40
1 FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010 © 1994 – 2009 Fieldbus Foundation FOUNDATIONTechnology Update 2010 by André Fritsch Product Manager Remote I/O & Fieldbus R. STAHL Schaltgeräte GmbH Member of the Fieldbus Foundation EMEA Steering Committee Member of Fieldbus Foundation Wireless & FF HSE-RIO Working Groups

FOUNDATION Technology Update 2010 - Fieldbus · FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010 ... Multiple Waveform Graph. Image. Multi-pen Trend Chart. Bargraph. ... Emerson

  • Upload
    dotram

  • View
    221

  • Download
    0

Embed Size (px)

Citation preview

1 FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010© 1994 – 2009 Fieldbus Foundation

FOUNDATION™Technology Update 2010

by André FritschProduct Manager Remote I/O & FieldbusR. STAHL Schaltgeräte GmbHMember of the Fieldbus Foundation EMEA Steering CommitteeMember of Fieldbus Foundation Wireless & FF HSE-RIO Working Groups

2 FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010© 1994 – 2009 Fieldbus Foundation

Overview

● Host registration program● Field Diagnostics & EDDL● Safety Instrumented Functions (F-SIF)● Field Device Integration (FDI)● AG 181 Revision● WIO (Wireless & Remote I/O)

3 FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010© 1994 – 2009 Fieldbus Foundation

Host Registration Program

4 FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010© 1994 – 2009 Fieldbus Foundation

Host Profile Registration

Operations

Maintenance

Engineering

Note: Illustrations are examples only. Supplier defines host.

Class 61 – Integrated Host

Class 63/64 – Bench Host

Class 62 – Visitor Host

FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010© 1994 – 2009 Fieldbus Foundation

Transition to Host Registration2006 2007 2008 2009 2010

Host InteroperabilitySupport Test

(HIST) 1.x

Valid through Dec 2008

Host 6Xa Profile Test/Registration

registration until June 2010

remain in catalogue but

no new registrations

Host 6Xb Profile Test/Registration

6 FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010© 1994 – 2009 Fieldbus Foundation

Registered Hosts (Oct. 2010)

2009 General AssemblyYokohama, Japan

FOUNDATION™ Technology Update: Diagnostics and EDDL

8 FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010© 1994 – 2009 Fieldbus Foundation

NAMUR NE107: Self-Monitoring and Diagnosis of Field Devices

Diagnosis results must be reliable

Diagnosis results must always be viewed in the context of the application.

Internal diagnosis must be categorized into 4 standard “status signals”

Configuration must be free, as reactions will depend on the user's requirements

Detailed information can be read out by the device specialist

9 FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010© 1994 – 2009 Fieldbus Foundation

Diagnostic Categories

Failure Function Check

Out of Specification

Maintenance Required

10 FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010© 1994 – 2009 Fieldbus Foundation

Role Based Diagnostics

1

Asset ManagementMaintenance Station

Process ControlEngineering Station

HSE Control Network

H1 Process Network

Plant operators

Plant maintenance engineering

11 FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010© 1994 – 2009 Fieldbus Foundation

New Field Diagnostic Alarms

Additional supporting parametersEnable/Disable of diagnostic detectionEnable/Disable SimulationConfigure PriorityConfigure Alert Suppression (Detect, but not alert)Recommended Actions

Parameter Name (*) NE107 Status SignalSD_FAIL_ALM FailureSD_OFFSPEC_ALM Out of SpecificationSD_MAINT_ALM Maintenance RequiredSD_CHECK_ALM Function Check

* Parameter names will have localized text labels. e.g. “Failure Alarm”

12 FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010© 1994 – 2009 Fieldbus Foundation

EDDL and Field Diagnostics

EDDL is essential for Field DiagnosticsDiagnostic ConditionsRecommended actionsConfiguration and Setep

13 FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010© 1994 – 2009 Fieldbus Foundation

Test and Registration

Field Diagnostics device registration is available today with ITK 6.0 (Sept. 2010)

Field Diagnostics will be required for new device registrations starting with ITK 6.0 (3Q 2010) – first device is registered Sept. 2010!

Field Diagnostics support will be required for new host registrations (3Q 2010)

14 FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010© 1994 – 2009 Fieldbus Foundation

FOUNDATION™ for Safety Instrumented Functions

(SIF)

15 FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010© 1994 – 2009 Fieldbus Foundation

2008SIF Demonstration and Press Day MaySIF Specification v1.2 Released to Developers SepSIF Interoperability Test Kit with SIF_AI Released to Developers OctSIF_AI Lab Validation Completed NovSIF_AI Approved by TSC Dec

2009SIF Interoperability Test Kit with SIF_DO Released to Developers JunBegin Testing with SIF_DO Prototype – Supplier A JunBegin Testing with SIF_DO Prototype – Supplier B NovBegin Testing with SIF_DO Prototype – Supplier C DecAG-181 SIF Best Practices and Guidelines Released Dec

2010SIF_DO Validation Completed AprSIF_DO Approved by TSC MaySIF Interoperability Test Kit with SIF_DO Released Jun

