33
ProposedFY2013/FY2013GAA1-03-2013 as of January 3, 2013 25 January, 2013 03:28:36 PM Scope of Work Allocation Implementing Office (2) (3) (4) (5) Target (1) FY 2013 DPWH INFRASTRUCTURE PROGRAM (Based on GAA) Region III Name of Project/Location Physical AURORA DEO 1,098,872 GOP 948,246 Lone District, Rep. Angara LOAN 150,626 I. Locally Funded Projects 922,257 a. National Arterial and Secondary Roads and Bridges 43.350 Km 922,257 1. Assets Preservation of National Roads Generated from 52,875 Pavement Management System/Highway Development and Management System-4 (HDM-4) Intermittent Sections a. Preventive Maintenance 7.740 Km 52,875 1. National Arterial (Preventive Maintenance) a. Nueva Ecija-Aurora Road 4.496 Km 31,057 Aurora DEO 1. K0212 + 265 - K0214 + 000 Overlay 50mm with corrections 1.750 Km 12,067 2. K0220 + 000 - K0221 + 000 Overlay 50mm 1.036 Km 6,910 3. K0229 + 000 - K0230 + 698 Overlay 50mm 1.710 Km 12,080 2. Secondary (Preventive Maintenance) a. Dingalan-Gabaldon Road 1. K0176 + 000 - K0179 + 000 Overlay 50mm 3.24 Km 21,818 Aurora DEO 2. Road Upgrading (Gravel to Paved) based 33.110 Km 819,382 on Gravel Road Strategies, Traffic Benchmark on Gravel Road Strategies, Traffic Benchmark for upgrading to paved natioal road standards (HDM-4 Project Analysis) Intermittent Sections a. National Arterial Road (Upgrading) 32.025 Km 789,139 1. Nueva Ecija-Aurora Road 7.404 Km 222,132 a. K0171+(-322) - K0171+000 0.322 Km 9,660 Aurora DEO 2.297 Km 68,910 Regional Office III b. K0177+470 - K0178+174 0.688 Km 20,640 c. K0178+415 - K0180+029 1.609 Km 48,270 4.595 Km 137,850 Regional Office III d. K0186+911 - K0189+189 2.288 Km 68,640 e. K0191+436 - K0194+000 2.307 Km 69,210 f. K0203+985 - K0204+175 0.190 Km 5,712 Aurora DEO 2. Baler-Casiguran Road (Dinadiawan-Casiguran Sect) 21.984 Km 511,638 6.029 Km 176,580 Regional Office III a. K0296+603 - K0298+000 1.294 Km 38,820 b. K0298+700 - K0301+841 2.897 Km 86,910 c. K0304+189 - K0306+909 0.816 Km 24,480 d. K0305+000 - K0305+120 0.120 Km 3,600 e. K0307+570 - K0308+000 0.430 Km 12,900 f. K0308+000 - K0308+426 0.428 Km 8,946 g. K0308+669 - K0308+713 0.044 Km 924 15.955 Km 335,058 Regional Office III h. K0312+000 - K0315+141 3.143 Km 66,003 i. K0315+958 - K0316+000 0.057 Km 1,197 j. K0316+160 - K0316+686 0.526 Km 11,046 k. K0316+840 - K0317+091 0.225 Km 4,725 l. K0317+896 - K0319+798 1.888 Km 39,648 m. K0320+248 - K0321+380 0.988 Km 20,748 n. K0323+894 - K0325+120 1.188 Km 24,948 o. K0325+838 - K0330+000 4.153 Km 87,213 p. K0330+000 - K0333+(-449) 2.539 Km 53,319 q. K0334+000 - K0335+(-244) 0.739 Km 15,519 r. K0335+177 - K0336+(-423) 0.331 Km 6,951 s. K0336+(-348) - K0336+(-170) 0.178 Km 3,741

FY 2013 DPWH INFRASTRUCTURE PROGRAM (Based on GAA) Region III · Region III Name of Project/Location Physical 3. Dinadiawan-Madella Road 2.637 Km 55,369 Regional Office III a. K0295+000

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: FY 2013 DPWH INFRASTRUCTURE PROGRAM (Based on GAA) Region III · Region III Name of Project/Location Physical 3. Dinadiawan-Madella Road 2.637 Km 55,369 Regional Office III a. K0295+000

ProposedFY2013/FY2013GAA1-03-2013 as of January 3, 2013 25 January, 2013

03:28:36 PM

Scope of Work Allocation Implementing Office

(2) (3) (4) (5)

Target

(1)

FY 2013 DPWH INFRASTRUCTURE PROGRAM

(Based on GAA)

Region III

Name of Project/Location Physical

AURORA DEO 1,098,872

GOP 948,246

Lone District, Rep. Angara LOAN 150,626

I. Locally Funded Projects 922,257

a. National Arterial and Secondary Roads and Bridges 43.350 Km 922,257

1. Assets Preservation of National Roads Generated from 52,875

Pavement Management System/Highway Development

and Management System-4 (HDM-4) Intermittent Sections

a. Preventive Maintenance 7.740 Km 52,875

1. National Arterial (Preventive Maintenance)

a. Nueva Ecija-Aurora Road 4.496 Km 31,057 Aurora DEO

1. K0212 + 265 - K0214 + 000Overlay 50mm

with corrections1.750 Km 12,067

2. K0220 + 000 - K0221 + 000 Overlay 50mm 1.036 Km 6,910

3. K0229 + 000 - K0230 + 698 Overlay 50mm 1.710 Km 12,080

2. Secondary (Preventive Maintenance)

a. Dingalan-Gabaldon Road

1. K0176 + 000 - K0179 + 000 Overlay 50mm 3.24 Km 21,818 Aurora DEO

2. Road Upgrading (Gravel to Paved) based 33.110 Km 819,382

on Gravel Road Strategies, Traffic Benchmarkon Gravel Road Strategies, Traffic Benchmark

for upgrading to paved natioal road standards

(HDM-4 Project Analysis) Intermittent Sections

a. National Arterial Road (Upgrading) 32.025 Km 789,139

1. Nueva Ecija-Aurora Road 7.404 Km 222,132

a. K0171+(-322) - K0171+000 0.322 Km 9,660 Aurora DEO

2.297 Km 68,910 Regional Office III

b. K0177+470 - K0178+174 0.688 Km 20,640

c. K0178+415 - K0180+029 1.609 Km 48,270

4.595 Km 137,850 Regional Office III

d. K0186+911 - K0189+189 2.288 Km 68,640

e. K0191+436 - K0194+000 2.307 Km 69,210

f. K0203+985 - K0204+175 0.190 Km 5,712 Aurora DEO

2. Baler-Casiguran Road (Dinadiawan-Casiguran Sect) 21.984 Km 511,638

6.029 Km 176,580 Regional Office III

a. K0296+603 - K0298+000 1.294 Km 38,820

b. K0298+700 - K0301+841 2.897 Km 86,910

c. K0304+189 - K0306+909 0.816 Km 24,480

d. K0305+000 - K0305+120 0.120 Km 3,600

e. K0307+570 - K0308+000 0.430 Km 12,900

f. K0308+000 - K0308+426 0.428 Km 8,946

g. K0308+669 - K0308+713 0.044 Km 924

15.955 Km 335,058 Regional Office III

h. K0312+000 - K0315+141 3.143 Km 66,003

i. K0315+958 - K0316+000 0.057 Km 1,197

j. K0316+160 - K0316+686 0.526 Km 11,046

k. K0316+840 - K0317+091 0.225 Km 4,725

l. K0317+896 - K0319+798 1.888 Km 39,648

m. K0320+248 - K0321+380 0.988 Km 20,748

n. K0323+894 - K0325+120 1.188 Km 24,948

o. K0325+838 - K0330+000 4.153 Km 87,213

p. K0330+000 - K0333+(-449) 2.539 Km 53,319

q. K0334+000 - K0335+(-244) 0.739 Km 15,519

r. K0335+177 - K0336+(-423) 0.331 Km 6,951

s. K0336+(-348) - K0336+(-170) 0.178 Km 3,741

Page 2: FY 2013 DPWH INFRASTRUCTURE PROGRAM (Based on GAA) Region III · Region III Name of Project/Location Physical 3. Dinadiawan-Madella Road 2.637 Km 55,369 Regional Office III a. K0295+000

ProposedFY2013/FY2013GAA1-03-2013 as of January 3, 2013 25 January, 2013

03:28:36 PM

Scope of Work Allocation Implementing Office

(2) (3) (4) (5)

Target

(1)

FY 2013 DPWH INFRASTRUCTURE PROGRAM

(Based on GAA)

Region III

Name of Project/Location Physical

3. Dinadiawan-Madella Road 2.637 Km 55,369 Regional Office III

a. K0295+000 - K0295+403 0.403 Km 8,463

b. K0296+923 - K0298+859 1.903 Km 39,963

c. K0302+000 - K0302+330 0.331 Km 6,943

b. Secondary (Upgrading) 1.085 Km 30,243

1. Dingalan-Gabaldon Road

a. K0181+844 - K0181+882 0.038 Km 798 Aurora DEO

2. Baler-Casiguran Road (Baler-Dinadiawan)

a. K0229+525 - K0229+657 0.132 Km 2,772 Aurora DEO

3. Sn Luis-Ma Aurora-A Castañeda Road 0.915 Km 26,673

0.822 Km 23,880 Aurora DEO

a. K0241+920 - K0242+044 0.156 Km 3,900

b. K0245+841 - K0246+(-111) 0.086 Km 2,580

c. K0248+074 - K0248+304 0.230 Km 6,900

d. K0253+440 K0254+000 0.067 Km 2,010

e. K0254+839 - K0255+(-082) 0.140 Km 4,200

f. K0255+837 - K0256+(-039) 0.143 Km 4,290

g. K0261+245 - K0262+166 0.093 Km 2,793 Aurora DEO

3. Address critical bottlenecks

a. Construction/widening/upgrading/rehabilitation of Access Roads to a. Construction/widening/upgrading/rehabilitation of Access Roads to

Major Airport, Major Seaports and Declared Tourism Destinations

1. To Declared Tourism Destinations

a. Sabang-Baler Road Improvement 2.500 Km 50,000 Aurora DEO

II.Foreign-Assisted Projects

A. Highways

On-going

1. Road Upgrading and Preservation Project (J-RUPP)

JICA Loan No. PH-P247

a. Upgrading/Improvement (UI)

1. Bongabon-Rizal-Pantabangan_Baler Road, 1.010 Km 176,615 PMO-PJHL

GOP 25,989

LOAN 150,626

Page 3: FY 2013 DPWH INFRASTRUCTURE PROGRAM (Based on GAA) Region III · Region III Name of Project/Location Physical 3. Dinadiawan-Madella Road 2.637 Km 55,369 Regional Office III a. K0295+000

ProposedFY2013/FY2013GAA1-03-2013 as of January 3, 2013 25 January, 2013

03:28:36 PM

Scope of Work Allocation Implementing Office

(2) (3) (4) (5)

Target

(1)

FY 2013 DPWH INFRASTRUCTURE PROGRAM

(Based on GAA)

