41
European Framework Programme for Business FP7UK Technology Strategy Board Driving Innovation FP7UK EU Funded Collaborative Research Peter Walters FP7UK National Contact Point Team

FP7UK - SMMT...6.1 30 Smart Energy Grid 2011 6.2 35 ICT systems for energy efficiency 2010 6.3 15 ICT for efficient water resources management 2011 6.4 20 ICT for energy-efficient

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: FP7UK - SMMT...6.1 30 Smart Energy Grid 2011 6.2 35 ICT systems for energy efficiency 2010 6.3 15 ICT for efficient water resources management 2011 6.4 20 ICT for energy-efficient

European Framework Programme for Business FP7UK

Technology Strategy BoardDriving Innovation

FP7UK

EU Funded Collaborative Research

Peter Walters

FP7UK National Contact Point Team

Page 2: FP7UK - SMMT...6.1 30 Smart Energy Grid 2011 6.2 35 ICT systems for energy efficiency 2010 6.3 15 ICT for efficient water resources management 2011 6.4 20 ICT for energy-efficient

European Framework Programme for Business FP7UK

Technology Strategy BoardDriving Innovation

Funding Fundamentals

Innovative Projects

50% support – 75% for an SME, etc

The Commission give their fraction of what is spent

By means of a Grant Agreement with The European Commission

In response to specific calls for Proposals

In Topics identified by The Commission’s Workprogramme

Involving Partners from Multiple Countries

At least 3 (from Member & Associated States)

Page 3: FP7UK - SMMT...6.1 30 Smart Energy Grid 2011 6.2 35 ICT systems for energy efficiency 2010 6.3 15 ICT for efficient water resources management 2011 6.4 20 ICT for energy-efficient

European Framework Programme for Business FP7UK

Technology Strategy BoardDriving Innovation

FP7 ICT Funding Schemes

Collaborative Projects (CP)

To develop new knowledge, new technology, products, demonstration

activities

Two types: Small or medium-scale focused research actions

(STREP), Large-scale integrating projects (IP)

Networks of Excellence (NoE)

To strengthen S&T excellence and to increase efficiency in the use of

resources by restructuring/integration of capacities

Coordination and support actions (CSA)

Aimed at coordinating or supporting research activities and policies

(networking, exchanges, coordination of funded projects, studies,

conferences, etc)

Two types: Coordination Actions (CA), Support Actions (SA)

Described in The Workprogramme

Page 4: FP7UK - SMMT...6.1 30 Smart Energy Grid 2011 6.2 35 ICT systems for energy efficiency 2010 6.3 15 ICT for efficient water resources management 2011 6.4 20 ICT for energy-efficient

European Framework Programme for Business FP7UK

Technology Strategy BoardDriving Innovation

Co-operation

And getting some money to help you do it

Access to missing skills

Achieving new things

Obtaining a different viewpoint

Sharing development costs

Building broader networks

Learning about others

In line with long term strategic aims

Page 5: FP7UK - SMMT...6.1 30 Smart Energy Grid 2011 6.2 35 ICT systems for energy efficiency 2010 6.3 15 ICT for efficient water resources management 2011 6.4 20 ICT for energy-efficient

European Framework Programme for Business FP7UK

Technology Strategy BoardDriving Innovation Extracted Slides – with Permission and Gratitude

Page 6: FP7UK - SMMT...6.1 30 Smart Energy Grid 2011 6.2 35 ICT systems for energy efficiency 2010 6.3 15 ICT for efficient water resources management 2011 6.4 20 ICT for energy-efficient

European Framework Programme for Business FP7UK

Technology Strategy BoardDriving Innovation

Extracting value from collaborative projects

Project

Research Results

Page 7: FP7UK - SMMT...6.1 30 Smart Energy Grid 2011 6.2 35 ICT systems for energy efficiency 2010 6.3 15 ICT for efficient water resources management 2011 6.4 20 ICT for energy-efficient

