

normal, short-term,

reversible,

Loss of business hours and disturbance of

residents and staff along the access routes

during mobilization

Adverse, direct,

normal,

irreversible, long-

term residual

Page 12: for PHCN-TCN Transmission Substation …documents.worldbank.org/curated/en/... · Aba 132/33kV Substation at Abia state was visited for direct data gathering. ESMP Goals and Objectives

12

Employment of local labour Beneficial, normal,

long-term

De-vegetation/loss of vegetation at

construction points.

Adverse, direct,

normal, short-term,

reversible

Fuel Storage Soil/groundwater contamination from

accidental leak or spill of stored fuel and

transformer oil at camp/construction sites

Adverse, indirect,

normal, short-term,

reversible,

cumulative

Foundation for the transformers

and associated equipment

Soil erosion, dust and accident due to falls

and damage to vegetation/alteration in the

gravelled substation switch yard.

Adverse, indirect,

abnormal, short-

term

Noise and vibration from construction

equipment

Adverse, direct,

normal, short-term,

reversible

Respiratory tract infections due to inhalation

of dust and toxic fumes during construction

activities

Adverse, direct,

normal, short-term

Risk of electrocution and burns (to onsite

workers during construction)

Adverse, direct,

normal, short-term

Induced secondary development in the

substations (work camps/stores)

surrounding by Contractor during

construction activities

Adverse, direct, normal, short-term, reversible

Engagement of indigenous labour and

supplies and stimulation of local economies

Beneficial, direct, normal, short-term, reversible

Rehabilitation/Reinforcement of the Transformers and ancillary equipments

Youths/community restiveness especially

during recruitment of local labour

Adverse, direct,

abnormal, short-

term, reversible

Community restiveness during heavy

vehicular movement due to road congestion

and damages

Adverse, direct,

abnormal, short-

term, reversible

Decommissioning of old transformers, solid

wastes and spillage of the transformer oil

suspected to contain PCB

Adverse, direct,

abnormal, long-

term, reversible

Page 13: for PHCN-TCN Transmission Substation …documents.worldbank.org/curated/en/... · Aba 132/33kV Substation at Abia state was visited for direct data gathering. ESMP Goals and Objectives

13

Decommission and Closure Station

Electric shock and severe burns to workers

during decommissioning

Adverse, indirect,

abnormal, long-

term, irreversible

Impaired aesthetic resources due to visual

presence of wastes and scraps

Adverse, direct,

abnormal, long-

term, reversible,

residual

Direct poisoning of vegetation/soil

contamination due to uncontrolled

application of maintenance,

chemical/herbicide

Adverse, direct,

abnormal, short-

term, irreversible

5.0 Environmental Impact Mitigation Measures for the Substation Rehabilitation

Project

Below is the table showing the intended mitigation measures for the key environmental

and social impacts of the NEGIP substation rehabilitation/reinforcement project.

Page 14: for PHCN-TCN Transmission Substation …documents.worldbank.org/curated/en/... · Aba 132/33kV Substation at Abia state was visited for direct data gathering. ESMP Goals and Objectives

14

Project Phase / Environmental Aspects

Critical Control Point Mitigation Measures

Action Party

Site 1.Preparation

Mobilisation of

personnel, material

and equipment to

project area

Transportation vehicles

& routes

Contractor trucks shall be

properly

serviced/maintained before

mobilisation

Contractor shall

mobilise heavy duty

trucks carrying

equipments in the night

to avoid traffic

delays/accidents

Outriders shall be

engaged when

possible and used

during mobilisation of

heavy duty trucks and

equipment.

Radio/TV

announcements shall

be made to inform the

general public of

activities/movements

Contractor shall

engage and use traffic

control wardens at

strategic points on

local roads

Strategic road

signs/warnings shall be

placed on local roads

PHCN shall enforce

approved speed limits

on local roads among

its drivers and

Contractors’ personnel

ERSU

Manager/PMT

Page 15: for PHCN-TCN Transmission Substation …documents.worldbank.org/curated/en/... · Aba 132/33kV Substation at Abia state was visited for direct data gathering. ESMP Goals and Objectives

15

Local roads

Work sites

Recreational

facilities

Markets, etc.

Contractor shall survey

and make use of best

road access to site and

repair damaged road

points/areas damaged

as a result of the

movement of their

equipment to site

Contractor shall

educate its workers on

the socio-cultural

norms of the host

communities so as to

conform to laid down

customs and norms of

the local community

Recreation areas

should be avoided by

vehicles carrying

equipments as those

areas are always busy

and they may cause

hold ups.