Region III

Name of Project/Location Physical

BATAAN DEO I 391,493

GOP 386,978

LOAN 4,515

Bataan 1st Legislative District, Rep. Herminia Roman

I. Locally Funded Projects 333,237

a. National Arterial and Secondary Roads and Bridges 22.417 Km 314,237

1. Assets Preservation of National Roads Generated from 22.277 Km 228,236

Pavement Management System/Highway Development

and Management System-4 (HDM-4) Intermittent Sections

a. Preventive Maintenance 16.967 Km 157,315

1. National Arterial (Preventive Maintenance)

a. Gapan-Sn Fernando-Olongapo Road 6.993 Km 72,381 Regional Office III

1. K0103 + 000 - K0103 + 499 Overlay 50mm 0.499 Km 3,355

2. K0104 + 000 - K0106 + 000 Overlay 50mm 2.010 Km 13,546

3. K0108 + 600 - K0110 + 000 Overlay 80mm 1.420 Km 15,241

4. K0112 + 000 - K0115 + 038 Overlay 100mm 3.064 Km 40,239

2. Secondary (Preventive Maintenance) 9.974 Km 84,934

a. Calaguiman Vicinal Road 2.150 Km 24,141 Bataan DEO I

1. K0123 + 000 - K0124 + 802 Overlay 80mm 0.390 Km 11,229

with corrections

2. K0124 + 038 - K0124 + 802 Overlay 80mm 1.000 Km 8,534 2. K0124 + 038 - K0124 + 802 Overlay 80mm 1.000 Km 8,534

with corrections

3. K0129 + 568 - K0129 + 953 Overlay 80mm 0.760 Km 4,378

with corrections

b. Jct Layac-Balanga-Mariveles Port Road 6.874 Km 48,977 Bataan DEO I

1. K0102 + 590 - K0103 + 000 Overlay 50mm 0.410 Km 2,758

2. K0105 + 212 - K0105 + 631 Overlay 50mm 0.419 Km 2,818

3. K0105 + 631 - K0105 + 828 Overlay 50mm 0.190 Km 1,307

with corrections

4. K0105 + 828 - K0106 + 269 Overlay 50mm 0.439 Km 2,953

5. K0108 + 000 - K0110 + 000 Overlay 50mm 2.000 Km 13,446

6. K0111 + 000 - K0112 + 000 Overlay 50mm 1.000 Km 6,726

7. K0118 + 272 - K0119 + 000 Overlay 80mm 0.676 Km 7,266

8. K0119 + 000 - K0120 + 000 Overlay 50mm 1.020 Km 6,860

9. K0121 + 000 - K0121 + 721 Overlay 50mm 0.720 Km 4,843

c. Hermosa Poblacion Road

1. Chainage 0252 - Chainage 0462 Overlay 80mm 0.210 Km 2,257 Bataan DEO I

d. Tabacan Poblacion Road

1. K0102 + (-736) - K0102 + 000 Overlay 100mm 0.740 Km 9,559 Bataan DEO I

b. Rehabilitation /Reconstruction/Upgrading of

Damaged Paved National Roads (Intermittent Sections)

1. Secondary (Rehabilitation/Reconstruction/Upgrading)

a. Calaguiman Vicinal Road 5.310 Km 70,921 Regional Office III

1. K0117 + 349 - K0119 + 714 Recon AC 50mm 2.380 Km 31,795

2. K0120 + 000 - K0120 + 736 Recon AC 50mm 0.740 Km 9,881

3. K0121 + (-259) - K0123 + 000 Recon AC 50mm 2.190 Km 29,245

Page 4: FY 2013 DPWH INFRASTRUCTURE PROGRAM (Based on GAA) Region III · Region III Name of Project/Location Physical 3. Dinadiawan-Madella Road 2.637 Km 55,369 Regional Office III a. K0295+000

ProposedFY2013/FY2013GAA1-03-2013 as of January 3, 2013 25 January, 2013

03:28:36 PM

Scope of Work Allocation Implementing Office

(2) (3) (4) (5)

Target

(1)

FY 2013 DPWH INFRASTRUCTURE PROGRAM

(Based on GAA)

Region III

Name of Project/Location Physical

2. Road Upgrading (Gravel to Paved) based

on Gravel Road Strategies, Traffic Benchmark

for upgrading to paved natioal road standards

(HDM-4 Project Analysis) Intermittent Sections

a. Secondary (Upgrading)

1. Mabatang Vicinal Road

a. K0126+850 - K0126+991 0.140 Km 3,525 Bataan DEO I

3. Address Critical Bottlenecks

1. Traffic Decongestion

a. Widening of Bridges, Bataan 1st Legislative District 92.90 Lm 71,696

1. Saguing Bridge along Gapan-San fernando-Olongapo 7.40 Lm 7,500 Bataan DEO I

Road, Dinalupihan

2. Orani Bridge II along Jct. Layac-Balanga-Mariveles Port 38.20 Lm 27,196 Bataan DEO I

Road, Orani

3. Pinulot Bridge along Gapan-San Fernando-Olongapo 47.30 Lm 37,000 Bataan DEO I

Road, Bry. San Pablo, Dinalupihan

4. National Bridges

a. Replacement/Rehabilitation/Strengthening of Permanent

Bridges Generated from Bridge Management System (BMS)

1. Samal Bridge along Jct. Layac-Balanga-Mariveles Port Road Repalcement 30.80 Lm 10,780 Bataan DEO I1. Samal Bridge along Jct. Layac-Balanga-Mariveles Port Road Repalcement 30.80 Lm 10,780 Bataan DEO I

b. Flood Control and Drainage Projects (MFO-3)

1. Repair/Rehabilitation of concrete revetment along Colo River (Naparing 475 Lm 19,000 Bataan DEO I

Section), Dinalupihan

II.Foreign-Assisted Projects

A. Highways

On-going

1. Gapan-San Fernando-Olongapo Road 2.500 Km 58,256 PMO-KEDCF

Phase II, (GSO) Project, Bataan and Pampanga Province GOP 53,741

Korean EDCF, EXIMBank, Loan No. PHL-10 LOAN 4,515

Page 5: FY 2013 DPWH INFRASTRUCTURE PROGRAM (Based on GAA) Region III · Region III Name of Project/Location Physical 3. Dinadiawan-Madella Road 2.637 Km 55,369 Regional Office III a. K0295+000

ProposedFY2013/FY2013GAA1-03-2013 as of January 3, 2013 25 January, 2013

03:28:36 PM

Scope of Work Allocation Implementing Office

(2) (3) (4) (5)

Target

(1)

FY 2013 DPWH INFRASTRUCTURE PROGRAM

(Based on GAA)

Region III

Name of Project/Location Physical

BATAAN DEO II

Bataan. 2nd Leg. District, Rep. Albert S. Garcia

I. Locally Funded Projects

a. National Arterial and Secondary Roads and Bridges 10.500 Km 277,234

1. Assets Preservation of National Roads Generated from 8.850 Km 118,514

Pavement Management System/Highway Development

and Management System-4 (HDM-4) Intermittent Sections

a. Preventive Maintenance 6.319 Km 68,514

1. National Arterial (Preventive Maintenance)

a. Roman Expressway 4.058 Km 47,960 Bataan DEO II

1. K0120 + 937 - K0121 + 113 Overlay 80mm 0.210 Km 2,537

2. K0121 + 988 - K0122 + 493 Overlay 80mm 0.785 Km 9,267

2. K0125 + 000 - K0127 + 192 Overlay 80mm 3.063 Km 36,156

2. Secondary (Preventive Maintenance)

a. Junction-Layac-Balanga-Mariveles Port Road

1. K0123 + (-1352) - K0124 + 400 2.261 Km 20,554 Bataan DEO II

b. Rehabilitation /Reconstruction/Upgrading of

Damaged Paved National Roads (Intermittent Sections)

1. Secondary (Rehabilitation/Reconstruction/Upgrading)

a. Jct Layac-Balanga-Mariveles Port Road (Mariveles

Zigzag Section)

1. K0158+(-398) - K0161+120 2.531 Km 50,000 Bataan DEO II

2. Road Upgrading (Gravel to Paved) based

on Gravel Road Strategies, Traffic Benchmark

for upgrading to paved natioal road standards

(HDM-4 Project Analysis) Intermittent Sections

a. Secondary (Upgrading)

1. Bagac-Mariveles Road

a. K0183+788 - K0185+390 1.650 Km 49,520 Bataan DEO II

3. Address Critical Bottlenecks

1. Traffic Decongestion

a. Widening of Camacho Bridge along Jct. Layac-Balanga- Widening 81 Lm 50,000 Bataan DEO II

Mariveles Port Road

4. National Bridges 94.4 Lm 59,200

a. Replacement/Rehabilitation/Strengthening of Permanent 84.6 Lm 53,320

Bridges Generated from Bridge Management System (BMS)

1. Bantan Bridge along Jct. Layac-Balanga-Mariveles Port Road Repalcement 9.00 Lm 5,400 Bataan DEO II

2. Limay Bridge along Jct. Layac-Balanga-Mariveles Port Road Repalcement 44.00 Lm 26,400 Bataan DEO II

3. Pangulisan Bridge along Jct. Layac-Balanga-Mariveles Port Road Repalcement 6.00 Lm 3,600 Bataan DEO II

4. Pukot Bridge along Mariveles-Talaga Bay Road Repalcement 25.60 Lm 17,920 Bataan DEO II

b. Replacement of Temporary to Permanent Bridges

1. Paysawan Bridge along Bagac-Mariveles Road Repalcement 9.80 Lm 5,880 Bataan DEO II

Page 6: FY 2013 DPWH INFRASTRUCTURE PROGRAM (Based on GAA) Region III · Region III Name of Project/Location Physical 3. Dinadiawan-Madella Road 2.637 Km 55,369 Regional Office III a. K0295+000

ProposedFY2013/FY2013GAA1-03-2013 as of January 3, 2013 25 January, 2013

03:28:36 PM

Scope of Work Allocation Implementing Office

(2) (3) (4) (5)

Target

(1)

FY 2013 DPWH INFRASTRUCTURE PROGRAM

(Based on GAA)

Region III

Name of Project/Location Physical

Bulacan, 1st Leg. District, Rep. Ma. Victoria Sy-Alvarado 390,693 a/

GOP 356,655

LOAN 34,038

MVUC 2,457

I. Locally Funded Projects 353,922

a. National Arterial and Secondary Roads and Bridges 6.336 Km 353,922

1. Assets Preservation of National Roads Generated from 34,922

Pavement Management System/Highway Development

and Management System-4 (HDM-4) Intermittent Sections

a. Preventive Maintenance 34,922

1. Secondary (Preventive Maintenance) 4.336 Km 34,922

a. Bigaa-Plaridel via Bulacan & Malolos Road 2.906 Km 24,608 Bulacan DEO I

1. K0043 + 157 - K0044 + 212 Overlay 80mm 1.000 Km 11,664

2. K0046 + 923 - K0047 + 480 Overlay 50mm 0.490 Km 3,577

3. K0048 + 000 - K0049 + 385 Overlay 50mm 1.416 Km 9,367

b. Pulilan Railroad Station Road 0.500 Km 3,499 Bulacan DEO I

1. K0044 + 470 - K0044 + 840 Overlay 50mm 0.370 Km 2,448

2. K0044 + 840 - K0044 + 970 Overlay 50mm 0.130 Km 1,051

with correctionswith corrections

c. Pulilan-Calumpit Road 0.930 Km 6,815 Bulacan DEO I

1. K0049 + 300 - K0050 + 000 Overlay 50mm 0.700 Km 5,296

with corrections

2. K0050 + 000 - K0050 + 232 Overlay 50mm 0.230 Km 1,519

2. Address Critical Bottlenecks

1. Traffic Decongestion

a. Widening/concreting of McArthur Highway (Manila North

Road) including drainages and traffic Management

1. Meycauayan (Bulacan) to Mabalacat Widening/ 2.00 Km 94,000 Regional Office III

(Pampanga) (Intermittent Sections) Drainage 2,000 Lm

1st District, Bulacan

3. National Bridges

a. Replacement/Rehabilitation/Strengthening of Permanent

Bridges Generated from Bridge Management System (BMS)

