37
FOUNTAIN OF LIFE MINISTRIES ORPHANS AND DISABLED PEOPLE AND EVANGELISM PROJECT (PROJECT HOPE) SIERRA LEONE

FOUNTAIN OF LIFE MINISTRIES ORPHANS AND DISABLED PEOPLE AND EVANGELISM PROJECT (PROJECT HOPE) SIERRA LEONE

Embed Size (px)

Citation preview

Page 1: FOUNTAIN OF LIFE MINISTRIES ORPHANS AND DISABLED PEOPLE AND EVANGELISM PROJECT (PROJECT HOPE) SIERRA LEONE

FOUNTAIN OF LIFE MINISTRIES

ORPHANS AND DISABLED PEOPLE AND EVANGELISM PROJECT

(PROJECT HOPE)SIERRA LEONE

Page 2: FOUNTAIN OF LIFE MINISTRIES ORPHANS AND DISABLED PEOPLE AND EVANGELISM PROJECT (PROJECT HOPE) SIERRA LEONE

PROJECT DESCRIPTION

• This project is envisaged to help orphans and disabled people, and also geared towards the provision of basic education and vocational training opportunities for the disabled and orphans, within Western area and the Country at large.

• It is also intended to facilitate skill training development for child combatant, and children who are forced to drop out of school because of war or poverty. To provide educational facilities for children free of charge and to reach out to the lost who need the word of God to console them from their traumatic states by way of evangelism and counseling in Freetown as well as the entire country.

Page 3: FOUNTAIN OF LIFE MINISTRIES ORPHANS AND DISABLED PEOPLE AND EVANGELISM PROJECT (PROJECT HOPE) SIERRA LEONE

Major Problems1. Lack of orphanage.2. Inadequate basic skill to enhance preparedness in the face

of the emerging issue and now situations in post war.3. Insufficient tools/implements, input materials, poor

management.4. The push-pull effect of city migration of women and

children Ten – Thirty four (10 – 34 years).5. Lack of funds to support free education programs

especially for Children.6. Exclusion of women and youths from community decision

making process.7. Severe traumatic experience as a direct result of rebel war.8. 8. Lack of Biblical teaching as most focus on their

secret societies (Devils)

Page 4: FOUNTAIN OF LIFE MINISTRIES ORPHANS AND DISABLED PEOPLE AND EVANGELISM PROJECT (PROJECT HOPE) SIERRA LEONE

PROJECT AIMS AND OBJECTION

• Building a better Orphanage and worship center is the main aim coupled with vocational and skill training for the children and disabled people, so that they will be involved in income generating activities to promote better living stand within the community. (And to reach out the people in the communities by way of counseling in order to identify the most needy children to help them by way of skill training and other educational facilities).

Page 5: FOUNTAIN OF LIFE MINISTRIES ORPHANS AND DISABLED PEOPLE AND EVANGELISM PROJECT (PROJECT HOPE) SIERRA LEONE

Specific Objectives1. To build orphanage and to provide basic education for the

children and vocational guidance for the disabled community through out the country.

2. To prepare workshops and Seminars for participants in children development and counseling.

3. To improve the general welfare of unfortunate children and disabled.

4. To increase the productivity of modern design gara mechanized soap making and larger skills to meet the growing population of the community. Enquiring participant’s income generating activities for self-reliance of the disabled community.

5. To provide necessary extension services for the children of the above objective. Provision of basic training technical support and extension guidance for the successful implementation of viable rural community development programs.

6. To support handicap and disabled children with free education.7. To open and equip vocational training and children’s center.8. To train disciples for effective evangelism.

Page 6: FOUNTAIN OF LIFE MINISTRIES ORPHANS AND DISABLED PEOPLE AND EVANGELISM PROJECT (PROJECT HOPE) SIERRA LEONE

PROJECT DURATION

As a first phase the project will be implemented in 12 months (i.e. June 2007 – June 2008). Extension into a second phase of another 12 months will depend on a successful implementation of the first phase and the availability of funds.

