@2011 Ministry of Environment and Forests.
Government of India. Paryavaran Bhawan,
Lodhi Road, New Delhi-110003
RIGHTS AND PERMISSIONS
Copying and/ or transmitting portions or
all of this report without permission and/
or attribution may be a violation of the
copyrights law. MoEF encourages the wide
dissemination and use of this report.
All queries should be directed to the office of
H S M Division, Ministry of Environment and
Forests, Paryavaran Bhawan, Lodhi Road,
New Delhi-110003 (India)
The guidelines for Off-site-Emergency Plan have been prepared by M/s PRESTELS Consultants, Pune.
This work was awarded by Ministry of Environment and Forests, Government of India.
Chapter - 1 : Introduction .................................................................................................................A-1
1.1 Need for Off-site Emergency Plan .............................................................................................................................................A-1
1.2 Responsibility for Preparation of Off-site Emergency Plan .............................................................................................A-1
1.3 The need for Preparation of Guidelines for Off-site Emergency Plan ...........................................................................A-1
1.4 Scope of Guidelines .......................................................................................................................................................................A-2
1.5 Organisation of Guideline document ......................................................................................................................................A-2
Chapter - 2 : Context, Compliance and Future Course of Off-site Emergency Plan ....................A-3
2.1 Historical Background and Recent Past ..............................................................................................................................................................A-3
2.2 Future Course of Off-site Emergency Plan Post Disaster Management Act, 2005 ..................................................A-3
2.2.1 Off-site Emergency Plan and District Disaster Management Plan .................................................................A-3
2.2.2 Co-existence of District Crisis Group (DCG) and District Disaster Management Authority (DDMA) ................................................................................................................................A-4
Chapter - 3: Rules and Regulation Pertaining to Off-site Emergency Plan .................................A-5
3.1 Important Regulations for Management of Chemical (and other) Disasters .............................................................A-5
3.2 Salient Features of Important Regulations ............................................................................................................................A-5
3.2.1 The MSIHC Rules, 1989 ..................................................................................................................................................A-5
3.2.2 The CA (EPPR) Rules, 1996 ............................................................................................................................................A-7
3.2.3 The Disaster Management Act, 2005 .......................................................................................................................A-7
3.3 Essential Responsibilities Assigned under Important Regulations ...............................................................................A-7
3.3.1 The MSIHC Rules, 1989 ..................................................................................................................................................A-7
3.3.2 The CA(EPPR) Rules, 1996..............................................................................................................................................A-7
3.3.3 The Disaster Management Act, 2005 ........................................................................................................................A-8
Contents
PART - A : Guidelines for Off-site Emergency Management Plan .................................................A-1
Chapter - 4 : Guidelines for Preparation of Off-Site Emergency Plan ...........................................A-9
4.1 Statutory Responsibility ................................................................................................................................................................A-9
4.2 Essential Authorities and Agencies: .........................................................................................................................................A-9
4.3 Preparation Process for the Plan ............................................................................................................................................. A-10
Stage 1: On-site Compliance ..................................................................................................................................................... A-10
Stage 2: Information Details from On-site Plan ................................................................................................................. A-10
Stage 3: Off-site Plan Draft 1 ..................................................................................................................................................... A-11
Stage 4: Technical Discussion(s): ............................................................................................................................................. A-11
Stage 5: Off-site Plan Draft 2: ................................................................................................................................................... A-11
Stage 6: Plan Presentation(s) .................................................................................................................................................... A-11
Stage 7: Off-site Plan Draft 3: ................................................................................................................................................... A-11
Stage 8: Plan Approval ............................................................................................................................................................... A-11
Chapter - 5 : Guidelines on Content of Off-site Emergency Plan ...............................................A-13
5.1 Schedule 12 of MSIHC Rules ..................................................................................................................................................... A-13
5.2 Template for Off-site Emergency Plan .................................................................................................................................. A-13
Chapter - 6 : Guidelines on Management, Implementation and the use of Off-site Emergency Plan ..........................................................................................A-14
6.1 Maintenance of Off-Site Emergency Plan ............................................................................................................................ A-14
6.2 Communication and Authorisation for Implementation of plan in case of an Emergency .............................. A-14
6.3 Use of Plan as a Ready-Reckoner in case of an Emergency ........................................................................................... A-15
6.4 Use of Plan for Resource Gap Analysis and Development ............................................................................................. A-15
6.5 Mock Drills and Off-site Emergency Plan ............................................................................................................................. A-15
6.6 Important Roles to Ensure Benefit from Off-Site Plan .................................................................................................... A-16
6.6.1 Role of District Collector (or the DEA) .................................................................................................................. A-16
6.6.2 Role of Factory Inspector In-Charge of District .................................................................................................. A-16
6.7 District Emergency Authority (DEA) ...................................................................................................................................... A-16
6.8 Conclusion ...................................................................................................................................................................................... A-17
ANNEXURE A : List of Relevant Statutes on Management of Hazardous Substances ................................................. A-18
ANNEXURE B : List of Chemical Accidents in Recent Past (2002-06) .................................................................................. A-19
PART - B : Template for Off-Site Emergency Management Plan
Edition History ........................................................................................................................................................................................... B-3
Directory of Key Responders in the District ................................................................................................................................... B-4
Chapter -1 : Enforcement of Plan ..................................................................................................... B-5
1.1 Statement by the District Collector (or the DEA) ................................................................................................................. B-5
1.2 Statement by the Officer Appointed to Carry Out the Maintenance and Upkeep tasks of the Plan ............... B-5
1.3 Commitment of Responders ....................................................................................................................................................... B-5
Chapter - 2 : Introduction, Use and Control of Off-site Emergency Plan ...................................... B-6
2.1 Background to Off-Site Emergency .......................................................................................................................................... B-6
2.2 Off-site Emergency ......................................................................................................................................................................... B-6
2.3 Off-site Emergency Plan and its Use ......................................................................................................................................... B-7
2.3.1 Pre-Emergency Use ......................................................................................................................................................... B-7
2.3.2 During Emergency Use .................................................................................................................................................. B-7
2.3.3 Post-Emergency Use ....................................................................................................................................................... B-7
2.4 Scope of Off-site Emergency Plan ............................................................................................................................................. B-7
2.5 Declaration of Off-Site Emergency and Enforcement of Plan ......................................................................................... B-7
2.6 Possessors of the Off-Site Emergency Plan and the Maintenance Officer of the Off-Site Emergency Plan ........... B-7
2.7 Review and Amendment of Plan ............................................................................................................................................... B-8
2.8 Dovetailing of On-Site Emergency Plans with this Plan .................................................................................................... B-8
2.9 Annexing of this Plan with District Disaster Management Plan ..................................................................................... B-9
Chapter - 3 : District Profile ............................................................................................................ B-10
3.1 Map of District ...............................................................................................................................................................................B-10
3.2 Description of Map and other Geographic Information .................................................................................................B-10
3.3 Demographic Information .........................................................................................................................................................B-10
3.4 Meteorological Information .......................................................................................................................................................B-10
3.5 Important Activities/Events/Festive Events in District .....................................................................................................B-10
3.6 Directory of Responders in the District ................................................................................................................................B-11
Chapter - 4 : Identification of Hazards .......................................................................................... B-12
4.1 Introduction to Hazards ..............................................................................................................................................................B-12
4.2 MAH Unit Installations .................................................................................................................................................................B-12
4.3 Transportation of Hazardous Goods.......................................................................................................................................B-12
Chapter - 5 : Identification of Emergency Scenarios and Delineation of Vulnerable Zones ..... B-14
5.1 Introduction to Emergency Scenarios and Vulnerable Zones ......................................................................................B-14
Emergency Scenarios ...................................................................................................................................................................B-14
Methodology for Calculation of Vulnerable Zones Prescribed by MOEF .................................................B-14
Toxic Exposure ................................................................................................................................................................B-14
Heat Radiation (Pool Fire, Flare, BLEVE) ..................................................................................................................B-15
Explosion ..........................................................................................................................................................................B-15
Use of Vulnerability Templates ..................................................................................................................................B-15
Computer Models ..........................................................................................................................................................B-16
Use of specific information ........................................................................................................................................B-16
5.2 Emergency Scenarios in MAH Installations ..........................................................................................................................B-16
5.3 Domino Effect Emergency Scenarios .....................................................................................................................................B-17
5.4 Other Emergency Scenarios Including Fall-Outs of Natural Disasters ......................................................................B-17
5.5 Development of Vulnerability Templates .............................................................................................................................B-17
Chapter - 6 : Identification of Emergency Resources ................................................................... B-18
6.1 Introduction to Emergency Resources ..................................................................................................................................B-18
6.2 Police ..............................................................................................................................................................................................B-18
6.3 Fire ..............................................................................................................................................................................................B-18
6.4 Medical Aid ......................................................................................................................................................................................B-19
6.5 Other Emergency Infrastructure .............................................................................................................................................B-19
6.6 Evacuation – Transport and Sheltering ..................................................................................................................................B-19
6.7 Technical Resources ......................................................................................................................................................................B-20
6.7.1 Technical Experts Directory .......................................................................................................................................B-20
6.7.2 Emergency Response Data Sheets (ERDS) ............................................................................................................B-20
6.8 Media Resources ............................................................................................................................................................................B-20
6.9 Other Emergency Resources .....................................................................................................................................................B-21
Chapter - 7 : Roles and Responsibilities ........................................................................................ B-22
7.1 Introduction .....................................................................................................................................................................................B-22
7.2 Responsibilities of Authorities and Agencies ......................................................................................................................B-22
7.2.1 District Emergency Authority (DEA – District Collector) ................................................................................B-22
7.2.2 Police .................................................................................................................................................................................B-22
7.2.3 Fire Service Department .............................................................................................................................................B-23
7.2.4 Medical Department ....................................................................................................................................................B-23
7.2.5 Factory Inspectorate Department ...........................................................................................................................B-23
7.2.6 Occupier of MAH Unit ..................................................................................................................................................B-23
7.2.7 Technical Experts ..........................................................................................................................................................B-23
7.2.8 Mutual AID Groups ........................................................................................................................................................B-23
7.2.9 Pollution Control Board ...............................................................................................................................................B-23
7.2.10 Transport Fleet Owners Including State Transport ............................................................................................B-24
7.2.11 Media .................................................................................................................................................................................B-24
7.2.12 Railways .............................................................................................................................................................................B-24
7.2.13 Transporter of Hazardous Chemical .......................................................................................................................B-24
7.2.14 Electricity Board .............................................................................................................................................................B-24
7.2.15 Telecommunication Department ............................................................................................................................B-24
7.2.16 Aviation Department....................................................................................................................................................B-24
7.2.17 Civil Defence ..................................................................................................................................................................B-24
7.2.18 Home Guards ..................................................................................................................................................................B-24
7.2.19 National Disaster Response Force ...........................................................................................................................B-24
7.2.20 Local Government Bodies ..........................................................................................................................................B-25
7.2.21 NGOs ..................................................................................................................................................................................B-25
7.2.22 Public Works Department ...........................................................................................................................................B-25
7.2.23 Water Supply Board ......................................................................................................................................................B-25
7.2.24 Civil Supplies Department .........................................................................................................................................B-25
7.2.25 Animal Husbandry Department ...............................................................................................................................B-25
7.2.26 Agriculture Department ..............................................................................................................................................B-25
7.2.27 Regional Transport Authority ....................................................................................................................................B-25
7.2.28 Other Members of DCG ...............................................................................................................................................B-25
7.2.29 Coasts Guards and Port Trusts (in case of emergency situation in coastal areas) ..................................B-25
7.3 Emergency Organisation Chart of Roles ..............................................................................................................................B-25
7.4 Emergency Behaviour of Public at Large ..............................................................................................................................B-26
1. Panic ..............................................................................................................................................................................................B-26
2. Curiosity or Excitement ...........................................................................................................................................................B-27
3. Purposeful Exploitation of situation ...................................................................................................................................B-27
7.5 Specific Actions Required by Public at Large and Communication to them ...........................................................B-27
Chapter - 8 : Emergency Response Plan ........................................................................................ B-28
8.1 Introduction .....................................................................................................................................................................................B-28
8.2 Enforcement and Implementation of Plan ...........................................................................................................................B-28
8.3 Marriage of Chapter 5, 6, 7 ..........................................................................................................................................................B-28
8.4 Discharging and Co-Ordination of Roles and Responsibilities ....................................................................................B-28
Chapter - 9 : Post-Emergency Restoration .................................................................................... B-29
9.1 Calling off Emergency .................................................................................................................................................................B-29
9.2 Controlling Long-Term Damage ..............................................................................................................................................B-29
9.3 Investigation Studies and Reporting ......................................................................................................................................B-29
9.4 Compensation and Settlements ..............................................................................................................................................B-29
Chapter - 10 : Past Accidents in the District .................................................................................. B-30
Chapter - 11: Mock Drills ................................................................................................................ B-31
ANNEXURE 1 Declaration of Off-site Emergency ....................................................................................................................B-32
ANNEXURE 2 Possessors of the Copy of Off-site Emergency Plan ....................................................................................B-33
ANNEXURE 3 Communication of Change in Copy of this Plan to all Possessors of the Copy of Off-site Emergency Plan .....................................................................................................................B-34
ANNEXURE 4 Communication of Change in Positions, Address and Phone Numbers to the Maintenance Officer of the Plan .................................................................................................................B-35
ANNEXURE 5 Calling off the Declared Off-site Emergency..................................................................................................B-36
ANNEXURE 6 Submission of Report on Long Term Damage or its Possibility ..............................................................B-37
ANNEXURE 7 Investigation Reporting .........................................................................................................................................B-38
ANNEXURE 8 Mock Drill Reporting ...............................................................................................................................................B-39
ANNEXURE 9 Sample ERDS for Chlorine .....................................................................................................................................B-40
PART - C : Work book on Prestels - PAC Analysis
PAC Analysis for Emergency Scenarios ........................................................................................... C-3
Introduction ..............................................................................................................................................................................................C-3
P-A-C ................................................................................................................................................................................................C-3
Person ................................................................................................................................................................................................C-3
Action ................................................................................................................................................................................................C-3
Communication ...............................................................................................................................................................................C-3
Explanation of Columns on the PAC sheet ......................................................................................................................................C-3
Person ................................................................................................................................................................................................C-3
Action ................................................................................................................................................................................................C-3
Communication ..............................................................................................................................................................................C-3
Remarks ...............................................................................................................................................................................................C-4
Serial Numbering Rules for PAC Sheet .....................................................................................................................................C-4
Benefits of PAC ..........................................................................................................................................................................................C-4
PAC Analysis for Emergency Scenarios - Explanation Sheet .....................................................................................................C-5
Case Study 1 - Chlorine Leak ................................................................................................................................................................C-6
Scenario...............................................................................................................................................................................................C-6
Development ....................................................................................................................................................................................C-6
PAC Analysis .......................................................................................................................................................................................C-8
Prestels PAC Analysis for Emergency Scenarios - Illustration Purpose Only ...............................................................C-8
Case Study 2 - Transportation Emergency ................................................................................................................................... C-15
Scenario............................................................................................................................................................................................ C-15
Development ................................................................................................................................................................................. C-15
PAC Analysis .................................................................................................................................................................................... C-16
Prestels PAC Analysis for Emergency Scenarios - Illustration Purpose Only ............................................................ C-16
Role of Incident Controller and Site Controller........................................................................................................................... C-20
Incident Controller ................................................................................................................................................................................ C-20
Site Controller ......................................................................................................................................................................................... C-20
Temporary Assumption of Roles ...................................................................................................................................................... C-21
Glossary of Terms................................................................................................................................................................................... C-22
References ............................................................................................................................................................................................. C-24
Key Contributors .................................................................................................................................................................................... C-25
ABBREVIATION
1. Address (O, R) - Office (O) and Residence (R) Address
2. BLEVE - Boiling Liquid Expanding Vapour Explosion
3. CA(EPPR) Rules - Chemical Accidents (Emergency Planning, Preparedness and Response)
Rules, 1996.
4. CCoE - Chief Controller of Explosives
5. CCG - Central Crisis Group
6. CIF - Chief Inspector of Factories
7. Contact (O, R, M) - Is phone number of Office (O), Residence (R) and Mobile (M)
8. DCG - District Crisis Group
9. DDMA - District Disaster Management Authority
10. DDMP - District Disaster Management Plan
11. DEA - District Emergency Authority
12. DG - Director General
13. DGFASLI - Director General, Factory Advice Services and Labour Institutes
14. DMA - Disaster Management Act, 2005
15. EC - European Community
16. ECC - Emergency Control Centre
17. ERV – Emergency Response Vehicle
18. ELSA - Emergency Life Saving Apparatus
19. EPA - Environment (Protection) Act, 1986
20. ERDS - Emergency Response Data Sheet
21. F&EI - Fire and Explosion Index
22. GOI - Government of India
23. IDLH - Immediately Dangerous to Life and Health
24. LCG - Local Crisis Group
25. LPG - Liquefied Petroleum Gas
26. MAH - Major Accident Hazard
27. MCLS - Maximum Credible Loss Scenario
28. MIC - Methyl Isocyanate
29. MOEF - Ministry of Environment and Forests, Government of India
30. MSDS - Material Safety Data Sheet
31. MSIHC Rules - Manufacturer, Storage and Import of Hazardous Chemicals Rules, 1989
32. NDMA - National Disaster Management Authority
33. NDRF - National Disaster Response Force
34. NIDM - National Institute of Disaster Management
35. NIOSH - National Institute of Occupational, Safety and Health, USA
36. NGO - Non-Governmental Organisation
37. OEP - Off-site Emergency Plan
38. PCB - Pollution Control Board
39. PLIA - Public Liability Insurance Act, 1991
40. PPE - Personal Protective Equipment
41. RTA - Regional Transport Authority
42. SCBA - Self Contained Breathing Apparatus
43. SCG - State Crisis Group
44. TPQ - Threshold Planning Quantity
45. UT - Union Territory
46. UVCE - Unconfined Vapour Cloud Explosion
The Ministry of Environment and Forests, Govern-
ment of India, proposes to notify the guidelines for
preparation of Off-site Emergency Plan as stipulated
in rule-14 of the Manufacture, Storage and Import of
Hazardous Chemicals Rules, 1989 to manage chemi-
cal accidents that spill outside the plant boundary
leading to Off-Site emergency.
This report on Guidelines for Preparation of Off-site
Emergency Plans addresses the following topics:
Preparation of Off-Site Emergency Plan �
Contents of the Off-Site Emergency Plan �
Management, Control and Use of the Off-site �
Emergency Plan, and
Implementation of Off-site Emergency Plan �
This report provides guidance to the preparation,
management and implementation process of the
Off-site Emergency Plan and is published to realize
the goal of an efficient and effective chemical
disaster management system in the Country. This
report is organised in three parts as follows:
Part A: Guidelines for Off-site Emergency Management Plan
The guideline recommends an eight stage approach
for preparation of Off-site Emergency Plan. The
adherence to this approach is vital to the off-site
emergency management process. This approach
has been outlined in section 4.3 of Chapter 4 of the
guideline document.
Part B: Template for Off-Site Emergency Management Plan
It is desirable that Off-site emergency plans drawn
up across the country are of a standard character
and include all the necessary elements of the off-
site emergency management. The NDMA guidelines
on Chemical Disaster, April 2007 clearly spell out this
need. Towards this endeavour, a template to assist
preparation of Off-site Emergency Plan has been
prepared. The template plan forms a part of Chapter
5 of the guidelines document and has been attached
separately as Part B.
Part C: Workbook for PAC Analysis
PAC (Person-Action-Communication) analysis for
emergency scenarios is introduced. The PAC analysis
ensures clarity of roles and responsibilities, brings
out the gap in technical resources and lays in place
the specifics of emergency communication. The
PAC analysis sheet with its explanation is attached
separately as Part C of this document. Two PAC
analyses have been attached as examples. The purpose
is, however, to introduce the concept of PAC analysis.
Executive Summary
Guidelines for Preparation of Off-site Emergency Plan | A-1 |
Chapter 1
Introduction
1.1 Need for Off-site Emergency Plan
Societal need
The effects of a major accident in an industrial set
up are not always restricted to the boundaries of
the industrial installation. They may spill over to the
community and the environment in vicinity.
Therefore, the Government authorities and emer-
gency agencies (hereinafter referred as the ‘authori-
ties and agencies’) are required to prepare them-
selves and be in a state of readiness at all times to
limit the consequences of any such emergency to
protect the people and the environment. A system-
atic approach is required to plan and prepare the
authorities and agencies to tackle any emergency
due to hazardous chemicals.
Statutory need
The Manufacture, Storage and Import of Hazardous
Chemicals (MSIHC) Rules, 1989 and the Chemical
Accidents (Emergency Planning, Preparedness and
Response) [CA(EPPR)] Rules, 1996 provide a statutory
structure for controlling major hazards posed by
hazardous chemicals.
The rule 13(1) of MSIHC Rules requires the occupier
of any Major Accident Hazard (MAH) installation
to prepare and On-site Emergency Plan. Likewise,
the rule 14(1) of MSIHC Rules requires the District
Authorities to prepare an Off-site Emergency Plan.
The Plan is required to be prepared in consultation
with the occupiers of MAH installation in the area.
1.2 Responsibility for Preparation of Off-site Emergency Plan
Statutory
The MSIHC Rules, 1989 via its Schedule-5 assigns the
responsibility of preparation of Off-site Emergency
Plan of a district to the District Collector of the
district as the District Emergency Authority (DEA)
or other authority, if such is explicitly designated
by the State Government. The Chief Inspector of
Factories (CIF) appointed under the Factories Act,
1948 is required to assist the DEA in the preparation
of the Off-site Emergency Plan. The other authorities
whose assistance shall be sought by the DEA
wherever applicable in the preparation of Off-site
Emergency Plan are the Chief Inspector of Dock
Safety appointed under the Dock Workers (Safety
Health and Welfare) Act, 1986, Chief Inspector of
Mines appointed under the Mines Act, 1952, Atomic
Energy Regulatory Board appointed under Atomic
Energy Act, 1972, the Chief Controller of Explosives
appointed under the Indian Explosives Act and
Rules, 1983.