1. Calumpit Bridge along Manila North Road, Calumpit, Repalcement 175.2 Lm 225,000 Regional Office III

Bulacan, 1st Leg

II.Foreign-Assisted Projects

A. Highways

On-going 36,771

GOP 2,733

LOAN 34,038

MVUC 2,457

1. National Roads Improvement and Management Project 7.480 Km 11,779 PMO-NRIMP

Phase II, Loan No. 7550-PH GOP -

LM-2.1 North Luzon Package LOAN 11,779

Manila North Road, Monumento-Agoo/Aringay Bdry., (La Union)

1st District

Page 7: FY 2013 DPWH INFRASTRUCTURE PROGRAM (Based on GAA) Region III · Region III Name of Project/Location Physical 3. Dinadiawan-Madella Road 2.637 Km 55,369 Regional Office III a. K0295+000

ProposedFY2013/FY2013GAA1-03-2013 as of January 3, 2013 25 January, 2013

03:28:36 PM

Scope of Work Allocation Implementing Office

(2) (3) (4) (5)

Target

(1)

FY 2013 DPWH INFRASTRUCTURE PROGRAM

(Based on GAA)

Region III

Name of Project/Location Physical

2. Road Upgrading and Preservation Project (J-RUPP)

JICA Loan No. PH-P247

a. Asset Preservation Contract (APC)

1. Sta. Rita-Nueva Ecija Bdry. (PBM-2) 2.900 Km 24,992 a/ PMO-PJHL

Bulacan 1st GOP 2,733

LOAN 22,259

MVUC 2,457

Note:

a/ - Exclusive MVU (P2.457M)

Page 8: FY 2013 DPWH INFRASTRUCTURE PROGRAM (Based on GAA) Region III · Region III Name of Project/Location Physical 3. Dinadiawan-Madella Road 2.637 Km 55,369 Regional Office III a. K0295+000

ProposedFY2013/FY2013GAA1-03-2013 as of January 3, 2013 25 January, 2013

03:28:36 PM

Scope of Work Allocation Implementing Office

(2) (3) (4) (5)

Target

(1)

FY 2013 DPWH INFRASTRUCTURE PROGRAM

(Based on GAA)

Region III

Name of Project/Location Physical

Bulacan, 2nd Leg. District, Rep. Pedro M. Pancho 360,064 a/

GOP 328,393

LOAN 31,671

MVUC 2,458

I. Locally Funded Projects 325,661

a. National Arterial and Secondary Roads and Bridges 9.731 Km 325,661

1. Assets Preservation of National Roads Generated from 6.253 Km 62,672

Pavement Management System/Highway Development

and Management System-4 (HDM-4) Intermittent Sections

a. Preventive Maintenance

1. Secondary (Preventive Maintenance) 5.109 Km 37,970

a. Bigaa-Plaridel via Bulacan & Malolos Road

1. K0050 + 053 - K0051 + 840 Overlay 50mm 1.810 Km 14,232 Bulacan DEO I

with corrections

b. Gen Alejo Santos Highway 3.299 Km 23,738 Bulacan DEO I

1. K0045 + 000 - K0047 + 000 Overlay 50mm 2.000 Km 15,133

with corrections

2. K0055 + 671 - K0056 + 102 Overlay 50mm 0.449 Km 2,971

3. K0056 + 102 - K0056 + 948 Overlay 50mm 0.850 Km 5,634

with corrections

b. Rehabilitation /Reconstruction/Upgrading of b. Rehabilitation /Reconstruction/Upgrading of

Damaged Paved National Roads (Intermittent Sections)

1. Secondary (Rehabilitation/Reconstruction/Upgrading) 1.144 Km 24,702

a. Baliwag-Candaba Road 1.034 Km 20,433 Bulacan DEO I

1. K0053 + 231 - K0053 + 474 Reconstruction 0.243 Km 4,802

PCCP 280mm

2. K0053 + 563 - K0054 + 000 Reconstruction 0.616 Km 12,173

PCCP 280mm

3. K0054 + 384 - K0054 + 559 Reconstruction 0.175 Km 3,458

PCCP 280mm

b. Bigaa-Plaridel via Bulacan & Malolos Road

1. K0031 + (-410) - K0031 + (-300) Raising of grade 0.110 Km 4,269 Bulacan DEO I

with drainage

improvement

(concrete) 280mm

2. Address Critical Bottlenecks

a. Traffic Decongestion 168,000

1. Widening/concreting of McArthur Highway (Manila North Road)

including drainages and traffic management

a. Meycauayan (Bulacan) to Mabalacat (Pampanga) 67.10 Lm 88,000 Regional Office III

(Intermittent Sections) 2 brs

2nd District, Bulacan

2. Widening Daang Maharlika (Doña Remedios Trinidad Widening 1.739 Km 40,000 Bulacan DEO I

Section), Baliwag, Bulacan, Km 45+452 - Km 52+722

3. Widening of Cagayan Valley Road (Baliwag Section), Widening 1.739 Km 40,000 Bulacan DEO I

Baliuag, Bulacan, Km 45+388 - Km 52+985, 2nd Leg

3. National Bridges

a. Replacement/Rehabilitation/Strengthening of Permanent 94,989

Bridges Generated from Bridge Management System (BMS)

1. Bocaue Bridge along Manila North Road Replacement 60 Lm 42,000 Bulacan DEO I

Page 9: FY 2013 DPWH INFRASTRUCTURE PROGRAM (Based on GAA) Region III · Region III Name of Project/Location Physical 3. Dinadiawan-Madella Road 2.637 Km 55,369 Regional Office III a. K0295+000

ProposedFY2013/FY2013GAA1-03-2013 as of January 3, 2013 25 January, 2013

03:28:36 PM

Scope of Work Allocation Implementing Office

(2) (3) (4) (5)

Target

(1)

FY 2013 DPWH INFRASTRUCTURE PROGRAM

(Based on GAA)

Region III

Name of Project/Location Physical

2. Gen. Alejo Santos Bridge along Baliwag-Bustos Rehab/Stregthening 292.9 Lm 29,534 Bulacan DEO I

Road

3. Plaridel-Pulilan Bridge (New) along Plaridel-Pulilan Rehab/Stregthening 168 Lm 23,455 Bulacan DEO I

Diversion Road

II.Foreign-Assisted Projects

A. Highways

On-going 36,861

GOP 2,732

LOAN 31,671

MVUC 2,458

1. National Roads Improvement and Management Project 5.970 Km 9,412 PMO-NRIMP

Phase II, Loan No. 7550-PH GOP -

LM-2.1 North Luzon Package LOAN 9,412

Manila North Road, Monumento-Agoo/Aringay Bdry., (La Union)

2nd District, Bulacan

2. Road Upgrading and Preservation Project (J-RUPP)

JICA Loan No. PH-P247

a. Asset Preservation Contract (APC)

1. Sta. Rita-Nueva Ecija Bdry. (PBM-2) 2.900 Km 24,991 a/ PMO-PJHL

Bulacan 2nd GOP 2,732

LOAN 22,259

Note: MVUC 2,458

a/ - Exclusive MVU (P2.458M)a/ - Exclusive MVU (P2.458M)

Page 10: FY 2013 DPWH INFRASTRUCTURE PROGRAM (Based on GAA) Region III · Region III Name of Project/Location Physical 3. Dinadiawan-Madella Road 2.637 Km 55,369 Regional Office III a. K0295+000

ProposedFY2013/FY2013GAA1-03-2013 as of January 3, 2013 25 January, 2013

03:28:36 PM

Scope of Work Allocation Implementing Office

(2) (3) (4) (5)

Target

(1)

FY 2013 DPWH INFRASTRUCTURE PROGRAM

(Based on GAA)

Region III

Name of Project/Location Physical

Bulacan, 3rd Leg. District, Rep. Joselito Mendoza 936,594 a/

GOP 485,484

LOAN 451,110

MVUC 2,458

I. Locally Funded Projects 251,122

a. National Arterial and Secondary Roads and Bridges 8.145 Km 251,122

1. Assets Preservation of National Roads Generated from 4.267 Km 60,160

Pavement Management System/Highway Development

and Management System-4 (HDM-4) Intermittent Sections

a. Preventive Maintenance

1. Secondary (Preventive Maintenance)

a. NCR/Bulacan Bdry-Bigte-Ipo Dam Road

1. K0042 + 116 - K0044 + 1000 Overlay 80mm 2.840 Km 30,524 Bulacan DEO II

b. Rehabilitation /Reconstruction/Upgrading of

Damaged Paved National Roads (Intermittent Sections)

1. Secondary (Rehabilitation/Reconstruction/Upgrading)

a. San Miguel-Sibul Road 1.427 Km 29,636 Bulacan DEO II

1. K0082 + 537 - K0083 + 236 Reconstruction 0.111 Km 2,305

PCCP 300mm

2. K0078 + (-400) - K0078 + 000 Reconstruction 0.268 Km 5,566

PCCP 300mm

3. K0083 + 236 - K0083 + 366 Reconstruction 0.130 Km 2,700

PCCP 300mm

4. K0078 + (-476) - K0078 + (-400) Reconstruction 0.038 Km 789

PCCP 300mm

5. K0086 + 000 - K0086 + 231 Reconstruction 0.230 Km 4,777

PCCP 300mm

6. K0086 + 908 - K0087 + 621 Reconstruction 0.650 Km 13,499

PCCP 300mm

2. Road Upgrading (Gravel to Paved) based

on Gravel Road Strategies, Traffic Benchmark

for upgrading to paved natioal road standards

(HDM-4 Project Analysis) Intermittent Sections

a. Secondary (Upgrading)

1. Eastern Bulacan Road 3.878 Km 96,962

a. K0080+200 - K0094+809 0.847 Km 21,175 Bulacan DEO II

b. K0098+000 - K0100+000 2.000 Km 50,000 Bulacan DEO II

c. K0104+000 - K0105+000 1.031 Km 25,787 Bulacan DEO II

3. National Bridges 94,000

a. Construction of Bridges including Approaches

1. Balaoang Bridge along Eastern Bulacan Road, DRT, New Bridge 65.00 Lm 70,000 Regional Office III

Bulacan

b. Replacement/Rehabilitation/Strengthening of Permanent

Bridges Generated from Bridge Management System (BMS)

1. Tartaro Bridge along San Miguel-Sibul Road Replacement 40 Lm 24,000 Bulacan DEO II

Page 11: FY 2013 DPWH INFRASTRUCTURE PROGRAM (Based on GAA) Region III · Region III Name of Project/Location Physical 3. Dinadiawan-Madella Road 2.637 Km 55,369 Regional Office III a. K0295+000

ProposedFY2013/FY2013GAA1-03-2013 as of January 3, 2013 25 January, 2013

03:28:36 PM

Scope of Work Allocation Implementing Office

(2) (3) (4) (5)

Target

(1)

FY 2013 DPWH INFRASTRUCTURE PROGRAM

(Based on GAA)

Region III

Name of Project/Location Physical

II.Foreign-Assisted Projects

A. Highways 685,472 a/

GOP 234,362

On-going LOAN 451,110

MVUC 2,458

1. Road Upgrading and Preservation Project (J-RUPP)

JICA Loan No. PH-P247

a. Asset Preservation Contract (APC)

1. Sta. Rita-Nueva Ecija Bdry. (PBM-2) 2.900 Km 24,991 a/ PMO-PJHL

Bulacan 3rd GOP 2,732

LOAN 22,259

MVUC 2,458

2. Arterial Road Bypass Project, Phase II, Construction of

Contract Packages III and IV, Plaridel Bypass II (Bustos to

San Rafael), JICA-assisted

a. 3rd District 2.900 Km 660,481 PMO-PJHL

GOP 231,630

LOAN 428,851

Note:

a/ - Exclusive MVU (P2.458M)

