From GOVERNMENT OF ANDHRA PRADESH DEPARTMENT OF MINES & GEOLOGY To P. Raja Babu, M.Se (Tech), Sri B. Jaya Chandra Reddy, Slo. B. Mnhananda Reddy, Deputy Director of Mines & Geology, KURNOOL. H.No: 13-88 1-10, Maruthi Nagar, Tadipatri (V &:M), Anantapuramu District. Letter No. 3276/MP- ATP / 2017. dt: -09-2017 Sir, Sub :- Mines & Quarries - Approval of Mining Plan (including Progressive Mine Closure Plan) for the period of five years for Black Granite over an extent of 1.918 Hectares in Sy.No.l31/16 of Gotukuru Village, Kuderu Mandai, Anantapuramu District in favour of S ri B. Jay a Chandra Reddy, prepared by Sri G. Es war Reddy, M.Sc., B.L., R.Q.P ·Mining Pl an· Approved- Regardin g. Ref:- I} G.O.Ms.No: 56, Ind.&: Comm. (M.ll) Dept., dated: 30.04.2016. 2) Prodgs.No: 28594/P.RQP/2001, dt: 13.05.2016 of the Director of Mines and Geology, Hyderabad. 3) Notice No: 18336/R4-1120 16, dt: 13.07.2017 of the Director of Mines & Geology, lbrahimpatnarn addressed to the applicant/RQP. 4) Letter Dated: 18 .08.2017, alongwith Draft Mining Plan from the lessee received in this office on 21.08.2017. 5) Lr. No.32761MP-ATPI2017, dt: 28.08.2017 to the R.Q.P. / Applicant of the Deputy Director of Mines & Geology, Kumool 6) Letter da!ed: 0 1. 09.2017, along with five sets of fair copies of mining plan from tlte applicant received in tltis office on 11.09.2017. **** In exercise of the powers conferred as per amended Rule 7 A (1}, (II), (Ill) and (IV) of APMMC Rules, 1966 read with Proceedings No: 28594/P.RQP/2001, dt: 13.05.2016 of the Di rector of Mines and Geology, GoAP, Hydembad and G.O.Ms.No: 56, Ind. &: Comm. (M.ll) Dept., dated: 30.04.2016, I hereby approve the Mining Plan {including Progressive Mine Closure Plan) for the period of five years for Black Granite over an extent of 1.918 Hectares in Sy.No.l31/16 of Got ukurn Village, Kuderu Mandai, Anantapuramu District in favour or Sri O. J::tya Chandra Reddy. This approva.l is subject to the following conditions. I. This Mining Plan (including Progressive Mine Closure Plan) is approved without prejudice to any other l aws appl i cable to the mine area from time to t ime whether made by the Central Qo, •emment, State Government or any other authority. 2. It is clarified that tlti s approval of the mining plan (includ ing Progressive Mine Closure Plan) does not in any way imply the approval of the Government in tenns of any other provisions of the Mines and Minemls (Devel opmc-nl and Regulation) Act, 1957 or the Mineral Concession Rules, 1960, APMMC Rules, 1966 and any other Jaws in cluding the Forest Conservation Act, 1980 and G.C.D.R, 1999. 3. This Mining Plan was approved as per the quarry lease executive sketch of the subjed area. Any deviation found later, approval authority does not owe responsibility. 4. The approval authority does not owe respoasibility with regard to recovery factor of granite and assessment of reserves, any erroneous certification made by the R.Q.P. if any, since the eva1uation is done on random basis. E nel: (2 eopies or A.M.P.) faithfully, Depu ty es & Geology, Ku ol. Copy submitted to tl 1e Director of Mines & Geology, Vijayawada alon with A.M.P. Copy to Sri G. Eswar Reddy, D.No. l 3-2-1 55-l, Shirdi Nagar, Ananntapurnmu - 5 I 5001 for inf onnation. Copy submitted to the Regional Controller of Mines, IBM, Suhwt Bazar, Hydembad for favour of info rmation. Copy submitted to the Director of Mines Safety, Bellary for favour of information. Copy submitted to the Zonal Joint Director of Mines and Geology, Kadltpa for favour of infonnation. Copy to the Asst. Director of Mines & Geology, Annntapuramu along with A.M.P.

Fromenvironmentclearance.nic.in/writereaddata/District/... · favor of Sri B.Jaya Chandra Reddy for a period of 20 years subject to submission of Approved Mining Plan within a period

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Fromenvironmentclearance.nic.in/writereaddata/District/... · favor of Sri B.Jaya Chandra Reddy for a period of 20 years subject to submission of Approved Mining Plan within a period

From

GOVERNMENT OF ANDHRA PRADESH DEPARTMENT OF MINES & GEOLOGY

To P. Raja Babu, M.Se (Tech), Sri B. Jaya Chandra Reddy,

Slo. B. Mnhananda Reddy, Deputy Director of Mines & Geology, KURNOOL. H.No: 13-88 1-10, Maruthi Nagar,

Tadipatri (V &:M), Anantapuramu District.

Letter No. 3276/MP-ATP/2017. dt: -09-2017 Sir,

Sub:- Mines & Quarries - Approval of Mining Plan (including Progressive Mine Closure Plan) for the period of five years for Black Granite over an extent of 1.918 Hectares in Sy.No.l31/16 of Gotukuru Village, Kuderu Mandai, Anantapuramu District in favour of Sri B. Jay a Chandra Reddy, prepared by Sri G. Eswar Reddy, M.Sc., B.L., R.Q.P ·Mining Plan· Approved- Regarding.

Ref:- I} G.O.Ms.No: 56, Ind.&: Comm. (M.ll) Dept., dated: 30.04.2016. 2) Prodgs.No: 28594/P.RQP/2001, dt: 13.05.2016 of the Director of Mines and

Geology, Hyderabad. 3) Notice No: 18336/R4-112016, dt: 13.07.2017 of the Director of Mines &

Geology, lbrahimpatnarn addressed to the applicant/RQP. 4) Letter Dated: 18.08.2017, alongwith Draft Mining Plan from the lessee

received in this office on 21.08.2017. 5) Lr. No.32761MP-ATPI2017, dt: 28.08.2017 to the R.Q.P. / Applicant of the

Deputy Director of Mines & Geology, Kumool 6) Letter da!ed: 0 1.09.2017, along with five sets of fair copies of mining plan

from tlte applicant received in tltis office on 11.09.2017.

**** In exercise of the powers conferred as per amended Rule 7 A (1}, (II), (Ill) and (IV) of

APMMC Rules, 1966 read with Proceedings No: 28594/P.RQP/2001, dt: 13.05.2016 of the

Director of Mines and Geology, GoAP, Hydembad and G.O.Ms.No: 56, Ind. &: Comm. (M.ll) Dept., dated: 30.04.2016, I hereby approve the Mining Plan {including Progressive Mine Closure Plan) for the period of five years for Black Granite over an extent of 1.918

Hectares in Sy.No.l31/16 of Gotukurn Village, Kuderu Mandai, Anantapuramu District in favour or Sri O. J::tya C handra Reddy.

This approva.l is subject to the following conditions. I. This Mining Plan (including Progressive Mine Closure Plan) is approved without

prejudice to any other laws applicable to the mine area from time to time whether made by the Central Qo,•emment, State Government or any other authority.

2. It is clarified that tltis approval of the mining plan (including Progressive Mine Closure Plan) does not in any way imply the approval of the Government in tenns of any other provisions of the Mines and Minemls (Developmc-nl and Regulation) Act, 1957 or the Mineral Concession Rules, 1960, APMMC Rules, 1966 and any other Jaws including the Forest Conservation Act, 1980 and G.C.D.R, 1999.

3. This Mining Plan was approved as per the quarry lease executive sketch of the subjed area. Any deviation found later, approval authority does not owe responsibility.

4. The approval authority does not owe respoasibility with regard to recovery factor of granite and assessment of reserves, any erroneous certification made by the R.Q.P. if any, since the eva1uation is done on random basis.

Enel: (2 eopies or A.M.P.) ~ours faithfully,

Deputy fl.~to es & Geology, Ku ol.

Copy submitted to tl1e Director of Mines & Geology, Vijayawada alon with A.M.P.

Copy to Sri G. Eswar Reddy, RQP/Geologis~ D.No. l3-2-155-l, Shirdi Nagar, Ananntapurnmu - 5 I 5001 for infonnation.

Copy submitted to the Regional Controller of Mines, IBM, Suhwt Bazar, Hydembad for favour of information.

Copy submitted to the Director of Mines Safety, Bellary for favour of information.

Copy submitted to the Zonal Joint Director of Mines and Geology, Kadltpa for favour of infonnation.

Copy to the Asst. Director of Mines & Geology, Annntapuramu along with A.M.P.

Page 2: Fromenvironmentclearance.nic.in/writereaddata/District/... · favor of Sri B.Jaya Chandra Reddy for a period of 20 years subject to submission of Approved Mining Plan within a period

(

(

.. .

MINING PLAN FOR BLACK GRANITE ·'.0'.~.::-~~ AN EXTENT OF 1.918HECTS. IN SY. NO. 131/16

,f.·, · C)L~~RU(V), KUDERU(M), ANANTHAPURAM DISTRICT, l.t... < ./~?0~~\ ~ ANDHRA PRADESH STATE. II • .t ,'<~ o ,._, "> ~ \ -~\Q' f.~ . ' t~' '"·~~~:;"';~'·~ . ) ..or:~ 4 ' ,'fr!: ;::f~;~.~~!~f!J'•Ji 2~ . UNDER RULE 12 OF GCDR 1999 ~,·!}~(.)~~,\~:{, '!,.;: (Under Rule 7(A) of M.M.C.R., 1966

.. ,....., ·.~., · "''" • • J ..... '!, • ·' ~ ......,.~... ,.., ...... , \·:~;€'-:-;-t'~~OTHERTHA~FULLY MECHANIZED "B" CATEGORY MINE

. '·:. ~) ~ f' GOVT. REVENUE LAND

OF

Sri B.Jaya Chandra Reddy, S/o B.Mahananda Reddy,

D.No.13-881-10, Maruthi Nagar, Tadipatri Town,

Ananthapuramu District, Andhara pradesh State.

Mobile: 9959985799

APPROVED

Prepared by

G.ESWAR REDDY M.Sc.,B L., RQP 1 Geologist,

RQP/DMG/ AP/07 /2014' IBM/RQP/HYD/302/20 13/ A'

D.No.13-2-155-l, Shirdi Nagar, ANANTAPURAMU 515001.