The above situation

applies to market

places

ERSU

Manager/PMT

ERSU

Manager/Comm

unity Relations

Officer

Page 16: for PHCN-TCN Transmission Substation …documents.worldbank.org/curated/en/... · Aba 132/33kV Substation at Abia state was visited for direct data gathering. ESMP Goals and Objectives

16

Site Preparation

Mobilisation of

personnel,

material and

equipment to

project area

Base campsite

Communities

Prior to mobilisation,

Contractor shall screen

all personnel for

communicable and

other diseases

Contractor shall

conduct a health and

safety awareness for

staff and host

communities

Contractor shall carry

out periodic health

screening for staff

while on site and

identified cases shall

be promptly isolated

for proper medical

attention

ERSU

Manager/PMT

/ Community

Relations Officer

Operational Vehicles Contractor shall ensure

that its operational

vehicles are at optimal

operating conditions

Site HSE Co-

ordinator/ transport

supervisor

Site Preparation

Vegetation clearing

at construction sites

Construction areas to

be cleared

Contractor shall limit

vegetation clearing to

minimum area required

for the campsite,

construction site and

access roads

Disturbed and

unwanted areas at

campsite, and access

roads shall be re-

vegetated with

appropriate local

species

Site

ERSU Manager/

Site Engineers

Page 17: for PHCN-TCN Transmission Substation …documents.worldbank.org/curated/en/... · Aba 132/33kV Substation at Abia state was visited for direct data gathering. ESMP Goals and Objectives

17

Project Phase / Environmental

Aspects

Critical Control Point Mitigation Measures

Action Party

Site Preparation

Fuel storage

Storage area

Storage containers shall be

periodically checked for leaks

Operators shall be trained on

safe fuel handling practice

Containers shall be provided

with secondary containment

capable of holding 110% of its

contents

Site HSE

Co-ordinator

Construction

Plinth for

transformer bases

and Installation of

other related S/S

equipment

Within the Substations Contractor shall employ best

engineering practice in the

excavation of the pits and for

ancillary facilities in order to

avoid adverse alteration of the

hydrological pattern of flow

Dug up areas shall be promptly

and properly restored

Site HSE

Co-ordinator / Site

Engineers

Construction points Contractor shall maintain all

construction equipment at

optimal operating conditions in

order to reduce noise and

vibration

Site ERSU

Manager

HSE Co-ordinator/

Site PMT

Health and Safety at

excavation points

Contractor shall design and

enforce workplace safety

procedures at sites based on

this hazard to prevent accidents

Page 18: for PHCN-TCN Transmission Substation …documents.worldbank.org/curated/en/... · Aba 132/33kV Substation at Abia state was visited for direct data gathering. ESMP Goals and Objectives

18

Project Phase / Environmental

Aspects

Critical Control Point Mitigation Measures

Action Party

Welding of

materials, erection

of transformers and

Installation/operation

of other S/S

equipments

Welding/construction

points

Specialized PPE shall be provided

and usage enforced during welding

activities

Site HSE

Co-ordinator/ Site

Engineers

Worksites Contractor shall design work

place procedures in line with

standard industrial practice

Specialised PPE shall be

provided for all on site workers

ERSU

Manager/Site HSE

Co-ordinator/ Site

Engineers

All pits/holes dug during

construction works shall be

appropriately filled.

Project Phase / Environmental

Aspects

Critical Control Point Mitigation Measures

Action Party

Welding of

materials, erection

of transformers and

Installation/operation

of other S/S

equipments

Campsite Contractor shall develop

comprehensive plan for location

of secondary development

ERSU Manager/PMT

Construction points Contractor shall ensure that its

construction equipment are

maintained and operated at

optimal conditions to reduce

emissions capable to air

pollution

Site HSE Co-ordinator

Installation points Contractor shall design, enforce

and maintain good work place

procedures in line with industry

standard and regulatory

requirement on safety

Standard work instructions for

HSE critical activities shall be

developed and enforced

ERSU

Manager/Site HSE

Co-ordinator/ Site

Engineers

Page 19: for PHCN-TCN Transmission Substation …documents.worldbank.org/curated/en/... · Aba 132/33kV Substation at Abia state was visited for direct data gathering. ESMP Goals and Objectives

19

Point of mobilisation Prior to mobilisation Contractor

shall screen all personnel for

communicable and other

diseases

Contractor shall conduct a

health and safety awareness for

staff and host communities

ERSU

Manager/Site HSE

Co-ordinator

Recruitment point

Contractor shall ensure that the

content of the memorandum of

understanding between it and

the host communities on

employment are religiously

followed

ERSU

Manager/Communi

ty Relations Officer

Project Phase / Environmental

Aspects

Critical Control Point Mitigation Measures

Action Party

Welding of

materials, erection

of transformers and

Installation/operation

of other S/S

equipments

Transmission line Where transmission lines are to

be involved, Contractor shall

maintain the selected route for

the transmission line (with

minimal interference with areas

of human activity)

Site HSE

Co-ordinator

Adequate and automatic

fault/damage detection system

shall be installed where possible

Personnel shall be trained on

the detection/handling of such

emergencies arising from

shocks or accidental damages

Site Engineers

Page 20: for PHCN-TCN Transmission Substation …documents.worldbank.org/curated/en/... · Aba 132/33kV Substation at Abia state was visited for direct data gathering. ESMP Goals and Objectives

20

Contractor shall install

specialised fire

detection/prevention equipment

at the substation

Staff shall be trained on

emergency fire/explosion

handling procedure

Contractor shall design and

maintain work place procedures

in line with industrial standards

ERSU

Manager/Site HSE

Co-ordinator Site

Engineers

Control rooms in the

Station (substation)