Page 7: FOUNTAIN OF LIFE MINISTRIES ORPHANS AND DISABLED PEOPLE AND EVANGELISM PROJECT (PROJECT HOPE) SIERRA LEONE

PROJECT PLAN ACTIVITIES

A. TRAUMA HEALING & COUNSELING & EVANGELISM DEPARTMENT

B. BUILDING OF ORPHANAGE, VOCATIONAL AND SKILL TRAINING

C. CARPENTRY, TRAINING WORKSHOP

D. TAILORING, SOAP MAKING AND GARA TIE DYING SECTION

Page 8: FOUNTAIN OF LIFE MINISTRIES ORPHANS AND DISABLED PEOPLE AND EVANGELISM PROJECT (PROJECT HOPE) SIERRA LEONE

A. TRAUMA HEALING & COUNSELING& EVANGELISM DEPARTMENT

• OBJECTIVE: Provide music, counseling, teaching and other worship activities which help a lot in the lives of children and disabled community and also reach out to lost souls for Christ.

• ACTIVITIES: Provide a platform where almost all counseling will be dramatized.

Page 9: FOUNTAIN OF LIFE MINISTRIES ORPHANS AND DISABLED PEOPLE AND EVANGELISM PROJECT (PROJECT HOPE) SIERRA LEONE

NO COMPONENTS UNIT COST(Le)

QUANTITY TOTAL COST(Le)

EQUIPMENT

1 2000 watt amplifier 3,500,000 1 3,500,000

2 2000 watt mixer 2,500,000 1 2,500,000

3 200 watt deck 1,500,000 1 1,500,000

4 Electronic keyboard(Yamaha) 1,800,000 1 1,800,000

5 Uninterrupted power supply(UPS) 1,400,000 1 1,400,000

6 Microphone and stand set 215,000 6 1,290,000

7 Video camera 3,800,000 2 7,600,000

8 Generator 10 KVA 16,400,000 1 16,400,000

9 Vehicle (van) 2ND hand 40,000,000 1 40,000,000

10 Wooden stage 12”x8” Lump sum 1 600,000

11 Megaphone 250,000 6 1500,000

12 Fuel petrol 8,000 1000gls 8,000,000

13 Engine oil 8,700 600gls 5,220,000

14 Cable (assorted) Lump sum - 100,000

15 Bulbs (assorted) Lump sum - 400,000

SUB TOTAL 91,810,000

Page 10: FOUNTAIN OF LIFE MINISTRIES ORPHANS AND DISABLED PEOPLE AND EVANGELISM PROJECT (PROJECT HOPE) SIERRA LEONE

B. BUILDING OF ORPHANAGE, VOCATIONAL AND SKILL TRAINING

• The building will have large space for orphanage both boys and girls and the vocational training department will be divided into three sections.

• OBJECTIVE:- To build good orphanage for the underprivileged children who lost their parents during our 10 years of rebel war.

• ACTIVITIES:- Take good and godly care of the children and disabled people so that they don’t feel like they are not human beings.

Page 11: FOUNTAIN OF LIFE MINISTRIES ORPHANS AND DISABLED PEOPLE AND EVANGELISM PROJECT (PROJECT HOPE) SIERRA LEONE

THE COMPUTER TRAINING SECTION

• OBJECTIVE:- To increase computer literacy within the community and to help those interested few who could not afford to pay for such course in other computer institutions. To also generate income to support the other project area such as scholarship scheme to orphans.

• OUTPUT:- over 2000 students to be trained as the community is well populated.

• ACTIVITIES:- Sensitize and train all classes of students with computer operation skills for a minimal fees to enhance the development and promotion of the other sections, by a well trained and qualify computer professionals.

• The classes will be divided into shift morning, afternoon, and evening, which each class will comprise of 20 students at start. This will increase as time goes on.

• Set up a mechanism for participation, monitoring, supervision, evaluation and reporting system.

• Set up a maintenance department to enhance a smooth running of the department.