European Framework Programme for Business FP7UK

Technology Strategy BoardDriving Innovation

PowerMan - example

Project JUMP

EU FP5

PowerMan Project

Internal

Jan 2000

Jun 2002Know how

IET 2006

Emerging Technology

AwardLicensing

Productised by Vendor

Dec 2006

Page 8: FP7UK - SMMT...6.1 30 Smart Energy Grid 2011 6.2 35 ICT systems for energy efficiency 2010 6.3 15 ICT for efficient water resources management 2011 6.4 20 ICT for energy-efficient

European Framework Programme for Business FP7UK

Technology Strategy BoardDriving Innovation

Extracting value from collaborative projects

Project

Softer values

Value before project end

Page 9: FP7UK - SMMT...6.1 30 Smart Energy Grid 2011 6.2 35 ICT systems for energy efficiency 2010 6.3 15 ICT for efficient water resources management 2011 6.4 20 ICT for energy-efficient

European Framework Programme for Business FP7UK

Technology Strategy BoardDriving Innovation

Multiple benefits (example)

EU FP6

Project SCOT

Jan 2004

Dec 2007

Semantic Knowledge

Demonstrator in

Showcase

Project

Deliverables

Research on Future

BT Requirements

Technical

Know-how

Supporting Business

Proposition

Development

Vendor

Knowledge

Internal

Business Case

with a Partner

Partner

Knowledge

Page 10: FP7UK - SMMT...6.1 30 Smart Energy Grid 2011 6.2 35 ICT systems for energy efficiency 2010 6.3 15 ICT for efficient water resources management 2011 6.4 20 ICT for energy-efficient

European Framework Programme for Business FP7UK

Technology Strategy BoardDriving Innovation

Framework 6 IST Integrating Project

26M€ planned expenditure over 4 years

To develop microelectronic medical implants to help the

aging population and those with disabilities

Jan 2003 … May 2008

Several devices now in trials

Page 11: FP7UK - SMMT...6.1 30 Smart Energy Grid 2011 6.2 35 ICT systems for energy efficiency 2010 6.3 15 ICT for efficient water resources management 2011 6.4 20 ICT for energy-efficient

European Framework Programme for Business FP7UK

Technology Strategy BoardDriving Innovation

24 Partners: Research Groups in micro and nano technology

Biomaterials experts

RF Communications experts

Power sources experts

Design teams

Medical Device manufacturers

Surgeons and clinical teams, including ethics

Collected, Selected, - Persuaded,

- Shepherded over 12 + months

- Brought together

Page 13: FP7UK - SMMT...6.1 30 Smart Energy Grid 2011 6.2 35 ICT systems for energy efficiency 2010 6.3 15 ICT for efficient water resources management 2011 6.4 20 ICT for energy-efficient

European Framework Programme for Business FP7UK

Technology Strategy BoardDriving Innovation

Zarlink – a newcomer to Framework in 2003

Became Workpackage leader for Body Area Radio

Developed expertise in Body Area Radio

Were recruited by other consortia

Grew their Research Activity threefold

Have launched BAR specific chips

Company research activity in this area retained in Europe

"I can now pick up the phone and discuss the direction of technology

with senior R&D Directors across Europe, you can't put a price on

that.”

Martin Mc Hugh: Business and Product Development Manager

Page 14: FP7UK - SMMT...6.1 30 Smart Energy Grid 2011 6.2 35 ICT systems for energy efficiency 2010 6.3 15 ICT for efficient water resources management 2011 6.4 20 ICT for energy-efficient

European Framework Programme for Business FP7UK

Technology Strategy BoardDriving Innovation

Co-operation

Working together to submit a proposal

Committed to achieving the joint result

With people you can trust

Understanding what they want to achieve

Sharing with them your aims / needs

With a formal agreement

Having risk plans

With strategies for exploitation

In line with your long term aims

Page 15: FP7UK - SMMT...6.1 30 Smart Energy Grid 2011 6.2 35 ICT systems for energy efficiency 2010 6.3 15 ICT for efficient water resources management 2011 6.4 20 ICT for energy-efficient

