Upload
preston-beasley
View
224
Download
3
Tags:
Embed Size (px)
Citation preview
FORAYS SERVICES & CONSTRUCTIONS PVT. LTD.OVERVIEW 2015
INTRODUCTION Welcome to Forays Services & Constructions Pvt. Ltd., an Engineering and
Construction Company striving to cater to the growing needs of the
Instrumentation, Electrical and Telecom Industry.
Relying on the expertise of our specialized teams composed of Project
Management and Site Supervision Professionals, we offer a wide spectrum of
services including construction, plant commissioning and annual maintenance of
process plants.
Our Project Management and Site Supervision Team consists of qualified
Engineers and Technical Experts capable of overseeing all aspects of construction
and customizing services to conform with each of our client’s requirements.
The company's strategy is aimed at strengthening the integration of its services
and thrive to build a longstanding relation with every client.
We endeavor to maintain our reputation of delivering projects on time with
excellent quality and safety records.
OUR NETWORKS
HEAD QUARTERSForays Services & Constructions Pvt. Ltd.Mumbai, India
OUR MISSION
To Develop Forays as a world scale, single source,
Instrumentation, Electrical, Telecom, Construction & Annual
Maintenance Engineering and Constructions Company
To provide service excellence meeting all Techno-Economic
requirements of our clients
OUR VISION
To develop a conducive working environment
To develop a slew of measures for improving operational
efficiency
To renew, rejuvenate and add human resource management &
development system so as to ensure a vibrant and motivated
workforce in order to provide continued quality service to all our
clients
To ultimately operate and run the organization with the strength
of its own procedures & systems
BUSINESS GROWTH
2010 2011 2012 2013 2014 2015
40.06
60.1
103.3
121.46
150.89
170.1Turnover in INR Million
ORGANISATION CHARTCHAIRMAN & MANAGING
DIRECTOR[CMD]
Mr. Mathew M. Mankanthanam
EXECUTIVE DIRECTOR[EXDR]
Mr. Suresh P. Thomas
BUSINESS DEVELOPMENT[BD]
Mr. Joel Johnson Sam
COMPANY SECRETARY[COSE]
Mr. V.G.Venkataraman
FINANCE, ACCOUNTING & CONTROL
[FACO]Mr. Nevin Alex
HUMAN RESOURCE MGT.[HRMA]
Mr. Manu Emmanuel Philip
PROCUREMENT[PROCU]
Mr. P. N. Pillai
ESTIMATION & PROPOSAL[EPRO]
Mr. Srinath Morampudi
QUALITY & HSE MGT.[QHSE]
Mr. Libin T. Thomas
PROJECT CONSTRUCTION[PROJCONST]
Mr. Binu George
CONSTRUCTION MANAGERS[CONST]
QA/QCEngineer
Planning Engineer
Field Engineer
Testing Engineer
SafetyEngineer
Site Admin& Accounts
MANPOWER BREAKUP
50%
38%
7%
3%2%
Total Direct & Indirect Manpower - 832 nos.
Direct Labour: 400 nos.
Direct Labour (Sub-Contractor): 300 nos.
Supervisors & Tech-nicians: 90 nos.
Construction Managers & Engineers: 26 nos.
Administration, Accounts & Logistics: 16 nos.
FIELD OF BUSINESS
Oil & Gas
Petrochemicals
Refineries
Cement & Steel
Telecommunication
Fertilizers/Chemicals
Power/Nuclear/Solar Power & Desalination
Pharmaceuticals & Food Processing
Liquefied Natural Gas
FIELD OF SERVICES
ELECTRICAL & INSTRUMENTATION
• Field Engineering
• Procurement
• Inspection
• Installation
• Testing/Calibration
• Commissioning Assistance
• Revamping/Retrofitting
• Shutdown/Annual Maintenance
• Supply of Technical Manpower
FIELD OF SERVICES
TELECOMMUNICATION
• Fiber Optic Splicing & OTDR Testing
• Software Installation, Integration & Commissioning of UBR, WMAX,
EDP, LMDS & OME Systems
• Cable Blowing & Trenching
MAJOR ONGOING PROJECTSSr. No.