Adequate and automatic

fault/damage detection system

shall be installed

Personnel shall be trained on

the detection/handling of such

emergencies arising fro

accidental damages

Site Engineers

Project Phase / Environmental

Aspects

Critical Control Point Mitigation Measures

Action Party

Welding of

materials, erection

of transformers and

Installation/operation

of other S/S

equipments

Substation safety

Contractor shall install

automated monitoring system

(CCTV) to check unauthorised

entry

Emergency response plan shall

be put in place for such

developments as

sabotage/vandalization

Site Engineer/

Site HSE

Co-ordinator

Contractor shall use only trained

and competent personnel for all

maintenance works

Maintenance personnel shall be

provided with appropriate PPE

Personnel shall be trained on

handling of emergencies

ERSU

Manager/Site HSE

Co-ordinator

Page 21: for PHCN-TCN Transmission Substation …documents.worldbank.org/curated/en/... · Aba 132/33kV Substation at Abia state was visited for direct data gathering. ESMP Goals and Objectives

21

Substation House

Keeping

Substation environment shall be

properly maintained and kept in

good healthy condition.

Lawns must be planted with

indigenous flower species and

grassed accordingly

Management shall maintain

naturally low growing vegetation

within the Substations

Management shall explore the

option of always using

mechanical maintenance

techniques

For chemical maintenance

option, Management shall

employ selective herbicide

application

Site Management shall maintain

appropriate gravelling level of

the Switch Yards

Equipment must be in sound

working condition and cleaned

as at and when due

Used transformer oil must be

disposed as appropriate in line

with regulatory requirements

Solid wastes must be disposed

of by using appropriate waste

disposal companies and in line

with laid down rules

ERSU

Manager/Site HSE

Co-ordinator

Page 22: for PHCN-TCN Transmission Substation …documents.worldbank.org/curated/en/... · Aba 132/33kV Substation at Abia state was visited for direct data gathering. ESMP Goals and Objectives

22

Project Phase / Environmental

Aspects

Critical Control Point Mitigation Measures

Action Party

Substation site location PHCN shall as much as practicable

avoid locating Substations near

market/city centres, tourist

attractions and places of special

value and interest to the people.

ERSU

Manager/PHCN

Engineers

Decommissioning /

Abandonment

PHCN shall ensure that the

decommissioning and abandonment

plan for the Substations and the

proposed projects are implemented

in details as contained in this

document.

ERSU

Manager/PHCN

Management

6.0 DETAILED GUIDELINES FOR THE SUBSTATION

REHABILITATION/REINFORCEMENT CONSTRUCTION AND INSTALLATION

This aspect of the ESMP is developed in such a way that it would be inserted in the Bid

documents for the intending Contractors to know what is expected of them during the

project implementation period. Based on their approved submission the PMU-ERSU will

monitor their site activities.

6.1 Project Design & Implementation

The design of the proposed Substation Rehabilitation Project of (NEGIP) is based on

Power Holding Company/TCN Operations, Maintenance and HSE guidelines as well as

relevant technical specifications in agreement with standard power and electrical

industry practices. These philosophies identify relevant standards, codes, practices and

specifications that apply to the technical/operating specifications to be used for the

design, construction and operations of the proposed NEGIP Project. The guidelines also

address controlling deviations from approved standards, codes, practices and

specifications, and providing feedback to improved standards.

6.2 Land Take & Vegetation Clearance

These Projects are to take place within existing TCN Substation and it is expected that

there will be no land take for this substation.

Page 23: for PHCN-TCN Transmission Substation …documents.worldbank.org/curated/en/... · Aba 132/33kV Substation at Abia state was visited for direct data gathering. ESMP Goals and Objectives

23

All clearing works at the construction site and access roads shall be carried out within a

defined perimeters and only when and where necessary. Clearing of vegetation shall be

kept to the minimum necessary to permit safe operations. Trees felled from site shall be

re-utilized for the benefit of the substation/host communities. Areas cleared in excess of

operational requirements shall be reinstated with indigenous topsoil and vegetation.

6.3 Foundation Works, Land / Sand Filling and Surfacing

Work along access roads and construction site shall be carried out in such a manner

that there is no damage or interference with existing water courses or drainage systems,

utilities, structures, roads or other property of public or private, vehicular or pedestrians

access, other than to the extent that is necessary for them to be removed or diverted to

permit the execution of work within the defined operational perimeter. Any facilities

disturbed or damaged directly or indirectly due to foundation works, site excavations,

land/sand/gravel filling and surfacing activities shall be restored to the original condition.

The clean up and restoration plan shall be in accordance with regulatory requirements.

If existing watercourses and drainage systems are required to be temporarily diverted to

enable the works to be carried out, approval for such diversions shall first be obtained

from the relevant authorities. The diversion shall be maintained while the work is being

carried out and shall be re-instated, including the removal of any obstruction to

hydrological flow as soon as practicable after work is completed.

No excavated material or debris shall be permitted to enter existing drainage systems or

water courses. Settling ponds or other approved means shall be provided, if necessary

to ensure compliance to the requirements of the local authorities.

6.4 Use of Public Access Roads

All transportation, construction/installation and surfacing works shall be executed in

such a manner that will ensure that interference with the use of public roads is minimal.

However, if operational safety demands the blockage of public roads, then the site HSE

Coordinator may approve such operation only when temporary traffic control and

diversion arrangements have been provided.

