Upload
lehanh
View
240
Download
0
Embed Size (px)
Citation preview
FRIEDLANDER ANGOLA PRESENTATION
APRIL2012Luanda - ANGOLA
WELCOMEBEMVINDOS
WELCOME
About the Group
KEY FIGURES
70 620 M€ 5000 1870 620 M€ 5000 18
BUSINESS OPERTATIONS IN FRANCE
TURN OVER EMPLOYEES SUBSIDIARIES IN 13 COUNTRIESIN FRANCE COUNTRIES
BUSINESS OPERATIONS IN AFRICA
18 subdisiaries in 13 countries Mauritania Niger Guinea Burkina Faso Ivory Coast Togo Bénin Ghana
C Cameroon Gaboon Congo Ouganda Ouganda Angola
ANNUAL TURN OVERANNUAL TURN OVER 100.000.000 USD
About FRIEDLANDER Angola
FRIEDLANDER ANGOLA : CREATED IN 1997
FRIEDLANDER ANGOIL CREATED IN 2011FRIEDLANDER ANGOIL : CREATED IN 2011
ACTIVITIES
Piping Works (Oil & Gas and Industry) : Fabrication and Installation Supports and Structures : Fabrication and Installation EPCC Contracts for Onshore and Offshore Maintenance : Routine jobs Maintenance : Routine jobs Well Jumpers, Subsea Structures : Fabrication Sea fastening Procurement Shut Downs
TURN OVER
ORGANIZATION CHART
Permanent
Permanent Manpower
710 personsPermanent Manpower
710 persons
710 persons
RESSOURCES & ANGOLAN CONTENT
Angolan People :Angolan People : General, HSE , QAQC, Administrative & Finance : 25 Construction Engineers : 2 Design Engineers : 2Design Engineers : 2 Team Leaders: 35 Safety Watchers: 50 Certified Welders: 115
Angolan Personnel : 600Expatriate People : 110
Pipe Fitters , Platters: 130 Riggers, Helpers: 96 Scaffolding fitters: 14
P i t 30
Angolan Content 85%
Painters: 30 Mechanicals / Electricians : 30 Logistic & maintenance : 70 Crane Operators: 5 Crane Operators: 5
ANGOLANIZATION COMMITMENT
INTERNAL TRAINING
ANGOLANIZATION COMMITMENT
INTERNAL TRAININGSkills Improvement Program
Mechanicals & Fitters TrainingsOur mechanicals and fitters follow a permanent training to keep at the best level.
Our Welding SchoolK i SMAW & TIG ld t th b t l lKeeping our SMAW & TIG welders at the best level is one of our top priorities.Our welders regularly follow trainings to ensure the best quality in their workbest quality in their work
3 Fitting & Welding Schools3 Fitting & Welding Schools
ANGOLANIZATION COMMITMENTANGOLANIZATION COMMITMENT
INTERNAL TRAININGSkills Improvement Program
AutoCAD TrainingDesign is an essential part of our
i i ti it t i i fengineering activity, so training of Angolan technicians is vital for us
Mi llMiscellanousQA QCHSEEngineeringEngineeringRH
ANGOLANIZATION COMMITMENTANGOLANIZATION COMMITMENT
EXTERNAL TRAINING
T h i l T i i b d f
EXTERNAL TRAININGSkills Improvement Program
Technical Training abroad or from abroadWelding Inspection / Coating InspectionPi fi W ld S ff ld CPipe fitter, Welders, Scaffolders, Crane operatorsLocal Training Centers / Certification Centerswith Recognized Certificate of Training Completion (APAVE, BV, ESSA )ESSA,…)
OUR WELDING CAPACITIES 148 Welders 469 Qualifications
Welding Technologies CurrentlyCarried & Certified for :
ASME IX EN 277-1AWS / API
Carbon Steels Stainless Steels Duplex and Super Duplexup e a d Supe up e Cupro Nickel Inconel 625
Welding Procedure Qualification ReportsWelding Procedure Qualification ReportsAvailable for plates and pipes with following WPS : TIG Orbital TIG TIG SMAW
OUR FACILITIES
B i t W k hBoavista Workshop
Engineering and Management
Piping and Construction Works
Hydrotesting
NDT
Sandblasting / Painting
QC before expédition
6 000 m²
OUR FACILITIES
W ll J F b i ti Y dWell Jumper Fabrication YardSONILS Base Engineering and ManagementEngineering and Management Piping and Construction works Hydrotesting NDT NDT Painting QC before expediting
8 600 m²
OUR FACILITIES