PROJECTSERVICE
DESCRIPTIONCLIENT YEAR MANHOURS
1.1.89 MTPA Benefication Plant, Hospet, Karnataka
Installation of Electrical Works
NMDC Ltd,EPC: Hindustan Dorr Oliver Ltd
2015 95,666
2. Aerial Cabling WorksErection of ADSS Cables
Reliance corporate IT Park Hyderabad
2015 72,333
3.
BBU, SRU, SWS, ARU, SGU,TGTU & All Utilities/Off sites of Sohar Refinery Improvement Project, Sohar Oman
Installation of Electrical, Instrumentation & Telecommunication Works
ORPIC- Oman Oil Refineries and Petroleum Industries CompanyEPC: Daelim-Petrofac JV
2015 1,078,008
4.CFU, PP, Coker & Alkylation- Reliance Refinery, Jamnagar
Instrumentation AMC & Field Inst. Modification
Reliance Industries Limited 2015 233,300
5. GMP Project at Vapi, Gujarat
Supply & Installation of Instrumentation works
Bayer Vapi Limited 2015 268,000*
6.Instrumentation ARC & Modification works at Vapi, Gujarat
ARC for Instrumentation works
Bayer Vapi Limited 2015 66,750
7.Instrumentation Cable Laying Works at Plant 9270,SMPL,Vadinar, Gujarat
Supply & Installation of Instrumentation works
Indian Oil Corporation Limited
2015 20,700*
8.SEZ Steam Super Heater project at Jamnagar, Gujarat
Supply & Installation of Electrical & Instrumentation works
Reliance Industries Limited/Linde Engineering India Ltd.
2015 116,775*
MAJOR ONGOING PROJECTSSr. No.
PROJECTSERVICE
DESCRIPTIONCLIENT YEAR MANHOURS
9.
SRU,HGU,HCU,TANK FARM, AVU, DHDT, DCU, PET COKE, DHDS, RFCCU, CCRU,VBU, CPP, PX & PTA Units of IOCL, Panipat Refinery, Haryana
ARC for Instrumentation Jobs
Indian Oil Corporation Limited
2015 195,250
10.DTA Steam Super Heater project at Jamnagar, Gujarat
Supply & Installation of Electrical & Instrumentation works
Reliance Industries Limited/Linde Engineering India Ltd.
2014 69,835*
11.Fiber Rectification Project, Andhra Pradesh
T&D, Blowing, Splicing, Testing
Reliance corporate IT Park Hyderabad
2014 43,750
12.
People Project Active Pharmaceutical Ingredient Facility Ambernath, Maharashtra
Supply & Installation of Electrical & Instrumentation Works
Ferring Therapeutics Pvt Ltd PMC : Bayer TechnologyEPC: Mott Mac Donald Pvt Ltd)
2014 312,663*
*Supply Value Extra
MAJOR COMPLETED PROJECTSSr. No.
PROJECT JOB CLIENT YEAR MANHOURS
1.Integrated Steel Plant, Danapur Village, Hospet, Karnataka
Installation of Electrical & Instrumentation works
BMM Ispat Limited 2015 82,083
2.CFU, PP, Coker & Alkylation- Reliance Refinery, Jamnagar
Instrumentation AMC & Field Inst. Modification
Reliance Industries Limited 2014 233,300
3.Internal Electrical works, RIL Jamnagar, Gujarat
Installation of Electrical Works
Reliance Industries Limited 2014 78,166
4.Ammonia Storage Tank of 10,000 MT Capacity for IFFCO– Kalol, Gujarat
Supply & Installation of Electrical Works
Uhde India Pvt Ltd 2013 24,666*
5.CFU, PP, Coker & Alkylation- Reliance Refinery, Jamnagar
Instrumentation AMC & Field Inst. Modification
Reliance Industries Limited 2013 79,500
6.PET3 (SSP,AHU & PCY Area) at RIL DMD, Dahej, Gujarat
Installation of Instrumentation Works
Reliance Industries Limited 2013 73,833
7.1.8 MTPA Syn Gas based DRI, Angul ,Orrissa
Supply & Installation of Electrical & Instrumentation Works
Jindal Steel and Power Ltd 2012 359,778*
8.1X50 MW Solar Thermal Power Plant, Rajasthan
Supply & Installation of Electrical & Instrumentation Works
Lauren Engineers & Constructors (I) Pvt Ltd
2012 93,777*
MAJOR COMPLETED PROJECTSSr. No.
