  • REMEDIAL INVESTIGATION/ ALTERNATIVES ANALYSIS WORK PLAN FORMER SCOTT AVIATION FACILITY AREA 1 LANCASTER, NEW YORK

    Prepared for: Scott Technologies, Inc. 6600 Congress Avenue Boca Raton, FL 33487

    Prepared by: AECOM Technical Services, Inc. 100 Corporate Parkway, Suite 341 Amherst, New York 14226 February 2010

  • Remedial Investigation/Alternatives Analysis Work Plan Former Scott Aviation Facility Area 1

    Lancaster, New York

    i February 2010

    TABLE OF CONTENTS

    SECTION PAGE LIST OF FIGURES .................................................................................................................................... iiLIST OF TABLES ...................................................................................................................................... iiLIST OF APPENDICES ............................................................................................................................ iiLIST OF ACRONYMS ............................................................................................................................. iii1.0 INTRODUCTION ............................................................................................................................. 1

    1.1 REMEDIAL INVESTIGATION/ALTERNATIVES ANALYSIS OBJECTIVE ...................... 11.2 REPORT ORGANIZATION ...................................................................................................... 1

    2.0 SITE DESCRIPTION AND HISTORY........................................................................................... 32.1 SITE DESCRIPTION ................................................................................................................. 32.2 PREVIOUS SITE ASSESSMENTS AND INVESTIGATIONS ............................................... 3

    2.1.1 Phase I Environmental Site Assessment ......................................................................... 32.1.2 Phase II Environmental Site Investigation ...................................................................... 42.1.3 Interim Remedial Measure for Soil at Area 1 ................................................................. 42.1.4 Preliminary Groundwater Assessment ............................................................................ 5

    3.0 REMEDIAL INVESTIGATION SCOPE OF WORK ................................................................... 83.1 REMEDIAL INVESTIGATION FIELD ACTIVITES .............................................................. 8

    3.1.1 Soil Vapor Intrusion Evaluation ..................................................................................... 93.1.2 Groundwater Elevation Measurement .......................................................................... 113.1.3 Utility Clearance ........................................................................................................... 123.1.4 Permanent Monitoring Well Installation, Development, and Sampling ....................... 123.1.5 Soil Contamination Delineation .................................................................................... 153.1.6 Temporary Piezometer Installation, Development, and Sampling ............................... 163.1.7 Surveying ...................................................................................................................... 173.1.8 Aquifer Characterization Testing .................................................................................. 173.1.9 Site Soil Characteristic Parameter Sampling ................................................................ 183.1.10 Investigation-Derived Waste Sampling ........................................................................ 18

    4.0 ALTERNATIVES ANALYSIS APPROACH ............................................................................... 204.1 REMEDIAL GOALS AND REMEDIAL ACTION OBJECTIVES DEVELOPMENT ......... 204.2 TECHNOLOGY SCREENING CRITERIA ............................................................................ 204.3 ALTERNATIVES ANALYSIS ................................................................................................ 21

    5.0 QUALITY ASSURANCE/QUALITY CONTROL ACTIVITIES .............................................. 226.0 SITE-SPECIFIC HEALTH AND SAFETY PROTOCOLS ........................................................ 237.0 PROJECT SCHEDULE, REPORTING, AND STAFFING ........................................................ 24

    7.1 PROJECT SCHEDULE ............................................................................................................ 247.2 PROJECT REPORTING .......................................................................................................... 247.3 PROJECT STAFFING ............................................................................................................. 25

    8.0 CITIZEN PARTICIPATION ACTIVITIES ................................................................................. 269.0 REFERENCES................................................................................................................................. 27

  • Remedial Investigation/Alternatives Analysis Work Plan Former Scott Aviation Facility Area 1

    Lancaster, New York

    ii February 2010

    LIST OF FIGURES

    Figure Title

    1 Site Location Map 2 Facility Layout Map 3 Groundwater Surface Contour Map Shallow Overburden Groundwater - May 31, 2007 4 Proposed Soil Vapor Intrusion and Shallow Overburden Monitoring/Sampling Locations 5 Proposed Deep Overburden and Bedrock Monitoring/Sampling Locations 6 Remedial Investigation Schedule 7 Project Organization Chart