Mobile:09849132789.Phone No: 085554 222737. Email :[email protected]

saigeoservices @ gmail.com

SEPTEMBER-2017

Page 3: Fromenvironmentclearance.nic.in/writereaddata/District/... · favor of Sri B.Jaya Chandra Reddy for a period of 20 years subject to submission of Approved Mining Plan within a period

(

l

l

I ~),.:,-, .. ,. "'\ •.\.,t-1', , • .,~ -. '

.•--\ :\\.¥·~~-:::-- . ' ..... /"It'• "~;; ..,:,• 1.-' • '- ..... \ f..._ /. / •U .---- '• ,..', (!;)\,

/f.;-\'f~/· ,.f;' . -~\.;-"'~iS· DECLARATION .. ) ·t ..... · ...... . ,, . \ ·~ ·- ·~'

, 1 (I , • ; ~-' -';;. . ,. ~ <,- -i}'

t;';~ Tli.iS.'f.IJI~~8!:~;~1f~orlf.(uarry lease applied area for Black Granite over an extent of

\;\.1::~Jal:l~~~h:· ''""'· No.131/16 of Gotukuru Village, Kuderu Mandai,

'~·~~~~r.l\:: ' rict, Andhra Pradesh State, prepared In consultation with me $..,.~ ........ -~--~ a d!.l:i!~f.s d its contents and agreed to implement the same in accordance

of APMMC Rule 28.

Date:01-09-2017.

!>lace: Anantapuramu.

CERTIFICATE

This is to certify that Mining Plan in respect of quarry lease applied area for Black

Granite over an extent of 1.918Hects. In Sy. No.131/16 of Gotukuru VIllage,

Kuderu Mandai, Ananthapuram District, Andhra Pradesh State, prepared by

G.Eswar Reddy Consultant Geologist & RQP from "M/s.SAI GEO SERVICES"

Office at Anantapuramu. The applicant agrees to follow the same in accordance

to the provisions of law.

Date:01-09-2017. Signature of the Applicant

YL . ~CU-~ Q~ csri B.Jaya Chandra Reddy!

Place: Anantapuramu.

Page 4: Fromenvironmentclearance.nic.in/writereaddata/District/... · favor of Sri B.Jaya Chandra Reddy for a period of 20 years subject to submission of Approved Mining Plan within a period

( ~------------------------------------.

,

\

' '

(

~l-~ A"?.;;;:"~ • '- / ~ " 11 '/ " ,~ ..... _J ' ,-...:. ~L. {,..·. (.: ~"" ... .;-:- ~·'4:S

!.~- ~::--........ _ :' t· .,, I ~,. . .,,:·'l- ·'"'~ I ' "'1. { ,:,.. ... , ''._"!, 01 i . ' .. ' } ':."'.. .. \ \ .. _ ...-,

~ I HI -:•·, •?~.> \\< -: ~~t 1 .. \ •j l; • - \ • ' . • .,. c;,t;·J, ·.1 ~-- ..,. I· • \:"' '\ .• L '':) \~ ,. ,, -~··::...· • ...-,....=- .. .:.. '\ • ~- • '•..:...:;:,\" ~ .L'· "':._> \

" -''\.":. • './ A.,. , ...... ~-'}/

CERTIFICATE

' . I~' 'e?f The pro¥isionid >f..:·GFaArte Conservation and Development Rules 1999 & APMMC ·\,,, , .. _;

Rule 28 observed in preparation of Mining Plan for quarry lease applied area for

Black Granite over an extent of 1.918 Heels. in Sy. No.131/16 of Gotukuru

Village, Kuderu Mandai, Ananthapuram District, Andhra Pradesh State.

Wherever specific permissions are required the applicant will approach the

concerned authorities.

Certified that the information provided in the mining plan is correct to the best of

my knowledge.

Date:Ol-09-2017.

Place: Anantapuramu.

Signature of the RQP

~!2_ ( G.Eswar Reddy)

(j, 1':5\VJ!.R :"..EDDY. M.Sc,~J..Pb.ll, Recognosed Gtlologost

IBM/RQP/HYD/30212013/A RQP/DMGIAP/07/2014

Page 5: Fromenvironmentclearance.nic.in/writereaddata/District/... · favor of Sri B.Jaya Chandra Reddy for a period of 20 years subject to submission of Approved Mining Plan within a period

\ I ~I ' INlR\,tJ.UJ,< I ~flt1- GENERAL )L \ ' to.CAJ?$' . JIVACCESSIBIUTY IIR·:·. :.t;>6'Mfls O'f '~P

1 GENERAl. DETAILS OF APPLIED AREA

2 GEOLOGY & EXPLORATION

3 MINING QUARRYING & RESERVES

4 MINE DRAINAGE MARKET ANALYSIS

5 WASTE MANAGEMENT PLAN

6 USE OF MINERAL AND MINERAL REJECT

7 PROCESSING OF ROM AND MINERAL REJECT

8 OTHERS

PART- B

PAGE No. 3 1 2 5

5

5

10

14

14

15

15

15

PROGRESSIVE MINE CLOSURE PLAN 1 ENVIRONMENTAL BASE LINE INFORMATION 17

2 ENVIRONMENTAL IMPACT ASSESSMENT 17

3 PROGRESSIVE RECLAMATION PLAN 21

4 MINED OUT LAND 22

5 TOP SOIL MANAGEMENT 23 6 TAIUNG DAM MANAGEMENT 24 7 DISASTER MANAGEMENT AND RISK ASSESSMENT 24 8

9

10

11

PLATE-1 PLATE-2 PLATE-3 PLATE-4 PLATE-S PLATE-6 PLATE-7

CARE AND MAINTENANCE DURING TEMPORARY DISCONTINUANCE TIME SCHEDUUNG FOR ABANDONMENT

FINANCIAL ASSURANCE

CERTIFICATE

LIST OF PLATES LOCATION CUM KEY PLAN LEASE SKETCH SURFACE GEOLOGICAL PLAN GEOLOGICAL SECTIONS YEAR WISE WORKING PLAN & SECTIONS CONCEPTUALPLAN & SECTIONS ENVIRONMENT PLAN

LIST OF ANNEXURES Photographs of the Area.

~ 1:50000

24

24

26

26

1 cm=1 Chains 1:2000 1:1000 1:2000 1:2000 1:5000

ANNEXURE- I ANNEXURE - II Copy of the notice No.18336/R4- 1/2016, dated:13-07-

2017 of DMG, l brahimpatnam. ANNEXURE - III Copy of the RQP Certificate.

Page 6: Fromenvironmentclearance.nic.in/writereaddata/District/... · favor of Sri B.Jaya Chandra Reddy for a period of 20 years subject to submission of Approved Mining Plan within a period

(

PRE - F~LITY / QUARRYING OPERATIONS & MINING PLAN FOR BLAqJS~~~J!.E-~VER AN EXTENT OF 1.918Hects LOCATED IN SY. _/-?,P:.13:l:.fl;~,,~~- GOTUKURU VILLAGE, KUDERU MANDAL,

/'::\ -:<.::-:·-~~~~-4fURAM DISTRJcr, ANDHRA PRADESH ( .l ( ·'' ·j(- '!''' '·' '\"1 ,. ~; .. ¥". •• .... , ~:.~· ("'1}-.. ~ 1 I' 'I .,-: •• ·- ~~- .. ,. ·~ • . APPLICANT· 'l ··\ I ~ ''l'rt:--•1.), ~ -i • \: 1{ ''-'....' -::ii/. 'i~~ Sri B.Jaya Chandra Reddy

1. \iN'I'AQD~C f "'l sii~e~~~~ Reddy has filed an application for grant of Q.L for Black

Granite over an eJ'ttent of 1.918 Hects, in Sy .No.131/16 of Gotukuru(V),Kuderu(M),

Ananthapuram District in the office of the Assistant Director of Mines and Geology,

Ananthapuram on 18·08-2016.

I he Assistant L>1rector of Mines and Geology, Ananthapuram submitted

proposals recommending for grant of quarry lease for Black Granite over an

extent of 1.918 Hects,in Sy.No.131/16 of Gotukuru(V), Kuderu(M), Ananthapuram

District.

After careful examination of the proposals of the Assistant Director of

Mines and Geology, Ananthapuram It is decided In principle to grant a Quarry

Lease the Director of Mines & Geology, Ibrahimpatnam in principle has

decided to grant a quarry lease for Black Granite over a precise extent of

1.918 Hects, in Sy. No.131/16 of Gotukuru(V), Kuderu(M), Ananthapuram District In

favor of Sri B.Jaya Chandra Reddy for a period of 20 years subject to

submission of Approved Mining Plan within a period of 6 months from the date

of issue of notice No.18336/R4-1/2016, dated: 13·07-2017, of DM&G,

Ibrahimpatnam. as per Rule 12 (5) (C) of Andhra Pradesh Minor Mineral

Concession Rules, 1966.

The submission of Mining plan Is a pre requisite for Quarry lease as per

Rule 12 (5) (C) of A.P.M.M.C. & G.C.D.R. 1999. The proposed mining plan

covers a scientific and systematic assessment of the deposit which indicates

the details of conservation of the deposit and protection of environment in and

around the mining area. The survey comprises of Topographical Survey, Large

Scale Mapping with contours.

"Granite Conservation and Development Rules 1999" formulated by

Government of India under section 18 of "Mines and Minerals" (Development

and Regulation) Act 1957", aims• at the conservation and systematic ,..,,.,., ·J';,' ~· ~~{luthe

~:~~~:,,~~::~ ~~~:(.h\~l~i>Jw\'1 P••d .. f ...... <;{!- 2.0l~

1

Page 7: Fromenvironmentclearance.nic.in/writereaddata/District/... · favor of Sri B.Jaya Chandra Reddy for a period of 20 years subject to submission of Approved Mining Plan within a period

(

(

(

development of Granite resources of India, and hence insists on submission of

mining pi A1'J~~r.M ~y a duly registered qualified person.

,ey~~~;~~~£t~t has entrusted the work to RQP Dr.G.Eswar Reddy

for Pr;4:~f(tlon .. "of ~ )~ plan in systematic manner under provisions of

ru l~s.Vic~fr.di'rigl~, · .; ·~lmining plan is prepared and submitted under

pr~\r :i~b~~';(·G'~i/tFcii, in accordance with G.O.Ms. No.56, of Industries & ' .. \'' '- -· ./..~ ~·(,.'!

Com ·;.-~~(i;'~';(~'}l}i),~ ~: 30-04-2016. In this connection it is to submit that . { ~-----""'c . ;--

the mina ~1\i§\. repared for first five years.

This survey enables the applicant to take up the exploration of color

Granite in a systematic manner and plan for future expansion programme.

I . GENERAL

Sri B.Jaya Chandra Reddy, S/o B.Mahananda Reddy,

Name and Address of the H.No.13-881-10,

2.1 Maruthi Nagar, Tadipatri Town, Applicant Ananthapuramu District, Andhara pradesh State Mobile: 9959985799

Status of the Applicant 2 .2 (Individual/ Private Company/ Individual

Firm)

2.3 Mineral (s) which are included in

BLACK GRANITE the Letter of Intent

G.ESWAR REDDY M.Sc.,B L., RQP/Geologlst,

Name and Details of RQP/DMG/AP/07/2014,

person IBM/RQP/HYD/302/2013/A' 2.4 employed for preparing Mining D.No.13-2-155-1,

Plan Shirdl Nagar, ANANTHAPURAM 515001 Mobile:09849132789. Phone No:08554 222737.