1.3 The need for Preparation of Guidelines for Off-site Emergency Plan
Role of Guidelines
It has been observed that the Off-site Emergency
Plan are being made with varying contents
| A-2 | Guidelines for Preparation of Off-site Emergency Plan
and there is a need to develop a uniform
structure of the Off-Site Emergency Plan. This
requirement has been indicated in the National
Disaster Management Guidelines on Chemical
Disasters, 2007
It is envisaged that an outlay of uniform structure for
the Off-site Emergency Plan will greatly facilitate the
preparation of plans as well as the use, monitoring
and implementation of the plans.
1.4 Scope of Guidelines
This document of Guidelines on Preparation of Off-
site Emergency Plan will lay out the guidelines for
4 – point Scope
Preparation of Off-Site Emergency Manage- �
ment plan
Contents of the Off-Site Emergency Manage- �
ment plan
Management, Control and Use of Off-site Emer- �
gency Management Plan
Implementation of Off-site Emergency Manage- �
ment plan
1.5 Organisation of Guideline document
Chapters
This Guideline document is organized in �
chapters and sub-sections there of:
Chapter 2 gives the context, compliance and �
future course of the Off-Site Emergency Plan
Chapter 3 deals with the Rules and Regulation �
pertaining to Off-Site Emergency Plan
Chapter 4 gives the guidelines for Preparation �
of Off-Site Emergency Plan
Chapter 5 gives the guidelines on content of �
Off-Site Emergency Plan
Chapter 6 gives the guidelines on management, �
Implementation and the use of Off-site Emer-
gency Plan.
Guidelines for Preparation of Off-site Emergency Plan | A-3 |
Chapter 2
2.1 Historical Background and Recent Past
The Flixborough, Bhopal, Mexico City and Seveso
disasters led to recognition of the potential of
hazardous chemicals to cause major emergencies.
The Government of India enacted various
regulations and provided for institutional and
organizational set up for prevention, control
and management of chemical emergencies and
disasters in the country.
Past Accidents
A list of chemical accidents in the recent past (2002-
2006) has been provided in Annexure B to outline
the nature and type of chemical accidents we have
encountered in the past.
The proper implementation of the enacted
regulations and responsible functioning of the
authorities and timely actions by the agencies
has seen benefits in dealing with the chemical
disasters.
2.2 Future Course of Off-site Emergency Plan Post Disaster Management Act, 2005
Off-site Emergency Plan envisaged as per Schedule
12 of the MSIHC rules provide for good control and
management over chemical disasters in the country.
The off-site emergency management plan is a vital
tool to help mitigate the consequence of a chemical
disaster through effective planning of resources. The
plan also serves as a handy reference to the various
emergency response agencies.
Post DMA
The Disaster Management Act, 2005 (DMA) now
provides for preparation of Disaster Management Plan
for every district. An off-site emergency falls within
the purview of ‘disaster’ as defined in the DMA. The
distinguishing feature between off-site emergency
such as a toxic gas release and a natural disaster such
as earthquake is that the former can be averted by
implementation of proper controls while the latter
a matter of providence. The Off-site Emergency Plan
needs to focus on the industrial hazards with due
consideration to the technical aspects of response
and mitigation. The offsite emergency plans must
be annexed to the district disaster management
plan and draw, for its implementation, the necessary
provisions made under the DMA.
2.2.1 Off-site Emergency Plan and District Disaster Management Plan
The district emergency management plan prepared
under DMA shall address all disasters including
chemical disasters and natural disasters such as
earthquake floods, tsunami among others. The
aspects of general disaster management in case
of an emergency shall find a common province
between the Off-site Emergency Plan and Disaster
Management Plan. However, the Off-site Emergency
Context, Compliance and Future Course of Off-site Emergency Plan
| A-4 | Guidelines for Preparation of Off-site Emergency Plan
Plan requires additional technical considerations
such as assessing the damage and delineation
of vulnerable zone, identification and availability
of particular fire-fighting resources and personal
protective equipments for likely chemical fires,
supply of antidotes required in case of toxic releases,
foreseeing domino effects and initiating preventive
measures among others. The offsite emergency plan
can facilitate a response suitable to the nature of
chemical disaster.
2.2.2 Co-existence of District Crisis Group (DCG) and District Disaster Management Authority (DDMA)
It is observed that the response strategies for natural
disasters and chemical disasters are essentially
different. The administrative authorities may be the
same in some regards. However, chemical disaster
management additionally requires participation
from industrial units and technical expert agencies.
The role of authorities is more in scope when it
concerns chemical disaster. For example, the fire
department authorities need to ensure adequacy
on knowledge and equipment in dealing with
various types of chemical fires. Likewise the medical
department authorities need to have knowledge
on various antidotes required and ensure their
availability. Hence, it is felt that DCG as provided
by CAEPPR, 1996 and DDMA as provided under
DMA, 2005 should co-exist. Their meetings may be
suitably clubbed since they share membership from
common authorities.
Guidelines for Preparation of Off-site Emergency Plan | A-5 |
3.1 Important Regulations for Management of Chemical (and other) Disasters
List of Regulations
The MSIHC Rules, 1989, the CA(EPPR) Rules, 1996
(both made under the Environmental Protection
Act, 1986), and the Disaster Management Act,
2005 are important regulations providing for the
management of chemical disasters in the country.
A list of regulations concerning or relevant to
industrial and transportation hazards is provided in
Annexure A
Three regulations mentioned above ummarized
as follows in terms of salient features and essential
responsibilities assigned
Chapter 3
Rules and Regulation Pertaining to Off-site Emergency Plan
3.2 Salient Features of Important Regulations
3.2.1 The MSIHC Rules, 1989
Salient Features MSIHC
The MSIHC Rules, 1989 provide for identification
of hazards and lay down provisions for their
control. It defines the MAH unit via its Schedule
2 or 3 based on quantities of hazardous
chemicals stored or handled at an industrial unit,
respectively. It provides for preparation of On-
site and Off-site Emergency Plans. It essentially
establishes a three-tier control on industrial
units of hazardous nature. The following diagram
elucidates the classification of industrial units
and control actions required.
| A-6 | Guidelines for Preparation of Off-site Emergency Plan
Source: A Guide to the Chemical Accidents (Emergency, Planning, Preparedness And Response) Rules, 1996 and On-site and Off-site Emergency Plan by H.N. Mirashi.
MSIHC Rules - Control Action
Guidelines for Preparation of Off-site Emergency Plan | A-7 |
3.3 Essential Responsibilities Assigned under Important Regulations
3.3.1 The MSIHC Rules, 1989
Responsibility MSIHC
The MSIHC Rules, 1989 via its Schedule-5 assigns
the responsibility of preparation of the Off-
site Emergency Plan of a district to the District
Collector of the district or the District Emergency
Authority, if such is explicitly designated by the
State Government. The Chief Inspector of Factories
appointed under the Factories Act, 1948 is required
to assist the District Collector (or the DEA, as the case
may be) in the preparation of the Off-site Emergency
Plan. The other authorities whose assistance shall
be sought by the District Collector (or the DEA)
wherever applicable in the preparation of Off-site
Emergency Plan are the Chief Inspector of Dock
Safety appointed under the Dock Workers (Safety
Health and Welfare) Act, 1986, Chief Inspector of
Mines appointed under the Mines Act, 1952, Atomic
Energy Regulatory Board appointed under Atomic
Energy Act, 1972, the Chief Controller of Explosives
appointed under the Indian Explosives Act and
Rules, 1983.
3.3.2 The CA(EPPR) Rules, 1996
Responsibility CA (EPPR)
The CA(EPPR) Rules, 1996 calls for the formation of
District Crisis Group along with Central Crisis Group,
State Crisis Group and Local Crisis Group. The
CA(EPPR) Rules, 1996 via Schedule-7, designates the
DEA of the district as the Chairman of the District
Crisis Group. Rule 9 of the CA(EEPR) Rules specifies
3.2.2 The CA (EPPR) Rules, 1996
Salient Features CA (EPPR)
The CA(EPPR) Rules, 1996 complement the
MSIHC Rules, 1989 and provide much needed
statutory backup for crisis management setup and
organisational support to ensure preparation of Off-
site Emergency Plan and its implementation.
A four tier set up has been envisaged under the
CA(EPPR) Rules namely, the Central Crisis Group
(CCG) at national level, the State Crisis Group (SCG)
at state level, District Crisis Group (DCG) at district
level and Local Crisis Group (LCG) at the level of
an industrial estate/pocket. The rules spell out the
constitution, functions and powers of the CCG, SCG,
DCG and the LCG.
3.2.3 The Disaster Management Act, 2005
Salient Features DMA
The Disaster Management Act, 2005 provides for
the formation of District Disaster Management
Authority (DDMA) along with State Disaster
Management Authority (SDMA) and National
Disaster Management Authority (NDMA). The Act
enlists the powers and functions of the DDMA
in Section 30 and also provides in Section 34, for
special powers and functions in case of a threatening
disaster situation.
The disaster as per DMA, 2005 shall include events
of forces of nature such as earthquake, floods, and
tsunami as well as events originating from activities
of man-kind including industrial or chemical
disasters.
| A-8 | Guidelines for Preparation of Off-site Emergency Plan
the District Crisis Group as the apex body in the
district to deal with major chemical accidents and
to provide expert guidance for handling chemical
accidents.
3.3.3 The Disaster Management Act, 2005
Responsibility DMA
The Disaster Management Act, 2005 calls for estab-
lishment of District Disaster Management Author-
ity for every district. The District Collector, District
Magistrate or the Deputy Commissioner as the case
may be is declared as the ex-officio chairman of the
District Disaster Management Authority as per Sec-
tion 25 (2) (a) of the Act. Section 30 of the Act lists
the powers and functions of the District Authority in
event of a disaster. The section summarily assigns to
the District Authority, the responsibility of planning
for disaster management, taking appropriate mea-
sures for prevention of disaster and ensuring pre-
paredness for a disaster as well as for co-ordinating
and implementing response in event of a disaster.
Guidelines for Preparation of Off-site Emergency Plan | A-9 |
4.1 Statutory Responsibility
The MSIHC Rules, 1989 via its Schedule-5 assigns
the responsibility of preparation of the Off-site
Emergency Plan of a district to the District Collector of
the district or District Emergency Authority, if such is
explicitly designated by the State Government. Chief
Inspector of Factories appointed under the Factories
Act, 1948 is required to assist District Collector (or
DEA as the case may be) in preparation of the Off-
site Emergency Plan. The other authorities whose
assistance shall be sought by the District Collector
(or DEA as the case may be) wherever applicable in
the preparation of Off-site Emergency Plan are the
Chief Inspector of Dock Safety appointed under
the Dock Workers (Safety Health and Welfare) Act,
1986, Chief Inspector of Mines appointed under the
Mines Act, 1952, Atomic Energy Regulatory Board
appointed under Atomic Energy Act, 1972, the Chief
Controller of Explosives appointed under the Indian
Explosives Act and Rules, 1983.
4.2 Essential Authorities and Agencies
The essential authorities and agencies whose
participation is vital in the Off-site Emergency Plan
process in preparation of the plan, and its control,
monitoring and execution are collectively referred
to as the Responders in this document. The list of
responders among the primary responders viz. the
Police, the Fire and Rescue Department, Medical
Department is given here with a brief outline of their
responsibilities. For detailed responsibilities please
refer to Chapter 7 of Part B of this document.
RespondersThe District Collector (or the District Emergency �
Authority, if such is explicitly designated by the
State Government under the MSIHC Rules, 1989):
Overall management and mitigation of off-site
emergency. Ensure that all responding agencies
work harmoniously and efficiently
The Police : � Cordoning and crowd control, evacu-
ation of people if necessary
The Fire and Rescue Department: � Fire-fighting
and rescue
The Medical Department including State Medi- �
cal officers, Medical and Hospital Associations,
Doctors Associations among others: Administra-
tion of medical help to victims
The Inspectorate of Factories: � Issue orders and
direction to the factory; also ensure necessary ad-
vice from technical experts
Occupier of MAH unit (where off-site emergency �
has occurred): Overall responsibility to combat
onsite emergency, and coordination with District
Collector and other responders to help combat
Offsite emergency
The Technical Experts Group: � Render expert
technical advice for combating Emergency
Mutual Aid Groups: � Mobilise resources to mitigate
emergency
The Pollution Control Board: � Assess and control
pollution damage
Transport Fleet Owners including State Trans- �
port : Provide vehicles (with drivers and fuel) for
evacuation
Media (Television, Radio, Newspaper): � Dissemi-
nation of vital information to public, avoid spread
Chapter 4
Guidelines for Preparation of Off-Site Emergency Plan
| A-10 | Guidelines for Preparation of Off-site Emergency Plan
of rumours
Railways: � To stop railway traffic as directed by
Collector
Transport company owner in case of transpor- �
tation accidents: Coordinate district collector, po-
lice and fire brigade during
The Electricity Board : � Ensure uninterrupted power
supply, also supply at temporary shelters
Telecommunication Department: � Ensure efficient
working of communication lines
Aviation Department : � Make available resources
like helicopters if required to combat emergency
The Civil Defence: � To assist police in their role
Home Guards: � To assist police in their role
National Disaster Response Force: � Mitigation of
the emergency/disaster as required
Local Government Bodies � viz. the Panchayat,
Corporations, Municipal Corporations as the
case may be: Mobilise resources for combating
emergency and also make shelters available for
evacuees
NGO bodies: � Aid and assist the responding
agencies
PWD: � Ensure adequate water supply for fire
fighting, and also for drinking at shelters
Water Supply Board: � Ensure adequate water
supply for fire fighting, and also for drinking at
shelters
Civil Supplies (Food and Water Supply) �
Department to Evacuees: Arrangement of food,
clothing etc. for evacuees
Animal Husbandry Department: � Taking care of
the cattle in the affected area, including evacuating
and sheltering
Agriculture Department: � Protect food grains and
standing crop
The Regional Transport Authority (RTA): � Enquiry
into transport emergency (Chemical)
Other Members of DCG, if any: � Assist and act as
per directions of the District Collector
In case of emergencies in coastal belts, i) Coast �
Guards, ii) Port Trusts: Provide assistance in
emergency mitigation
It is essential to include the participation of all the
responders in the making of Off-site Emergency Plan.
4.3 Preparation Process for the Plan
An eight stage approach is recommended for the
preparation of the off-site emergency management
plan. (see Table 1: Eight stage approach to the
preparation of Off-site Emergency Plan).
Stages in Plan Preparation
Stage 1: On-site ComplianceIt is essential that all hazards within the vulnerable in-
dustrial units are identified and possible consequences
of the hazards are projected before the commence-
ment of the preparation of Off-site Emergency Plan.
It is responsibility of occupier of every MAH unit un-
der rule 13(1) of the MSIHC rules to prepare an on-site
emergency plan. The factory inspector in-charge of the
district shall ensure that all MAH units in the district
have prepared an on-site emergency plan.
Stage 2: Information Details from On-site Plan The onsite plans of MAH units in a district should
be complete in all details and furnish the important
the elements for incorporation into the off-site plan.
The assigned agency (see below) shall extract the
relevant information from the on-site plans. If details
of such information are missing or are inadequate the
assigned agency shall recommend these additions
or inclusions to the onsite plan of the MAH unit. The
MAH unit shall be given a time period of 15 days to
incorporate the recommendations made. The lapse
by the MAH unit to comply shall be brought to the
notice of the concerned inspector of factories who
Guidelines for Preparation of Off-site Emergency Plan | A-11 |
shall proceed with appropriate action in this regard.
Stage 3: Off-site Plan Draft 1It is prudent to appoint an agency either government
or private for preparation and compilation of Off-
site Emergency Plan. The agency appointed to
this effect is referred to as Assigned Agency. The
assigned agency may be appointed by the Factory
Inspector of the District in consultation with the Chief
Inspector of Factories. The Assigned Agency must be
technically competent to compile and prepare the
off-site plan based on the vulnerabilities projected
in the on-site plan. The Assigned Agency shall have
to make required presentations suggested in Stage
3 and Stage 5 of this process. The Assigned Agency
shall compile, modify and fine-tune the Off-site
Emergency Plan till it satisfies the District Collector
(or the DEA), the Factory Inspector of the District and
other members of the DCG.
Stage 4: Technical Discussion(s): The projections made in the Off-site Emergency Plan
have to be considered for their technical soundness.
Additional deliberations may be required concerning
the projection domino effect of on-site disasters,
which may build up even more severe emergency
scenarios at the district level. The proper dovetailing
of off-site plan with the individual on-site plan needs
to be ensured. Hence, the presence of occupier and
concerned officers from every MAH unit is essential
in this discussion round to ensure that off-site plan
dovetails with his particular on-site plan. Factory
Inspector in-charge of the district, members of PCB,
technical experts shall attend this discussion round.
Other members may be invited by the Assigned
Agency in consultation with the factory inspector
whose participation shall be beneficial to this round.
Stage 5: Off-site Plan Draft 2: Following the technical discussion(s), the Assigned
Agency shall prepare Draft 2 of the plan incorporating
the necessary additions or modifications in light
of the issues raised and matter agreed to at the
technical discussions.
Stage 6: Plan Presentation(s)On compilation of Draft 2 of the plan, the Assigned
Agency shall make a presentation to all members
of DCG and Responders listed in 4.2. The presence
of Responders is necessary to understand their
responsibilities as laid out in the plan, seek clarifica-
tion and spell out their concerns and suggestions for
appropriate consideration and incorporation in the
off-site plan. The chairman and member secretary
of the concerned SCG and those of the CCG shall be
informed and invited for this presentation, who may
attend and/or suitably nominate others members to
attend this presentation as they may think fit. The
assigned agency shall invite, in consultation with
District Collector or the DEA and factory inspector in-
charge of the district, other authorities or members,
whose presence is necessary or expedient to the
offsite plan of the particular district.
Stage 7: Off-site Plan Draft 3: Following the plan presentation(s), the Assigned
Agency shall prepare Draft 3 for approval of the DEA.
Stage 8: Plan Approval Having satisfied himself of the competency
and viability of the plan, the District Collector
or the DEA shall put his signature to the plan,
thus enacting the plan for the District. He/she
may arrange for the translation of plan in local
language.
The following table provides for the stages, tasks,
responsibilities and checks essential in the eight
stage approach for preparation of the Off-site
Emergency Plan.
| A-12 | Guidelines for Preparation of Off-site Emergency Plan
Table 1 Eight stage Approach to the Preparation of Off-site Emergency PlanSummary: Plan Preparation
S. No. Stage Tasks Responsibility Ensured by
1 On-site compliance Ensuring On-site Emergency Plan Preparation by all MAH units in the district
Occupiers of MAH units
Factory Inspector in charge of District
2 Onsite Plan Scrutiny Checking the On-site plans for their completeness
Assigned Agency*#1, #2
Factory Inspector in charge of District
3 Off-site Plan Draft 1 Preparation of Off-site plan based on On-site plans
Assigned Agency* District Collector or the DEA
4 Technical Discussion(s) Presentation of Plan by assigned agency, discussions on issues raised, brain-storming sessions on problems identified. Participants: Occupiers of MAH units, Factory Inspector in charge of District, Members of PCB, Technical Experts and others who are invited
Assigned Agency* Factory Inspector in charge of District
5 Off-site Plan Draft 2 Modification of Draft 1 in light of the Technical Discussion above
Assigned Agency* Factory Inspector in charge of District
6 Plan Presentation(s) Presentation of Plan by assigned agency. Participants: All members of DCG, Responders identified in section 4.2, select members of SCG and CCG and others who are invited
Assigned Agency* District Collector or the DEA
7 Off-site Plan Draft 3 Modification of Draft 2 in light of accepted suggestions from the above
Assigned Agency* Factory Inspector in charge of District
8 Plan Approval Reading, Signature and Enactment of the plan by the DEA
District Collector or the DEA
SCG (for all district compliance)
* Assigned Agency is an agency, institution, organization either Government or Private appointed for the preparation of Off-site Emergency Plan (see Stage 2, Section 4.3)
# 1 The responsibility of assigned agency shall be limited to scrutinize and extract the necessary information from the on-site emergency plans (and safety reports) made available by the respective MAH units. In case of non-availability of information or any discrepancies observed, the assigned agency should bring this to notice of the MAH unit and also report the same to the concerned Inspector of Factories, who shall ensure that the MAH unit complies with the preparation of on-site plans as per Schedule 11 of MSIHC Rules, 1989.
# 2 In addition to on-site plans, the assigned agency may also use Safety Reports (prepared under MSIHC Rules, 1989) to obtain relevant information.
Guidelines for Preparation of Off-site Emergency Plan | A-13 |
5.1 Schedule 12 of MSIHC Rules
Schedule 12, MSIHC rules
The details to be furnished in the Off-site Emergency
Plan are given in Schedule 12 of the Rules. These are:
The type of accidents and release to be taken �
into account.
Organizations involved including key personnel �
and responsibilities and liaison arrangements
between them.
Information about the site including likely �
locations of dangerous substances, personnel
and emergency control rooms.
Technical information such as chemical and �
physical characteristics and dangers of the
substances and plant.
Identification of the facilities and transport �
routes.
Contact for further advice e.g. meteorological �
information, transport, temporary food and
accommodation, first aid and hospital services,
water and agricultural authorities.
Communications links including telephones, �
radios and standby methods.
Special equipment including fire fighting �
materials, damage control and repair items.
Details of emergency response procedures. �
Notification to the public. �
Evacuation arrangements. �
Arrangements for dealing with the press and �
other media interests.
Long term clean up. �
5.2 Template for Off-site Emergency Plan
Plan Template
A template has been developed for Off-site
Emergency Plan. It facilitates easy preparation
of the plan. The use of template shall bring out
standardization of the Off-site Emergency Plan
made across the country.
