141
8/19/2019 Fr Igeast Nw40054 w Ed http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 1/141  Celcom 3G Project NodeB Project File Document Version © Huawei Date Page Telekom Group 3G ProjectReport.doc Ver1.0 Confidential 06/11/2007 Page 1 of 51 Celcom 3G Project NodeB Project File Site Code: NW 40054 Site Name: IGEAST Equipment Type: BTS3812A

Fr Igeast Nw40054 w Ed

  • Upload
    kltower

  • View
    228

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 1/141

 

Celcom 3G ProjectNodeB Project File

Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

Ver1.0 Confidential 06/11/2007 Page 1 of 51

Celcom 3G Project

NodeB Project File

Site Code: NW 40054

Site Name: IGEAST

Equipment Type: BTS3812A

Page 2: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 2/141

 

Celcom 3G ProjectNodeB Project File

Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

Ver1.0 Confidential 06/11/2007 Page 2 of 51

© COPYRIGHT for Huawei

All rights reserved.

 No part of this document may be copied, distributed, transmitted, transcribed, stored in a retrieval system or translated into any human or

computer language without the prior written permission of Huawei. The manufacturer will if necessary explain issue which may not be

covered by the documents. The manufacturer’s liability for any errors in the documents is limited to the correction of errors services.

The documents have been prepared to be used by professional and properly trained personnel and the customer assumes full responsibilitywhen using them. The manufacturer welcomes customer comments as part of the process of continual development and improvement of the

documentation in the best way possible from the user’s viewpoint.

Any trademarks mentioned in the documents are the property of their respective owners.

Page 3: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 3/141

 

Celcom 3G ProjectNodeB Project File

Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

Ver1.0 Confidential 06/11/2007 Page 3 of 51

Table of Contents

Chapter 1 Map Reference ..........................................................................................01-01  

Chapter 2 SDP ............................................................................................................02-01  

Chapter 3 Project Description

Project Description .....................................................................................03-01

Node B cell parameter and data configuration............................................03-02

Chapter 4 Project Responsibility Interface .............................................................04-01  

Chapter 5 Equipment Location

Node B Installed .........................................................................................05-01

 AC/DC Power Tapping Point ......................................................................05-02

E1 Connection Point ...................................................................................05-03

Chapter 6 Antenna Location 

 Antenna Location........................................................................................06-01

Sector Beam width View.............................................................................06-02

Panoramic View..........................................................................................06-03

Chapter 7 Feeder Cable Routing

Feeder Cable Routing.................................................................................07-01

Earth Point..................................................................................................07-02

Chapter 8 Engineering Drawing................................................................................08-01

Chapter 9 Material Request & BOQ .........................................................................09-01

Chapter 10 Hardware Configuration 

Cabinet Board Layout.................................................................................10-01

Board Information .......................................................................................10-02

Host Version Information List......................................................................10-03

Chapter 11 External Cable Connection ......................................................................11-01

Chapter 12 DTF & VSWR Plots....................................................................................12-01

Chapter 13 Commissioning & Integration Checklist.................................................13-01

Chapter 14 Equipment Installation Report.................................................................14-01

Chapter 15 Node B Hardware Installation Acceptance.............................................15-01Chapter 16 User Acceptance Report ..........................................................................16-01

Chapter 17 Single Site Verification Report ................................................................17-01

Chapter 18 Punch List ................................................................................................18-01

Chapter 19 Certification of Acceptance .....................................................................19-01

Page 4: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 4/141

 

Celcom 3G ProjectNodeB Project File

Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

Ver1.0 Confidential 06/11/2007 Page 4 of 51

1

MAP REFERENCE

Page 5: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 5/141

 

Celcom 3G ProjectNodeB Project File

Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

Ver1.0 Confidential 06/11/2007 Page 5 of 51

1 Map Reference

MAP AND SQUARE 

MAP REFERENCE: IGEAST

Page 6: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 6/141

 

Celcom 3G ProjectNodeB Project File

Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

Ver1.0 Confidential 06/11/2007 Page 6 of 51

2

SDP

Page 7: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 7/141

Page 8: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 8/141

SITE PICTURE

PEMBINAAN

SDN BHD

3G SITE DESIGN PACKAGE

IPOH

NORTHERN REGION

G 554

IG EAST

PERAK DARUL RIDZUAN

Page 9: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 9/141

SITE ID : G 2554

SITE NAME :

SITE CONFIGURATION : 1 +1 +1

FREQ. BAND : 3G

PEMBINAAN

SDN BHD

CELCOM (M) BHD.

NORTHERN REGION

SITE DESIGN PACKAGE

Prepared by ;

IG EAST

Page 10: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 10/141

CELCOM (M) BHD 1 Site Information

NORTHERN REGION

PERAK 2 RF Design

3 Existing 2G Information

4 New 3G Information

5 Site Picture

6 Mobile Checklist / BOQ

7 Transmission Check List

G 2554 8 CME BOQ

IG EAST 9 INSTALLATION PLAN

1 + 1 +1 10 SMU

Page 11: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 11/141

SITE ID : G 2554

SITE NAME : IG EAST

SITE CONFIGURATION : 1 +1 +1

CELCOM (M) BHD.

NORTHERN REGION

Site Informations

Page 12: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 12/141

Site Informations

Survey Date : 7 March 2006

Project: Celcom 3G, Northern Region, Malaysia

Celcom (M) Bhd.

Site: G 2554 IG EAST

1.0

1.1 Site Location and Access

GPS Positio n

Latitude: N 04° 37' 06"

Longitude : E 101° 7' 30"

 Altitude : 18m

1.2  Address : Water Tank Tower

Jalan Perajurit 11,T.Ipoh Timur

31400 Ipoh Perak

SITE INFORMATIONS

Site Location

Legend

14(33)

Page 13: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 13/141

Site Informations

Survey Date : 7 March 2006

Project: Celcom 3G, Northern Region, Malaysia

Celcom (M) Bhd.

Site: G 2554 IG EAST

1.3 Site Details (Existing )

Type of Site : Land Outdoor

Height of Building : N/A

Equipment Location : Plinth Outdoor

Plinth Dimension : 4000mm(L) x 900mm(w) x 400mm(H)

 Air Conditioning : NA

Cable Ladder  : 300mm cable Ladder

Lightning Protection : Good Condition

Type of Tower  : 3m Tripod floor Mount

Type of terrain : Flat

 Access road : Tar / Good / Car

Distance to main road : 1Km

Site Access Information : J.Tasek--> Jalan Perajurit 119(behind jusco) --> Menara Air

1.4 Contact Information

Celcom : Mizazuddin b Muhiyuddin

Telephone No. : 04-3973030

Fax No. : 04-3974040

Mobile No. :

019-5713060

Contractor Name : Mohd Yazid B md Yunus

Telephone No. : 03-4252 9589

Fax No. : 03-4252 5313

Mobile No. : 019-3555014

15(33)

Page 14: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 14/141

SITE ID : G 2554

SITE NAME : IG EAST

SITE CONFIGURATION : 1 +1 +1

CELCOM (M) BHD.