2.5 E-Mail &. Website Email:[email protected].

2.6 RQP Registration No. &. Validity DEC-2024

. . . . II. Location and Access•b•hty

2

Page 8: Fromenvironmentclearance.nic.in/writereaddata/District/... · favor of Sri B.Jaya Chandra Reddy for a period of 20 years subject to submission of Approved Mining Plan within a period

(

(

(

(

(

(

(

(

The quarry lease area falls In the Survey of India, Toposheet No. 57 F/lO(Scale 1:

50,000) and is bounded in below Latitudes and Longitudes.

GCP Latitude Longitude ... ~. ;,:-

Jj-f.)':. •V ~ .. ~~-.·' ·~..:.'1'1:: 44' 42.1" r·/0 1 1

77 ' 30' 44.5"

"~-f_fX2 ,, ~

.... i/. ·" , .. -<·~~4' 42.6" .. ··· '{~.,\ ...... 77° 30' 46.3"

I 1~3 f . .. ···;: '). )t~f44' 41.2" 77° 30' 49.7" 7 . ' t ·· j ? r

~ ~4'_\ ' . .• . ,

/11~4' 38.9" 77' 30' 57.4" . ' . ' \, . '. \Rs : ·- . :~;:-1:~., 44' 37.8" 77 ' 30' 57.2" ..

4 ••• .,. ,~

R6 ' il.\ ·~;>14 ° 44' 37.7" 77° 30' 53.7"

R7 14" 44' 39.5" 77• 30' 49.2"

The subject QL applied area Is marked on Indian topo sheet No: 57 F/10 and

it Is enclosed as "Location Cum Key Plan" (Plate -1). The village map,

showing the Sy.No. 313 of the recommended for Quarry lease area Is

enclosed as Plate - 2. The QL applied area is located at a distance of 1.5 km

from Kammuru due East. QL applied area is approached from Anantapuramu

to Kuderu Road after 14km take right diversion at Kammuru cross by

travelling 2.2km Kammuru village is reached and then take right diversion

towards Kotanka village road after 1.75 km right side QL applied area can be

reached by travelling 1.2km towards Gotukuru road. Kammuru is located

Anantapuramu to Bellary road at a distance of 14 km from Anantapuramu

town. NH-44 Is 14km and 365 Km from Hyderabad, 220 km from Bangaluru.

The details of the area are tabulated below:

District State Village Mandai Sy. No. Extent Ownership of Occupancy

Ananthapuram, kuderu

1.918 Gotukuru 131/16 Govt.Land

Andhra Pradesh Hects

The Sketch approved by the ADM&G, Anantapuramu, in favor of Sri

B.Jaya Chandra Reddy. is given as Plate No. II.

2.7 Period of quarry lease required = 20 years 2.8 Infrastructure and Communication

3

Page 9: Fromenvironmentclearance.nic.in/writereaddata/District/... · favor of Sri B.Jaya Chandra Reddy for a period of 20 years subject to submission of Approved Mining Plan within a period

Availability of Water is available at near the Quarry site Bore Well

Water fitted with Submersible Pump. Power connections are -· y _vailable near to QL applied area. /t r·,,. Availabili~~;~ )Ci~~nnections are available up to Kammuru v illage. Electricity('' ., '/ _ . . Th~-,;e P.any will draw power lines from the vil lage. . . / ; ,.

'· .. " ' .. ':Ji ' J:v ·II ' <Te1.e~m )'nunlcation facility is available at Kammuru

Comm~~t~tJ~ .o4,.ic\- · • ~\ . ·I·' ~~i~~if ,~ t a distance of about 1.5 km and all networks

Networ \ ' , \\' ·.\} - '\:::•, - -canlfuri~:;fr on in the site area.

\•\.">-" rr~~:Wapplied area has got good accessibility to the ,~·0kt Road Netwo (f)()~J ;Ba!}g\3-fOre- Hyderabad NH-44 Road crossing at

f-Anantapuramu about 15km

Nearest Rail Head The nearest ra ilway station is at Anantapuramu which is about 15 km.

Nearest Port facilities are at Chennai, Krishnapat nam, Port Facility Mangalore and Tuticoreine. The processing of the raw

blocks is not available at the Ouarrv site.

School High school Is present In the Gotukuru village, Degree level Educa tional facilities exist at Anantapuramu.

Medical Facility Hospital facility is available at kuderu which is 5.5 km . from the quarry.

Boundaries

North Govt.Land The area surrounding 500 m Is virgin land without

South Govt.Land. quarrying operatlon.s. The existing quarry lease applied

East Govt.Land areas are to be ascertained from the Office of the Asst.

West Govt.land Director of Mines & Geology, Anatapuramu.

Further good potential exists for the employment of unskilled labour in the

existing Quarries and allied Small-Scale Industries. The area experiences

Tropical Climatic Conditions, General Monsoons are SW & NE with an average

annual normal rainfall of 506.6 mm and 719.4 Is In the year of 2009·10. The

local day temperature varies from 2s.o•c (Minimum In winter) to 47.0•C

(Maximum in summer) in the Month. Total Population of this Kammuru

Village is around 450 (Source :Census of India- 2011)

4

Page 10: Fromenvironmentclearance.nic.in/writereaddata/District/... · favor of Sri B.Jaya Chandra Reddy for a period of 20 years subject to submission of Approved Mining Plan within a period

(

(

(

(

(

(

(

'

{

(

(

[

(

c

l

(

III. Detai ls of Approved Mining Plan, if any No Mining plan was approved earlier. The Present document is for

assessment of the quarry activity, Reserve Estimation, Proposed Method of

Mining, Envi~~~~f'~~~p~ement Plan including Reclamation and

Rehabilitatio.y~?J~f.:l!lre~_..~~.~~~~opted. The Applicant will approach ADMG for

necessary ~~r-~lss,i.~~~.,~.~.·;~:~.~ 8~~. 1 rry Operations. 17~·11 ,,::.~. '" r ·~? ., )rn :-r. lf·- ~\~ '{,~:J'i'~1 r ·fJ 1 _?

PART - A \(' \ \K\<~·~--' !\': .. ·: ,. ~yr.~ 1. Gener~lr!J,e~'l[ls~~Iy;~~~ . ..P~f d area I Mining Lease: 1.1 Topogra~t.\~<.~\ X.-.:,'·

'<t{~?£qo~ The Granite quarry lease area is located on slightly elevated 372m to 390m MSL above ground level within the quarry lease area slightly elevated with 18m difference of Low to High Level. Topographical Survey The baseline Is considered from the GPS reading In co-relation with Toposheet contours, the levels were taken using total station of LEICA with 5 em accuracy covering the total area. The geo co-ordinates were fixed using the 12 channel handheld GPS, GARMIN make.

MAP DATUM: WGS - 84

Position Format hddd - mm - ss.s

Map Datum WGS - 84

Units Metric

North Reference Magnetic

Variance oo1•w

Angle Degrees

2. Geology and Ex ploration: Topogr aphy:

The lease area Is a elevated mound which mostly covered by rock boulders.

These boulders are in irregular shapes and vary In size and shape. The elevated

feature Is a result of weathering and denudation, and rise in height from the general

ground level to about 8mts from 372m to 380m MSL . The area is devoid of any

forest or tree cover. It comprises shrubs only. There are no prominent natural

drainage channels in the area. In general the area is plain studded with hillocks.

5

Page 11: Fromenvironmentclearance.nic.in/writereaddata/District/... · favor of Sri B.Jaya Chandra Reddy for a period of 20 years subject to submission of Approved Mining Plan within a period

Sometimes they may rise gently as continuous hills, presenting a rugged

topography. ,.~:-:: c-r(l.-.. ,.•. . .. ~ ", ·• •....;."· .,. a) Regional Geological sefu~):: .. : ;;;;t::!i,',.'· ·- . ··::...• ;... .. --....... ·'

The region of the sy!?Je~t a'f'~ajb~JAD'!is to Peninsular Gneiss of Archean Group. ~I~ s ' /1r '''~ 't.'•

The Regional area formsr_j~fTt ';Q~~~~e green stone terrain of eastern part of

Dharwar Craton. The gr ~lY~6r1f!'ji~~are ~~~e up of metabasalt, acid volcanic

and banded iron formatio ~xpos·~-9-~~- belts hosting hold mineralization.

These green stone rocks are 1 ' tt:o~fanitic rocks of grey, Brown and black

variet ies.

In this area the granite terrain comprises banded/streaky gneiss ranging in

composition from tonalite to qranodiorite, miqmatitic qneiss and qranodiorite qranite

with compositional variation between granodiorite granite and alkali feldspar granite.

Among these varieties of gneissic granites and dykes are suitable for us in stone

industry.

The stratigraphy of the region is given below.

Geologjcal Era Geologjcal Unjt

Proterozoic Closepet granite and its

Archean

Equivalents Peninsular Gneiss

With older Granites and

Migmatites

Schistose rocks of Greenstone

Belts and Its equivalents

b) LOCAL GEOLOGY:

Rock Tvoe

Granite variants

Migmatites

*gneisses and

granites

The Subject area belongs to small mound rising to a height of about 8· 10 m

with boulders from ground level. The Black Granite is exposed as a Boulder rock in

the centre portion with gentle slopes and Boulders are covering on top portion. The

lease area is mostly consists lot of big dolorite boulders on the surface all along the

trend of East & West. In this area the deposit is having exposures on the surface to

maximum height of 8mts from the adjacent ground level. In this lease area about 5·

6m thick material is containing small, medium size and uneven boulders with

multiple fractures and joint zones. At surface itself the ripple type and migmatite

granite boulders are exposed with a height of 6 to 8 m. however the size of boulders

varies from 4·5 m3 will be utilized for marketing after necessary dressing. The

boulders and sheet rock are available at the reef of the mound itself after 10m

depth.

6

Page 12: Fromenvironmentclearance.nic.in/writereaddata/District/... · favor of Sri B.Jaya Chandra Reddy for a period of 20 years subject to submission of Approved Mining Plan within a period

(

(

The boulders are predominantly more in wavy design granites, which are of

5x3x3m size on the mound oJ- the;_d~~~ small boulders are 3x2x2 m size are

moderately distributed on tt_sl6pe·of.~pplied area . . It •/ ·:,..·· ~·. ....... ~ ....,, QL area Is yleldl')sf' good :deP.O:<\~ '~ j~k Granite, which shows uniform in

ti l ,J / • ·<·;'"¢.1·~ -\1?1 grain size with less mafi1r ahd' r-oldely.s~ io1r)ts. Geological plan of the lease area

V1 ,\ \\,.V' ,., ·'"''0.'1 /Cii'''i is given as Plate No. III. r \,; .;·;:.;.; ·;::.!:'',/(~~0

; ' l "' .......... _ ... ....._\ '~1 1

The commerdal n-a~e::-f~z~~·., ~!'Ute Black Granite of Anantapuramu.