Fabrication YardFabrication YardSONILS Base Engineering and Managementg g g Piping and Construction works Dedicated Stainless Steel Area HydrotestingHydrotesting NDT Painting
QC b f diti QC before expediting Client Storage Dedicated Area Client Offices
10 000 m²
RENTED FACILITIESHeavy Lift - SONILS
Dock :
Water Depht : -12,5m CD
Lifting : 2 x 500 t
Length: 90m / Width : 33 mg
Fabrication Area :
Area : 41 100 m²
41 100 m²
LIFTING & TRANSPORTATION MEANS
SONILS Means (exclusively)
Mobile Cranes (30t, 60t, 90t, 450 t)( , , , ) Heavy Lift Gantry Crane (< 50t, > 50t,
500t) Trailer / Carrier + Mack TruckTrailer / Carrier Mack Truck Forklift (< 15t)
PORT AMBOIM / PAENAL :FRIEDLANDER FACILITIES
WELDING SCHOOL IN PORT AMBOIMOPEN IN 2010
5 000 m²
OUR WORK LOAD CAPACITYBased on current projects and contracts
10 000 m²
OUR WORK LOAD CAPACITYBased on current projects/contracts and present negotiation/bids
HSE STATISTICS
HSE STATISTICS - 2011
HSE STATISTICS - 2011
1 945 000 h
HSE STATISTICSDetails of LTI’s over the last 3 years
HSE ORGANIZATION
This plan sets out the principal health, safety and environment improvement activities to take
HSE DEVELOPMENT PLAN FOR 2012
p p p y pplace in Friedlander Angola during the year 2012. It supplements the on-going HSEactivities that continue throughout everyday activities.The 2012 plan is based on 3 key themes that Friedlander aims to develop during this period.
These themes are:
Leadership and active managementFriedlander Angola will demonstrate commitment to HSE of our staff to highest level
These themes are:
Action 1: Top management will participate to HSE monthly site visits.
Action 2: HSE will be discussed quarterly at HSE committee meetings and monthly at Supervision
meetings.
Action 3: We will continue to develop and implement HSE procedures to ensure good and safe condition
of work.
Action 4: We will ensure that HSE Mgt system is effective and HSE information is accessible on every site
A ti 5 W ill i l t th d d ti f i t l d t l ditAction 5: We will implement the agreed recommendations from internal and external audit.
HSE DEVELOPMENT PLAN FOR 2012
HSE behavior at workFriedlander Angola will raise the HSE skills and competency of everybody
Action 6: In line with the objectives set in 2011 Friedlander Angola will continue to train the staff toAction 6: In line with the objectives set in 2011, Friedlander Angola will continue to train the staff to improvethe skills and competency of everybody.
Action 7: HSE department will conduct safety behavioral visit to increase the awareness of our workers.
HSE DEVELOPMENT PLAN FOR 2012
Measurements and monitoringKey Performance indicators
Every year Friedlander Angola sets HSE targets that include leading and lagging indicatorsEvery year, Friedlander Angola sets HSE targets that include leading and lagging indicators.For this year, our targets are:
MonitoringTo be in line with the targets set, Friedlander Angola need to assess the progress on a monthly basis and take corrective actions.Action 8: Develop and implement monthly monitoring of KPI and trends analysis, the progress of p p y g y p gthese KPI will be discussed during the HSE committee meeting.
QA QC ORGANIZATION
QUALITY CONTROL DATA BASE MANAGEMENT SYSTEM
To support and facilitate the requirements of projects
Assistance in daily activities in site , project key performance
index auditing reports and documentationindex, auditing, reports and documentation
Basis for tracking the project quality requirements, progress status,
billing and final documentation for final turn over of each project.billing and final documentation for final turn over of each project.