NORTHERN REGION

RF DESIGN

Page 15: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 15/141

Legend : Site Nodes :

10

RSCP Coverage Prediction Plots

RSCP Coverage w ith G2554

RSCP Coverage wit hout G2554

Page 16: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 16/141

Legend : Site Nodes :

10

Single Site RSCP Coverage with G2554

RSCP Coverage Prediction Plots

Page 17: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 17/141

Site Name:

Site ID :

Existing 2G Site Name:

Existing 2G Site ID:

Co-locate Operator: Cluster No:

Candidate:

Version:

Lat (N-WGS 84-Decimal): 4.61828 101º 7" 30'

Long (E-WGS 84-Decimal): 101.125 4º 37" 5'

Node B room Type: Node B Type:

Node B Configuration:

Transmission Type on site:

Cell Site RF Configu ration

Cell ID

 Antenna Hei ght (mid . of ant )

 Antenna Di rect ion (deg)

Electrical Tilt

Mech. Tilt

Cable Length (m)

Cable Type (inch)

MHA (Y/N)

Technical Site Surveyor : Company : Signature

Contact No:

RF Planner Company : Signature

Contact No:

TM/Celcom Reviewer :

Structure Height(m): 3

Proposed 3G antennae for all sectors. Using new 3m boom at height 20m.Azimuth for new sectors same as existing sectors.

15/8" 15/8" 7/8"

1

Type

IGEAST

G2554

0

2

20

Sector 1

No

 Alcatel

20 20

6565

Sector 3Sector 2

62 57 25

65

80 200 320

2 2

0

Y

Mount

Pole Pole

3 3

1

Height (m)

No of Pole/ Tripod

Structure type

Manufacturer Kathrein

Beam width (deg) Antenna Type Singleband Singleband Singleband

3

Bipod

 Area:

3G System

1

Ipoh

2

Outdoor 

 Ams l(m):

Reason for Node B type:

Technical Site Survey Report (Proposed Antenna Location)

Survey Date:

Building Height(m):

IGEAST

G2554

6-Mac-2006

18

Sector 1 cover housing, shoplot area, main road and commercial area.Proposed using new 3m boom at height 20m.

Comment/ Problem:

Sector 1 :

Sector 1 cover housing and shoplot area. Proposed using new 3m boom at height 20m.

Outdoor 

Phase:

S1+1+1

Y N

1

PoleBipod Bipod

013-4566019

Sector 3 cover housing, shoplot, apartment and commercial area.Proposed using new 3m boom at height 20m.

Sector 2 :

Sector 3 :

0

Others:

Mohd Faizal Aziz

 Ai rco m Internat ion al

 Air com Conf iden tial 11/7/2007 Page 1

Page 18: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 18/141

Site Name:

Site ID :

Existing 2G Site Name:

Existing 2G Site ID:

Co-locate Operator: Cluster No:

Version:

Lat (N-WGS 84- Decimal): 101.125 101º 7" 30'

Long (E-WGS 84-Decimal): 4.61828 4º 37" 5'

BTS room Type: BTS Type:

BTS Configuration:

Transmission Type on site:

Cell Site RF Configu ration

Cell ID

 Antenna Hei ght (mid . of ant )

 Antenna Di rect ion (deg)

Electrical Tilt

Mech. Tilt

Cable Length (m)

Cable Type (inch)

MHA (Y/N)

Technical Site Surveyor : Company : Signature

Contact No:

RF Planner Company : Signature

Contact No:

TM/Celcom Reviewer :

IGEAST Survey Date: 6-Mac-2006

Technical Site Survey Report (Existing Antenna System Locations

G2554 Building Height(m): 18

IGEAST Structure Height(m): 3

G2554  Area: Ipoh

No

Phase: 2

1

 Ams l(m):

Outdoor GSM 1800

S2+2+2

 Alcatel

Sector 1 Sector 2 Sector 3

Kathrein Antenna Type Model Number  Kathrein Kathrein

Beam width (deg) 65

20 20 20

65 65

80 190 320

2 2 2

0 0 0

52 44 22

7/8" 7/8' 7/8"

Structure type Bipod Bipod Bipod

Mount

Type Pole Pole

No of Pole/ Tripod 1 1

Pole

Height (m) 3 3 3

1

Comment/ Problem:

Sector 1 :

Sector 1 cover housing and shoplot area.

Others:

Sector 2 :

Sector 1 cover housing, shoplot area, main road and commercial area.

Sector 3 :

Sector 3 cover housing, shoplot, apartment and commercial area.

013-4566019

Mohd Faizal Aziz

 Ai rco m Internat ion al

 Air com Conf iden tial 11/7/2007 Page 2

Page 19: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 19/141

SIDE VIEW

Technical Site Surveyor : Company : Signature

Contact No:

RF Planner Company : Signature

Contact No:

TM/Celcom Reviewer :

 Ai rco m Internat ion al

Technical Site Survey Drawing

 Air com Conf iden tial 11/7/2007 Page 3

Page 20: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 20/141

PLAN VIEW

Technical Site Surveyor : Company : Signature

Contact No:

RF Planner Company : Signature

Contact No:

TM/Celcom Reviewer :

 Ai rco m Internat ion al

Technical Site Survey Drawing

 Air com Conf iden tial 11/7/2007 Page 4

Page 21: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 21/141

Please Do not "Zoom in" on the photo

Site View

Technical Site Survey Photograph

Site Photograph (Size 6" x 6")

 Air com Conf iden tial 11/7/2007 Page 5

Page 22: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 22/141

Sector 1 80 Degree Pl ease Do n ot " Zoom i n" on the pho to

Sector 2 200 Degree

Sector 3 320 Degree

Sectorial RF View (size 3.2" x 4.2")

Technical Site Survey Photograph

Housing Area

Shoplot

Shoplot

Main Road

Housing Area

Commercial Area

 Apartment AreaHousing Area

Shoplot

Commercial Area

 Air com Conf iden tial 11/7/2007 Page 6

Page 23: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 23/141

0 degree Please Do not "Zoom in" on the photo

40 degree

80 degree

Technical Site Survey Photograph

Panoramic View (size 3.2" x 4.2")

 Air com Conf iden tial 11/7/2007 Page 7

Page 24: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 24/141

120 degree

160 degree

200 degree

Technical Site Survey Photograph

 Air com Conf iden tial 11/7/2007 Page 8

Page 25: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 25/141

240 degree

280 degree

320 degree

Technical Site Survey Photograph

 Air com Conf iden tial 11/7/2007 Page 9

Page 26: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 26/141

SITE ID : G 2554

SITE NAME : IG EAST

SITE CONFIGURATION : 2 + 2+ 2

CELCOM (M) BHD.

NORTHERN REGION

2G Info

Page 27: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 27/141

Existing 2G

Survey Date : 7 March 2006

Project: Celcom 3G, Northern Region, Malaysia

Celcom (M) Bhd.

Site: G 2554 IG EAST

2.0

2.1 Ex it ing Equipment

Existing Equipment Type

No Of Cabinet

Configuration

Comments :

2.2 Existing Antenna Data 2G

Make

Height AGL (m)Gain (dBi)

 Antenna Band

Polarization

Comments : Sect. 1: M-tilt=0° ; E-tilt= 0° ;Sect. 2: M-tilt=0° ; E-tilt= 0°

Sect. 3: M-tilt=0° ; E-tilt= 0°

Sect 1=80° ; Sect.2=190°; Sect.3=320°

2.3 Feeder Data 2G

Total no. of feeders (pcs)

Type of feeders

Feeder lengths (m) Tx

Rx

TOTAL

Comments :

2.4 Antenna Support Detai l

Type of antenna support :3.0 m Tripod Floor Mount

No. of H-Boom :NA

No. of G.I. Pipe :NA

Length of G.I. Pipes (m) : NA

Comments :

EXISTING 2G

GSM1800

Khaterine

Cell 3

20

Khaterine

Cell 1

Khaterine

Cell 2

20

236

118

1520

Cell 3 TOTAL

2   6

GSM1800

104 88 44

52 44 22

52 44

7/8"

22   118

7/8"7/8"

15

GSM1800

X-pol X-polX-pol

15

2

Cell 1 Cell 2

2

 Alcatel Evolium MBO2

1

1800 (2 + 2 + 2)

16(33)

Page 28: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 28/141

SITE ID : G 2554

SITE NAME : IG EAST

SITE CONFIGURATION : 1+1+1

CELCOM (M) BHD.