Page 12: FY 2013 DPWH INFRASTRUCTURE PROGRAM (Based on GAA) Region III · Region III Name of Project/Location Physical 3. Dinadiawan-Madella Road 2.637 Km 55,369 Regional Office III a. K0295+000

ProposedFY2013/FY2013GAA1-03-2013 as of January 3, 2013 25 January, 2013

03:28:36 PM

Scope of Work Allocation Implementing Office

(2) (3) (4) (5)

Target

(1)

FY 2013 DPWH INFRASTRUCTURE PROGRAM

(Based on GAA)

Region III

Name of Project/Location Physical

Bulacan, 4th Leg. District, Rep. Linabelle Ruth Villarica 232,306 -

GOP 227,557

LOAN 4,749

I. Locally Funded Projects 227,557

a. National Arterial and Secondary Roads and Bridges 197,557

1. Assets Preservation of National Roads Generated from 5.645 Km 86,597

Pavement Management System/Highway Development

and Management System-4 (HDM-4) Intermittent Sections

a. Preventive Maintenance 42,085

1. Secondary (Preventive Maintenance) 3.392 Km 42,085

a. Bocaue-Sn Jose Road

1. K0030 + (-603) - K0036 + 450 Overlay 100mm 2.360 Km 30,993 Bulacan DEO II

b. Marilao Service Road

1. Chainage 0000 - Chainage 0455 Overlay 80mm 0.455 Km 4,891 Bulacan DEO II

c. Meycauayan Service Road

1. Chainage 0000 - Chainage 0577 Overlay 80mm 0.577 Km 6,201 Bulacan DEO II

b. Rehabilitation /Reconstruction/Upgrading of

Damaged Paved National Roads

1. Secondary (Rehabilitation/Reconstruction/Upgrading)

a. Sta . Maria-Norzagaray Road

1. K0036 + 128 - K0039 + 000 Reconstruction 2.253 Km 44,512 Bulacan DEO II

PCCP 280mm

2. Address Critical Bottlenecks

1. Traffic Decongestion

a. Widening/concreting of McArthur Highway (Manila North Road)

including drainages and traffic management

1. Meycauayan (Bulacan) to Mabalacat Widening 1.000 Km 80,000 Regional Office III

(Pampanga) (Intermittent Sections) Drainage 2,300 Lm

4th District, Bulacan

3. National Bridges

a. Replacement/Rehabilitation/Strengthening of Permanent 51.60 Lm 30,960

Bridges Generated from Bridge Management System (BMS)

1. Pulong Buhangin Bridge along Sta. Maria-Norzagaray Replacment 27.60 Lm 16,560 Bulacan DEO II

2. Sta. Maria Bridge 3 along Sta. Maria By Pass Road Replacment 24.00 Lm 14,400 Bulacan DEO II

Road

b. Flood Control and Drainage Projects (MFO-3)

1. Meycauayan River Control Projects 833 Lm 30,000 Bulacan DEO II

Page 13: FY 2013 DPWH INFRASTRUCTURE PROGRAM (Based on GAA) Region III · Region III Name of Project/Location Physical 3. Dinadiawan-Madella Road 2.637 Km 55,369 Regional Office III a. K0295+000

ProposedFY2013/FY2013GAA1-03-2013 as of January 3, 2013 25 January, 2013

03:28:36 PM

Scope of Work Allocation Implementing Office

(2) (3) (4) (5)

Target

(1)

FY 2013 DPWH INFRASTRUCTURE PROGRAM

(Based on GAA)

Region III

Name of Project/Location Physical

II. Foreign-Assisted Projects

A. Highways

On-going

1. National Roads Improvement and Management Project 3.020 Km 4,749 PMO-NRIMP

Phase II, Loan No. 7550-PH GOP -

LM-2.1 North Luzon Package LOAN 4,749

Manila North Road, Monumento-Agoo/Aringay Bdry., (La Union)

4th District, Bulacan

Page 14: FY 2013 DPWH INFRASTRUCTURE PROGRAM (Based on GAA) Region III · Region III Name of Project/Location Physical 3. Dinadiawan-Madella Road 2.637 Km 55,369 Regional Office III a. K0295+000

ProposedFY2013/FY2013GAA1-03-2013 as of January 3, 2013 25 January, 2013

03:28:36 PM

Scope of Work Allocation Implementing Office

(2) (3) (4) (5)

Target

(1)

FY 2013 DPWH INFRASTRUCTURE PROGRAM

(Based on GAA)

Region III

Name of Project/Location Physical

San Jose del Monte City, Lone Leg. District, Rep. Arturo B. Robes

I. Locally Funded Projects

a. Flood Control/Drainage Projects (MFO-3) 150,000

1. Flood Control Structures in San Jose Del Monte City 4,158 Lm 150,000

a. Construction of slope protection along NCR-Bulacan Bdry. Bigte- 3,049 Lm 110,000

Ipo Dam Road

1. Sto. Cristo River 1,386 Lm 50,000 Bulacan DEO II

2. San Jose River 1,109 Lm 40,000 Bulacan DEO II

3. Ilog Bayan Bridge 554 Lm 20,000 Bulacan DEO II

b. Flood Control Structures in San Jose Del Monte City 1,109 Lm 40,000 Bulacan DEO II

Page 15: FY 2013 DPWH INFRASTRUCTURE PROGRAM (Based on GAA) Region III · Region III Name of Project/Location Physical 3. Dinadiawan-Madella Road 2.637 Km 55,369 Regional Office III a. K0295+000

ProposedFY2013/FY2013GAA1-03-2013 as of January 3, 2013 25 January, 2013

03:28:36 PM

Scope of Work Allocation Implementing Office

(2) (3) (4) (5)

Target

(1)

FY 2013 DPWH INFRASTRUCTURE PROGRAM

(Based on GAA)

Region III

Name of Project/Location Physical

Nueva Ecija, 1st Leg. District, Rep. Josefina M. Joson 250,598 a/

GOP 207,274

LOAN 43,324

MVUC 16,502

I. Locally Funded Projects 167,713

a. National Arterial and Secondary Roads and Bridges 167,713

1. Assets Preservation of National Roads Generated from 13.766 167,713

Pavement Management System/Highway Development

and Management System-4 (HDM-4) Intermittent Sections

a. Preventive Maintenance 10.570 Km 111,149

1. National Arterial (Preventive Maintenance) 7.765 Km 83,731

a. Nueva Ecija-Pangasinan Road

1. K0151 + 503 - K0154 + 000 Overlay 80mm 2.490 Km 29,359 Nueva Ecija DEO I

b. Sta Rosa-Tarlac Road 5.275 54,372 Regional Office III

1. K0118 + (-275) - K0118 + 759 Overlay 50mm 1.034 Km 7,941

with corrections

2. K0118 + 759 - K0119 + 000 Overlay 100mm 0.241 Km 3,476

3. K0121 + 000 - K0122 + 000 Overlay 50mm 1.000 Km 7,387

4. K0124 + 000 - K0125 + 094 Overlay 50mm 1.095 Km 8,089

5. K0125 + 094 - K0127 + 000 Overlay 100mm 1.905 Km 27,479 5. K0125 + 094 - K0127 + 000 Overlay 100mm 1.905 Km 27,479

2. Secondary (Preventive Maintenance)

a. Cabanatuan City-Carmen Road 2.805 Km 27,418 Nueva Ecija DEO I

1. K0137 + 707 - K0138 + 690 Overlay 100mm 0.972 Km 13,938

2. K0138 + 690 - K0140 + 000 Overlay 50mm 1.383 Km 10,171

3. K0140 + 469 - K0141 + 043 Overlay 50mm 0.450 Km 3,309

b. Rehabilitation /Reconstruction/Upgrading of

Damaged Paved National Roads (Intermittent Sections)

1. National Arterial (Rehabilitation/Reconstruction/Upgrading) 3.196 Km 56,564

a. Nueva Ecija-Pangasinan Road

1. K0166 + 799 - K0167 + 827 Recon AC 50mm 1.029 Km 13,741 Nueva Ecija DEO I

b. Sta Rosa-Tarlac Road 2.167 42,823 Nueva Ecija DEO I

1. K0120 + 000 - K0121 + 000 Reconstruction 1.00 Km 19,761

PCCP 280mm

2. K0122 + 000 - K0122 + 937 Reconstruction 0.94 Km 18,517

PCCP 280mm

3. K0123 + 720 - K0124 + 000 Reconstruction 0.23 Km 4,545

PCCP 280mm

II.Foreign-Assisted Projects

A. Highways

On-going 82,885 a/

GOP 39,561

LOAN 43,324

MVUC 16,502

1. Road Upgrading and Preservation Project (J-RUPP)

JICA Loan No. PH-P247

a. Asset Preservation Contract (APC)

1. Sta. Rita-Nueva Ecija Bdry. (PBM-2) 2.900 Km 24,991 a/ PMO-PJHL

Nueva Ecija 1st GOP 2,733

LOAN 22,258

MVUC 2,458

Page 16: FY 2013 DPWH INFRASTRUCTURE PROGRAM (Based on GAA) Region III · Region III Name of Project/Location Physical 3. Dinadiawan-Madella Road 2.637 Km 55,369 Regional Office III a. K0295+000

ProposedFY2013/FY2013GAA1-03-2013 as of January 3, 2013 25 January, 2013

03:28:36 PM

Scope of Work Allocation Implementing Office

(2) (3) (4) (5)

Target

(1)

FY 2013 DPWH INFRASTRUCTURE PROGRAM

(Based on GAA)

Region III

Name of Project/Location Physical

b. Preventive Maintenance (PM)

1. PPH/talavera-Rizal (PM-A1) 10.200 Km 57,894 a/ PMO-PJHL

Nueva Ecija 1st GOP 36,828

LOAN 21,066

MVUC 14,044

Note:

a/ - Exclusive MVU (P16.502M)

Page 17: FY 2013 DPWH INFRASTRUCTURE PROGRAM (Based on GAA) Region III · Region III Name of Project/Location Physical 3. Dinadiawan-Madella Road 2.637 Km 55,369 Regional Office III a. K0295+000

ProposedFY2013/FY2013GAA1-03-2013 as of January 3, 2013 25 January, 2013

03:28:36 PM

Scope of Work Allocation Implementing Office

(2) (3) (4) (5)

Target

(1)

FY 2013 DPWH INFRASTRUCTURE PROGRAM

(Based on GAA)

Region III

Name of Project/Location Physical

Nueva Ecija, 2nd Leg. District, Rep. Joseph Gilbert Violago 277,359 a/

GOP 212,426

LOAN 64,933

MVUC 16,502

I. Locally Funded Projects

a. National Arterial and Secondary Roads and Bridges 13.610 Km 172,866

1. Assets Preservation of National Roads Generated from 13.570 Km 171,866

Pavement Management System/Highway Development

and Management System-4 (HDM-4) Intermittent Sections

a. Preventive Maintenance

1. Secondary (Preventive Maintenance) 6.710 Km 50,837

a. San Jose City-Rizal Road via Pinili-Porais-Villa Joson

1. K0160 + 173 - K0161 + 000 Overlay 50mm 0.830 Km 6,655 Nueva Ecija DEO I

b. Pantabangan-Canili-Basal-Baler Road 2.160 Km 15,384 Nueva Ecija DEO I

1. K0276 + 437 - K0278 + 000 Overlay 50mm 1.570 Km 10,473

2. K0278 + 405 - K0279 + 000 Overlay 50mm 0.590 Km 4,911

c. Jct Pinagpanaan-Rizal-Pantabangan Road

1. K0155 + 292 - K0159 + 000 Overlay 50mm 3.720 Km 28,798 Nueva Ecija DEO I

with corrections

b. Rehabilitation /Reconstruction/Upgrading of 6.860 Km 121,029

Damaged Paved National Roads (Intermittent Sections)Damaged Paved National Roads (Intermittent Sections)

