1 FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010© 1994 – 2009 Fieldbus Foundation
FOUNDATION™Technology Update 2010
by André FritschProduct Manager Remote I/O & FieldbusR. STAHL Schaltgeräte GmbHMember of the Fieldbus Foundation EMEA Steering CommitteeMember of Fieldbus Foundation Wireless & FF HSE-RIO Working Groups
2 FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010© 1994 – 2009 Fieldbus Foundation
Overview
● Host registration program● Field Diagnostics & EDDL● Safety Instrumented Functions (F-SIF)● Field Device Integration (FDI)● AG 181 Revision● WIO (Wireless & Remote I/O)
3 FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010© 1994 – 2009 Fieldbus Foundation
Host Registration Program
4 FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010© 1994 – 2009 Fieldbus Foundation
Host Profile Registration
Operations
Maintenance
Engineering
Note: Illustrations are examples only. Supplier defines host.
Class 61 – Integrated Host
Class 63/64 – Bench Host
Class 62 – Visitor Host
FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010© 1994 – 2009 Fieldbus Foundation
Transition to Host Registration2006 2007 2008 2009 2010
Host InteroperabilitySupport Test
(HIST) 1.x
Valid through Dec 2008
Host 6Xa Profile Test/Registration
registration until June 2010
remain in catalogue but
no new registrations
Host 6Xb Profile Test/Registration
6 FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010© 1994 – 2009 Fieldbus Foundation
Registered Hosts (Oct. 2010)
8 FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010© 1994 – 2009 Fieldbus Foundation
NAMUR NE107: Self-Monitoring and Diagnosis of Field Devices
Diagnosis results must be reliable
Diagnosis results must always be viewed in the context of the application.
Internal diagnosis must be categorized into 4 standard “status signals”
Configuration must be free, as reactions will depend on the user's requirements
Detailed information can be read out by the device specialist
9 FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010© 1994 – 2009 Fieldbus Foundation
Diagnostic Categories
Failure Function Check
Out of Specification
Maintenance Required
10 FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010© 1994 – 2009 Fieldbus Foundation
Role Based Diagnostics
1
Asset ManagementMaintenance Station
Process ControlEngineering Station
HSE Control Network
H1 Process Network
Plant operators
Plant maintenance engineering
11 FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010© 1994 – 2009 Fieldbus Foundation
New Field Diagnostic Alarms
Additional supporting parametersEnable/Disable of diagnostic detectionEnable/Disable SimulationConfigure PriorityConfigure Alert Suppression (Detect, but not alert)Recommended Actions
Parameter Name (*) NE107 Status SignalSD_FAIL_ALM FailureSD_OFFSPEC_ALM Out of SpecificationSD_MAINT_ALM Maintenance RequiredSD_CHECK_ALM Function Check
* Parameter names will have localized text labels. e.g. “Failure Alarm”
12 FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010© 1994 – 2009 Fieldbus Foundation
EDDL and Field Diagnostics
EDDL is essential for Field DiagnosticsDiagnostic ConditionsRecommended actionsConfiguration and Setep
13 FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010© 1994 – 2009 Fieldbus Foundation
Test and Registration
Field Diagnostics device registration is available today with ITK 6.0 (Sept. 2010)
Field Diagnostics will be required for new device registrations starting with ITK 6.0 (3Q 2010) – first device is registered Sept. 2010!