NORTHERN REGION

NEW 3G REQUIREMENT

Page 29: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 29/141

Site Requirements

Survey Date : 7 March 2006

Project: Celcom 3G, Northern Region, Malaysia

Celcom (M) Bhd.

Site: G 2554 IG EAST

3.0

3.1 Feeder Data

Total no. of feeders (pcs)

Type of feeders

Feeder lengths (m)

Comments : 1. New 3 x 3m tripod floor mount

2.New 3 x MGB 10 holes c/w isolator 

3. Azimuth : Sect 1=80° ; Sect.2=200°; Sect.3=320°

3.2 CABLING

Cable required

DDF free space (ports) : YES

Comments :

3.3 A ntenn a Su pp or t Det ai l

Type of antenna support : 3m Tripod Floor Mount

No. of H-Boom : NA

No. of G.I. Pipe : NA

Length of G.I. Pipes (m) : NA

Other Special Bracket : NA

Comments : 1. New 3m Tripod floor mount 3 pcs

62

62

50   288TOTAL 114124

1 5/8"

57

TOTAL

1 5/8" 1 5/8"

2

Cell 1

2

Cell 3Cell 2

144

Rx 57   144

25

25

Tx

NEW SITE REQUIREMENTS

15m

DDF to DF NA NA NA

2   6

Node B to MGB Grounding / 35mm Cable Lug / 35mm

Cable Cable type / size Connector type / size Length Needed

Node B E1 to DF Coax/3C2.5V Siemens (male) 3E1 x 15m

Node B to Breaker  10mm Cable Lug / 10mm 15m

17(33)

Page 30: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 30/141

Site Requirements

Survey Date : 7 March 2006

Project: Celcom 3G, Northern Region, Malaysia

Celcom (M) Bhd.

Site: G 2554 IG EAST

3.4 OTHERS

Comments : 1. Re-construct and extend existing Fencing to cover new Node B(see CME picture)

2. Require Lorry Crane upon Delivery

3.5 POWER SUPPLY SYSTEM

Rectifier 

Make Link Model Vout Iout

Capacity : NA

Banks : NA

Type / Model : NA

Comments :

Breaker 

Used:

Required:

Used:

Free:

Required:

Free: -

4000mm(L) x 2000mm(w)

x 500mm(H)

NA NA

NA NA

NA

5Inlet,near bending and near

antenna

NA NA

NA See CME Photo

Capacity

1m x 1m reserved for node-B

Good condition

- -NA - -

Lightning Protection

CommentExisting Required

Good condition 300mm x 25m Refer to cme picture

BTS Location Outdoor NA

Cable Inlet

 AC Ear thi ng B usb ar  NA

DC Earthing Busbar  NA

MGB 2

NA

Cable Gantry

Cabin Size NA

Plinth Size4000mm(L) x 900mm(w) x

400mm(H)NA

NA NA

18(33)

Page 31: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 31/141

Site Requirements

Survey Date : 7 March 2006

Project: Celcom 3G, Northern Region, Malaysia

Celcom (M) Bhd.

Site: G 2554 IG EAST

3.6 SITE APPROVAL

Prepared by

3.6 ( Contractor )

MOHD YAZID B MD YUNUS

Site Approved

( Celcom )

Mobile Access - GN Date

Prepared by

( Contractor )

Site Approved

( Celcom )

TRANSMISSION - GN Date

 AS Pembin aan Sdn . Bhd . Date

CME - GN Date

19(33)

Page 32: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 32/141

SITE ID : G 2554

SITE NAME : IG EAST

SITE CONFIGURATION : 1 +1 +1

CELCOM (M) BHD.

NORTHERN REGION

Site Pictures

Page 33: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 33/141

Existing Site Pictures

Survey Date : 7 March 2006

Site: G 2554 IG EAST

Photo 1. Site View

Photo 3. Existing BTS Location

Comment : MBO2

SITE PICTURES

 Ant Hgt:

20 m agl

 Ant Hgt:

18m agl

20(33)

Page 34: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 34/141

Existing Site Pictures

Survey Date : 7 March 2006

Site: G 2554 IG EAST

SITE PICTURES

Photo 4. Existing Feeder Route

Comment:

Photo 6. Existing Feeder Route

Comment : Feeder Route sector to sector 1

21(33)

Page 35: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 35/141

Existing Site Pictures

Survey Date : 7 March 2006

Site: G 2554 IG EAST

SITE PICTURES

Photo 7. Existing Feeder Route

Comment : Sector 1

Photo 8. Existing Antenna Location

Comment: 3m boom wall mount

Cell 1 = 80'

Cell 2 = 190'

Cell 3 = 320'

 Ant.

Height:

20m AGL

22(33)

Page 36: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 36/141

Existing Transmission

Survey Date : 7 March 2006

 

Site: G 2554 IG EAST

Photo 1. Microwave Locat ion

Comment : Shoot to Jusco Ipoh

Photo. 2 Re-Use existing Free E1

Comment

 SITE PICTURES

 Antenna Dish

Height: 34m

23(33)

Page 37: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 37/141

Existing Transmission

Survey Date : 7 March 2006

 

Site: G 2554 IG EAST

 SITE PICTURES

Photo 3. DDF Location

Comment: New DDF Location

Photo 4. Line Of sight(link to Taman perpaduan)

Comment:

24(33)

Page 38: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 38/141

New Requrement

Survey Date : 7 March 2006

Site: G 2554 IG EAST

Photo 1 Propose Node B

Comment : Extend And Modified Fencing

Photo 2 Propose New Feeder Route

Comment : New feeder route

SITE PICTURES

New MGB

New MGB

25(33)

Page 39: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 39/141

New Requrement

Survey Date : 7 March 2006

Site: G 2554 IG EAST

SITE PICTURES

Photo 3 Propose Antena Sector 1

Comment : New 3m Boom Tripod c/w air terminal and MGB

Photo 4. Antenne Location Sector 3

Comment : New 3m Boom Tripod c/w air terminal and MGB

NA

Cell 3 = 340'

20m agl

20m agl

26(33)

Page 40: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 40/141

New Requrement

Survey Date : 7 March 2006

Site: G 2554 IG EAST

SITE PICTURES

Photo 5. Antenna Location Sector 2

 

Comment : New 3m Boom Tripod c/w air terminal and MGB

Photo 6. Lorry crane

Comment:

Cell 2 = 220'

20m agl

Need to closed drain

27(33)

Page 41: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 41/141

Existing CME

Survey Date: 7 March 2006

Site: G 2554 IG EAST

Photo 1. Existing ACPDB

Comment : Exiting ACPDB- sufficient to supply the voltage for Node B

Photo 2. Exiting ACPDB / DCPDB

Comment : Remain Existing and re-use existing DB

SITE PICTURES

3 X 20A free Breaker 

28(33)

Page 42: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 42/141

Existing CME

Survey Date: 7 March 2006

Site: G 2554 IG EAST

SITE PICTURES

Photo 3. Existing Breaker AC or DC

Comment: Re-Use existing Breaker 

Photo 5. Existing MGB

Comment : Existing MGB for BTS grounding(closed view)

Re-Use

existing

3 X 20A

Breaker 

29(33)

Page 43: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 43/141

Existing CME

Survey Date: 7 March 2006

Site: G 2554 IG EAST

SITE PICTURES

Photo 6. Existing MGB 2

Comment : Un sufficient For new 3G feeder cable

Existing Structure (Closed Up)

Comment: 3m Tripod Floor Mounted

Photo.8

3.0m

30(33)

Page 44: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 44/141

SITE ID : G 2554

SITE NAME : IG EAST

SITE CONFIGURATION : 1 +1 +1

NORTHERN REGION

Mobile Checklist / BOQ

CELCOM (M) BHD.