1. National Arterial (Rehabilitation/Reconstruction/Upgrading)

a. San Jose-Lupao Road

1. K0162 + 400 - K0164 + 633 Recon AC 50mm 2.270 Km 30,324 Nueva Ecija DEO I

2. Secondary (Rehabilitation/Reconstruction/Upgrading)

a. San Jose City-Rizal Road via Pinili-Porais-Villa Joson 4.590 Km 90,705

1. K0164 + 000 - K0165 + 000 Reconstruction 1.000 Km 19,762 Nueva Ecija DEO I

PCCP 280mm

2. K0173 + 247 - K0176 + 841 Reconstruction 3.590 Km 70,943 Regional Office III

PCCP 280mm

2. Road Upgrading (Gravel to Paved) based

on Gravel Road Strategies, Traffic Benchmark

for upgrading to paved natioal road standards

(HDM-4 Project Analysis) Intermittent Sections

a. Secondary (Upgrading)

1. Pantabangan-Canili-Basal-Baler Road

a. K0278+361 - K0278+405 0.04 Km 1,000 Nueva Ecija DEO I

II.Foreign-Assisted Projects

A. Highways

On-going 104,493 a/

GOP 39,560

LOAN 64,933

MVUC 16,502

1. Road Upgrading and Preservation Project (J-RUPP)

JICA Loan No. PH-P247

a. Asset Preservation Contract (APC)

1. Sta. Rita-Nueva Ecija Bdry. (PBM-2) 2.900 Km 46,600 a/ PMO-PJHL

Nueva Ecija 2nd GOP 2,733

LOAN 43,867

MVUC 2,458

Page 18: FY 2013 DPWH INFRASTRUCTURE PROGRAM (Based on GAA) Region III · Region III Name of Project/Location Physical 3. Dinadiawan-Madella Road 2.637 Km 55,369 Regional Office III a. K0295+000

ProposedFY2013/FY2013GAA1-03-2013 as of January 3, 2013 25 January, 2013

03:28:36 PM

Scope of Work Allocation Implementing Office

(2) (3) (4) (5)

Target

(1)

FY 2013 DPWH INFRASTRUCTURE PROGRAM

(Based on GAA)

Region III

Name of Project/Location Physical

b. Preventive Maintenance (PM)

1. PPH/talavera-Rizal (PM-A1) 10.200 Km 57,893 a/ PMO-PJHL

Nueva Ecija 2nd GOP 36,827

LOAN 21,066

MVUC 14,044

Note:

a/ - Exclusive MVU (P16.502M)

Page 19: FY 2013 DPWH INFRASTRUCTURE PROGRAM (Based on GAA) Region III · Region III Name of Project/Location Physical 3. Dinadiawan-Madella Road 2.637 Km 55,369 Regional Office III a. K0295+000

ProposedFY2013/FY2013GAA1-03-2013 as of January 3, 2013 25 January, 2013

03:28:36 PM

Scope of Work Allocation Implementing Office

(2) (3) (4) (5)

Target

(1)

FY 2013 DPWH INFRASTRUCTURE PROGRAM

(Based on GAA)

Region III

Name of Project/Location Physical

Nueva Ecija, 3rd Leg. District, Rep. Czarina "Cherry" Umali 456,761 a/

GOP 434,502

LOAN 22,259

MVUC 2,457

I. Locally Funded Projects 431,769

a. National Arterial and Secondary Roads and Bridges 36.706 Km 431,769

1. Assets Preservation of National Roads Generated from

Pavement Management System/Highway Development

and Management System-4 (HDM-4) Intermittent Sections

a. Preventive Maintenance 32.824 Km 288,129

1. National Arterial (Preventive Maintenance) 14.317 Km 148,181

a. Nueva Ecija-Aurora Road 11.769 Km 125,906

1. K0117 + (-799) - K0119 + 175 Overlay 100mm 2.970 Km 42,897 Nueva Ecija DEO II

2.220 Km 23,101 Nueva Ecija DEO II

2. K0122 + 215 - K0122 + 423 Overlay 80mm 0.210 Km 2,479

3. K0125 + 106 - K0125 + 161 Overlay 80mm 0.060 Km 708

4. K0127 + 158 - K0128 + 410 Overlay 80mm 1.250 Km 14,780

5. K0129 + 300 - K0130 + 000 Overlay 50mm 0.700 Km 5,134

3.889 Km 30,824 Nueva Ecija DEO II

6. K0135 + 000 - K0135 + 149 Overlay 50mm 0.149 Km 1,101

7. K0135 + 149 - K0137 + 295 Overlay 50mm 1.940 Km 15,461 7. K0135 + 149 - K0137 + 295 Overlay 50mm 1.940 Km 15,461

with corrections

8. K0142 + 000 - K0143 + 000 Overlay 50mm 0.980 Km 7,672

with corrections

9. K0144 + 000 - K0144 + 820 Overlay 50mm 0.820 Km 6,590

with corrections2.690 Km 29,084 Nueva Ecija DEO II

10. K0151 + 000 - K0152 + 286 Overlay 100mm 1.290 Km 18,608

11. K0154 + 000 - K0155 + 400 Overlay 50mm 1.400 Km 10,476

with corrections

b. Sta Rosa-Tarlac Road 2.548 Km 22,275 Nueva Ecija DEO II

1. K0110 + 000 - K0111 + 000 Overlay 50mm 1.271 Km 10,396

with corrections

2. K0111 + 818 - K0113 + 000 Overlay 50mm 1.177 Km 9,704

with corrections

3. K0118 + 000 - K0118 + 102 Overlay 50mm 0.100 Km 2,175

with corrections

2. Secondary (Preventive Maintenance) 18.507 Km 139,948

a. Cabanatuan City-Carmen Road

1. K0123 + (-952) - K0125 + 084 Overlay 50mm 3.000 Km 22,162 Nueva Ecija DEO II

b. Cabanatuan City Circumferential Road 2.242 Km 16,913 Nueva Ecija DEO II

1. K0113 + 300 - K0113 + 492 Overlay 50mm 0.192 Km 1,769

with corrections

2. K0114 + (-512) - K0114 + 1541 Overlay 50mm 2.050 Km 15,144

c. Bongabon-Rizal-Aurora Road

1. K0145 + (-975) - K0147 + 000 Overlay 50mm 2.980 Km 22,014 Nueva Ecija DEO II

d. Jct Tablang-Gabaldon Road 5.875 Km 63,537

1. K0164 + 000 - K0164 + 1145 Overlay 50mm 1.145 Km 8,458 Nueva Ecija DEO II

2. K0168 + 320 - K0173 + 071 Overlay 50mm 4.730 Km 34,941 Nueva Ecija DEO II

2.720 Km 20,138 Nueva Ecija DEO II

3. K0136 + (-725) - K0136 + 000 Overlay 50mm 0.730 Km 5,393

4. K0142 + 007 - K0143 + 000 Overlay 50mm 0.990 Km 7,313

5. K0144 + 000 - K0145 + 005 Overlay 50mm 1.000 Km 7,432

with corrections

Page 20: FY 2013 DPWH INFRASTRUCTURE PROGRAM (Based on GAA) Region III · Region III Name of Project/Location Physical 3. Dinadiawan-Madella Road 2.637 Km 55,369 Regional Office III a. K0295+000

ProposedFY2013/FY2013GAA1-03-2013 as of January 3, 2013 25 January, 2013

03:28:36 PM

Scope of Work Allocation Implementing Office

(2) (3) (4) (5)

Target

(1)

FY 2013 DPWH INFRASTRUCTURE PROGRAM

(Based on GAA)

Region III

Name of Project/Location Physical

e. Bangad-Fort Magsaysay Road

1. K0129 + 330 - K0131 + 000 Overlay 50mm 1.690 Km 15,322 Nueva Ecija DEO II

with corrections

2. Road Upgrading (Gravel to Paved) based

on Gravel Road Strategies, Traffic Benchmark

for upgrading to paved natioal road standards

(HDM-4 Project Analysis) Intermittent Sections

a. National Arterial (Upgrading)

1. Nueva Ecija-Aurora Road 3.882 Km 116,460 Regional Office III

a. K0160+575 - K0161+731 1.165 Km 34,950

b. K0161+791 - K0164+484 2.717 Km 81,510

3. National Bridges

a. Replacement of Temporary to Permanent Bridges 45.30 Lm 27,180

1. Cuyapa Br. 1 along Jct. Tablang-Gabaldon Road 21.3 Lm 12,780 Nueva Ecija DEO II

2. Vega Bridge 2 along Bongabob-Rizal-Aurora Road 24.0 Lm 14,400 Nueva Ecija DEO II

II.Foreign-Assisted Projects

A. Highways

On-goingOn-going

1. Road Upgrading and Preservation Project (J-RUPP)

JICA Loan No. PH-P247

a. Asset Preservation Contract (APC)

1. Sta. Rita-Nueva Ecija Bdry. (PBM-2) 2.900 Km 24,992 a/ PMO-PJHL

Nueva Ecija 3rd GOP 2,733

LOAN 22,259

MVUC 2,457

Note:

a/ - Exclusive MVU (P2.457M)

Page 21: FY 2013 DPWH INFRASTRUCTURE PROGRAM (Based on GAA) Region III · Region III Name of Project/Location Physical 3. Dinadiawan-Madella Road 2.637 Km 55,369 Regional Office III a. K0295+000

ProposedFY2013/FY2013GAA1-03-2013 as of January 3, 2013 25 January, 2013

03:28:36 PM

Scope of Work Allocation Implementing Office

(2) (3) (4) (5)

Target

(1)

FY 2013 DPWH INFRASTRUCTURE PROGRAM

(Based on GAA)

Region III

Name of Project/Location Physical

Nueva Ecija, 4th Leg. District, Rep Rodolfo W. Antonino 149,648 a/

GOP 127,390

LOAN 22,258

MVUC 2,458

I. Locally Funded Projects 124,657

a. National Arterial and Secondary Roads and Bridges 24,657

1. Assets Preservation of National Roads Generated from

Pavement Management System/Highway Development

and Management System-4 (HDM-4) Intermittent Sections

a. Preventive Maintenance

1. National Arterial (Preventive Maintenance)

a. Gapan-Sn Fernando-Olongapo Road

1. K0098 + 800 - K0101 + 782 Overlay 50mm 2.980 Km 24,657 Nueva Ecija DEO II

with corrections

b. Flood Control and Drainage Projects (MFO-3)

1. Construction of Cabiao Viaduct along GSO, Cabiao 504.80 Lm 100,000 Regional Office III

II.Foreign-Assisted Projects

A. HighwaysA. Highways

On-going

1. Road Upgrading and Preservation Project (J-RUPP)

JICA Loan No. PH-P247

a. Asset Preservation Contract (APC)

1. Sta. Rita-Nueva Ecija Bdry. (PBM-2) 2.900 Km 24,991 a/ PMO-PJHL

Nueva Ecija 3rd GOP 2,733

LOAN 22,258

Note: MVUC 2,458

a/ - Exclusive MVU (P2.458M)

Page 22: FY 2013 DPWH INFRASTRUCTURE PROGRAM (Based on GAA) Region III · Region III Name of Project/Location Physical 3. Dinadiawan-Madella Road 2.637 Km 55,369 Regional Office III a. K0295+000