QUALITY CONTROL DATA BASE MANAGEMENT SYSTEM
System Data Base Overview :
Quality Control Data Base
D t C t l S t D t b Document Control System Database
Field Material Control System Database
W ldi C t l S t Welding Control System
Piping and Painting Planning Tools
Equipment Tools Equipment Tools
Punch Base
Experiences in Angola
PORTOFOLIO 2012
OIL & GAS
New WorksFrom Construction Works to Onboard InstallationFrom Construction Works to Onboard Installation
EXPERIENCE IN FPSOs
TOTAL Block 17 Dalia – Girassol
OPS/EXXON Block Kizomba A-B-C / S iOPS/EXXON Block
15 SaxiMondo – Xicomba
OPS/CHEVRON Block 0 Kuito – Sanha
Operations on 9 FPSO’s in Angola
Currently 2 x 105 people onboardp p
EXXON / OPS – EXPERIENCES ON FPSOs[New Works & Shut Down]
Client :
EXXON & OPSGAS GATHERING PROJECT
Location :
Onshore (LUANDA) & Offshore (Bk 15)Year / Duration :
2010Description :ONSHORE
Fabrication and modification of piping in carbon steel for MondoFabrication and modification of piping in carbon steel for Mondo
Fabrication of supports for Mondo and Saxi
Fabrication of a 3,5T deck extension for MondoOFFSHORE
Installation of 16T of equipments
10 workers in permanence for 10 months
Shutdown work on SAXI and MONDO FPSO, up to 20 people for
2x15d
TOTAL / TECHNIP – EXPERIENCES ON FPSOs[New Works & Shut Down]
Client :
TOTAL & TECHNIPFPSO HOOK UP
Location :
Onshore (LUANDA) & Offshore (Bk 17- DALIA FPSO)Year / Duration :
2006-2007Description :ONSHORE
Piping and StructuresPiping and StructuresWell jumper fabrication
Sea fasteningOFFSHORE
Manpower provision – More than 50 people onbord (peack)(Angolan foremen, Pipe fitters, Welders,
Scaffolding Fitters, Fire watchers,...)
TOTAL – EXPERIENCES ON FPSOs[New Works & Shut Downs]
Client : TOTAL E&P ANGOLAJASMIN Tie In and Deck Integrations Project
Location : FPSO Girassol (Bk 17)
2001Year : 2001Description : Fabrication & Installation of :
90 tons of Piping 18 tons of Structures
EXXON / SONASURF – BOAT LANDINGS[New Works]
Client :
EXXON / SONASURFBOAT LANDING
Location :
Onshore (LUANDA) & Offshore (Various Vessels)Year / Duration :
2009-2010Description :
Fabrication and Installation of 4 boat landings2 x 25 t for KIZOMBA A&B2 x 25 t for KIZOMBA A&B
2 x 15 t for TLP A&B
SBM – BUOY CONSTRUCTION[New Works]
+ Diameter : 16 m
+ Height : 6 m
Client : SBMLOADING BUOY
Location : Lobito (ANGOLA)
+ Weight : 250 T
Year / Duration : 1 an / 2008Description : Construction of a Loading Buoy (for FPSO or ports), Significant welding,Fabricated components and fitting of the two separate parts comprising the buoy,Fabrication processes certified by ABS marine and offshore classification body,
Mechanical, dimensional, hydraulic and hydrostatic tests.