SIF Schedule

16 FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010© 1994 – 2009 Fieldbus Foundation

Electronic Device Description Language (EDDL)

Cooperation Team(ECT)

Field Device Integration(FDI)

17 FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010© 1994 – 2009 Fieldbus Foundation

Phase 1 - Completed 2006Graphs – Graphical display of static Y-T and X-Y dataCharts – Graphical display of real-time data from deviceImages – Embedded images Enhanced User Interface – Screen layoutsEnhanced Data Storage- Securely store data on the host

EDDL Enhancements

Phase 2 - Completed 2007Complex Devices – Off line configuration, Access to Multiple BlocksBasic Client Applications – OPC Unified Architecture (OPC UA) Data Access

18 FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010© 1994 – 2009 Fieldbus Foundation

Multiple Waveform Graph

Image

Multi-pen Trend Chart

Bargraph

Gauge

Navigation

Bar-chartHistogram

EDDL Enhancements ExamplesGraphs, Charts, Images, Screen Layouts Supported

19 FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010© 1994 – 2009 Fieldbus Foundation

Radar Level Temperature Valve Positioner

Machinery Health Pressure Mass Flow

pH Ultrasonic Flow

EDDL Enhancements ExamplesAll Device Types Supported – Full Functionality

20 FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010© 1994 – 2009 Fieldbus Foundation

Host system independent Platform and operating system independentProvide access to the full capability of the field deviceBased on OPC UA client/server specifications and information modelSupport FOUNDATION™ fieldbus, HART®, PROFIBUS and PROFINETAdoptable to support other fieldbus communication technologiesSpecifications independently validated by the ECT organizationsProvide backward compatibility with existing EDD’s and DTM’sProvide guidelines for field device and system developersProvide conformance tests to assure compliance

FDI Project – General Requirements

21 FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010© 1994 – 2009 Fieldbus Foundation

ABBSMARAPATBusCorpFDT GroupDearbornEmerson ProcessManagementEndress + HauserFieldbus FoundationHART Communication Foundation

HoneywellitmifakInvensysM&M Software GmbHOPC FoundationProfibusNutzerorganisationRockwell AutomationSiemensSmarYokogawa

Participants

22 FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010© 1994 – 2009 Fieldbus Foundation

DeviceDefinition

User Interface Description

User Interface Plug-in

Business Logic

Based onIEC 61804-3 EDDL

Based onIEC 62453 FDT

Runs on ClientInterpreted on ClientInterpreted on Server

Mandatory Optional Optional Optional

Device Package

Based onIEC 62541 OPC UA

FDI Device Package Technologies

23 FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010© 1994 – 2009 Fieldbus Foundation

FDI Project approved 1Q 2007FDI Project technical team kickoff meeting 2Q 2007Initial use case review with NAMUR and WIB 4Q 2007Use cases and requirements approved 2Q 2008Architecture 3Q 2008Technology criteria 4Q 2008Technology selection 1Q 2009Functional Specification 2Q 2009Draft Technical Specifications for Validation 1Q 2010Verification and Validation 1Q 2010Final specifications 4Q 2010

FDI Project Timeline

Note: some delay is expected

24 FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010© 1994 – 2009 Fieldbus Foundation

High Speed Ethernet(HSE)

25 FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010© 1994 – 2009 Fieldbus Foundation

HSE - High Speed Ethernet

Exchange control data and communication between HOSTS, Linking Devices and other HSE Equipments

Interoperability Tests for H1/HSE Linking Devices and Hosts

Previous logo was , but this is no longer used!

27 FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010© 1994 – 2009 Fieldbus Foundation

Coriolis MassFlow Meter

EmissionMonitor

FlowComputer

GasAnalyzer

GasChromatograph

LinkingDevice

RTU

UltrasonicFlow Meter

VariableSpeed Drive

MachineryVibrationMonitoring

WirelessGateway

Ethernet Field Devices: HSE Potentials

HSE - High Speed Ethernet

28 FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010© 1994 – 2009 Fieldbus Foundation

HSE - H1 – Registered HSE Linking Devices

29 FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010© 1994 – 2009 Fieldbus Foundation

Wireless and Remote I/O(WIO)

30 FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010© 1994 – 2009 Fieldbus Foundation

WIO CharterDevelop use cases and requirements for HSE remote I/O and wireless communication in monitoring and control that are interoperable using function blocks and EDDL.