Page 45: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 45/141

BILL OF QUANTITY SITE G 2554

NO TYPE ITEMS ART NO. PACKING REQUEST SUPPLY IRON WORK Fill in your requested item(s)

1 SPECIAL BRACKET SET 3

2 6m Tripod NA SET

3 6m BOOM N/A PC

4 WALL BRACKET N/A SET

 POWER / RF CABLES & ACCESSORIES

1 Power Cable METER

2 METER

3 AC ARMOURED CABLE, 4CORE, 16mm AC.ARM.4C.16mm METER

4 PVC/PVC AC CABLE 5 CORE, BLACK, 10mm 5C/10mm METER

5 CABLE TIE 4" (WHITE) CBL. TIE -W-IND-4" PC

6 CABLE TIE 8" (WHITE) CBL. TIE -W-IND-8" PC

7 CABLE TIE 14" (WHITE) CBL. TIE -W-IND-14" PC

8 CABLE TIE 14" (BLACK) CBL. TIE -W-OUD-14" PC

9 7/8" COAXIAL CABLE EC5-50 METER

10 1/2" COAXIAL CABLE LDF4-50A METER

11 TX JUMPER CABLE (716M - 716M), 2 MTR F4A-PDMDM-2M PC

12 RX JUMPER CABLE (716M - NM), 2 MTR F4A-PNMDM-2M PC

 EARTHING SYSTEM 

1 COPPER BARE WIRE, 35MM, MULTI STRAND N/A METER

2 ANDREW CONNECTOR EARTHING KIT (INDOOR) 244495 PC

3 ANDREW FEEDER EARTHING KIT (OUTDOOR) SGL5-06B1 PC

CONNECTORS

1 RFS ANGLE ADAPTER N-TYPE (MALE TO FEMALE) 15852401 PC

2 H+S BNC CONN. (JACK FULL), 75 OHM, FOR RG59 21BNC-75-4-4 PC

3 RFS 7/16 FEMALE CONNECTOR FOR 7/8" CABLE 15570560 PC

4 H+S N-MALE CONNECTOR FOR 7/8" CABLE 11N-50-23-10 PC

5 H+S N-MALE CONNECTOR FOR 1/2" CABLE 11N-50-12-10 PC

6 H+S TNC-MALE TO BNC FEMALE ADAPTOR 33-TNC-BNC50-1 PC

7 H+S N-MALE TO N-MALE ADAPTOR 32N-50-0-2 PC

8 RFS FEEDER COUPLING (SPLICER) 155 730 60 PC

 MISCELLANEOUS ITEMS

1 AC TRUNKING, 2" X 2", ORANGE C/W ACCESS N/A PC

2 METAL CABLE TRAY, 4" X 1", H.D.G., C/W ACCESS N/A PC

3 CABLE LUG 35MM N/A PC

4 CABLE LUG 150MM N/A PC

5 C-CLAMP (C-TYPE) COMPRESSED FOR 35MM N/A PC

6 3M COOL SHRINK N/A PC

7 CABLE GLAND (FEEDER THROUGH) N/A PC

8 3M ELECTRICAL TAPE, SUPER 33+, 3/4 X 66' 6132 PC

9 3M ELECTRICAL PUTTY , SCOTCHFILL, 1 1/2" X 60" 15140 PC

10 FEEDER CLAMP (2 IN 1) N/A PC

11 FEEDER CLAMP (3 IN 1) N/A PC

12 PVC TRUNKING (GREY), 4" X 2" X 1.8M 7 LENGTH

13 SYW RAWL PLUG (M6X450MM) PC

14 SYW RAWL PLUG (M12) with rod PC

15 SYW RAWL PLUG (M12) w/o rod PC

TOTAL COST (FOR INSURANCE PURPOSES)

Requester: _________________________ Checked By: _________________________

(SIGNED & STAMPED) (SIGNED & STAMPED)

IG EAST

Page 46: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 46/141

SITE ID : G 2554

SITE NAME : IG EAST

SITE CONFIGURATION : 1 +1 +1

NORTHERN REGION

Transmission Checklist

CELCOM (M) BHD.

Page 47: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 47/141

A. SITE DETAILS

1 . X OWN TRANSMISSION SOLUTION

X MICROWAVE VSAT FIBER OPTIC

REMARKS

REMARKS :

2 . LEASED LINE

 TM LEASED LINE POI/POP : .  2 E1

 3 E1

REMARKS :

C . ADDITIONAL REQUIREMENT FOR TRANSMISSION SOLUTION.

1 . CME

 TRM/TOC  DC POWER SUPPLY ( Pls specify : )

 TRIPOD  SHELTER ( Pls specify : )

 PLINTH DDF

REMARKS :

-

SITE A SITE B

Jusco Ipoh NA - -

INSTALLED FREEUSED RESERVED

IG East

IG East

G 2554

E1 SHARING ( MAXIS / DIGI) POI/POP : .

  SITE NAME

SITE ID

RNC HOME

NODE B TYPE

AS Pembinaan

2-Mar-06

(Not Known)

Verify by,  (Name, TX Region. HP num)

  TSS TRANSMISSION CHECKLIST FOR 3G

Prepared by,(Mohd Yazid B Md Yunus;019-3555014)

B . TRANSMISSION MEDIA FOR NODE-B CONNECTION.

  REGION

SURVEY BY

SURVEY DATE

 NORTHERN

Page 48: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 48/141

SITE ID : G 2554

SITE NAME : IG EAST

SITE CONFIGURATION : 1 +1 +1

CELCOM (M) BHD.

NORTHERN REGION

CME BOQ

Page 49: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 49/141

SITE ID : G 2554

SITE NAME : IG EAST

SITE CONFIGURATION : 1 +1 +1

CELCOM (M) BHD.

NORTHERN REGION

Installation Plan

Page 50: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 50/141

SITE ID : G 2554

SITE NAME : IG EAST

SITE CONFIGURATION : 1 +1 +1

SMU

CELCOM (M) BHD.