European Framework Programme for Business FP7UK

Technology Strategy BoardDriving Innovation

Finding Partners

CORDIS Partner Finding Service Do it Yourself

http://cordis.europa.eu/partners-service/

Hang around in foreign bars

IDEAL*IST Partner Finding Service– Free – assisted service– UK Contact Singleimage

• http://www.singleimage.co.uk/PartnerSearch/idealist.htm• 44 1480 497712

Use Local support if available

Page 16: FP7UK - SMMT...6.1 30 Smart Energy Grid 2011 6.2 35 ICT systems for energy efficiency 2010 6.3 15 ICT for efficient water resources management 2011 6.4 20 ICT for energy-efficient

European Framework Programme for Business FP7UK

Technology Strategy BoardDriving Innovation

Finding Partners

Existing

Contacts

Friends of

Existing

Contacts

Partner

Finding

Services

Page 17: FP7UK - SMMT...6.1 30 Smart Energy Grid 2011 6.2 35 ICT systems for energy efficiency 2010 6.3 15 ICT for efficient water resources management 2011 6.4 20 ICT for energy-efficient

European Framework Programme for Business FP7UK

Technology Strategy BoardDriving Innovation

1

2

3

4

5

67

8

9

10

11

12

MonthsCall Opens

FirstPayment

Evaluation

Grant etc

Preparation

Negotiation

Call Closes

WIN

Timing

HINT

Page 18: FP7UK - SMMT...6.1 30 Smart Energy Grid 2011 6.2 35 ICT systems for energy efficiency 2010 6.3 15 ICT for efficient water resources management 2011 6.4 20 ICT for energy-efficient

European Framework Programme for Business FP7UK

Technology Strategy BoardDriving Innovation

Evaluation criteria:

Just three: defined in Workprogramme Annex

1. Scientific and technical quality

Soundness of concept, and quality of objectives

Quality and effectiveness of methodology and associated workplan

2. Implementation

Management Quality of participants and the consortium as a whole

Adequacy and Use of the resources

3. Impact

Contribution (European or international) impacts listed

Appropriateness of measures for dissemination / use

All Proposals are scored out of 5 against these three criteria

Page 19: FP7UK - SMMT...6.1 30 Smart Energy Grid 2011 6.2 35 ICT systems for energy efficiency 2010 6.3 15 ICT for efficient water resources management 2011 6.4 20 ICT for energy-efficient

European Framework Programme for Business FP7UK

Technology Strategy BoardDriving Innovation

FP7 ICT Call 1

Open 22 Dec 2006

Budget 1194 M€

Close 8 May 2007 (17:00 BLT)

1836 Proposals

Retained

317Reserve

61

Low Budget

446Rejected

1012

UK wins grants of 151 M €

Participating in 204 projects

Page 20: FP7UK - SMMT...6.1 30 Smart Energy Grid 2011 6.2 35 ICT systems for energy efficiency 2010 6.3 15 ICT for efficient water resources management 2011 6.4 20 ICT for energy-efficient

European Framework Programme for Business FP7UK

Technology Strategy BoardDriving Innovation

Proposal Success - Simple

An excellent idea clearly expressed

To take the state of the art forward

A planned project to deliver meaningful results

That will make a difference and be exploited

Comprising clearly identified tasks and the effort to achieve them

Provided by the right number of world class partners

With management necessary to complete the plan

Addressing an identified objective from the Workprogramme

Page 21: FP7UK - SMMT...6.1 30 Smart Energy Grid 2011 6.2 35 ICT systems for energy efficiency 2010 6.3 15 ICT for efficient water resources management 2011 6.4 20 ICT for energy-efficient

European Framework Programme for Business FP7UK

Technology Strategy BoardDriving Innovation

The ICT Workprogramme 2 Years, 2.4 B€

A set of Eight Challenges

overcoming technology roadblocks

end-to-end systems targeting socio-economic goals

Each Challenge is composed of a set of Objectives

An Objective is described in terms of

target outcome

expected impact.