The rock is essent ially composed of*'I,@JW, plagioclase feldspar, clino-pyroxenes and -~

olivine are the major essential minerals. The rock is compact and moderately hard

with less joints. During Q.L. period the lessee has carried out exploration on North

c;idP of thP nrPil hy P><<"ilviltlno c1imPnc;innal hlocks.

d) BRIEF DESCRIPTION OF LITHO UNITS;

Black Granite Consists of Augite, plagioclase feldspar, clino-pyroxenes and

olivine are the major essential minerals. The Rock belongs to Archean age; The

periphe<"Y of the area is covered by soil. The main litho units expose in the area

Granite consists of Augite, plagioclase feldspar, clino-pyroxenes and olivine are the

major essential minerals, low quantit ies of Biotite with Iron Oxides are accessories.

The rock belongs to Archean age.

a) Texture and Grain size:- The rock shows which shows uniform in grain size

with less mafic and widely spaced joints and medium to fine grained texture .

b) Black and aesthetic beauty of the stone:- The fresh rock has shades of

Black, and light Green shade without white flowers. It takes good polish that Is

aesthetically appealing.

c) Hardness:-6-6.5.

d ) Mineralogical composition: - Petrologically, the rock has Augite, plagioclase

feldspar, cllno-pyroxenes and olivine are the major minerals In this rock.

Apat it e, Zircon and some opaque minerals constitute the miner minerals.

e) Density/ Specific gravity:- 2.78.

f ) Water absorption Capacity;- 0.15%(kg/cm2)

g) Porosity: - 0.35.

h ) Compression Strength:- 1969kg/cm' (In d<"Y state) and tensile strength

96kg/cm2• " The value given is based on the Physical tests carried out for

different rocks in the laboratories of the Geological Survey of India, and

published by the Organisation".

i) Abrasiveness:-6-4.5.

j) Permeability:- 0.55%.

7

Page 13: Fromenvironmentclearance.nic.in/writereaddata/District/... · favor of Sri B.Jaya Chandra Reddy for a period of 20 years subject to submission of Approved Mining Plan within a period

l

(

'

k) Rock quality designation:- Good RQD% between 75-90.

I) Young Modules of Elasticity:-The rock will not become weak in the presence

of water and also it remai~W;:~jf"~~, . /"'"''\\~_,. . ..-; C l ")

m)Degree of weathe~•,.,_9>~·~,der-"~,~,S~( Microscope:- The outer layer of

the sheet rock on · ~~~~JjPi!'.~:,.~~i'!f.:~fri~ weathering Is seen to a lesser

degree bringing it t 1

• ,~!! '~¥~1h~~~sJu~ck surface seen at the active mine is . ·\~ ~~- ·' ',g.) f:;:.. • fr

un weathered and it ~' ·~g<?rizedeoY!fa r fi'-:A' The overall classification is grade \ I (.,.- \ ._ :'-.-••• _.- )._~.._\; /j A only. (; •. '~·-,-... v "Y'

n) Glossiness:-The rock t;~~~ing.

2.2 QUARRYING CARRIED OUT Details of Quarrying Operations

Lease is yet to be granted. The Preliminary survey has been done. The

Q.L applied area does not contain any forest cover. The applied area does not

consist any wild life.

2.3 RESERVES

Geological traverses in the quarry and the study exposures In the vicinity of quarries

facilitated to access the shape and size of the deposit in the area. It is a slightly

elevated Deposit rising 10 M above ground level within the quarry lease area. The

surface of sheet rock is wavy and irregular.

2.4 Method of Estimation of Reserves

The calculat ion of reserves of prospects, deposit of mine is done at

every stage, right f rom preliminary to lost stage of explorat ion and m ining.

Based on the prospecting work carried out and the present exposure of

the boulders & sheet rock, and the observations made in the adjacent Quarry

the reserves of the area have been estimated by t he following parameters.

The proved zone is 10m and probable and possible zones are Sm each and the

recovery factor Is taken only 20% and it may vary In depth. The reserves are

estimated by the Cross Sectional Method.

Section wise calculation of Black Granite reserves are given In the

following table.

Two Cross Sections ( A-A', B-B') is drawn perpendicular to the slope direction for profile purpose. Section Area (Sq. m) x Section Influence {m) = Volume of Geological Reserve (Cu. m) 2.5 Tot al Mineable Reserves

8

Page 14: Fromenvironmentclearance.nic.in/writereaddata/District/... · favor of Sri B.Jaya Chandra Reddy for a period of 20 years subject to submission of Approved Mining Plan within a period

(

(

r

(

r

r

(

'

a) Total Geological Reserves

Sectional Production m3

~P-a Category Sections Ar~~ :" Heig " ' :' j ' ! ll

•,V9iume m•

~-R.F.

Granite Waste .... ., . ~ . .

A-A' 5~~_3', ·· 20~ l \·:1:'1~650 0.20 23330 93320 Proved B-B' 5!397 ·~ 1 ,\, 1('~1' ~~ 1fob~41 0.20 20048 80192

\...,\ ., ~ · ., .'r"' ~-~..?! ,. . ·• . , ··~/. . I ~i6891 43378 173512

A-A' 58~3\: , .. 5·..:>' . -. .. ~. 2~163 0.20 5833 23330 Probable B-8' 5897x. <:'5 .::; ~d9483 0.20 5897 23586

....... , ,9 ~58645 11729 46916 A -A' 5833 5 29163 0.20 5833 23330

Possible B-8' 5897 5 29483 0.20 5897 23586 58645 11729 46916

Total 11729 334181 66836 267344

AFTER BUFFER ZONE 224351 44870 179480

AFTER BENCH SLOPE 210753 42151 168602

The recovery of the Granite from the quarry Is 20% hence 80% waste is generated. b) Mineable Reserves

TOTAL MINEABLE RESERVES(Color Granite) Geological

Recoverable @ 20% Category Reserves

(m') Waste 80°/o m 3

(m') Proved

210753 42151 168602 Reserves

c) Life of the Quarry = 42151 m 3/ 4154 m 3 = 10 YEARS

3.0 MINING (a) Open Cast Mining

There are no public buildings, places of importance and historical monuments. However, the applicant will conduct the quarry operations duly adopting the restrictions regarding the safety measures as per the regulations 109 & 127 of Metalliferrous Mines Regulations '1961' and Rules & regulations of APPCB and MOEF.

( I) Method of Mining (Open Cast other than fully Mechanized 1 Semi Mechanized)

The Granite In the quarry lease area is exposed on the surface. Hence, it is proposed to mine the Black Granite by open cast, semi-mechanized methods, by developing the benches of 6 M height with 1.5 M bench width from top of the hillock with shallow drilling and blasting. The development of benches will be maintained @ 60° safety slopes.

9

Page 15: Fromenvironmentclearance.nic.in/writereaddata/District/... · favor of Sri B.Jaya Chandra Reddy for a period of 20 years subject to submission of Approved Mining Plan within a period

(

(

Therefore, mmmg operations are to be carried out in this area In 2

stages. ;:>St":"i·':'Tm:: -1) Development :--)~~(f:J~/I;,i>~~ 2) Production _l./.· .,_... .. ~~~(' .

r:~~' . ; ~~ '~;;._~'/. ... \.:.· Stage - 1 \I~, ' . .•. ,~,~:.\ ·. The removal of bi

1 ~~z~i a~<i'-~ .. .., :r J~~. boulders will be cleared in the quarry lease area t~e:'fjrst fl~ ~a~~:by using excavator. The Hard Rock e ,C?sed>w[l~5s'' u»jected to drilling, blasting and splitting from motherr~· 7:·~9<;5') Stage-2 ~

After removal of weathered and Semi Weathered Rock under sized boulders. The quanrylng will be followed In the form of linear cut method. This involves

loosing of thP. rrimi'lry hlor.k from mothP.r rnrl<. HPnrP rrimMy rutting will bP.

done by line drilling method where close spaced parallel holes along straight

line will be made. Line drilling method is used for separation of primary blocks.

i) Once the free face Is developed in working place, the primary cuts are taken

up over a maximum length of 10 mtrs to a width of 3 mtrs and to a depth of 6 mts

depends upon the joint; availability. These dimensions are confirmed as for field

studies. Primary block will be cut into secondary blocks by Jackhammer drilling and

wedge cutting and this block will be dislodged from in-situ position by an

excavator.

ii) Line drilling method will be used for cutting the primary blocks which

involve drilling and blasting.

iii) The holes are charged with low explosive cartridge like gun powder and

non-delay detonators for smooth blasting.

lv) The use of delay detonates causes fragmentation and cracks In rocks. The

non detonating cords are Inserted into the holes and the holes are stemmed

with muck and plugged at the mouth and fired.

v) Thus the block will separate from the mother rock, which is pulled off from

the face with cranes or shovel.

Drilling Drill holes of 1.5 - 6.0 M depth will be drilled in a staggered pattern at 2 m interval: i) Drill hole Diameter 32 mm up to 1.5-6.0 M long

ii} Depth and Inclination of drill hole Generally drilled vertically in an alignment, drilled.

iii} Explosive Type Delayed detonators with cartridges.

10

Page 16: Fromenvironmentclearance.nic.in/writereaddata/District/... · favor of Sri B.Jaya Chandra Reddy for a period of 20 years subject to submission of Approved Mining Plan within a period

(

(.

l

l

(

(

l

l

(ii) Production Proposed for the first five years In the present area there is of quarries of different sizes. As recent

rules and regulations APPMC, all Quarries should follow

Mining Plan , EC, CFE _that DMG issuing the permission

p~::~~TI~:,~!;~~~~;~;~G:;.r~[lite during first five years plan period with an •e ' of 4154 m3 from an area of

It is proposed to

9169m2. Two benches or-.bm ;[f~~:: & 3rd years & 2m in 4th and 5th

developed during the plan period from

top of hillock to depth of previous year workings successively.

The 80% Waste is generating in general in Granite quarry@ 83088 m3.

The Applicant proposes to take up quarrying operations in Westem side of

quarry lease applied area. The excavation activity will be taken up in middle

top of the quarry lease applied area and then cont inue moves to East.

l 5'Year

In the first year mining will be carried out in the West of the quarry lease

applied area after leaving distance from buffer zone covering an area of 1409

m2 two benches of 6 m height will be formed.

The mining advances East wards. An area of 1409m2 will be excavated

producing 3164m3 of Market Grade Granite.

z•• Year

In the second year the mining will continue towards East of 1st year workings

covering an area of 1385 m2 two benches of 6m height will be formed.

The mining advances East wards. An area of 1385 m2 will be excavated

producing 3107m3 of Market Grade Granite.

3'0 Year

In the third year the mining will continue towards East of 2nd year workings

covering an area of 2008m2 two benches of 6m height with bench width will

be formed.

The mining advances East wards. An area of 2008m2 will be excavated

producing 4570m3 of Market Grade Granite.

4th Year

In the fourth year the mining will continue towards East of 3"' year workings

covering an area of 2007m2 two benches of 6m height with bench width will

be formed.

I I

Page 17: Fromenvironmentclearance.nic.in/writereaddata/District/... · favor of Sri B.Jaya Chandra Reddy for a period of 20 years subject to submission of Approved Mining Plan within a period
Page 18: Fromenvironmentclearance.nic.in/writereaddata/District/... · favor of Sri B.Jaya Chandra Reddy for a period of 20 years subject to submission of Approved Mining Plan within a period

b) Magazine Type and Capacit,t_.