Storage of litter/debris, tools and equipment in public or private roads shall be

prohibited. Contractors shall develop road clearing strategies to ensure that public roads

are kept clear, safe and passable throughout the duration of their job as they will not be

permitted to cause any public nuisance.

Page 24: for PHCN-TCN Transmission Substation …documents.worldbank.org/curated/en/... · Aba 132/33kV Substation at Abia state was visited for direct data gathering. ESMP Goals and Objectives

24

6.5 Sacred / Archaeological Sites

Agreement shall be made with Contractors and relevant authorities working on site to

clearly demarcate areas of exclusion around existing sites of heritage and cultural value

to the host community. Contractors shall not remove or relocate any of such sites in the

course of project execution without notifying PHCN’s representative who shall make

necessary arrangements and obtain authorization from members of the affected

community before such removal or relocation.

6.6 Hydrological Properties and Drainage Protection

Contractors shall ensure that there will be minimal adverse environmental impact on the

drainage pattern of the project area, and that all hydrological characteristics and

qualities will be maintained at its present status or be improved upon.

During excavation, construction/installation works, the Contractors shall where

necessary ensure that the surface water flows on land or swamp areas are controlled

and if necessary channelled into temporary discharge pits. Such pits shall be located,

designed and constructed in a manner that will minimize the potential threat of erosion.

Muddy water and surface run-off from work sites shall be drained into suitable silt traps

before discharge into rivers or creeks. The silt trap shall be of adequate size and

regularly de-silted. Excessive site clearing shall be avoided and exposed surfaces shall

be re-vegetated as soon as practicable to minimize erosion.

6.7 Pollution Control

6.7.1 Air Pollution

In operating equipment, Contractor shall utilize all practical methods and devices

available in order to control, prevent and otherwise minimize atmospheric emissions or

the discharge of air contaminants. Good engine efficiency of equipment and vehicles

shall be adequately maintained. Indiscriminate burning of materials resulting from

clearance from trees, bushes and combustible materials shall also not be permitted.

6.7.2 Water and Soil Pollution

Pollution of surface water by wastewater, oil and other lubricants/ liquid wastes shall be

prevented by proper management practices. Drainage and effluent water from the

chemical/fuel storage and processing facilities shall be collected and treated to

approved regulatory requirements of 10ppm oil in water using wastewater treatment

plant to be installed before discharge.

Page 25: for PHCN-TCN Transmission Substation …documents.worldbank.org/curated/en/... · Aba 132/33kV Substation at Abia state was visited for direct data gathering. ESMP Goals and Objectives

25

Contractor shall perform all excavation, construction and surfacing activities by methods

that will prevent pollution of the soil media by accidental spills of contaminants, debris,

and other objectionable pollutants. Regular checks shall be conducted on equipment to

minimize minor lube oil and combustible leaks from engines.

Safe distances and buffer zones shall be established between facilities, work sites and

host communities/substation staff to reduce the impact of high noise levels from the

facilities being reinforced or rehabilitated..

6.8 Transport Operations

The Contractor shall manage all transport operations in line with the following guidelines

in order to forestall accidents/incidents.

6.8.1 Pre-mobilization of Vehicles

All vehicles to be used for transportation of equipment, materials and personnel shall be

pre-mobilized by the site ERSU Manager. The pre-mobilization shall be conducted to

confirm that the vehicles and the drivers have the necessary competence needed for the

journey. It shall also be confirmed during pre-mobilization exercise that a Job Hazard

Analysis (JHA) has been conducted for the trip and that all recommended precautions

(mitigation measures) have been adopted.

6.9 Inspection and Maintenance Procedures for Contractor Equipments

In order to assist on maintaining the technical integrity of the facilities, a well defined

inspection and maintenance management system will be put in place in order to ensure

compliance with (safety) regulations. Contractor’s maintenance programme shall deal

with establishing the processes to develop and sustain necessary maintenance

procedures. The system shall address identifying and classifying procedures required as

to their impact on operating integrity, controlling deviations from procedures and

updating of procedures to capture lessons learned. It will also address training and

verifying competency for facility specific procedures.

The maintenance system will include plans and procedures for:

Normal maintenance (routine and breakdown maintenance performed by the

maintenance technicians involved in the proposed project.

Preventive maintenance (activities carried out at pre-determined intervals)

Predictive maintenance (as initiated by facility condition monitoring and assessment

Inspection (in accordance with a pre-defined programme and based on statutory and

company requirements)

Page 26: for PHCN-TCN Transmission Substation …documents.worldbank.org/curated/en/... · Aba 132/33kV Substation at Abia state was visited for direct data gathering. ESMP Goals and Objectives

26

7.0 Environmental and Social Monitoring Plan

Contractor and the PMT shall strictly operate a monitoring programme that would lead to

sustainable project-environment relationship. This will be strengthened with the

occasional monitoring visits of the ERSU-PMU. The monitoring programme shall

commence from site preparation through implementation to operation stages in order to

keep track of the entire project activities and performance. The programme will provide

information on impacts compared with prediction and by doing so provide advance

warning of any adverse changes in both the ecosystem and socio economic

development.