NORTHERN REGION

Page 51: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 51/141

Page 52: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 52/141

Page 53: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 53/141

Page 54: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 54/141

Page 55: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 55/141

 

Celcom 3G ProjectNodeB Project File

Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

Ver1.0 Confidential 06/11/2007 Page 7 of 51

3

PROJECT DESCRIPTION

Page 56: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 56/141

 

Celcom 3G ProjectNodeB Project File

Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

Ver1.0 Confidential 06/11/2007 Page 8 of 51

3.1 Project Description

General introduction:

NodeB name IGEAST Address Jalan Perajurit 11, T.Ipoh Timur, 31400 Ipoh

Project type 3G macro

NodeB type S1/1/1

Equipment type NodeB 3812A

Diversity mode 2×antenna diversity

Coordinate scale N 04º 37’ 5.8” E 101º 07’ 30”

Antenna system Sector 1 Sector 2 Sector 3 Sector 4 Sector 5 Sector 6

 Antenna type AGINIT

RUST AGINIT

RUST AGINIT

RUST

Number of antennas 1 1 1

 Antenna gain (dBi) 18.3 18.3 18.3

 Antenna polarization modeDual

polarization

Dualpolarizat

ion

Dualpolarizat

ion

 Antenna semi-wave angle 63 63 63

 Azimuth 80˚  200˚  320˚ 

 Antenna weight (kg) 5.3 5.3 5.3

 Antenna Height 20 20 20

TTA presented or not N/A N/A N/A

Feeder type 1 5/8” 1 5/8” 7/8”

Length of a single feeder 63 52 26

E. Tilt 2 2 2

M. Tilt 0 0 0

Corollary equipment:Power supply(V) -48V DC

Battery capacity(Ah) 160

Transmission mode E1

No. of E1 2

Transmission Vendor Existing MW

No. of Battery Bank 1

DC power supply Existing ACPDB

User information

Person in charge

Celcom

Jason Stephen Nayagam Email  [email protected]

Telephone Fax

Participants of the projectTelephone

Survey personnel CelcomEmail

TelephoneDesign personnel Celcom

Email

Page 57: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 57/141

 

Celcom 3G ProjectNodeB Project File

Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

Ver1.0 Confidential 06/11/2007 Page 9 of 51

3.2 NodeB Cell parameter and data configuration

Cell information Cell 1 Cell 2 Cell 3

Cell Name NW400541_1_1 NW400542_1_2 NW400543_1_3

Cell ID 11121 11122 11123

Max Transmit Power (dBm) 44 44 44

DL primary scrambling code 180 188 196

Time offset 256 512 768

UL Frequency 9812 9812 9812

DL Frequency 10762 10762 10762

LAC 3022 3022 3022

SAC 34054 34054 34054

RAC 1 1 1

URA 3022 3022 3022

CPICH (dBm) 33 33 33

Neighboring Cell

Neighboring Cell 1

Neighboring Cell 2

Neighboring Cell 3

NodeB Data Configuration Info

Version No. BTS3812E&3812A V100R006C01B080

Local IP Address 17.21.2.15

Local Cell ID 0, 1, 2

IMA Link No. 0, 1

UNI Link No. -

Note: Please input the cell parameter.

Page 58: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 58/141

 

Celcom 3G ProjectNodeB Project File

Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

Ver1.0 Confidential 06/11/2007 Page 10 of 51

4

PROJECT RESPONSIBILITY INTERFACE

Page 59: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 59/141

 

Celcom 3G ProjectNodeB Project File

Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

Ver1.0 Confidential 06/11/2007 Page 11 of 51

4. Project Responsibility Interface

R&A TELECOMMUNICATION

SDN BHD

PROJECT RESPONSIBILITY INTERFACE

 

Page 60: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 60/141

 

Celcom 3G ProjectNodeB Project File

Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

Ver1.0 Confidential 06/11/2007 Page 12 of 51

5

EQUIPMENT LOCATION

Page 61: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 61/141

 

Celcom 3G ProjectNodeB Project File

Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

Ver1.0 Confidential 06/11/2007 Page 13 of 51

5. Equipment Location

5.1 Node B Installed

5.2 AC/DC Power Tapping Point

 AC PowerTaping Point

Page 62: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 62/141

 

Celcom 3G ProjectNodeB Project File

Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

Ver1.0 Confidential 06/11/2007 Page 14 of 51

5.3 E1 Connection Point

Page 63: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 63/141

 

Celcom 3G ProjectNodeB Project File

Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

Ver1.0 Confidential 06/11/2007 Page 15 of 51

6

ANTENNA LOCATION

Page 64: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 64/141

 

Celcom 3G ProjectNodeB Project File

Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

Ver1.0 Confidential 06/11/2007 Page 16 of 51

6.1 Antenna Location

Sector 1

Sector 2

Page 65: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 65/141

 

Celcom 3G ProjectNodeB Project File

Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

Ver1.0 Confidential 06/11/2007 Page 17 of 51

Sector 3

Page 66: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 66/141

 

Celcom 3G ProjectNodeB Project File

Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

Ver1.0 Confidential 06/11/2007 Page 18 of 51

6.2 Sector Beam width View

a. Sector 1

b. Sector 2

c. Sector 3

Page 67: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 67/141

 

Celcom 3G ProjectNodeB Project File

Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

Ver1.0 Confidential 06/11/2007 Page 19 of 51

6.3 Panoramic View

a. 0 degree

b. 40 degree

c. 80 degree

Page 68: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 68/141

 

Celcom 3G ProjectNodeB Project File

Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

Ver1.0 Confidential 06/11/2007 Page 20 of 51

d. 120 degree

e. 160 degree

f. 200 degree

Page 69: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 69/141

 

Celcom 3G ProjectNodeB Project File

Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

Ver1.0 Confidential 06/11/2007 Page 21 of 51

g. 240 degree

h. 280 degree

i. 320 degree

Page 70: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 70/141

 

Celcom 3G ProjectNodeB Project File

Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

Ver1.0 Confidential 06/11/2007 Page 22 of 51

7

FEEDER CABLE ROUTING

Page 71: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 71/141

 

Celcom 3G ProjectNodeB Project File

Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

Ver1.0 Confidential 06/11/2007 Page 23 of 51

7.1 Feeder Cable Routing

Page 72: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 72/141

 

Celcom 3G ProjectNodeB Project File

Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

Ver1.0 Confidential 06/11/2007 Page 24 of 51

Page 73: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 73/141

 

Celcom 3G ProjectNodeB Project File

Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

Ver1.0 Confidential 06/11/2007 Page 25 of 51

7.2 Earth Point

Page 74: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 74/141

 

Celcom 3G ProjectNodeB Project File

Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

Ver1.0 Confidential 06/11/2007 Page 26 of 51

8

ENGINEERING DRAWING

Page 75: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 75/141

Page 76: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 76/141

Page 77: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 77/141

 

Celcom 3G ProjectNodeB Project File

Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

Ver1.0 Confidential 06/11/2007 Page 27 of 51

9

MATERIAL REQUEST&

BOQ

Page 78: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 78/141

Page 79: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 79/141

Page 80: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 80/141

Page 81: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 81/141

Page 82: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 82/141

Page 83: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 83/141

Page 84: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 84/141

Page 85: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 85/141

Page 86: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 86/141

Page 87: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 87/141

Page 88: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 88/141

Page 89: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 89/141

Page 90: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 90/141

Page 91: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 91/141

Page 92: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 92/141

Page 93: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 93/141

Page 94: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 94/141

 