The Template for Off-site Emergency Plan is attached
separately as Part B.
Chapter 5
Guidelines on Content of Off-site Emergency Plan
| A-14 | Guidelines for Preparation of Off-site Emergency Plan
6.1 Maintenance of Off-Site Emergency Plan
Plan Maintenance
The Off-Site Emergency shall be prepared as per
process laid in Section 4.3 of Chapter 4. However, the
Off-Site Emergency Plan is a dynamic document and
needs to undergo change to have proper bearing
with the ground realities.
The District Collector or the DEA is the authority
responsible for maintenance and upkeep of Off-Site
Emergency Plan. He may specifically appoint for
this purpose an officer (say, Maintenance Officer) to
carry out the tasks pertaining to this role. It shall be
the duty of such officer appointed thereof to:
Possess master copy of the plan and ensure at �
all times that it is up-to-date
Ensure distribution of the latest plan copy to all �
the responders
Maintain signatures of the responders in the �
Master Copy of the plan(See Template Plan)
Communicate changes in the plan to all the �
possessors of the plan via Annexure 3 of the
Template Plan (see Part B)
Initiate revision of plan whenever it is due �
It shall be the duty of the possessors of offsite plan
to report to the District Collector (or the DEA) or the
officer appointed thereof, any change that they are
the cause of and which shall require modification in
the offsite plan via Annexure 4 of the template.
Off-Site Emergency Plan shall be a guiding document
for all meetings of the District Crisis Group.
6.2 Communication and Authorisation for Implementation of plan in case of an Emergency
Prompt Authorisation and Communication
Prompt declaration for off-site emergency, instanta-
neous communication to all the Responders in or-
der and priority of their role in the emergency and
implementation of the plan in letter and spirit can
help to bring the benefit of the off-site plan in miti-
gating the effect of a disaster.
The responsibility for prompt declaration of off-
site emergency lies with the District Collector
(or the DEA). The MAH unit shall immediately
inform him/her, when they fore-see the likelihood
of an off-site emergency situation. The District
Collector (or the DEA) shall declare emergency via
Annexure 1 of the Template Plan (see Template
Plan). An updated soft-copy of this annexure
shall always be kept available on his computer
desktop. A conveniently folded hard copy shall
always be kept available at the notice board of
his/her office.
The District Collector (or the DEA) shall make
on-phone communication of emergency to the
Chapter 6
Guidelines on Management, Implementation and the use of Off-site Emergency Plan
important responders such as Police, Fire, Technical
Experts and Transport Service Provider among
others so that they may initiate response actions. A
written communication may follow via a telegram,
fax or messenger. In absence of District Collector
(or the DEA), the authorization shall be made by
the Resident Collector In-charge or any other
authority appointed temporarily in lieu thereof.
The authorities of crucial services shall be informed
by the above means of authorization. The authorities
as well as executors of crucial services shall be
bestowed with suitable discretion, should there be
no prudence in waiting for due authorizations.
The flow of communication from the first observer
on the source-site of emergency till the last re-
sponder to get information shall be well defined.
Quick and prompt information to crucial respond-
ers viz. Fire, Police, Transporter and Medical Depart-
ment is important for curbing and mitigating of
disaster. The PAC analysis (see Part C) shall help in
clearly defining the flow of communication along
with the communication means and the specifics
of messages to be communicated.
6.3 Use of Plan as a Ready-Reckoner in case of an Emergency
Ready –Reckoner
The information in the plan that shall serve as a
ready reckoner in case of an emergency is:
� The Responders Directory (see Section 3.6 of
Template Plan)
The Emergency Resource Information (see �
Chapter 6 of Template Plan)
The ERDS of chemicals handled provided in �
Annexure 9 of the Template Plan
6.4 Use of Plan for Resource Gap Analysis and Development
Resource-Gap Analysis
Chapter 6 of the Template Plan (Part B) identifies
the resources for dealing with mitigation of an
off-site emergency.
Chapter 8 of the Template Plan maps the resources
to their requirement in emergency scenario. While
performing the PAC analysis, it may become evident
that the resources required at a particular stage
of response are insufficient. This shall be noted in
the ‘Remarks – Resource Gap’ column of the PAC
analysis sheet.
Such a resource requirement shall then be put
before the Authorities and Agencies responsible for
the development of the region.
6.5 Mock Drills and Off-site Emergency Plan
Mock Drill objectives
Mock Drills have two basic functions, namely
“training” and “testing”. The objectives of Mock Drills
are as under:
To identify deficiencies in resources (both in �
manpower and equipment).
To clarify each individual’s role and areas of �
responsibility.
To reveal weaknesses in the plans and �
procedures, before emergencies occur
To improve the level of co-ordination among �
various response personnel, departments and
agencies.
Guidelines for Preparation of Off-site Emergency Plan | A-15 |
important responders such as Police, Fire, Technical
Experts and Transport Service Provider among
others so that they may initiate response actions. A
written communication may follow via a telegram,
fax or messenger. In absence of District Collector
(or the DEA), the authorization shall be made by
the Resident Collector In-charge or any other
authority appointed temporarily in lieu thereof.
The authorities of crucial services shall be informed
by the above means of authorization. The authorities
as well as executors of crucial services shall be
bestowed with suitable discretion, should there be
no prudence in waiting for due authorizations.
The flow of communication from the first observer
on the source-site of emergency till the last re-
sponder to get information shall be well defined.
Quick and prompt information to crucial respond-
ers viz. Fire, Police, Transporter and Medical Depart-
ment is important for curbing and mitigating of
disaster. The PAC analysis (see Part C) shall help in
clearly defining the flow of communication along
with the communication means and the specifics
of messages to be communicated.
6.3 Use of Plan as a Ready-Reckoner in case of an Emergency
Ready –Reckoner
The information in the plan that shall serve as a
ready reckoner in case of an emergency is:
� The Responders Directory (see Section 3.6 of
Template Plan)
The Emergency Resource Information (see �
Chapter 6 of Template Plan)
The ERDS of chemicals handled provided in �
Annexure 9 of the Template Plan
6.4 Use of Plan for Resource Gap Analysis and Development
Resource-Gap Analysis
Chapter 6 of the Template Plan (Part B) identifies
the resources for dealing with mitigation of an
off-site emergency.
Chapter 8 of the Template Plan maps the resources
to their requirement in emergency scenario. While
performing the PAC analysis, it may become evident
that the resources required at a particular stage
of response are insufficient. This shall be noted in
the ‘Remarks – Resource Gap’ column of the PAC
analysis sheet.
Such a resource requirement shall then be put
before the Authorities and Agencies responsible for
the development of the region.
6.5 Mock Drills and Off-site Emergency Plan
Mock Drill objectives
Mock Drills have two basic functions, namely
“training” and “testing”. The objectives of Mock Drills
are as under:
To identify deficiencies in resources (both in �
manpower and equipment).
To clarify each individual’s role and areas of �
responsibility.
To reveal weaknesses in the plans and �
procedures, before emergencies occur
To improve the level of co-ordination among �
various response personnel, departments and
agencies.
| A-16 | Guidelines for Preparation of Off-site Emergency Plan
Under the CA(EPPR) Rules, 1996, the LCG is respon-
sible to conduct the off-site mock drill every six
month in an Industrial Pocket. The DCG is required
to conduct mock drills in the district each year.
The following two types of Mock Drills are recom-
mended.
Communication Exercise Drills
In these, communication between various authori-
ties and agencies is put to trial and test. A simple
goal such as confinement of residents of a particu-
lar building is drawn. The chain of communication
beginning from first observer of source-site up to
the residents closing their windows and confining
themselves in their houses is exercised. The commu-
nication delays are noted and causes are analysed
and appropriately addressed. The communication
drills shall be carried out once in 6 months.
Full-Scale Drills
In these, the communications as well as the
response action measures by various authorities
and agencies are put to test. The response time
for reaching of fire-brigade vehicles, ambulances
to the site is tested. The efficacy of the police to
divert traffic is also put to test. Evacuation of
members in a particular building is carried out
and pertinent observations are noted. Member(s)
of expert group are present at various points such
as police station, fire department, hospitals, office
of transportation services to make and note their
observations. Their observations are compiled
and lessons are drawn from the mock-drill for
incorporation and inclusion in the off-site plan.
The full-scale drills shall be carried out at least
once in a year. The reports of the mock drills shall
be filed in Off-site Emergency Plan via Annexure 8
of the Template ( Part B)
6.6 Important Roles to Ensure Benefit from Off-Site Plan
6.6.1 Role of District Collector (or the DEA)
District Collector
The role of the District Collector (or the DEA) is
essential in order to:
Ensure due participation in the plan process �
from all the Responders listed in Section 4.2
above.
Drive the implementation of plan, in case an off- �
site emergency situation arises in the district
Ensure availability of manpower and material �
resources to combat an off-site emergency
situation
Conduct mock drills at periodic intervals. �
6.6.2 Role of Factory Inspector In-Charge of District
Factory Inspector
The role of the factory inspector is essential in order
to:
Keep a check and control on the industrial �
hazards in the district
Ensure participation of MAH units and create �
awareness of their responsibilities in event of
off-site emergency
Ensure availability of technical knowledge and �
resources to nip in bud, any potential off-site
emergency situation.
6.7 District Emergency Authority (DEA)
The MSIHC Rules, Schedule 5 assigns the responsibility
of the preparation of Off-site Emergency Plan to the
Guidelines for Preparation of Off-site Emergency Plan | A-17 |
6.6 Important Roles to Ensure Benefit from Off-Site Plan
6.6.1 Role of District Collector (or the DEA)
District Collector
The role of the District Collector (or the DEA) is
essential in order to:
Ensure due participation in the plan process �
from all the Responders listed in Section 4.2
above.
Drive the implementation of plan, in case an off- �
site emergency situation arises in the district
Ensure availability of manpower and material �
resources to combat an off-site emergency
situation
Conduct mock drills at periodic intervals. �
6.6.2 Role of Factory Inspector In-Charge of District
Factory Inspector
The role of the factory inspector is essential in order
to:
Keep a check and control on the industrial �
hazards in the district
Ensure participation of MAH units and create �
awareness of their responsibilities in event of
off-site emergency
Ensure availability of technical knowledge and �
resources to nip in bud, any potential off-site
emergency situation.
6.7 District Emergency Authority (DEA)
The MSIHC Rules, Schedule 5 assigns the responsibility
of the preparation of Off-site Emergency Plan to the
District Collector or the District Emergency Authority
designated by the State Government. Therefore, unless
any other authority is explicitly designated for particular
district or districts by the State Government, the District
Collector shall be the ex-officio, District Emergency
Authority (DEA) of the district. In the template of Off-
site Emergency Plan, the term DEA is used. Other than
in exceptional cases as mentioned above, the DEA will
be the District Collector of the District.
6.8 Conclusion
The Off-site Emergency Plan for a district as envis-
aged in the MSIHC rules, 1989, 2000 is a vital tool
to keep a tab on prevention of chemical disasters
and ensuring effective response mitigation in
event of a disaster. The role of District Authorities
and Agencies is important draw benefit from the
plan and put it in use and implementation prior,
during and post emergency. The DEA, Factory In-
spector in charge of the district must ensure that
various elements of the plan must be used in let-
ter and spirit. It is endeavour of this document to
provide maximum service in facilitation of a practi-
cally useful Off-site Emergency Plan. The template
provided as a Part B shall serve towards this end.
| A-18 | Guidelines for Preparation of Off-site Emergency Plan
The Environment (Protection) Act. 1986(amended �
1991) and following Rules thereunder:
The Environment (Protection) Rules, 1986 •
(amended 2004).
The Manufacture, Storage and Import of •
Hazardous Chemicals Rules, 1989 ( amended ,
1994 and 2000).
The Hazardous Wastes (Management and •
Handling) Rules, 1989(amended 2000 and
2003), now replaced by: Hazardous Waste
(Management, Handling & Trans-boundary
Movement) Rules, 2008.
The Environment Impact Assessment Notifi-•
cation, 2006.
The Chemical Accidents (Emergency Planning, •
Preparedness and Responses) Rules, 1996.
Bio-medical Wastes (Management and •
Handling ) Rules, 1989.
The Factories Act, 1948 (amended 1987). �
States Factory Rules.•
The Inflammable Substances Act, 1952 �
The Motor Vehicles Act, 1988 (amended 2001). �
The Central Motor Vehicles Rules, 1989 •
(amended 2005).
The Public Liability Insurance Act, 1991 (amend- �
ed 1992).
The Public Liability Insurance Rules, •
1991(amended 1993).
The Petroleum Act, 1968 (amended 2000). �
The Petroleum Rules, 2002.•
The Insecticide Act, 19687 (amended 2000). �
The Insecticide Rules, 1971 (amended 1999).•
The National Environment Tribunal Act, 1995. �
The Explosives Act, 1884 (amended till 1983). �
The Gas Cylinder Rules, 2004.•
The Static and Mobile Pressure Vessels •
(Unfired) Rules, 1981 (amended 2002.)
The Explosives Rules, 1983 (amended 2002).•
aNNeXUre a
List of Relevant Statutes on Management of Hazardous Substances
Source: National Disaster Management Guidelines - Chemical Disasters, 2007 by National Disaster Management Authority, Government of India
Guidelines for Preparation of Off-site Emergency Plan | A-19 |
aNNeXUre B
List of Chemical Accidents in Recent Past (2002-06)
S. No. Name of Unit Date of Accident SourceDeath/Injury/Missing;
Losses
1 GACL, Vadodara, Gujarat 05.09.2002 Chlorine gas-explosion 4/20/nil
2 IPCL, Gandhar, Gujarat 20.12.2002 Chlorine gas-release Nil/18 workers & 300 villagers in Jageshwar affected/nil.
3 IOC Refineries, Digboi, Assam 07.03.2003 Fire in motor spirit tank Nil; Product loss Rs.11.55crore
4 Ranbaxy Laboratories Ltd., Mohali, Punjanb
11.06.2003 Toluene 2/19/nil
5 BPCL Bottling Plant, Dhar, Madhya Pradesh
05.10.2003 LPG leak from tank lorry Nil
6 Orient Paper Mills, Amla, Shahdol, Madhya Pradesh
13.10.2003 Liquid Chlorine Nil/88/nil/;5 pipe affected
7 IDL Gulf Oil, Kukkatpally, Hyderabad, Andhra Pradesh
25.11.2003 Explosion 8/5/2001
8 Anil Enterprises, Zakhira, Rohtak, Haryana
28.04.2003 Fire in LPG fired oven 6/2nil
9 HIL Uduogmandal, Kerala 06.07.2003 Toluene fire Nil
10 Shyamfal Industries, GIDC, Vatva, Ahmedabad, Gujarat
12.04.2004 Benzene fire Nil
11 Chemical Factory, Dombivilli, Maharashtra.
31.05.2004 Hexane release 1/8/Nil
12 Chemiplast, Mettur, Tamil Nadu 18.07.2004 Chlorine leak Nil/27/Nil
13 Gujarat Refinery, Vadodara, Gujarat 29.10.2004 Explosion in slurry setter 2/13/Nil
14 Ranbaxy Laboratories Ltd., Mohali, Punjanb
30.10.2004 Fire in dryer room 1/2/nil
15 Matrix Laboratory Ltd. Unit 1, Kazipally, Medak District, Andhra
Pradesh
05.03.2005 Sodium hydride 8/nil/nil
16 Gujarat Refinery, Gujarat 15.06.2005 Fire Nil
17 Coromondal Fertilizer Ltd., Ennor, Tamil Nadu
22.07.2005 Ammonia Nil/5/nil
18 Gulf Oil Corporation Ltd., Sanathanagam, Hyderabad, Andhra
Pradesh
04.10.2005 Explosion/fire 2/2/nil
19 Orchid Chemicals and Pharmaceuticals Ltd., Alathur,
Kancheepuram District, Tamil Nadu
03.11.2005 Explosion with fire 2/4/nil
20 Aurobindo Pharma Ltd., Unit-V, IDA Pashamylaram Medak Dist., Andhra
Pradesh
28.11.2005 Explosion while drying cloxaciline sodium
1/4/ni;
21 Indian Oil Corporation Ltd., Mathura Refinery , Mathura, Uttar
Pradesh
29.12.2005 Fire 1/nil/nil
| A-20 | Guidelines for Preparation of Off-site Emergency Plan
S. No. Name of Unit Date of Accident SourceDeath/Injury/Missing;
Losses
22 Kanoria Chemicals and Industries Ltd. Renukoo, Sonebhadra, Uttar
Pradesh
29.03.2006 Chlorine release 6/23/nil
23 Anjana Explosives Ltd., Peddakaparthi Nalgonda District,
Andhra Pradesh
18.07.2006 Spilage of hazchem 5/nil/nil
24 Ravi Organics Ltd., Muzzaffarnagar, Uttar Pradesh
19.09.2006 Gas release 1/nil/nil
25 Reliance Industries Refinery, Jamnager, Gujarat
25.10.2006 Leaked hot vacuum gas oil catches fire in air
2/nil/nil
Source: National Disaster Management Guidelines - Chemical Disasters, 2007 by National Disaster Management Authority, Government of India
Guidelines for Preparation of Off-site Emergency Plan | B-1 |
Template
for
Off-site Emergency
Management Plan
Part - B
| B-2 | Guidelines for Preparation of Off-site Emergency Plan
[SEAL OF THE OFFICE OF THE DISTRICT COLLECTOR (or the DEA)]
OFFSITE EMERGENCY PLAN
FOR
DISTRICT OF: [NAME OF DISTRICT]
STATE: [NAME OF STATE]
EDITION NUMBER: [EDITION NUMBER}
EDITION DATE: [DATE ON WHICH THIS PLAN IS EFFECTED]
PREPARED BY:
[NAME OF AGENCIES/INSTITUTIONS WHO PREPARED THE PLAN
WITH ADDRESS AND CONTACT NUMBERS]
Word version of the templete can be made available upon request. Concact PRESTELS ([email protected])
Guidelines for Preparation of Off-site Emergency Plan | B-3 |
Edition No: Date of Edition Name of the District Collector (or the DEA)
Name of Factory Inspector In-charge of the District
Edition History
Table 1. Edition History
| B-4 | Guidelines for Preparation of Off-site Emergency Plan
Directory of Key Responders in the District
Table 2. Directory of key Responders
Sr. Authority Name of Current Office
Holder
Address (O, R) Telephone (O, R, M)
Email Remark
1 District Collector (or DEA)
1A Alternate
2 Superintendent of Police
2A Alternate
3 Fire Department Chief
3A Alternate
4 Medical Officer
4A Alternate
5 Inspector of Factories
6 Pollution Control Board member
7 Technical Experts
a)
b)
c)
8 Transport Provider
9 Mutual Aid Group
10 Media
11 Railways
12 Other members of DCG, Coast Guards and other authorities as may be applicable
Guidelines for Preparation of Off-site Emergency Plan | B-5 |
1.1 Statement by the District Collector (or the DEA)
“This document has been prepared in close co-
operation with the local authorities and with the
support of MAH installations in the area. I, hereby,
declare the plan to be effected”.
[NAME, SIGNATURE, SEAL AND DATE]
1.2 Statement by the Officer Appointed to Carry Out the Maintenance and Upkeep tasks of the Plan (See Section 6.1 of Part a)
“I take responsibility for the maintenance and
upkeep of the plan and shall:
Possess Master Copy of this Plan and ensure at �
Chapter 1
Enforcement of Plan
all times that it is up-to-date
Ensure distribution of the latest plan copy to the �
key responders
Maintain signatures of the responders in the �
Master Copy of the plan
Communicate changes in the plan to all the �
possessors of the plan (see Annex. 3)
Initiate revision of plan whenever it is due �
and perform other tasks that may needed for
up-to-date maintenance and sufficiency of this
plan”
[NAME, SIGNATURE, SEAL AND DATE]
1.3 Commitment of Responders
“I accept to fulfil the roles and responsibilities
assigned to me for effective implementation of off-
site plan” (See Roles and Responsibilities in Chapter 7)
Sr. Authority Designation Name of Office Holder Date Signature
Table 3. Commitments of Responders
| B-6 | Guidelines for Preparation of Off-site Emergency Plan
2.1 Background to Off-site Emergency
Manufacture, storage and use of hazardous sub-
stances pose a serious risk to industry, people in the
neighbourhood and the environment. Accidental
release of hazardous chemicals, which are flam-
mable, explosive or toxic, may lead to emergencies.
Depending upon the nature of the substance and
magnitude of the release, emergency could either
be confined within the industry (On-site Emergen-
cy) or could transgress the boundary of the industry
and affect the public in the neighbourhood in which
case it would be an Off-site Emergency
The Off-site Emergency Plan is a document detailing
how emergencies relating to a possible major
accident involving a hazardous chemical in an
industry, which may have ramifications outside the
boundary walls of that industry will be dealt with.
The rule 14(1) of MSIHC Rules read with Schedule 5
requires the District Authorities to prepare an Off-
site Emergency Plan in consultation with the Chief
Inspector of Factories and assistance from the Chief
Controller of Explosives.
The details to be furnished in the Off-site Emergency
Plan are given in Schedule 12 of the Rules. These are:
The type of accidents and release to be taken �
into account.
Organizations involved including key personnel �
and responsibilities and liaison arrangements
between them.
Chapter 2
Introduction, Use and Control of Off-site Emergency Plan
Information about the site including likely �
locations of dangerous substances, personnel
and emergency control rooms.
Technical information such as chemical and �
physical characteristics and dangers of the
substances and plant.
Identification of the facilities and transport routes. �
Contact for further advice e.g. meteorological �
information, transport, temporary food and
accommodation, first aid and hospital services,
water and agricultural authorities.
Communications links including telephones, ra- �
dios and standby methods.
Special equipment including fire fighting mate- �
rials, damage control and repair items.
Details of emergency response procedures. �
Notification to the public. �
Evacuation arrangements. �
Arrangements for dealing with the press and �
other media interests.
