Fraser DuncanQueen’s UniversitySynergies in Low Background Techniques26 July 2005
Underground Facilities at
SNOLAB
Synergies Workshop 05/07/26
SNOLAB
Synergies Workshop 05/07/26
SNOLAB
2km
SNOLAB
SurfaceFacilities
INCOCreighton#9 Mine
Synergies Workshop 05/07/26
ExistingSNO Facility
SNOLAB
Synergies Workshop 05/07/26
Phase I
ExistingSNO Facility
Relocate-Lab Entry-Personnel Facilities
UtilityArea- Chiller- Generator
SNOLAB
Synergies Workshop 05/07/26
Phase IIPhase I
ExistingSNO Facility
Relocate-Lab Entry-Personnel Facilities
Phase II notexpected tobe constructedfor Day 1
UtilityArea- Chiller- Generator
SNOLAB
Synergies Workshop 05/07/26
SNOLAB – Ladder LabsWide Drift
20’x12’(19’ to back) Wide Drift
25’x17’(25’ to back)
Access Drift15’x10’(15’ to back)
ChemistryLab
Electrical,AHUs
Synergies Workshop 05/07/26
SNOLAB – Rectangular Hall
RectangularHall60’L x 50’W50’ (shoulder)65’ (back)
Utility Drift
Control Rm
Staging Area
Synergies Workshop 05/07/26
SNOLAB – SNO Cavern
SNO Cavern70’dia x 100’ h
SNO UtilityDrift
Control Rm
South Drift- Existing Personnel Facilities
Synergies Workshop 05/07/26
SNOLAB – Cryopit (Phase II)
Cryopit50’ dia50’ (Shoulder)65’ (Back)
Utility DriftStaging Area
20 Bar Bulkheads
Exhaust Pipe
Experimental Space Length Width Height Area(ft) (ft) Shoulder/Back (sq ft)
Existing SNO Cavern Cavern 85’/100’ 3848Utility Drift 187 23 4300Control Room 57 20 1140
South Drift Drift 106 17 10’/16’ 1802Phase I Ladder Labs Drift C1 105 20 12’/19’ 2100
Drift C2 75 25 17’/25’ 1875Drift B&D 360 15 10’/15’ 5400
Rectangular Hall Hall 60 50 50’/65’ 3000Utility Drift 115 20 10’/17’ 2300Staging Area 45 16 10’/15’ 720Control Room 62 18 10’/16’ 992
Phase II Cavern 50’/65’ 1963Utility Drift 141 20 10’/17’ 2820Staging Area 66 16 10’/15’ 1056Control Room 64 16 10’/15’ 1024
Existing SNO 11090Phase I 27477Phase II 34340
70(dia)
Cryopit 50(dia)
Synergies Workshop 05/07/26
Experiment Spaces
● Entire Lab will be a class 2000
clean room.
● Ventilation system designed
for 10 air changes per hour
through HEPA filters.
● Positive pressure from
Cleanest spaces to dirtiest.
Laboratory Ventilation
Synergies Workshop 05/07/26
● Ventilation
● Power
● Cooling
● Water
● Communications
● Material Transport
● Radon Reduced Air
● LN2
● Low Background CountingSynergies Workshop 05/07/26
Laboratory Infrastructure
● Setting up a small Ge Counter
● Lead + “aged copper” shield
● Lifting arm for Pb Plug
● Cu cover to be flushed with N2 for Radon removal.
● 1 litre sample sizesSynergies Workshop 05/07/26
Low Background Counting
Synergies Workshop 05/07/26
Low Background Counting
Excavation Status
Surface Facilities
Surface Facilities
M
Cleanroom Labs Locker Rooms
Meeting Rooms IT Server Room
● 1 large experiment in the Rectangular Hall
– (15 m scale)
● 1 large experiment in the SNO Cavern
– (22 m scale)
● ~2 medium scale experiments in the ladder labs.
– (4-6 m scale)
● Several smaller prototyping activities
– (1-2 m scale)Synergies Workshop 05/07/26
Phase I Experimental Program
Physics
0nu BB Other Target Possible Space Participating Institutions
CDMS X 1T Solid State Ge/Si US(12)
CLEAN X X 200T Cryogenic Liquid Ne US(4)COBRA X Ladder Labs UK(6), DE, ItDRIFT X 100kg Gaseous CS2 Ladder Labs UK(4), US(4)
EXO X US(6), Ca(2), Ru, HL
GERDA X 1T Solid State Enriched 76Ge DE
HALO Supernova Ladder Labs US(1), Ca(1)LENA 64kT Liquid Scintillator Not appropriate DELithium X 10T Liquid Li Ladder Labs Ru(1)
X 1T Solid State Enriched 76Ge Ladder Labs US(5), Ca(1)Noble Liquid X US(12)
NOSTOS Theta_13 Spherical TPC SNO Cavern
PICASSO X Cube Hall Ca(3), US, ItSNO+ X X Geo Nu SNO Cavern Ca(2), US(1)TRIGA US
XENON X Ladder Labs US(7)ZEPLIN X 1T Cryogenic Liquid Xe Ladder Labs UK(4), US(2), Ru, Pt
ExptDark Matter
Solar Nu
Ladder Labs, Rectangular Hall
Cryopit, Rectangular Hall350 kg Solid State CdZnTe
1T Cryogenic Liquid Xe or Gaseous Xe
Ladder Labs, Rectangular Hall
SNO Cavern, Cryopit90T Pb with 3He Neutron Counters
Majorana
Fr, Sw, DE, Ne, Gr, US, UK, Ca
Superheated Droplet F detec-tor1000T Liquid Scintilator
N-Nbar100kg – 1T Cryogenic Liquid Xe
Synergies Workshop 05/07/26
Experiment Letters of Interest
● Finalize outfiting engineering design by September.
● Phase I excavation completed June 2006.
● Start outfitting Feb 2006.● Ready for experiments beginning of
2007.
Synergies Workshop 05/07/26
Schedule
● SNOLAB Phase I will provide 27,000 sq ft of class 2000 clean room at 6000 mwe.
● Excavation 25% complete
● Surface Facility Ready in September
● First Experiments 2007
Synergies Workshop 05/07/26
4th SNOLAB Workshop15-17 August 2005SNOLAB Site Sudburyhttp://www.snolab.ca
Summary
End