    Assembly-Line Balancing:A Valuable Tool for

    Increasing Efficiency

    By Rex Webb

  • 8/14/2019 Free Quality - Line Balancing - Rex Webb

    2/26

    2

    Overview1. What is assembly-line balancing?

    2. How can assembly-line balancing be used in your organization?

    3. What are the steps in balancing an assembly line?4. Example of assembly-line balancing.5. Assembly-line balancing exercise.6. Summary.7. Suggested reading list.

  • 8/14/2019 Free Quality - Line Balancing - Rex Webb

    3/26

    3

    What is Assembly-Line Balancing?Assigning each task to a workstation within an assembly

    line in order to meet the required production rate and to achieve a minimum amount of idle time.

    A

    H

    I

    F

    G J K

    C

    E

    B

    D

    Example of 11 tasks assigned to 5 workstations.

  • 8/14/2019 Free Quality - Line Balancing - Rex Webb

    4/26

  • 8/14/2019 Free Quality - Line Balancing - Rex Webb

    5/26

    5

    Steps in Balancing an Assembly Line

    1. List the sequential relationships among tasks and thendraw a precedence diagram

    2. Calculate the required workstation cycle time3. Calculate the theoretical minimum number of

    workstations4. Choose a primary rule that will determine how tasks

    are to be assigned to workstations

  • 8/14/2019 Free Quality - Line Balancing - Rex Webb

    6/26

    6

    Steps in Balancing an Assembly Line

    5. Beginning with the first workstation, assign each task,

    one at a time, until the sum of the task times is equal tothe workstation cycle time or until no other tasks canbe assigned due to sequence or time restrictions

    6. Repeat step 5 for the remaining workstations until all

    the tasks have been assigned to a workstation7. Evaluate the efficiency of the line balance8. Rebalance if necessary

  • 8/14/2019 Free Quality - Line Balancing - Rex Webb

    7/26

    7

    Example of Assembly-Line Balancing

    Scenario : The Model Z Bicycle is assembled in anassembly line. Four hundred bicycles are requiredeach day. Production time per day is 420 minutes.

    Find the balance that minimizes the number of

    workstations, that stays within the workstationcycle time limitation, and that complies with taskprecedent constraints.

  • 8/14/2019 Free Quality - Line Balancing - Rex Webb

    8/26

    8

    Business View

    Task Task Time(in seconds)

    Task Description Tasks thatmust precede

    A 50 Connect the front tire to the bicycle frame.

    B 16 Insert the handle bar. A

    C 14 Tighten handle bar with two screws and nuts. B D 55 Connect the rear tire to the bicycle frame.

    E 20 Position chain mechanism to the frame. D

    F 17 Attach right hand brake to handle bar. C

    G 17 Attach left hand brake to handle bar. C

    H 17 Attach right side pedal. E

    I 17 Attach left side pedal. E

    J 13 Position chain onto chain mechanism. F,G,H,I

    K 14 Attach seat post. J

    250

    Building the Model Z Bicycle: Assembly Steps and Times

  • 8/14/2019 Free Quality - Line Balancing - Rex Webb

    9/26

    9

    1. List the sequential relationships among tasksand then draw a precedence diagram

    Tasks Tasks thatmust precede

    Tasks Tasks thatmust precede

    Tasks Tasks thatmust precede

    A E D I E

    B A F C J F,G,H,I

    C B G C K J

    D H E

  • 8/14/2019 Free Quality - Line Balancing - Rex Webb

    10/26

    10

    1. List the sequential relationships among tasksand then draw a precedence diagram

    H

    G

    14 sec.

    55 sec.

    50 sec.

    A

    16 sec.

    B

    20 sec.

    E

    14 sec.

    C

    17 sec.

    17 sec.

    17 sec.

    17 sec.

    F

    I

    13 sec.

    J K

    D

  • 8/14/2019 Free Quality - Line Balancing - Rex Webb

    11/26

  • 8/14/2019 Free Quality - Line Balancing - Rex Webb

    12/26

    12

    3. Calculate the theoretical minimumnumber of workstations

    Sum Totalof Task Times 250 seconds

    Number of = = = 3.97 = 4 (rounded up)workstations Cycle Time 60 seconds

  • 8/14/2019 Free Quality - Line Balancing - Rex Webb

    13/26

    13

    4. Choose a primary rule that will determine howtasks are to be assigned to workstations

    For this example, our primary ruleis to prioritize tasks based on thelargest number of following tasks.

    If there is a tie, our secondaryrule is to prioritize tasks in theorder of the longest task time.