Long term clean up. �
Transportation of hazardous chemical by road or
pipeline may pose a threat to the population and
environment. Such accidents also belong to the
category of off-site emergency. The definition of
major chemical accident includes accidents during
transportation vide rule 2(f ) of the CA(EPPR) Rules
2.2 Off-site Emergency
The chemical release, fire, explosion or spillage in an
industrial unit including isolated storages that may
Guidelines for Preparation of Off-site Emergency Plan | B-7 |
have ramifications outside the boundary of that
particular industrial unit or such a chemical release,
fire, explosion or spillage during the transportation
of hazardous chemicals by road or by pipeline, all
of which may pose a threat to life and property of
public at large, is a situation qualifying to be an off-
site emergency with the declaration to this effect by
the DEA.
2.3 Off-site Emergency Plan and its Use
Off-site Emergency Plan foresees the possible
emergency scenarios leading to Off-site Emergency
Plan.
The following are the use of Off-site Emergency
Plan
2.3.1 Pre-Emergency UseThe plan identifies the resources required for deal- �
ing with likely emergencies and draws attention
to additional resources that may be required.
The plan helps to inform the necessary authorities �
and stake-holders of their responsibilities during
the emergency.
2.3.2 During Emergency UseThe plan gives the procedures to be executed �
by various roles during the off-site emergency
for its control and mitigation.
The plan serves as a ready-reckoned for all vital �
and factual information that is required during
emergency.
2.3.3 Post-Emergency UseThe plan gives procedures for prevention of �
damage in the long term that may arise as effect
of an emergency.
The plan lays for review of emergency to draw �
necessary observations and lessons for self-
enrichment of plan for future emergencies.
2.4 Scope of Off-site Emergency Plan
The Off-site Emergency Plan applies to the entire
district. The Off-site Emergency Plan compiles all
the possible emergency scenarios pertaining to
industrial or transportation hazards that may arise
within the district boundaries and provides for the
response mitigation of the same.
The inter-relationship Off-site Emergency Plan is
depicted in the diagram below
2.5 Declaration of Off-site Emergency and Enforcement of Plan
The responsibility and the power of declaring the
off-site emergency in the district vests with the DEA.
In his absence, the responsibility and power vests
with the authority appointed in lieu of the DEA.
The declaration of emergency shall be made via
Annexure 1.
2.6 Possessors of the Off-site Emergency Plan and the Maintenance Officer of the Off-site Emergency Plan
The copy of the off-site plan must be possessed by
all the responders who contribute in the off-site
| B-8 | Guidelines for Preparation of Off-site Emergency Plan
Table 4. Possessors of Off-site Emergency Plan
Sr. Authority Designation
Name of Office Holder
Address
(O, R)
Contact
(O, R, M)
Remarks
# Address (O, R) is Address of Office (O) and Residence (R)
## Contact (O, R, M) is phone number of Office (O) and Residence (R) and Mobile (M)
planning process or in mitigation response. The
list of all the possessors of the off-site plan is as
following:
The District Collector (or the DEA) is responsible
for the maintenance and upkeep of the Off-site
Emergency Plan. He may designate one officer to
carry out the tasks pertaining to this role. This officer
should be indicated in the ‘Remarks’ column of the
table above.
2.7 Review and Amendment of Plan
The Off-site Emergency Plan shall be distributed
to all people listed in Annexure 2. It shall be the
duty of the District Collector (or the DEA) to ensure
distribution of up-to-date copy of this plan to all
people listed in Annexure 2. It shall also be the duty
of all authorities listed in Annexure 2 to see to it
that they receive an up-to-date copy of subsequent
versions of the plan.
This Off-site Emergency Plan is a dynamic document
and must at all times reflect the ground realities by
changing when these change.
For this purpose, the Off-site Emergency Plan is set
to expire after a period of 2 years from the date on
which it is effected. A new version of the plan shall
be prepared, released and distributed before the
expiry of the current version. Should there be any
major changes such as upcoming of new industrial
units, identification of new hazards among others
or an instance of an off-site emergency the Off-site
Emergency Plan shall be revised even before its due
expiry.
Should there be any minor changes such as changes
in person(s) holding particular authorities, changes
in phone numbers among others, these shall be
communicated to all the possessors of the Off-site
Emergency Plan via Annexure 3 by the DEA. The
stakeholders of the plan undergoing change in
positions or having changed their phone numbers
should inform the same to the DEA via Annexure 4.
2.8 Dovetailing of On-site Emergency Plans with this Plan
This Off-site Emergency Plan is put use when an
industrial on-site emergency is expected to or has
already transcended the boundaries of the industrial
unit. It is necessary that the actions enlisted in the
on-site plan are consistent with the plan of action
in this Off-site Emergency Plan. For this purpose it
is necessary for the MAH units to ensure that their
Guidelines for Preparation of Off-site Emergency Plan | B-9 |
plans agree to and is consistent with the Off-site
Emergency Plan. The dovetailing to this effect needs
to be ensured in the following areas among others:
Communication to the District Authorities �
/Agencies (see Chapter 8: Emergency Scenarios)
Line of command (See Chapter 7: Organisation �
of Roles)
2.9 Annexing of this Plan with District Disaster Management Plan
The offsite plan should be annexed to the district
disaster management plan.
The diagram below shows the relation of offsite plan
with in the schema of disaster management plans.
The Onsite Plans and Offsite Plans are chemical disaster plans as stipulated in the MSIHC Rules, 1989. The District Disaster, State Disaster and National Disaster Plans are general disaster plans as stipulated in the Disaster Management Act, 2005.
| B-10 | Guidelines for Preparation of Off-site Emergency Plan
3.1 Map of District
The map should be to scale 1:50000. The map should
indicate political boundaries with neighbouring
districts, talukas, major cities/villages within
district, major roads, railways, rivers, wells and other
important features. It should indicate the locations
of MAH units and other hazardous areas. Police
stations, Fire Services, Hospitals shall also be located
on the map. Evacuation areas, Schools, Colleges,
Community Centres around MAH units shall be
identified and indicated on the map. Other resources
useful in emergency mitigation such as Emergency
Response Centres etc. shall be indicated. The routes
of transportation of hazardous chemicals, pipelines
transporting hazardous chemicals shall also be
shown on the map
3.2 Description of Map and other Geographic Information
3.3 Demographic Information
Chapter 3
District Profile
The maximum and minimum value for the district
on whole is recorded. The maximum value of a pa-
rameter is the maximum value of that parameter
observed anywhere in the district during the past
10 years. Same applies to the minimum value.
Should there extreme variations in the above pa-
rameters suitable seasonal or geographic classifica-
tions shall be made.
Sr. Village / Town
Male Female Children Total Remarks
Table 5. Population Distribution
3.4 Meteorological Information
The meteorological factors which govern the disper-
sion of toxic releases are temperature, humidity and
wind-speed. It is important to record the indicative
values of these for use of dispersion calculations.
Table 6. Meteorological Information
Sr. Parameter Maximum Minimum
1 Temperature
2 Humidity
3 Wind-velocity
The data pertaining to the table 5 may be obtained
from the local meteorological department. The
meteorological department shall provide the
necessary data available for the district.
3.5 Important Activities/Events/Festive Events in District
Table 7. List of important events in the district
Sr. Event Name
Date Location Population involved
Remark
Guidelines for Preparation of Off-site Emergency Plan | B-11 |
3.6 Directory of Responders in the District
Table 8. Natural disaster history
Sr. Natural Disaster, Date and Location
Description, Magnitude and Effects
Remark
Table 9. Responder directory (See Chapter 4 of Part A)
Sr. Authority Name of Current Office Holder Address
(O, R)
Telephone (O, R, M)
Email Remark
| B-12 | Guidelines for Preparation of Off-site Emergency Plan
4.1 Introduction to Hazards
Hazard is the existence of a situation that can
potentially lead to disaster. The offsite emergency
plan identifies the hazards that can lead to a chemical
disaster. The hazards identified are primarily the MAH
installations including isolated storages. However
hazards are not restricted to MAH installations
Chapter 4
Identification of Hazards
Table 10 Information on MAH Unit Installations
Sr. MAH Unit Name With Address
Activity Carried Out
Hazardous Chemicals Handled With Quantities (All
Chemicals that make the unit MAH)
Disasters Likely
Contact Persons Name
# (Occ, Fm, Si) With Phone Numbers (O,
R, M)
Remarks
alone. Therefore, identification of hazards other than
those at MAH installations is important as well. This
chapter identifies the hazards in the district.
4.2 MAH Unit Installations
All MAH units including isolated storages have been
listed and detailed in the table below:
#
Occ: Occupier
Fm: Factory Manager
Si: Site Incident Controller
4.3 Transportation of Hazardous Goods
Sr. Road No.
From – To
Stretch Length Details Of Hazardous Chemicals Flow With
Quantity
Villages / Towns Enroute
Remarks
Table: 11 Information on Hazmat transportation by road
Guidelines for Preparation of Off-site Emergency Plan | B-13 |
Table 12. Information on Hazmat transportation by rail
Sr. Stretch
From – To
Length Details Of Hazardous Chemicals Flow With Quantity
Stations enroute Remarks
Table 13. Information on Hazmat transportation by water
Sr. Stretch
From – To
Length Details Of Hazardous Chemicals Flow With
Quantity
Coastal Areas Enroute
Remarks
Table 14. Information on Hazmat transportation by pipeline
Sr. Pipeline Stretch.
From-To
Company Name With Address And Phone
Number
Length Details of Hazmat Flow
With Quantity
Villages / Towns / Vulnerable Points
Enroute
Remarks
| B-14 | Guidelines for Preparation of Off-site Emergency Plan
5.1 Introduction to Emergency Scenarios and Vulnerable Zones
Emergency ScenariosMajor industrial hazards are generally associated
with the potential for toxic chemical release, fire or
explosion
Events involving release of toxic materials �
Slow or intermittent release of toxic substance •
from a leaking valve,
Rapid release for limited duration due to •
fracture of pipe leading to a toxic cloud which
may travel or dissipate,
Massive release of toxic substance due to •
failure of large storage or process vessel or
uncontrolled chemical reaction.
Loss of containment for a plant threatened by •
a fire
Events involving spillage of flammable liquids �
or loss of containment of flammable gases
Confined spill •
Unconfined spill •
Major fires with no danger of explosion �
Hazards from high levels of thermal radiation
and smoke, for example:
Pool fire, •
Flash fire, •
Jet fire etc. •
Explosion.•
Chapter 5
Identification of Emergency Scenarios and Delineation of Vulnerable Zones
Explosion Events �
Hazards from blast waves, flying debris, high
level of thermal radiation. Serious emergencies
that can be envisaged are
Confined explosions, •
Unconfined vapour cloud explosion, •
BLEVE•
Assessment of possible incidents is to be carried out
for each MAH installation, in terms of:
The quantity of hazardous material which could �
be released
The rate of release �
Effects of such a release �
Thermal radiation from a fire at different �
distances
Blast over-pressures due to an explosion as �
function of distance from the incident spot
Toxic effects affecting the vulnerable zone (circle �
showing concentrations)
Number of people likely to be affected �
Methodology for Calculation of Vulnerable Zones Prescribed by MOEFThe injury criteria or level of concern is used to determine
vulnerable zones. The consequence distances for Toxic
Release, Fire and Explosion scenario are worked out as
per micro-methodology evolved by the MOEF.
Toxic ExposureThe IDLH (immediately dangerous to life and health)
concentration value is taken as the criterion for
Guidelines for Preparation of Off-site Emergency Plan | B-15 |
identifying vulnerability zone. Accidents giving rise
to toxic clouds from each of the MAH units in the
area need to be considered.
The calculations for consequence distances should
be done for weather stability class D with wind speed
of 3 m/s and also for class F with wind speed of 1 to 2
m/s. The circles with radii equal to the consequence
distances should be drawn on maps to indicate
vulnerable zones for planning and preparedness
purpose. The toxic cloud arrival and departure time
should also be indicated on the map for each circle.
Heat Radiation (Pool Fire, Flare, BLEVE)The heat radiation equal to 10 kW/m2 produces
second-degree burns on unprotected parts of
the human body. The heat radiation of 5 kW/m2
produces first-degree burns. These inten sities of
radiation are chosen as the limit value to identify
vulnerable zones. The radiation intensity of 10 kW/m2
is taken as a limit value to identify fatality zone and
that of 5 kW/m2 is taken for the injury zone.
ExplosionIt is assumed that everyone inside an area in which
the peak over-pressure is greater than 0.1 bar will
be wounded. This area is and will be represented
by a circle drawn around the explosion centre and
having radius equal to the (calculated) distance
from explosion centre at which peak over-pressure
= 0.1 bar is expected.
In the case of a vapour cloud explosion, the explosion
centre, which coincides with the cloud centre, will vary
depending upon the prevailing weather conditions
and the time when it gets source of ignition.
Use of Vulnerability TemplatesThe Maps showing the location of likely
emergencies and corresponding vulnerable
zones are to be included in the Plan. The maps
are useful for planning and preparing, in advance,
for the likely emergencies. The maps are also
useful to identify area under threat in an actual
emergency.
To assess the impact of toxic release, use of
computer software along with the real time input of
meteorological data would be an ideal method to
identify the area under threat. However, it may not
be always possible to have such sophisticated facility
available at every place. Under such circumstances,
transparent “Templates” can be developed and
used to assess the effects of spread of the toxic
cloud with concentration levels as function of
distance from the point of origin.
The transparent templates for each scenario which
are to be used in the following manner.
Place the transparency on the relevant map with
The toxic release source on the map and the �
plume source on the transparency coinciding.
The X-axis of the plume pointing in the prevailing �
wind direction.
Injuries requiring medical attention will extend �
up to the contours of the transpar ency superim-
posed on the area map.
Templates should be developed for the Hazardous
Chemicals used, stored or transported in the MAH
Units to provide the District Emergency Authority
and the Local Crisis Group with a tool for rapid
assessment of vulnerable zones.
Templates should be drawn on transparent sheets
and indicate the shape and ex tent of a vulnerable
zone. The vulnerable zone in the event of a given
toxic release scenario is assessed by using the ap-
propriate template in conjunction with its associ-
| B-16 | Guidelines for Preparation of Off-site Emergency Plan
ated map. The scale of the template needs to be the
same as that of the map.
It may be noted that the templates will be useful for
identifying the vulnerability zone in case of toxic cloud.
Computer ModelsMOEF in association with National Informatics Centre
(NIC) is in process of evolving computer software
model for calculation of vulnerable zone and its
projection on digital maps. Wherever available this
computerized model may be used for delineation of
vulnerable zones.
Use of specific informationThe use of specific information regarding wind
velocity, temperature etc. at the site during the
actual occurrence of emergency can be made
wherever the computer software model is in use.
In its absence the standard calculations of Class D
with wind speed of 3 m/s and Class F with wind
Table 15. Emergency Scenarios in MAH Installations
Sr. MAH Unit Name
Hazardous Chemicals Handled
Disaster Scenarios #
(L1/L2/L3 )* Vulnerable Zone Dia.
With Distinct Features Such As Schools Etc.
Population In Vulnerable Zone
Remarks
# Based on Maximum Credible Loss Scenario (MCLS)
* Project disaster category L1, L2, L3 as per the National Disaster Management Guidelines on Chemical Disasters, April 2007 by NDMA. According to the guidelines, the classification is to be given on the basis of magnitude of probable severity and the level of control required. The classification L1-L3 is explained as:
speed 1 to 2 m/s as prescribed by MOEF shall be
used accordingly for delineation of vulnerable
zones.
5.2 Emergency Scenarios in MAH Installations
L1: A district level disaster within the capabilities of
the district administration to deal with.
L2: A state level disaster within the capabilities of
the state government to deal with.
L3: A National level disaster requiring major direct
intervention of the Central Government.
Also, the guidelines define fourth category ‘L0’ as ‘No
disaster situation. This is a level at which surveillance,
preparedness and mitigation activities must be
carried out.’
Since the off-site plan is a district-level plan, the possible
emergencies within a district of higher magnitude (L2,
L3) should get identified in the off-site plan.
Guidelines for Preparation of Off-site Emergency Plan | B-17 |
5.3 Domino Effect Emergency Scenarios
5.4 Other Emergency Scenarios Including Fall-Outs of Natural Disasters
Table 16. Domino Effects of Emergency Scenarios
Sr. Disaster Scenario (Table no., Sr. and
Description)
Triggered Scenario 1
Triggered Scenario 2
Triggered Scenario 3
Remarks
Table 17. Emergency Scenarios arising out of Natural Disasters
Sr. Natural Disasters Likely Vulnerable MAH Unit, Disaster Scenario Remarks
5.5 Development of Vulnerability Templates
Table 18. Vulnerability Template Catalogue
Sr. MAH Unit Disaster Scenario Ref No: and
Description
Vulnerability Template Identification No:
Map Identification No: Remarks
| B-18 | Guidelines for Preparation of Off-site Emergency Plan
6.1 Introduction to Emergency Resources
Prompt availability of emergency resources is vital
to mitigating an offsite emergency. The emergency
Chapter 6
Identification of Emergency Resources
resources required should be identified with the
sources of their availability and the means to call for
them. The emergency resources and their sources
are identified in this chapter.
Table 19. Police Information
Sr. Police Station with Address and
Phone Number
Designated Contact Persons with Address and Phone Numbers
(O, R, M)
NUMBER OF
# PI, SI, ASI, HC, PC, Total
NUMBER OF VEHICLES
VAN, JEEP, M.CYCLE
REMARKS
6.2 Police
# PI: Police Inspector, SI: Sub-Inspector, ASI: Assistant Sub-Inspector, HC: Head Constable, PC: Police Constable
Table 20. Fire Department Information
Sr. Fire Station with Address
and Phone Number
Designated Contact Persons with Address
(O, R) and Phone Numbers (O, R, M)
Type and Number Of Fire Tenders
(Water, Foam, Mist tenders)
Other equipments and materials (SCBA,
PPE, Dry Chemical Powder etc.)
Number Of Fire Men
Remarks
Table 21. Resources with MAH units forming part of Mutual Aid Resources
Sr. MAH unit name with Address and
Phone Number
Designated Contact Persons with Address
(O, R) and Phone Numbers (O, R, M)
Type and Number Of Fire Tenders (Water, Foam, Mist tenders)
Other equipments and materials
(SCBA, PPE, Fire Extinguishers etc.)
Remarks
6.3 Fire
Guidelines for Preparation of Off-site Emergency Plan | B-19 |
6.5 Other Emergency Infrastructure
Table 22. Medical Aid Information
Sr. Hospital Name with Address
And Phone Number
Designated Contact Persons with Address
(O, R) and Phone Numbers (O, R, M)
No. Of Beds Number Of Doctors, Nurses,
Staff, Total
No. Of Burn Wards
No. Of Ambu-lance
Remarks
Table 23. Emergency Response Vehicles
Sr. Emergency Response Vehicle Description and Facilities
available
Location Contact Authorities Name, Address And Phone Numbers (O,
R, M)
Remarks
Table 24. Emergency Response Centre (ERC), Poison Control Centre (PCC)
Sr. ERC / PCC Description and Facilities available
Location Contact Authorities Name, Address And Phone Numbers (O,
R, M)
Remarks
6.6 Evacuation – Transport and Sheltering
Table 25. Evacuation Information – Transport
Sr. Transport Company
Fleet (No. Of Buses And Trucks)
Contact Authorities Name, Address And Phone Numbers (O, R, M)
Remarks
6.4 Medical Aid
| B-20 | Guidelines for Preparation of Off-site Emergency Plan
6.7 Technical Resources
6.7.1 Technical Experts Directory
Table 26. Evacuation Information – Sheltering
Sr. Evacuation Area Location
Capacity (Number Of People)
Contact Authorities Name, Address And Phone Number
Remarks
Table 27. Technical Experts Directory
Sr. Expert Name Expertise Details, Qualification, Designation
Address
(O, R)
Phone Numbers (O, R, M)
Remarks
6.7.2 Emergency Response Data Sheets (ERDS)
PRESTELS recommends maintenance of Emergency
Response Data Sheets (analogous to Material Safety
Data Sheets - MSDS) for all the hazardous chemicals
handled in the district. The ERDS should contain all
the information required by the District Authorities
and Agencies to take appropriate emergency
response measures. The sample ERDS sheet for MIC
is attached in Annexure 9.
6.8 Media Resources
Table 28. Media Resources Information
Sr. Agency (Radio, Television, Mobile Public Announcement, Mass-Sms) With Address And
Phone Number
Contact Persons Name, Address And Phone Number (O, R, M)
Remarks
Guidelines for Preparation of Off-site Emergency Plan | B-21 |
6.9 Other Emergency Resources
Table 29. Other Emergency Resources – Earthmoving Equipment
Sr. Toxic Chemicals Handled in District (esp. in MAH
units)
Antidotes Required
Antidote Supplier* Name With Address And Phone
Numbers, Contact Persons
Quantity of Antidotes Available
Remarks
Table 30. Other Emergency Resources – Antidote Suppliers
Sr. Toxic Chemicals Handled in District (esp. in MAH units)
Antidotes Required
Antidote Supplier* Name With Address And Phone Numbers,
Contact Persons
Quantity of Antidotes Available
Remarks
* The antidote suppliers include industrial unit stock, retail medical stores, wholesaler, distributor and manufacturer of antidotes
Table 31. Other Emergency Resources – NGOs
Sr. NGO Name With Address And Phone Number
Contact Persons Name, Address And Phone Number (O, R, M)
Remarks
Table 32. Assembly Points
Sr. MAH unit Assembly point (School, Hall, Ground)
Contact Persons Name, Address And Phone Number (O, R, M)
Remarks
Table 33. MAH Unit Statutory Compliance Status
Sr. MAH Unit Name With Address And Phone Number
On-site Plan Status PLI status Remarks
| B-22 | Guidelines for Preparation of Off-site Emergency Plan
7.1 Introduction
Meticulous role playing and effective discharging
of responsibilities is crucial to management
of off-site emergency. The responsibilities of
various authorities and agencies are provided in
this chapter. It is important that the concerned
authorities and agencies know, understand and
accept their responsibilities. The issues pertaining
thereof should be resolved in peace times. Apart
from the assigned responsibilities, the specifics of
situation may call for prudent action. It is however
envisaged to foresee various tasks and assign the
respective responsibilities. The list of responders to
off-site emergency is provided in Chapter 4 of Part
A of this guideline document. The responsibilities
of the responders listed therein are provided
below.