Celcom 3G ProjectNodeB Project File

Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

Ver1.0 Confidential 06/11/2007 Page 28 of 51

9. BTS 3812A BOQ

BOM NO. DESCRIPTION QTY UOM

02130608 Power module,-33~65degC,90~290Vac,-53.5V/30A 3 PCS

02313069 Power System Monitor Module-EPMU01 1 PCS

31070026 Huawei License Certificate 1 PCS

02313078 Multicarrier Antenna Filter Unit 1 PCS

02313078 Multicarrier Antenna Filter Unit 1 PCS

02313078 Multicarrier Antenna Filter Unit 1 PCS

02312783NodeB band 1 Multi-Carrier Transceiver Unit

38W,Band1,RX1920-1980/TX2110-2170MHz)1 PCS

02312783NodeB band 1 Multi-Carrier Transceiver Unit

(38W,Band1,RX1920-1980/TX2110-2170MHz)1 PCS

02312783 NodeB band 1 Multi-Carrier Transceiver Unit(38W,Band1,RX1920-1980/TX2110-2170MHz)

1 PCS

03039105 HSDPA supported baseband processing and interface unit 1 PCS

03039105 HSDPA supported baseband processing and interface unit 1 PCS

03030ATX NodeB Digital Trunk Interface unit 1 PCS

03030CPM NodeB Main Processing & Timing unit without GPS 1 PCS

02111720 Battery Cabinet 1 PCS

02112092 3812A Outdoor 220V Hot-Exchange Assembly Cabinet 1 PCS

02234487 Filler Panels for WCDMA NodeB BTS3812A Power 4 PCS

21150495 BTS3812A Mount Base Kit 1 PCS

21150429 battery cabinet mount set component 1 PCS

27010236Directional antenna,1710~2170M,18dBi,65deg,dual

polarization,250W,2deg,,DIN/Female,With downtilts1 PCS

27010236Directional antenna,1710~2170M,18dBi,65deg,dual

polarization,250W,2deg,,DIN/Female,With downtilts1 PCS

27010236Directional antenna,1710~2170M,18dBi,65deg,dual

polarization,250W,2deg,,DIN/Female,With downtilts1 PCS

02210177 Conductive Material-ESD Glove, With Chinese/English Manual 1 PCS

04040653Trunk Cable,20m,75ohm,4E1,3.9mm,D25M,

SYVP75-2/0.34*8(S),BTS36121 PCS

04040795 Single Cable, Self-loop Cable,D25F,12*18UL1015BL,BTS3812 4 PCS

04044187Single Cable, Temperature Sensor External Cable,10m, H2(2.5),

16SJTW(4C)B, BTS3806A Auxiliary Storage Battery Cabinet1 PCS

14040137Coaxial Connector,7/16 DIN,50ohm,Plug/Straight,

Male, Matching Superflexible 1/2" Cable12 PCS

14040166Coaxial Connector, SMB Connector,

75ohm/Straight/Female,Matching SYV-75-2-2 Cable8 PCS

Page 95: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 95/141

 

Celcom 3G ProjectNodeB Project File

Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

Ver1.0 Confidential 06/11/2007 Page 29 of 51

14180219Termi-Blok Stacking Connector,6PIN,Top Screw, Horizontal

Leading Wire, AWG13-2,Commissioning Before Choice1 PCS

21100015 Wire Clip,GT-150I,150*3.6mm,Strength 18.2kg 200 PCS

21100144Nonmetallic parts-GT-300I-cable fastener-

300*3.6mm-strength 18.2kg200 PCS

21101259 Cable Tie-GT-300IUV£¨3.6*300£© 100 PCS

21120291 Grounding Hardware Combination 2 SET

21200708 Label Type Harness 12 PCS

26010496Standard Parts-bolt with cross head, combination of spring

washer and plain washer-(GB9074.4-88)-M4*10-zinc plated4 PCS

28010212

GE TSE382C insulated fixing adhesives, translucence, manually

applying, single component room temperature vulcanization,

Silicone Sealant

5 PCS

28040013 Heat Shrink Tube/D18/Radial Shrink Rate>50%/Black 50 CM

28040015 Heat-Shrink Tube,D25,Radial Shrinkage Ratio>50%,Black 50 CM

28040017 Heat-Shrink Tube,D30,Radial Shrinkage Ratio>50%,Black 50 CM

28040023 Heat-Shrink Tube/D8.0/Radial Shrinkage Ratio %>50%/Black 50 CM

28050001 Wrist Strap 1 PCS

29040316

Blank Label,DB0699, Huawei D Blank Cable Label,40 Groups 40Pcs,

4 Columns*10 Rows, Height 17.8 Width 48.0,1Pcs Each Group,

White

1 PCS

29041038 Outdoor Label 4 PCS

29041060 Signal Cable label 2 PCS

29041061 Power Cable label 1 PCS

63120038 small metal parts 1 PCS

63200065DKBA0.480.0238,Cable Tie,GT-300HDUV,7.6X300,

Anti-Ultraviolet And Anti-Freeze, Black, For BTS3001C150 PCS

24020329Rechargeable Battery, VRLA Battery,48V,200Ah,

Battery Group, Single Cell 94*176*394mm1 SET

24020329Rechargeable Battery, VRLA Battery,48V,200Ah,

Battery Group, Single Cell 94*176*394mm1 SET

Page 96: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 96/141

 

Celcom 3G ProjectNodeB Project File

Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

Ver1.0 Confidential 06/11/2007 Page 30 of 51

10

HARDWARE CONFIGURATION

Page 97: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 97/141

 

Celcom 3G ProjectNodeB Project File

Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

Ver1.0 Confidential 06/11/2007 Page 31 of 51

10. Hardware Configuration

10.1 Cabinet Board Layout

Cabinet Board Layout

Page 98: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 98/141

 

Celcom 3G ProjectNodeB Project File

Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

Ver1.0 Confidential 06/11/2007 Page 32 of 51

10.2 Board Information List ( BTS3812A)

Board name Boardcategory Board version Quantity Board serial NO.

QW-BNMAC

Outdoor3812ACabinetHeat-

exchanger-220V

N/A 1 210212316N064000093

KM-BAT-RACK

OutdoorStorageBatteryCabinet

N/A 1 210212315N0640001111

QW-FAN FAN Node B Fan Box 1 -

PMU PowerMonitorModule

V100R006 1 2958820

1 2957741

1 3014038PSU

PowerSupply

Module forMacro BTS

V100R006

1 3013738

NMPT SCC V100R006 1 030CPM106100028

V100R006 1 0391051067000093

HBBI

InterfaceProcessing

BoardHSDPA

SupportedV100R006 1 0391051067000072

NDTIDigital trunk

Interfaceboard

V100R006 1 030DEF1064000476

V100R006 1 21023130781061000655

V100R006 1 21023130781061000644MAFUMulticarrier AntennaFilter Unit

V100R006 1 21023130781061000508

V100R006 1 2199011478E063000029

V100R006 1 2199011478E063000005MTRUMulti-CarrierTransceiver

V100R006 1 2199011478E063000009

Page 99: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 99/141

 

Celcom 3G ProjectNodeB Project File

Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

Ver1.0 Confidential 06/11/2007 Page 33 of 51

10.3 Host Version Information List

1. BTS3812 Version: 

Host version  Description 

Version used by the local BS

(mark √ in the relevant column) 

Remarks 

BTS3812EID of the Node B

versionV100R006C02B080 

Page 100: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 100/141

 

Celcom 3G ProjectNodeB Project File

Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

Ver1.0 Confidential 06/11/2007 Page 34 of 51

11

EXTERNAL CABLE CONNECTION

Page 101: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 101/141

 

Celcom 3G ProjectNodeB Project File

Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

Ver1.0 Confidential 06/11/2007 Page 35 of 51

11. External Cable Connection

Antenna Connection Table

 Antenna connection table

NDDLNo.