OIL & GAS
Subsea Spools and StructuresTechnical construction in tight deadlinesTechnical construction in tight deadlines
TOTAL / FMC – WELL JUMPERS[New Works]
Client : TOTAL E&P ANGOLA / FMCPGB & Well Jumper Fabrication for Girassol & Rosa – Bk 17
Location : Onshore (Luanda)2007 2009Year : 2007-2009
Description : PGB Fabrication (18) / Well Jumpers (28)
EXXON / CAMERON – WELL JUMPERS[New Works]
Client :
EXXON & OPSWell Jumper Fabrication – (Kizomba A & B) - Bk 15
Location :
Onshore (LUANDA)Year / Duration :
2010Description :
Fabrication and Maintenance of Well Jumpers (12)
VETCO – WELL JUMPERS[New Works]
Client : VETCOWELL JUMPERS (PRODUCTION AND INJECTION) FOR KIZOMBA FIELD
Location : LUANDAYear / Duration: 2007-2008 / 2 Years
Description : Detailed Engineering, Fabrication, NDT / Hydrotest, Load Out and Seafastening36 WJ for EXXON (Bk15) & 52 WJ for TOTAL DALIA (Bk17)( ) ( )
[New Works]
TOTAL – SUBSEA STRUCTURES & SPOOLS
Client : TOTALGIRASSOL WI15 PIPELINE REPAIR (Bk 17)
Location : Luanda (ANGOLA)Year / Duration : 2009 / 1 an
Descriptif : 12 Spool Deployment Frame Structure (60t) – Supply (structure & spool),Descriptif : 12 Spool Deployment Frame Structure (60t) Supply (structure & spool),Prefabrication, Assembly, Painting, NDE and Hydrotest, Seafastening
OIL & GAS
Maintenance Operations Routines JobsRoutines Jobs
SONANGOL – ROUTINE JOBS[Maintenance Operations]
Clients : SONANGOL P&PConstruction and Maintenance Operations
Location : Offshore - Bk 3 (Angola)f 2005 tillYear : from 2005 till now
Description : Line Substitution / Modification, Structure Maintenance, Supports ...
TOTAL – ROUTINE JOBS[Maintenance Operations]
226 000 manhoursmanhoursfor 2010
Clients : TOTALConstruction and Maintenance Operations – ITV
Location : Offshore – Bk17 (Angola)f 2010 tillYear : from 2010 till now
Description : Frame Contract for FPSOs (including PAZFLOR and incoming CLOVE)for Substitution / Modification, Structure Maintenance, Supports...
OIL & GAS
SeafasteningsOn duty by your sideOn duty by your side
VARIOUS CLIENTS – SEAFASTENINGS[Operations]
Major Clients : SUBSEA SEVEN (BP, CAMERON) - HULL BLYTH (BP, CAMERON)TECHNIP (TOTAL) - TOTAL - PANALPINA - EMAS (TOTAL)
Seafastening Operations (Structures, Well Jumpers, Reels,…)L ti Various VesselsLocation : Various Vessels Year : from 2002 till now
Description : Dedicated Team & Material available at SONILS Yard for short notice mobilization(50 People, 10 Diesel Weld. Machines, Compressors, Tool Boxes, Generators,…)
OIL & GAS
EPCC ContractsWe take care of your successWe take care of your success
SONANGOL P&P – FIELD DEVELOPPEMENT[EPCC Contract]
Clients : SONANGOL P&P (Bk 3)PACF4 & PACF1 Infill Wells - Topside Modifications
Location : Offshore – Bk3 (Angola)2009 2010Year : 2009-2010
Description : Well Connection (3 W.) / Tie-in (8’’ / 10’’ / 12’’) for Future Process ModificationLaser Dimensional Survey, Detailed Engineering, Procurement,
Prefabrication, Installation, E&I, Precommissioning
ANGOBETUMES – OIL PRODUCT TERMINAL[EPCC Contract]
Client : ANGOBETUMESLobito Terminal - Construction of a Oil Product Terminal
Location : Lobito (ANGOLA)
2008 2010 / 2Year / Duration : 2008- 2010 / 2 yearsDescription : Engineering, Procurement, Earth Works, Civil Works, Prefabrication ,