PROJECT JOB CLIENT YEAR MANHOURS
9.2 x 35 MW CPP & Rolling Mill, TUML Plant, Nagpur, Maharashtra
Installation of Instrumentation Works
Topworth Urja and Metals Ltd
2012 59,000
10.Ammonia, Urea & OSBL Units of Matix Fertilizer, Durgapur, West-Bengal
Installation of Electrical and Instrumentation Works
ESSAR Projects (India) Ltd 2012 383,916
11.Ammonia, Urea & OSBL Units of Matix Fertilizer, Durgapur, West-Bengal
Installation of Electrical and Instrumentation Works
Uhde India Pvt. Ltd. 2012 52,500*
12.AVU,STR LPG, SWS 2 units, ARU 2 units for IOCL Refinery, Orissa
Installation of Instrumentation Works
ESSAR Projects (India) Ltd.Client – Indian Oil Corporation Limited, Paradeep,PMC – Foster Wheeler
2012 502,000*
13.CFU, PP, Coker & Alkylation- Reliance Refinery, Jamnagar, Gujarat
Instrumentation AMC & Field Inst. Modification
Reliance Industries Limited 2012 79,500
14.Johnson Matthey Chemical-123, Kanpur- Uttar Pradesh
Supply & Installation of Electrical & Instrumentation Works
Johnson Matthey Chemical India Pvt Ltd. Engg Consultant: Aker Solutions
2012 176,000*
15. PBR Project, Hazira, GujaratInstallation of Instrumentation Works
Reliance Industries Limited 2012 196,750
MAJOR COMPLETED PROJECTSSr. No.
PROJECT JOB CLIENT YEAR MANHOURS
16.SRU -H2 Plant of Adani Wilmar, Mundra, Kutch, Gujarat
Supply & Installation of Electrical & Instrumentation Works
Linde Engineering India Pvt. Ltd.
2012 22,083*
17.SRU Project of HPCL Mumbai Refinery, Maharashtra
Supply & Installation of Electrical & Instrumentation Works
Engg Consultant: Linde Engineering India Pvt. Ltd. PMC–Jacobs Engineering (I) India Ltd
2012 195,999*
18.40 MW Thin Film Solar Power Plant, Kutch, Gujarat
Supply & Installation of Electrical Works
ADANI INFRA (India) Limited 2011 300,666*
19.CFU, PP, Coker & Alkylation- Reliance Refinery, Jamnagar, Gujarat
Instrumentation AMC & Field Inst. Modification
Reliance Industries Limited 2011 115,835
20.Essar Oil Refinery Expansion, Jamnagar, Gujarat
Instrumentation works for ETP & Desalination Unit.Train-1
ESSAR Projects (India) Ltd. 2011 233,916
21.BUTENE-1- Reliance Industries, Hazira, Surat, Gujarat
Installation of Instrumentation Works
Reliance Industries Limited 2010 71,500
22.CFU, PP, Coker & Alkylation-Reliance Refinery, Jamnagar, Gujarat
Instrumentation AMC & Field Inst. Modification
Reliance Petroleum Limited 2010 107,500
MAJOR COMPLETED PROJECTSSr. No.