Page 12: FOUNTAIN OF LIFE MINISTRIES ORPHANS AND DISABLED PEOPLE AND EVANGELISM PROJECT (PROJECT HOPE) SIERRA LEONE

CONSTRUCTION OF ORPHANAGE AND VOCATIONAL CENTRE

NO COMPENENTS UNIT COST QUANTITY TOTAL COST

CLEARING, DIGGING, FOUNDATION, CHANNELS AND FILLING

Land 40,000,000 40,000,000

Machetes 8,000 5 40,000

Head pan 7,000 5 35,000

Shovel 10,000 10 100,000

Wheel barrow 60,000 2 120,000

Pickaxe 10,000 6 60,000

Page 13: FOUNTAIN OF LIFE MINISTRIES ORPHANS AND DISABLED PEOPLE AND EVANGELISM PROJECT (PROJECT HOPE) SIERRA LEONE

Earth for backfill 40,000 20 trips 800,000

SUB TOTAL 41,155,000

FLOATING AND ERECTION OF BUILDING

Cement blocks 6”x9x18” 4,000 8000 32,000,000

Cement 25,000 2000bags 50,000,000

Sand 130,000 60 trips 7,800,000

Granite stone 180,000 40trips 7,200,000

a) Timbers 2x4x12”b) 2x3x12”c) 2x6x12”d) 1x12x12”e) 2x2x12”

18,000 220 3,960,000

18,000 180 3,240,000

18,000 25 450,000

18,000 150 2,700,000

18,000 2000 3,600,000

Fleet 1”x12 20,000 20 dls 400,000

c.i. sheet 110,000 18 dls 1,980,000

Page 14: FOUNTAIN OF LIFE MINISTRIES ORPHANS AND DISABLED PEOPLE AND EVANGELISM PROJECT (PROJECT HOPE) SIERRA LEONE

Wire nail (assorted) 1500 220 pckts 330,000

Iron rod (5/8”x40”) 3,800,000 10tons 38,000,000

Iron rod(1/2”x40”) 2,850,000 15tons 42,750,000

Hinges (4”) 700 15 10,500

Corried 12,500 5 gals 62,500

White wash 45,000 20 bags 900,000

Emulsion paint 30,000 35 gallons 1,050,000

Oil paints 38,000 15 gallons 570,000

Locker 70,000 10 set 700,000

Balusters 2000 600 ic 1,200,000

Steel Windows 300,000 16 4,800,000

Steel doors 560,000 5 2,800,000

SUB TOTAL 206,503,000

Page 15: FOUNTAIN OF LIFE MINISTRIES ORPHANS AND DISABLED PEOPLE AND EVANGELISM PROJECT (PROJECT HOPE) SIERRA LEONE

CONSTRUCTION WORK

Skilled labour Lump sum 30,000,000

Unskilled labour Lump sum 5,000,000

Supervision (monitoring and evaluation) Lump sum 3,000,000

Transport Lump sum 2,000,000

Miscellaneous 2,000,000

SUB TOTAL 42,000,000

GRAND TOTAL 289,658,000

Page 16: FOUNTAIN OF LIFE MINISTRIES ORPHANS AND DISABLED PEOPLE AND EVANGELISM PROJECT (PROJECT HOPE) SIERRA LEONE

COMPUTER DEPARTMENT COMPONENTNO COMPONENT UNIT COST QUANTITY TOTAL COST

COMPUTER AND ACCESSORIES

Computer 5,500,000 20 110,000,000

Printer (laser jet 2100) 2,800,000 3 8,400,000

Uninterrupted power supply(UPS) 1,400,000 10 14,000,000

Floppy diskettes 30,000 20 boxes 600,000

Hp toner cartridge for printer 300,000 10 3000,000

Air conditioner 2h/p 2,500,000 3 7,500,000

Stand-by generator 16,000,000 1 16,000,000

Computer table set 250,000 20 5,000,000

Chairs 90,000 20 1,800,000

SUB TOTAL 166,300,000

Page 17: FOUNTAIN OF LIFE MINISTRIES ORPHANS AND DISABLED PEOPLE AND EVANGELISM PROJECT (PROJECT HOPE) SIERRA LEONE

C. CARPENTRY, TRAINING WORKSHOP

• OBJECTIVE: To promote skilled training facility for drop-out children.

• OUTPUT: 1,000 children are expected to go through this training program in the first and second phase of the project.

• ACTIVITIES: Children from 13 – 18 years who don’t have the courage to go to school should register into this department for skill training under trained and qualified instructors to be trained in the field of carpentry, cabinet making and up-holster.

