1
MTR Corporation Limited Kwun Tong Line Extension Contract No. NEX/2207 Environmental Impact Assessment TYPICAL LAYOUT OF ENCLOSURE FOR MUCKOUT POINTS Figure: Scale: 7.22 NTS Rev: GANTRY COVERED WITH NOISE / DUST BARRIER

GANTRY COVERED WITH NOISE / DUST BARRIER

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

MTR Corporation LimitedKwun Tong Line Extension Contract No. NEX/2207 Environmental Impact Assessment

TYPICAL LAYOUT OF ENCLOSURE FOR MUCKOUT POINTS

Figure:

Scale:

7.22

NTS

Rev:

GANTRY COVERED WITH

NOISE / DUST BARRIER