From S&OP to Mobility Business and System Roadmap Cirrus Logic, Inc.
Tom Strandwitz
Introduction
Tom Strandwitz, Director – Program Development Company: Cirrus Logic, Inc. – 2002 to present Previous roles: Director – IT, Business Analyst – SAP ECC (MM/PP) Past employment: Consultant – PricewaterhouseCoopers
3 year program aimed at addressing supply chain challenges
Improvement needed, but not sure where to start Faced with considerable growth, processes not scalable Reporting was difficult, considerable time spent merging files off-line / Excel Bottoms up approach, foundational changes required first
More than 3,000 active customers with 700 innovative products
~600 Worldwide
1984 – Headquarters in Austin, Texas
~$156 Million in cash, with no debt
~1,100 Issued and pending U.S. patents
Founded
Fabless pioneer since early ’80s
Cirrus Logic Overview (NASDAQ: CRUS)
How can we plan and execute more efficiently?
Topics that come to mind:
Forecast Accuracy MRP Capacity Planning Available to Promise Business Planning Metrics Vendor EDI – commits and ship out dates Vendor Evaluation
All have value, but where to begin?
Terms “plan” and “execute” can take on a variety of meanings
“Plan”
DEMAND Forecasted Requirements -> FP level (independent) -> Wafer / die level (dependent) Sales Orders Deliveries Safety Stock targets
SUPPLY Inventory on-hand -> Finished goods -> Die bank Work In Process / Yields Wafer POs Assembly POs Test POs … etc. – other POs for services
FUNDAMENTAL ELEMENTS
(backlog)
“Plan”
DEMAND Forecasted Requirements -> FP level (independent) -> Wafer / die level (dependent) Sales Orders Deliveries Safety Stock targets
SUPPLY Inventory on-hand -> Finished goods -> Die bank Work In Process / Yields Wafer POs Assembly POs Test POs … etc. – other POs for services
SYSTEM TRACKING ADX – Adexa
CAM – Camstar SAP – SAP ECC
EXC – Excel
ADX
EXC
SAP
EXC
SAP
CAM
SAP
(backlog)
Loosely tied to FP via lot number, PO delivery dates not used
consistently
“Plan”
DEMAND Forecasted Requirements -> FP level (independent) -> Wafer / die level (dependent) Sales Orders Deliveries Safety Stock targets
SUPPLY Inventory on-hand -> Finished goods -> Die bank Work In Process / Yields Wafer POs Assembly POs Test POs … etc. – other POs for services
ADX – Adexa CAM – Camstar SAP – SAP ECC
EXC – Excel
ADX
EXC
SAP
EXC
SAP
CAM
SAP
(backlog)
BUILDING A FOUNDATION
SAP
Wafer POs Production Orders (FP, Die) -> Assembly POs -> Test POs -> etc. – other POs for services
SAP
Production Orders represent lots, and will have expected start and
finish dates
SAP
Forecast results uploaded into SAP software as input
for Planning
SAP
SAP
All necessary Planning elements will be on one system.
SAP ECC Sales Orders (BBB)
Finished Goods WIP EXECUTION
End-State – systems
Integration Layer
SAP APO Forecasting
MRP / Capacity Backlog ATP
Sterling Integrator
EDI / B2B
SAP BusinessObjects
portfolio Reporting
SAP NetWeaver BW
Business Warehouse Data Queries
SAP systems
Partner systems
Model N Opportunities
Quotes POS
Roadmap of Project Efforts
….
….