7.2 Responsibilities of Authorities and Agencies
The general responsibilities of the various authori-
ties and agencies involved in mitigation of off-site
emergency are listed below. In addition, the authori-
ties and agencies should perform all such tasks as
per the demands of emergency situation at hand.
7.2.1 District emergency Authority (DEA – District Collector)
Take overall responsibility for combating the �
Off-site emergency
Ensure the Police and Fire, personnel combat �
the emergency
Chapter 7
Roles and Responsibilities
Arrange, if necessary, for warning and evacuating �
the public, through the Depart ment of Police
Communicate with Media to disseminate vital �
information to public
Arrange for dispensing vital information to �
public using arrangements like mass-sms, public
announcement using pre-recorded tapes
Direct the team of Doctors headed by the �
Medical Officer
Direct the local chief of State Transport �
Corporation to arrange for transport of victims
and evacuation of people trapped within the
hazard zone, if necessary
Direct the Electricity Board officials to � give
uninterrupted power supply
Direct the official in-charge to provide �
uninterrupted water supply as required
If evacuation of population is necessary direct �
the Revenue officer and the Supply officer
to provide safe shelters, food and other life
sustaining requirements for the evacuees, if
required
Co-ordinate with the media �
Arrange for, release and provide necessary funds �
at various stages of disaster mitigation
Direct railways to stop train, if required �
7.2.2 Police Communicate and co-ordinate with �
MAH unit•
DEA•
Fire Services.•
Transport authorities.•
Medical Department•
Guidelines for Preparation of Off-site Emergency Plan | B-23 |
Media•
Civil Defence and Home Guards.•
Local Army establishment as required.•
Warn and advice the people in the affected �
area
Regulate and divert traffic �
Arrange for evacuation �
Maintain law and order in the area �
Ensure protection of life and property of �
evacuees
Deal sternly with people exploiting opportunism �
in wake of a disaster
7.2.3 Fire Service DepartmentPerform fire-fighting operations by deploying �
men and appliances
Perform rescue operation in the affected area. �
Communicate and co-ordinate with Police, �
Medical Department of necessary informa-
tion
Keep knowledge on appropriate response to �
different chemical emergency scenarios
Keep adequate stock and resource information �
on necessary means, material, appliances
required to deal with particular emergency
situations with updated details of suppliers and
stockists
7.2.4 Medical DepartmentArrange for preparing casualties to be sent to �
government/private hospitals
Set up temporary medical camp and ensure �
medical facilities at affected location and
neighbourhood
Keep knowledge on appropriate response �
to different cases of toxic consumption and
injuries
Set up temporary mortuary, identification of �
dead bodies and post-mortem
7.2.5 Factory Inspectorate DepartmentProvide necessary direction to MAH � unit and
assistance to DEA, Fire Department, Medical
Department among others
Seek help from and involve assistance of �
Technical Experts of relevant and appropriate
expertise and specialization
Initiate, facilitate and provide for investigation �
into the accident
7.2.6 Occupier of MAH UnitPossess up-to-date copy of Off-site Emergency �
Plan
Communicate promptly, any foreseeable �
disaster, to the DEA, Police, Fire Service and
Inspector of Factories in-charge of the District
Communicate changes within the factory that �
may require inclusion or suitable modification
in the off-site plan to the DEA (Maintenance
Officer) of the Plan
7.2.7 Technical Experts Promptly respond to provide the necessary �
technical advice to MAH unit, DEA, Factory In-
spectors, Fire Department, Medical Department
among others
Provide on-phone help after properly under- �
standing and assessing the situation
Make visit to the site in co-ordination with DEA, �
Factory Inspector(s) to provide for appropriate
technical assistance
7.2.8 Mutual AID GroupsTo quickly mobilize the resources required to �
emergency mitigation at the site or wherever
required
7.2.9 Pollution Control BoardProject likely areas to be polluted. �
| B-24 | Guidelines for Preparation of Off-site Emergency Plan
Carry out pollution assessment at suspected lo- �
cations including soil, river and air assessment
Ensure controlling of long-term pollution dam- �
age
Identify unidentified substances, chemical re- �
leases, if any
7.2.10 Transport Fleet Owners Including State Transport
Act on the direction of DEA or Police �
Ascertain the extent of transport required with �
pick-points, routes and destinations to transport
people
Promptly arrange for dispatch of vehicles with �
sufficient fuel for evacuation purposes
Arrange vehicles to transport water and other �
provision to camps set up
7.2.11 MediaDisseminate vital information to public on �
direction of DEA, Police and other Authorities
Act responsibly in disseminating vital informa- �
tion and dispel rumours, if any
7.2.12 RailwaysAct as per the direction of DEA to stop incoming �
trains, if required
Arrange for evacuation, if required �
7.2.13 Transporter of Hazardous ChemicalPossess up-to-date copy of Off-site Emergency �
Plan
Communicate promptly, any foreseeable �
disaster during transportation to the DEA, Police,
Fire Service and Inspector of Factories in-charge
of the District
Communicate new assignments, newly added �
routes or other changes that may require inclusion
or suitable modification in the off-site plan to the
DEA (Maintenance Officer) of the Plan
7.2.14 Electricity Board Arrange for uninterrupted power supply to the �
plant, as required
Arrange for lighting; at temporary medical �
camps etc
Arrange for switching off power supply on �
request from District Authorities
Take care of electrical equipment within the �
damaged zone
7.2.15 Telecommunication DepartmentEnsure working of communication lines to en- �
able effective communication between various
responder agencies
7.2.16 Aviation DepartmentMobilise resources such as helicopters for �
knocking down vapour clouds etc
7.2.17 Civil Defence Co-ordinate with Police authorities �
Extend help in evacuation �
Arrange for round the clock security arrange- �
ments in the affected and evacuation areas
Safeguard the properties and belongings of �
evacuees
7.2.18 Home GuardsCo-ordinate with Police authorities. �
Extend help in evacuation. �
Arrange for round the clock security arrange- �
ments in the affected and evacuation areas.
Safeguard the properties and belongings of �
evacuees
7.2.19 National Disaster Response ForceCarry out tasks for disaster mitigation as re- �
quired
7.2.20 Local Government BodiesMobilise necessary resources in emergency �
Guidelines for Preparation of Off-site Emergency Plan | B-25 |
mitigation
Provide for community halls, town halls for �
evacuees
7.2.21 NGOsAct as per the direction of DEA, Police and other �
District Authorities
Aid and assist the district authorities in emer- �
gency mitigation
7.2.22 Public Works DepartmentEnsure adequate water supply for fire- fighting. �
Arrange for drinking water for evacuated persons �
at rallying posts, parking yards and evacuation
centres
Arrange water for cattle. �
7.2.23 Water Supply BoardArrange for supply of water to evacuees and all �
others involved in emergency control operations
7.2.24 Civil Supplies DepartmentArrangement to provide food and clothing as �
necessary, to the evacuees and all others in-
volved in emergency controlling operations
7.2.25 Animal Husbandry DepartmentArrange for taking care of cattle - especially milch �
animals living in affected zone
If evacuation of cattle is required, identify the �
evacuation area and shelter
Transport arrangements for evacuation �
Fodder, drinking water arrangements for cattle. �
Arrange for veterinary doctor �
7.2.26 Agriculture DepartmentArrange for protection of food grains and �
standing crops in the vulnerable zone.
Give instructions, to farmers, if any
7.2.27 Regional Transport AuthorityTo investigate into the cause of road accident in-
volving hazardous goods carrier and take necessary
action
7.2.28 Other Members of DCGAssist and act as per directions of the District �
Collector
7.2.29 Coasts Guards and Port Trusts (in case of emergency situation in coastal areas)
Co-ordinate with Police authorities. �
Provide necessary help in emergency mitigation �
7.3 Emergency Organisation Chart of Roles
The emergency organization chart of roles must be
clearly defined. The emergency organization and
line of command may differ from the operational
line of command during peace times.
A sample emergency organization of roles is
attached here for reference:
| B-26 | Guidelines for Preparation of Off-site Emergency Plan
EMERGENCY ORGANSTAION FOR INDUSTRIAL DISASTER - Example
EMERGENCY ORGANISATION FOR ROAD TRANSPORT DISASTER - Example
Guidelines for Preparation of Off-site Emergency Plan | B-27 |
7.4 Emergency Behaviour of Public at Large
The extent of damage control in an emergency situ-
ation can improve greatly if the public at large con-
ducts itself in a responsible and intelligent manner.
The possible reasons for disadvantageous behav-
iour by the public is
Panic �
Curiosity or Excitement �
Purposeful exploitation of the situation �
The following are the ways and means of addressing
the above causes of disadvantageous behaviour
1. PanicPanic arises out of sense of urgency coupled with
lack of knowledge and information to deal with
the situation. Panic can be dealt with effectively by
dissemination of important knowledge, information
and instructions on response behaviour. A toxic gas
leak may require people to stay confined than run
out in helter-skelter. Such useful response instruction
can be disseminated to public at large through
mass education campaigns. Such campaigns shall
be periodically conducted by vulnerable industrial
units. Educational syllabus for schools shall include
lesson on response behaviour in case of emergency.
Chemistry lessons shall include simple tips on
responding to various gases. For instance, in case
of MIC leak at Bhopal, the magnitude of toxic
consumption could have greatly reduced had
people put a wet handkerchief on their nose since
MIC dissolves in water.
2. Curiosity or ExcitementUproar, noise, mass gatherings bring curiosity to the
mind of people who add to the number of on-lookers.
Police should play an active role in cordoning off the
emergency area and judiciously allow volunteers
who are willing to act to mitigate the disaster.
3. Purposeful Exploitation of situationUnfortunately some people seek opportunism
for themselves in wake of a disaster. Such
people contribute only to the reducing the
efficacy of mitigation effort. Such people
should be identified and dealt sternly with by
the Police and other authorities involved in
mitigation.
7.5 Specific Actions Required by Public at Large and Communication to them
An emergency situation may call for the public at
large to act on information such as evacuation to a
particular area or confinement of themselves in their
houses with all windows closed. The dissemination
of such information shall be made using media
such as Radio, Television, Mass-SMS, Mobile Public
Announcement System.
| B-28 | Guidelines for Preparation of Off-site Emergency Plan
8.1 Introduction
The emergency response plan is the detailed plan to
be executed in case of an emergency. The emergency
response plan is drawn for the emergency scenario
under consideration.
No two emergency scenarios are alike and as such
the possible emergency scenarios at any given time
can be infinite. Laying down common emergency
response plan is not possible and also not advisable
as different scenarios will call for different plans.
It is therefore prudent to begin with emergency
response planning for most critical emergency
scenarios. The emergency response planning can
be put to test during the mock drill. This should
ensure preparation of emergency response plan for
new emergency scenario every time a mock drill is
conducted. PRESTELS has developed PAC analysis
for emergency response planning, which is attached
and explained in Part C of this document. The PAC
analysis yield emergency response plan for the
emergency scenario under consideration
8.2 Enforcement and Implementation of Plan
The responsibility for enforcement and implementa-
tion of the plan rests with the DEA. In event of offsite
emergency, the DEA will declare the emergency via
Annexure 1 and communicate the same to the au-
thorities and agencies listed there under along with
other responders. The various authorities and agen-
cies shall discharge their responsibility and carry out
all such tasks that the situation on hand may call for.
8.3 Marriage of Chapter 5, 6, 7
Chapter 5 deals with projection of emergency �
scenarios
Chapter 6 deals with identification of resources �
Chapter 7 deals with roles and responsibilities �
An emergency scenario is an undesired event that
may occur. Resources both material and intellectual
are required to mitigate the possible effect of an
emergency scenario. The people involved in applying
the resources for mitigation should discharge their
expected roles and responsibilities intelligently and
faithfully. Thus, we must in advance keep the resourc-
es and roles-responsibilities mapped to the emergen-
cy scenario. This mapping is determinedly referred
to as the ‘Marriage of Chapter 5, 6 and 7). PRESTELS
recommends PAC analysis for developing a complete
course of response in case of an emergency.
(see information on PAC analysis attached in Part C)
8.4 Discharging and Co-Ordination of Roles and Responsibilities
It is of utmost importance that all authorities
and stakeholders involved in disaster mitigation
discharge their roles and responsibilities in letter
and spirit. It is for this purpose necessary to ensure
that the authorities and stakeholders know with full
awareness their roles and responsibilities.
Chapter 8
Emergency Response Plan
Guidelines for Preparation of Off-site Emergency Plan | B-29 |
9.1 Calling off Emergency
Having satisfied himself that the emergency is over,
the DEA shall call off the emergency via Annexure
5. The calling off of emergency shall restore life to
normalcy and curtail the spread of misinformation,
rumours giving opportunism for exploitation of the
situation. The emergency camps set up shall contin-
ue to function after calling off of emergency till they
provide all the needed support to the aggrieved.
9.2 Controlling Long-Term Damage
The emergency may affect natural resources of soil,
water and air. The PCB unit shall make assessment
of the areas adjoining the emergency scene where
such a damage may take place. The PCB shall submit
their report to the DEA via Annexure 6. The DEA
shall act on the information and recommendation
Chapter 9
Post-Emergency Restoration
provided by the PCB.
9.3 Investigation Studies and Reporting
The DEA shall appoint a committee constituting the
necessary stakeholders who may be necessary to
carry out thorough investigation into the emergency
as well as introspection of the response actions and
measures. The investigation reporting shall be via
Annexure 7. The investigation report shall become a
part of Chapter 10 of this report. The lessons drawn
from the investigation shall be incorporated into
this plan in the appropriate chapters.
9.4 Compensation and Settlements
The compensation and settlements shall be carried
out by the DEA. The DEA shall process compensations
as claimed under the PLIA.
| B-30 | Guidelines for Preparation of Off-site Emergency Plan
Chapter 10
Past Accidents in the District
The investigation reports of offsite emergencies made
via Annexure 7 shall be filed in this chapter. The notes
Table 34. Lessons from Past Accidents
Sr. Off-site Emergency Reference with Investigation Report No:
Notes of changes made in the plan
Remarks
of changes made in the plan drawing lessons from
the off-site emergency shall be recorded in this plan
Guidelines for Preparation of Off-site Emergency Plan | B-31 |
Mock drills are exercises to test the effectiveness
of plan. Mock drills must be carried out at periodic
intervals as specified in the MSIHC rules (i.e. once in
a year). The lessons drawn from Mock drills must be
used to improve the plan. The Mock drill reports via
Chapter 11
Mock Drills
Table 35. Lessons from Mock Drills
Annexure 8 shall be filed in this chapter.
The notes of changes made in the plan drawing les-
sons from the mock drills shall be recorded in this
plan
Sr. Off-Site Emergency Reference With Investigation Report No:
Notes Of Changes Made In The Plan
Remarks
| B-32 | Guidelines for Preparation of Off-site Emergency Plan
I declare Off-site Emergency in the district of [NAME OF THE DISTRICT] starting at this _____________________
hour on this day of ________________________________________________________________________.
DEA:[NAME, SIGNATURE AND SEAL]
Date: [DATE]
Information to the following be made via phone followed by written communication
aNNeXUre 1
Declaration of Off-site Emergency
Sr. No. Authority Name of Person(s) Contact Number(s) Address
1. Police
2 Fire Brigade
3 Medical Department
4 Factories Inspectorate
5 Mutual Aid Group
6 Pollution Control Board
7 Media
8 Other Authorities
Guidelines for Preparation of Off-site Emergency Plan | B-33 |
aNNeXUre 2
Possessors of the Copy of Off-site Emergency Plan
Sr. No. Authority Name of Person(s) Contact Number(s)
Postal Address Put √ On Receipt Confirmation
1. Police Commissioner
2 Fire Brigade
3 Medical Officer
4 Technical Experts
5 Mutual Aid Group
6 Factories Inspectorate
7 Pollution Control Board
8 Other Authorities
| B-34 | Guidelines for Preparation of Off-site Emergency Plan
aNNeXUre 3
Communication of Change in Copy of this Plan to all Possessors of the Copy of Off-site Emergency Plan
Sr. Page Number Existing Information Change(s) Made
Sr. No. Authority Name of Person(s)
Contact Number(s)
Postal Address Put √ On Receipt Confirmation
1. Police Commissioner
2 Fire Brigade
3 Medical Officer
4 Technical Experts
5 Mutual Aid Group
6 Factories Inspectorate
7 Pollution Control Board
8 Other Authorities
The following change(s) are made to the version ___________________________________ of the Off-site
Emergency Plan dated _________________________________________.
Communication to the following:
Guidelines for Preparation of Off-site Emergency Plan | B-35 |
To,
The DEA,
(The Maintenance Officer)
Off-site Emergency Plan,
[NAME AND ADDRESS]
Date:________________
Sub: Change information for updating Off-site Emergency Plan
Dear Sir/Madam,
Please note the following change(s) in the Off-site Emergency Plan:
_________________________________________________________________________________________
_________________________________________________________________________________________
_________________________________________________________________________________________
Please incorporate the above changes in the plan with effect from
(Date): _______________
Thanking you,
Yours Faithfully,
[NAME, SIGNATURE AND SEAL OF THE AUTHORITY AND DATE]
aNNeXUre 4
Communication of Change in Positions, Address and Phone Numbers to the Maintenance Officer of the Plan
| B-36 | Guidelines for Preparation of Off-site Emergency Plan
I call off the declared Off-site Emergency in the district of [NAME OF THE DISTRICT] starting at this
___________________ hour on this day of _________________________________.
DEA:[NAME, SIGNATURE AND SEAL]
Date: [DATE]
Information to the following be made via phone followed by telegram
aNNeXUre 5
Calling off the Declared Off-site Emergency
Sr. No. Authority Name of Person(s) Contact Number(s) Address
1. Police
2 Fire Brigade
3 Medical Department
4 Factories Inspectorate
5 Mutual Aid Group
6 Pollution Control Board
7 Media
8 Other Authorities
Guidelines for Preparation of Off-site Emergency Plan | B-37 |
aNNeXUre 6
To
DEA
___________________________________________
___________________________________________
cc: Factory Inspector
___________________________________________
Submission of Report on Long Term Damage or its Possibility
Sr. Area affected Description Required Actions Remarks
___________________________________________
Sd/- Pollution Control Board
__________________________________________
__________________________________________
| B-38 | Guidelines for Preparation of Off-site Emergency Plan
Investigation Report No:
Name of Event �
Accident Description �
Cause of Accident �
Effects of Accident �
a1. No. of people dead
a2. No. of people injured
aNNeXUre 7
Investigation Reporting
Sr. Agency Response(s) Remarks
b. Property damage(s)
c. Pollution (short-term)
d. Pollution (long-term)
Lessons to be drawn from the event �
Resource Gap:•
Communication Gap: •
Others: •
Response measures taken �
Guidelines for Preparation of Off-site Emergency Plan | B-39 |
aNNeXUre 8
Mock Drill No: �
Mock Drill Scenario Description: �
Observations: �
Mock Drill Reporting
Sr. Response Agency Response Observation and Comments Remarks
Lessons to be drawn from the event �
Resource Gap:•
Communication Gap: •
Others: •
Response measures taken �
Sr. Agency Response(s) Remarks
| B-40 | Guidelines for Preparation of Off-site Emergency Plan
ERDS for CHLORINE
SYNONYMS: NoneFormula: Cl
2
Yellow/Green Colour, Gas, Pungent Door,
Corrosive (Chlorine gas is heavier than air and
dispersion is slow)
aNNeXUre 9
Sample ERDS for Chlorine
Flammable : NO
Flash Point : N.A.
LEL – UEL : N.A.
Toxic : YES
IDLH : 10 ppm
TLV : 1 ppm
I. General Response Actions
ON-SITE: Stop Chlorine leakage, if possible �
safely.
Wear Self Contained Breathing Apparatus �
(SCBA) and use Chlorine Emergency Kit.
INFORM people to stay confined indoors with �
doors and windows tightly shut and ventilators
and ACs off.
SHELTER AND CONFINE unhoused people to �
an indoor area outside likely cloud travel path
Use water spray/fog to disperse and dilute �
vapors.
Collect runoff for disposal as potential �
hazardous waste.
II. Evacuation Zone Dimensions
Sr. Mass of Release (tonnes)
Appx. Vulnerable Distance (m) (in the direction of wind)
Appx. Time to reach Max.
Vulnerable dist. (min)
1 1 3000* 5*
2 5 5000* 8*
3 10 6000* 10*
III. Fire
Chlorine is non flammable, so the cascading �
effect in case of fire explosion is absent. Hence,
no Domino Effect.
However, it may ignite or explode on contact �
with combustible materials.
Suggested ActionsUse water, spray/fog as extinguishing medium. �
Do not use dry chemicals, carbon dioxide or �
halogenated extinguishing agents.
For large fires-Flood with fine water spray. �
* The figures in above table are not true values but arbitrary for demonstrating the concept
(The above values are reference values for a particular Maximum Credible Loss Scenario and are to be used only in absence of any other values, only as an aid to form a judgement)
Guidelines for Preparation of Off-site Emergency Plan | B-41 |
IV. Medical
DangersPoisonous if inhaled. Fatality may be caused �
due to inhalation when concentration in air is
greater than 10 ppm (IDLH)
Low level exposures to Chlorine in air will cause �
eye/skin/airway irritation, sore throat and cough.
At higher levels of exposure, signs and symptoms �
may progress to chest tightness, wheezing,
dyspnoea, and bronchospasm.
Low level exposures to Chlorine gas will cause �
eye and skin irritation. Higher exposures may
result in severe chemical burns or ulcerations.