Tank Erection, Piping Works, E&I, NDT, Painting, Insulation, Precommissioning, CommissioningGasoil : 2 Tanks (15 000 m3) – HFO : 1 Tank (7 500 m3) – Bitumen : 2 Tanks (10 000 m3)
Ongoing Projects
TOTAL – GAS EXPORT PROJECT[New Works]
Client :
TOTAL GAS EXPORT PROJECTGAS EXPORT PROJECT
Location :
Onshore (SONILS) / Offshore (Girassol / Dalia)Year / Duration :
2010 20122010-2012Description :
GIRASSOLFab. & Installation of a 25 tons module
incl. 700’’of carbon steel pipingincl. 700 of carbon steel pipingE&I, Fabrication and installation of supports
DALIA Prefab. of 1800’’of piping (Carb. Steel, Stainl. Steel, Inconel 625)
Offshore installation of an exchangerOffshore installation of an exchangerPiping and E&I installation
60T of scaffoldingCompleted
TOTAL – GirRI FPSO 1[New Works]
Client :
TOTALTOTAL GIRASSOL RESSOURCE INITIATIVE PROJECT
Location :
Onshore (SONILS) / Offshore (Girassol)Y / D tiYear / Duration :
2010-2012Description :
GIRASSOLEPCIEPCI contract
Tie in of chemical and methanol lines
800" of piping
E&I Tie-ins
New E&I cabinetOnshore works: 100%Offshore works : 95 %
FMC / TOTAL – GirRI Subsea[New Works]
Client :
FMC GIRASSOL RESSOURCE INITIATIVE PROJECT
Location :
O h (SONILS)Onshore (SONILS)Year / Duration :
2010-2012Description :
Fabrication of :8 PGBs
13 Well Jumpers (Injection / Production)
PGBs Completed2 WJ already loaded out2 WJ already loaded out
CAMERON / BP – PSVM Development[New Works]
Client :
CAMERON / BP PSVM DEVELOPMENT (Bk 31)
Location :
O h (SONILS)Onshore (SONILS)Year / Duration :
2011-2014Description :
Fabrication of :22 Well Jumpers
Inconel clading technology
3 Well Jumpersalready completed
VETCO / EXXON – KIZOMBA Satellites Development[New Works]
Client :
VETCO / EXXON KIZOMBA Satellites Development (Bk 15)
Location :
O h (SONILS)Onshore (SONILS)Year / Duration :
2010-2013Description :
Mud Mats Completed1 WJ already loaded out2 WJ in progress
Fabrication of :6 Mud Mats (4 SDU/UTA - 2 UTA) - 195 t
18 Well Jumpers
TOTAL – Bk17 Field Development[New Works]
Client :
TOTAL Bk17 Field Development (Dalia, Rosa, Pazflor)
Location :
Onshore (SONILS)Year / Duration :
2010-2014Description :Description :
Fabrication of :52 + 9 Well Jumpers for Dalia
22 Well Jumpers for Pazflor (and 12 WJ for CLOV)
Global Progress60%
PORT AMBOIM – MARINE OIL TERMINALPORT AMBOIM – MARINE OIL TERMINAL
PHASE 1 IN PROGRESS : PIPE LINES PHASE 3 FUTURE WORKS : SEA LINES
LOBITO – SONANGOL PALANCA CALM BUOY OVERHAUL
250 tons CALM BUOY250 tons CALM BUOY RECERTIFICATION WORKS IN LOBINAVE SHIP YARD
LOBITO – ANGOBETUMES PIPE LINES FOR LOBITO TERMINAL
SUBSEA SEVEN/BP – GES BLOCK31 PROJECT
FABRICATION 371 tons
PLET & SPOOLS
MODEC/BP – COMMISSIONING FPSO
PSVM FPSO COMMISSIONINGWITH 30 WELDERS / FITTERSWITH 30 WELDERS / FITTERS
QUALIFICATION 18 WELDING PROCEDURESPROCEDURES
CuNi , Alloy Steel , SS , API X65FOR MODIFICATIONS ON BOARD
SUBSEA SEVEN/BP - SEA FASTENING POUR BLOCKS 18 et 31 ( 24 hours )
FMC – FLOW BASE FABRICATION FOR GirRI PROJECT
FABRICATION
4 PRODUCTION & INJECTION
FLOW BASES
TECHNIP – SPOOL 6” SD FABRICATION FOR GirRI PROJECT
ANGOFLEX LOBITO – MONTAGE HELIX MACHINE
SLINGS & BASKET S FABRICATION
TOTAL – GAS EXPORT PROJECT BLOCK2
CUCA . COCA COLA - EXTENSIONS OF PLANTS . SS PIPING WORKS
PERMANENR ACTIVITIESIN CASTELL GROUP
BREWERIES
THANK YOUOBRIGADO
THANK YOU