7.1 The main objectives of the monitoring programme are to:

Ensure compliance with regulatory emission and discharge limits

Monitor changes in existing physico-chemical, biological and social characteristics of the

environment, compared to both the environmental baseline and predicted conditions

Ensure continual interactions and flow of information between Contractor and the

stakeholders

Determine whether any detected changes in socio- economic and environmental

components are caused by the project or by other forces

Determine the effectiveness of the control and mitigation/ enhancement measures and

provide basis for recommending additional measures

Ensure that the established transparent procedures for carrying out the proposed project

are sustained

Ensure sustenance of accountability and a sense of local ownership through out the

project lifecycle.

The programme is for the initial stages of the project. The monitoring frequency is

subject to review after the first year to determine its effectiveness and possibly include

other identified areas of concern. The ERSU-PMU shall ensure that the monitoring

programme is fully implemented.

Page 27: for PHCN-TCN Transmission Substation …documents.worldbank.org/curated/en/... · Aba 132/33kV Substation at Abia state was visited for direct data gathering. ESMP Goals and Objectives

27

The Environmental monitoring programme designed for the construction and operations

phases of the project is shown in Table below.

Table 7.1: Environmental Monitoring Programme for the proposed NEGIP

Components Project Phase Impact Indicator Location

Method of monitoring

Duration/

Frequency

Biodiversity (Vegetation and wildlife)

Site preparation and operation/maintenance phases

Abundance and diversity of native plant and animal species, presence of exotic plant species

Survey and sampling within the S/S and access way corridor and within the communities along transmission route

During Site

Preparation and

yearly during

operation phase

Air Quality Site Preparation, Construction/installation and Operation Phases

CO, SOX, NH3, NOX, and HC

Sampling and measurement within the S/S

Weekly during site

preparation and

construction yearly

during operation

phase

Soil Site Preparation, construction/installation and Operation Phases

PCB, HC, Heavy metals, & Hydrocarbon utilizing Fungi and Bacteria

Sampling and testing around the transformer locations and within the switch yard

During Site

Preparation and

Twice yearly during

operation phase

Surface Water

Construction/installation and Operation Phases

pH, Cond., TDS, BOD, PCB, COD, Turbidity, Oil and Grease etc.

Sampling and in-situ testing of water from wells around the S/Ss and streams near the laboratory testing

During

construction/

installation and

yearly during

operation phase

Noise Site preparation construction/installation and operation phases

Noise Level 90 dB (A) Measurement around Substation and the adjoining host communities

Weekly during site

preparation and

construction yearly

during operation

phase

Community health

Site preparation construction/installation and operation phases

Common/prevalent diseases in the S/S & host communities

Collection of data and statistics from Clinics and Hospitals within host communities

Yearly and or when

necessary

Socio-economic indices

All phases Traffic flow, income levels, housing, trading activities, and social infrastructure

Within host communities

Twice yearly during

project phase

Employment pattern

All phases Contractors/suppliers, part/full time Employment,

Consultations with community leaders and youths in host

Yearly during

project phases

Page 28: for PHCN-TCN Transmission Substation …documents.worldbank.org/curated/en/... · Aba 132/33kV Substation at Abia state was visited for direct data gathering. ESMP Goals and Objectives

28

skilled/unskilled labour recruitment

communities and review of Employment quota

Compensations/Homage

All phases Land take, accident victims, landlords/community relationship, leadership and governance

Consultations and review of MOU with host communities

During construction

phase and bi-

annually during

operation/maintena

nce

7.2 Regulatory Compliance Plan

A comprehensive checklist shall be developed in order to check every HSE-related

regulations for the proposed project including those yet to come. The specific

requirements of each of the regulators. Standards or codes shall also be clearly defined

in the checklist. Project-specific compliance shall be interpreted and documented into a

Regulatory Compliance Plan (RCP) which will be approved and then incorporated into

the routine administrative activities.

8.0 Work Safety and Occupational Health Plan

Operations within the work site shall be subject to government, industry and PHCN

Policies guidelines. All PHCN and Contractor staff shall be well informed and trained on

the HSE policies and guidelines. All facilities shall also be designed to enhance safety

planning, and activities shall be executed within the confines of relevant legislation and

stakeholders interests.

PHCN/Contractors shall provide adequate health services as well as site first aid

services for its workforce. The first aid services shall be extended to visiting personnel

and casual workers. All construction activities shall be properly managed through careful

planning and the applicable and relevant HSE policies and inclusive of the following:

8.1 Use of Permit-to-Work

Job Hazard Analysis and toolbox meetings

Use of appropriate PPE in designated areas

Prohibition to drinking of alcohol during working hours and at work sites and facilities

Prohibition to night trips

Regular emergency drills

Prohibition to smoking in fire hazards areas

Page 29: for PHCN-TCN Transmission Substation …documents.worldbank.org/curated/en/... · Aba 132/33kV Substation at Abia state was visited for direct data gathering. ESMP Goals and Objectives

29

9.0 Waste Management Plan

The manner in which wastes are handled, stored and disposed is dictated by the nature

of the waste and this waste management plan takes into consideration the nature of all

wastes that will be generated during the lifetime of the proposed project.

The following objectives form the basis for the waste management plan of the project.

