Upload
phungnga
View
213
Download
0
Embed Size (px)
Citation preview
- 1 -
MINISTRY FOR AN ECOLOGICAL AND INCLUSIVE TRANSITION / MINISTRY OF TERRITORIAL COHESION
From eco-design to a circular economy: a French way to engage stakeholders?
- 2 -
MINISTRY FOR AN ECOLOGICAL AND INCLUSIVE TRANSITION / MINISTRY OF TERRITORIAL COHESION
2015 Circular Economy Package
2015 Energy Transition for Green Growth Act
Directive 2008/98/EC on waste
December 17, 2010 order
2018 Circular Economy Roadmap
Synergies between European and national policies
EU action plan for a Circular Economy
Pre-demolition assessment guidelines for the construction sector
Voluntary industry-wide recycling protocol for construction and demolition waste
Core indicators for the assessment of buildings’ lifecycle, environmental performance, and incentives for their implementation
- 3 -
MINISTRY FOR AN ECOLOGICAL AND INCLUSIVE TRANSITION / MINISTRY OF TERRITORIAL COHESION
French Regulation on analysis of waste generation before demolition
May 2011 Decree (Grenelle laws)
The project manager in charge of waste shall designate an independent auditor to:
Assess the quantity and type of materials
Identify waste recovery and recycling clusters according to materials and site
location
Track and trace the final waste location
The Circular Economy Roadmap enhances the audit implementation:
Increases awareness of stakeholders
Clarifies (and maybe broadens) the operation’s scope
Strengthens auditor’s training, verifies auditor’s skills
Implements government authorities’ surveillance and monitoring
Les principes méthodologiques Action 1: Mandatory pre-demolition waste audit
- 4 -
MINISTRY FOR AN ECOLOGICAL AND INCLUSIVE TRANSITION / MINISTRY OF TERRITORIAL COHESION
1/ French “Green Deals”
Established between the Ministry and the industrial sector on a voluntary basis (Dutch model)
Mutual commitments to improve waste recycling rate on the basis of existing laws and rules
By sectors: inert mineral waste, plaster, flat glass, concrete, wood waste used in the cement
plants
Partnership-based approach
Provide support for good practices for construction and demolition waste disposal
Share feedback
Provide guidelines for the private sector
Develop training/awareness for project managers
2/ Other actions
National project Recybeton: concrete recycling
Certification process in the private sector (HQE-GBC, BBCA, …),
SOGED : Voluntary protocol for the management and disposal of demolition waste
Waste treatment sites cartography
…
Les principes méthodologiques Action 2: Waste management protocol
- 5 -
MINISTRY FOR AN ECOLOGICAL AND INCLUSIVE TRANSITION / MINISTRY OF TERRITORIAL COHESION
In 2016, France launched a national trial phase for new construction (residential + office buildings) in
order to prepare the future environmental regulation (after RT2012)
How can we improve construction performance on the basis of products and buildings eco-conception
tools (LCA assessment)?
Les principes méthodologiques Action 3: Core indicators to assess building performance
A technical baseline was established and shared by a large panel of
stakeholders
This baseline lays down the rules for: Energy calculation
Environmental assessment (definition of assumptions for the LCA of
buildings)
The baseline is available here
www.batiment-energiecarbone.fr
- 6 -
MINISTRY FOR AN ECOLOGICAL AND INCLUSIVE TRANSITION / MINISTRY OF TERRITORIAL COHESION
Greenhouse gas emission related to energy use and
embedded carbon in construction products and devices
Les principes méthodologiques Technical baseline – Carbon
Reference study period
50 years for all types of buildings Based on a LCA environmental assessment
All environmental impacts are calculated (multi-
criteria assessment – NF EN 15804+A1 / PEP 3rd
edition and NF EN 15978)
For each step of the building’s life cycle
(multi-steps assessment)
Goals
Limit the transfer of impacts between the various steps of the LCA
Identify drivers to reduce environmental impact
Prerequisites
A repeatable assessment
An operating/quick and reliable assessment
- 7 -
MINISTRY FOR AN ECOLOGICAL AND INCLUSIVE TRANSITION / MINISTRY OF TERRITORIAL COHESION
Which input data for the environmental assessment?