The client does not n~e~ -aryy:~~flosive magazine. Applicant can utilize

normal Explosive De . nafi>rs-w(tt{~permissions . ';, -..-; ... ~·;-;--, . . ~ '· I .. jo~.~-~ .,· •·

Smooth blasting t ~?~!?'~t.~·f';.~~t,\ s.pecial explosives and silent non

explosive demolish p,\a~p}~~e used. An area is not demarcated

within the lease are f,Or:po'f;ta~.Qazine. This site is located at a safe

distance from the qua~'>~~~-?t·~ering to the rules and regulations , ·i;@)v . laid down for safe storage 'iinna~d l ing of the explosives as per the

explosives act. The applicant at the moment is not In possession of

blasting license. He will apply for a license as and when it required.

c) Stack Yard Temporary stocks will be maintained on North West side of applied area; entire ROM (Run of Mine) will be cleared within days (I.e. 10 to 15 days).

d) Handling of blocks within the quarry Blocks are separated from mother rock by excavator and the slope of the ramp is gentle.

e) Transportation of Blocks from quarry to yard and to Destination The rough blocks in the mine area will be handled by using excavator and transported to destinations by trucks.

4.0 MINE DRAINAGE

The general direction of ground water flow is towards NE. The areas of

Gotukuru form a part of the Mid Pennar River Basin. The height of quarry

ranges from 372 - 380 m above MSL.

Ground water table is 100 m bgl in the surrounding areas. The mine lease is

on little elevated area max. mining depth is 25 m I. Hence ground water table

will not have any Impact due to the mining operations.

5.0 WASTE MANAGEMENT PLAN (SOUD &. UQUID)

5 . 1 Solid waste for the first five years

80% Solid waste of rocks 83088m3 is generated In this Granite quarry.

5.2 Dumping Site Particulars

80% Solid waste of rocks Is generated can be used for the development of

Internal roads and dumped in Dump Yard in South side of QL applied area, So that

dumping site is proposed in North side of the quarry applied area.

5.4 Liquid Waste

Mine Drainage:

The drainage system of mine in this area consists of surface run off generated

from rain fall and seepage.

13

Page 19: Fromenvironmentclearance.nic.in/writereaddata/District/... · favor of Sri B.Jaya Chandra Reddy for a period of 20 years subject to submission of Approved Mining Plan within a period

The water that will generated in the mine pits will be pumped out for the _ _,__ benefit for agricultur~dSexisf\Rg,,around.

a) Run off from waste,{~~~;;a"r,i~as'~res proposed to arrest run off:

Rainfall over the qu ff.Y-~·~~~::·~:~!?J,.~l~t~if,,affected different by waste dumps,

mine pits roads etc. 1.~f. ~~~{~~~t~:~~J~~~;;to small rallies and there by a lot of

runoff is generated il(::~.~~i·~~:~~t~ Some cases The following measure

proposed to arrest su ~~~~~·~~· • Garland drains around ~~~ump • Retention wall at the foot of the dump

• Check dam construction against drainage channels to arrest silt.

• Growinq veqetation on the slopes of the dumps.

b) Excavation drainage ditches all around the quarry to direct surface drainage:

Garland drains proposed around pit to divert the run off In to natural drainage

channels.

c) Utilization of run off for general surface use or discharge in to surface drainage

networks only after meeting with prescribed discharge standards and further

the agricultural purposes on the surface.

d) Surface run off general during rainfall event cannot be ut.ilized for the general

use, hence through the garland drains proposed run off will be diverted in to

drainage network. Napa slabs mines or dumps have no pollutants or toxic

substances; hence, no contamination is expected, except siltation.

e) Treating waste water to obtain the desired quality for industrial use as may be

required:

No industries exist in the vicinity of the quarry lease area. Hence, no treatment

Is required for the run off.

6.0 USE OF MINERAL AND MINERAL REJECT

The district has significant resources of Granite. Black Granite blocks can be

used for Const ruction purpose as flooring material and wall tiles. Some blocks

are used as decorative stones of monumental purpose. Waste Crushed stone

or 'road metal' is used in landscape design and gardening for gardens, parks,

and municipal and private projects as a mulch, walkway, path,

and driveway pavement, and cell infill for modular permeable paving units. As

mineral mulch its benefits include erosion control, water conservation, weed

suppression, and aesthetic qualities. It is often seen used in rock gardens and

cactus gardens.

14

Page 20: Fromenvironmentclearance.nic.in/writereaddata/District/... · favor of Sri B.Jaya Chandra Reddy for a period of 20 years subject to submission of Approved Mining Plan within a period

7.

8 .

(

Processing of ROM and Mineral Rej ect ~--·..._,

No processing is req~i ~:t:>nl)(' ,ollressing of the rock and screening to the ,..._..- ·· ~ ftr. ·

required sizes as per. )1,7-'m.ar;i<.e"t.:aii.JI:i(nd will be produced.

Others .'Q/ /'· .. · _;· ;~-7~' , J~':':; \ ( ) S 't s . c.; . ': :, '/"\'~~ 'l ' (;' a 1 e erv•c '-' 1 l , · .· . .,,,~ .._, ·' 1:

The Applicant is ~1)\'e'stabll~ ... t~'" - 1s.:l:~uarry Operations since long , So ~ \ ._ l i __ A r

Permanent Office, R '}~q_~~~;' F\r. .i'!ii>om, Shelters and Water for drinking

will be provided in the ~~~n make shift arrangement.

(b) Employment Potential

A total of 22 persons shall be engaged to carry out the various operations at

the QL area. The man power required for the mininq operations shall be as per

Table given below.

s. Category

No. of No. Persons 1. Foreman 1 2. Supervisors 1

3. Excavator and Tipper

2 Operators

4. Helpers 6 s. Drill Operators 6

6. Compressor

2 Operators

7. Unskilled Labor 4 Total 22

(a) Machinerv Deployed : The Proposed machinery ut ilized during the

working period in QL applied area were as follows.

list of Machinery in below table:

S.No. Name of Machinery No. of machinery Power

1 TATA HITACHI350 2 246KW EXCAVATOR

2 WATER PUMP 1 S.OKW

3 GENERATOR 1 125 KV 4 LEYLAND TIPPER 2 100 HP

5 ATLAS COMPRESSOR 2 116 KV

6 JACK HAMMERS 6 ..

7 WIRESAW MACHINE 2 60HP

15

Page 21: Fromenvironmentclearance.nic.in/writereaddata/District/... · favor of Sri B.Jaya Chandra Reddy for a period of 20 years subject to submission of Approved Mining Plan within a period

(

(

(

(

(

(

l (

l

(

8 .

I)

ii)

iii)

iv)

PART- B pROGRSSIVE MINE CLOSURE PLAN

ENVIRONMENTAL BASE UNE !J:lfORMATION . ,.,c.. . Existing Land Use Pattern .. :(' :kj" . · · · ·

1' ~().. ·~· .. . The Quarry area belongs tp_·>~el,~,me~t apd it is not being used for any

other use except for grazing' . • ·,· 4:~ .. ~ ·~:~ ·1 ;' · . .. · ,:~; o/'\. • • . 1 ,.

• : . i. I ' '"' • •• '· " • t\ · ._, W t R . . • ·' ;.. ·~ : ,,· ... :· .

a er eg1me . ~'9,·-:-~~- .'-· ... · The rain water flows throJgli t~~~opi[~J>f.th~·:area and drained off through a

seasonal nalas. There are ·.:.;~~~t,1fiv'a~~r sources in and around the -~\JQ()I . ··.: ·

applied area with soom radius. ""='::...:--

Human Settlements

The following villages are within Skm radius In the applied area. The

population, distance and location of these villages with respect to Applied Area

are given In the following table.

S.No. Name of the village Populat ion Distance Directions In km

1 Kammuru 400 3.0 w 2 Kotanka 500 3.5 NE

3 Gotukuru 250 2.0 SE

4 Bramhanapalle 200 2.5 South

Public Buildings, Places & Monuments

There are no public Buildings, Places of Worship and Monuments within or

near the area. Weather the area falls under the notified area of water act.

l 1974.

v) Sanctuaries and eco-sensitive areas

No Sanctuaries and eco-sensitive areas are seen in and around the quanry

lease area.

vi) Flora and Fauna

The subject area is rocky terrain and does not consists any trees or major

vegetation. Excepting for the presence of replies and other minor wild life like

rabbits, fields etc., no major wild life exists in this area.

16

Page 22: Fromenvironmentclearance.nic.in/writereaddata/District/... · favor of Sri B.Jaya Chandra Reddy for a period of 20 years subject to submission of Approved Mining Plan within a period

r

(

(

(

r

2.0 Environmental Impact Assessment

A. Landscape changes

During the first 5 years g16gm2 of the q_uarry lease area will be reduced by 6m.

The quarrying will alter the shape o . ~Jqn_q with a large sliced pit. '/. ~v·

Aesthetic Environment ,1 ' ,!(q.SJ', · ~ .

i ' . . ~ ~ . .. . There is no aesthetic envirdni;ne' w.;!vai[ing in and around the quarry lease

\

l,r' '~/jj:,':O!,• ' area I ! . _ • .,. ..;...~ t'-j •

. to - ..t;v ~ ··' . \ ~,fr,.::;'<:; I .

Soil and Land Use Pattern ,,· \1\~'\ 'i'/1}Y./, The Q.L area does not have ah,y'~·cGiiji'r. However some top soil will be

available between the slabs. '~'\!.~~-~ _;.: . (b) Air Quality in Environment

The area is surrounded by Agricultural lands and there are no industries nearby. Hence natural air is available In this area. There are chances for air pollution at the time of Jackhammer drilling and at the time transportation of Mineral and waste. But this air pollution will be controlled to the ambient air

quality standards (24hours) i.e,= S02 =120ug/ m3, NOz = 120ug/ m3

, Suspended

Particulate Matter (SPM) = 500UG/ m3• Respirable Particulate Matter size < 10um)

(RPM) = 150ug/ m' , CO= 5mg/ m 3 by keeping dust collector at the jackhammer drilling site. The mine roads will be sprayed with water, before starting the transportation of Mineral and Wastes to minimize air pollution. (c) Water Quality

There are no chances for changes in quality of surface water or ground water the quarry operations will be carried out on slope of the rocky terrain. No water course is passing through the area excepting run off streams during monsoon.

The quarrying of Granite has no adverse effect is ant icipated on the water regime in the area.

IS 10 500 - 1944

S.No. Characteristic Desirable Maximum Permissible

Limit Limit

1 Black 5 25

2 Odour & Taste Un Objectionable

3 Turbidity 5 NTU 10 NTU

4 pH Value 6.5 to 8.5 No Relaxation

5 TDS 500 mg.per

2000 mg. per ltr. ltr.

6 Total Hardness 300 mg.per

600 mg. Per ltr. ltr.