A total of 45 Objectives expressed within

8 Challenges

Plus 22 in FET and Support measures

http://tinyurl.com/3y3xad6

Page 22: FP7UK - SMMT...6.1 30 Smart Energy Grid 2011 6.2 35 ICT systems for energy efficiency 2010 6.3 15 ICT for efficient water resources management 2011 6.4 20 ICT for energy-efficient

European Framework Programme for Business FP7UK

Technology Strategy BoardDriving Innovation

2 Cognitive Systems

and Robotics

1 Pervasive and Trusted Network

and Service Infrastructures

3 Alternative Paths to

Components and Systems

4 Technologies for Digital

Content and Languages

FP7 ICT Workprogramme Structure

5. ICT for

Health,

Ageing Well,

Inclusion

and

Governance

6. ICT for

a low

carbon

economy

7. ICT for the

Enterprise and

Manufacturing

8. ICT for

Learning

and

Access to

Cultural

Resources

Socio-economic goals

Fu

ture

an

d E

merg

ing

Tech

no

log

ies (

FE

T)

Tech

no

log

y r

oad

blo

cks

Page 23: FP7UK - SMMT...6.1 30 Smart Energy Grid 2011 6.2 35 ICT systems for energy efficiency 2010 6.3 15 ICT for efficient water resources management 2011 6.4 20 ICT for energy-efficient

European Framework Programme for Business FP7UK

Technology Strategy BoardDriving Innovation

ICT Workprogramme 2011-12

M€

1 Pervasive and Trusted Network and Service Infrastructures 625

2 Cognitive Systems and Robotics 155

3 Alternative Paths to Components and Systems 402

4 Technologies for Digital Content and Languages 165

5 ICT for Health, Ageing Well, Inclusion and Governance 260

6 ICT for a low carbon economy 280

7 ICT for the Enterprise and Manufacturing 140

8 ICT for Learning and Access to Cultural Resources 100

9 Future and Emerging Technologies 261

10 International Cooperation 15

11 Horizontal Actions 19

Budget 2011-12 2422

Challenge

Page 24: FP7UK - SMMT...6.1 30 Smart Energy Grid 2011 6.2 35 ICT systems for energy efficiency 2010 6.3 15 ICT for efficient water resources management 2011 6.4 20 ICT for energy-efficient

European Framework Programme for Business FP7UK

Technology Strategy BoardDriving Innovation

Challenge 6:

ICT for a low carbon economy

Objective Budget Title Call opens

6.1 30 Smart Energy Grid 2011

6.2 35 ICT systems for energy efficiency 2010

6.3 15 ICT for efficient water resources management 2011

6.4 20 ICT for energy-efficient buildings and spaces of public

use2010

6.5 30 ICT for energy-positive neighbourhoods 2011

6.6 50 Low carbon multi-modal mobility and freight transport 2010

6.7 40 Cooperative Systems for energy efficient and sustainable

mobility2011

6.8 30 ICT for fully electric vehicle 2010

6.8 30 ICT for fully electric vehicle 2012

Page 25: FP7UK - SMMT...6.1 30 Smart Energy Grid 2011 6.2 35 ICT systems for energy efficiency 2010 6.3 15 ICT for efficient water resources management 2011 6.4 20 ICT for energy-efficient

European Framework Programme for Business FP7UK

Technology Strategy BoardDriving Innovation

The ICT Workprogramme

Has a two year life

Has a budget of ~ 2B€

Defines the research topics to be addressed

The sorts of Project required

The distribution amongst various calls for proposals

Approved by Programme Management Committee

Drafted by DG INFSO

Do they know enough about the technology / Business area ?