N-ports on MAFUpanel

No. of the ports on the top of thecabinet

Corresponding sector Remarks

MAFU_TXM ANT_0A Sector 1MAFU

MAFU_TXD ANT_0B Sector 1

MAFU_TXM ANT_1AMAFU

MAFU_TXD ANT_1B

MAFU_TXM ANT_2A Sector 2

MAFU MAFU_TXD ANT_2B Sector 2

MAFU_TXM ANT_3AMAFU

MAFU_TXD ANT_3B

MAFU_TXM ANT_4A Sector 3MAFU

MAFU_TXD ANT_4B Sector 3

MAFU_TXM ANT_5AMAFU

MAFU_TXD ANT_5B

Page 102: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 102/141

 

Celcom 3G ProjectNodeB Project File

Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

Ver1.0 Confidential 06/11/2007 Page 36 of 51

Trunk Cable Connection Table

E1 transmission mode E1 port No. Characteristic impedance

NDTINo.

No. of DB25 oncabinet top

E1port

Characteristicimpedance

Port No. ofDDF rack

Used orUnused

Peerequipment

Remarks

0 75 0 Used SYRN1

1 75 1 Used SYRN1

2 75E1_0

3 75

4

5

6

NDTI0

E1_1

7

89

10E1_2

11

12

13

14

NDTI1

E1_3

15

Optical transmission mode

NAOINo.

STM-1 portNo.

Optical typePort No. ofODF rack

Used orunused

Peerequipment

Remarks

0NAOI0

1

2NAOI1

3

NAOINo.

E1 port No. Characteristic impedancePort No. ofDDF rack

Used orunused

Peerequipment

Remarks

0

1

2NAOI1

3

4

5NAOI1

6

Page 103: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 103/141

 

Celcom 3G ProjectNodeB Project File

Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

Ver1.0 Confidential 06/11/2007 Page 37 of 51

12

DTF & VSWR PLOTS

Page 104: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 104/141

 

Celcom 3G ProjectNodeB Project File

Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

Ver1.0 Confidential 06/11/2007 Page 38 of 51

1. Sector 1 Tx/RxA – DTF

1.0

1.1

1.2

1.3

1.4

1.5

0 10 20 30 40 50 60 70 80

M1 M2 M3 M4 M5

Distance-to-faultIG EAST TX1/RX1A

Model: S251B Serial #: 00112098 Prop.Vel:0.890Date: 09/29/2006 Time: 15:35:02 Ins.Loss:0.043dB/mStd: Channel: 0BiasTee: OFF Output Power: 6.00 dBmResolution: 517 CAL:ON(COAX) CW: ON

    V    S    W    R

Distance (0.0 - 80.0 Meter)

M1: 1.004 @2.02 Meter M2: 1.043 @4.65 Meter M3: 1.039 @65.43 Meter  

M4: 1.047 @67.75 Meter M5: 1.144 @69.61 Meter 

 

2. Sector 1 Tx/RxA – VSWR

1.0

1.1

1.2

1.3

1.4

1.5

1.6

1750 1800 1850 1900 1950 2000 2050 2100 2150

Limit : 1.5

M1 M2

VSWR IG EAST TX1/RX1A

Model: S251B Serial #: 00112098Date: 09/29/2006 Time: 15:33:31Std: Channel: 0BiasTee: OFF Output Power: 6.00 dBmResolution: 517 CAL:ON(COAX) CW: ON

    V    S    W    R

Frequency (1710.0 - 2170.0 MHz)

M1: 1.25 @1816.98 MHz M2: 1.245 @2112.95 MHz

 

Page 105: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 105/141

 

Celcom 3G ProjectNodeB Project File

Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

Ver1.0 Confidential 06/11/2007 Page 39 of 51

3. Sector 1 RxB – DTF

1.0

1.1

1.2

1.3

1.4

1.5

0 10 20 30 40 50 60 70 80

M1 M2 M3 M4M5

Distance-to-faultIG EAST RX1B

Model: S251B Serial #: 00112098 Prop.Vel:0.890Date: 09/29/2006 Time: 15:36:00 Ins.Loss:0.043dB/mStd: Channel: 0BiasTee: OFF Output Power: 6.00 dBmResolution: 517 CAL:ON(COAX) CW: ON

    V    S    W    R

Distance (0.0 - 80.0 Meter)

M1: 1.018 @2.33 Meter M2: 1.033 @4.50 Meter M3: 1.033 @64.96 Meter  

M4: 1.022 @67.29 Meter M5: 1.047 @68.84 Meter 

 

4. Sector 1 RxB – VSWR

1.0

1.1

1.2

1.3

1.4

1.5

1.6

1750 1800 1850 1900 1950 2000 2050 2100 2150

Limit : 1.5

M1 M2

VSWR IG EAST RX1B

Model: S251B Serial #: 00112098Date: 09/29/2006 Time: 15:36:21Std: Channel: 0BiasTee: OFF Output Power: 6.00 dBmResolution: 517 CAL:ON(COAX) CW: ON

    V    S    W    R

Frequency (1710.0 - 2170.0 MHz)

M1: 1.167 @1715.35 MHz M2: 1.2 @2094.22 MHz

 

Page 106: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 106/141

 

Celcom 3G ProjectNodeB Project File

Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

Ver1.0 Confidential 06/11/2007 Page 40 of 51

5. Sector 2 Tx/RxA – DTF

1.0

1.1

1.2

1.3

1.4

1.5

0 10 20 30 40 50 60 70

M1 M2 M3 M4 M5

Distance-to-faultIG EAST TX2/RX2A

Model: S251B Serial #: 00112098 Prop.Vel:0.890Date: 09/29/2006 Time: 15:25:25 Ins.Loss:0.043dB/mStd: Channel: 0BiasTee: OFF Output Power: 6.00 dBmResolution: 517 CAL:ON(COAX) CW: ON

    V    S    W    R

Distance (0.0 - 70.0 Meter)

M1: 1.012 @2.31 Meter M2: 1.02 @4.61 Meter M3: 1.035 @54.40 Meter  

M4: 1.035 @56.71 Meter M5: 1.128 @58.60 Meter 

 

6. Sector 2 Tx/RxA – VSWR

1.0

1.1

1.2

1.3

1.4

1.5

1.6

1750 1800 1850 1900 1950 2000 2050 2100 2150

Limit : 1.5

M1 M2

VSWR IG EAST TX2/RX2A

Model: S251B Serial #: 00112098Date: 09/29/2006 Time: 15:26:58Std: Channel: 0BiasTee: OFF Output Power: 6.00 dBmResolution: 517 CAL:ON(COAX) CW: ON

    V    S    W    R

Frequency (1710.0 - 2170.0 MHz)

M1: 1.24 @1778.64 MHz M2: 1.22 @2038.95 MHz

 

Page 107: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 107/141

 

Celcom 3G ProjectNodeB Project File

Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

Ver1.0 Confidential 06/11/2007 Page 41 of 51

7. Sector 2 RxB – DTF

1.0

1.1

1.2

1.3

1.4

1.5

0 10 20 30 40 50 60 70

M1 M2 M3 M4 M5

Distance-to-faultIG EAST RX2B

Model: S251B Serial #: 00112098 Prop.Vel:0.890Date: 09/29/2006 Time: 15:28:46 Ins.Loss:0.043dB/mStd: Channel: 0BiasTee: OFF Output Power: 6.00 dBmResolution: 517 CAL:ON(COAX) CW: ON

    V    S    W    R

Distance (0.0 - 70.0 Meter)