17

Page 23: Fromenvironmentclearance.nic.in/writereaddata/District/... · favor of Sri B.Jaya Chandra Reddy for a period of 20 years subject to submission of Approved Mining Plan within a period

(

(

r

(

(

(

(

(

r

t

'

(d) Noise Levels In the quarry, the machinery operations like jackhammer drilling

compressor and excavators ~e~erat~ sound pollution. The sound level

should be within the llmlt;:~o~)£:l_~,~: :To minimize this sound pollution within

the permissible limits, t~1et ~-~~~-till be operated at different places at

different t imes. The ~ound 1 m~~:t~~f;.; can be reduced by conducting

periodical maintenance~? ,t,~j\~~!~~~ipment. The permissible limits of

noise are given below·- \'' (\~·-,~f ..,...•;,· Permiss given below:

. . · -~·'· "'' " - -·:'(' . . ible noise exposure 'f~~l7~?i:.:~eri_od of time is

Duration per day (Hrs ~und level dBA 1/8 115 v. 110 Y2 105 1 100 2 95 4 90 8 85 16 80

(e) Vibration Levels The vibrations may not be caused due to shot hole drilling and since the

operations are only for short duration. The impact of vibration will be

negligible.( Vibration tolerance limit prescribed In DGMS circulars is 6922-

1973).Where maximum allowable limit of 70mm/sec. For soil and weathered

rock 100mm/sec. For hard rock as the peak particle velocity for safety and

design of the strata's.

(f) Water Regime

Mining Operations will be carried out on the slope of the Rocky terrain.

Hence neither ground water table nor the general surface drainage pattern Is

affected.

(g) Acid Mine Drainage

Not Applicable

(h) Surface subsidence

Not Applicable

(i) Socio Economic Environment

The local inhabitants of the villages In surrounding villages of the mine

area is Agriculture. The mining activity in this belt will benefit the locals both

directly and Indirectly. The directly beneficiaries will be those who get employed

in the mines as skilled and un-skilled workers. The indirect beneficiaries will be

18

Page 24: Fromenvironmentclearance.nic.in/writereaddata/District/... · favor of Sri B.Jaya Chandra Reddy for a period of 20 years subject to submission of Approved Mining Plan within a period

(

('

(

(

(

l

(

(

(

r

c

(

those who open small business to sell goods required by the residents whose •

Per Capita • income will be enhance~y .the mining activity, and thereby their

purchasing power will be increas~':.-the l~ng run a lot of social goods Is

expected in the comparatively ~~~"~1!:~. when the inhabitants will be able

to sent their children to school I,. ,-:) ·}:"' ;,~,, ~ ,_ '· '..J i .. . ... ~ '•· ' j

Positive effects: I,,, \' \··'~';;,.~'., \• ti.l ,. "~'<'/' ' 1. The locals get the employmJnt\$§me'p~r~rl? ar_e found to be buying trucks

\ ':,~~·,.') . . "·t,f\-;' · and renting tO the quarry OWners;( I(''· ' .' ' ·: '/ . ..,' .'

'"."\.'' ·-·- <.

2. The locals get some job opportu~lti~~-laru:h!'specially the skill levels Increase

due to their exposure to the machine environment.

3. Due to higher earnings their qeneral status of livinq improves.

Negative effects:

1. The dust if not controlled can harm the inmates.

2. The worst problem is due to dust generated during transport and the main

roads can be seen with this menace.

3. The rate of truck transport has Increased the rate of accidents to locals and

the area Is found to have increased number of accidents due to careless

driving.

4. Although the higher Noise levels may not harm persons working In quarry,

they will face the problem on a longer run.

(j) Occupation Health and Safety

The quarrying in this area does not involve any hazardous methods. The

quarrying is simple and open cast mining method. In this, the possibilities of

small injuries are anticipated. The Applicant is providing First Aid facilities at

quarry site and Office room.

This also consists of issuing PPE (Personal Protective Equipments) to all the

persons working, and those that are needed for the site specific operations.

The following PPE are proposed to be distributed.

• Helmets once in t hree years as needed under Mines Act

• Safety shoe to all the employees twice a year as per the same statute.

• Safety goggles to the Drill operators and Crusher operators which is a

site specific requirement.

• Nose masks once two months (Actually these are the cotton thin towels)

• Other step to improve safety conditions is to inculcate the safety culture

among the persons working.

19

Page 25: Fromenvironmentclearance.nic.in/writereaddata/District/... · favor of Sri B.Jaya Chandra Reddy for a period of 20 years subject to submission of Approved Mining Plan within a period

(

(k) Historical Monuments No historical monuments are located in and around the lease a rea. ( !)Bio-Diversity 4~~ Agriculture .~;~.f:c:. ·· _ The quarry lease area is an ciP,eT~t.iQg . mine and far away from agricultural

. . / h ' . . • lands. Therefore, there Is rio adv~ti-f~'frect.on agriculture.

;..-r-.. ·- •

Forest \.-·. \ ~;::\~}l· ~ The quarry lease area Is n~h~·l'(r~~g;~.est zone. (However, the Applicant

is proposing to undertake aff'o'r~~~~{Cirea). Vegetation ~-The quarry lease area has operating mines, with an exception that, small

ch rub~, herbs and thorny bushes have grown along the interspace~ of boulder~

and joints where some soil exists.

3. Progressive reclamation plan

The quarry lease area is just elevated 24 m above MSL. Reclamation Is not

required In the life of the quarry as there is mineral deposit In depth that is

under operation. During first five years the progressive reclamation plan is not

given.

4 . Mined Out Land No mined out land will be formed during this Plan period as mineral is

exist ing much below the proposed workings during this pian period.

The land that will be broken in the successive conceptual periods (the Life of the quarry is ant icipated to be 53. years as of present),

LAND USE The on-going mmmg and the downstream activities have covered the lease hold for about 1.2821 Hectares as detailed below:

1 Working Pit 9169 m2 0.9169 Ha

2 Dump/Stock Yards 1927 m2 0.1927 Ha

3 Buildings 225m2 0.0225 Ha

4 Ramp Area, Internal

Within the Quarry Road Ways

5 Green Belt 0.1500 Ha

6 TOTAL 1.2821 Ha

20

Page 26: Fromenvironmentclearance.nic.in/writereaddata/District/... · favor of Sri B.Jaya Chandra Reddy for a period of 20 years subject to submission of Approved Mining Plan within a period

Proposed for reclamation of land affected by quarrying activity during

and at the end of mining A('\f';-·· /.?O~r.- .

No reclamation Is envisaged,(.!!!. :tmf\..jfe .. of the quarry as there are adjacent ,, ,~~-·~

quarries that are operation ;fth i.~~~~~)l be dealt while the cluster guidelines

are received. Hence, no re1~Tii¥9foi.:@IB_sals are made.

Plantation Programme ~·.\1;~-~',if:':i~'i The quarry lease area is sca\ttJ-'~~i:~f..plantation as entire area Is rocky.

~- h''-~c-~,-;~·'(': There are absolutely no chanc~ _ ,ny··tree growing in the quarry area.

However it is proposed to plant~·ifees in the nearby village area In the

place shown by the village panchayat. The details of proposed plantation are

shown below.

Details of Year wise Plantation Plan

Year Planned

Location of Plantation Type of Plants Remarks Plantation

l"Year Five in buffer & Five in Neem, or

10 village or road sides Mango, or

Pee pal

2 .. Year Five in buffer & Five in Neem, or

10 village or road sides Mango, or

Pee pal

3n.t Year Five in buffer & Five in Neem, or

10 village or road sides Mango, or

SO% of Peepal

Neem, or survival Is

4"' Year Five in buffer & Five in envisaged. 10

village or road sides Mango, or

Pee pal

51"' Year Five in buffer & Five in

Neem, or 10

village or road sides Mango, or

Peepal

Five in buffer & Five in Neem, or

Total 50 village or road sides

Mango, or Pee pal

All around the quarry that is in the buffer/safety zone of 7.5 meters as per AP

PCB and MOEF rules, around the quarry attempts will be made to grow plants

with local arrangement of drums filled with mud. Thus it is envisaged that

around 10 plants will be planted and taken care of In one year. Thus the area

available around the periphery will be sufficient for around 15 years.

Although the area in general is fertile the location where the quarry Is situated

is totally rocky. Expect for some wild growing medium sized plants that grow

in the cracks of boulders; there are no notable species in the area. However 2 i

Page 27: Fromenvironmentclearance.nic.in/writereaddata/District/... · favor of Sri B.Jaya Chandra Reddy for a period of 20 years subject to submission of Approved Mining Plan within a period

r

s.

trees like Neem, Ashoka, Mango, and local species Peepal are found in and

around. Therefore these three sp~i!lS are planned for plantation. Maintenance //,(~.,...

of these plants that are gro~rl' i~ft._. e buffer zone will be taken care by the .6 ~" •

quarry management. The p~ll~~-~f~lll be grown In the village will be taken

care by the management, i? -c?o[pilftit~..,w. ith the panchayat members.

Top soil Management \ ,_ : ,,\ .'\};::-:/·.

The Q.L area have any top ~{I_ 2~.;~~f'~\er some top soil will be available

between the weathered zone.~"'f:«rtile.s~ii'C!vailabl e will be used for ... -;x!\11 · ~

plantation around site services and'1!ft-alorlg the road. Soil mixed with boulders

is unfertile which will be used for laying roads.

6. Tailing Dam Management

Not Applicable at this stage as it is progressive mine.

7. Disaster Management and Risk Assessment To mitigate the emergency, planning is the first & four most thing, i.e. recognizing the accident or possible, assessing the consequences of such possible accidents and deciding on emergency planning I procedures In advance both on site & off site that would necessary to be implemented , t he event of emergency without any delay and confusion. Proper bench design in mines and observing safety measures for transportation, storage, handling of explosives & fuels, etc, good maintenance of vehicles, roads, fire prevention measures shall go in prevent ing disaster I accidents. Quarrying shall be carried out as per MMR 1961 & Rules and regulations applicable the project in charge is having a mobile communication for quick intimation of Information If need arises. The Applicant is committed to Identify the possible causes for potential disaster and draw a code of emergency measures and procedures to deal with such disasters, which is otherwise also advised by DGMS through their Circulars. The quarry is having good communication like telephone & mobile facility. In case of any minor I major accidents within the quarry, the same will be communicated to the Agent by the Mines Manager and intern he will inform to the Revenue Authorit ies, Police, Fire Department, DGMS etc for action. A vehicle is kept all the time at the quarry site for conveyance. At quarry level first aid will provide and person(s) shall be shifted to nearby hospital at Guntur which Is having all basic amenities if in Serious Conditions.

8. Care and Maintenance during temporary discontinuance

The quarry workers are taken on contract basis on need based orders; the

workers always get Employment I Contract in similar quarries existing around.

9. Time Scheduling f or Abandonment

As the quarrying in the lease hold is active proposal of abandonment is

proposed in first 5 years period.