Develop a project plan which includes:Solutions using FOUNDATION™ and wireless technologies developed in accordance with ISA100 and future IEC workSolutions for device interoperability and network configurationValidation of technical specificationsinteroperability test and registration procedures

Obtain Technical Steering Committee (TSC) approval of the Project Plan

Develop the Technical Specifications (Status Wireless)

Obtain lab prototypes &validate technical specifications (Status HSE-RIO)

Demonstrate interoperability of WIO devices at end user sites

31 FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010© 1994 – 2009 Fieldbus Foundation

Gateway

ConventionalI/O

Wired HART

H1

WirelessHART

Host

ISA100.11a

HSE RIO Team

Fieldbus Foundation - ISA100Cooperation

HSE Backhaul Team

Wireless Sensor Team

WIO Development Teams

32 FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010© 1994 – 2009 Fieldbus Foundation

WIO backhaul application example

33 FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010© 1994 – 2009 Fieldbus Foundation

WIO Top Level Organization

WIOManagement

Team

WIO Chief ArchitectBill Hodson

Hodson Consulting

WIO Program DirectorWireless Program Manager

ISA100.15 WG Co-ChairDave Glanzer

Fieldbus Foundation

HSE RIO Technical Team Leader

Detlef ArndtP+F

Wireless Technical Team LeaderMarcos Peluso

Emerson

MarketingBill Tatum

Fieldbus Foundation

Device RegistrationProcess

Stephen MitschkeFieldbus Foundation

HSE RIOProgram Manager

Ian VerhappenMTL

TSC LiaisonLibanio de Souza

Smar

ISA100 and EUACAdvisor

Herman StoreyShell GS

WirelessSpecification Development Team

HSE RIOSpecification Development Team

WIOValidation Team

ISA100.15 WGCo-Chair

Penny ChenYokogawa

WIO Validation Team LeaderNaoyuki Fukau

Yamatake

34 FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010© 1994 – 2009 Fieldbus Foundation

WIO Development Teams

HSE RIO Team HSE Backhaul Team Wireless Sensor Team

35 FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010© 1994 – 2009 Fieldbus Foundation

Gateway

Convent’lI/O

HART I/O

Wired FF HSE

FF H1

Convent’lI/O

Othernetworks

Gateway

HART I/O

FFB

or

WirelessHART

orWiredFF HSE

or

ISA100

GatewayGateway

WIO Phase 1

HSE Remote I/O

WIO Phase 3

Flexible Function Blocks&

I/F to other Networks

WIO Phase 2

HSE Backhaul&

WirelessHART I/F

WIO Phase 4

ISA100 I/F

WirelessFF HSE

backhaulWired

FF HSE

WirelessFF HSEBackhaul

Wired FF HSE

WirelessFF HSEBackhaul

WIO Development Phases

36 FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010© 1994 – 2009 Fieldbus Foundation

WIO timeline

37 FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010© 1994 – 2009 Fieldbus Foundation

n WIO Phase 1 Specifications

n WIO Phase 1 ITK

n WIO Phase 2 Specifications

n WIO Phase 2 Demo

n WIO Phase 2 ITK

n WIO Phase 1 Demo

n WIO Phase 4 Specifications

n WIO Phase 4 Demo

n WIO Phase 4 ITK

2009 2009 20104 7 104 7 10 4 7 10 4 7 10

2011

Specification Development

Demo

Validation and Test Kit

Specification Development

Demo

Validation and Test Kit

Specification Development

Validation and Test Kit

4 7 102012

n WIO Phase 3 Specifications

n WIO Phase 3 Demo

n WIO Phase 3 ITK

Specification Development

Demo

Validation and Test Kit

Demo

DEMO WIO Phase 1 & 2

HSE Wireless BackhaulConventional I/O

WirelessHARTWired HART

H1

DEMO WIO Phase 3

Other Networks

DEMO WIO Phase 4

ISA100

WIO Timeline

3rd.q. 2011

38 FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010© 1994 – 2009 Fieldbus Foundation

Gateway

ConventionalI/O

Wired HART

Wireless HSE

Backhaul

H1WirelessHART

WIO Host

WiredHSE

or

Demo Sites (Preliminary)

North America – Emerson Ovation DCSEnd User: City of Edmonton

South America – Smar DCSEnd User: Santa Elisa - Brazil

Europe – ABB 800xA?End User: Shell Global Solutions

Asia – Yamatake DCSEnd User: Mitsubishi

APATMTL ??STAHLSmar

SmarEmerson OvationYamatake (2011)APAT

WIO Phase 1 + 2 Prototypes for Validation

39 FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010© 1994 – 2009 Fieldbus Foundation

Device Development StatusVendor Component

typeDelivery schedule

Issues

APAT Conventional I/O Tested as PC simulator (no prototype at FF) Hardware expected by end August.

See Validation Results Spreadsheet

Wired HART Gateway Tested as PC simulator (no prototype at FF)Hardware expected by end August.

See Validation Results Spreadsheet

Wireless HART Expected a first version by end of September.

SMAR Conventional I/O Delivered. Expected new firmware by 20 August

See Validation Results Spreadsheet + new ARs

Wired HART Gateway Delivered. Expected new firmware by 20 August

See Validation Results Spreadsheet + new ARs

STAHL Conventional I/O Delivered simple HSE modular device.Conventional IO expected end 2010.

40 FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010© 1994 – 2009 Fieldbus Foundation

Host Development StatusVendor Delivery

scheduleIssues

APAT To be delivered by end August.

Yamatake Still in planning Demo for 2011 (wired and wireless).

SMAR Delivered.