If a proposal doesn’t fit the workprogramme and an open call

it will NOT get Funded

Page 26: FP7UK - SMMT...6.1 30 Smart Energy Grid 2011 6.2 35 ICT systems for energy efficiency 2010 6.3 15 ICT for efficient water resources management 2011 6.4 20 ICT for energy-efficient

European Framework Programme for Business FP7UK

Technology Strategy BoardDriving Innovation

European Technology Platforms

Commission Inspired

Industrially Led

Internal Values

Excellent networking potential

Open / Closed

Strategic Research Agendas

Input to Workprogramme

Knowledge Systems

Software

Broadband

eHealth

Microsystems

Technology

Platform

http://cordis.europa.eu/technology-platforms/home_en.html

Page 27: FP7UK - SMMT...6.1 30 Smart Energy Grid 2011 6.2 35 ICT systems for energy efficiency 2010 6.3 15 ICT for efficient water resources management 2011 6.4 20 ICT for energy-efficient

European Framework Programme for Business FP7UK

Technology Strategy BoardDriving Innovation

34 European Technology PlatformsARTEMIS Embedded Computing Systems

ENIAC European Nanoelectronics Initiative Advisory Council

EPoSS European Technology Platform on Smart Systems Integration

ISI Integral Satcom Initiative

EUROP Robotics

eMobility Mobile and Wireless Communications

ERTRAC European Road Transport Research Advisory Council

NEM Networked and Electronic Media

NESSI Networked European Software and Services Initiative

Photonics21 Photonics

NanoMedicine Nanotechnologies for Medical Applications

MANUFUTURE Future Manufacturing Technologies

ESTP European Space Technology Platform

EuMaT Advanced Engineering Materials and Technologies

ACARE Advisory Council for Aeronautics Research in Europe

ECTP European Construction Technology Platform

Page 28: FP7UK - SMMT...6.1 30 Smart Energy Grid 2011 6.2 35 ICT systems for energy efficiency 2010 6.3 15 ICT for efficient water resources management 2011 6.4 20 ICT for energy-efficient

European Framework Programme for Business FP7UK

Technology Strategy BoardDriving Innovation

Run by a Joint Undertaking

The Commission and a JTI body

Calls use Workprogramme based on

Strategic Research Agenda

Majority of funding from

participating Member States

With top up from Commission (16.7%)

Central proposal/evaluation process

Knowledge

Systems

Software

Broadband

eHealth

Cognition

Technology

Platform

Joint

Technology

Initiative

Joint Technology Initiative

Page 29: FP7UK - SMMT...6.1 30 Smart Energy Grid 2011 6.2 35 ICT systems for energy efficiency 2010 6.3 15 ICT for efficient water resources management 2011 6.4 20 ICT for energy-efficient

European Framework Programme for Business FP7UK

Technology Strategy BoardDriving Innovation

FP7 ICT Areas of Research

2 Cognitive Systems

and Robotics

1 Pervasive and Trusted Network

and Service Infrastructures

3 Alternative Paths to

Components and Systems

4 Technologies for Digital

Content and Languages

5. ICT for

Health,

Ageing Well,

Inclusion

and

Governance

6. ICT for

a low

carbon

economy

7. ICT for the

Enterprise and

Manufacturing

8. ICT for

Learning

and

Access to

Cultural

Resources

Socio-economic goals

Fu

ture

an

d E

merg

ing

Tech

no

log

ies (

FE

T)

Tec

hn

olo

gy r

oad

blo

cks

ARTEMIS ENIAC

Page 30: FP7UK - SMMT...6.1 30 Smart Energy Grid 2011 6.2 35 ICT systems for energy efficiency 2010 6.3 15 ICT for efficient water resources management 2011 6.4 20 ICT for energy-efficient

