Full Mission Simulation Report. New Jersey Space Grant Consortium at Stevens Institute of Technology and Rutgers University Ethan Hayon, Mark Siembab, Mike Giglia, Robert Hopkins, Sean Watts. Mission Statement:. - PowerPoint PPT Presentation

Citation preview

Page 1: Full Mission Simulation Report

Full Mission Simulation Report

New Jersey Space Grant Consortium at Stevens Institute of Technology and

Rutgers University

Ethan Hayon, Mark Siembab, Mike Giglia, Robert Hopkins, Sean Watts

Page 2: Full Mission Simulation Report

Mission Statement:

–To collect and analyze data for future space research operations through various experiments designed and implemented on a payload.

Page 3: Full Mission Simulation Report

Mission Overview:

• The payload has been assembled and we have began testing it. o Pressure tests of the ACV and pneumatic

components will take place in the upcoming week. o The IR temperature sensor will be mounted in the

coming week.o We are working on acquiring access to a vibration

table.o Code will be organized into cleaner functions for

easier maintainability.

Page 4: Full Mission Simulation Report

Subsystem Overview:

• Mechanical/Structure• Electrical• Power / EPS• Atmospheric Containment Vessel/Pneumatics• Software

Page 5: Full Mission Simulation Report

Mechanical / Structure:

• After minor adjustments to the pneumatic system, nearly all components were integrated successfully.

• Written integration procedure and current parts list have not been drafted but will be, if required; so far we have encountered no problems with assembly, nor keeping track of components.

• Spare hardware and components are available for nearly every subsystem.

• Payload weight: 1318.4g (46.5 ounces or 2.9 lbs)o A ballast may be necessary; it will consist of nuts +

short bolts (steel) mounted through the payload plates at specific locations.

Page 6: Full Mission Simulation Report

Mechanical / Structure:

• Integrating with Mitchell County College:o Aluminum hex standoffs will be used to combine the

payloads.• Inside will be threaded steel rods used to connect the female-

female aluminum standoffs.• These standoffs are 2" in height each making our payload

height 4.5" including the thickness of the plates.o The combined center of gravity is to be reviewed this

week to be finalized.• Action Items: Teleconference with Mitchell County

College regarding final integration plans and combined mass and center of gravity.

Page 7: Full Mission Simulation Report

Electrical:

• All electronics have been integrated except for the Infrared Temperature Sensor. The sensor is connected, but not yet attached to the plate.o We are unsure of the best location to mount it. It needs to be as close

to the rocket skin as possible. Can we use the access window on the canister?

• We have received data, and it makes sense.

• Data on the next slide

• Once we connect the IR temp sensor (code is already written and functional) the payload will be electrically complete.

• We also need to organize the wires and stake down the components.

Page 8: Full Mission Simulation Report

Sample Data (From SD Card):Time: 20 | x: 0 | y: 0 | z: 7 | CO2: 805

Time: 21 | x: 0 | y: 1 | z: 8 | CO2: -1

Time: 22 | x: 0 | y: 0 | z: 8 | CO2: -1

Time: 23 | x: 0 | y: 0 | z: 7 | CO2: -1

Time: 24 | x: 0 | y: 0 | z: 7 | CO2: -1

Time: 25 | x: 0 | y: 1 | z: 7 | CO2: -1

Time: 26 | x: 0 | y: 1 | z: 7 | CO2: -1

Time: 27 | x: 1 | y: 0 | z: 7 | CO2: -1

Time: 28 | x: 0 | y: 0 | z: 7 | CO2: -1

Time: 29 | x: 2 | y: 0 | z: 12 | CO2: -1

Time: 30 | x: 0 | y: 0 | z: 7 | CO2: 1255

Time: 31 | x: 0 | y: 0 | z: 7 | CO2: -1

Time: 32 | x: 0 | y: 0 | z: 7 | CO2: -1

Time: 33 | x: 0 | y: 0 | z: 7 | CO2: -1

Time: 34 | x: 0 | y: 0 | z: 7 | CO2: -1

Time: 35 | x: 0 | y: 0 | z: 9 | CO2: -1

Time: 36 | x: 0 | y: 0 | z: 7 | CO2: -1

Time: 37 | x: 0 | y: 0 | z: 6 | CO2: -1

Time: 38 | x: 0 | y: 0 | z: 3 | CO2: -1

Time: 39 | x: 0 | y: 3 | z: 2 | CO2: -1

Time: 40 | x: 0 | y: 0 | z: 8 | CO2: 1285

Each increment to "time" is 1/20th of a second.

Page 9: Full Mission Simulation Report

Power / EPS:

• The 600mAh NiCD battery used for initial testing lasted approximately 45 minutes

• The idle current draw of the servo proved more significant than expected, but still marginal compared to the previous pinch valve and will not cause any problems

• Acquisition of a higher capacity 9.6V NiMH battery pack. o Ordered on April 28th

Page 10: Full Mission Simulation Report

Atmospheric Containment Vessel / ACV:

• Final machining on the ACV was completed and it was mounted successfully.

• ACV ports were over-tapped and angled barbed fittings were used to minimize the ACV's footprint and simplify assembly.

• Silicone-bead sealing will be pressure tested within the next week.

Page 11: Full Mission Simulation Report

Pneumatic System:

• A welded metal bracket was devised to secure the ball valve to the plate.

• Bracket provides 1/2" of left-right position adjustment if required.

• HS-625MG Servo tested and found to actuate ball valve with no problems.

• Servo mounted to ball-valve using machined metal parts to ensure durability.

Page 12: Full Mission Simulation Report

Software:• The software ran as expected.

o We are still working out the timing for when the inlet valve will open and close.

o Data was written successfully to the SD Card.

• We are sampling the IR temperature sensor and the accelerometer at 20Hz. The CO2 sensor is being sampled at 2Hz (using a mod 10 operation)

• Set up the timing on the open/close valve operation. Right now we can automatically open and close the valve, however, it is not on a timer.

Page 13: Full Mission Simulation Report

Action Item Summary:

• Order a third revision of the shield. This board will contain some extra ports for flexibility if we choose to add components. Also, additional power outputs will be helpful. o Order before May 1st.

• Use a higher capacity NiMH batteryo Ordered on April 29th.

• Set timing on ball valve open/close actiono Coded before May 1st

Page 14: Full Mission Simulation Report

Pictures

Page 15: Full Mission Simulation Report
Page 16: Full Mission Simulation Report
Page 17: Full Mission Simulation Report

Conclusions:

• Currently we do not have a location planned for our IR thermometer and we request advice as it is expected to measure rocket skin temperature. Note: C of G will not be impacted by placement of thermometer because it weighs <1 gram.