M1: 1.012 @2.17 Meter M2: 1.049 @4.61 Meter M3: 1.041 @55.76 Meter  

M4: 1.045 @57.93 Meter M5: 1.06 @59.96 Meter 

 

8. Sector 2 RxB – VSWR

1.0

1.1

1.2

1.3

1.4

1.5

1.6

1750 1800 1850 1900 1950 2000 2050 2100 2150

Limit : 1.5

M1 M2

VSWR IG EAST RX2B

Model: S251B Serial #: 00112098Date: 09/29/2006 Time: 15:29:08Std: Channel: 0BiasTee: OFF Output Power: 6.00 dBmResolution: 517 CAL:ON(COAX) CW: ON

    V    S    W    R

Frequency (1710.0 - 2170.0 MHz)

M1: 1.225 @1883.84 MHz M2: 1.273 @2001.51 MHz

 

Page 108: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 108/141

 

Celcom 3G ProjectNodeB Project File

Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

Ver1.0 Confidential 06/11/2007 Page 42 of 51

9. Sector 3 Tx/RxA – DTF

1.0

1.1

1.2

1.3

1.4

1.5

0 5 10 15 20 25 30 35 40 45

M1 M2 M3 M4 M5

Distance-to-faultIG EAST TX3/RX3A

Model: S251B Serial #: 00112098 Prop.Vel:0.890Date: 09/29/2006 Time: 15:18:30 Ins.Loss:0.069dB/mStd: Channel: 0BiasTee: OFF Output Power: 6.00 dBmResolution: 517 CAL:ON(COAX) CW: ON

    V    S    W    R

Distance (0.0 - 45.0 Meter)

M1: 1.043 @2.35 Meter M2: 1.02 @5.23 Meter M3: 1.02 @28.08 Meter  

M4: 1.024 @30.26 Meter M5: 1.141 @32.18 Meter 

 

10. Sector 3 Tx/RxA – VSWR

1.0

1.1

1.2

1.3

1.4

1.5

1.6

1750 1800 1850 1900 1950 2000 2050 2100 2150

Limit : 1.5

M1 M2

VSWR IG EAST TX3/RX3A

Model: S251B Serial #: 00112098Date: 09/29/2006 Time: 15:18:51Std: Channel: 0BiasTee: OFF Output Power: 6.00 dBmResolution: 517 CAL:ON(COAX) CW: ON

    V    S    W    R

Frequency (1710.0 - 2170.0 MHz)

M1: 1.252 @1813.41 MHz M2: 1.24 @2104.92 MHz

 

Page 109: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 109/141

 

Celcom 3G ProjectNodeB Project File

Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

Ver1.0 Confidential 06/11/2007 Page 43 of 51

11. Sector 3 RxB – DTF

1.0

1.1

1.2

1.3

1.4

1.5

0 5 10 15 20 25 30 35 40 45

M1 M2 M3 M4 M5

Distance-to-faultIG EAST RX3B

Model: S251B Serial #: 00112098 Prop.Vel:0.890Date: 09/29/2006 Time: 15:21:02 Ins.Loss:0.069dB/mStd: Channel: 0BiasTee: OFF Output Power: 6.00 dBmResolution: 517 CAL:ON(COAX) CW: ON

    V    S    W    R

Distance (0.0 - 45.0 Meter)

M1: 1.018 @2.53 Meter M2: 1.066 @5.06 Meter M3: 1.026 @27.99 Meter  

M4: 1.033 @30.26 Meter M5: 1.058 @32.27 Meter 

 

12. Sector 3 RxB – VSWR

1.0

1.1

1.2

1.3

1.4

1.5

1.6

1750 1800 1850 1900 1950 2000 2050 2100 2150

Limit : 1.5

M1 M2

VSWR IG EAST RX3B

Model: S251B Serial #: 00112098Date: 09/29/2006 Time: 15:20:31Std: Channel: 0BiasTee: OFF Output Power: 6.00 dBmResolution: 517 CAL:ON(COAX) CW: ON

    V    S    W    R

Frequency (1710.0 - 2170.0 MHz)

M1: 1.172 @1821.43 MHz M2: 1.227 @2085.31 MHz

 

Page 110: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 110/141

 

Celcom 3G ProjectNodeB Project File

Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

Ver1.0 Confidential 06/11/2007 Page 44 of 51

13 Antenna System Test Result

Sector 1 Sector 2 Sector 3

Tx/RxA RxB Tx/RxA RxB Tx/RxA RxB

VSWR (Peak) 1.25 1.200 1.24 1.273 1.252 1.227

DTF (Peak) 1.144 1.047 1.128 1.06 1.141 1.058

DTF at End Jumper 1.047 1.022 1.035 1.045 1.024 1.033

DTF at Indoor

Jumper 1.043 1.033 1.02 1.049 1.043 1.066

Indoor jumper (m) 2.5 2.5 2.5 2.5 2.5 2.5

End jumper (m) 2.5 2.5 2.5 2.5 2.5 2.5

Feeder length (m) 62.93 62.46 51.90 52.76 25.26 2526

Total length (m) 32.13 32.10 31.55 31.55 31.94 31.94

Page 111: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 111/141

 

Celcom 3G ProjectNodeB Project File

Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

Ver1.0 Confidential 06/11/2007 Page 45 of 51

13

COMMISSIONING & INTEGRATIONCHECKLIST

Page 112: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 112/141

Page 113: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 113/141

Page 114: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 114/141

Page 115: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 115/141

Page 116: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 116/141

 

Celcom 3G ProjectNodeB Project File

Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

Ver1.0 Confidential 06/11/2007 Page 46 of 51

14

EQUIPMENT INSTALLATION REPORT

Page 117: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 117/141

Page 118: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 118/141

Page 119: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 119/141

Page 120: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 120/141

 

Celcom 3G ProjectNodeB Project File

Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

Ver1.0 Confidential 06/11/2007 Page 47 of 51

15

NODE B HARDWARE INSTALLATIONACCEPTANCE

Page 121: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 121/141

Page 122: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 122/141

Page 123: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 123/141

Page 124: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 124/141

Page 125: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 125/141

Page 126: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 126/141

Page 127: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 127/141

Page 128: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 128/141

Page 129: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 129/141

 

Celcom 3G ProjectNodeB Project File

Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

Ver1.0 Confidential 06/11/2007 Page 48 of 51

16

NODE B USER ACCEPTANCE REPORT

Page 130: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 130/141

Page 131: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 131/141

Page 132: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 132/141

Page 133: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 133/141

Page 134: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 134/141

Page 135: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 135/141

Page 136: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 136/141

 

Celcom 3G ProjectNodeB Project File

Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

Ver1.0 Confidential 06/11/2007 Page 49 of 51

17

SINGLE SITE VERIFICATION REPORT

Page 137: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 137/141

Page 138: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 138/141

 

Celcom 3G ProjectNodeB Project File

Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

Ver1.0 Confidential 06/11/2007 Page 50 of 51

18

PUNCH LIST

Page 139: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 139/141

Page 140: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 140/141

 

Celcom 3G ProjectNodeB Project File

Document Version © Huawei Date PageTelekom Group 3GProjectReport.doc

Ver1.0 Confidential 06/11/2007 Page 51 of 51

19

CERTIFICATE OF ACCEPTANCE

Page 141: Fr Igeast Nw40054 w Ed

8/19/2019 Fr Igeast Nw40054 w Ed

http://slidepdf.com/reader/full/fr-igeast-nw40054-w-ed 141/141