1
Fukushima Daiichi NPS Survey Map As of 5:00 PM on July 8, 2014Unit 1 R/B Unit 2 R/B Unit 3 R/B Unit 4 R/B UnitmSv/h 2.0 0.28 0.75 0.055 0.35 0.32 Transfer pipe 100 (surface) 1.0 (Atmosphere) Transfer pipe 1.2 (surface) 0.80 (atmosphere) Transfer pipe 0.10(surface) 0.060(atmosphere) Transfer pipe 80(surface) 10(atmosphere) Transfer pipe 0.18 (surface) 0.18 (atmosphere) Transfer pipe 0.35 (surface) 0.065(atmosphere) 0.15 0.10 July 2011 70~ 100 Units 1-2 SGTS pipe >10,000 October 2012 0.26 0.30 0.060 0.21 0.10 0.90 0.65 0.17 0.25 0.38 0.17 0.20 0.050 0.25 0.30 0.20 June 2012 July 2012 0.25 0.4 1.3 0.50 0.20 0.50 Roof top1.0 0.20 0.30 0.05 0.43 0.24 1.3 0.50 0.60 0.21 0.10 0.20 0.20 0.60 1.0 0.7 0.20 November 2012 December 2012 March 2013 0.020 0.050 0.020 0.070 0.030 0.025 0.18 0.050 0.040 0.15 0.15 0.3 0.8 0.3 1.3 0.20 0.27 Upper part of concrete-filled vertical shaft 0.25(After gravel installation) 0.14 0.10 0.10 0.040 0.090 0.050 0.20 0.90 1.0 1.0 0.50 0.092 0.060 0.47 0.085 0.10 0.30 0.80 0.026 Bottom of side ditch 30(Surface) 1.3 ( Atmosphere ) 0.12 0.068 0.20 2.3 0.10 0.20 0.10 June 2013 0.35 July 2013 0.20 2.0 2.5 4.0 Atmosphere 1.8 Surface: 8.5 1.5 Atmosphere 1.7 Ground surface 8.5 1.0 September 2013 November 2013 0.4 2.7 0.045 0.35 0.050 0.045 0.085 0.055 0.090 0.050 April 2014 0.030 0.050 0.050 0.026 0.025 0.050 0.040 0.055 0.090 0.20 July 2014 June 2014 0.11 In front of the door of carry-in entrance 3.5

Fukushima Daiichi NPS Survey Map As of 5:00 PM …...2014/07/11  · Fukushima Daiichi NPS Survey Map (As of 5:00 PM on July 8, 2014)Unit 1 R/B Unit 2 R/B Unit 3 R/B Unit 4 R/B

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Fukushima Daiichi NPS Survey Map As of 5:00 PM …...2014/07/11  · Fukushima Daiichi NPS Survey Map (As of 5:00 PM on July 8, 2014)Unit 1 R/B Unit 2 R/B Unit 3 R/B Unit 4 R/B

Fukushima Daiichi NPS Survey Map ( As of 5:00 PM on July 8, 2014)

Unit 1R/B Unit 2

R/BUnit 3R/B

Unit 4R/B

Unit:mSv/h

2.0

0.28

0.75

0.055

0.35

0.32

Transfer pipe100 (surface)

1.0 (Atmosphere)

Transfer pipe1.2 (surface)

0.80 (atmosphere) Transfer pipe0.10(surface)

0.060(atmosphere)Transfer pipe80(surface)

10(atmosphere)

Transfer pipe0.18 (surface)

0.18 (atmosphere)

Transfer pipe0.35 (surface)

0.065(atmosphere)

0.15

0.10

July 2011

70~100

Units 1-2 SGTS pipe

>10,000

October 2012

0.26

0.30

0.060

0.21

0.10

0.90

0.65

0.170.25

0.38

0.17

0.20

0.050

0.25 0.30 0.20

June 2012

July 2012

0.25

0.4

1.3

0.50

0.20

0.50(Roof top)

1.0

0.20

0.300.05 0.43

0.24

1.3

0.500.60

0.21

0.10

0.200.20

0.60

1.0 0.7 0.20

November 2012

December 2012

March 2013

0.020

0.050 0.020

0.070

0.0300.025

0.18

0.050

0.040

0.15

0.150.3

0.80.3

1.30.200.27

Upper part of concrete-filled vertical shaft

0.25(After gravel installation)

0.14

0.10

0.10

0.040

0.090

0.050

0.20

0.90

1.0

1.0

0.50

0.092

0.0600.47

0.085

0.10

0.30

0.80

0.026

Bottom of side ditch

30(Surface)1.3

( Atmosphere )

0.12

0.068

0.20

2.3

0.10

0.200.10

June 2013

0.35

July 2013

0.20

2.0

2.5

4.0

Atmosphere 1.8Surface: 8.5

1.5

Atmosphere 1.7Ground surface 8.5

1.0

September 2013

November 2013

0.4 2.7

0.0450.35

0.050

0.045

0.085

0.055

0.090

0.050April 2014

0.030

0.050

0.050

0.026

0.0250.050

0.040

0.055 0.090 0.20

July 2014

June 2014

0.11In front of the doorof carry-in entrance

3.5