Exposure to compressed liquid Chlorine may
cause frostbite of the skin and eyes.
Suggested ActionsInhalational Chlorine poisoning can be treated �
with supportive care and can include adminis-
tration of humidified oxygen, bronchodilators
and airway management.
Pulmonary oedema may be delayed and, there- �
fore, patients should be monitored for up to 24
hours following severe inhalation exposures.
Antidotes N.A. �
V. Pollution
A leak of Chlorine vapour poses a significant air �
pollution hazard.
Chlorine is heavier than air and � dispersion is
slow. Hence, state of emergency will last longer.
CHLORINE ERDS – PAGE 2 OF 3
VI. Chemical Information
A] Chemical ReactivityReactivity with Water:
Chlorine is sparingly soluble in water. The water
solubility of Chlorine is 0.7% @ 20°C.
Reactivity with Common Materials
Chlorine is aggressive to certain non-metallic mate-
rial like natural rubber and many plastics; therefore
equipment and hoses must be suitable for Chlorine.
Chlorine is chemically stable. It is incompatible with
strong oxidizers.
It does not react with common materials but may
react with oxidizing materials.
Olefinic impurities may lead to narcotic effect or it
may act like a simple Asphyxiate.
Polymerization: Hazardous polymerization will not
occur
B] Combustion ProductsNot Applicable since Chlorine is not flammable.
C] PropertiesPhysical State at 15°C and 1atm.: Gas �
TLV: � 1 ppm
DLH: � 10 ppm
MOLECULAR WEIGHT: � 70.906
BOILING POINT: � -34°C
FREEZING POINT: � -101°C
VAPOR PRESSURE: � 5168 mmHg @ 21°C
VAPOR DENSITY (air=1): � 2.49
LIQUID DENSITY(water=1): � 1.56 @ -34°C
LIQUID VAPOR CONVERSION: � 1:450
Guidelines for Preparation of Off-site Emergency Plan | C-1 |
Work book
on
Prestels - PAC Analysis
Part - C
Guidelines for Preparation of Off-site Emergency Plan | C-3 |
Introduction
The PAC analysis is a method developed by PRESTELS
for developing Emergency Response Plan for a
particular emergency scenario. The PAC analysis
clarifies the roles and responsibilities of various
responders, actions to be taken and communication
to be made. The PAC analysis throws light on the
resources required to combat emergency. It also draws
attention to the specifics of communication that must
be made.
P-A-C
The term PAC stands for Person – Action – Com-
munication. During an emergency, each responder
is required to take certain Action and make certain
Communication. The PAC analysis charts the Actions
to be taken and the Communication to be made
against every responder. The analysis begins at the
onset of signs for a looming disaster and ends with
the ‘calling-off’ of the off-site emergency.
PersonThe person is an individual authority or role such
as District Collector or Site Controller. It may also
be group of people such as Police Constables, Bus
Drivers or NGOs volunteers.
ActionThe action is an act undertaken by person such as
assessment of damage potential or projection of
vulnerable zone or transportation of person from
one place to another or diversion of traffic.
PAC Analysis for Emergency Scenarios
CommunicationCommunication is a message communicated from
one person to other person(s) to initiate actions
from the person(s) to whom the message is
communicated.
Explanation of Columns on the PAC sheet
PersonPrimary
Here, enter name of authority, role such as District
Collector, Police officer or Site Incident Controller.
Enter the name of persons in brackets.
Alternate
Here, enter name of person who will assume
temporary charge in absence of the person listed in
the Primary.
ActionAct
Here, enter the activities to be undertaken such
as Assess Damage, Divert Traffic and others by
concerned persons.
Resource
Here enter the resource(s) required by the person
to carry out his Act sufficiently and efficiently. e.g.:
Nose Masks, Ambulances, Water etc.
Communication Whom
Here enter the authority, role to whom the commu-
nication must be made. Enter the name of person in
brackets
| C-4 | Guidelines for Preparation of Off-site Emergency Plan
How
Here, enter the means of communication and phone
numbers as:
INT: for internal line numbers
O: for office landline numbers
R: for residence landline numbers
M: for mobile numbers
What
Here, enter the specifics of message to be commu-
nicated
RemarksThis section is to be used for making observations on
the Person – Action – Communication proceeds. This
section may be filled during a Mock Drill exercise
Time
Here, enter the clock time at the completion of
a particular Person – Action – Communication
Sequence.
Resource Gap
Here, enter the shortcoming in resources and
additional resources necessary
Communication Gap
Here, enter communication gaps observed
Other
Here, enter other observations, comments or
suggestions
Serial Numbering Rules for PAC SheetEvery row of PAC corresponds to the entity ‘Person’.
Number rows as ‘1, 2, 3…etc.’. For every ‘Person’, there
will be numbers of actions. Label ‘Act’ as ‘a, b, c…etc’.
Every ‘Act’ will have its resource requirement. Label
‘Resources’ as ‘a, b, c…etc’ corresponding to the
respective ‘Act’. Likewise, one ‘Person’ may have to
communicated to many others. Under communication
columns, label ‘Whom’ as ‘a, b, c…etc’ and label the
‘How’ and ‘What’ as ‘a, b, c…etc’ corresponding to
the ‘Whom’ respectively. (see examples for clarity of
labelling serial numbers. Wherever required grouping
of serial numbers such as ‘a, b)’ or ‘a-f )’ is permitted.
Where only one item exists labelling can be dropped.
However, every label in ‘Act’ column must have a
corresponding label in ‘Resources’ column and every
label in ‘Whom’ column must have a corresponding
label in ‘How’ and ‘What’ column. In case a particular
‘Act’ does not require any ‘Resources’, then the entry
may be made as ‘-’ in the Resources column.
Benefits of PAC
The benefits of PAC are as under:
Clarity of roles and responsibilities to people �
involved in emergency management.
Identification of resource gaps for resource �
planning and procurement.
Specificity of communication and improvement �
in communication messages, which is crucial to
efficient response mitigation.
Improved specificity of observations during �
mock-drills and identification of improvement
opportunities.
The PAC can be a very effective tool for training �
emergency responders.
Guidelines for Preparation of Off-site Emergency Plan | C-5 |
PAC
Anal
ysis
for E
mer
genc
y Sc
enar
ios
- Exp
lana
tion
Shee
t
Emer
gen
cy S
cen
ario
Des
crip
tio
n: _
[Her
e w
rite
th
e Em
erg
ency
Sce
nar
io fo
r wh
ich
th
e PA
C A
nal
ysis
is b
ein
g c
arri
ed o
ut]
____
____
____
____
_
Sr.
Per
son
Act
ion
Co
mm
un
icat
ion
Rem
arks
(To
be
fille
d b
y O
bse
rver
s d
uri
ng
Mo
ck D
rill
tria
l)
Pr
imar
yA
lter
nat
e A
ctR
eso
urc
eW
ho
m H
ow
Wh
at T
ime
(min
)R
eso
urc
e G
apC
om
mu
nic
atio
n
Gap
Oth
er
1In
cid
ent
Co
ntr
olle
r (N
ame)
(Nam
e o
f A
lter
nat
e In
cid
ent
Co
ntr
olle
r)
Act
ion
s re
qu
ired
b
y In
cid
ent
Co
ntr
olle
r
Res
ou
rces
re
qu
ired
to c
arry
o
ut
the
assi
gn
ed
acti
on
s
Wh
o is
to b
e co
nta
cted
Ho
w is
th
e p
erso
n to
be
con
tact
ed (I
NT:
Inte
rnal
lin
e, O
: Off
ice
lan
dlin
es, R
: R
esid
ence
lan
dlin
es, M
: M
ob
iles)
Wh
at is
th
e m
essa
ge
to b
e co
mm
un
icat
ed
Tim
e ta
ken
R
eso
urc
e g
aps
ob
serv
edC
om
mu
nic
atio
n
gap
s o
bse
rved
Oth
er
rem
arks
, if
any
Po
lice
Off
icer
(M
r. B.
G.
Kas
hap
)
Mo
bile
- La
nd
line
(255
0025
) Ex
ten
t o
f d
amag
e,
Exte
nt
of
dis
aste
r p
oss
ible
| C-6 | Guidelines for Preparation of Off-site Emergency Plan
Case Study 1 - Chlorine Leak
ScenarioA chlorine pipeline connected to the bulk storage
tank is ruptured. Initially about 500 kg of liquid
chlorine leaks out creating a major emergency. The
flow is stopped by applying special cement, and
the transfer of chlorine to the spare tank is started.
However, there is a danger of escalation because
the cement could give way to the internal pressure
before the transfer is completed. Thus, the off-site
plan is activated including evacuation. The scenario
incorporates situations illustrating how the plan is
activated, how each responder responds and what
problems arise.
DevelopmentThe incident occurs at 4-30 pm when the second �
shift has started.
As soon as the emergency occurs, the shift �
maintenance engineer assumes charge of
Incident Controller. The Dy. Chief Engineer who
is in charge of the factory at that time assumes
the charge of Site Controller. He informs the
District Collector, Fire Brigade, Police, Medical
Officer and other agencies. He informs the Chief
Maintenance Engineer, who arrives and takes
over as the Incident Controller. He informs the
CEO/Manager, who immediately reaches factory
and then takes over as Site Controller from Dy.
Chief Engineer.
The RDC who was in the office when the �
message is received assumes the charge and
informs the Collector who reaches office in 15
minutes. Before the Collector arrives, the RDC
has activated the Plan and has informed the
Fire Brigade, Police, Medical Officer, Transport
provider among responders and has confirmed
that they have received the information and
have initiated their action.
Meanwhile the Site Controller procures and �
projects the details on extent of emergency and
informs it to the District Collector, Fire Brigade,
Police and other responders. He informs that
the situation is getting under control but can
develop into a major emergency requiring
intimation to public to stay confined indoors
and evacuation from certain areas. He also
identifies the area likely to be affected and gives
the details to the agencies.
The Police block the traffic, send a vehicle with �
loud speaker to alert public to go stay confined
indoors. Those who are on the streets are
directed to walk crosswind.
Police realize that a public meeting is going on �
an open ground nearby. A constable is sent to ask
the public to walk away in particular direction
and get inside confined shelters. The leaders
of the political party conducting the meeting
(which is the opposition party) take it amiss and
refuse to disperse, taking it as a ploy to prevent
their meeting. A senior officer is deputed with a
police van. The leaders understand the gravity
and situation is under control. People start
evacuating the ground.
In a nearby cinema house a show is going on. �
Police inform the manager of cinema theatre.
An announcement is made to ask the people
to stay inside. The air conditioning system is
stopped. As the AC system is stopped the people
are uncomfortable and in bad mood. Situation
is tactfully controlled.
Hutments near the factory, are not “gas-proof”, �
staying inside is not safe. The Collector asks
State Transport to dispatch buses to undertake
evacuation. The ST drivers refuse, questioning
about their safety. There are no PPE for them.
They are persuaded to go with wet cloth tied
over the nose. A decision is taken to evacuate
women, children and old people first. They are
Guidelines for Preparation of Off-site Emergency Plan | C-7 |
shifted to “shelters” (such as school). Food and
water arrangements are made through the civil
supplies department and help from NGOs.
There is a milk dairy in the vicinity. The cattle are �
in open sheds and hence not safe. Evacuation is
difficult. The diary owners are asked to cover the
sides of the sheds by tarpaulin sheets, which are
provided by the nearby supplier.
People affected by chlorine are shifted to �
hospitals and treated by medical teams.
The Fire Brigade tenders help the Incident �
Controller to establish water curtains.
Ambulance is kept ready near the incident-spot, �
in case anybody from the incident controller’s
team gets affected.
The District Collector continuously monitors �
the actions being taken and ensures proper co-
ordination amongst the responding agencies.
The District Collector also requests for additional
assistance from the neighbouring districts
and the State Authorities. The Collector also is
constantly in touch with the Site Controller at
the factory to know the status and to ascertain
the developing situation. (For example, the wind
direction may change, leak may aggravate.)
The Incident Controller and his team work �
hard and ensure that the emergency does not
escalate further and Chlorine is transferred from
the affected tank to the spare tank.
When the Chlorine transfer to safe spare tank is �
complete, the Site Controller informs the District
Collector, who calls off the emergency.
Arrangements are made to ensure that the �
people who were shifted from the hutments are
again brought back to their homes. The Factory
Inspectorate initiates accident investigation. The
Pollution Control Board alerts the District Col-
lector on the possible pollution and its effects
on near and distant future. The long term clean
up and post-emergency restoration activities
and initiated.
| C-8 | Guidelines for Preparation of Off-site Emergency Plan
PAC
Anal
ysis
PR
ESTE
LSPA
C A
NA
LYSI
S fo
r EM
ERG
ENC
Y S
CEN
AR
IOS
- ILL
UST
RA
TIO
N P
UR
PO
SE O
NLY
Emer
gen
cy S
cen
ario
Des
crip
tio
n: 1
0T
Ch
lori
ne
Bu
llet
leak
at
AB
C C
hem
ical
s, A
nan
dn
agar
(02
61
)
Sr.
Per
son
Act
ion
Co
mm
un
icat
ion
P
rim
ary
Alt
ern
ate
Act
Res
ou
rce
Wh
om
How
W
ha
t
1In
cid
ent
Co
ntr
olle
r (R
ahu
l Paw
ar)
(An
and
Sa
xen
a)a)
Att
end
to le
akag
e w
ith
mai
nte
nan
ce
team
.
b) S
tart
tra
nsf
er a
ctiv
ity.
c) U
se n
eutr
aliz
ing
m
ediu
m fo
r sp
illed
liq
uid
, fo
g a
nd
wat
er
curt
ain
to p
reve
nt
spre
ad.
a) T
eam
of t
rain
ed
wo
rker
s, eq
uip
men
t fo
r re
pai
rs, e
mer
gen
cy k
it,
loca
l exh
aust
, SC
BA
s, sp
ecia
l qu
ick
sett
ing
ce
men
t.
b) P
erm
anen
t p
ipin
g
arra
ng
emen
t fo
r tr
ansf
er to
oth
er
sto
rag
e ve
ssel
.
c) N
eutr
aliz
ing
m
ediu
m, g
as
scru
bb
ing
ar
ran
gem
ent,
wat
er fo
r cr
eati
ng
fog
an
d w
ater
cu
rtai
n.
Site
Co
ntr
olle
rIN
T: 2
02, O
: 232
432,
M:
9823
2435
34C
hlo
rin
e le
ak fr
om
pip
e o
f bu
lk s
tora
ge
tan
k, fl
ow
bei
ng
sto
pp
ed te
mp
ora
rily
by
usi
ng
cem
ent,
tran
sfer
bei
ng
sta
rted
, Hel
p
of F
ire
Bri
gad
e fo
r fo
g a
nd
wat
er c
urt
ain
n
eed
ed, A
sses
sed
qu
anti
ty s
pill
ed a
bo
ut
300
kg a
nd
th
at l
eak
may
sta
rt a
gai
n if
ce-
men
t g
ives
way
.
2Si
te C
on
tro
ller
(Nee
raj P
atel
)
(Ku
nja
n
Pars
i)b
) Co
ord
inat
e ac
tio
ns
wit
h In
cid
ent
Co
ntr
olle
r fo
r sta
ff, m
ater
ial,
equ
ipm
ent,
exp
erts
ad
vice
an
d a
rran
ge
for
hel
p.
c) Id
enti
fy if
all
wo
rker
s ar
e sa
fe a
nd
arr
ang
e fo
r re
scu
e w
her
e n
eces
sary
.
a) T
emp
late
s, w
ind
sock
, p
lan
t an
d a
rea
map
b) I
nte
rnal
tele
ph
on
e
c) T
ran
spo
rt fo
r in
jure
d
d) C
omm
unic
atio
n ce
ntr
e
a) D
istr
ict
Co
llect
or
b) P
olic
e
c) F
ire
Bri
gad
e
e) F
acto
ry
Insp
ecto
r
f) M
utu
al A
id
rep
rese
nta
tive
g) M
edia
a) O
: 252
483,
R: 2
5421
8,
M:9
8813
6707
4
b
) O: 2
4345
4, R
: 23
5434
, M:9
3248
3495
6
c) O
: 223
241,
R: 2
1232
4,
M:9
7865
6889
9
d
) O: 2
3754
8, R
: 22
4844
, M:9
9212
3752
7
e) O
: 269
874,
R:
2632
54, M
:976
6303
009
f)
O: 2
3435
3, R
: 253
453,
M
:983
4323
453
g) O
: 271
258,
R: 2
5451
4,
M:9
8235
4875
9
a-f)
Th
e n
atu
re o
f em
erg
ency
, co
nse
-q
uen
ces,
area
like
ly to
be
affe
cted
pre
sen
tly
and
if e
mer
gen
cy is
esc
alat
ed, w
hat
hel
p is
re
qu
ired
g) N
atu
re o
f em
erg
ency
, are
a lik
ely
to b
e af
fect
ed a
nd
pre
cau
tio
ns
to b
e ta
ken
by
pu
blic
at
larg
e
Guidelines for Preparation of Off-site Emergency Plan | C-9 |
Sr.
Per
son
Act
ion
Co
mm
un
icat
ion
P
rim
ary
Alt
ern
ate
Act
Res
ou
rce
Wh
om
How
W
ha
t
3D
istr
ict
Co
llect
or
(Asi
m S
hei
kh )
Ass
t. D
istr
ict
Co
llect
or
(Sh
yam
M
itta
l)
a) C
on
firm
th
at P
olic
e,
Fire
Bri
gad
e an
d
Med
ical
Off
icer
hav
e re
ceiv
ed in
form
atio
n
and
act
ivat
ed t
hei
r Pla
n.
Dir
ect
them
su
itab
ly.
b) D
irec
t co
nce
rned
R
even
ue
off
icia
l fo
r ev
acu
atio
n, s
hel
teri
ng
ar
ran
gem
ent
wh
erev
er
nec
essa
ry.
c) M
on
ito
r sit
uat
ion
at
fact
ory
co
nti
nu
ou
sly
and
in t
he
affe
cted
are
a an
d is
sues
dir
ecti
on
s to
re
spo
nd
ers.
d) R
equ
isit
ion
fro
m
Au
tho
riti
es a
nd
A
gen
cies
(bo
th
Gov
ern
men
t an
d
Priv
ate)
su
ch a
s Tr
ansp
ort
atio
n, W
ater
, El
ectr
icit
y Pr
ovid
ers
as
nec
essa
ry.
e) A
rran
ge
Med
ia
Cen
tre
to g
ive
info
rmat
ion
to m
edia
, p
ub
lic, f
amili
es.
a-d
) Are
a m
ap,
vuln
erab
ility
te
mp
late
s, te
lep
ho
nes
e) C
om
mu
nic
atio
n
cen
tre
a) P
olic
e
b) F
ire
Bri
gad
e
c) M
edic
al
off
icer
d) S
tate
Tr
ansp
ort
d
epo
t m
anag
er
e) E
lect
rici
ty
bo
ard
off
icia
ls
f) W
ater
su
pp
ly
off
icer
(Mr.
Aru
n
Iyer
)
g) S
up
ply
o
ffic
er
(Rev
enu
e D
ept.)
(Mr.S
.G.
Kulk
arn
i )
h) S
tati
on
M
aste
r, A
nan
dn
agar
i) M
edia
j) O
uts
ide
Dis
tric
t A
uth
ori
ties
(n
eig
hb
ou
rin
g
dis
tric
ts, S
tate
au
tho
rity
)
a) O
: 243
454,
R: 2
3543
4,
M:9
3248
3495
6
b
) O: 2
2324
1, R
: 21
2324
, M:9
7865
6889
9
c) O
: 237
548,
R: 2
2484
4,
M:9
9212
3752
7
d
) O: 2
4258
7, R
: 28
4522
, M:9
8658
4213
5
e) E
lect
rici
ty b
oar
d
off
icia
ls
f) O
: 265
489,
R:
254
824,
M:9
8815
6874
8 g
) O: 2
7154
8, R
: 25
4621
, M:9
9215
7846
8
h) O
: 269
387,
R:
2421
54, M
:992
2458
789
i)
O: 2
7125
8, R
: 254
514,
M
:982
3548
759
j) O
: 265
398,
R: 2
7468
2,
M:9
3687
5412
5
a) In
form
Po
lice
abo
ut
nat
ure
of e
mer
gen
-cy
, per
sist
ing
win
d d
irec
tio
n, a
ffec
ted
are
as,
iso
lati
on
are
a, a
rran
gem
ent
for w
arn
ing
an
d p
rep
arat
ion
for e
vacu
atio
n.
b) I
nfo
rm F
ire
Bri
gad
e ab
ou
t n
atu
re o
f em
erg
ency
, win
d d
irec
tio
n, c
asu
alti
es in
th
e fa
cto
ry, r
escu
e re
qu
irem
ent,
mit
igat
ion
re
qu
irem
ents
.
c) In
form
med
ical
off
icer
ab
ou
t n
atu
re o
f em
erg
ency
, cas
ual
ties
in t
he
fact
ory
, are
a lik
ely
to b
e af
fect
ed. D
irec
t m
edic
al o
ffic
er
to a
lert
ho
spit
als
in t
he
area
.
d) I
nfo
rm S
tate
Tra
nsp
ort
dep
ot
man
ager
ab
ou
t n
atu
re o
f em
erg
ency
, lik
ely
affe
cted
ar
ea. D
irec
t h
im to
kee
p b
use
s re
ady
wit
h
dri
vers
, fu
ll w
ith
fuel
an
d a
wai
t in
stru
ctio
ns
fro
m D
C/p
olic
e.
e) D
irec
t el
ectr
icit
y b
oar
d o
ffic
ials
to e
nsu
re
con
stan
t el
ectr
ic s
up
ply
to t
he
area
.
f) D
irec
t w
ater
su
pp
ly o
ffic
er to
en
sure
co
n-
tin
uo
us
wat
er s
up
ply
wit
h p
rop
er p
ress
ure
.
g) A
lert
su
pp
ly o
ffic
er (r
even
ue
dep
t.)
and
inst
ruct
him
to b
e re
ady
to a
rran
ge
to e
vacu
ate
peo
ple
in c
oo
rdin
atio
n w
ith
p
olic
e an
d to
arr
ang
e fo
r pro
vid
ing
saf
e sh
elte
rs, f
oo
d.
h) D
irec
t st
atio
n m
aste
r, A
nan
dn
agar
to
sto
p t
he
traf
fic o
n t
he
railw
ay li
ne
pas
sin
g
thro
ug
h t
he
area
like
ly to
be
affe
cted
.
i) A
rran
ge
for i
nfo
rmin
g p
ub
lic t
hro
ug
h lo
-ca
l cab
le T
V, S
MS,
loca
l FM
Rad
io, P
A s
yste
m.
j) R
equ
est
for a
ll ad
dit
ion
al h
elp
req
uir
ed to
m
itig
ate
the
emer
gen
cy.
| C-10 | Guidelines for Preparation of Off-site Emergency Plan
Sr.