European Framework Programme for Business FP7UK

Technology Strategy BoardDriving Innovation

Embedded Systems: ARTEMISIndustrial Priorities

Reference designs and architectures

Seamless connectivity and middleware

Design methods and tools

Sub Programmes

Methods and processes for safety-relevant embedded systems

Healthcare systems

Smart environments

Efficient manufacturing and logistics

Computing environments for embedded systems

Inter-networked ES for Security and Critical Infrastructures Protection

Embedded technology for sustainable urban life

Human-centred design of embedded systems

Page 31: FP7UK - SMMT...6.1 30 Smart Energy Grid 2011 6.2 35 ICT systems for energy efficiency 2010 6.3 15 ICT for efficient water resources management 2011 6.4 20 ICT for energy-efficient

European Framework Programme for Business FP7UK

Technology Strategy BoardDriving Innovation

Nanoelectronics: ENIAC

Sub Programmes

Automotive & Transport

Wireless Communications

Energy Efficiency

Design Methods and Tools

Silicon Process and Integration

Equipment, Materials, and Manufacturing

Healthcare and the Ageing Society

Page 32: FP7UK - SMMT...6.1 30 Smart Energy Grid 2011 6.2 35 ICT systems for energy efficiency 2010 6.3 15 ICT for efficient water resources management 2011 6.4 20 ICT for energy-efficient

European Framework Programme for Business FP7UK

Technology Strategy BoardDriving Innovation

JTI Funding Fundamentals

Industrially led Innovative Projects

30% - 50% support from National Agency with Commission fraction

Subject to National rules

Involving Partners from Multiple Countries

At least 3

In Topics identified by The Workprogramme

In response to specific calls for Proposals

In UK by means of a Contract with TSB

Page 33: FP7UK - SMMT...6.1 30 Smart Energy Grid 2011 6.2 35 ICT systems for energy efficiency 2010 6.3 15 ICT for efficient water resources management 2011 6.4 20 ICT for energy-efficient

European Framework Programme for Business FP7UK

Technology Strategy BoardDriving Innovation

JTI Sherpa Report

The “Ideal House” for the future of JTIs

New Financial regulation “ Special Body”

Risk Tolerance

Flexibility, Adaptability

Easier management

SME Friendly

Sustainability of Organisation

Addressing MS Issues

ftp://ftp.cordis.europa.eu/pub/fp7/docs/jti/jti-sherpas-report-2010_en.pdf

Page 34: FP7UK - SMMT...6.1 30 Smart Energy Grid 2011 6.2 35 ICT systems for energy efficiency 2010 6.3 15 ICT for efficient water resources management 2011 6.4 20 ICT for energy-efficient

European Framework Programme for Business FP7UK

Technology Strategy BoardDriving Innovation

Public Private Partnerships

ISBN Number:9789264042797

Publication date: June 2008 142 pages

“Any formal relationship or arrangement over

a fixed-term/indefinite period of time,

between public and private actors, where

both sides interact in the decision-making

process, and co-invest scarce resources

such as money, personnel, facilities, and

information in order to achieve specific

objectives in the area of science, technology,

and innovation”.

www.oecd.org/dataoecd/23/60/40762625.ppt

Page 35: FP7UK - SMMT...6.1 30 Smart Energy Grid 2011 6.2 35 ICT systems for energy efficiency 2010 6.3 15 ICT for efficient water resources management 2011 6.4 20 ICT for energy-efficient

European Framework Programme for Business FP7UK

Technology Strategy BoardDriving Innovation

First ones involve simultaneous calls across themes

Public Private Partnerships

Devoutly to be wished

Require Legislation

Legislation takes time

Use label to show wishes

Introduced 2009 as part of Commission Recovery Package

Rely upon Existing Legislation – “STREPS”, “IPs”, “CSAs”

Page 36: FP7UK - SMMT...6.1 30 Smart Energy Grid 2011 6.2 35 ICT systems for energy efficiency 2010 6.3 15 ICT for efficient water resources management 2011 6.4 20 ICT for energy-efficient

