    FS ENGINEERING

    CONSULTANT SDN. BHD.

    GEOMETRIC DESIGN PROJECT FORHIGHWAY ENGINEERING

  • 8/10/2019 Fs Engineering Consultant Sdn

    2/22

    Organization Chart

    Managing DirectorNurafiqah Binti Panot

    Project EngineerNoraini Binti Zainudin

    Senior EngineerTan Suet LeeGoh Jun Da

    Site EngineerGary Julis

  • 8/10/2019 Fs Engineering Consultant Sdn

    3/22

    Objective

    To design a highway which capable ofaccommodating a maximum of traffic volume of

    average daily traffic (ADT) of 10,175 vehicles sothat a rise in socio-economy of Samarahan canbe achieved

  • 8/10/2019 Fs Engineering Consultant Sdn

    4/22

    Project Detail

    Proposed road will start from point C(N5158000, E2075500) to point F (N5158500,E2078000) in the map

    Rolling terrain

    Design standard,R5.

    Road category is highway Partial control of access

  • 8/10/2019 Fs Engineering Consultant Sdn

    5/22

    Road Design

  • 8/10/2019 Fs Engineering Consultant Sdn

    6/22

    Proposed Elevation

  • 8/10/2019 Fs Engineering Consultant Sdn

    7/22

    5.00

    10.00

    15.00

    20.00

    25.00

    30.00

    35.00

    0 500 1000 1500 2000 2500 3000

    SoilProfile(m)

    Chainage

    Soil profile against Chainage

    ExistingLevel

    Proposedlevel

  • 8/10/2019 Fs Engineering Consultant Sdn

    8/22

    Mass Haul Diagram

    Total area ofembankment is128844m

    Total area of excavationis 93430.3m

    Total different is35413m

    -40000

    -30000

    -20000

    -10000

    0

    10000

    20000

    30000

    40000

    0 500 1000 1500 2000 2500

    Masshaulordinate

    Chainage

    Mass Haul Diagram

  • 8/10/2019 Fs Engineering Consultant Sdn

    9/22

    Horizontal Alignment

    First curve Second curve

    Minimum radius (m) 242.08

    Design radius (m) 650 300Length of curve (m) 397 165

    Central angle () 35 23

    Stopping sight

    distance, SSD (m) 211 120

  • 8/10/2019 Fs Engineering Consultant Sdn

    10/22

    Superelevation

    Minimum radius = 275m

    Design radius = 650m

    e maximum = 10%

    e maximum design = 6.15% Length of tangent runout, Lt = 23.1m

    Length of runoff, Lr = 71m

    Length of fully superelevated = 208.8m

  • 8/10/2019 Fs Engineering Consultant Sdn

    11/22

  • 8/10/2019 Fs Engineering Consultant Sdn

    12/22

    VerticalAlignment

    Stopping sight distance (SSD) = 160mLength of curve for sagging = 180mLength of curve for crest = 120mSlope grade = 1.9%

    14

    16

    18

    20

    700 800 900 1000 1100 1200 1300 1400

    Ele

    vation

    Chainage

    Full Vertical Alingment

    Proposed elevation

    Full curve

  • 8/10/2019 Fs Engineering Consultant Sdn

    13/22

  • 8/10/2019 Fs Engineering Consultant Sdn

    14/22

    Flexible Pavement Structure

    DesignCharacteria

    Value Comment

    ESALY1 ( Base year) = 2.58 million -

    ESALDES 69.3 million Traffic category T5

    Characteristic subgrade modulusvalue

    134.65 Mpa Sub-grade categorySG3,

  • 8/10/2019 Fs Engineering Consultant Sdn

    15/22

    Option 1 :

    Full depth asphaltpavement withunmodified penetration

    70/100.Advantages :

    - Cost

    - Durability- Sources available

    - Maintenance

    - Long life span

  • 8/10/2019 Fs Engineering Consultant Sdn

    16/22

    Bridge

    Location of bridge : chainage 1+850 to 1+870

    Length = 20m

    Beam bridge

    Cost effective, easy to manufacture

    Can resist bending and twisting

  • 8/10/2019 Fs Engineering Consultant Sdn

    17/22

    Drainage

    Types of drainage design:

    1. Traversable Ditch with Concrete Lining

    2. Symmetrical or V-shaped Ditch

    For superelavation at the horizontal alignment, openchannel ditch is used with the frame and vane cratesinlet.

    Culvert is also installed to allows water flows

    underneath the road, then divert them to low-lyingarea.

  • 8/10/2019 Fs Engineering Consultant Sdn

    18/22

    Traversable Ditch withConcrete Lining

    Symmetrical or V-shapedDitch

  • 8/10/2019 Fs Engineering Consultant Sdn

    19/22

    Drainage Maintenance

    Cutlassing or cleaning off the ditch regularly to avoidthem from silting up and sending water back to the road.

    Provide vegetation to reduce soil erosion at the side

    slope of the V-shaped ditch.

  • 8/10/2019 Fs Engineering Consultant Sdn

    20/22

    Conclusion

    Route length is 2.615km with one bridge. Road standard of R5 with design speed of

    85km/hour.

    Design consideration is following the standard Embankment volume > Excavation volume

    Therefore, volume of soil needed to fill in forproject purposed is 35413m.

    Hopefully can improved the quality of road inSarawak by performing good design, betteroption for road pavement, effective bridge anddrainage system design.

  • 8/10/2019 Fs Engineering Consultant Sdn

    21/22

    Q & A