ProposedFY2013/FY2013GAA1-03-2013 as of January 3, 2013 25 January, 2013

03:28:36 PM

Scope of Work Allocation Implementing Office

(2) (3) (4) (5)

Target

(1)

FY 2013 DPWH INFRASTRUCTURE PROGRAM

(Based on GAA)

Region III

Name of Project/Location Physical

PAMPANGA 3rd DEO

Pampanga, 1st Leg. District, Rep. Carmelo F. Lazatin 334,535

GOP 321,904

LOAN 12,631

I. Locally Funded Projects 321,904

a. National Arterial and Secondary Roads and Bridges 271,904

1. Assets Preservation of National Roads Generated from

Pavement Management System/Highway Development

and Management System-4 (HDM-4) Intermittent Sections

a. Preventive Maintenance

1. Secondary (Preventive Maintenance)

a. Old Manila North Road

1. Chainage 0330 - Chainage 2355 Overlay 80mm 2.025 Km 23,904 Pampanga DEO III

2. Address Critical Bottlenecks

a. Traffic Decongestion

1. Widening/concreting of McArthur Highway (Manila North Road)

including drainages and traffic managementincluding drainages and traffic management

a. Meycauayan (Bulacan) to Mabalacat (Pampanga) Widening 2.09 Km 48,000 Pampanga DEO III

(Intermittent Sections)

1st District, Pampanga

b. Construction/widening/upgrading/rehabilitation of Access Roads to 10.000 Km 200,000

Major Airport, Major Seaports and Declared Tourism Destinations

1. To Declared Tourism Destinations

a. Clark-Angeles-Magalang Road, Angeles City Widening 5.000 Km 100,000 Regional Office III

b. West Circumferential Road, (Friendship Highway), Angeles Widening 5.000 Km 100,000 Regional Office III

City Section

b. Flood Control and Drainage Projects (MFO-3) 50,000

1. Rehabilitation/Improvement of Drainage System, Pampanga 1st

District

a. Old Manila North Road (MNR), Angeles City Drainage 1,909 Lm 25,000 Pampanga DEO III

b. Manila North Road (Angeles City to Mabalacat), with exception Drainage 1,909 Lm 25,000 Pampanga DEO III

II.Foreign-Assisted Projects

A. Highways

On-going

1. National Roads Improvement and Management Project 8.010 Km 12,631 PMO-NRIMP

Phase II, Loan No. 7550-PH GOP -

LM-2.1 North Luzon Package LOAN 12,631

Manila North Road, Monumento-Agoo/Aringay Bdry., (La Union)

1st District

Page 23: FY 2013 DPWH INFRASTRUCTURE PROGRAM (Based on GAA) Region III · Region III Name of Project/Location Physical 3. Dinadiawan-Madella Road 2.637 Km 55,369 Regional Office III a. K0295+000

ProposedFY2013/FY2013GAA1-03-2013 as of January 3, 2013 25 January, 2013

03:28:36 PM

Scope of Work Allocation Implementing Office

(2) (3) (4) (5)

Target

(1)

FY 2013 DPWH INFRASTRUCTURE PROGRAM

(Based on GAA)

Region III

Name of Project/Location Physical

PAMPANGA DEO II 397,799

GOP 113,760

LOAN 284,039

Pampanga, 2nd Leg. District, Rep. Gloria Macapagal Arroyo

I. Locally Funded Projects

a. National Arterial and Secondary Roads and Bridges 5.481 Km 52,049

1. Assets Preservation of National Roads Generated from 36,049

Pavement Management System/Highway Development

and Management System-4 (HDM-4) Intermittent Sections

a. Preventive Maintenance 5.046 Km 36,049

1. National Arterial (Preventive Maintenance)

a. Angeles-Porac-Floridablanca-Dinalupihan Road 2.074 Km 13,720 Pampanga DEO II

1. K0093 + 000 - K0094 + 000 Overlay 50mm 1.010 Km 6,682

2. K0096 + 761 - K0097 + 844 Overlay 50mm 1.064 Km 7,038

2. Secondary (Preventive Maintenance) 2.972 Km 22,329

a. Sn Fernando-Lubao Road 1.117 Km 10,000 Pampanga DEO II

1. K0076 + 000 - K0076 + 636 Overlay 80mm 0.639 Km 6,981 1. K0076 + 000 - K0076 + 636 Overlay 80mm 0.639 Km 6,981

2. K0076 + 636 - K0077 + 000 Overlay 50mm 0.348 Km 2,302

3. K0084 + 057 - K0084 + 182 Overlay 50mm 0.130 Km 717

b. Sn Antonio-Floridablanca Road 1.855 Km 12,329 Pampanga DEO II

1. K0089 + 130 - K0090 + 485 Overlay 50mm 1.275 Km 8,492

2. K0091 + 050 - K0091 + 630 Overlay 50mm 0.580 Km 3,837

2. Address Critical Bottlenecks

1. Traffic Decongestion

a. Widening of Sasmuan-Lubao Road 0.435 Km 10,000 Pampanga DEO II

3. National Bridges

a. Replacement/Rehabilitation/Strengthening of Permanent

Bridges Generated from Bridge Management System (BMS)

1. San Juan Bautista Bridge along San Fernando-Lubao Road Replacement 10 Lm 6,000 Pampanga DEO II

II. Foreign-Assisted Projects

A. Flood Control

1. Mt. Pinatubo Hazard Urgent Mitigation Project , Phase III 51,500 Lm 345,750 PMO-MPE

(Flood Control Works in Porac-Gumain River, including GOP 61,711

FloodingProblems in the City of San Fernando, Pampanga, LOAN 284,039

(JBIC, 27th YLP, PH-P241, Pampanga 2nd and 3rd Districts

Page 24: FY 2013 DPWH INFRASTRUCTURE PROGRAM (Based on GAA) Region III · Region III Name of Project/Location Physical 3. Dinadiawan-Madella Road 2.637 Km 55,369 Regional Office III a. K0295+000

ProposedFY2013/FY2013GAA1-03-2013 as of January 3, 2013 25 January, 2013

03:28:36 PM

Scope of Work Allocation Implementing Office

(2) (3) (4) (5)

Target

(1)

FY 2013 DPWH INFRASTRUCTURE PROGRAM

(Based on GAA)

Region III

Name of Project/Location Physical

Pampanga, 3rd Leg. District, Rep Aurelio "Dong" Gonzales 425,167

GOP 387,160

LOAN 38,007

I. Locally Funded Projects 387,160

a. National Arterial and Secondary Roads and Bridges 332,160

1. Address Critical Bottlenecks 10.570 Km 225,000

a. Traffic Decongestion

1. Widening/concreting of McArthur Highway (Manila North Road)

including drainages and traffic management

a. Meycauayan (Bulacan) to Mabalacat 3.070 Km 75,000 Regional Office III

(Pampanga) (Intermittent Sections) Widening 1.780 Km

3rd District, Pampanga Reblocking 1.290 Km

b. Construction/widening/upgrading/rehabilitation of Access Roads to

Major Airport, Major Seaports and Declared Tourism Destinations

1. To Declared Tourism Destination

a. Aquino Byway-Manila North Road (via San Jose Malino- Widening 7.500 Km 150,000 Regional Office III

Anao Road and Del Rosario-Calulut), San Fernando

2. National Bridges

a. Replacement/Rehabilitation/Strengthening of Permanent 107,160

Bridges Generated from Bridge Management System (BMS)

1. Cabetican Bridge along San Fernando-Lubao Road Replacement 151 Lm 90,360 Regional Office III

2. San Antonio Bridge along Gapan-San Fernando- Replacement 24 Lm 16,800 Pampanga DEO I

Olongapo Road

b. Flood Control and Drainage Projects (MFO-3)

1. Asphalting of Apalit-Arayat Setback Levee, Arayat Section 4,319 Lm 50,000 Pampanga DEO I

c. Various Infrastructure Including Local Projects 5,000 Pampanga DEO I

II.Foreign-Assisted Projects 38,007

GOP -

LOAN 38,007

A. Highways

On-going

1. National Roads Improvement and Management Project 14.830 Km 23,379 PMO-NRIMP

Phase II, Loan No. 7550-PH GOP -

LM-2.1 North Luzon Package LOAN 23,379

Manila North Road, Monumento-Agoo/Aringay Bdry., (La Union)

3rd District

B. Flood Control

1. Mt. Pinatubo Hazard Urgent Mitigation Project , Phase III 5,840 Lm 14,628 PMO-MPE

(Flood Control Works in Porac-Gumain River, including GOP 0

FloodingProblems in the City of San Fernando, Pampanga, LOAN 14,628

(JBIC, 27th YLP, PH-P241, Pampanga 2nd and 3rd Districts

Page 25: FY 2013 DPWH INFRASTRUCTURE PROGRAM (Based on GAA) Region III · Region III Name of Project/Location Physical 3. Dinadiawan-Madella Road 2.637 Km 55,369 Regional Office III a. K0295+000

ProposedFY2013/FY2013GAA1-03-2013 as of January 3, 2013 25 January, 2013

03:28:36 PM

Scope of Work Allocation Implementing Office

(2) (3) (4) (5)

Target

(1)

FY 2013 DPWH INFRASTRUCTURE PROGRAM

(Based on GAA)

Region III

Name of Project/Location Physical

Pampanga, 4th Leg. District, Rep. Anna York P. Bondoc

I. Locally Funded Projects 160,090

a. National Arterial and Secondary Roads and Bridges 7.060 Km 110,090

1. Assets Preservation of National Roads Generated from 5.660 Km 80,631

Pavement Management System/Highway Development

and Management System-4 (HDM-4) Intermittent Sections

a. Preventive Maintenance

1. Secondary (Preventive Maintenance) 3.180 Km 20,006

a. San Simon-Baliwag Road

1. K0068 + 951 - K0069 + 388 Overlay 50mm 0.440 Km 2,549 Pampanga DEO I

with corrections

b. Bahay Pare-Sn Luis-Sto Domingo Road

1. K0066 + 102 - K0066 + 942 Overlay 50mm 0.840 Km 5,647 Pampanga DEO I

c. Tulauc-Sto Domingo Road

1. K0061 + 545 - K0062 + 000 Overlay 50mm 0.420 Km 2,825 Pampanga DEO I

d. San Vicente-Apalit Road

1. K0000 + 876 - K0000 + 449 Overlay 50mm 0.560 Km 3,766 Pampanga DEO I

e. Sto. Tomas-Minalin Road (Minalin Tail Dike Sect)

1. K0070 + 076 - K0071 + 000 Overlay 50mm 0.920 Km 5,219 Pampanga DEO I

with correctionswith corrections

b. Rehabilitation /Reconstruction/Upgrading of

Damaged Paved National Roads (Intermittent Sections)

1. Secondary (Rehabilitation/Reconstruction/Upgrading) 2.480 Km 60,625

a. San Simon-Baliwag Road 1.290 Km 25,492 Pampanga DEO I

1. K0068 + 212 - K0068 + 910 Reconstruction 0.700 Km 13,833

PCCP 280mm

2. K0069 + 409 - K0070 + 000 Reconstruction 0.590 Km 11,659

PCCP 280mm

b. Baliwag-Candaba-Sta Ana Road

1. K0063 + (-020) - K0063 + 564 Reconstruction 0.580 Km 11,462 Pampanga DEO I

PCCP 280mm

c. Bahay Pare-Sn Luis-Sto Domingo Road

1. K0070 + 156 - K0070 + 438 Raising of grade 0.280 Km 10,866 Pampanga DEO I

with drainage

improvement

(concrete) 280mm

d. Candaba-Sn Miguel Road

1. K0070 + (-197) - K0070 + 134 Raising of grade 0.330 Km 12,805 Pampanga DEO I

with drainage

improvement

(concrete) 280mm

2. Road Upgrading (Gravel to Paved) based

on Gravel Road Strategies, Traffic Benchmark

for upgrading to paved natioal road standards

(HDM-4 Project Analysis) Intermittent Sections

a. Secondary (Upgrading)