Page 18: FOUNTAIN OF LIFE MINISTRIES ORPHANS AND DISABLED PEOPLE AND EVANGELISM PROJECT (PROJECT HOPE) SIERRA LEONE

CARPENTRYCOMPONENT QUANTITY UNIT COST TOTAL COST

TOOLS

Jack plane No. 7 4 160,000 640,000

Jack plane No. 6 6 120,000 720,000

Jack plane No. 4 6 120,000 720,000

Smoothing plane No. 4 8 70,000 560,000

Grooving machine 4 175,000 700,000

Tenon saw 10 15,000 150,000

Ripping saw 8 45,000 360,000

Hand saw 5 16,000 80,000

Page 19: FOUNTAIN OF LIFE MINISTRIES ORPHANS AND DISABLED PEOPLE AND EVANGELISM PROJECT (PROJECT HOPE) SIERRA LEONE

Gross cut saw 10 25,000 250,000

Trans square 10 12,000 120,000

Mytre square 10 12,000 120,000

Goat hammer 15 10,000 150,000

Pin hammer 20 15,000 300,000

Screw driver set 5 25,000 125,000

Tape rules 16 ft 20 6,000 120,000

Bench vice 4 250,000 1,000,000

Six feet clamp 4 120,000 480,000

G. clamp 10 20,000 200,000

Hack saw 10 15,000 150,000

Carpentry bar 6 10,000 60,000

Page 20: FOUNTAIN OF LIFE MINISTRIES ORPHANS AND DISABLED PEOPLE AND EVANGELISM PROJECT (PROJECT HOPE) SIERRA LEONE

Chisels (set) 6 25,000 150,000

Pliers 20 6,000 120,000

Sharping stone rod 6 35,000 210,000

Pincher 10 12,000 120,000

Braze orbit 6 25,000 150,000

Block plane 10 15,000 150,000

Rough files 10 6,000 60,000

Spock shape 20 20,000 400,000

Sewing machine(Upholstery) 3 250,000 750000

SUB TOTAL 9,115,000

WORKING MATERIALS

Timbers 2”x 4x14” 300 10,000 3,000,000

Page 21: FOUNTAIN OF LIFE MINISTRIES ORPHANS AND DISABLED PEOPLE AND EVANGELISM PROJECT (PROJECT HOPE) SIERRA LEONE

Timbers 1”x 12x4” 200 15,000 3,000,000

Timbers 2”x 2x14” 170 10,000 1,700,000

Timbers 2”x 12x14” 200 20,000 4,000,000

Caskamite 50 pkts 1,5000 75,000

Sand paper 100 sheet 30,000 3,000,000

Clear polish 50 tins 12,000 600,000

Sand seeler 50 yds 25,000 1,250,000

Chair cover (cloth) 600 18,000 10,800,000

Sponge 1” 50 sheet 18,000 900,000

Sponge 4” 50 sheet 25,000 1,250,000

Evostic 20 cups 10,000 200,000

Unskilled labour - - 2,000,000

Page 22: FOUNTAIN OF LIFE MINISTRIES ORPHANS AND DISABLED PEOPLE AND EVANGELISM PROJECT (PROJECT HOPE) SIERRA LEONE

Skilled labour 1,500,000

SUB TOTAL 33,275,000

Page 23: FOUNTAIN OF LIFE MINISTRIES ORPHANS AND DISABLED PEOPLE AND EVANGELISM PROJECT (PROJECT HOPE) SIERRA LEONE

TRAINING AND ADMINISTRATION NO DESCRIPTION QUANTITY UNIT COST TOTAL COST

Seminars and workshops Seminars and workshop for 200 counselors

Refreshment and traveling etc.

2,500,000

Training of vocational guidance Training of 100 vocational guidance and counselors

Refreshment and training materials

1,800,000

Training Computer Department Training of 10 members in one group x 4 in computer section

Refreshment and training materials for instructors

1,300,000

Training of carpenters Training of 25 members in one group x 4 in workshop

Refreshment and training materials

1,000,000

Training in tailoring/dressing making/designing

Training of 20 members in one group x 4 in tailoring

Refreshment and training materials

500,000

Training of members Training of 20 members in one group x 2 in soap making and gara dying

Refreshment and training materials for both departments

1,000,000

Management and administration Meetings, visits, entertainment and stationary

Lump sum 2,000,000

Management and administration Consultancies Lump sum 500,000

SUB-TOTAL 10,600,000

Page 24: FOUNTAIN OF LIFE MINISTRIES ORPHANS AND DISABLED PEOPLE AND EVANGELISM PROJECT (PROJECT HOPE) SIERRA LEONE

D. TAILORING, SOAP MAKING AND GARA TIE DYING SECTION

• OBJECTIVE: To promote a small scale income generation activities and to provide a basic training skill for disabled and less-privilege youths for a sustainable development and self reliance.