Per
son
Act
ion
Co
mm
un
icat
ion
P
rim
ary
Alt
ern
ate
Act
Res
ou
rce
Wh
om
How
W
ha
t
4Fi
re B
rig
ade
Ch
ief
(Dh
anaj
ay
Tam
be)
Dep
uty
Fi
re C
hie
f (P
urs
ho
ttam
A
gar
wal
a) A
rran
ge
for w
ater
cu
rtai
ns
and
fog
aro
un
d
the
spill
ed li
qu
id
chlo
rin
e in
ass
oci
atio
n
wit
h t
he
fact
ory
fire
te
am.
b) R
escu
e th
e af
fect
ed
per
son
s. Ev
acu
ate
them
an
d o
ther
cas
ual
ties
an
d h
and
ove
r to
m
edic
al te
am.
a) W
ater
, noz
zles
for
fog
an
d c
urt
ain
, fir
e te
nd
ers,
SCB
As.
b) F
ire
ten
der
wit
h
exte
nd
ible
lad
der
s, SC
BA
s, st
retc
her
s, ar
ran
gem
ent
to lo
wer
th
e st
retc
her
s fr
om
h
eig
ht.
a) F
ire
Bri
gad
e (n
eig
hb
ou
rin
g
Dis
tric
t)
b) M
edic
al
Off
icer
c) D
istr
ict
Co
llect
or
a) O
: 223
241,
R: 2
1232
4,
M:9
7865
6889
9
b
) O: 2
3754
8, R
: 22
4844
, M:9
9212
3752
7
c) O
: 252
483,
R: 2
5421
8,
M:9
8813
6707
4
a) R
equ
est
for f
ire
ten
der
s.
b) I
nfo
rm lo
cati
on
of a
ffec
ted,
resc
ued
p
erso
ns.
c) R
equ
est
for a
dd
itio
nal
ass
ista
nce
fro
m
Fire
Bri
gad
e o
f nei
gh
bo
uri
ng
cit
ies,
dis
tric
ts
if re
qu
ired
.
5Po
lice
Sup
er-
inte
nd
ent
(Bh
up
ind
er
Sin
gh
)
Dep
uty
Po
-lic
e Su
per
-in
ten
den
t (S
hee
la
Sag
ar)
a) C
ord
on
off
are
a, s
top
tr
affic
go
ing
tow
ard
s af
-fe
cted
are
a.b
) Arr
ang
e fo
r war
nin
g p
ub
lic.c
) A
rran
ge
for p
erso
n-
nel
at
vari
ou
s sp
ots
to
mai
nta
in la
w a
nd
o
rder
.d) S
end
Po
lice
to p
ub
lic c
on
gre
ga-
tio
n to
ask
th
em to
st
ay c
on
fined
.e) M
ake
arra
ng
emen
ts to
ev
acu
ate
dw
elle
rs fr
om
n
eig
hb
ou
rin
g h
ut-
men
ts, w
hic
h a
re li
kely
to
be
affe
cted
. Han
d
over
ch
arg
e o
f eva
cu-
ees
to re
ven
ue
off
icer
.f)
Inte
ract
co
nti
nu
ou
sly
wit
h s
ite
con
tro
ller a
nd
D
istr
ict
Co
llect
or.
a) B
arri
cad
esb
) PA
sy
stem
fixe
d o
n
a je
epc-
e) P
olic
e Pe
rso
nn
el, v
ehic
lesf
) Te
lep
ho
ne
a)
Co
mm
and
ant
Ho
me
Gu
ard
sb)
Co
mm
and
ant
Civ
il D
efen
cec)
St
ate
Tran
spo
rt
Man
ager
d)
Dis
tric
t C
olle
cto
re)
Nei
gh
bo
uri
ng
D
istr
ict
Hea
dq
uar
ters
a) O
: 274
521,
R:
2656
28, M
:932
6587
418
b
) O
: 271
258,
R: 2
6587
4,
M:9
8235
8745
8
c) O
: 274
485,
R:
2665
82, M
:992
1587
485
d
) O
: 252
483,
R: 2
5421
8,
M:9
8813
6707
4
e)
O: 2
7562
4, R
: 254
824,
M
:989
0254
781
a) In
form
wh
ere
they
are
nee
ded
an
d a
bo
ut
acti
on
to b
e ta
ken
.b) I
nfo
rm w
her
e th
ey a
re
nee
ded
an
d a
bo
ut
acti
on
to b
e ta
ken
.c) R
e-q
ues
t to
arr
ang
e b
use
s to
eva
cuat
e p
eop
le
fro
m p
ub
lic c
on
gre
gat
ion
an
d h
utm
ents
.d)
Info
rm g
rou
nd
-sta
tus
and
req
ues
t fo
r ad
dit
ion
al a
rran
gem
ents
or m
easu
res
to
be
take
n.e
) In
form
em
erg
ency
an
d a
sk fo
r ad
dit
ion
al s
taff
an
d re
sou
rces
.
Guidelines for Preparation of Off-site Emergency Plan | C-11 |
Sr.
Per
son
Act
ion
Co
mm
un
icat
ion
P
rim
ary
Alt
ern
ate
Act
Res
ou
rce
Wh
om
How
W
ha
t
6M
edic
al O
f-fic
er
(Sm
riti
Jai
n)
Ass
t. M
edi-
cal O
ffic
er
(Lee
la J
ain
)
a) A
rran
ge
for a
mb
u-
lan
ces,
do
cto
rs a
nd
st
aff.
b) A
rran
ge
for
oxyg
en a
nd
oth
er
req
uir
emen
ts fo
r em
erg
ency
tre
at-
men
t.
a) A
mb
ula
nce
s, D
oct
ors
, Nu
rsin
g
staf
f
b) O
xyg
en C
ylin
der
s
Iden
tifie
d
ho
spit
als
and
d
oct
ors
a) O
: 254
287,
R:
256
428,
M
:996
0254
713
Info
rm a
bo
ut
nat
ure
of e
mer
gen
cy,
and
ask
th
em to
be
read
y fo
r tre
at-
men
t. In
form
ab
ou
t lik
ely
nu
mb
er
of c
asu
alti
es a
nd
ask
th
em to
mak
e b
eds
avai
lab
le p
rom
ptl
y, d
isp
atch
am
bu
lan
ces
and
pic
k u
p c
asu
alti
es in
co
ord
inat
ion
wit
h P
olic
e an
d o
ther
au
tho
riti
es.
7St
ate
Tran
s-p
ort
Man
-ag
er (P
rab
ha
Rao
)
Ass
t. St
ate
Tran
spo
rt
Man
ager
(P
un
it M
al-
ho
tra)
a) K
eep
veh
icle
s re
ady
wit
h d
rive
rs
and
wit
h s
uff
icie
nt
fuel
. Asc
erta
in n
um
-b
er o
f bu
ses,
pic
k p
oin
ts, r
ou
tes
and
d
esti
nat
ion
s fr
om
D
istr
ict
Co
llect
or
and
Po
lice.
Dis
pat
ch
veh
icle
s w
ith
nec
es-
sary
inst
ruct
ion
s to
d
rive
rs a
s d
irec
ted
by
Polic
e /
Dis
tric
t C
ol-
lect
or f
or e
vacu
atio
n,
or f
or t
ran
spo
rtat
ion
o
f pro
visi
on
s.
b) A
rran
ge
for m
ore
ve
hic
les
fro
m o
ther
d
epo
ts if
req
uir
ed.
a) B
use
s, w
ater
ta
nke
rs, D
rive
rs.
b) T
elep
ho
ne
a) P
olic
e/D
istr
ict
Co
llect
or
b) O
ther
d
epo
ts fo
r ad
dit
ion
al
veh
icle
s
a) O
: 243
454,
R:
235
434,
M
:932
4834
956
/ O
: 25
2483
, R: 2
5421
8,
M:9
8813
6707
4
b) O
: 254
872,
R:
274
215,
M
:976
6245
842
a) D
etai
ls o
f req
uir
emen
ts o
f bu
ses,
pic
kup
po
ints
, ro
ute
s, d
esti
nat
ion
s
b) R
equ
irem
ent
for a
dd
itio
nal
veh
icle
s
8Fa
cto
ry
Insp
ecto
r in
-ch
arg
e o
f Dis
tric
t (A
kash
Sa
tpu
te)
Dep
uty
Fa
cto
ry
Insp
ecto
r (M
anis
h
Gir
i)
a) V
isit
sit
e in
co
ord
i-n
atio
n w
ith
tech
nic
al
exp
erts
.
b) I
nves
tig
ate
acci
-d
ent
in d
ue
cou
rse.
a) T
ran
spo
rt
arra
ng
emen
t.
b) I
nves
tig
atio
n
form
a) E
xper
ts
b) M
utu
al A
id
Mem
ber
s
a) O
: 264
489,
R:
2725
48, M
:932
6548
713
b
) O
: 254
687,
R: 2
6982
4,
M:9
4228
7541
4
a) In
form
ab
ou
t em
erg
ency
an
d s
eek
thei
r tec
hn
ical
ad
vice
.
b) D
irec
t to
pro
vid
e as
sist
ance
in h
an-
dlin
g e
mer
gen
cy.
| C-12 | Guidelines for Preparation of Off-site Emergency Plan
Sr.
Per
son
Act
ion
Co
mm
un
icat
ion
P
rim
ary
Alt
ern
ate
Act
Res
ou
rce
Wh
om
How
W
ha
t
9Te
chn
ical
Ex-
per
t (K
amal
M
eno
n)
(Tas
lim
Shet
ty),
(Pri
tam
K
aur)
a) R
esp
on
d w
ith
ap
-p
rop
riat
e te
chn
ical
ad
vice
to t
he
fact
ory
, D
istr
ict
Co
llect
or,
Polic
e, F
ire
Bri
gad
e,
med
ical
off
icer
, fac
-to
ry in
spec
tor.
b) V
isit
sit
e in
co
ord
i-n
atio
n w
ith
Dis
tric
t C
olle
cto
r, Fa
cto
ry
Insp
ecto
r to
pro
vid
e n
eces
sary
ad
vice
.
a) O
wn
exp
erti
se,
tech
nic
al re
fere
nce
lib
rary
, in
tern
et
faci
lity,
tele
ph
on
e
b) V
ehic
le
a) F
acto
ry
b) F
acto
ry
insp
ecto
r
c) D
istr
ict
Co
llect
or
d) F
ire
Bri
gad
e
e) M
edic
al
Off
icer
a) O
: 271
254,
R:
2714
86, M
:988
1574
825
b
) O
: 269
874,
R: 2
6325
4,
M:9
7663
0300
9
c
) O
: 252
483,
R: 2
5421
8,
M:9
8813
6707
4
d) O
: 223
241,
R:
212
324,
M:
9786
5688
99
e)
O: 2
3754
8,
R: 2
2484
4,
M:9
9212
3752
7
a-e)
Tec
hn
ical
ad
vice
for h
and
ling
em
erg
ency
10Po
lluti
on
C
on
tro
l B
oar
d M
em-
ber
(Gir
ija
Gav
asan
e)
Ass
t. M
emb
er,
PCB
(Te
jas
Than
kur)
Pro
ject
are
as to
be
affe
cted
an
d m
on
ito
r ch
lori
ne
con
cen
tra-
tio
n le
vels
at
vari
ou
s sp
ots
Mo
nit
ori
ng
eq
uip
men
t-
--
11El
ectr
ic-
ity
Bo
ard
(P
rab
hu
D
Silv
a)
(Nee
lam
M
un
i)En
sure
un
inte
rru
pt-
ed e
lect
ric
sup
ply
to
the
fact
ory
an
d a
t sh
elte
rs
--
--
12A
nim
al
Hu
sban
dry
(J
eeva
n
Gan
esh
)
(Hel
en
Kej
wal
)Pr
ovid
e n
eces
sary
ca
re fo
r cat
tle
of t
he
dai
ries
, arr
ang
e fo
r ve
teri
nar
y d
oct
or.
-Ve
teri
nar
y d
oct
or
O: 3
4354
3, L
: 345
654,
M
: 956
7545
679
Loo
k af
ter t
he
catt
le
13A
gri
cult
ure
D
epar
t-m
ent
(An
ish
Ja
dh
av)
(Man
dee
p
Kis
ho
r)-
---
--
Guidelines for Preparation of Off-site Emergency Plan | C-13 |
Sr.
Per
son
Act
ion
Co
mm
un
icat
ion
P
rim
ary
Alt
ern
ate
Act
Res
ou
rce
Wh
om
How
W
ha
t
14C
ivil
Def
ence
an
d H
om
e G
uar
ds
(Rit
a K
apo
or)
(Raj
Rai
-so
ni)
a) C
o-o
rdin
ate
wit
h
Polic
e an
d a
rran
ge
to
con
tro
l tra
ffic
, ass
ist
in e
vacu
atio
n.
b) A
ssis
t Po
lice
for
secu
rity
of e
vacu
ated
p
rop
erty
.
a, b
) Sta
ffPo
lice
O: 2
4345
4, R
: 235
434,
M
:932
4834
956
Info
rmat
ion
reg
ard
ing
eva
cuat
ion
an
d
traf
fic c
on
tro
l arr
ang
emen
ts
15PW
D/W
a-te
r Su
pp
ly
(Res
ham
i So
od
)
(Dee
pak
K
atti
)a)
En
sure
co
nti
nu
ou
s w
ater
su
pp
ly w
ith
ad
equ
ate
pre
ssu
re
for F
ire
Bri
gad
e.
b) A
rran
ge
dri
nki
ng
w
ater
at
shel
ters
.
c) E
nsu
re w
ater
for
the
catt
le.
a) W
ater
b) D
rin
kin
g w
ater
c) W
ater
for c
attl
e
--
-
16C
ivil
Sup
plie
s D
epar
tmen
t (R
ames
h
Meh
end
ale)
(Dili
p S
ah-
ani)
Arr
ang
e fo
r fo
od,
wa-
ter a
nd
oth
er b
asic
am
enit
ies
as n
eces
-sa
ry fo
r eva
cuee
s
Foo
d, w
ater
an
d o
ther
bas
ic
amen
itie
s
--
-
17M
utu
al
Aid
Gro
up
co
-ord
inat
or
(Kis
ho
r G
up
ta)
(Mee
nal
D
ev)
a) A
scer
tain
wh
at
equ
ipm
ent,
mat
eria
l, p
erso
nal
pro
tect
ive
equ
ipm
ent
are
req
uir
ed a
nd
arr
ang
e to
del
iver
it a
s fa
st a
s p
oss
ible
wh
ere
that
m
ay b
e o
f use
.
b) R
end
er te
chn
ical
as
sist
ance
.
a) E
mer
gen
cy
resp
on
se
equ
ipm
ents
, PP
Es, S
CB
As,
Trai
ned
per
son
nel
, A
mb
ula
nce
s, Fi
re
Ten
der
s.
b) T
ech
nic
al
exp
erti
se.
a) A
ffec
ted
fa
cto
ry.
b) M
emb
ers
of t
he
Mu
tual
A
id G
rou
p.
c) F
ire
Bri
gad
e
d) M
edic
al
Off
icer
a) O
: 265
842,
R:
2356
84, M
:953
5842
456
b
) O
: 254
875,
R: 2
6524
8,
M:9
9665
4872
5
c
) O
: 223
241,
R: 2
1232
4,
M:9
7865
6889
9
d) O
: 237
548,
R:
224
844,
M
:992
1237
527
a) F
ind
ou
t w
hat
is n
eed
ed (e
qu
ip-
men
t, m
ater
ial,
PPEs
).
b) I
nfo
rm a
nd
req
ues
t to
del
iver
re-
sou
rces
to t
he
affe
cted
fact
ory
.
c,d
) Tec
hn
ical
ass
ista
nce
for h
and
ling
em
erg
ency
, asc
erta
in w
hat
is n
eed
ed
(eq
uip
men
t, m
ater
ial,
PPEs
).
| C-14 | Guidelines for Preparation of Off-site Emergency Plan
Sr.
Per
son
Act
ion
Co
mm
un
icat
ion
P
rim
ary
Alt
ern
ate
Act
Res
ou
rce
Wh
om
How
W
ha
t
18R
ailw
ay S
ta-
tio
n M
aste
r (S
ora
b
Mis
hra
)
Ass
t. St
a-ti
on
Mas
ter
(Pre
eti
Hu
bb
e)
a) S
top
tra
ins
pas
sin
g
thro
ug
h t
he
affe
cted
ar
ea a
s ad
vise
d b
y D
istr
ict
Co
llect
or.
b) C
oo
rdin
ate
wit
h
Polic
e if
evac
uat
ion
is
nec
essi
tate
d.
a, b
) -D
istr
ict
Co
llect
or
O: 2
5248
3, R
: 254
218,
M
:988
1367
074
Gro
un
d s
tatu
s re
po
rtin
g
19H
ead
of L
o-
cal G
over
n-
men
t B
od
y (G
ajan
an
Rat
ho
d)
(See
ma
Mu
nim
)M
ob
ilise
reso
urc
es
req
uir
ed u
nd
er t
he
con
tro
l of t
he
bo
dy
like
bu
ses,
shel
ters
(c
om
mu
nit
y h
alls
, to
wn
hal
l, sc
ho
ols
), fo
od
an
d w
ater
su
pp
ly
Emer
gen
cy S
hel
ters
, Fo
od
an
d W
ater
su
pp
ly
Dis
tric
t C
olle
cto
rO
: 252
483,
R: 2
5421
8,
M:9
8813
6707
4Fi
nd
ou
t re
sou
rces
, per
son
nel
hel
p
req
uir
ed
20Te
leco
m-
mu
nic
atio
n
Dep
artm
ent
(Do
lly D
an-
iels
)
(Rim
a R
edd
y)En
sure
th
at c
om
-m
un
icat
ion
lin
es a
re
effic
ien
tly
wo
rkin
g
--
--
21N
GO
(Gre
en
Cit
y - J
yoti
Ku
mar
, Sav
e Pl
anet
- N
itu
Pa
nd
ey)
a) A
ssis
t em
erg
ency
re
spo
nd
ers.
b) H
elp
fam
ilies
of
casu
alti
es, c
ou
nse
l vi
ctim
s.
a, b
) --
--
22M
edia
(R
adio
A
nan
dn
a-g
ar -
Man
u
Mit
ra, C
able
A
nan
dn
a-g
ar -
Lavi
sh
Jaco
b)
Dis
sem
inat
e vi
tal
info
rmat
ion
to p
ub
lic
in a
resp
on
sib
le
man
ner
-Pu
blic
at
larg
eM
edia
ch
ann
els
Prec
auti
on
s an
d a
ctio
ns
to b
e ta
ken
b
y p
ub
lic
Guidelines for Preparation of Off-site Emergency Plan | C-15 |
CASE STUDY 2
Case Study 2 - Transportation Emergency
ScenarioA tanker carrying highly flammable naphtha over-
turns on mountainous road (ghat) and develops a
leak after its valve is damaged. The leak is minimal
but can develop further if untreated. The driver and
his assistant (cleaner) are luckily not injured. The
tanker belongs to Kerala state and accident takes
place in Karnataka state.
DevelopmentThe driver, using his cell phone, tries to call the �
Police Control Room but the network is weak.
Meanwhile, the cleaner requests a passing
vehicle to report the incidence to the next
police station on way.
The driver succeeds in calling the Police Control �
Room and informs them about the type of
emergency, location and what help is required.
The driver also tries to contact his employer.
(The Police also receive information from the
driver of a passing vehicle, which had seen the
overturned vehicle.)
The cleaner tries to keep the moving traffic as �
far away as possible by using stones and tree
branches. (He improvises because he is not
carrying the equipment for road blockage like
the portable plastic cones or a barrier stand). He
is unable to repair or stop the leak.
Some local nomads gather and try to collect the �
leaking liquid. Driver tries to stop them, warns
them about the hazard.
Traffic jam ensues. �
The police team reaches the spot. The police �
control room alerts and transmits information
to District Collector, Fire Brigade, Medical Office,
Police headquarters for additional staff to control
the situation. The District Collector declares and
off-site emergency. The technical team to repair
and stop the leakage, a spare tanker and a crane
to move the overturned tanker is called for.
The driver briefs the police who have arrived at �
the spot and they immediately stop the traffic,
and also disperse the crowd local nomads.
(Observe that first the driver and later the police �
team are the ‘Incident Controllers’. The officer at
the Police Control Room is the ‘Site Controller’)
The technical team arrives and the leader of the �
team takes charge as the ‘Incident Controller’.
The repairs stopped the leakage, but it is
decided that the tanker will be emptied before
it is made to stand on its wheels. The fire brigade
arrives and is kept on standby in case its service
is required. The spare tanker, requested earlier,
arrives. The transfer is started. The crane arrives
and the overturned tanker is lifted. The police
regulate the traffic and the jam is gradually
reduced. The incident is brought under control.
The off-site emergency is called off and the
post-emergency operations are initiated.