Field Diagnostics support will be required for new host registrations (3Q 2010)
14 FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010© 1994 – 2009 Fieldbus Foundation
FOUNDATION™ for Safety Instrumented Functions
(SIF)
15 FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010© 1994 – 2009 Fieldbus Foundation
2008SIF Demonstration and Press Day MaySIF Specification v1.2 Released to Developers SepSIF Interoperability Test Kit with SIF_AI Released to Developers OctSIF_AI Lab Validation Completed NovSIF_AI Approved by TSC Dec
2009SIF Interoperability Test Kit with SIF_DO Released to Developers JunBegin Testing with SIF_DO Prototype – Supplier A JunBegin Testing with SIF_DO Prototype – Supplier B NovBegin Testing with SIF_DO Prototype – Supplier C DecAG-181 SIF Best Practices and Guidelines Released Dec
2010SIF_DO Validation Completed AprSIF_DO Approved by TSC MaySIF Interoperability Test Kit with SIF_DO Released Jun
SIF Schedule
16 FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010© 1994 – 2009 Fieldbus Foundation
Electronic Device Description Language (EDDL)
Cooperation Team(ECT)
Field Device Integration(FDI)
17 FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010© 1994 – 2009 Fieldbus Foundation
Phase 1 - Completed 2006Graphs – Graphical display of static Y-T and X-Y dataCharts – Graphical display of real-time data from deviceImages – Embedded images Enhanced User Interface – Screen layoutsEnhanced Data Storage- Securely store data on the host
EDDL Enhancements
Phase 2 - Completed 2007Complex Devices – Off line configuration, Access to Multiple BlocksBasic Client Applications – OPC Unified Architecture (OPC UA) Data Access
18 FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010© 1994 – 2009 Fieldbus Foundation
Multiple Waveform Graph
Image
Multi-pen Trend Chart
Bargraph
Gauge
Navigation
Bar-chartHistogram
EDDL Enhancements ExamplesGraphs, Charts, Images, Screen Layouts Supported
19 FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010© 1994 – 2009 Fieldbus Foundation
Radar Level Temperature Valve Positioner
Machinery Health Pressure Mass Flow
pH Ultrasonic Flow
EDDL Enhancements ExamplesAll Device Types Supported – Full Functionality
20 FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010© 1994 – 2009 Fieldbus Foundation
Host system independent Platform and operating system independentProvide access to the full capability of the field deviceBased on OPC UA client/server specifications and information modelSupport FOUNDATION™ fieldbus, HART®, PROFIBUS and PROFINETAdoptable to support other fieldbus communication technologiesSpecifications independently validated by the ECT organizationsProvide backward compatibility with existing EDD’s and DTM’sProvide guidelines for field device and system developersProvide conformance tests to assure compliance
FDI Project – General Requirements
21 FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010© 1994 – 2009 Fieldbus Foundation
ABBSMARAPATBusCorpFDT GroupDearbornEmerson ProcessManagementEndress + HauserFieldbus FoundationHART Communication Foundation
HoneywellitmifakInvensysM&M Software GmbHOPC FoundationProfibusNutzerorganisationRockwell AutomationSiemensSmarYokogawa
Participants
22 FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010© 1994 – 2009 Fieldbus Foundation
DeviceDefinition
User Interface Description
User Interface Plug-in
Business Logic
Based onIEC 61804-3 EDDL
Based onIEC 62453 FDT
Runs on ClientInterpreted on ClientInterpreted on Server
Mandatory Optional Optional Optional
Device Package
Based onIEC 62541 OPC UA
FDI Device Package Technologies
23 FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010© 1994 – 2009 Fieldbus Foundation
FDI Project approved 1Q 2007FDI Project technical team kickoff meeting 2Q 2007Initial use case review with NAMUR and WIB 4Q 2007Use cases and requirements approved 2Q 2008Architecture 3Q 2008Technology criteria 4Q 2008Technology selection 1Q 2009Functional Specification 2Q 2009Draft Technical Specifications for Validation 1Q 2010Verification and Validation 1Q 2010Final specifications 4Q 2010
FDI Project Timeline
Note: some delay is expected
24 FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010© 1994 – 2009 Fieldbus Foundation
High Speed Ethernet(HSE)
25 FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010© 1994 – 2009 Fieldbus Foundation
HSE - High Speed Ethernet
Exchange control data and communication between HOSTS, Linking Devices and other HSE Equipments
Interoperability Tests for H1/HSE Linking Devices and Hosts
Previous logo was , but this is no longer used!
26 FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010© 1994 – 2009 Fieldbus Foundation
HSE - High Speed Ethernet
4-20 mA
HSE
27 FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010© 1994 – 2009 Fieldbus Foundation
Coriolis MassFlow Meter
EmissionMonitor
FlowComputer
GasAnalyzer
GasChromatograph
LinkingDevice
RTU
UltrasonicFlow Meter
VariableSpeed Drive
MachineryVibrationMonitoring
WirelessGateway
Ethernet Field Devices: HSE Potentials
HSE - High Speed Ethernet
28 FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010© 1994 – 2009 Fieldbus Foundation
HSE - H1 – Registered HSE Linking Devices
29 FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010© 1994 – 2009 Fieldbus Foundation
Wireless and Remote I/O(WIO)
30 FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010© 1994 – 2009 Fieldbus Foundation
WIO CharterDevelop use cases and requirements for HSE remote I/O and wireless communication in monitoring and control that are interoperable using function blocks and EDDL.