    LIST OF TABLES

    Table Title

    1 Temporary Piezometer Installation Details 2 Shallow Groundwater Elevation Measurements 3 Analytical Sampling Program 4 Sample Container, Preservation, and Holding Time Requirements

    LIST OF APPENDICES

    Appendix Title

    A Quality Assurance Project Plan B Requirements for American Land Title Association Land Title Surveys C Site-Specific Health and Safety Plan D IRM Backfill Analytical Data

  • Remedial Investigation/Alternatives Analysis Work Plan Former Scott Aviation Facility Area 1

    Lancaster, New York

    iii February 2010

    LIST OF ACRONYMS

    AA Alternatives Analysis ALTA American Land Title Association ASP Analytical Services Protocol ASTM American Society for Testing Materials AVOX AVOX Systems Inc. BCP Brownfield Cleanup Program bgs below ground surface DOT Department of Transportation DUSR Data Usability Summary Report EPA Environmental Protection Agency ESA Environmental Site Assessment ESI Environmental Site Investigation HASP Health and Safety Plan IDW Investigation-Derived Waste IRM Interim Remedial Measure K Hydraulic Conductivity g/L micrograms per liter g/m3 micrograms per cubic meter NYSDEC New York State Department of Environmental Conservation NYSDOH New York State Department of Health PCB polychlorinated biphenyls PGA Preliminary Groundwater Assessment PID photoionization detector ppm parts per million PVC polyvinyl chloride RAO remedial action objectives RI Remedial Investigation QA/QC Quality Assurance/Quality Control QAPP Quality Assurance Project Plan SCGs Standards, Criteria, and Guidance SVOC Semi-Volatile Organic Compound STL Severn Trent Laboratories, Inc. 1,1,1-TCA 1,1,1-trichloroethane TAGM Technical and Administrative Guidance Memorandum TAL Target Analyte List TCE Trichloroethene TCL Target Compound List UFPO Underground Facilities Protection Organization VOC Volatile Organic Compound

  • Remedial Investigation/Alternatives Analysis Work Plan Former Scott Aviation Facility Area 1

    Lancaster, New York

    1 February 2010

    1.0 INTRODUCTION

    On behalf of Scott Technologies, Inc., AECOM Technical Services, Inc. (AECOM) submitted an application on September 11, 2008 to enter the New York State Department of Environmental Conservation (NYSDEC) Brownfield Cleanup Program (BCP) per Title 6 New York State Official Compilation of Codes, Rules, and Regulations (NYCRR) Part 375-3.4 for Area 1 (Site) located at the former Scott Aviation Facility, 225 Erie Street, Village of Lancaster, Erie County, New York (Figure 1). On September 1, 2004, the former Scott Aviation Facility was sold by Scott Technologies, Inc. to the current facility owner/operator, AVOX Systems Inc. (AVOX). Scott Technologies, Inc. has applied for entry into the NYSDEC BCP as a participant.

    AECOM, on behalf of Scott Technologies, Inc. has developed this Remedial Investigation (RI)/ Alternatives Analysis (AA) Work Plan for Area 1 to meet the requirements of Title 6 NYCRR Parts 375-1.6, -1.8 and 375-3.6, -3.8.

    1.1 REMEDIAL INVESTIGATION/ALTERNATIVES ANALYSIS OBJECTIVE

    Several Site investigations and an interim remedial measure (IRM) for soil have previously been conducted at Area 1 (refer to Section 2.0 of this Work Plan for further information). As such, the objective of this RI/AA Work Plan is to address data gaps in the existing Site investigation data collected for Area 1 in order to definitively identify the contaminant source area, define the nature and extent of contamination, assess contaminant fate and transport, and to complete a qualitative exposure assessment. The results from the RI/AA will be utilized to develop a Conceptual Site Model, determine appropriate remedial action objectives (RAOs), and identify the recommended remedial alternative for Area 1 in the subsequent AA Report.

    1.2 REPORT ORGANIZATION

    This RI/AA Work Plan was developed to adhere to NYSDEC Site investigation and remediation requirements (NYSDEC, December 2002). More specifically, the RI/AA Work Plan for Area 1 at the former Scott Aviation Facility is organized into nine sections and three appendic