(Note: The following PAC draft may show the same
communication or task being done by multiple
agencies. This is to ensure that intimation has
reached at least from one source or action is initiated
in fastest possible manner.)
| C-16 | Guidelines for Preparation of Off-site Emergency Plan
PAC
Anal
ysis
PR
ESTE
LSPA
C A
NA
LYSI
S fo
r EM
ERG
ENC
Y S
CEN
AR
IOS
- ILL
UST
RA
TIO
N P
UR
PO
SE O
NLY
Emer
gen
cy S
cen
ario
Des
crip
tio
n: N
aph
tha
15
kl t
anke
r le
ak o
n N
H 4
8 n
ear
Shim
og
a at
M
ilest
on
e 4
2 k
m
Sr.
Per
son
Act
ion
Co
mm
un
icat
ion
P
rim
ary
Alt
ern
ate
Act
Res
ou
rce
Wh
om
How
W
ha
t
1D
rive
r, (D
eep
ak
Nai
k)C
o-d
rive
r (A
rju
n
Yad
av)
a) C
all t
he
Polic
e. R
equ
est p
assi
ng
veh
icle
s to
info
rm th
e p
olic
e, if
ph
on
e o
ut o
f ran
ge.
b) S
top
veh
icle
s an
d d
iver
t tr
affic
aw
ay
fro
m le
akin
g t
ank.
c) W
arn
peo
ple
by
pu
ttin
g u
p d
isp
lay
bo
ard
sta
tin
g ‘D
ang
er’.
a) P
ho
ne
b) R
oad
blo
ckin
g
arra
ng
emen
t
c) D
isp
lay
bo
ard
o
f ‘D
ang
er’
a) P
olic
e C
on
tro
l R
oo
m
b) E
mp
loye
r
a) O
: 243
454,
R:
235
434,
M
:932
4834
956
b) O
: 274
451,
R:
254
624,
M
:982
3658
422
a)Th
e ta
nke
r car
ryin
g
hig
hly
flam
mab
le N
aph
tha
has
ove
rtu
rned
, th
ere
is
leak
age
fro
m t
he
valv
e an
d
ther
e is
a d
ang
er o
f fir
e an
d
po
ssib
le e
xplo
sio
n. D
etai
ls
of l
oca
tio
n. T
raff
ic h
as to
be
sto
pp
ed. R
epai
rs n
eed
ed
and
sp
are
tan
ker f
or t
ran
sfer
o
f mat
eria
l req
uir
ed. C
row
d
is g
ath
erin
g a
nd
nee
ds
qu
ick
con
tro
l.
2Po
lice
Co
ntr
ol
Ro
om
(Po
oja
M
adh
avan
)
Polic
e C
on
tro
l R
oo
m (S
um
an D
ev)
--
a) N
eare
st
Polic
e St
atio
n
b) D
istr
ict
Co
llect
or
c) F
ire
Bri
gad
e
d) M
edic
al
Off
icer
e) M
utu
al A
id
Gro
up
co
-o
rdin
ato
r
a) O
: 243
454,
R:
235
434,
M:
9324
8349
56
b
) O: 2
5248
3,
R: 2
5421
8, M
:98
8136
7074
c) O
: 223
241,
R:
212
324,
M:
9786
5688
99
d
) O: 2
3754
8,
R: 2
2484
4, M
:99
2123
7527
e) O
: 234
353,
R:
253
453,
M
:983
4323
453
a-e)
Th
e d
etai
ls o
f th
e in
cid
ent
and
det
ails
of e
xact
lo
cati
on
.
Guidelines for Preparation of Off-site Emergency Plan | C-17 |
Sr.
Per
son
Act
ion
Co
mm
un
icat
ion
P
rim
ary
Alt
ern
ate
Act
Res
ou
rce
Wh
om
How
W
ha
t
3Le
ader
of
Polic
e te
am a
t th
e sp
ot (
Vip
ul
D S
ou
za)
(Mo
han
Pat
el)
a) S
top
tra
ffic
fro
m b
oth
dir
ecti
on
s.
b) C
ord
on
off
are
a to
en
sure
th
at p
eop
le
are
at s
afe
dis
tan
ce.
c) E
nsu
re t
hat
th
ere
is n
o s
ou
rce
of
ign
itio
n li
ke a
sm
oki
ng
bid
i/ci
gar
ette
.
d) E
nsu
re t
hat
th
ere
is n
o b
lock
age
of
smo
oth
arr
ival
of e
mer
gen
cy re
spo
nd
ers.
a-d
) Sta
ff,
road
blo
ckin
g
equ
ipm
ent,
cau
tio
nar
y b
oar
ds.
Polic
e co
ntr
ol
roo
mO
: 243
454,
R:
235
434,
M
:932
4834
956
Req
ues
t fo
r re
info
rcem
ents
, if
nee
ded
, Up
dat
e o
n
stat
us
at s
ite.
4D
istr
ict
Co
llect
or
(Ash
ok
Mit
ra)
Ass
ista
nt
Dis
tric
t C
olle
cto
r (M
een
al G
uja
r)
Asc
erta
in t
ype
of a
ccid
ent
and
po
ssib
le
con
seq
uen
ces
-a)
Fir
e B
rig
ade
b) M
edic
al O
f-fic
er c
) Mu
tual
A
id G
rou
pd
) R
oad
tra
ns-
po
rt A
uth
ori
-ty
e) P
rovi
der
o
f cra
ne,
sp
are
tan
ker w
ith
p
um
pin
g a
r-ra
ng
emen
tf)
Fact
ory
in
spec
tor
a) O
: 223
241,
R:
212
324,
M
:978
6568
899
b) O
: 237
548,
R:
224
844,
M
:992
1237
527
c) O
: 254
687,
R:
269
824,
M:
9422
8754
14
d
) O: 2
7542
4,
R: 2
5652
4, M
:99
2254
8732
e) O
: 245
248,
R:
265
624,
M
:982
2487
588
a-c)
Info
rm a
bo
ut
the
inci
den
t et
c, if
th
ey h
ave
no
t re
ceiv
ed it
ear
lier,
mo
nit
or p
rog
ress
of
acti
on
s ta
ken
.d) I
nfo
rm
abo
ut
the
inci
den
t an
d
loca
tio
n, a
nd
dir
ect
him
to
arr
ang
e fo
r a c
ran
e an
d a
sp
are
tan
ker.
Dir
ect
him
furt
her
to re
ach
th
e sp
ot.e
) Req
uis
itio
n
for r
eso
urc
es s
uch
as
cran
e, s
par
e ta
nke
r wit
h
pu
mp
ing
arr
ang
emen
t, if
req
uir
edf)
Info
rm a
bo
ut
inci
den
t an
d d
irec
t to
see
k ap
pro
pri
ate
tech
nic
al a
dvi
ce
5Fi
re B
rig
ade
Ch
ief (
Man
u
Tan
do
n)
Dep
uty
in
char
ge-
Fire
B
rig
ade
(Sh
yam
M
itta
l)
Sen
d a
fire
ten
der
to t
he
spo
t.Fi
re te
nd
er-
--
6M
edic
al
Off
icer
(Kir
an
Josh
i)
Ass
ista
nt
Med
ical
O
ffic
er (N
ares
h
Sach
dev
)
Arr
ang
e to
sen
d a
n a
mb
ula
nce
fro
m
a so
urc
e n
eare
st to
th
e sp
ot.
Am
bu
lan
ceH
osp
ital
s (S
anje
evan
i H
osp
ital
)
O: 2
4525
6,
R: 2
5652
4,
M:9
9215
4587
4
Info
rm a
bo
ut
the
inci
den
t. R
equ
est
them
to b
e in
sta
te o
f re
adin
ess
if th
ere
are
fire/
exp
losi
ve c
asu
alti
es.
| C-18 | Guidelines for Preparation of Off-site Emergency Plan
Sr.
Per
son
Act
ion
Co
mm
un
icat
ion
P
rim
ary
Alt
ern
ate
Act
Res
ou
rce
Wh
om
How
W
ha
t
7R
oad
Tr
ansp
ort
A
uth
ori
ty
Ch
ief (
Man
ish
K
atg
iri)
Dep
uty
off
icer
, R
TA (P
rita
m
Ho
lgi)
a) A
rran
ge
for r
eso
urc
es re
qu
ired
su
ch a
s cr
ane,
sp
are
tan
ker w
ith
p
um
pin
g a
rran
gem
ent
b) P
roce
ed to
th
e sp
ot
for r
end
erin
g
assi
stan
ce
c) In
itia
te a
ccid
ent
inve
stig
atio
n
a) R
eso
urc
e d
irec
tory
b) V
ehic
le
c) A
ccid
ent
inve
stig
atio
n
rep
ort
form
at
Nea
rest
pro
-vi
der
of c
ran
e,
spar
e ta
nke
r w
ith
pu
mp
ing
ar
ran
gem
ents
O: 2
6635
4,
R: 2
5452
1,
M:9
8225
4878
5
Req
uis
itio
n fo
r cra
ne,
sp
are
tan
ker w
ith
p
um
pin
g a
rran
gem
ent.
8Fa
cto
ry In
-sp
ecto
r (M
al-
likar
jun
Rao
)
Dep
uty
Fac
tory
In
spec
tor
(Kri
shn
a Pa
nd
it)
a) A
rran
ge
for
tech
nic
al a
ssis
tan
ce
fro
m te
chn
ical
exp
erts
b) D
irec
t M
utu
al A
id G
rou
p to
ren
der
as
sist
ance
a) R
eso
urc
e d
irec
tory
b) T
elep
ho
ne
--
-
9M
utu
al A
id
Gro
up
Co
-or-
din
ato
r (A
sho
k A
nan
d)
(See
ma
Roy
)a)
Arr
ang
e fo
r res
ou
rces
req
uir
ed
such
as
cran
e, s
par
e ta
nke
r wit
h
pu
mp
ing
arr
ang
emen
t
b) P
roce
ed to
th
e sp
ot
wit
h te
chn
ical
ex
per
ts fo
r ren
der
ing
ass
ista
nce
a) A
vaila
ble
re
sou
rces
b) V
ehic
les,
Tran
spo
rt
arra
ng
emen
t
a) D
istr
ict
Co
l-le
cto
r
b) P
olic
e
c) F
ire
Bri
gad
e
d) R
TA
a) O
: 252
483,
R:
254
218,
M:
9881
3670
74
b
) O: 2
4345
4,
R: 2
3543
4, M
:93
2483
4956
c) O
: 223
241,
R:
212
324,
M:
9786
5688
99
d
) O: 2
7125
4,
R: 2
6525
4,
M:9
8902
4558
7
a-d
) In
form
an
d o
ffer
av
aila
ble
reso
urc
es to
m
itig
ate
the
emer
gen
cy
Guidelines for Preparation of Off-site Emergency Plan | C-19 |
Sr.
Per
son
Act
ion
Co
mm
un
icat
ion
P
rim
ary
Alt
ern
ate
Act
Res
ou
rce
Wh
om
How
W
ha
t
10O
wn
er o
f ve-
hic
le in
volv
ed
in a
bov
e ac
-ci
den
t (H
arsh
Ir
ani)
Man
ager
at
Ow
ner
’s fa
cilit
y (G
auta
m F
iran
g-
pan
i)
a) A
rran
ge
for r
eso
urc
es re
qu
ired
su
ch a
s cr
ane,
sp
are
tan
ker w
ith
p
um
pin
g a
rran
gem
ent
b) P
roce
ed to
th
e sp
ot
for r
end
erin
g
assi
stan
ce
a) A
vaila
ble
re
sou
rces
b) V
ehic
les,
Tran
spo
rt
arra
ng
emen
t
a) D
istr
ict
Co
l-le
cto
r
b) P
olic
e
c) F
ire
Bri
gad
e
d) R
TA
e) N
eig
hb
ou
r-in
g o
wn
ers
of
such
tra
ns-
po
rtat
ion
co
mp
anie
s
a) O
: 252
483,
R:
254
218,
M:
9881
3670
74
b
) O: 2
4345
4,
R: 2
3543
4, M
:93
2483
4956
c) O
: 223
241,
R:
212
324,
M:
9786
5688
99
d
) O: 2
7125
4, R
: 26
5254
, M:9
8902
4558
7
e) O
: 254
485,
R:
274
532,
M
:992
1587
421
a-d
) In
form
an
d o
ffer
av
aila
ble
reso
urc
es to
m
itig
ate
the
emer
gen
cy
e) In
form
ab
ou
t in
cid
ent
det
ails
an
d s
eek
assi
stan
ce
| C-20 | Guidelines for Preparation of Off-site Emergency Plan
Role of Incident Controller and Site ControllerThe Site Controller and the Incident Controller are
the two vital roles in the management of emergency.
This note seeks to clarify the two roles.
Incident ControllerThe incident controller is responsible for attending to
the source or the cause of emergency. He leads the
team involved in repairing, controlling and preventing
escalation at the source. He is expected to have the
required technical knowledge, skill and resources
required to attend to the incident causing emergency.
For example, if there is a crack in a pipeline carrying
toxic gas, he ensures that the valve on the supply line
is closed and repairs the damaged pipeline. If a bulk
storage tank has a crack, transfer of the contents to a
spare tank is started and repairs undertaken.
The incident controller co-ordinates with only the
‘Site Controller’ (see below). The incident controller
must ask for any additional help (staff, tools, material,
equipment etc required for dealing with the
incident) from the Site controller. The site controller
will arrange for the same at the earliest. This enables
incident controller to concentrate on his job of
attending to the incident without being burdened
by communication tasks. Also, in the normal course,
the incident controller does not directly interact
with the outside industry authorities and agencies
such as the District Collector, Fire brigade, Police etc.
This is done by the site controller.
The incident controller gives continuous feedback
about the status of the operation to the site
controller.
Site ControllerThe ‘Site Controller’ is overall in-charge of the operation
at the incident-site. While the incident controller
attends to the source or the cause of emergency, the
site controller will be in the Emergency Control Room
(ECR). The ECR is a place to be well equipped with
telephones, drawings and maps, computer programs
for dispersion modelling etc.
The site controller ensures that the off-site responders
(District Collector, Police, Fire Brigade etc) are given
quick intimation. He also ensures prompt assistance
to the requirements of the incident controller. He may
have to arrange the assistance from the factory itself
or get help from outside (from fire brigade, mutual
aid member, stockiest etc). He will continuously
monitor the progress and give information to the
offsite responders. He will identify the areas likely
to be affected and communicate the same to the
responders. He will update all concerned responders
with the emergency status. For example: Escalation
in the emergency, change in wind direction etc. The
site controller will also communicate the necessary
information to the media and public
at large. In short, the site controller acts as the focal
point who on the one hand interacts with the incident
controller to give him required assistance and know
the status and on the other hand, interacts with other
district authorities and agencies to give information.
Temporary Assumption of RolesIt needs to be noted that ‘Incident Controller’
and ‘Site Controller’ are emergency roles. It is
not necessary that only the one person will
act as incident controller / site controller from
beginning to end. For example, when a valve fails
and toxic gas starts leaking, the person on the
spot assumes the charge of incident controller
till a senior expert, personnel (appointed
incident controller) reaches the spot and takes
over from him. This will be especially true when
the incident happens during a late night shift,
Guidelines for Preparation of Off-site Emergency Plan | C-21 |
when only the skeleton staff may be present.
Similarly, a senior person present will assume the
charge of site controller till the manager / CEO
(appointed Site Controller) reaches the factory
and takes over.
For a transport emergency, the driver may be the
first incident controller till the Police team and
subsequently a technical team reaches with tools to
take care of the emergency. Then the police and later
the technical team leader will be incident controller.
It may be mentioned that it is difficult to lay down
specific and rigid guidelines in this respect. What is
important is that the relevant functions are carried
out efficiently, smoothly and promptly. There should
be no loss of time, there should be no conflict, and
the aim should be to bring the emergency control
as fast as possible with least damage or loss.
| C-22 | Guidelines for Preparation of Off-site Emergency Plan
Blast wave: A pressure wave generated from
explosion.
BLEVE: Boiling Liquid Expanding Vapor Explosion
usually occurs from a sudden release of large mass
of liquid under pressure. The most likely scenario is
a flame of fire impinging on a vessel above the liq-
uid level thereby weakening the vessel and causing
sudden rupture.
Consequence: The outcome of an incident.
Consequence analysis: The a nalysis of the possible
manifestation and effect of an incident.
Dispersion model: The mathematical model de-
scribing the dispersion of a material release, usually
in free atmosphere.
Domino effect: The triggering of secondary in-
cidents from a primary incident, thus leading to
increase in the consequence or the vulnerable
zone. For example: Explosion of a tank produc-
ing high pressure wave leading rupture and
subsequent toxic release from a neighbouring
tank.
Dovetailing: The process of aligning a sub-level plan
to higher level plan. For example, the onsite plan of a
factory should be in line and agreement to the offsite
plan of the district in which the factory is situated.
The onsite procedure or part thereof should not be in
conflict with the offsite procedure or a part thereof.
Explosion: Sudden release of energy that causes
pressure disturbance.
Fireball: The atmospheric burning of fuel-air mixture
in which thermal energy is radiated.
Flash point: The lowest temperature at which the
liquid can produce sufficient flammable vapour to
ignite in presence of external source of ignition.
Hazard: A chemical or physical condition that
has the potential for causing damage to people,
property, or the environment.
Hazard Analysis: A process used to identify hazards
and select means to controlling or eliminating them.
Incident: The undesirable loss of containment of
material or energy. For example, gas release, fire or
explosion.
IDLH: Immediately Dangerous to Life and Health is an
estimate of the maximum concentration in the air to
which a healthy person could be exposed for a speci-
fied period of time (30 minutes as per NIOSH stan-
dards) without suffering permanent health effects.
Lower Explosive Limit (LEL): The concentration of a
flammable vapour in air below which the air -vapour
mixture will not ignite.
Maximum Credible Loss Scenario (MCLS): A loss
scenario with a maximum damage effect, which is
Glossary of Terms
Guidelines for Preparation of Off-site Emergency Plan | C-23 |
believed to be possible.
Over pressure: The pressure above the normal
atmospheric pressure, usually arisin g from a blast
wave.
Plume: The gas cloud resulting from a continuous
release.
Pool fire: The combustion of material evaporating
from a layer of liquid underneath.
Risk: A measure of human, property or environmental
damage in terms of both the magnitude and the
likelihood of damage.
Risk assessment: The quantitative estimate of risk.
Upper Explosive Limit (UEL): The concentration
of a flammable vapour in air above which the air-
vapour mixture will not ignite.
UVCE: Unconfined Vapor Cloud Explosion is open
explosion of flammable vapour and air. The term is
also referred to as Vapor Cloud Explosion.
Vulnerable zone: The area that can get affected by
an incident. For toxic release, it is the area over which
the airborne concentration of toxic gas exc eeds
certain accepted level of concentration. For fire, it is
the area over which the intensity of heat radiation
exceeds certain accepted levels. For explosion, it is
area over which the pressure of blast wave excess
certain accepted level.
| C-24 | Guidelines for Preparation of Off-site Emergency Plan
Manual on Emergency Preparedness for �
Chemical Hazards, MOEF, 1992
A Guide to Chemical Accidents (Emergency �
Planning, Preparedness and Response) Rules,
1996 and On-site and Off-site Emergency Plan,
2001 by H.N. Mirashi
National Disaster Management Guidelines �
Chemical Disasters, April 2007, National Disaster
Management Authority, Government of India.
Handbook of Chemical Hazard Analysis Procedures, �
US Federal Emergency Management Agency
Guidelines for Chemical Process Quantitative Risk �
Analysis by Centre for Chemical Process Safety
Staff and Centre for Chemical Process Safety,
American Institute of Chemical Engineers
Manufacture, Storage and Import of Hazardous �
Chemical Rules, 1989 – 2000 (MSIHC)
Public Liability Insurance Act and Rules, 1991 �
Chemical Accidents (Emergency Planning, �
Preparedness and Response) Rules, 1996
Disaster Management Act, 2005 �
Offsite Emergency Plans: Pune, Raigad �
(Maharashtra) Baroda, Rajkot, Baruch (Gujarat)
Sambalpur (Orissa), Medak (Andhra Pradesh),
Dharwad (Karnataka)
Disaster Management Plans: Delhi, Dakshin �
Kannada (Karnataka)
References
Guidelines for Preparation of Off-site Emergency Plan | C-25 |
Key Contributors
Core TeamDr. Chhanda Chowdhury, MoEF
Mr. Shard Sapra, MoEF
Mr. Sundar Ramanathan, MoEF
Mr. Prakash Patil, Prestels
Mr. Pranav Patil, Prestels
Workshop and other contributions (alphabetical order)Lt Gen (Dr) J.R. Bhardwaj, Member, NDMA
Dr. R. Banerjee (IAS), CEO GSDMA
Mr. G. Balakishore, Factories Inspectorate,
Andhra Pradesh
Mr. R.P. Chakraborty, CIF, West Bengal
Mr. Koteshwar Rao, CIF, Andhra Pradesh
Mr. Navin Mittal (IAS), DC, Hyderabad
Mr. V S More, CIF, Maharashtra
Mr. V.N. Patel, CIF, Gujarat
Mr. S. Raghunathan, CIF, Tamil Nadu
Mr. T. Salim, Factories Inspectorate, Tamil Nadu
Mr. H. Srinivasaiah CIF, Karnataka
Mr. G. Sundaramurthi (IAS), DC, Thiruvallur
Advisors and Reviewers (alphabetical order)Mr. K.M. Amanulla, Core Expert Committee, MoEF
Dr. Indrani Chandrasekharan, Advisor, Planning
Commission
Dr. V.N. Das, Core Expert Committee, MoEF
Dr. R.K. Garg, Core Expert Committee, MoEF
Mr. H.N.Mirashi, Retd CIF, Maharashtra
Mr. Sumeet Patil, Prestels
Mr. K. Ravichandra, Core Expert Committee, MoEF
Mr. V.B. Sant, Core Expert Committee, MoEF