Develop a project plan which includes:Solutions using FOUNDATION™ and wireless technologies developed in accordance with ISA100 and future IEC workSolutions for device interoperability and network configurationValidation of technical specificationsinteroperability test and registration procedures
Obtain Technical Steering Committee (TSC) approval of the Project Plan
Develop the Technical Specifications (Status Wireless)
Obtain lab prototypes &validate technical specifications (Status HSE-RIO)
Demonstrate interoperability of WIO devices at end user sites
31 FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010© 1994 – 2009 Fieldbus Foundation
Gateway
ConventionalI/O
Wired HART
H1
WirelessHART
Host
ISA100.11a
HSE RIO Team
Fieldbus Foundation - ISA100Cooperation
HSE Backhaul Team
Wireless Sensor Team
WIO Development Teams
32 FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010© 1994 – 2009 Fieldbus Foundation
WIO backhaul application example
33 FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010© 1994 – 2009 Fieldbus Foundation
WIO Top Level Organization
WIOManagement
Team
WIO Chief ArchitectBill Hodson
Hodson Consulting
WIO Program DirectorWireless Program Manager
ISA100.15 WG Co-ChairDave Glanzer
Fieldbus Foundation
HSE RIO Technical Team Leader
Detlef ArndtP+F
Wireless Technical Team LeaderMarcos Peluso
Emerson
MarketingBill Tatum
Fieldbus Foundation
Device RegistrationProcess
Stephen MitschkeFieldbus Foundation
HSE RIOProgram Manager
Ian VerhappenMTL
TSC LiaisonLibanio de Souza
Smar
ISA100 and EUACAdvisor
Herman StoreyShell GS
WirelessSpecification Development Team
HSE RIOSpecification Development Team
WIOValidation Team
ISA100.15 WGCo-Chair
Penny ChenYokogawa
WIO Validation Team LeaderNaoyuki Fukau
Yamatake
34 FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010© 1994 – 2009 Fieldbus Foundation
WIO Development Teams
HSE RIO Team HSE Backhaul Team Wireless Sensor Team
35 FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010© 1994 – 2009 Fieldbus Foundation
Gateway
Convent’lI/O
HART I/O
Wired FF HSE
FF H1
Convent’lI/O
Othernetworks
Gateway
HART I/O
FFB
or
WirelessHART
orWiredFF HSE
or
ISA100
GatewayGateway
WIO Phase 1
HSE Remote I/O
WIO Phase 3
Flexible Function Blocks&
I/F to other Networks
WIO Phase 2
HSE Backhaul&
WirelessHART I/F
WIO Phase 4
ISA100 I/F
WirelessFF HSE
backhaulWired
FF HSE
WirelessFF HSEBackhaul
Wired FF HSE
WirelessFF HSEBackhaul
WIO Development Phases
36 FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010© 1994 – 2009 Fieldbus Foundation
WIO timeline
37 FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010© 1994 – 2009 Fieldbus Foundation
n WIO Phase 1 Specifications
n WIO Phase 1 ITK
n WIO Phase 2 Specifications
n WIO Phase 2 Demo
n WIO Phase 2 ITK
n WIO Phase 1 Demo
n WIO Phase 4 Specifications
n WIO Phase 4 Demo
n WIO Phase 4 ITK
2009 2009 20104 7 104 7 10 4 7 10 4 7 10
2011
Specification Development
Demo
Validation and Test Kit
Specification Development
Demo
Validation and Test Kit
Specification Development
Validation and Test Kit
4 7 102012
n WIO Phase 3 Specifications
n WIO Phase 3 Demo
n WIO Phase 3 ITK
Specification Development
Demo
Validation and Test Kit
Demo
DEMO WIO Phase 1 & 2
HSE Wireless BackhaulConventional I/O
WirelessHARTWired HART
H1
DEMO WIO Phase 3
Other Networks
DEMO WIO Phase 4
ISA100
WIO Timeline
3rd.q. 2011
38 FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010© 1994 – 2009 Fieldbus Foundation
Gateway
ConventionalI/O
Wired HART
Wireless HSE
Backhaul
H1WirelessHART
WIO Host
WiredHSE
or
Demo Sites (Preliminary)
North America – Emerson Ovation DCSEnd User: City of Edmonton
South America – Smar DCSEnd User: Santa Elisa - Brazil
Europe – ABB 800xA?End User: Shell Global Solutions
Asia – Yamatake DCSEnd User: Mitsubishi
APATMTL ??STAHLSmar
SmarEmerson OvationYamatake (2011)APAT
WIO Phase 1 + 2 Prototypes for Validation
39 FIELDBUS FOUNDATION CONFIDENTIAL Technology Update 2010© 1994 – 2009 Fieldbus Foundation
Device Development StatusVendor Component
typeDelivery schedule
Issues
APAT Conventional I/O Tested as PC simulator (no prototype at FF) Hardware expected by end August.
See Validation Results Spreadsheet
Wired HART Gateway Tested as PC simulator (no prototype at FF)Hardware expected by end August.
See Validation Results Spreadsheet
Wireless HART Expected a first version by end of September.
SMAR Conventional I/O Delivered. Expected new firmware by 20 August
See Validation Results Spreadsheet + new ARs
Wired HART Gateway Delivered. Expected new firmware by 20 August
See Validation Results Spreadsheet + new ARs
STAHL Conventional I/O Delivered simple HSE modular device.Conventional IO expected end 2010.