ON1RiOPIIIJV 1. Page: 1 of 12
GENERATIONSevere Accident Management Guidance Implementation 10 - 62449 (OM&A)
Developmental Business Case Summary N - BCS - 09013 - 10000 - R000
i&i2öi4Z LAZAINick IvanoffFukushima Project — Support P82-2 Prepare BCS J SAI702-5107 ‘ /
r
Elizabeth Lopez,, ,Director Fukushima Project P82-2 ,z7 /L4j’ /702-5070 7 Z N.
___fJ
u e P82-3
Mark ElliottSenior Vice President and CNE P82-5 14 /702-5418
Fred Dermarkar/
h6F shima Project P82-6 /
F
_-j
ea
Filed: 2013-09-27 EB-2013-0321 Ex. F2-3-3 Attachment 1 Tab 10
Z of 12
Severe Accident Management Guidance Implementation 10 - 62449 (OM&A)
Developmental Business Case Summary N - BCS-09013-10000 - R000
1! RECOMMENDATION:
We recommend a Developmental Release of an initial $0.621 Million OM&A to fund Preliminary Engineering
for this project. Approval of this request will bring the total to date funding to $0.621 Million including a
contingency of Million. The total project is estimated to cost $25.4 Million with an estimated completion
date of 12/31/2015
The Business Objective of this Regulatory project is to improve the Severe Accident Management Program at
OPGN and to ensure that the related CNSC Fukushima Action Items are completed.
While the OPG Nuclear Fleet has already implemented a Severe Accident Management Program, OPG
Management has decided to further enhance the capability to respond to a Severe Accident by addressing
improvement areas identified during initial implementation, by staging emergency kits to facilitate response, by
incorporating the use of new portable Emergency Mitigating Equipment (EME) where possible. and by
undertaking assessments to ensure adequacy of response given the lessons learned from the Fukushima Daiichi
Nuclear Power Plant accident.
4o )c14i 4zc4
H.j4
OAR Element 1.2 Project not in Budget)
Submitted By; (Date)
21 -
i;fn Léezbector Fukusnia Suppor’
F nancia Approva By Date
?L-Fred [ertmrkarD rector FusNrn’a Po &t
Filed: 2013-09-27 EB-2013-0321 Ex. F2-3-3 Attachment 1 Tab 10
[OPITARIOFOWII[ENERAT1ON Ii Sus ase
Severe Accident Management Guidance Implementation 10 62449 (OM&A)Developmental Business Case Summary N - BCS - 09013 - 10000 - R000
2! BACKGROUND & ISSUES:
As a result of the nuclear accident at the Fukushima Daiichi Nuclear Power Plant on March 11, 2011, OPGNexpedited the implementation of its Severe Accident Management Guidance (SAMG) Program which had beenpartially established in 2010. The goal of the SAMG program is to establish a means of precluding largeuncontrolled releases of radioactivity to the environment subsequent to a severe reactor accident, which is asubset of beyond design basis events.
Phase 1 of the implementation was completed in 2010 and focused initially on providing SAMG within theEmergency Response Organization (ERO). Phase 2 of the implementation plan included issuance of detailed sitelevel proceduralized guidelines; these were completed by July 26, 2011 at both the Darlington and PickeringNuclear Power Plants. By year end 2011 additional activities associated with Phase 2, including ERO procedurerevisions and training of certified staff, were completed.
During Phase 2 implementation, a number of improvement opportunities were identified in SAMG. Theseincluded procedural issues. strategy issues. and the need to provide emergency equipment in the field to supportthe Enabling Instructions. While these issues do not invalidate the use of the guidelines, they must be addressedto ensure timely and effective execution of SAMG should the need arise. Therefore, the need for a furtherimplementation phase (i.e. Phase 3) has been identified. The primary focus of SAMG Phase 3 implementationwill be to better prepare for field execution by refining and validating existing guidelines and by training andconducting drills. Additionally. in support of SAMG Improvements, several engineering assessments will beperformed as part of Phase 3. These assessments may result in design changes and/or requirements to reviseSAMG procedures. In Phase 3, the deliverable for these assessments will include detailed assessment reportsand recommendations which will be used to define the scope of all remaining work. Subsequently, a fourth andfinal phase of SAMG implementation will be required to address the final improvement requirements andcomplete the project. The scope of Phase 4 will be defined in Q2 2013 when the assessments are completed.