• OUTPUT: over 200 people are targeted to go through this training in the first and second phase of the programme.

• ACTIVITIES: About 200 people are to undergo a technical training in tailoring and designing, soap making and gara tie dying under qualified instructors.

Page 25: FOUNTAIN OF LIFE MINISTRIES ORPHANS AND DISABLED PEOPLE AND EVANGELISM PROJECT (PROJECT HOPE) SIERRA LEONE

• The 200 students are trained in groups of 20 for effective participation of others for a period of 12 months especially for soap making and gara dying. Within which members will be adequately prepared to become extension trainers in the Rural Districts.

• Moreover it is also planned that a micro-credit scheme be provided for members who have completed training to enable them provide tools and materials for extension programs. Finally logistic for implementation is the major problem to enhance production.

Page 26: FOUNTAIN OF LIFE MINISTRIES ORPHANS AND DISABLED PEOPLE AND EVANGELISM PROJECT (PROJECT HOPE) SIERRA LEONE

• The program is divided into Counseling and vocational and income generation activities each headed by a sub–committee chairman. It entails the organization of country–wide counseling and vocational training facilities for the less privilege and children such as basic education, computer literacy, carpentry, jointary and up–holstry tailoring dress making, and other income generation activities such as soap making and gara tie dying.

Page 27: FOUNTAIN OF LIFE MINISTRIES ORPHANS AND DISABLED PEOPLE AND EVANGELISM PROJECT (PROJECT HOPE) SIERRA LEONE

• It is planned by the Fountain Of Life Ministries to advocate on behalf of the project to donors and communities to support the initiative for better living condition, growth in the word of God and sustainable development of the underprivileged children and disabled in the western area and other regions so that the rate of children dropping out from homes and schools will if possible cut down completely.

• Work will be designed to community groups for the successful implementation of the project on daily basis.

Page 28: FOUNTAIN OF LIFE MINISTRIES ORPHANS AND DISABLED PEOPLE AND EVANGELISM PROJECT (PROJECT HOPE) SIERRA LEONE

TAILORING COMPONENTNO DESCRIPTION QUANTITY UNIT COST TOTAL COST

(Le)

Sew machine (butterfly) 20 300,000 6,000,000

Over lock machine 5 500,000 2,500,000

Designing machine 4 400,000 1,600,000

Cupboard 5 200,000 1,000,000

Chairs 25 20,000 500,000

Cutting table 10 30,000 300,000

Wall shelf Lump sum 200,000

Tape rule 25 500 12,500

Machine needle 60 1,000 60,000

Page 29: FOUNTAIN OF LIFE MINISTRIES ORPHANS AND DISABLED PEOPLE AND EVANGELISM PROJECT (PROJECT HOPE) SIERRA LEONE

Thread (assorted) 100 pkts 4,000 400,000

Steffen 100 yds 2000 200,000

Scissors 15,000 50 750,000

Cloths (poplin) 100 yds 3,000 300,000

Electric iron 5 20,000 100,000

Hangers 3 dz 6,000 6,000 18,000

SUB TOTAL 13,940,000

Page 30: FOUNTAIN OF LIFE MINISTRIES ORPHANS AND DISABLED PEOPLE AND EVANGELISM PROJECT (PROJECT HOPE) SIERRA LEONE

SOAP MAKING COMPONENTNO DESCRIPTION QUANTITY UNIT COST TOTAL COST

(Le)