22

Page 28: Fromenvironmentclearance.nic.in/writereaddata/District/... · favor of Sri B.Jaya Chandra Reddy for a period of 20 years subject to submission of Approved Mining Plan within a period

\

(

l

(

L

L

(

t

(

l (

9.1 Abandonment Costs FOR THE R ~f.l'lVE YEARS

Area'{H'a)'!l i/ 9:;ontltV Expenditure

ne.m• o.mlla . . ; -,. . ' . (b)

P~a•ttet • !Pr_OPo-1 Proposed

\ . .. '···· ·;. .... , . . . . . Back filling Yes · <: ~:;: N.A

. :~ ~~-:; :.,. / Afforestation a. bock Nil '!.!:: !RuR-;- ;;.· fiRed Areo

<Xh<!<s (frecbng the Barbed Wre fence Nil N.A

Reclomatlcn l RehablhtaUon

around the QL era)

ot mined out Pisdculture Nil

land

COnverting tnto water ruervoir

Yos

Picnic Spot Nil

Tenaclng Nl

Pllchl119 Nll

Con structlon of retaining wall at Toe of Yes Dumps

SlabiliUtlcn l COnstrudlan ol Chec k Reha bltotlltlon dams

Yos

of Dumps (within k!a.se) ConstnoctiOn of g&Mand

drains Yes

Oesllting ol Httting Yes

ponds, d\loi\Mts

Atrorestatton on dumps N •. A

Others (please SpecifY)

Rehabilitation Green Belt 0.1500 1125 m' Rs. 35,000 of ban-en ..... wlttUn Luse <Xh<!<s (Please Specoty)

Ambient air queloty

Water quahty Environmental Rs 30,000 per

Morwcorlng Noise Level survey per Annum)

(Core zone &. (For S yeat> Buffer zono) GroundVitntJon Rs. 1,50,000)

OtherS (Please Speclly)

Total 0.1500 Rs 1,85,000

Remarks

BaclcfiJitng wil no< bo done duri119 the ftrst

nvo year plan periOd. so cost Is not included,

No cost is Involved tor converting the quarry

pit Into a water H6Nestl119 S!Tuc:tUre/

Pisc:lcUI\lJre tank. As the pits gets tllled durlll9

ra1ny per10dS and rtse In the water table Jr ony In

the a rea

23

Page 29: Fromenvironmentclearance.nic.in/writereaddata/District/... · favor of Sri B.Jaya Chandra Reddy for a period of 20 years subject to submission of Approved Mining Plan within a period

(

(

(

{

(

t

(

l

l

(.

(

(.

(

(

,. f t:'.'."· .. -~,~~­j,/1-,.·, ... ~

It t.'li .. ~,· ' , .. . ' . .;,,.."';- -:. ~ '\,"'· ' '·. { , IN;...f.c, V t • •: .• ,..§ .. '~':_· I •

10. Financial Assurance: Not agpltcabl' ~:..;.,~~~AI I ~. .. '-'~'"'. .,... c. ~ot'" 't;\.'" •

\ . ·...:_·rt;.:· ~.; 11

'1 ~:~:~:t~at the above men~~~~~en care In the Mine

Closure Plan for Black Granite over an extent of 1.918Hects In Sy. No.

131/16 of Gotukuru Village, kuderu Mandai, Ananthapuram District,

Andhra Pradesh State.

All statutory organizations, courts etc. have been taken into

consideration and wherever any specific permission is required, the

Applicant only will approach the concerned authorities.

All the measures proposed in this closure plan will be Implemented in a

time bound manner as proposed.

11.2 PLANS & SECTIONS The plans and sections are enclosed.

APPUCANT

il j;x:::=.~~ SIGNATURE OF RQP

~) G.Eswar Reddy

RQl' /GEOLOGIST, RQP/ DMG/ HYD/ 07/2014, RQP/IBM/HYD/302/2013/ A,

G. ES\ , ., - .f.D[W Sc 81. PI.A,

Recoglused c.~ log:st IBM/RQPIHYD/302/2013/A

RQP/OMG/AP/07/2014

24

Page 30: Fromenvironmentclearance.nic.in/writereaddata/District/... · favor of Sri B.Jaya Chandra Reddy for a period of 20 years subject to submission of Approved Mining Plan within a period

(

(

(

r (

(

ANNEXURE· I Propo~ed;.Worklng Area

/~. ~ /. 0 ·'-· -. . ,.,.. , /.: .

I h·: •

' ••• 0(::

View of Black Granite at surface in Area.

25

Page 31: Fromenvironmentclearance.nic.in/writereaddata/District/... · favor of Sri B.Jaya Chandra Reddy for a period of 20 years subject to submission of Approved Mining Plan within a period

'

(

(

[

(

(

(

(

ANNEXURE II

/,;~~"~1\.Tf:t~ . GOVERNMENT...(,~ ~PRADESH

DEPARTMENT OF ~!t?~~; ~ltf:::S.BRAHIMPATNAM ., .. !~~ ~ :f}{i.\t/1>:~). \. '.-l

NOTICE No.l8336/ R4·1/2016 fi_A~..:f . ;_'/$~~~\ r ·l ~1 Da<ed:l3·07·2017. 1i " ' • ·· <'i!.~;1~e- I ' · · '' · 1~-t'' . • :·i0~:o.~s. r::1:..1' \\\.~~~~.~-'"~~·ttl :~- i:"' .::::.:

sub:· MINES AND QU-'\RR!ES~~isi{tibp ror grent or Quarry Lease ror Black Gntnlte ov~·~!' "'S~m: . .Of.,l.frtq_,.Hectares In Sy.No. 131/1~ of Gotukuru Village, l<,uctertl:~.fi.Qt:let'~nanthapuramu D1strict - F•lod by Sri B . Jayachani::fr;,~ "'".!lemtv.· ·\J"pprovod Mining Plan alongwith consent for Establi.s:hm.;..'l;!l.ii'Om A.P. Pollution contrOl 6oard & Environmental C leorence trom MinistrY of Environment & Forests as per Environment Impact Asses:s:ment Notification through 5.0.1533, dated:14-09-2006/ OEIA Ananth~purcmu - Called for­Regarding.

Ref:· 1 . Quarry Lease application dated.l9.09.2016 of Sri B. J;Jyachandra Reddy.

2. ADM&.G, AnDnthDpuramu Flle.No.2913/GQL/CG/2016. dt:NII received on 10.11.2016.

Sri B. Jayachandra Reddy filed on oppiieatlon for grant or Quarry Lease for Bl:.ck G~nlta over an extent of 2.000 Hectares ln Sy .No. 131/16 of Gotukuru Villogc,. Kuderu Mandel, Ananthapuramu District vide reference 1• cited. The said Querry Lease eppHcatton was received by the Assistant Director of Mines and Geology, Ananthapuramu on 19.08.2016.

Through the reference 2"" cited the Mslste.nt Director of Mines and Geologv, Anonthepuramu submftted proposals recommending for grant of Quarry L.a.;.s:a for etack Granite over an extent of 1.918 Hectares In Sy.No. 131/16 or Gotul<uru VIllage, Kuderu Mandai,. Ananthapuremu District infavour or Sri 6. Jeyachandro Reddy.

After carefu l examlnotion of the proposals of the Assistant Director of Mines and Geology, Ananthapuramu It Is decided in principle to grant a Quarry lease for Black Granite over an extent of 1.916 Hectares In Sy.No. 131/16 or Gotukuru Village, Kuderu Mondel, AncnthllpurlJmu District In favour Sri B. Jay&chendr.a Reddy ror a p eriod of (20) years subject to cubmiccion of Approved Mining PJ&n within a period of (6) months from tha date of Issue of thts notice under Rule 12(5) {c) of APMMC Rules, 1966 alongwlth consent for establishment from A.P. Pollution Control Bobrd & environmental Clearanco from Ministry of Environment &. Forests as per Environment Impact Assessment Notification through 5 .0 . 1533, dated: 14· 09-2006.

However, the approved mining plan shall a ls-o reflect the restrictions to be adopted by the applicant while conducting quarry operations due to the existence or any structures# railw&y line, rood$, w&ter bodies !!Such O$ river, lake etc., and the stipulated dis-tances as per the various Regulations prescribed under Mctoiilliforous Mines Regulatlons, 1961.

In view of t he above Sri B. leyache.ndr'e Reddy Is her"eby requested to submit Approved Mining Pion efongwlttl consent for Establishment from A .P. Pollvt.lon Control eoarcr &. EnvJronmental Clearance from Ministry of Environment &. Forests as per Environment Impact Assessment Notifieetlon through 5.0.1533, dated: 14· 09-2006 or from District Environment Impact Assessment Authority as the case may be for the proposed precise area for grant of Quarry Lease within perloa or (6) manths rrom the date or Issue of this notice duly approved by the Deputy Director of Mines and Geology, Kumool to consider for grant of quarry lease for Black Grenite. It the applic&nt fails to submit the Approved Mlnln9 Plan within the stipulated period,. it will be presumed that the applicant is not fntercsted

26

Page 32: Fromenvironmentclearance.nic.in/writereaddata/District/... · favor of Sri B.Jaya Chandra Reddy for a period of 20 years subject to submission of Approved Mining Plan within a period

/ -..-~:-. ~-- · .. . , ~ .. , ,.._ .·

In getting the quarry lease over t/)e ~ct'area and further course of action will be initiated as per the rules. ft copy ,of ~~eye~ sketch snowing the precise area of 1.918 Hecteres propos~ Jp~ gr~ry~~I'Y ~e~se in favour of the appiialnt is enclosed herewith. l t~·l. ... ,. ~~,) 1 . ::. "·. \' ,. .,...~;,'\)'/' / ..

\("\, ·.' ~· .. " '\"" ' ""-..,; -~,

' :"W • .~ .... 'ffF..,. ~·"" " ;i~ --::,· ..

"-.:~ ; ScJf- B.SREEDHAR, I.A.S End:- (As above) DIRECTOR OF MINES AND GEOLOGY.

1/ ATTESTED//

'J< 4 .. uJ:cf-.?-4raJ~ ASSISTANT DIRECTOR OF MINES AND GEOLOGY

~

To

Sri B. Jeyathandro Reddy, S/o B. Ml!hanl!ndll Reddy, O.No. 13-881-10, Maruthl Nagar, Tadipatri Town, Anenthapuram District. {BY RPAO)

Copy to the Asst. Director of Mine' and Geology, Ananthapuramu for information. Copy to the Deputy Director of Mines and Geology, Kumool for information.

27

Page 33: Fromenvironmentclearance.nic.in/writereaddata/District/... · favor of Sri B.Jaya Chandra Reddy for a period of 20 years subject to submission of Approved Mining Plan within a period

(

(

(

(

(

(

(

l

t

(

(

(

ANNEXURE III

PRADESH

DEPARTMENT OF MINES AND GEOLOGY

CERTIFICATe Of" ReGISTRATION

AS QUALIFIED PERSON TO PREPARE MINING PLAN

[Under Rule 1.4(2) of Granite Conservation and Development Rules 1.999]

••• * *

Sri ti. c·s ~VAif l?f.'DIJY. Slo G Pakkiri Reddy. Rio No: / 3-2-155-1.

Pamnanilayam. Near R. T.C. Bus Stand. Ananlhapuram. whose photograph and

si$:fUlllll<' is a.ffixed hemin ab<we. ha••ing given evidenc<: Q{ hi.> qualification and

experience is hereby grallled renewal Q{ recognition under rule /4(2) of'

Granite Conservation & D<Nelopment Rules 1999 as Qualified Person to

prepart? Mining Plan.

