Funding Asset Replacement:One Agency’s Experience

WEFTEC 2000Anaheim, CaliforniaOctober 18, 2000

Page 2: Funding Asset Replacement: One Agencys Experience WEFTEC 2000 Anaheim, California October 18, 2000

2

SRP’s Purpose

SRP: “System Replacement Planning

Help water/wastewater utility management formulate financial policy for long-term system replacement needs

Page 3: Funding Asset Replacement: One Agencys Experience WEFTEC 2000 Anaheim, California October 18, 2000

3

Why?

CMOM “long-term spill mitigation”

GASB 34 “modified approach” compliance

Establish effective reserve policy

Defend existing reserves (“Little Hoover” issues)

Maintain integrity of infrastructure (WIN Report)

Position for upcoming federal funding

Key component of good asset management!

Page 4: Funding Asset Replacement: One Agencys Experience WEFTEC 2000 Anaheim, California October 18, 2000

4

Who?

Irvine Ranch Water District

Orange County Sanitation District

Orange County Water District

Maui Board of Water Supply

Roseville Water and Sewer

City of Oxnard

Page 5: Funding Asset Replacement: One Agencys Experience WEFTEC 2000 Anaheim, California October 18, 2000

5

Elements of an SRP

SystemReplacement

Plan

Pipe inventory

Replacement costs

Plant inventory

Useful lives

Earnings rate

Inflation rate

Page 6: Funding Asset Replacement: One Agencys Experience WEFTEC 2000 Anaheim, California October 18, 2000

6

Orange County Water District

Major groundwater management agencyManages groundwater for 2.2 million people in Orange CountySignificant infrastructure assets (pipes, reclamation plants, wells, etc.)Planning (with Orange County Sanitation District) a very large reclamation/recharge project, “GWRS”Asset management considered a key issue

Page 7: Funding Asset Replacement: One Agencys Experience WEFTEC 2000 Anaheim, California October 18, 2000

7

Inventories in General

Need to inventory assets: Plant Pipe Equipment

Each asset needs: Useful life in years Current replacement cost

Page 8: Funding Asset Replacement: One Agencys Experience WEFTEC 2000 Anaheim, California October 18, 2000

8

Useful Life

Remaining useful life can be based on assessed condition plus engineering judgment

If there is no assessment, it can also be based on year in service and “typical” useful life for the type of asset

Page 9: Funding Asset Replacement: One Agencys Experience WEFTEC 2000 Anaheim, California October 18, 2000

9

Replacement Cost

What would it cost to replace now?

This may be higher than original cost,

especially pipe (right-of-way issues)

Changes in standards and technology

can also affect replacement cost

Page 10: Funding Asset Replacement: One Agencys Experience WEFTEC 2000 Anaheim, California October 18, 2000

10

Refurbishments

Each asset class can have several types of capital refurbishment – for instance: Painting Electrical rehab Mechanical rehab New pumps

Each needs a cost and an interval

Cost can be a percentage of replacement cost

Page 11: Funding Asset Replacement: One Agencys Experience WEFTEC 2000 Anaheim, California October 18, 2000

11

Tying Assets to the Fund

Replacement Fund is the fundamental tool for accumulating replacement money

Need: Starting balance, earnings rate Annual replenishment amount(s) Percent of replacements funded Annual “miscellaneous” costs

Page 12: Funding Asset Replacement: One Agencys Experience WEFTEC 2000 Anaheim, California October 18, 2000

12

Other Funding Sources

Rate surcharges

Special bond issues

Misc. cash flows

Page 13: Funding Asset Replacement: One Agencys Experience WEFTEC 2000 Anaheim, California October 18, 2000

13

Replacement Planning Model

The RPM takes the inventories and

financial data and creates reports

Calculates future replacement costs and

facilitates replacement fund analysis

Page 14: Funding Asset Replacement: One Agencys Experience WEFTEC 2000 Anaheim, California October 18, 2000

14

RPM Reports

Fund expenditures by yearFund balances by yearCash flow from bond issuancesReplacement needs (various categories)System replacement value, in aggregate or by sub-systemOthers

Page 15: Funding Asset Replacement: One Agencys Experience WEFTEC 2000 Anaheim, California October 18, 2000

15

RPM’s “Control Panel”

Page 16: Funding Asset Replacement: One Agencys Experience WEFTEC 2000 Anaheim, California October 18, 2000

Pattern of Future Costs

16

Page 17: Funding Asset Replacement: One Agencys Experience WEFTEC 2000 Anaheim, California October 18, 2000

Expected Fund Performance

17

Page 18: Funding Asset Replacement: One Agencys Experience WEFTEC 2000 Anaheim, California October 18, 2000

Value of System Assets

18

Page 19: Funding Asset Replacement: One Agencys Experience WEFTEC 2000 Anaheim, California October 18, 2000

19

Making policy

Replacement policy will be a mix of: Establishing the initial fund balance Setting annual transfers from operations Issuing bonds (as needed) Assessing user surcharges (as needed)

Best mix of these four will have smoothest rate impact and will avoid accumulation of large fund balances

Page 20: Funding Asset Replacement: One Agencys Experience WEFTEC 2000 Anaheim, California October 18, 2000

20

OCWD’s Experience

OCWD established an asset replacement fund (balance and replenishment amount)

To control fund expenditures, procedures were needed and questions had to be answered

Page 21: Funding Asset Replacement: One Agencys Experience WEFTEC 2000 Anaheim, California October 18, 2000

21

Typical Questions (1)

“We need to replace meters and pump impellors as they are drawn from stock for routine maintenance. Should these be funded from the Replacement Fund?”