1. Baliwag-Candaba-Sta Ana Road

a. K0065+256 - K0066+687 1.400 Km 29,459 Pampanga DEO I

b. Flood Control and Drainage Projects (MFO-3)

1. Flood Control Works for Pampanga Delta

a. Dredging of Pampanga River, Macabebe to Masantol, Pampanga 2,500 Lm 50,000 Pampanga DEO I

Page 26: FY 2013 DPWH INFRASTRUCTURE PROGRAM (Based on GAA) Region III · Region III Name of Project/Location Physical 3. Dinadiawan-Madella Road 2.637 Km 55,369 Regional Office III a. K0295+000

ProposedFY2013/FY2013GAA1-03-2013 as of January 3, 2013 25 January, 2013

03:28:36 PM

Scope of Work Allocation Implementing Office

(2) (3) (4) (5)

Target

(1)

FY 2013 DPWH INFRASTRUCTURE PROGRAM

(Based on GAA)

Region III

Name of Project/Location Physical

Tarlac, 1st Leg. District, Rep. Enrique Cojuangco 462,891

GOP 421,444

LOAN 41,447

I. Locally Funded Projects 421,444

a. National Arterial, Secondary and Local Roads 15.136 Km 421,444

and Bridges

1. Assets Preservation of National Roads Generated from 10.774 Km 91,113

Pavement Management System/Highway Development

and Management System-4 (HDM-4) Intermittent Sections

a. Preventive Maintenance 9.852 Km 72,898

1. National Arterial (Preventive Maintenance)

a. Romulo H-way 2.330 Km 16,665 Tarlac DEO I

1. K0156 + 000 - K0157 + 000 Overlay 50mm 1.000 Km 6,615

2. K0157 + 398 - K0159 + 000 Overlay 50mm 1.330 Km 10,050

2. Secondary (Preventive Maintenance) 7.522 Km 56,233

a. Ramos-Pura Road 3.390 Km 18,689 Tarlac DEO I

1. K0154 + (-389) - K0154 + 931 Overlay 50mm 1.320 Km 7,277

2. K0156 + 000 - K0157 + 000 Overlay 50mm 1.000 Km 5,513

3. K0157 + 227 - K0158 + 294 Overlay 50mm 1.070 Km 5,899

b. Anao-Ramos Roadb. Anao-Ramos Road

1. K0164 + 018 - K0165 + 910 Overlay 50mm 1.892 Km 12,516 Tarlac DEO I

c. Paniqui-Ramos Road

1. K0147 + 764 - K0150 + 000 Overlay 80mm 2.240 Km 25,028 Tarlac DEO I

with corrections

b. Rehabilitation /Reconstruction/Upgrading of

Damaged Paved National Roads (Intermittent Sections)

1. Secondary (Rehabilitation/Reconstruction/Upgrading)

a. Anao-Ramos Road

1. K0161 + 000 - K0161 + 922 Reconstruction 0.922 Km 18,215 Tarlac DEO I

PCCP 280mm

2. Road Upgrading (Gravel to Paved) based

on Gravel Road Strategies, Traffic Benchmark

for upgrading to paved natioal road standards

(HDM-4 Project Analysis) Intermittent Sections

a. Secondary (Upgrading)

1. Capas-San Jose-Mayantoc-Malacampa Road

a. K0145+(-283) - K0147+(-476) 1.806 Km 37,926 Tarlac DEO I

3. Address Critical Bottlenecks

1. Traffic Decongestion

a. Widening/concreting of McArthur Highway (Manila North Road)

including drainages and Traffic Management Widening 2.556 Km 292,405 Regional Office III

1. 1st District, Tarlac Line Canal 3,621 Lm

Page 27: FY 2013 DPWH INFRASTRUCTURE PROGRAM (Based on GAA) Region III · Region III Name of Project/Location Physical 3. Dinadiawan-Madella Road 2.637 Km 55,369 Regional Office III a. K0295+000

ProposedFY2013/FY2013GAA1-03-2013 as of January 3, 2013 25 January, 2013

03:28:36 PM

Scope of Work Allocation Implementing Office

(2) (3) (4) (5)

Target

(1)

FY 2013 DPWH INFRASTRUCTURE PROGRAM

(Based on GAA)

Region III

Name of Project/Location Physical

II.Foreign-Assisted Projects

A. Highways

On-going

1. National Roads Improvement and Management Project 26.290 Km 41,447 PMO-NRIMP

Phase II, Loan No. 7550-PH GOP -

LM-2.1 North Luzon Package LOAN 41,447

Manila North Road, Monumento-Agoo/Aringay Bdry., (La Union)

1st District

Page 28: FY 2013 DPWH INFRASTRUCTURE PROGRAM (Based on GAA) Region III · Region III Name of Project/Location Physical 3. Dinadiawan-Madella Road 2.637 Km 55,369 Regional Office III a. K0295+000

ProposedFY2013/FY2013GAA1-03-2013 as of January 3, 2013 25 January, 2013

03:28:36 PM

Scope of Work Allocation Implementing Office

(2) (3) (4) (5)

Target

(1)

FY 2013 DPWH INFRASTRUCTURE PROGRAM

(Based on GAA)

Region III

Name of Project/Location Physical

Tarlac, 2nd Leg. District, Rep. Susan Yap

I. Locally Funded Projects 110,911

a. National Arterial and Secondary Roads and Bridges 9.037 Km 110,911

1. Assets Preservation of National Roads Generated from 7.124 Km 68,911

Pavement Management System/Highway Development

and Management System-4 (HDM-4) Intermittent Sections

a. Preventive Maintenance 4.891 Km 32,443

1. National Arterial (Preventive Maintenance)

a. Tarlac-Sta Rosa Road 1.444 Km 9,607 Tarlac DEO I

1. K0143 + 095 - K0144 + 120 Overlay 50mm 1.020 6,748

2. K0144 + 120 - K0144 + 544 Overlay 50mm 0.424 2,859

with corrections

2. Secondary (Preventive Maintenance) 3.447 Km 22,836

a. Capas-San Jose-Mayantoc-Malacampa Road

1. K0128 + 250 - K0129 + 000 Overlay 50mm 0.750 Km 4,995 Tarlac DEO I

b. Tarlac-Sn Miguel via Macabulos Road

1. K0122 + 177 - K0124 + 000 Overlay 50mm 1.827 Km 12,086 Tarlac DEO I

c. Gerona Poblacion Road

1. Chainage 0000 - Chainage 0873 Overlay 50mm 0.870 Km 5,755 Tarlac DEO I

b. Rehabilitation /Reconstruction/Upgrading of 2.233 Km 36,468

Damaged Paved National Roads (Intermittent Sections)

1. National Arterial (Rehabilitation/Reconstruction/Upgrading)

a. Tarlac-Sta Rosa Road

1. K0145 + 560 - K0146 + 000 Reconstruction 0.441 Km 8,704 Tarlac DEO I

PCCP 280mm

2. Secondary (Rehabilitation/Reconstruction/Upgrading) 1.792 Km 27,764

a. Capas-San Jose-Mayantoc-Malacampa Road 1.676 Km 25,472 Tarlac DEO I

1. K0124 + 201 - K0124 + 478 Upgrade to concrete 0.280 Km 4,255

230mm

2. K0124 + 701 - K0125 + 436 Upgrade to concrete 0.740 Km 11,247

230mm

3. K0125 + 537 - K0125 + 794 Upgrade to concrete 0.260 Km 3,952

230mm

4. K0143 + 681 - K0144 + 079 Upgrade to concrete 0.396 Km 6,018

230mm

b. Tarlac-Sn Miguel via Macabulos Road

a. K0119 + (-267) - K0119 + 000 Reconstruction 0.116 Km 2,292 Tarlac DEO IPCCP 280mm

2. Road Upgrading (Gravel to Paved) based

on Gravel Road Strategies, Traffic Benchmark

for upgrading to paved natioal road standards

(HDM-4 Project Analysis) Intermittent Sections

a. Secondary (Upgrading)

1. Capas- San Jose- Mayantoc-Malacampa Road 1.913 Km 42,000 Tarlac DEO I

a. K0123+(-301) - K0123+(-212) 0.089 Km 1,869

b. K0123+353 - K0124+(-312) 0.335 Km 7,035

c. K0124+114 - K0124+201 0.087 Km 1,827

d. K0124+478 - K0125+(-299) 0.223 Km 4,683

e. K0125+436 - K0126+(-463) 0.101 Km 2,121

f. K0126+(-206) - K0126+959 1.165 Km 24,465

Page 29: FY 2013 DPWH INFRASTRUCTURE PROGRAM (Based on GAA) Region III · Region III Name of Project/Location Physical 3. Dinadiawan-Madella Road 2.637 Km 55,369 Regional Office III a. K0295+000

ProposedFY2013/FY2013GAA1-03-2013 as of January 3, 2013 25 January, 2013

03:28:36 PM

Scope of Work Allocation Implementing Office

(2) (3) (4) (5)

Target

(1)

FY 2013 DPWH INFRASTRUCTURE PROGRAM

(Based on GAA)

Region III

Name of Project/Location Physical

TARLAC 2nd DEO

Tarlac, 3rd Leg. District, Rep. Jeci A. Lapus 375,031

GOP 361,182

LOAN 13,849

I. Locally Funded Projects 361,182

a. National Arterial, Secondary and Local Roads 23.821 Km 361,182

and Bridges

1. Assets Preservation of National Roads Generated from 16.253 Km 134,716

Pavement Management System/Highway Development

and Management System-4 (HDM-4) Intermittent Sections

a. Preventive Maintenance 15.552 Km 125,355

1. National Arterial (Preventive Maintenance) 10.302 Km 68,509

a. Tarlac-Sta Rosa Road 2.035 Km 13,489 Tarlac DEO II

1. K0129 + 078 - K0129 + 383 Overlay 50mm 0.305 Km 2,018

2. K0129 + 463 - K0131 + 200 Overlay 50mm 1.730 Km 11,471

b. Tarlac-Zambales Road 8.267 Km 55,020 Regional Office III

1. K0112 + 697 - K0113 + 143 Overlay 50mm 0.447 Km 3,110

with corrections

2. K0113 + 143 - K0113 + 341 Overlay 50mm 0.198 Km 1,310 2. K0113 + 143 - K0113 + 341 Overlay 50mm 0.198 Km 1,310

3. K0113 + 699 - K0114 + 300 Overlay 50mm 0.599 Km 3,963

4. K0114 + 793 - K0116 + 155 Overlay 50mm 1.360 Km 9,047

5. K0116 + 777 - K0117 + 432 Overlay 50mm 0.653 Km 4,437

with corrections

6. K0117 + 432 - K0122 + 512 Overlay 50mm 5.010 Km 33,153

2. Secondary (Preventive Maintenance)

a. Concepcion-Capas Road

1. K0114 + 000 - K0119 + 256 Overlay 80mm 5.250 Km 56,846 Regional Office III

b. Rehabilitation /Reconstruction/Upgrading of

Damaged Paved National Roads (Intermittent Sections)