Progressive reduction of wastes with the target to minimize overall

emissions/discharges, which have adverse impact on the environment

To meet the environmental requirements of FMENV and other national and international

waste management as well as PHCN corporate waste management guidelines

To establish, implement and maintain waste segregation aimed at enhancing recycling

To ensure that PHCN and Contractors are responsible for effective waste handling and

disposal process, which shall be monitored by relevant waste disposal authorities

To ensure that waste management programme is in line with the provisions of the

Environmental Management Programme of ISO 14001.

The standard for the plan are binding on all staff and Contractors involved in the

proposed project with respect to the:

Emission or release of pollutant and fugitive gases

Discharge or spill of untreated liquid effluent on land and into surface water

Discharge of solid waste on land and into surface water

Generation of noise.

9.1 Waste Handling Guidelines

For proper handling and disposal, wastes shall be well defined at source and the

definition transmitted along with the wastes to the final disposal points. PHCN and

Contractors personnel shall define and document all wastes generated in the course of

work in a monthly waste stream report, which shall be used to track/monitor wastes

generated from the Substations.

Basic information that must be provided as a minimum for adequate definition of wastes

include:

9.2 Waste type identification

The major categories of wastes envisaged from the Substation Projects are outlined as

follows:

Page 30: for PHCN-TCN Transmission Substation …documents.worldbank.org/curated/en/... · Aba 132/33kV Substation at Abia state was visited for direct data gathering. ESMP Goals and Objectives

30

Category/Definition

Solid wastes This include felled vegetation/trunks, woods from crates, metals, papers,

printer cartridges and other office services, domestic waste (waste generated from camp

kitchens, packing materials, boxes and plastics)

Liquid wastes This include non hazardous operational waste generated from

work construction sites e.g. lubes, lubricants, sanitary water, paints etc

Gaseous wastes This include combustion products from construction engines,

welding gas, natural gas leaks etc

Hazardous waste is any gaseous, liquid or solid, which due to quantity, physical,

chemical or infectious characteristics have the potential to harm human health,

environment when improperly handled, stored, disposed, transported or treated e.g.

acids, lead, phenols, etc.

9.3 Waste Minimization / Reduction

Waste minimization implies reduction to the greatest extent possible of the volume or

toxicity of waste materials. The four principles of waste minimization process are -

recycle, reduce, reuse and recover, shall be adopted as applicable. The key elements of

the four waste minimization/management principles practices are outlined.

Minimization Definition

Reduce Process modification / design change

Material elimination

Inventory control and management

Material substitution

Improved housekeeping

Reuse Chemical / Oil containers

Reuse waste heat

Recycle / Recover Recycle scrape materials

Recycle paper

Burn waste lubricating oil for energy recovery

Recover oil from tank bottom

Page 31: for PHCN-TCN Transmission Substation …documents.worldbank.org/curated/en/... · Aba 132/33kV Substation at Abia state was visited for direct data gathering. ESMP Goals and Objectives

31

Waste Segregation

Waste segregation and characterization shall be carried out on wastes that are similar

and may be combined to simplify storage, treatment, recycling and effective

implementation of appropriate waste disposal methods. Wastes shall be segregated,

preferably at source into clearly designated bins at strategic locations. Particular

attention shall be given to the work area where a variety of wastes including fast food

packaging shall be generated. The site HSE Coordinator shall be responsible for

maintenance of the waste segregation scheme at the site.

Waste Disposal

All debris, spoil materials, and other wastes shall be cleared regularly from the site and

dispose off at approved dump sites operated by designated waste disposal authorities.

Instructions on material safety handling sheet shall be strictly adhered to and shall form

basis for the disposal of wastes related to such products. Wastes in transits shall be

accompanied and tracked by waste disposal notes. The note shall as minimum contain

such information as date of dispatch, description of wastes, waste quantity, container

type, designated disposal site and method, consignee name, means of transport and

confirmation of actual disposal time and date

Waste management audit of facilities shall be carried out in consultation with the HSE

Department of PHCN, and findings shall be properly documented and followed up.

Accommodation, catering services areas and work site shall maintain acceptable

standard of hygiene and good house keeping.

10.0 GENERAL Security Plan

The project team led by the ERSU Manager shall ensure that adequate security

arrangements are made to handle security related incidents effectively. The project

team will identify, evaluate and manage risks to personnel and property arising from

theft, malicious practices, crime, civil disorder or armed conflict.

In addition, each Contractor will be required to prepare a project security plan and

submit to PHCN for review and approval before mobilization to site. The project will also

organize a security workshop to identify, evaluate and recommend contingency plans for

all security risks.

Page 32: for PHCN-TCN Transmission Substation …documents.worldbank.org/curated/en/... · Aba 132/33kV Substation at Abia state was visited for direct data gathering. ESMP Goals and Objectives

32

10.1 Journey Management Plan

PHCN and Contractor shall follow its journey management procedures strictly. Trips

shall be planned and combined to reduce driving exposures, mandatory use of seat

belts by drivers and passengers in company and Contractors vehicles shall be enforced.

All drivers shall attend defensive driving course while night driving (out of town limits)

shall be discouraged.