Logical sequence to meet our business needs
WIP Execution Forecasting Planning Backorder Processing
Not your standard Forecast
Product / Location is not enough Channel, Purchasing Customer, Design Customer – all play a role
Customers – Types and Attributes Purchasing Customer – territory drives forecast ownership Design Customer – tier drives forecast strategy and planning priority
Statistical vs. User Input Still employ user input for key customer-product combinations Introduced automation for run-rate business or lower tiers Collect necessary transaction history (Direct, POP and POS) to support both
More foundation building – Sales data
All Sales data was normalized into common structure
Channel Product Purchasing Customer Design Customer
Direct Disti by Name
Division Product Line Product Group Product Family
Geography Region Territory Tier Corporate Customer
Geography Region Territory Tier Corporate Customer
ATTRIBUTES AND DIMENSIONS FOR ANALYSIS
Sales Orders, Backlog, Billings (direct, POP, POS), Opportunities All Sales data “tagged” with a common set of master data from SAP ECC Serves as the basis for all forecast and actuals reporting
All five steps of the process are
integrated
1. Baseline Forecast Create CVCs Load History Alerts and Exceptions Manual Adjustments 2. Sales Forecasting
Planning View by Purchasing Customer
Tiering by Design Customer Inclusion of Price/ASP’s
3. Marketing Review and Adjustments View by Product Hierarchy /
Material NPI/EOL Product Transitions
4. Consensus Review and Adjustments Single Number Forecast Discuss Gaps Plan vs. Actual Exception Management Identify Gaps between S&OP and
Strategic Goals
5. Release to SNP Net POS Disti Inventory Overlay Consensus
Demand on Warehouses Planning runs – Material
and Capacity Planned Starts – Wafer and
Assembly
Systematic S&OP Process SAP APO
Slide courtesy of SAP
Demand Flow to Warehouses
CHANNELS CUSTOMERS WAREHOUSES
$ Transactions
CONSENSUS DEMAND Forecasting Combinations
Channel / PC / DC / Product
Direct and POP Distis Needs to funnel down to the
appropriate warehouses
POS Distis Needs to be netted against on-hand inventory at the specific
distributor, then funnel down to the appropriate warehouses
Sell-In POS
HK
AUS
TUC
SH
SZ
POS Distribution Disti 4 Disti 5 Disti 6
Consensus Demand
(netted by POS
Distributor)
Consensus Demand to correct warehouse:
Single warehouse or disaggregated to multiple
Direct
POP Distribution Disti 1 Disti 2 Disti 3 …
Ability to Provide Accurate and Timely Commit Dates to our Customers… the Final Piece of the Puzzle.
SAP APO SAP ECC
Demand Planning SNP, PP/DS, GATP
Production Planning
Sales and Distribution
Demand: By Channel By Product
By Purchasing Cust By Design Cust
By Tier
Demand: By Product
By Tier By Location
Planning Runs: MRP / Bottoms Up
Infinite / Finite Capacity
Wafer Starts Assembly Starts
Test Starts
WIP Die Bank
Finished Goods
SALES ORDERS By Tier, Location, CRD
Can we allocate and confirm? GATP
BOP – Backorder Processing
B2B – Vendor WIP
End State – processes in SAP software Forecasting – SAP APO – Demand Planning
Statistical, User-input -> drive to consensus -> released to SAP APO – SNP
Requirements and Capacity Planning – SAP APO – Supply Network Planning Unconstrained and Constraint-based planning – materials and resources (vendor or floor capacity) Results – Planned Orders for Fab, Assembly, Test, subassemblies; PRs for purchased components
WIP Execution – SAP ECC – Production Planning Planned Orders from APO – executed as Production Orders (Lots)
Material Availability – SAP APO – Backorder Processing Allocation based on book date and tier
Reporting – SAP Netweaver BW, SAP BusinessObjects portfolio SAP BEx information broadcasting option (analyzer tools); SAP BusinessObjects Explorer, and SAP
BusinessObjects Web Intelligence software
Reporting and Analysis
Dashboards in SAP BusinessObjects tools
SAP NetWeaver BW
SAP APO
SAP ECC
Model N
Tools BI – SAP BEx SAP BusinessObjects Explorer,
analyzer, and SAP BusinessObjects Web Intelligence
Content (examples) BBB – summary and detail Revenue vs. Consensus Wafer Starts Sales Funnel / Design Wins Gross Margin Forecast
Devices PCs Macs iPhone iPad
Everything in BI Eliminate local user data marts
One version of the truth
Data in SAP BusinessObjects
tools
Query as a Web Service
Extranet Intranet Other systems
…And now, Mobile Access
Dashboards in SAP BusinessObjects tools
SAP NetWeaver BW
SAP APO
SAP ECC
Model N
Thank you …
For the opportunity to share our journey
Overview of Cirrus Logic’s supply chain challenges Steps we took to make foundational changes first How we employed SAP tools to meet those challenges
Back-up slides
How can we Plan and Execute more efficiently?
