Foundations and FloorsResidential and Commercial
BuildingsJohn Patch
Group Director – Roger Bullivant Ltd
Established 1971Established 1971
1100/600 employees
£128m turnover per annum in 2008
£85m turnover forecast for 2010
£2m R&D spend per annum
Roger Bullivant Ltd XX
Product manufacture Precast piling
1 million linear metres of pile per year
Manufactured to stock length & size
RBL designs and manufactures most of its own plant & equipment
And carries out its own design for packages of work.
Fully engineered foundation packages for the domestic, residential sector
Foundation packages - SystemFirst
RB SystemFirst
CO2 released (KG) Water Use (Litres) RM Use (KG)
Traditional – Trench fill 71,463.94 36,530.00 132,860.00
Piles and Precast Beams 25,590.74 6,406.00 36,532.90
RB SystemFirst 15,164.00 3,299.25 15,164.00
CARBON FOOTPRINT
0.00
20,000.00
40,000.00
60,000.00
80,000.00
100,000.00
120,000.00
140,000.00
CO2 released (KG) Water Use (Litres) RM Use (KG)
Traditional - Trenchfill
SystemFirst Stage 1
SystemFirst Stage 2
-
-+
Heat pumps, solar collector, PV, heat recovery
Vacuum tube solar collector
Control Valve
Underfloor heating
Compressor
Circulating Pump
Geothermal heat storage battery
heat loop in piled foundation
Hot water tank
PV panel
Control Valve
Heat recovery unit
GSHP
Chilled ceiling
KTPCollaboration – Nottingham
University/Roger Bullivant Ltd
• Benefits society at large.• Provides best solution for Product
development.• Provides resources not normally available
to Companies.• Provides expertise from outside the
Company.• Provides funding.