In February 2012, the CNSC issued a number of Fukushima Action Items to OPG, This project includes SAMGPhase 3 and Phase 4: it encompasses all of the work required to improve the SAMG program and complete theactions committed to the CNSC.
Filed: 2013-09-27 EB-2013-0321 Ex. F2-3-3 Attachment 1 Tab 10
ONTAR1OruiriiH 11 Page 4of 12
GENERATION a , r r
Severe Accident Management Guidance Implementation 10 - 62449 (OM&A)
31 ALTERNATIVES & ECONOMIC ANALYSIS:
$*O0s Alt emmerided Alt 2
Base Case Full IncrementalC
T*tatQM&A 0 25Ii1 WA
I IIICapital Expenditures 0 0 0 0
1RR% NIA WA NIA NIA
Discounted Payback (Yrs) NIA NIA NIA WA
Present Value (PV)
Net Present Value (NPV)
U
WA if
.. NIA
NIA
Base Case: Do Nothing
This project is required to address several CNSC Fukushima Action Items and is in response to the CNSC Task
Force Report Recommendations for improvements as a result of the lessons learned after the Fukushima Nuclear
Power Plant Accident. As such, the Do Nothing option is not a viable alternative.
Alternative 1: SAMG Implementation Improvements
Initial assessments of the required improvements include addressing and correcting items on the gap lists
documented during Phase 2 SAMG implementation, staging of Emergency Kits, updating SAMG documents, and
performing assessments committed to in the CNSC Fukushima Action Items. Emergency Mitigating Equipment
(purchased under Projects 13-49229/491 59 and 16-31508) may somewhat offset the scope of SAMG Phase 3
however this needs to be assessed. A Developmental Release is recommended to fully define the scope and cost
of the improvements required. a Partial Release and Full Release will follow,
Alternative 2: SAMG Implementation Improvements (do more>
SAMG da not Qrgnai ncae tre Eergerc Mtgaton Equprnent EME whIch ‘as neen recerty procurea as
a result of the Fukushima ac dent Conip eton of SAMG as onginaily rtended ndudea actions whch are no
onger beneficial when credit s taken for the new EME e they now become additional or redunaant It s rot
recommended to implement all gaps associated with earIer implementation of SAMG unti an assessment s
made which ncludes crediting the use EME for Severe Accident mitigation
Filed: 2013-09-27 EB-2013-0321 Ex. F2-3-3 Attachment 1 Tab 10
ONTARIOruwdI Page: 5of12
GENERATION 3r se S irarySevere Accident Management Guidance implementation 10- 62449 (OM&A)
I., Developmental Business Case Summary N - BCS - 09013 - 10000 - R000
4! THE PROPOSAL
The deliverables for this Developmental Release are as follows:
Complete the preliminary assessments and engineering necessary to define the scope for a partial fundingrelease to implement the proposed improvements to the Severe Accident Management Guidance (SAMG)Program. Phase 3. These assessments include the following improvement areas:
o reconcile the documented gaps identified during Phase 2 SAMG implementation.o stage equipment kits in the field to support deployment during an emergency,o conduct training, validation, and drills using the new procedures and equipmento update the SAMG Technical Basis Documentso revise SAMG documents where appropriate, to include the use of Emergency Mitigating
Equipment (e.g. portable pumps and generators) in severe accident situations.
Complete the preliminary assessments to define the scope of engineering work for a partial fundingrelease required to address improvement areas identified in CNSC Fukushima Action Items, Theseinclude assessments of:
o Equipment and instrument survivability subsequent to Beyond Design Basis Accidentso Required strategies for Hydrogen mitigationo Required strategies for Containment ventingo Impact of Shield Tank relief capacity on Containment performance and SAMG strategieso Potential impact of SAMG strategies on IFB loss of cooling and inventory makeup accidentso Options and SAMG strategies with regard to multi-unit severe accidents
• Prepare and obtain approval of a Partial Release BCS, expected July 2012.