Increased forecast accuracy Reduced cycle times Forecast preparation Demand planning / re-planning Supply chain – wafer fabrication to finished goods
Reduced obsolescence Increased on-time commit to Customer Request Date Enhanced capacity planning
How can we improve?
Boiling it down – what do we want?
REQUIREMENTS FEATURES OPTIONS
An ROI analysis was performed on each option.
Options – Feature Comparison
The ROI and features provided lead us to choose the “Full” option.
Best option to meet our goals
Integration of Pricing
SAP BI (data stores)
SAP APO (cubes)
SOURCE SYSTEMS
Bookings
Backlog
Billings
POS
Opps
Quotes
Bookings
Backlog
Billings*
Opps
Quotes
SAP Model N
Combined Billings
Backlog
Opps
/rev sub
Material Price
File Material Price
Sales Price Report Sales Price
* CRD used for baseline forecast
POS
Corrected Price -> Last cycle
Planning CVCs
Product Flow to Customers
CHANNELS CUSTOMERS WAREHOUSES
Direct
POP Distribution Disti 1 Disti 2 Disti 3
POS Distribution Disti 4 Disti 5 Disti 6
Purchasing Customers
$ Transactions
Sell-In POS
HK
US
TUC
SH
SZ
Shipments
Stocking Orders
Direct Receipt
Sales from Disti
Sales from Disti
…
Design Customers
GEO: APAC REG: PRC
TER: S China
GEO: AMER REG: West
TER: Northwest
How can you adequately come up with a
Demand Forecast?
Where are we now …
Unified data model Consolidated billings – Direct, POP and POS By Channel, Purchasing Customer, Design Customer, Product Hierarchy
Highly integrated demand planning system Billings, backlog, opportunities, ASPs, product introductions / transitions Comparison – Statistical vs. Sales vs. Marketing vs. Consensus vs. History Input into revenue planning process
Access to centralized data Migrating from user Excel data marts – push into SAP BusinessObjects BI suite Old adage – “one version of the truth”
BENEFITS REALIZATION
Where are we going …
Clear finished product demand statement Aggregated by Product, Location and Design Customer Tier Maintain fidelity in supply planning, dynamic pegging to resolve bottlenecks
Forecast consumption by Design Customer Tier Early response to upside when product/tier forecast is fully consumed Careful monitoring of unconsumed forecast and adjust accordingly
Sales order allocation and confirmation When the order hits, allocate and confirm against CRD Multiple factors to be considered – Booking lead time, Tier of Design customer,
check against feasible build plan
Forecast Consumption – with Tier Nov Fcst
Tier 3
Tier 1
Tier 2
1000
7000
2000
Nov 3
10,000
Fcst
10,000
fcst:
6000
Revised Build: 11,000
Nov 27
Tier 3
Tier 2
Tier 1
Revised Build: 13,000
Nov Fcst
Tier 3
Tier 3
Tier 2
1000
7000
2000
10,000
Nov 3
Remaining fcst to build:
9000
Revised Build: 13,000
Tier 3
Tier 1
Tier 2
Tier 3
4000 Tier 3
It took almost 3 weeks for the system to begin reacting to the upside!
Nov 23
Tier 3 Tier 3
4000
Tier 2 Tier 2
7000
Forecast Consumption – without Tier
Once a forecast for a tier has been consumed within a predefined
window (e.g. 14 days backwards / 28 forwards) the system will plan for
the overage and consider it as additional demand.
Dashboards in SAP BusinessObjects tools
“One View”
SAP BusinessObjects
BI suite
JIRA Issue Tracking
JIVE Content Management Repository Collaboration
SAP APO
SAP ECC
Model N Activity Tracking, Issue Tracking Extranet … and more?
Account Plans
Trip Reports
Existing Master Data Structures e.g. Corp Customer, Div, Product Groups
Data Views