EPD
(of devices and products)
if available
Default penalized values
as substitutes of EPD
Fixed values
for the footprint
of energy
Les principes méthodologiques Technical baseline - Carbon
French authorities have two goals:
Increase the amount of EPD (NF EN 15804+A1 / PEP 3rd edition with an independent third party review)
provided by industrials
Improve data quality and consistency through the environmental building assessment methodology
Industrials French Ministry
- 8 -
MINISTRY FOR AN ECOLOGICAL AND INCLUSIVE TRANSITION / MINISTRY OF TERRITORIAL COHESION
Which assessment database?
Les principes méthodologiques Technical baseline - Carbon
The INIES database is run by the supervisory board and the technical committee
The supervisory board ensures that the database operates ethically and professionally
The technical committee oversees the collection and processing of data as well as database content updates
Environmental and health
reference data for building
1 database – 2 reviewing programs
INIES for FDES (EPD of products)
PEP ecopassport (EPD of equipment)
EPD are verified by independent third party reviewers
Quality? 1) A procedure exists to control reviewers’ skills (managed by the programs) Professional experience (professional 4 years, construction sector 2 years, LCA practice, EPD, critical review, verification in construction sector…) Proficiency testing Renewal every 3 years
2) Programs may arbitrate verification conflicts
PROGRAMME PEP ecopassport®
PCR
Règles de définition des catégories de produits relatives aux équipements électriques, électroniques et de génie
climatique
PCR-ed3-FR-2015 04 02
© 2015 Association P.E.P.
Copyright du PCR Les Règles de définition des Catégories de Produits ou PCR sont la propriété © du programme PEP ecopassport ®, si rien de particulier n’a été spécifié (par exemple, une publication croisée avec des PCR d’autres programmes). L'utilisation du PCR pour tout autre but que le développement de PSR et l’enregistrement de PEPs dans le programme international PEP ecopassport ® est soumis à autorisation par le Secrétariat général, qui peut être contacté via : [email protected]
Association P.E.P. 11/17, rue de l’Amiral Hamelin - 75016 Paris Téléphone : 01.45.05.71.61 - Fax : 01.47.04.68.57
Association Loi 1901 – Non assujettie au régime de T.V.A. – N°SIRET : 789 180 320 00010
- 9 -
MINISTRY FOR AN ECOLOGICAL AND INCLUSIVE TRANSITION / MINISTRY OF TERRITORIAL COHESION
INIES Base
EDP
Default values
Fixed values
LCA
building softwares Compatible with technical baseline
connected - numerical data
E+C- Buildings database
Collects all LCA buildings
operations
engineering consultant
Designers &
LCA
consultants
Industrials
1 - 2 days operating assessment
• Human skills
• Digital data
• LCA Softwares
Contractingo
wner
Les principes méthodologiques How to use digital EPD for building LCA?
Ministry
The French technical organisation makes it possible to share the responsibilities and skills among a chain of
stakeholders up to the LCA building’s final goal
- 10 -
MINISTRY FOR AN ECOLOGICAL AND INCLUSIVE TRANSITION / MINISTRY OF TERRITORIAL COHESION
Vers une règlementation environnementale Synergies LEVEL(S) / E+C-
Consistency
Voluntary test phase (1.5 - 2 years)
Common language to track the levels of sustainability performances over the whole lifecycle
Quantification of multiple indicators (not just GHG emissions)
Allowing businesses to start with a good foundation & practice transfer
Good starting point for existing standards/rules
Possible use at different stages of a building project
E+C- specificities
Regulatory framework/baseline (RT2012)
Levels for both Energy and Carbon
Global cost assessment
Massification: support of a future rule, stability needs in methods and data
Overall consistency for the Energy and assessment of LCA indicators
Easy transfer of E+C- buildings in Levels with some adjustments (bridges)
Opportunity for sharing feedback