1. Secondary (Rehabilitation/Reconstruction/Upgrading)

a. Capas-San Jose-Mayantoc-Malacampa Road

1. K0116 + 000 - K0116 + 701 Recon AC 50mm 0.701 Km 9,361 Tarlac DEO II

2. Address Critical Bottlenecks 7.568 Km 226,466

a. Traffic Decongestion

1. Widening/concreting of McArthur Highway (Manila North Road)

including drainages and traffic management

a. 3rd District, Tarlac Line Canal 5,825.9 Lm 67,400 Regional Office III

b. Road Opening/Construction to close gap sections (with determined

alignment) of national Roads (Including ROW)

1. Capas-Botolan Road 2.568 Km 59,066 Regional Office III

c. Construction/widening/upgrading/rehabilitation of Access Roads to

Airport/Major Sea Ports and Declared Tourism Destinations

1. To Declared Tourism Destinations

a. Lourdes-Clark Airbase Road Gravel to concrete 5.000 Km 100,000 Regional Office III

Page 30: FY 2013 DPWH INFRASTRUCTURE PROGRAM (Based on GAA) Region III · Region III Name of Project/Location Physical 3. Dinadiawan-Madella Road 2.637 Km 55,369 Regional Office III a. K0295+000

ProposedFY2013/FY2013GAA1-03-2013 as of January 3, 2013 25 January, 2013

03:28:36 PM

Scope of Work Allocation Implementing Office

(2) (3) (4) (5)

Target

(1)

FY 2013 DPWH INFRASTRUCTURE PROGRAM

(Based on GAA)

Region III

Name of Project/Location Physical

II.Foreign-Assisted Projects

A. Highways

On-going

1. National Roads Improvement and Management Project 8.730 Km 13,849 PMO-NRIMP

Phase II, Loan No. 7550-PH GOP -

LM-2.1 North Luzon Package LOAN 13,849

Manila North Road, Monumento-Agoo/Aringay Bdry., (La Union)

1st District

Page 31: FY 2013 DPWH INFRASTRUCTURE PROGRAM (Based on GAA) Region III · Region III Name of Project/Location Physical 3. Dinadiawan-Madella Road 2.637 Km 55,369 Regional Office III a. K0295+000

ProposedFY2013/FY2013GAA1-03-2013 as of January 3, 2013 25 January, 2013

03:28:36 PM

Scope of Work Allocation Implementing Office

(2) (3) (4) (5)

Target

(1)

FY 2013 DPWH INFRASTRUCTURE PROGRAM

(Based on GAA)

Region III

Name of Project/Location Physical

ZAMBALES DEO II

Zambales, 1st Leg. District, Rep. Milagros Magsaysay 268,114

GOP 195,214

LOAN 72,900

I. Locally Funded Projects 149,099

a. National Arterial and Secondary Roads and Bridges 5.007 Km 79,099

1. Assets Preservation of National Roads Generated from 3.607 Km 59,099

Pavement Management System/Highway Development

and Management System-4 (HDM-4) Intermittent Sections

a. Preventive Maintenance 3.164 Km 46,033

1. National Arterial (Preventive Maintenance)

a. Gapan-Sn Fernando-Olongapo Road 2.553 Km 37,276 Zambales DEO II

1. K0121 + 300 - K0121 + 693 Overlay 100mm 0.393 Km 7,608

2. K0121 + 832 - K0122 + 889 Overlay 100mm 1.000 Km 13,802

with corrections

3. K0123 + 922 - K0125 + 080 Overlay 100mm 1.160 Km 15,866

2. Secondary (Preventive Maintenance)

a. Magsaysay Drivea. Magsaysay Drive

1. Chainage 0000 - Chainage 0611 Overlay 50mm 0.611 Km 8,757 Zambales DEO II

b. Rehabilitation /Reconstruction/Upgrading of

Damaged Paved National Roads (Intermittent Sections)

1. National Arterial (Rehabilitation/Reconstruction/Upgrading)

a. Gapan-Sn Fernando-Olongapo Road

1. K0118 + 735 - K0119 + 159 Reconstruction 0.443 Km 13,066 Zambales DEO II

PCCP 280mm

2. Address critical bottlenecks

a. Construction/widening/upgrading/rehabilitation of Access Roads to

Major Airport, Major Seaports and Declared Tourism Destinations

1. To Major Seaports

a. Subic-Cawag -Balaybay Road, (Intermittent Section) Rehabilitation 1.400 Km 20,000 Zambales DEO II

b. Flood Control and Drainage Projects (MFO-3)

1. Dredging/Desilting/Rehabilitation of Flood Control in Zambales 1st 70,000

Legislative District

a. Improvement of Pamatawan River, Brgy. Del Pilar Side, Castillejos 1,500 Lm 30,000 Zambales DEO II

b. Improvement of Camachile River, Brgy. Nagbunga, San Marcelino 940 Lm 17,000 Zambales DEO II

c. Rehabilitation of Consuelo River, San Marcelino 555 Lm 10,000 Zambales DEO II

d. Improvement of Sacatihan River, Brgy. Sacatihan, Subic 722 Lm 13,000 Zambales DEO II

II.Foreign-Assisted Projects

A. Highways

On-going

1. Road Improvement and Institutional Development Project (RIIDF)

Loan No. 2936-PHI

a. Olongapo-Bugallon Road 12.820 Km 119,015

GOP 46,115 GOP 46,115

LOAN 72,900

Page 32: FY 2013 DPWH INFRASTRUCTURE PROGRAM (Based on GAA) Region III · Region III Name of Project/Location Physical 3. Dinadiawan-Madella Road 2.637 Km 55,369 Regional Office III a. K0295+000

ProposedFY2013/FY2013GAA1-03-2013 as of January 3, 2013 25 January, 2013

03:28:36 PM

Scope of Work Allocation Implementing Office

(2) (3) (4) (5)

Target

(1)

FY 2013 DPWH INFRASTRUCTURE PROGRAM

(Based on GAA)

Region III

Name of Project/Location Physical

Zambales, 2nd Leg. District, Rep. Jun Omar Ebdane 394,511

GOP 294,331

LOAN 100,180

I. Locally Funded Projects 230,956

a. National Arterial and Secondary Roads and Bridges 90,956

1. Assets Preservation of National Roads Generated from 46,756

Pavement Management System/Highway Development

and Management System-4 (HDM-4) Intermittent Sections

a. Preventive Maintenance 3.969 Km 46,756

1. National Arterial (Preventive Maintenance) 2.437 Km 29,273

a. Olongapo-Bugallon Road

1. K0158 + 000 - K0159 + 000 Overlay 100mm 1.009 Km 13,925 Zambales DEO I

with corrections

b. Zambales-Tarlac Road

1. K0200 + 000 - K0201 + 428 Overlay 80mm 1.428 Km 15,348 Zambales DEO I

2. Secondary (Preventive Maintenance)

a. Sn Marcelino-Sn Antonio-Sn Narciso Road

1. K0165 + 012 - K0166 + 546 Overlay 80mm 1.532 Km 17,483 Zambales DEO I

with correctionswith corrections

2. National Bridges

a. Replacement/Rehabilitation/Strengthening of Permanent 44,200

Bridges Generated from Bridge Management System (BMS)

1. Bedding Bridge along San Marcelino-San Antonio- Rehab/Strengthening 10 Lm 3,000 Zambales DEO I

San Narciso Road

2. Lipay Bridge along Olongapo-Bugallon Road 106.5 Lm 30,000 Zambales DEO I

3. Palanginan Bridge along Olongapo-Bugallon Road Replacement 7 Lm 4,900 Zambales DEO I

4. Sta. Rita Bridge along Olongapo-Bugallon Road 21 Lm 6,300 Zambales DEO I

b. Flood Control and Drainage Projects (MFO-3)

1. Flood Control Structures in Zambales, 2nd Legislative Districts 140,000

a. Raising of Grade, Vega-Maculcol Dike, San Narciso 520 Lm 15,000 Zambales DEO I

b. Construction of slope protection/flood control, Maloma Dike 1400 Lm 40,000 Zambales DEO I

(Upstream Section), San Felipe side, San Felipe

c. Construction of slope protection/flood control, Bucao Dike 260 Lm 10,000 Zambales DEO I

(Downstream Section), Botolan

d. Rehabilitation of Existing dike, Paite-Maculcol, San Felipe side, 390 Lm 20,000 Zambales DEO I

San Felipe

e. Construction of slope protection/flood control, Maculcol Dike 450 Lm 20,000 Zambales DEO I

(Downstream), San Felipe Side, San Felipe

e. Construction of slope protection/flood control, Kiling (North side) 390 Lm 15,000 Zambales DEO I

Cabangan

f. Construction of Maloma Dike (Upstream Section), Cabangan side, 520 Lm 20,000 Zambales DEO I

Cabangan

II.Foreign-Assisted Projects

A. Highways

On-going

1. Road Improvement and Institutional Development Project (RIIDF)

Loan No. 2936-PHI

a. Olongapo-Bugallon Road 17.650 Km 163,555 PMO-ADB

GOP 63,375

LOAN 100,180

Page 33: FY 2013 DPWH INFRASTRUCTURE PROGRAM (Based on GAA) Region III · Region III Name of Project/Location Physical 3. Dinadiawan-Madella Road 2.637 Km 55,369 Regional Office III a. K0295+000

ProposedFY2013/FY2013GAA1-03-2013 as of January 3, 2013 25 January, 2013

03:28:36 PM

Scope of Work Allocation Implementing Office

(2) (3) (4) (5)

Target

(1)

FY 2013 DPWH INFRASTRUCTURE PROGRAM

(Based on GAA)

Region III

Name of Project/Location Physical

Regionwide/Interprovincial 1,083,278

GOP 952,542

LOAN 130,736

I. Locally Funded Projects 891,706

a. National Arterial and Secondary Roads and Bridges 19.54 Km 465,975

1. Address Critical Bottlenecks

1. Traffic Decongestion

a. Widening/concreting of McArthur Highway (Manila North Road)

including drainages and traffic management

1. TEAM (Bulacan) 65,975 PMO-TEAM

2. Road Opening/Construction to close gap sections (with determined

alignment) of national Roads (Including ROW)

a. Road opening/Construction of Bridges, Pantabangan- 13.043 Km 300,000

Canili Bypass Road, Phase III

3. Construction/widening/upgrading/rehabilitation of Access Roads to Regional Office III

Major Airport, Major Seaports and Declared Tourism Destinations

a. To Declared Tourism Destinationsa. To Declared Tourism Destinations

1. Pantabangan_Canili Bypass Road, Aurora, Phase II Improvement 6.500 Km 100,000

b. Flood Control and Drainage Projects (MFO-3) 410,731

1. Flood Control Works for Pampanga Delta

a. Rehabilitation/Improvement of Pampanga Delta Dike 14,000 Lm 210,000 Regional Office III

(Left and Right), Pampanga

2. Drainage/protection Works along National Roads & bridges 200,731 CO

c. Preliminary Detailed Engineering 15,000 CO

II.Foreign-Assisted Projects

A. Flood Control 191,572

GOP 60,836

LOAN 130,736

On-going

1. Mt. Pinatubo Hazard Urgent Mitigation Project , Phase III Consultancy/Right LS 69,002 PMO-MPE

(Flood Control Works in Porac-Gumain River, including of Way GOP 28,266

FloodingProblems in the City of San Fernando, Pampanga, LOAN 40,736

(JBIC, 27th YLP, PH-P241, Pampanga 2nd and 3rd Districts

New

2. Integrated Disaster Risk Reduction and Climate Change Consultancy LS 122,570 PMO-MPE/MFCDP

Adaptation Measures in the Low Lying Areas of Pampanga Services/DE GOP 32,570

Bay, Pampanga (Consultancy Services,Detailed Engineering) LOAN 90,000