Grounds for AD hall consolidation project
Future of AD is clearer and deserves investment New AEGIS experiment being prepared, requires
new control room Existing ACE experiment desperately needs a
control room Severe lack of space inside hall 193, no storage
space available so far Visits were prohibited due to safety issues Radiation level needs to be integrated in general
hall occupation policy Numerous problems linked with existing
experiments control rooms (see next slide)
Problems linked with existing control rooms
The radiation level reaches 17 mSv/h on one gangway and up to 8 mSv/h at permanent workplace
Permanent occupation of a controlled area does not conform with ALARA rule
Users eat and drink in control rooms in radiation controlled area (no cafeteria)
Serious potential risk in case of fire, being made of plywood No natural light, breaks the French work code R 235-2 Noise in the barracks was measured up to is 71 dBA (norm is 50 dBA ) The barracks are constantly flown over by objects suspended from the
crane, in particular liquid He dewars, weighing over 300 kg. The roof of the barrack is 1cm of plywood only!
Lack of space for users, no decent meeting facility. The air conditioning systems are obsolete, noisy and rather inefficient.
Their replacement was quoted at 30 kCHF.
Very good case for work inspectors who could easily prohibit exploitation of AD !
Main objectives for AD hall consolidation
SAFETY:1. Assess performance of all safety systems: end 2010 2. Solve all main points of the safety inspection report: March 20113. Find alternatives to crane handling of liq He dewars
VISITS:4. Create conditions so that visits can restart, in a temporary mode: 1st September 20105. Prepare conditions for long term visits (improved itinerary, new emergency exit): Proposal
end 2010, operational mid 2011
STORAGE:6. Find long term storage space in an existing building: 1st July 2010… oups !7. Propose new short/medium term storage hall: proposal end 2010, operational end 2011
CONTROL ROOMS:8. Build a new control room for AEGIS/ACE, and new toilets: Proposal September2010,
operational early 20119. Build new control rooms for all experiments, with cafeteria and meeting room
EXPERIMENTAL AREAS INTEGRATION:10. Suppress gangway over AEGIS, redistribute circulation: Proposal end Sept 2010,
operational March 2011 11. Propose a new EA layout, new space for racks, integrate ELENA: Proposal end 2010,
operational mid 2012 ?
Bat193 – AD – Locaux ExpériencesPré-étude Implantation
Hall ADBâtiment 193
Bâtiment 513
Bâtiment 54Tunnel
Bâtiment 181
Bâtiment 133
New storage bdg
New
contro
l room
s
“New” existing ASACUSA gangway
New gangway
Suppress AEGIS gangway
Create emergency exit
Emergency exit
Cre
ate
Rack sp
ace
on 2
floors
Rack sp
ace
on
2 fl
oors
Rack space on 2 floors
Workshop
Kicker platform ?
ELENA ?
New access
600 m² Control rooms on 2 floors, with toilets, rest room, meeting room
Medium term storage area: 500 m²With lorry access and OTC
Hall ADBâtiment 193
Bldg193 – AD – New control rooms
12
3
45
6
78
1011
12
13
14
151617
2nd Stage:5.Rest room6.Meeting room7.ACE Ccontrol room8.Toilets9.Stairs exit module level 110.Stairs entry module level 211.Toilets12.ASACUSA Control room13.ALPHA control room14.ATRAP control room15.ELENA related control room16.Toilets17.Stairs exit module level 2
1st Stage:1.Toilets2.AEGIS Control Room3.Stairs entry module level14.Technical room
9
New Control Rooms barely visible from anywhere: between 193, cooling towers and bank…
Future pedestrian access door
Difficult to be closer to the hall entrance !
Nice and green environment…
Conclusions
Technical aspects are sound (safety, CE, HVAC, power distrib, networks)
Technical Note submitted to EN management
Will be presented to site committee in November
Phasing considered:1. January 2011: AEGIS/ACE CR+ toilets +
tech room)2. Later: Other CR’s + meeting room +
cafeteria Need green light from management… Next: storage hall… but MUST find
intermediate solution (bldg 133 ???)