    In general, select rules thatprioritize tasks according to thelargest number of followers or based on length of time.

    TaskNumber ofFollowing Tasks

    A 6

    B or D 5

    C or E 4

    F, G, H, or I 2J 1

    K 0

  • 8/14/2019 Free Quality - Line Balancing - Rex Webb

    14/26

    14

    5. Beginning with the first workstation, assigneach task, one at a time, until the sum of the task times is equal to the workstation

    cycle time or until no other tasks can beassigned due to sequence or timerestrictions

    6. Repeat step 5 for the remainingworkstations until all the tasks have beenassigned to a workstation

  • 8/14/2019 Free Quality - Line Balancing - Rex Webb

    15/26

  • 8/14/2019 Free Quality - Line Balancing - Rex Webb

    16/26

    16

    Precedence Graph for Model Z BicycleThe five workstations are identified by color

    14 sec.

    H G 55 sec.

    50 sec.

    A

    16 sec.

    B

    20 sec.

    E

    14 sec.

    C

    17 sec.

    17 sec.

    17 sec.

    17 sec.

    F

    I

    13 sec.

    J K

    D

  • 8/14/2019 Free Quality - Line Balancing - Rex Webb

    17/26

    17

    7. Evaluate the efficiency of the line balance

    Sum Totalof Task Times 250

    Efficiency = = = 0.83 or 83%

    Actual Number (5)(60)of WorkstationsX Cycle Time

  • 8/14/2019 Free Quality - Line Balancing - Rex Webb

    18/26

  • 8/14/2019 Free Quality - Line Balancing - Rex Webb

    19/26

    19

    Assembly-Line Balancing Exercise

    Based on the task information on the previous screen:

    1. Draw a precedent diagram2. Determine the required cycle time to meet a demand

    of 540 units per day based on nine-hour work day.3. Determine the minimum number of workstations using

    the information above in number 2.4. Balance the line using the longest task time as your

    primary rule5. Calculate the efficiency of your line balance.

  • 8/14/2019 Free Quality - Line Balancing - Rex Webb

    20/26

    20

    Exercise Solutions1. Draw a precedent diagram

    32 sec.

    F

    H

    18 sec.

    33 sec.

    A

    16 sec.

    D

    40 sec.

    C

    11 sec.

    G

    30 sec.

    28 sec.

    25 sec. 16 sec.

    I

    E

    42 sec.

    J

    K

    B

  • 8/14/2019 Free Quality - Line Balancing - Rex Webb

    21/26

  • 8/14/2019 Free Quality - Line Balancing - Rex Webb

    22/26

    22

    Exercise Solutions3. Determine the theoretical minimum number of workstations using

    the information in the previous slides.

    Sum Totalof Task Times 291 seconds

    Number of = = = 4.85 = 5 (rounded up)

    workstations Cycle Time 60 seconds

  • 8/14/2019 Free Quality - Line Balancing - Rex Webb

    23/26

    23

    4. Balance the line using the longest task time as your primary rule

    Stations FeasibleTasks

    Task Task Time (seconds)

    RemainingUnassignedTime

    Station 1 A,BB,D

    AB

    3318

    279

    Station 2 C,DD

    CD

    4016

    204

    Station 3 EF

    EF

    2511

    3524

    Station 4 G,HH,I

    GH

    2830

    322

    Station 5 I,JJ

    IJ

    4216

    182

    Station 6 K K 32 28

  • 8/14/2019 Free Quality - Line Balancing - Rex Webb

    24/26

    24

    Exercise Solutions5. Calculate the efficiency of your line balance.

    Sum Totalof Task Times 291

    Efficiency = = = 0.81 or 81%

    Actual Number (6)(60)of WorkstationsX Cycle Time

  • 8/14/2019 Free Quality - Line Balancing - Rex Webb

    25/26

  • 8/14/2019 Free Quality - Line Balancing - Rex Webb

    26/26

    26

    Suggested Reading List1. Bayhan, G. Mirac and Kilincci, Ozcan, A Petri Net Approach for

    Simple Assembly Line Balancing Problems, International Journal of Advanced Manufacturing Technology , vol. 30, pgs. 1165-1173,1 Nov. 2006.

    2. Amen, M., Cost -oriented Assembly Line Balancing: ModelFormulations, Solution Difficulty, Upper and Lower Bounds,European Journal of Operational Research , vol. 168, pgs. 747-770, 1 Feb. 2006.

    3. Boysen, Nils et. al., A Classification of Assembly Line BalancingProblems, European Journal of Operational Research, vol. 183,pgs. 674-694, 1 Dec. 2007.