Future Partial Release:
• Funding for the Partial Release will cover Phase 3 of the SAMG Implementation Improvement Project.Completion of Phase 3 is anticipated to be December 31. 2013.
• Scope of Phase 3 will be as defined in detail and described under the Developmental Release mentionedabove.
• The Phase 3 dehverabies wi include recommenoauons based on engineering assessments that w LI beused to deve op the scope for mprovements and/or modif at ors that may be required .n the final Phaseof the proiect
Future Full Release
• Funding for the Full Release will cover the 4 and final phase of this project
• Phase 4 SAMG scope will include odates to SAMG documents and moiementatior 0f recommendatonsbasd on assessmrts a’d eg ri g rrr t—d d r a 3 a r de pdat s t M
o rate qu pmrt ci r 1 ar’i pa’t If t a p a ! tr. E £raLrc
Filed: 2013-09-27 EB-2013-0321 Ex. F2-3-3 Attachment 1 Tab 10
ONTARIOF’OWdITZ I r Pages 6of 12
BENERATIIJNJSevere Accident Management Guidance Implementation 10 - 62448 (OM&A)
Developmental Business Case Summary N - BCS - 09013 - 10000 - R000
• Scope of the Full Release will be developed in 2013 and Phase 4 completion is expected by the end of
2015 (plant modification work requiring outages may extend beyond this date)
51 QUALITATIVE FACTORS
The initial qualitative factor gained by proceeding with the project will be to proactively meet OPG commitments to
the CNSC to circumvent a regulatory Order. It also demonstrates to the public and our peers, that OPG is
applying lessons learned from the Fukushima event in a timely manner, Enhancements to SAMG will address
vulnerabilities which currently exist and will improve OPG preparedness to deal with a severe emergency.
6! RISKS ANALYSIS (See Attachment D for details)
5
Probab1Utc X impactturn
4 8C.)
3 6 9C
4 6 8 ii
2 3 4 5
MatingAc1vities MiigationskDon
a)
a)
0Cl)
Co
a
C0
Cu
C.a)
a)(0
0CI..0
C-)
0Co
a)
OPG Engineering andManagement resourcesmay be unavailable todo the work or reviewsin the requiredtimeframe
>.—a
CoU)
x
Co‘-a
C)EC0I
>
w
CoU)I-(0a)C.)
2
9 9Before
After
Use OPG resources toreview engineeringestimates and provideoversight of work.Consider external OPGexperienced ProjectManagement,Engineering, andCertified Staff wherepossible. Consider COGJoint Project withindustry partners
2 2 9
3 3
Increased scope due toegac/ ;SSUeS abackground nfor’rati n
COG SAMGDourn tat on DKaae
I I
BeforeUse external previouslyexoeenceo QPGEng reerig and ReactoSaet Staff to ass st aidprov u spec ‘contingency for externaenaineerina
30After
2
Detays to developmentof scope and scopevartattons due to need toalign wtn CANDU
UU V frd’ e
[.42
Use memDershp onCOG SAMG WorkingGroup, CANDU Industry
Team and possbieCOG ceottu
Filed: 2013-09-27 EB-2013-0321 Ex. F2-3-3 Attachment 1 Tab 10
-
II—
ONTAR1OruviiI II PG Go Page: 7 of 12
LENERAT1ONIE ser iaSevere Accident Management Guidance Implementation 10 - 62449 (OM&A)
Developmental Business Case Summary N - BCS - 09O131O0O0 - R0007/ POST IMPLEMENTATION REVIEW
Note: PIR N/A for Developmental Release
tr————-.[-,,.
Measura$ 4owvifl lbe WhelNlitmeasuref’arametei measured? PersnGro4p?
