Daniel Nåfors
181116 Stockholm
Future of Space Manufacturing
11/30/2018 Chalmers 2
Starting point of the
project• New space
• Adapt the production system
• Understanding the production
system
11/30/2018 Chalmers 3
Simulation model (part of)
11/30/2018 Chalmers 4
Current state
• Gather an understanding
• 14 interviews with different roles
throughout RUAG
• Senior managers
• Finance
• HR
• Engineers
• Key account manager
11/30/2018 Chalmers 5
Digitalization of factory
11/30/2018 Chalmers 6
Mapping the
production system
11/30/2018 Chalmers 7
Production system analysis
Time per process in
one sub-flow
11/30/2018 Chalmers 8
Production system analysis
Percent of time spent
on different
categories
11/30/2018 Chalmers 9
Production system analysis
Percent of time spent
on directly adding
value
11/30/2018 Chalmers 10
Production system analysis
Summary of time spent in
all production flows
11/30/2018 Chalmers 11
Production system analysis
Time required per
sub-flow for a
complete product
11/30/2018 Chalmers 12
Simulation models
• Two simulation models of the
production system
• Visual components
• Automod
11/30/2018 Chalmers 13
Simulation models
Individual sub-flow
11/30/2018 Chalmers 14
11/30/2018 Chalmers 15
11/30/2018 Chalmers 16
New space
• Interviews
• Demands and requests on the future
system
• More work needed
11/30/2018 Chalmers 17
Scientific publications
• Four conference proceedings spread over CIRP Conference on
Manufacturing Systems and Winter Simulation Conference
• Poster competition at AAAS
Student projects
• Two master theses (2017 and 2018)
• Report from student project in a 7,5 credit project course (2018)
• Reports by two intern students from a French University (2017 and
2018)
Publications and documentation
11/30/2018 Chalmers 18
Daniel Nåfors
Maja Bärring
Thank you for listening