Each trip/journey to be undertaken during the proposed project shall be managed in

such a manner that will not result to harm to life or property. A journey management

plan specific to each trip shall be produced and submitted to the Site HSE Coordinator

for approval. The details of the journey management plan shall include proposed

mobilization date, mode of transportation, routes, type of cargo as well as the details of

the JHA conducted for the trip. The Site HSE Coordinator may only approve the trip if he

can confirm that all necessary precautions have been taken to forestall transport

accidents/incidents.

10.2 Accident/Incident Management Plan

Accidents do not just happen but are caused mainly due to human factors. They result

in pains to the victims and their families, and waste of money and resources and time to

the Company. Consequently, the main priority to PHCN shall be to prevent accidents

during mobilization, construction and operations stages of the proposed projects.

Prevention of workplace accidents during the proposed projects shall be achieved using

the JHA tool and approved work plan/instructions by supervisors.

Consequently, the technical team must conduct JHA for all HSE critical activities and

develop written and explicit work plans/instructions for such operations. The work

instructions shall integrate the recommendations of the JHA. It is only upon submission

of the written work instructions and the supporting JHA document that the Site HSE

Coordinator may consider the project activity for approval. Project activities may only be

approved if the site HSE Coordinator is objectively convinced that the Written Work

Instruction (WWI) are practicable, safe and in accordance with regulatory requirements.

The use of JHA and WWI as work management systems shall include job planning and

permitting, shift / tour handover meetings and logs, special procedures governing higher

risk activities, control of simultaneous activities, energy isolation and workplace

preparation, management controls for temporarily removing safety devices, and

reinstating the facilities and preparing to restart operations. It shall also include

Page 33: for PHCN-TCN Transmission Substation …documents.worldbank.org/curated/en/... · Aba 132/33kV Substation at Abia state was visited for direct data gathering. ESMP Goals and Objectives

33

requirements for reviewing completed jobs and capturing and communicating lessons

learned about the work and management system.

Accidents shall be reported and investigated to the ERSU Manager in line with PHCN

accident reporting procedure. All personnel shall be encouraged to report all

accidents/incidents and to cooperate in the investigation of such occurrence. Staff shall

be made to know that accidents/incidents investigation are “fact finding” and not “fault

finding” exercises and are particularly useful as lessons in preventing re-occurrence.

10.3 Emergency Response Plan

The PMT and Contractors will demonstrate that all potentially significant hazards and

potential impacts of the project activities have been identified, the associated

risks evaluated and understood, and that control and recovery measures to effectively

manage these risks and impacts are in place before mobilization to site. PHCN will

assist Contractors, where necessary, with the provision of a generic hazard list for

guidance.

In case of an emergency, Contractor emergency response procedure will be activated.

Its objectives are:

To ensure no loss of life

To ensure that the environment is protected

To ensure that manpower, equipment and funds are available to effectively contain the

emergency (fire, explosion, electrocution, shocks, accident, spill clean up for

oil/chemical, etc)

In order to ensure that good record keeping is maintained and accurate information

concerning emergency are disseminated to the workers, public and government,

the under mentioned procedures cover the information and issues on the following:

Transformer shut down

Search for leakages

Isolation of supply points

Notification of authorities

Safety precaution and environmental proceedings

Repair methods and procedures

Emergency repairs

Contractor arrangement

Re-commissioning and start up

Page 34: for PHCN-TCN Transmission Substation …documents.worldbank.org/curated/en/... · Aba 132/33kV Substation at Abia state was visited for direct data gathering. ESMP Goals and Objectives

34

The PMT and Contractors will identify all potential emergency situations and develop

procedures to use in such scenarios as explosions or fires, hydrocarbon/chemical spills,

weather related disasters, hostage taking, community disturbance, kidnapping, etc.

Emergency drills will be conducted to demonstrate preparedness for response and

schedule of drills and testing of emergency instruments will be prepared by

PHCN/Contractors on the proposed projects.

Every technical Contractor on the proposed projects will prepare and submit for

approval contingency plan for emergency situations and possible incidents beyond the

capability of site facilities.

10.4 Consultation Plan

This involves soliciting people’s views on proposed actions and engaging them in

dialogue. It is characterized by two way information flow, from project authorities to

people, and from people to project authorities. The overall aim of the consultation plan

for the project therefore is addressing the concerns and opinions of the stakeholders

with the ultimate view to assuring a smooth project implementation.

Consultation about these rehab/reinforcement projects have been initiated by the PMU-

ERSU to Federal Ministry of Environment, the World Bank Safeguard Team, PHCN-

TCN HQ & project sites, surrounding Communities and shall remain a continuous

process during implementation. The programme for the project construction and

operations stages include:

Visits and courtesy calls on community leaders and other stakeholders to discuss the

effectiveness of the addressed social issues on the lives of the host communities.

Direct visit to the affected populations to consider (through questionnaires, interviews

and visual observations.

Organizing large public meetings (participatory rural appraisal- PRA) to discuss public

welfare, clarify misconceptions and address new issues as regards the project.

Holding workshops and extension courses on resource management (using simply

written materials, visual representation, videos and scale models to decode technical

languages) and sensitising local people on the latest impact mitigation techniques.

Organizing public seminars aimed at identifying new ways of rendering socio-economic

assistance for the locals.