European Framework Programme for Business FP7UK

Technology Strategy BoardDriving Innovation

FP7 ICT Areas of Research 2011-2012

2 Cognitive Systems

and Robotics

1 Pervasive and Trusted Network

and Service Infrastructures

3 Alternative Paths to

Components and Systems

4 Technologies for Digital

Content and Languages

Fu

ture

an

d E

merg

ing

Tech

no

log

ies (

FE

T)

Tech

no

log

y r

oad

blo

cks

ARTEMIS ENIAC

5. ICT for

Health,

Ageing Well,

Inclusion

and

Governance

6. ICT for

a low

carbon

economy

7. ICT for the

Enterprise and

Manufacturing

8. ICT for

Learning

and

Access to

Cultural

Resources

Socio-economic goals

Green Car

Energy

Efficient

Buildings

Factory

of the

Future

Public Private

Partnerships

Future Internet

Page 37: FP7UK - SMMT...6.1 30 Smart Energy Grid 2011 6.2 35 ICT systems for energy efficiency 2010 6.3 15 ICT for efficient water resources management 2011 6.4 20 ICT for energy-efficient

European Framework Programme for Business FP7UK

Technology Strategy BoardDriving Innovation

Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

ARTEMIS & ENIAC JTI Calls

ICT Calendar 2010

Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

ARTEMIS & ENIAC JTI Calls

ICT PSP 2010

Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

ICT CALL 6

ICT 2010 Conference

Jan Feb Mar

ICT CALL 7

Various PPP calls

Workprogramme 2011-12

Page 38: FP7UK - SMMT...6.1 30 Smart Energy Grid 2011 6.2 35 ICT systems for energy efficiency 2010 6.3 15 ICT for efficient water resources management 2011 6.4 20 ICT for energy-efficient

European Framework Programme for Business FP7UK

Technology Strategy BoardDriving Innovation

And Then

Green Car PPP 20 July 2010 – 2 Dec 2010

ICT Call 7 27 Sept 2010 – 18 Jan 2011

Expect Budget 780 M€

Draft Workprogramme – Now.

Study existing projects – Talk to UK Participants

Follow FP7UK ICT NEWS

Go to ICT events

– Including ICT 2010

Page 39: FP7UK - SMMT...6.1 30 Smart Energy Grid 2011 6.2 35 ICT systems for energy efficiency 2010 6.3 15 ICT for efficient water resources management 2011 6.4 20 ICT for energy-efficient

European Framework Programme for Business FP7UK

Technology Strategy BoardDriving Innovation

https://ktn.innovateuk.org/web/fp7-ict/news

Local Support - keep up to date

Page 40: FP7UK - SMMT...6.1 30 Smart Energy Grid 2011 6.2 35 ICT systems for energy efficiency 2010 6.3 15 ICT for efficient water resources management 2011 6.4 20 ICT for energy-efficient

European Framework Programme for Business FP7UK

Technology Strategy BoardDriving Innovation

Advice and Assistance in the UK

FP7UK National Contact Points:

Technology Strategy Board: Business Support Group: 0300 321 4357

(does not ring - lady asks you for which option FP7 is option 3)

ICT Web Presence https://ktn.innovateuk.org/web/fp7-ict

The NEWS tab carries latest news [ shortcut http://tinyurl.com/ 3y8vpjy ]

Explanatory Document http://tinyurl.com/3adb5xa

Peter Walters ICT National Contact Point

01932 251 260 [email protected]

Technology Strategy Board

Page 41: FP7UK - SMMT...6.1 30 Smart Energy Grid 2011 6.2 35 ICT systems for energy efficiency 2010 6.3 15 ICT for efficient water resources management 2011 6.4 20 ICT for energy-efficient

European Framework Programme for Business FP7UK

Technology Strategy BoardDriving Innovation

This slideset

http://tinyurl.com/3ycjdk8

Sadly appears to work only with Explorer