Regis/ration N11mber is : RQP/DMG/AP/07/201;; l This Recognition is •·a/id for a period r!f' I 0 yem:r ll'ith e,Uel'l fiwn

21.12.1014

?11is certijicllle ail! liable to be withdrawn/cancelled in the eveJI/ o.f

jill'nishing the wrong information /documents in the Mining Plan .whmilled l~v

him.

Place: Hyderabad Oate:)..'}.-.12.2014

Director of Mines ond Gcolocr/

28

Page 34: Fromenvironmentclearance.nic.in/writereaddata/District/... · favor of Sri B.Jaya Chandra Reddy for a period of 20 years subject to submission of Approved Mining Plan within a period

'" ~-1

-,-- --!• ~"'

f- l I --'-r -+--+--OOkm I Otm l.O km 40 km

. -·~ .. .. ,.!~~~ .--.

l "' • •

•· r

•'

PLATE NO-I

INDEX

~ SFtt.O.JA.YACHANDAA REDOV

~ Signature of R.O.P

0. fSWAtl ?.EOOY. II..Sc..,B.l.Ph.O..

Rteognised Geologist ISMmOP/HY0/30212013/A

RQP/DMG/AP/0712014

tHIS IS tOCCIIlln' 1""T M N'O'lwllJO'IIIIIfHI& I'V<Tf: II f!IU: N#J C:OII#IIfef fO ntE 81lfl' ()( ~E: 64lf.O vt>OH t.U.SI!' wJi ~TED ..-rrJ.te GOo'EAAMEHT

Page 35: Fromenvironmentclearance.nic.in/writereaddata/District/... · favor of Sri B.Jaya Chandra Reddy for a period of 20 years subject to submission of Approved Mining Plan within a period

I'LATENo 2

DISTRICT : ANANTAPURAMU ~--~========~--~-~~~gl~-====~~========---=====~----=======-~~~

D Quarry Lease Applied Area (for Black Granite) surveyed to Sri B. Jaya Chandra Reddy ! over an extent of 1.000 Hector in Sy No:131/16 of Gotukuru (V). Kuderu (M),Anantapuramu·~-t MANDAL : KUDERU .•

ViLLP '3E : GOTURU ;; _

VILLAGE NO : 56 ~$ FIELD NO :131/16 uf ~;-,..

rr' ., ~~;:_ b \: ':t·· ·..,:·;\ .... ~.;:"-;..

.... ~ ... :.,>:· . :...•

I APPROVEO

(Dist). \ ~ GI'I .......... Wbtm•••idaS ·- LlnMt..._.......t ....... ~> ........ ~-PI ,. .......... £17"lO'll.9 ~·

1 ., 14'.U'~.O £77"3!J'l2S • .. 14'-«'0.t (11'30'39.6 • •• ptl4"4.t'Q..S U7"30')9t •

-- -· ""' ~··•2 "' P) · Pl Ull .... , . .. . N -PI ,,...

~ vl v>-· Ta...c N • ._,.,.

u.<J:s:h/J L' ,.,.,.,.· t.w.•

D a..,., ...._. ~iod Area<~<>< Bleck O.W.te) SU'Wya:t "' Sri e. ~·a-. Reddy - ~ v-..-- h ., ,_,. d ~ 11-18 HeciD<in Sy No 131116 d GoL*~n~ M ~ (M~ ([)1St). ~

G u•-WJUOOY. • .& .,.......,...,.. ' ReeOIJ1"*M'd ~ f<l A

- .......,......_.... IBM'ROPIH'YOI3 01 - .. ROP/Ot\GIAPI07120 -- "'::· •• NI4"1U'Ut ,,.,.,., "' ..... ~<U.&' ,,.,.,., .,., ., NI4V41.2' 171"))'.t9. • ....

• ., . .. N14"4-t'JU' ,.,..,., -~ .. H1 .... 4'Stl' ,,.,..., • .... .. N1<Nnt7' • ....

•• KI#IIUJI.F ........... • .. ~ ~

11!

.. ... • • ~

••

~

' . . .. •

- ·-- . - . '

-• -·- . •

~-~· - . •

Page 36: Fromenvironmentclearance.nic.in/writereaddata/District/... · favor of Sri B.Jaya Chandra Reddy for a period of 20 years subject to submission of Approved Mining Plan within a period

TOPOGRAPHICAL CUM GEOLOGICAL PLAN

' APPROVED

Geo Coordinates ollease area Da1IJm WGS-&6

POINT~ LATITUDE LONGITUDE

R1 N14.44'42.1" en• 30' 44.5' -

R2 N14' 44' 42.6" en• 30' 46.3'

R3 N14' 44' 41.2' en· 30' 49. r -

R4 N14' 44' 38.9' e77' 30 57 4" -

R5 N14' 44' 31.tr E77' 30 57:r

R6 N14' 44' 37.r e77'3053.r

R7 N14' 44' 39.5' e77' 30 49.2"

PLATE -Ill

MINING PlAN FOR BlACK GRANITE

TOPOGRAPHICAL CUM GEOLOGICAL PLAN - · T~To.l!\ ... - · o..:t.A#

Signature ol AP91c1n1

~ G. £.SWA-& :'".LOOT. IL fU.

Reco,, IBM."RQPJta'fO '0 1. II~

THII . TOCERTrtlilal'lll.!1/i~q/;l.ii,',t,. 0\ATI • "'VI N«> COM!Cr TO fHI ll!ll fY II<HOM.IOOE IAIEO UP OHLL\Sf. MAP N.ITHEHTICAflD fN ITATI OOYE.ANMEHT

Page 37: Fromenvironmentclearance.nic.in/writereaddata/District/... · favor of Sri B.Jaya Chandra Reddy for a period of 20 years subject to submission of Approved Mining Plan within a period

' l

)

l

)

GEOLOGICAL CROSS SECTIONS

40d ~

390 390

380 390

37 I ~ . . . . . . . . . . . . 380

. . . . . . . . . ~· - r,~ .

3 . . . . . . . . . . . . . . . . . . . . . . .

70

380

350

340

~

390

380 -

370 370 .

PLATE - IV

' _INDEX

? 'QIWOl£

:.:-. ....... """ . '"""""" ""'"

MINING PLAN FOA BLACK GRANITE

SRI.B.JAYACHANDRA REDDY IN SI.Ho 1.S111t, Ell11 .t1t Htci1. ~w).

Kucllf\; , .... tliiidtzt

GEOlOGICAL CROSS SECTIONS

- MB.Jo)-ldfo Rocldy, SID • .....,....,......., ~.1,..1•10. ............ , ..... ,"""' ~~"-"

~\ ~- -.lh -oiRO.P

6. £.5"'-· !".t'OOl' II' .IL,_._ R•cfX" J ...

IRU:'R_. · - - ~~~ ROP/OioiGJAI'f~712014

n.1 II TO CfJfrFY TttAT nei ~nDN .. fMa PlAT£

II"""-~! NGOOIW"C'T TO 'ne IQT 01 KNOW\EDOE ...sED I#OH LlAIE. ~ .wn-tOmCATIOIY ITAT£ GeNt~

Page 38: Fromenvironmentclearance.nic.in/writereaddata/District/... · favor of Sri B.Jaya Chandra Reddy for a period of 20 years subject to submission of Approved Mining Plan within a period

)

APPitoVED

Geo Coot<llnaln of lease area Datum WGS-84

PO INn LATITUDE LONGITUDE

R1 N14'4-4'42.1" E77' 30' 44.5"

R2 N14' 4-4' 42.6" E77' 30' 46.3"

R3 N14'4-4'41 .2" E77" 30' 49.7"

R4 N14' 4-4' 36.9" E77" 30 57.4"

R5 N14' 4-4' 37.tf' E77" 30 57 .2"

R6 N14•U'37.r E77" 30 53.7"

R7 N14' 4-4' 39.5" E77" 30 49.2'"

PLATE- V

~ .:S v-. 1h ~OIFtOP

a. E.sw-.a :.co • ...._ Rec:og (j ·Kr

IBM.'ROP. •; • ---120· ~A ROPIOMGIAPI0712014

n.s IS TO csnn l*T nc IHfiiOIIIIMA T'ION w '* ""'Tt. IS TM.IE NG ()(Wt(CT TO ntE IUl 0# 1C:N0W1..U1Ce: IAS(O

Page 39: Fromenvironmentclearance.nic.in/writereaddata/District/... · favor of Sri B.Jaya Chandra Reddy for a period of 20 years subject to submission of Approved Mining Plan within a period

CONCEPTUAL PLAN AND SECTIONS

APPUOVfO

Geo Cootdlnat .. ot lease area Datum WGS-34

POINT! LATITUDE LONGITUDE

R1 N14' 44' 42.1" E77' 30' 44.5"

R2 N14' 44' 42.6" E77" 30' 46.3"

R3 Nl4' 44' 41.2" E77" 30' 49.7"

R4 Nl4' 44' 38.9" E77' 30 57 .4"

R5 Nl4' 44' 37.8'" E77' 30 57 .2"

R6 N14' 44' 37.7" E17"3053.7"

R7 N14' 44' 39.5" E77" 3049.2"

MINING PIAN fOR BlACK GRANrTe

- - Sri "' ................ H.HD.tla1 ·16......__,... ,.....,.,-, ~ Dlllfoct, ,._,

ifl.. t;;:::p c(,~ •. ,L ... (k_~ S~Qt~acuro or Applcent

-4 ""' ~t:L. sv-,..ot~O.P

Ci. [......... 01 ...... Reeogn ~

tBWROP l1l t l/A RQPIOt!I"-4API0712;014

ntiS IS fOCERTWY fMo\T M '*CWMTQoi 1H TMIII\AI"! IS fR.IE ANO COIVIfCT fO M lOT f# ICHOM.IDGE 1M51ED

Page 40: Fromenvironmentclearance.nic.in/writereaddata/District/... · favor of Sri B.Jaya Chandra Reddy for a period of 20 years subject to submission of Approved Mining Plan within a period

'

l }

ENVIRONMENT PLAN

vvvvvv vvv

v

vvvvvv vvv

v

vvvvv~ vvv

v

vvvvvv vvv

vvvvvv vvv

v

vvvvvv vvv

v

v

vvvvvv vvv

v

vvvvvv vvv

v

vvvvvv vvv

v

vvvvvv vvv

vvvvvv vvv

v

v vvvvvv vvv

vvvvvv vvv

v

vvvvvv vvv

v

vvvvvv vvv

v

v

vvvvvv vvv

v

vvvvvv vvv

vvvvvv vvv

v

vvvvvv vvv

v

vvvvvv vvv

v

v vvvvvv vvv

vvvvvv vvv

v

v

PLATE - VII

-- Sri.B.J~~. ... .__ ...,..,,..., ... .._....,..., ,.......,.,OIIf\ __ ,_,

~~-;,0.~ o. caw.-• r .,, 1. ~