PROJECT JOB CLIENT YEAR MANHOURS
23. KCIL-FORMALDHYDE UNIT
Supply & Installation of Electrical & Instrumentation Works
Kanoria Chemical India Ltd.Consultant-Uhde India Pvt. Ltd
2010 80,555*
24. POLY ISCOYNATE UNIT
Supply & Installation of Electrical & Instrumentation Works
EPC Aker Power gas Pvt. Ltd Client: Bayer Technology Services
2010 76,111*
25.REPLICA Plant, Kanpur – Uttar Pradesh
Supply & Installation of Electrical & Instrumentation Works
Johnson Matthey Chemical India Pvt Ltd. Engg Consultants: Aker Solutions
2010 72,611*
26. 30 MW Power PlantSupply and Erection of Instrumentation Works
Shree Virangana Steels Ltd 2009 19,000*
27.CFU, PP, Coker & Alkylation-RIL Refinery, Jamnagar
Instrumentation AMC & Field Inst. Modification
Reliance Industries Limited 2009 101,665
28.DHDS-2 – Reliance Refinery Jamnagar
Instrumentation Erection Works
Reliance Industries Limited 2009 43,500
29.HPU System in Coker-Reliance Refinery, Jamnagar
Instrumentation Erection Works
Reliance Industries Limited 2009 10,000
MAJOR COMPLETED PROJECTSSr. No.
PROJECT JOB CLIENT YEAR MANHOURS
30.LNUU 471 Compressor; FCC and Crude-2 of Reliance Refinery Jamnagar
Instrumentation Erection Works
Reliance Industries Limited 2009 26,250
31.Sulphur Unit 672 & 431; Reliance Refinery, Jamnagar
Instrumentation Erection Works
Reliance Industries Limited 2009 35,000
32. Wire Line Project Hyderabad Splicing Reliance Infocom Engineering Pvt Ltd
2009 99,300
33. Wire Line Project Orissa Splicing Reliance Infocom Engineering Pvt Ltd
2009 12,835
34.WIN Project East Godavari District
Splicing Reliance Infocom Engineering Pvt Ltd
2008 82,416
35.WIN Project Kamman & Meheboob Nagar & Ananthpur
Splicing Reliance Infocom Engineering Pvt Ltd
2008 47,000
36. Wire Line Project Hyderabad Splicing Reliance Infocom Engineering Pvt Ltd
2007 64,916
*Supply Value Extra
PHOTOGRAPHS OF SOME OF OUR INSTALLATION WORKS
QUALITY ASSURANCE
We at Forays are committed to total quality management &
continuous quality improvement.
The key goal of Forays’ Quality Policy is client satisfaction.
The company's Quality Assurance System is dedicated to
satisfying every client’s Technical and Economical requirements.
This covers all phases of Project Management & conforms with
ISO.
The effectiveness of the QA system is constantly monitored by
top management through the Quality Committee, the QA Manual
& the procedures established by the QA/QC Manager.
QUALITY CONTROL
Forays has a dedicated and well experienced team of Quality Control
Personnel.
It provides checks, testing documents, control and measures against
established requirements.
The Quality workmanship is based on specification of the contract and
other contract documents.
Local regulation & codes of standards have been referred to in the
contract documents.
Quality Control Procedures and Test Plan (duly approved by clients).
SAFETY
Safety is our top most priority and paramount attention is paid toward
following safety procedures throughout the execution of a project.
Forays' safety department, shall identify, through “zero accident policy”.
How to prevent accidents?
• Eliminate unsafe act
• Eliminate unsafe condition
• Discover the causes
Safety is achieved by adhering to strict safety management and its
procedures.
FORAYS SERVICES & CONSTRUCTIONS PVT. LTD.
REGISTERED OFFICE
1301, 13th Floor, The Ambience Court, Plot No- 2, Sector-19 D,
Vashi, Navi Mumbai- 400 705.
Tel: +91- 022- 2783 2809 / 2820 / 2821
Fax: +91- 22-2783 2815
E-mail: [email protected]
Website: www.forays.co.in
BRANCH OFFICE
1st Floor, 3-5-996, Street No. 5,
Narayanaguda, Opp. Honda Showroom,
Hyderabad-500029, A.P., India
Tel: +91-40-23223134, 30221632
E-mail: [email protected]