Establishing a voluntary participatory programme in the local media, television and

radio) through which NGOs, CBOs and other key stakeholders concerned and the

Page 35: for PHCN-TCN Transmission Substation …documents.worldbank.org/curated/en/... · Aba 132/33kV Substation at Abia state was visited for direct data gathering. ESMP Goals and Objectives

35

general public can comment on various aspects of the project and to ensure that all

socio-economic and environmental issues are adequately addressed.

In case of any Grievances, the affected person(s) should come to or write the CEO of

PHCN-TCN and copy the head of Substation who then will attempt to resolve any

grievance. He will liaise with the PMT in sorting out the grievance and notify the CEO

PHCN. When the CEO of PHCN-TCN cannot resolve the grievance himself, the

offended can then seek redress from any Court of Law in Nigeria.

10.5 Communication Plan

Effective two-way communication between PHCN and Contractor staff on HSE and

security issues will include awareness programmes to motivate staff and Contractors.

HSE and security information experiences will be shared between PHCN and

Contractors to facilitate improvement in HSE and security performance.

Contractor shall ensure its staff involved at all levels in the proposed projects become

familiar with the importance of compliance with the adopted HSE policy, regulatory

compliance plan, security plan and their individual roles and responsibilities in achieving

their compliance.

Each person shall be aware of his respective work activities, inherent job risks and

hazard and their controls, mitigation measures and emergency and response

procedures that have been established. They also need to be aware of potential

consequences of departure from agreed operating procedures. Consequently each

Contractors will have a project communications focal point to enhance communications

with the Contractor project team at various locations. Contractors will set up appropriate

procedures and lines of communication to handle HSE and security issues (e.g. direct

access to the nearest clinic, direct access to emergency services, etc).

Contractors should be able to communicate easily with their base offices, work site and

local PHCN in an emergency situation. Appropriate safety programmes and promotions

need to be employed in order to effectively promote HSE and create awareness e.g.

minutes of meetings, plans and performance targets, HSE performance on news board,

posters, bulletins, video, news flash, e-mail etc.

Page 36: for PHCN-TCN Transmission Substation …documents.worldbank.org/curated/en/... · Aba 132/33kV Substation at Abia state was visited for direct data gathering. ESMP Goals and Objectives

36

Appropriate HSE incentive programmes should be established to promote individual

HSE performance improvements e.g. suggestion boxes, personal recognition,

observation of annual safety week, HSE performance bonus schemes etc.

11.0 Commissioning/Hand over Plan

The risks associated with the commissioning and handover phase of the Projects will be

adequately evaluated and will be covered by detailed commissioning procedures and

guidelines. The Engineering, Procurement, Installation and Commissioning (EPIC)

contract strategy will allow time for familiarity of the commissioning/operation team. This

will allow for effective supervision and carryover of priority items into the operation

phase. A pre-commissioning audit will be carried by the PMT for the proposed projects.

Specific commissioning plans covering all significant Contractor commissioning

activities, particularly control of potential dangerous operations during the

commissioning will be developed. The proposed facility will not be put into operation

unless commissioning approval is received from PMU and PHCN-TCN.

12.0 Decommissioning / Abandonment Plan

The design and facilities shall take due recognition of the need to decommission the

Transmission Substation and the ancillary facilities at the end of their operational life,

the abandonment plan shall take due note of the current national and international

legislative requirements.

The following shall be consider at the end of the project lifecycle:

Need for facilities decommissioning and notification to FMENV.

Team shall be set up to study and plan the decommissioning/abandonment programme

in a manner that meets standard requirement.

An Environmental Evaluation Report (EER) to determine if the activities carried out at

the site have caused any detrimental effects and if any, discuss mitigations and

restoration measures.

In-depth Environmental Studies for the actual removal of equipment (demolition) has to

be carried out.

Page 37: for PHCN-TCN Transmission Substation …documents.worldbank.org/curated/en/... · Aba 132/33kV Substation at Abia state was visited for direct data gathering. ESMP Goals and Objectives

37

ANNEX 1

ENVIRONMENTAL INTERNAL AUDIT OF ABA 132/33 KV SUBSTATION ABA, ABIA

STATE

The Aba 132/33 KV substation is located in Aba town in Abia state with fifteen to twenty

minutes drive from the town. The access road to the substation is in a very poor state

and it is about 2-4 km. The station was commissioned in 1962 with all the equipments in

it and other associated substation facilities. This substation services Aba township,

Umuahia, Echie and every parts of Abia state except Arochukwu with power supply.

The substation has its surroundings over grown with weeds and the switch yard water

logged whenever it rains. The security of this station is poor has the fence is dilapidated.

Only very office spaces exist. Due to the age of the transformer, the oil contains PCB

and leakages exist. This is a serious environmental hazard. The access road to the

station is in a deplorable condition, the switch yard condition is very poor and not

illuminated. The cable trenches covers are broken and collapsed.

The environmental management of this station is not satisfactory and ERSU do not exist

in the substation. The environmental health safety of the staffs is poor as the staffs do

not have personal protective equipments to work with.

This ESPM is designed to address the environmental and social impacts that may arise

from the rehabilitation activities at the Aba transmission substation and as well establish

an ERSU within the substation that will supervise subsequent environmental audits of

the substation and implement the reports of same at the close of the rehabilitation

project.