--________
i:___3,
-_________________
4.5.
pd
APPENDIX “A’ GLOSSARY (acronyms, codes, technical terms)
CNSC — Canadian Nuclear Safety CommissionOM&A — Operations, Maintenance and AdministrationBDBE Beyond Design Basis EventEME — Emergency Mitigating EquipmentCOG - CANDU Owners GroupERO — Emergency Response OrganizationEP — Emergency PreparednessSAMG — Severe Accident Management Guidance
APPENDIX “B”
LTD SpentLTD SpentD Sni
Comparison of Total Project Estimates
100
o361
omments
Filed: 2013-09-27 EB-2013-0321 Ex. F2-3-3 Attachment 1 Tab 10
ONTARIOruvi. II 0 Page: 8of12 p
GENERATION II So mnarv
Severe Accident Management Guidance Implementation 10 - 62449 (OM&A)
Developmental Business Case Summary N - BCS - 09013 - 10000 - R000
APPENDIX “C” FINANCIAL MODEL - ASSUMPTIONS
- —- — ——- -—-.----,— ----
Discount Rate: 7% Cost Escalation (Yr) 0% SR&D Opportunity YeZZJProgress Payments No Foreign Currency No Retainer Fee No
Depreciaon Rate (Capital) NIA PST No Interest Rate (Capital) OM&A NIA
Revenue Rate NIA Leasing No Indexed Priced Contract No
Comments:
Design Complete: tip to — 40% Fixed Price Contract No 3rd Party Estimate No
Quality of Estimate Budget +30% to .15% OPEX used Yes Lessons Learned Yes
Similar Projects Nothing Similar Budgetary Quote No First Unit Actual Used WA
Firm Vendor Proposal No Cost Sharing No Competitive Bid No
Reviewed by Sponsor Yes Fee for Service No Contracts in place No
Comments:
Jun-20 I 515
Jun-20 515
Nov-18 516
I — Sen 878
2 Feb-18 878
3 Sep 19 878
4 Jan-21 878
PickeringB
Darlington -
8-
- a---—-:
L____
zztzComments:No outage work anticipated at this time however as scope is developed may be identified later
Filed: 2013-09-27 EB-2013-0321 Ex. F2-3-3 Attachment 1 Tab 10
Removal Costs (above>Inventory W 10
Spare Parts in Invent
Reviewed b (Date) Approved by (Date)
Nck vancyff zabe1 LpezStat V Ma1aaer
ii’flNTARIOruiiwi: p Page: 9of 12
GENERATION Simi’arSevere Accident Management Guidance Implementation 10 - 62449 (OM&A)
Developmental Business Case Summary N - BCS - 09013 - 10000 - R000ATTACHMENT “A” PROJECT COST SUMMARY
—- V-
Project Mgmnt& Support 84J 13001 60J 600 3,341Engineering 64401 2 500J 2 100 14,690Procurementöion
F
lnrest(CapdaIProject)—
General ContingencySpecific Contingency
Project Co 1Z140 j 365Oj 3,Z5O 3I
rr” w— ‘‘rh
CurrentRelease
Project Costs
TotalContingency
Adjto ProjectCostsCurrent Contingency
Release Total• Project Costs
ThisContingency
ReleaseTotal
DProjeciCostsnContingency
ReleasedTalProjectCosts
FutureContingency
ReleasesTotal
ptiContingency Funding
Total Funding I 6,21 12j40 3650 3,250 2L36i
Variance to Budget 0 0 ] 5,691 10940 3,100 2,700 0 0 j
Project Manager
Filed: 2013-09-27 EB-2013-0321 Ex. F2-3-3 Attachment 1 Tab 10
IiIfr lFONTARIOru,niirii Page: lOofl2
IENERATION S ar
Severe Accident Management Guidance Implementation 10 - 62449 (OM&A)
Developmental Business Case Summary N-BCS-08013 - 10000 - R000
ATTACHMENT “B” PROJECT VARIANCE ANALYSIS
AJIi iA. Projçct Mgmnt & Support — 3,341 3.341 N/A, first release
Engjneering 14.690 14,690 N/A, first release
Procurement 1,700 1,700 N/A, first release
Construction N/A. first release
Other
).——
—
F Interest (Capital Project Only ,
. ProjectCosts(ScoresBasis) N!A,first release
General Contingency NIA, first release
‘ Specific Contingency N/A, first release
L Oiectcosts (ScoresBasis) - - 25,361 j’ *364R4!A,fIrstr&Ièas&
jReioval Costs included above -—
ilnventorY to be written off -
JSpare Parts in Inventory -
Comments:
This is the first release; therefore, no variance analysis is required.
