The ConditionsThe Conditions
• A large free-product plume of JP-4 and 5 existed
under the active aircraft maintenance facility.
• The plume was nearly 250 feet long by 100 feet wide
with a maximum thickness of 5 to 6 feet. The with a maximum thickness of 5 to 6 feet. The
amount of fuel in the subsurface was estimated at
250,000 gallons.
• Aircraft maintenance activities could not be
disrupted.
• An emergency water force main was located under
the building.
The DesignThe Design
• Three 450-ft horizontal wells constructed of 8-inch
HDPE with 200-ft of slotted well screen.
• Three 2-inch collection pipes installed in each
horizontal well to remove product from different horizontal well to remove product from different
areas.
• Hydrophobic pumps transfer free-product to
treatment equipment for collection.
LocationLocation
Installation Challenges
• Achieving the designed entry angle.
• Unexpected conditions – cypress stumps.
• Missing the water line and moving from a walk-over
location method to a wire-line location method.location method to a wire-line location method.
LocationLocation
LocationLocation
LocationLocation
LocationLocation
The Results
• The system became operational in August 1997.
• The system recovered an average of approximately
280 gallons of free-product per day and over 52,000
gallons of free-product the first year.gallons of free-product the first year.
• Recovered fuel was transported to the Air Station’s
central heating plant where it was blended and used
to operate the plant’s steam boilers.
• The system was regarded as a success and received
recognition from the DOD as the free product
recovery system of the year.
Founded in 1992, Directional Technologies, Inc. has installed over 1,000 horizontal
Horizontal Remediation Wells for Horizontal Remediation Wells for
Improved Site Cleanup Training WorkshopImproved Site Cleanup Training Workshop
www.directionaltech.comwww.directionaltech.com
Andrew Collins [email protected] 203-294-9200
Founded in 1992, Directional Technologies, Inc. has installed over 1,000 horizontal
remediation wells throughout the world.
Corporate Headquarters in Wallingford, CT
Branches offices in Philadelphia, PA; Ashby, MA; Atlanta, GA; Destin, FL