“We’re replacing a pickup, but want the new one to be four-wheel drive with an extended cab. It will cost 50 percent more. How do we handle this?”

Page 22: Funding Asset Replacement: One Agencys Experience WEFTEC 2000 Anaheim, California October 18, 2000

22

Typical Questions (2)

“We’re replacing several desktop computers. The new computers will be far more powerful than the old ones, but the costs will be about the same. Which fund should we charge to?”

“Some of our analytical equipment is obsolete, even though it’s only three years old. It cannot detect contaminants at the levels required by new regulations. Does this qualify as a Replacement Fund expenditure?”

Page 23: Funding Asset Replacement: One Agencys Experience WEFTEC 2000 Anaheim, California October 18, 2000

23

Typical Questions (3)

“One of our injection wells is failing. We want to replace it with a new one, but to leave the old well in place with limited capacity. Is this a replacement?”

“We want to extend the lives of some of our pipes by interior coating. Is this a qualifying cost?”

Page 24: Funding Asset Replacement: One Agencys Experience WEFTEC 2000 Anaheim, California October 18, 2000

24

Responding to the Questions

Clear policies were needed for expenditures qualifying for the replacement fund

These policies were built around definitions of key terms: Replacements Refurbishments Upgrades Additions

Page 25: Funding Asset Replacement: One Agencys Experience WEFTEC 2000 Anaheim, California October 18, 2000

25

Replacement Criteria

“A qualifying investment will replace the functionality of an existing asset, and the existing asset will be taken out of service or remain in a state of severely impaired functionality.”

Page 26: Funding Asset Replacement: One Agencys Experience WEFTEC 2000 Anaheim, California October 18, 2000

26

Refurbishment Criteria

“A qualifying investment will maintain an existing asset’s functionality, will have a value of greater that $3,000, and will extend the asset’s life by three years or more.”

Page 27: Funding Asset Replacement: One Agencys Experience WEFTEC 2000 Anaheim, California October 18, 2000

27

Upgrade Criteria

An upgrade will qualify for funding if:

The functionality of the new asset includes the functionality of the asset being replaced

Management agrees that the added functionality is required or desirable; and

The cost of the new asset does not exceed 130% of the original cost of the asset being replaced on an inflation-adjusted basis.

Page 28: Funding Asset Replacement: One Agencys Experience WEFTEC 2000 Anaheim, California October 18, 2000

28

Asset additions

“An addition is the placing in service of an asset that does not replace the functionality of an existing asset being taken out of service or extend the life of an existing asset. The Replacement Fund does not pay for additions.”

Page 29: Funding Asset Replacement: One Agencys Experience WEFTEC 2000 Anaheim, California October 18, 2000

29

Accounting Effects of Funding

Separate funds were set up to account for replacement and refurbishment expenses

Because of OCWD’s fund structure, this became somewhat complex

Page 30: Funding Asset Replacement: One Agencys Experience WEFTEC 2000 Anaheim, California October 18, 2000

30

Assignment of Expendituresto Funds

Purchase item orservice

Is it a project?

Is it a newproject?

PROJECT(system asset or

infrastructure)

901 CapitalFund

60-01 account70-01 account

991 ReplacementFund

60-01 account70-01 account

A NEW PROJECT

Is it replacing aretired asset?

NOT A PROJECT(fixed asset or

service & supply)

REPLACING AFIXED ASSET

Is it a Replacementor a refurbishment?

NOT A NEW PROJECT

A NEWFIXED ASSET

991 RefurbishmentFund

60-02 account

REFURBISHMENT(on-going repairs)

REPLACEMENT(one-time)

881 GeneralFund

Service & Supplies14-01 to 39-99

accounts

901 CapitalFund

40-01 account40-02 account

991 ReplacementFund

40-01 account40-02 account

Is it less than$1,000?

LESS THAN $1,000service or supply

GREATER THANOR EQUAL TO

$1,000

Amount aboveoriginal operational

level?

Amount aboveoriginal operational

level?

AMOUNT ABOVEORIGINAL

OPERATINGVALUE

AMOUNT OFORIGINAL

OPERATINGVALUE

AMOUNT OFORIGINAL

OPERATINGVALUE

Page 31: Funding Asset Replacement: One Agencys Experience WEFTEC 2000 Anaheim, California October 18, 2000

31

RPM Calibration

Finally, the RPM needed to be “calibrated” against real-life replacement costs

For two years, replacement costs have been somewhat lower than RPM forecasts

Staff is considering adjusting (lengthening) some useful lives to increase forecast accuracy

Page 32: Funding Asset Replacement: One Agencys Experience WEFTEC 2000 Anaheim, California October 18, 2000

32

Summary

Orange County Water District has established a replacement fund based on its actual infrastructure inventory

Policies required for this fund and its use have been put into place

Staff is dealing with replacement funding programmatically, measuring results, and adjusting policies on an ongoing basis

Page 33: Funding Asset Replacement: One Agencys Experience WEFTEC 2000 Anaheim, California October 18, 2000

33

An Unexpected Benefit

OCWD’s bond rating, already high, was upgraded last year

The rating firm stated that the replacement fund, and staff’s seriousness about its application, contributed to this upgrade

Page 34: Funding Asset Replacement: One Agencys Experience WEFTEC 2000 Anaheim, California October 18, 2000

34

Questions/Discussion

Andrew V. CzornyAssociate General Manager/CFOOrange County Water DistrictFountain Valley, CA(714) [email protected]

V. Kenneth HarlowDirector of Management ServicesBrown and CaldwellIrvine, CA(949) [email protected]