FSP REVIEW

PLANNING

BENEFITS

CONCERNS

IMPROVEMENTS

A presentation at the PFIT Post FSP Workshop by Cam Leitch on Pope and Talbot’s experience implementing FSPs.

OVERVIEW

• TFL 23

• Shared LU’s

• KBHLP

• FSP Approved March 2006

TRANSITION

• FSP = FDP More or Less

• Relationships

• Dec 31, 2005 Cut off

• Sec 196 Blocks

• FDU’s

• KBHLP

• Practices

PLANNING UNDER FSP

• Annual Updates– Analysis– Assessments– Referrals– MOF meetings

• Amendments– SP– FSP

PLANNING UNDER FSP

• Tracking Mechanisms / Due Diligence– Genus linked– Block & Roads Checklist– Analysis– ARC Map

• Stay Ahead of Issues

BENEFITS

• Improved Operational Flexibility

• Less time with MOF & Gov’t?

• Professional Reliance

• Deal With Resources ID’d Up Front

CONCERNS

• Less Innovation

• Practice Requirements Arbitrary

• Time Frames

• Results Based / Professional Reliance

• Internal Administration

IMPROVEMENTS

• C&E Role / Encourage Innovation

• DM’s Role

• Strategic Planning

• FTA

• Professional Reliance & ABCFP

• Effectiveness Monitoring / Information Exchange

FSP 101

CONCEPTUAL DESIGNInitial Development, No Field Work

LAYOUTField Layout Completed

PAPER PLANField Recce Completed

TRAVERSING & ASSESSMENTSBlock level assessments, cruising, etc.

ANALYSISGIS Analysis for BDV, UWR, Caribou, Patch

DECLAREDDeclare to the DM that the blocks meets the

tests in the FSP

CP SUBMIT / APPROVEDBlend and submit

Review Previous FSP/LU AnalysisIf OK – Proceed

GENUS UPDATEFSP Plan

GENUS UPDATEFSP Analysis

GENUS UPDATEFSP Declared

GENUS UPDATE(Block Bndys)

GENUS UPDATECP Approved

Include ForSup, DevFor, IWA?Review FSP, priorities and Analysis.ID areas to start planning in.Establish broad objectives (FH, patch, UWR)Preliminary Budget

Review ForSup, DevFor, Other?SP’s must be prepared prior to blendingSupport documentation generatedCruise compiledAppraisal generated

Monday, March 05, 2007

Pope & Talbot Ltd – Arrow Lakes

Generally done in December for following year submissions, all blocks in analysis updated with exception of CP approved blocks

FINAL BUDGET(Formalized)

ROUND TABLE

ROUND TABLE

Involve logging and roads prior to finalizing

Primarily planning & silviculture

Option to not notify DM, at this point we will inform DM with map and listing of blocks