Caustic soda 20 bags 32,000 640,000

Palm oil 20 containers 50,000 1,000,000

Nut oil 20 containers 34,000 680,000

Drum 20 30,000 600,000

Bucket 20 9,000 180,000

Large bowl 20 9,000 180,000

Small bowl 20 3,000 60,000

Medium bowl 20 4,000 80,000

Soap mixer 10 50,000 500,000

Page 31: FOUNTAIN OF LIFE MINISTRIES ORPHANS AND DISABLED PEOPLE AND EVANGELISM PROJECT (PROJECT HOPE) SIERRA LEONE

Cutting table 10 10,000 100,000

Mould 50 10,000 500,000

Blue powder 50 pkts. 500 25,000

Dettol 10 bottles 1,000 60,000

Camphor 100 lumps 1,000 100,000

Net 1 roll 3,000 3,000

Grates 10 50,000 500,000

Mixing spoon 20 500 10,000

Plastic bag 100 1,000 100,000

Gloves 20 2,500 50,000

Detergent 20 galls. 3,000 60,000

Wood 50 piles 5,000 25,000

Page 32: FOUNTAIN OF LIFE MINISTRIES ORPHANS AND DISABLED PEOPLE AND EVANGELISM PROJECT (PROJECT HOPE) SIERRA LEONE

Unskilled labour Lump sum 500,000

Transport 500,000

SUB TOTAL 6,453,000

Page 33: FOUNTAIN OF LIFE MINISTRIES ORPHANS AND DISABLED PEOPLE AND EVANGELISM PROJECT (PROJECT HOPE) SIERRA LEONE

GARA TIE DYING COMPONENTNO DESCRIPTION QUANTITY UNIT COST TOTAL COST

(Le)

Sulphate powder 2 containers 225,000 450,000

Chemical 50 liter 1,000 50,000

Candle 5 doz. pkts 24,000 120,000

Stamp 12 5,000 60,000

Thread 12 rolls 6,000 72,000

Needle 24 500 6,000

Glove 36 5,000 180,000

Black Ink 6 kilo 22,000 132,000

Green Ink 6 kilo 30,000 180,000

Page 34: FOUNTAIN OF LIFE MINISTRIES ORPHANS AND DISABLED PEOPLE AND EVANGELISM PROJECT (PROJECT HOPE) SIERRA LEONE

Red Ink 6 kilo 30,000 180,000

Mauve Ink 6 kilo 22,000 132,000

Blue Ink 6 kilo 22,000 132,000

Brown Ink 6 kilo 30,000 180,000

Orange Ink 6 kilo 40,000 240,000

Yellow Ink 6 kilo 20,000 180,000

Drum 20 30,000 600,000

Bucket 20 9,000 180,000

Large bowl 20 9,000 180,000

Small bowl 20 3,000 60,000

Medium bowl 20 4,000 80,000

Unskilled labour Lump sum 500,000

Page 35: FOUNTAIN OF LIFE MINISTRIES ORPHANS AND DISABLED PEOPLE AND EVANGELISM PROJECT (PROJECT HOPE) SIERRA LEONE

Transport “ “ 500,000

Wood 50 piles 5,000 25,000

SUB TOTAL 4,419,000

Page 36: FOUNTAIN OF LIFE MINISTRIES ORPHANS AND DISABLED PEOPLE AND EVANGELISM PROJECT (PROJECT HOPE) SIERRA LEONE

BUDGET SUMMARYNO COMPONENT TOTAL COST

1. Trauma/Evangelism 91,810,000

2. Construction 289,658,000

3. Computer Dept. 166,300,000

4. Carpentry 9,115,000

5. Carpentry tools 33,275,000

6. Tailoring 13,940,000

7. Gara/Batik 4,419,000

8. Soap 6,453,000

9. Training & Admin. 10,600,000

10. MISCELLANEOUS 3,000,000

TOTAL COST 617,970,000

DISTRIBUTION 100%

EXCHANGE RATE - Le 2,600 $ 1.00TOTAL SUM REQUIRED - Le 617,970,000 $ 241,757.69

Page 37: FOUNTAIN OF LIFE MINISTRIES ORPHANS AND DISABLED PEOPLE AND EVANGELISM PROJECT (PROJECT HOPE) SIERRA LEONE

CONTACT PERSONThe Fountain Of Life Ministries have made all effort to have its

members settled and have revive its activities as you will find out from our website or come to our Grey Bush, Ascension Town office where we have locally contributed and started our building project which is still a long way from completion. The following persons will be contacted for briefing.

Pastor Emmanuel GibsonFountain Of Life Ministries18R Bismark Johnson Street .Grey Bush, Ascension TownPMB 222 FreetownTel:- 232-22-233341

Bro. Dennis T. Solleh – Email: [email protected] or [email protected] .