Filed: 2013-09-27 EB-2013-0321 Ex. F2-3-3 Attachment 1 Tab 10
SCHEDULE
Key Milpfnnpr-7 ww w
--- -
,-- ,-— -- p a a31-Jul-12 Partial BCS Funds approved for release
30-Jun-13 Scope developed for Phase 4 of SAMG
31Dec13 SAMG Phase 3 complete and Full Release approved for Phase 4 SAMG31-Dec15 SAMG fully implemented (Phase 3 and 4), Prolect complete
Click here to enter a date.
Click here to enter a date.Click here to enter a date.
Click here to enter a date.Click here to enter a date.
Click here to enter a date.
Click here to enter a date.
A Project Execution Plan (PEP) will be approved by
In Service Declarations: (Capital only)w- ---w —w — — -- - - -
: ,
Click here to enter a date.
Click here to enter a date.
Click here to enter a date.
Click here to enter a date.Click_here to enter a date.
Click here to enter a date.Click here to enter a_date.Click here to enter a date.
Click here to enter a date.Click here to enter a date
ATTACHMENT “C”
ONTAR10ruiwrn 0 Page: 11 of 12
GENERATIDSevere Accident Management Guidance Implementation 10 - 62449 (OM&A)
Developmental Business Case Summary N- BCS - 09013 - 10000 - R000
Click here to enter a dateComments:
Filed: 2013-09-27 EB-2013-0321 Ex. F2-3-3 Attachment 1 Tab 10
I
i aJt,(
iu r ‘:
wkr r Als ta
NTARIOOr,ri1EZ Page: l2of 12
-
Severe Accident Management Guidance Implementation 10 - 62449 (OM&A)
Developmental Business Case Summary N - BCS - 09013 - 10000 - R000
Attachment “D” Risk Probabilities Chart
Prity
I
n1OO AboutllOOjAboutIlntêj olinS
f
Risk Impact Chart
>80% of > 0 day Significant, National and Non-compliance with Potential for Spll or release causing Loss or
Tota delay unacceptable nternational potental for signficant fatality(s) mn’ediate and serious
Project S non- adverse implicabons for extended impact with degradation
conformance coverage or personnel. potentially off-site impacts. of a safety
requiring impacts large damages or e g. :Cleanup costs> system
extensive Criminal Charges OR $l5MCat. A spill (>55
rework Potential loss of pts)
operating licenses
30% - 80% 30 - 90 day Unacceptable Long-term Legislative non- Potential for fe- Exceedances resulting Reduced
of Total delay non- local or compliance with threatening in charges or Directors effectiveness
Project $ conformance national potential for fines, critical injury or OrderCat. A spill (45 - of a safety
4requiring impact charges. and permanent total 55 pts)Public system
some rework, damages ORMajor disability complaints with OPG
but not major degradation of including implications Explosion
reputation with occupational and/or major fire
regulatory bodies disease
15% - 30% 10 -30 day Non- Major local Systematic non- Potential for Cat. B spillsEmission in Reduced
of Total delay conformance impact or compliance with less serious exceedance of effectiveness
Project $ borderng minor natonal potental for critical injuries regulatory or legal of redundant
design inpact.Minor finesORPotential to (e.g. fractures). limitsField orders or safety
tolerances. local damage cause strained permanent AMP sPublic complaints system
potenta to relationship with partial with OPG components
require regulator, increased disablities and implicationsDangerto
rework surveillance and/or temporary total health, life, or property
reguiations disabi ties of asign ficant
nature
Complaintsfrom ocalofficialsDot cans
5% - 15%of TotalProlect S
3 lOdaydelay
a as
Systematic noncompliance withmoacts to prcfect
sched,eORPoss bii tyo regulatory legal
m0 aor
Potential orless serioustemporary
asab ties analuneS requ ringffste ned ra
Acceptablenon
conformancew hn designtoierances no
ow rk
i (
Impact on asafety
support orsafetyreiatedsvsteir
Cat. C spills -
reportableAdministrativei nfractionsPu bl’c
Compants with o anteve implicatons
.IDO ‘S C
Filed: 2013-09-27 EB-2013-0321 Ex. F2-3-3 Attachment 1 Tab 10